Loading...
HomeMy WebLinkAbout2021-01-26Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 194501 - SLO Marsh Street Bridge Replacement  919 Palm St. San Luis Obispo, California 93401 P: 8057817200 Daily Log Inspection: Tuesday 1/26/2021      NOTES LOG   No.Comments   1 Observation by Jerry Missamore Souza crews on site at 7 Am to beging vac testing SSMH. Traffice control was set up to take one lane of traffic at a time. All SSMH passsed vac testing and Souza crews were off site by 10AM. KD jannie landscaping was onsite to preform the TCE aggreement planting in front of Davita on site at 7 am and off site by 12 PM. Super Seal and Stripe arrived on site at 10 AM to beging painting curbs and handicap parking stalls.      MANPOWER LOG 7 Workers  |   38.0 Man Hours  No.Contact/ Company Notes: Workers # Hours Man Hours Location   1 Souza Sam Hanley-Loaborere Foreman vac test SSMH   1 4.0 4.0       2 Souza Jake Rexford-Operator Vac test SSMH   1 4.0 4.0       3 Souza Cole Foster-Laboorer Vac Test SSMH/Traffic Control   1 2.0 2.0       4 Souza Jose Sanchez-Laborer Vac test SSMH/Traffic Control   1 4.0 4.0       5 Super Seal and Striping Mark Thomas-Journeyman Striper Paint Curbs/install thermo for handicap parking   1 8.0 8.0       6 Super Seal and Striping Torre Negrete-Apprentice Laborer Paint Curbs/install Thermo for handicap parking   1 8.0 8.0       7 Super Seal and Striping Albert Roa-Journeyman striper Paint curbs and thermo for handicap parking stalls   1 8.0 8.0          7  38.0      Filippin Engineering Page 1 of 2 Printed on 2/4/2021 at 01:33 PM PST      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 F250 crew truck No   01:50 PM    Notes:Souza  2 4500 flat bed No   01:50 PM    Notes:Souza  3 Iszuzu Crew truck flatbed No   01:50 PM    Notes:Super Seal and stripe  4 Iszuzu Crew truck flatbed No   01:50 PM    Notes:Super seal and strip  5 Doosan P185 Air Compressor No   01:50 PM    Notes:Souza    OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 36°F 53°F 45°F 0.16 in.0.25 in.0.39 in.42%66%97%34°F 7.2 mph 18 mph 33 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM clear-night   37°F clear-day   43°F clear-day   52°F partly-cloudy-day   53°F partly-cloudy-night   49°F rain   48°F     By  Date  Copies To     Filippin Engineering Page 2 of 2 Printed on 2/4/2021 at 01:33 PM PST        Jerry Missamore 1/26/2021