HomeMy WebLinkAbout2021-02-04Filippin Engineering
354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 194501 - SLO Marsh Street Bridge
Replacement
919 Palm St.
San Luis Obispo, California 93401
P: 8057817200
Daily Log Inspection: Thursday 2/4/2021
NOTES LOG
No.Comments
1 Observatoin By Jerry Missamore
Souza crew on site at 8 AM to begin demo of the sidewalk in front of Davita to move the water meter box over the correct
meter.
2 KD Jani on site to install ball valve on irrigation line. Water was shut down to davita for about an hour.
MANPOWER LOG 3 Workers | 22.0 Man Hours
No.Contact/
Company
Notes: Workers # Hours Man Hours Location
1 Souza Antelmo Garcia-Laborer
Break out sidewalk and move meter box
1 8.0 8.0
2 Souza Stuart Souza-Superintendent
Break out sidewalk and move meter box
1 8.0 8.0
3 Souza Carlos Pina- Cement Mason
Pour back misssion style sidewalk
1 6.0 6.0
3 22.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 2500 GMC utility Truck 8.0 0.0 No 02:33 PM
Notes:Souza
2 Doosan P185 Air
Compressor
2.0 0.0 No 02:34 PM
Notes:Souza
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
Filippin Engineering Page 1 of 2 Printed on 2/12/2021 at 03:49 PM PST
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
44°F 62°F 51°F 0.01 in.0.01 in.0.02 in.40%61%84%37°F 10.0 mph 13 mph 26 mph
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
clear-night
45°F
clear-day
48°F
clear-day
57°F
clear-day
60°F
clear-night
54°F
clear-night
52°F
By Date Copies To
Filippin Engineering Page 2 of 2 Printed on 2/12/2021 at 03:49 PM PST
Jerry Missamore 2/4/2021