Loading...
HomeMy WebLinkAbout05-20-13ARCHITECTURAL REVIEW COMMISSION AGENDA Council Hearing Room City Hall - 990 Palm Street San Luis Obispo, CA 93401 May 20, 2013 Monday 5:00 p.m. ROLL CALL: Commrs. Ken Curtis, Suzan Ehdaie, Steven Hopkins, Anthony Palazzo, Greg Wynn, Vice -Chair Michelle McCovey-Good, and Chairperson Jim Duffy ACCEPTANCE OF AGENDA: Commissioners or staff may modify the order of items. PUBLIC COMMENT: At this time, people may address the Commission about items not on the agenda. Persons wishing to speak should come forward and state their name and address. Comments are limited to five minutes per person. Items raised at this time are generally referred to the staff and, if action by the Commission is necessary, may be scheduled for a future meeting. PUBLIC HEARINGS: NOTE: Any court challenge to the action taken on public hearing items on this agenda may be limited to considering only those issues raised at the public hearing, or in written correspondence delivered to the City of San Luis Obispo at, or prior to, the public hearing. If you wish to speak, please give your name and address for the record. Any decision of the Architectural Review Commission Council within 10 days of the action. Any persoi Commission may file an appeal with the City Clerk. Community Development Department, City Clerk's (www.slocity.org), The fee for filing an appeal is $26 documentation. is final unless appealed to the City aggrieved by a decision of the Appeal forms are available in the office, or on the City's website 3 and must accompany the appeal 651 Tank Farm Road. ARC 26-13; Review of an approximately 60,000-square foot building and site development plans including a four -level parking structure for MindBody; BP-SP zone; Tank Farm Office Park LLC, applicant. (Continued from April 1, 2013, ARC meeting) (Pam Ricci) COMMENT & DISCUSSION: 2. Staff a. Agenda Forecast 3. Commission ADJOURNMENT Presenting Planner.- Pam Ricci city of Meeting Date: May 20, 2013 An tuts oBis o Item Number: 1 ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT SUBJECT: Final review of plans to develop an approximately 60,000 square -foot, two-story office building large outdoor plaza, surface parking, and a four -level parking structure on a 3.5- acre site for MindBody on the south side of Tani: Farm Road near its intersection with Broad Street. PROJECT ADDRESS: 651 Tank Farm Road BY: Pam Ricci, Senior Planner (781-7168) E-mail: pricci@slocity.org FILE NUMBER: ARC 26-13 FROM: Pam Ricci, Senior Planner RECOMMENDATION: Adopt the Draft Resolution (Attachment 6) which grants final approval to the project, based on findings, and subject to conditions. SITE DATA Applicant Tank Farm Office Park LLC Representative RRM Design Group Zoning BP-SP (Business Park Specific Plan) General Plan Business Park Site Area 153,106 square feet (3.5 acres) Environmental Exempt from environmental Status review under Class 32 (Section 15332), Infill Development, of the CEQA Guidelines. SUMMARY The applicant is proposing a new headquarters office building for Mind Body, a local business that specializes in software programs for fitness studios. Initially, a total of 59,248 square Feet of floor area is proposed within the office building with the ossibility of increasing the total floor area to 64,022 square feet in the future. The company already -occupies much of the space within the existing series of buildings to the immediate east. The new building has been sited and oriented to have a symbiotic relationship with the adjacent development and ftmction as a campus for the business. The applicant is also proposing a four -level parking structure containing 373 spaces at the rear of the site to accommodate the demand of employees. On April 1, 2013, the project was conceptually reviewed by the ARC and continued with 16 directional items focused on informational needs and responses to traffic study recommendations. The applicant is seeking final approval of updated project plans from the ARC. File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 5-20-13) Page 2 1.0 COMMISSION'S PURVIEW The project is a new office development, The ARC's role is to review the project in terms of its consistency with the Community Design Guidelines (CDG) and Chapter 5 of the Airport Area Specific Plan (AASP). Attachment A is the 4-1-13 ARC staff report which provides a detailed project description and an analysis of the project's consistency with the applicable guidelines. Relevant excerpts from the CDG & AASP are included in the analysis where pertinent. Attachment 3 of the prior staff report contained excerpts from Chapter 5 of the AASP. 2.0 PROJECT ANALYSIS When the project was reviewed conceptually on April 1st, the ARC indicated their overall support for the main building design. The change to the trellis detailing at the northwest corner of the main building was discussed as part of the presentation at that meeting and accepted. The following paragraphs highlight a few of the remaining project elements that the ARC wanted more information on before granting final approval to the project design. 2.1 Parking Structure With conceptual review of the project, the elevations of the proposed four -level parking structure were still very preliminary. The ARC's direction on terms of the parking structure was; "Provide floor plans and elevations of the proposed parking structure. The design of the structure shall be subordinate to the main building but complement it in terms of colors, materials, and detailing. " Figure 1. Conceptual Plans West View of Project showing Main Building & Parking Structure Current plans show the parking structure with the same general footprint and location, but with slightly fewer spaces — 373 now proposed; 390 previously shown. While the current elevations are still somewhat sketchy, they are more detailed regarding proposed design elements and colors (see Figure 2 below) and floor plans have also been provided, Figure 2. Current Plans West View of Project showing Main Building & Parking Structure File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 5-20-13) Page 3 Applicant's Response: Parking structure will be subordinate to the main building but compliment it in color, material and detailing by the following: • Stair Tower will have a similar roof form and detailing to the exiting clerestory features of the existing building. • Glazing frame at stair tower will match building glazing. • Vertical Concrete Column form will match the accent color of the building smooth metal awnings with a similar smooth surface. • Horizontal Banding walls will match the field walls of the building with matching paint color and a matching stucco texture. • Additional texture will be provided at the North side of the parking structure facing the plaza with the proposal of a screen art piece showing the yoga image but providing visual semi - transparency. Staffs Analysis: The location of the structure behind the main building and at the back of the site, along with its overall height generally being lower than the offices, will minimize its visibility from street views as well as meets the intent of the directional item to be clearly subordinate to the main building. This is probably best illustrated by looking at the sections on Sheet 12 which provide call -outs on overall heights of different features on the main building and the parking structure. The highest portions of the butterfly roof over the building entry are at 45 feet and the mechanical roof screen is at 39 feet. Most of the parking structure is at about 34 feet in height. Having these taller features in the foreground along with the building's distance from the street will mostly obscure views of the structure from adjacent streets to the casual observer. The parking structure will be of poured -in -place concrete construction. As noted with the applicant's response letter, the parking structure has incorporated details such as the glazing frame and roof of the stair tower to add articulation and tie in with the main building, and also included coordinated materials such as the horizontal stucco panels and metal railings in the stair tower. Colors have also been selected to coordinate with the main building. One issue that came up with the submittal of floor plans for the parking structure is the high percentage of compact spaces proposed (125 compact spaces of the 373 parking spaces in the parking structure or 33%) While this garage is being constructed for the employees of this particular business and is not a public structure, the large number of congregated compact spaces could be difficult for drivers to maneuver into. The concern is that if the spaces are not functional, the higher number of spaces provided may not be properly utilized. The Parking & Driveway Standards allow for the use of compact spaces in projects up to a maximum of 40% for extenuating circumstances and with the approval of the ARC. Finding No. 5 is included which supports the use of compact spaces in the project not to exceed 33% of the total spaces proposed because it helps maximize the number of parking spaces available to File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 5-20-13) Page 4 employees in a private development which prevents the need for offsite parking and lessens impacts to adjacent properties. There are other details with the layout and bay widths of the parking structure that may change with the development of structural and other more detailed working drawings for a building permit. Since the project will have a much greater supply of parking spaces than required, staff has determined that there is flexibility to work out these technical issues during plan check review. 2.2 Signage A preliminary sign program is included as a separate sheet in plans. The Sign Regulations do not list specific standards for the Business Park zone, but the standards for the C-S zone have been determined to be the most appropriate to apply to BP development projects. C-S zone standards allow for two signs and a total of 200 square feet per tenant space. Proposed signage includes 69 square feet of entry signage facing the plaza consisting of a 41 square -foot decorative logo mounted on upper clerestory windows and a 28 square -foot "MindBody" identification sign mounted vertically on the canopy. Both signs will be constructed of metal with illumination from building down -lighting. The second sign is proposed on the trellis at the northwest corner of the building next to Tank Farm Road. It is called out as being 51.2 square feet in area, but if the two sign components (i.e. the logo and business name) were separately calculated, the sign would be about 27 square feet. With the more conservative calculation, the total area of the two signs would be 120.2 square feet. The key map shows a call -out for an additional sign on the northeast awning, but no particular signage is currently proposed. This would be a location for future signage if another tenant eventually leases spaces within the building. Staffs Analysis: Staff supports the two signs proposed as being appropriate in scale and design with the locations on the building where they will be placed and a complementary addition to provide for business identification. Finding No. 4 is provided in the attached resolution to allow the logo at the entry at its proposed height between 27' and 34'. Typically wall signs are not allowed above 25 feet in height. Reasons to support an exception here are that the sign faces the entry plaza, rather than the street, and its design is more of an artistic element, than typical commercial copy. Staff s recommendations on signage are reflected as Condition No. 5 in the attached resolution. 2.3 Lighting Sheet 19 is a preliminary electrical plan which includes a schedule with different types of lighting, including pole lights, wall -mounted fixtures, landscape bollards, and decorative up - lights, and their locations. Fixture details have been provided and generally appear to be File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 5-20-13) Page 5 compliant with the City's Night Sky Preservation standards. Staff will work with the applicant to insure that decorative up -lights for plants and public art, as well as open sconces, are properly directed and shielded. As part of the project presentation, staff and the applicant will provide more information on the variety of lighting proposed. Of particular, concern will be the height and lighting levels of fixtures on the parking structure's roof deck. Conditions 6-8 provide the requirements and performance standards for lighting to be included in working drawings for a building permit. 2.4 Trash and Storage Areas An enclosure location is shown on the east side of the main project driveway just before the entry to the parking structure. A detail is shown on Sheet 20. San Luis Garbage submitted a letter in support of the location, size and design. Condition No. 10 is included regarding final details. Staff suggests that the outer skin of the structure be stucco or a spilt -face block in colors to coordinate with the buildings. 3.0 OTHER DEPARTMENT COMMENTS Comments from the other departments have been incorporated into the recommended resolution as conditions of approval. 4.0 ATTACHMENTS 1. Vicinity map 2. Applicant's responses to more substantive ARC directional items & revised project plans 3. 4-1-13 ARC follow-up letter & minutes 4. 4-1-13 ARC staff report & attachments 5. Updated MindBody Traffic Analysis 6. Draft Resolution Included in ARC portfolios: 11" x 17" colored project plans NO 0 PF R-2-S P VICINITY MAP 651 Tan Attachment 1 - 101 BP-SP File No. 26=13 k Farm Attachment 2 NKT COMMERCIAL ARC Response Letter RRM Design Group April 22th 2013 ARC Directional Item Response Response to Directional Item 5: Parking structure will be subordinate to the main building but compliment it in color, material and detailing by the following: • Stair Tower will have a similar roof form and detailing to the exiting clerestory features of the existing building. • Glazing frame at stair tower will match building glazing. • Vertical Concrete Column form will match the accent color of the building smooth metal awnings with a similar smooth surface. • Horizontal Banding walls will match the field walls of the building with matching paint color and a matching stucco texture. • Additional texture will be provided at the North side of the parking structure facing the plaza with the proposal of a screen art piece showing the Yoga Image but providing visual semi transparency. (See PublicArt Proposal below, contingent on art approval. If art is not approved the Yoga pose will be located on a solid wall in place of the art). Response to Directional Item 16: Deliveries for the existing similar facility currently comes from small delivery vans or trucks that use hand carts to transport the supplies into the building. This is expected to be the case for the new facility. Deliveries will take place in the nearest parking area that is intended as open plaza overflow area. This parking area is not for employee parking and is to remain open for visitor parking, thus being open a majority of the time. The drive has been widened to a 26' wide opening and the curbs at the corner have a widened radius. This configuration is verified with a turning layout of a larger delivery truck shown on the site plan, in the event that one needs to visit the site. Other comments are addressed as part of the drawings in the submittal package. Inclusionary Housing This project will meet the inclusionary housing requirement through the payment of in - lieu fees. Public Art Proposal This project proposes to privately provide the public art component as a part of the project as shown in the application. The art component will be a texture and screening device that provides a silhouette of the Yoga pose fabricated from plastic disks that placed on a chain link screen to for the image. The remaining area of the open screen will provide visual texture that is semi -transparent between the parking garage and the plaza. The screen will be help off of the parking garage by 12"-18" with a metal post that is mounted at the structural columns and beams of the parking garage. If the concept is accepted by ARC the owner will proceed with seeking a designer and installer of such a piece as the public art component in place of paying fees. Green Building Narrative LEED for Commercial Interiors will be used as a guideline for the project since a large amount of strategies will be during the tenant improvement. The project will be designed to achieve a minimum of Certification level, yet will aspire to reach the silver or gold levels. The building will be commissioned by a third party commissioning Agent and is being designed by LEED accredited professionals. Credits will be achieved based on the following strategies: • Sustainable Sites and Regional Priority — site will be located near services that can be utilized by employees without requiring vehicular transportation such as banks, grocery stores and restaurants. The building will house a cafeteria for the purpose of providing food to employees to avoid the need to leave campus for lunch. • Water Efficiency— high efficiency fixtures will be used that are ultra low flow, including waterless urinals. • Energy and Atmosphere o High efficiency lighting will be used, including the use of LED fixtures in some areas. o The exterior light system will have lighting controls at the exterior that will reduce light provided on off peak hours. The building is designed to maximize exterior light with placement of exterior glazing, and clerestory glazing at the entry lobby and the raised monitor at the center of the building. The interior light system lighting controls will reduce lighting when exterior light provides what is needed. o South Facing windows are shaded with an awning and balcony system to reduce heat gain while providing natural light. o Operable windows at both the low level office areas and the upper clerestory allow for natural stack ventilation. o A high efficiency variable air volume HVAC system will be used to provide greater control and flexibility. Efforts will be made to transfer heat from heat producing areas such as communication equipment rooms to areas within the building that require it, such as workspace near North facing windows to reduce heat loads. o Equipment and appliances purchased will be high efficiency energy star when possible. • Indoor Environmental Quality — o Operable windows provide natural ventilation and control for the user. Training and conference rooms will have a movable exterior wall system that will allow for maximum exterior access and ventilation when desired. o An indoor air quality management plan will be provided during construction and before occupancy. o Low Emitting materials will be utilized at the interior of the building, including: paints and coatings, composite wood and agrifiber products, and systems furniture and seating. o Natural light will be provided at a large area of the building through the use of the exterior glazing, entry lobby glazing and north facing clerestory glazing at the center of the building. Innovation and Design Process —The project is being designed by LEED accredited professionals and will include and Educational Display of the Sustainable features of the building. rig q� doLS l a _ ix a �E� c ait Vaa+Ti m to 'J VS 2 92 2 14 4 .-w [v tv . . . . . . .. i i E b N p 45 mj a y i 0 �� II 6 a oq H ? { 1 04 Cq M s N Jsa GP ry w17 - _ u IL J3 W � ~ a 6{ 2yb r � � 9 i2 S � s di •u A� ��m ,� ��or yr�mama ���f�� LL� �° ' c .. 4 IzII IF6 € r w � g in w ks w eg 4 "s' r ay € ro -6 iiQ I € =Rq � m � `3 ash` a a Y Y o 7mn ' y O s a 0. dgN h u m' 17m 4 a n� a� �a� m� j L Z CL LLJ 7 N 22M 9 a, ■o 0 a z O LL W i CL- w U Q� U J V7 E u W U J u W �0 Y `- i ■: ry LU U Q U o J u W L) J u W 0 u z ■- R Ir- 7, oil W 0 q _qj �avppt � r�q�z h^OU l7Tmd 4 �w Uqv n oi p i P4.1 a sr� z CUJ - 9c �a�00, �za rii� .0 = a2 L } =� z s J F 0 z i,J = T< m LA O� 4 W FCL �a2W LL. Q z Z �j I 20 J u ce W O u z ou X W 00 Z CL ❑C W u Z 0 m a z .o CL C7,'N a < tia t CL F— �e z ►� J Q U W w 0 U Z 0 m r) Z P� I I I I I I I II ,1 I ! 1 t i 1 11 1 1 11 � ! ! I ! 17 t 11 1 y a �o 1 I I 77 I I I I I 1 I 1 0� E1 z 0 W v7 H 9 ca z _0 uJ L/) J u LJ 0 z O no 0 z 0� Q J r CL L) o • Z W • W J u ry W O u z ►] w v .0 O_ h d (Al Z W 0 L) z ■o .CZ \ w > ��BQ 0 � � \§( LU 0- V) §& ce W §\\ W Cat§ (�L CL��� \(� � � t kip w§\ z $/cc -Sx� 0 \2\ � /)§ �(§ � w � u W 06 V) Q� LLI 06 � � � w � � N 4� CL � � � z LU up) T� � � � � w � � 0 u � z � W �@ ; W �a� Uo Zg- �_� 3sa� s£"'a$ a w �4 �^ R J L o _ LLJ rz, bJ J Q U w w O u z o � I I I 0 J W 6 - W Jw� � �aJwJ >r N Q - Mmy < r �a e g n O o 7�D E 0� , 1 0 LL R _ � . 0 0 0 O C)000 � 0 0 ¢k a 0 1_. E s_ o # — I . o 0 0 i I T—o `` uj d W e LU Jw� G uai¢ N w n 0 O O O OO 0- e G E)_..._ .1- z _0 w J w W Cif U) CC d 0 z Z 00 _0 F_ TL z �g b_ LV_ r W J W w J u t; w 0 2 z 2i CY 0 Vl LJ O 00 r1 z 09 � � F �z UR Us wh a �v� z q a" �°Da 'coo m °1 me m� ma com 1 J Q W O U z r) 0 CO z ►d U Z O U CA rq m 5 HIM g d N LU n c — � E "e S� W J Q U aC W 0 U z r) 0 00 z ►] L�a N MA O m z Fd I N N mow: �E f E 0� Attachment 3 city Of sAn lu i IS OBISPO Community Development Department • 919..Palm Street, San Luis Obispo, CA 93401-3218 Nick Tompkins Tank Farm Office Park LLC 684 Higuera Street, #B San Luis Obispo, CA 93401 SUBJECT: ARC-C 26-13: 651 Tank Farm Road Conceptual review of building and site development plans including a four -level parking structure for. MindBody Dear Mr. Tompkins: The Architectural Review Commission, at its meeting of April 1, 2013, continued action on your project to a date certain, May 20, 2013, with the following directional items: 1. Submit complete plans with all of the required information on the City's checklist for final architectural approval. 2. Include detailed information on pedestrian pathways, lighting, location of backflow prevention devices, and screening of mechanical equipment. 3. A sign program will be required either as a condition or as a part of the approval of final plans. The sign program shall include information on the sizes, locations, colors, materials, and types and illumination of signage proposed for the building and the overall site. The wall sign at the main driveway entry may need to be lowered or otherwise integrated with the building so that it is not over 25 feet in height. 4. Submit a revised traffic analysis to reflect the changes from surface parking to the parking structure. Additional review of the on -site circulation, connecting access driveway(s), and access into and out of the parking structure should be included in the final analysis. 5. Provide floor plans and elevations of the proposed parking structure. The design of the structure shall be subordinate to the main building but complement it in terms of colors, materials, and detailing. 6. Consider setting the building further back from the main access driveway to accommodate the potential for one additional travel lane in the future. If on -site circulation becomes congested, a dedicated right turn lane may provide significant relief at this intersection. Future signal timing changes to accommodate on -site congestion should not be expected. The City of San Luis Obispo is committed to include the disabled in all of its services, programs and activities. Telecommunications Device for the Deaf (805) 781-7410. Architectural Review Commission Meeting April 1, 2013 ARC-C 26-13 (651 Tank Farm Road) Page 2 7. Further lengthen the transition for the inbound traffic lane from Tank Farm Road. 8. Consistent with the recommendations of the traffic study, align the driveway aisle at the rear of the property with the adjoining property to the east. 9. Show specific proposals for bicycle parking. Bike parking shall be located as conveniently as most convenient auto parking and installed at highly -visible locations that are as close to the main entry as possible. 10. Provide a utility plan that delineates the location of the property's existing and proposed water meter(s), water services, and sewer laterals to the points of connection at the City water and sewer mains. The site shall be plumbed for recycled water so that it may be used for irrigation when it is available in the future. 11. Provide preliminary plans that show and note the existing and proposed frontage improvements, street widening, utility undergrounding, proposed utilities, and lane assignments. 12. Details of the design of the proposed trash and recycling enclosure shall be submitted in both plan and elevation views. Plans shall include the size, capacity, and location of the enclosure, consistent with the City's Solid Waste Enclosure Standards. The final exterior finish and detailing of the enclosure shall coordinate with the design of the building. The applicant shall secure a letter from San Luis Garbage that the design is acceptable to them in terms of service standards. 13. Provide additional information in plans about sustainable project features. 14. Prepare a preliminary drainage and soils report. 15. Submit requested information from Fire and Building regarding code compliance of plans. 16. Provide more information on how site deliveries would be handled. If you have any questions, please contact me at (805) 781-7168. Sincerely, V / GGr+ Pamela Ricci, Al Senior Planner 4' Architectural Review Commission Meeting April t, 2013 ARC-C 26-13 (651 Tank Farm Road) Page 3 cc: County of SLO Assessor's Office Mike Scott RRM Design Group 3765 S. Higuera Street, Suite 102 San Luis Obispo, CA 93401 SLO Co. Farm Bureau, Inc. 651 Tank Farm Road San Luis Obispo, CA 93401 ARC Minutes April 1, 2013 Page 3 n motion by Commr. Palazzo seconded by Commr. Curtis to continue the -project to a da uncertain with the directional items recommended by staff i ddition to the follows a. Modi Item # 11 to read: "Consider an alternative ich reorients proposed Building to parallel Long Street with the storage and internal to the site and screened b e building." b. Modify Item 4 to read: "Move the ped trian access across the central parking lot to alig with the entry to the hist is barn." c. Eliminate Item # 16. d. Modify Item # 17 to re "Revise th esign of exterior elements of the building to appear as integral to th structu rather than "tacked on" features." e. Modify Item # 18 to rea the proposed Tractor Supply building, add articulation to the north (si and the east (Long Street) elevations of the building." f. Modify Item # 19 to r d: "Use variety of materials within the project to articulate buildings. combination o mooth and precision block, along with other materials, is onsidered acceptable.' g. Add new direc ' nal Item: "Consider an a rnative to the proposed site plan which retain he historic assemblage of buil i gs without juxtaposing the new Building B ' AYES: Commrs. Curtis, Palazzo, Wynn, McCovey-Go and Duffy NOESeT- ANone RECU: None ABS Commrs. Hopkins and Ehdaie e motion passed on a 5:0 vote. Commr. Wynn and Vice -Chair McCovey-Good recused themselves from item #2 and asked staff to present the agenda forecast. 2. 651 Tank Farm Road. ARC-C 26-13; Conceptual review of building and site development plans including a four -level parking structure for MindBody; BP-SP zone; Tank Farm Office Park LLC, applicant. (Pam Ricci) Pam Ricci, Senior Planner, presented the staff report, recommending continuance of the project to a date certain, May 20, 2013, with direction to staff and the applicant on items to be addressed in plans submitted for final approval. Commr. Curtis asked if the access road to the north will be a requirement and if a traffic signal will be required at the project driveway with Tank Farm Road. Ms. Ricci indicated the access road will be a requirement when the property to the north comes forward with a development plan, although the exact alignment may differ from the graphic included in the traffic study as it is very conceptual. She noted that a new traffic study would be required for final ARC review to take into account the addition of the proposed ARC Minutes April 1, 2013 Page 4 parking structure. That study will ultimately provide more guidance on what type of traffic control will be required at the intersection. Rick Stollmeyer, owner of Mindbody, explained the company's growth and vision and reasons for selecting San Luis Obispo as the company's headquarters. He noted that the new building would include a cafeteria and dining facility, large meeting room, and a daycare facility. Scott Martin, applicant architect, went over the proposed project in detail including the rationale for the main entry from the plaza. He explained that the trellis at the northwest corner of the building would be modified to be more horizontal. He noted that the architecture had a variety of influences including Asian, Railroad, and Industrial. He added that the parking structure will be compatible yet subordinate to the main building. Lief McKay, landscape architect, went over the landscaping plan of the plaza in detail. Commr. Curtis questioned if there was an entrance for pedestrians along the Tank Farm Road. Mr. Martin indicated that there were required exits but no entry element on the street side for pedestrians. Commr. Hopkins questioned if all the proposed windows were true. Mr. Martin stated they were real and some were operable. Commr. Palazzo questioned what the finish on the parking structure was. Mr. Martin stated it would be concrete. PUBLIC COMMENTS: Hilding Larson, San Luis Obispo, voiced concern with the intersection and urged the Commission to require a traffic signal as part of the approval of this project. He also pointed out that plans should analyze delivery truck needs. There were no further comments from the public. COMMISSION COMMENTS: Commr. Palazzo voiced his overall support of the proposed project. He recommended the parking structure include more texture to complement the architecture of the adjacent building. Commr. Hopkins supported the proposed project and building architecture. He stated that this project design was synergistic with SESLOC and other projects in the vicinity. Commr. Curtis supported the architectural design of the main building and recommended that delivery needs should be studied further. He stated that the parking ARC Minutes April 1, 2013 Page 5 structure needs additional detail to soften the appearance, to conceal cars, and the colors should harmonize with the main building. Chairperson Duffy recommended that additional details be submitted regarding the parking structure and building features such as eaves and canopies. There were no further comments made from the Commission. On a motion by Commr. Palazzo, seconded by Commr. Hopkins, to continue the project to a date certain, May 20, 2013, with direction to staff and the applicant on items to be addressed in plans submitted for final approval as recommended in the staff report with the following changes (4:0): 1) Eliminate the third sentence of Item # 5; and 2) add a directional item to provide more information on how site deliveries would be handled. AYES: Commrs. Curtis, Palazzo, Hopkins, and Duffy NOES: None RECUSED: Commrs. Wynn and McCovey-Good ABSENT: Commr. Ehdaie The motion passed on a 4:0 vote. COMMENT AND DISCUSSION: 3. Staff: a. Agenda Forecast — Pam Ricci provided a forecast for upcoming agendas. She reminded the ARC that the next regularly -scheduled meeting would be held on April 22"d rather than April 15t". Commission: There were no specific communications to report. ADJOURNMENT: The meeting adjourned at 8:00 p.m. Respectfully submitted by, Dawn Rudder Recording Secretary Approved by the Architectural Review Commission on April 22, 2013. Ryan Betz Supervising Administrative Assistant Attachment 4 city Of Meeting Date: April 1, 2013 sAn 1ui s ompo Item Number. 2 ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT SUBJECT: Conceptual review of plans to develop an approximately 60,000 square -foot, two- story office building large outdoor plaza, surface parking, and a four -level parking structure on a 3.5-acre site for MindBody on the south side of Tank Farm Road near its intersection with Broad Street. PROJECT ADDRESS: 651 Tank Farm Road BY: Pain Ricci, Senior Planner (781-7168) E-mail: pricci@slocity.org FILE NUMBER: ARC-C 26-13 FROM: Parn Ricci, Senior Planner RECOMMENDATION: Continue the project to a date certain, May 20, 2013, with direction to staff and the applicant on items to be addressed in plans submitted for final approval. �Z II.M Do 11MVIr0 Applicant Tank Farm Office Park LLC Representative RRM Design Group Zoning BP-SP (Business Park Specific Plan) General Plan Business Park Site Area 153,106 square feet (3.5 acres) Environmental Exempt from environmental Status review under Class 32 (Section 15332), Infill Development, of the CEQA Guidelines. a11eA, The applicant is proposing a new headquarters office building for Mind Body, a local business that specializes in software programs for fitness studios. The company has been very successful and has clients worldwide. The new headquarters building will provide the additional space and facilities that the company needs to accommodate its continuing growth. The company already occupies much of the space within the existing series of buildings to the immediate east. The new building has been sited and oriented to have a symbiotic relationship with the adjacent development and function as a campus for the business. The project has been scheduled for a conceptual review before the ARC to allow staff and the applicant, to receive feedback prior to finalizing plans and returning for final approval. The following analysis Ends that the plans are generally consistent with the policies, goals and guidelines of the Airport Area Specific Plan and notes information needed for final ARC review. rr_ File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 2 1.0 COMMISSION'S PURVIEW The project is a new office development. The ARC'S role is to review the project in terms of its consistency with the Community Design Guidelines (CDG) and Chapter 5 of the Airport Area Specific Plan (AASP). Relevant excerpts from the CDG & AASP are included in the analysis where pertinent. . 2.0 PROJECT INFORMATION 2.1 Site Inform ation/Settin cF Site Size 3.5 acres Present Use & Development SLO County Farm Bureau Topography Relatively flat Access Tank Farm Road driveway & access easement through development to the east. Surrounding Use/Zoning North: BP-SP; vacant land, small commercial uses & R-2-SP; mobile home park South: BP-SP; business park & County land with commercial uses East: BP-SP; office buildings & gas station with mini -mart West: C-S-SP; commercial/industrial uses Existing site development includes four separate buildings ranging in size from 2,490 square feet to 11,702 square feet. Most of the site includes some type of hard surface of either asphalt, concrete or highly compacted soil in the industrial yard areas. There is a small amount of landscaping along the site's street frontage. All of these existing site buildings would be demolished to accommodate proposed development. 2.2 Project Description NKT Commercial is proposing to develop a new two-story building to be occupied by MindBody. Initially, a total of 59,248 square feet of floor area is proposed within the office building with the possibility of increasing the total floor area to 64,022 square feet in the future. As noted in Table 2.3 below, the surface parking provided is based on the future 64,022 square feet of floor area. MindBody is planning on leasing the new building as their headquarters. The site is optimal for the company since they plan to continue utilize the existing space that they occupy in the office development to the immediate east. The building has been sited to function with the existing development to the east as a campus. This will be effectuated through common driveways to link parking and circulation as well as the provision of a public plaza behind the proposed building as a gathering place for employees at the center of the campus., The applicant is also proposing a four -level parking structure at the rear of the site to File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 3 accommodate the demand of employees. Parking availability is at a premium on the adjacent business park site where MindBody is currently located. The company has made arrangements with the Airport Center to the south to provide off -site employee parking. 2.3 Proiect Statistics Statistics Item Proposed' Ordinance Standard 2 Street Yard 16 feet 16 feet Max. Building Height - occupied buildings (no more than 3 stories) 44 feet 45 feet Max. Building Height - non- occupied architectural features 44 feet 52 feet Building Coverage (footprint) 42% 80% Parking Spaces — surface lots 95 213 spaces (64,022 sf/300 = 213) Parking Spaces — structure 390 Landscaping 24% 20% Notes: 1. Applicant's project plans submitted March 13, 2013 2. Airport Area Specific Plan 3.0 PROJECT ANALYSIS The applicant went through the pre -application process to make sure that there were no red flags with the overall development plans and to get early feedback from the various City departments. Plans have been well -received by City staff with relatively few issues raised. Since the pre - application phase, the most significant addition to the plans was to add the four -level parking garage at the back of the main headquarters building. The site is located within the boundaries of the Airport Area Specific Plan (AASP). The AASP includes Chapter 5 on Community Design. Selected excerpts from this chapter on site planning and building design are included in Attachment 3. The AASP including the entire Chapter 5 is available on the City's website at the following path; slocity.org>community development>documents online>documents and codes>arport area specific plan. The following paragraphs highlight a few keyelements of the site and building design of the project that the ARC should discuss and provide direction to staff and the applicant. 3.1 Site Plan: Consistent with guidelines for commercial development in the Community Design Guidelines (CDG), Chapter 5 of the AASP includes many of the same guiding principles about having buildings address the street, locating parking where it is less visible to street views, and providing pedestrian linkages. File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 4 Site Planning & Organization Goal 5.1 calls for "A continuous, well-defined streeiscape edge Mat unifies and enhances the character of the development areas and that supports pedestrian activity through its site planning and design." Guidelines for Goal 5.1 include street orientation of a building. Buildings are encouraged to front directly on the landscaped setback adjacent to the street right of way and parking should be located behind or along the sides of the buildings. Staff's Analysis: The project is consistent with this goal and guidelines by the office building's � placement at the back of a landscaped setback paralleling the street (see Figure = N B`oH� r, 1 - Site Plan to the right). As has been pointed out, there are many positive facets of the L-shaped building footprint r to provide an orientation toward and connectivity with the office development - z �- to the east as a campus for Mind Body. Croat 5.10 recommends that the building placement create pedestrian areas that # `t are protected from the wind, but have' appropriate sun exposure. " The .. placement of the courtyard behind the Figure 1 - Site Pla building helps to reduce the impact of prevailing winds and the southern orientation of the space is optimal for sun exposure. 3.2 Site Circulation Currently site access is provided by two driveways on the far west and east ends of the site. With the proposed project, there would be a single driveway on the west side of the property from Tank Farm Road. The project driveway placement and width are planned to align with a driveway/street on the north side of Tank Farm Road that would ultimately connect with the private local street that is planned with the development of SESLOC new facilities on that project's west side (see Figure 2 — Future Street Connector). The long-range plan would be to accommodate a future signal here. Attachment 4 is a traffic analysis that in addition to discussing the driveway alignment, trip generation, and street volumes was prepared for the project Figure 2 — Future Street File ARC-C 26-13; 651 Tank Fann Road (MindPody Headquarters 4-1-13) Page 5 which also makes some recommendations on on -site circulation. Public Works Transportation staff has asked that the traffic analysis be updated prior to final architectural review to look at the changes made to site circulation with the addition of the parking structure. The recommendations for the revised traffic analysis and other recommendations to site circulation are listed at the end of the report as directional items. 3.3 Building Design: Main Office Headquarters Building The contemporary building design predominantly has flat roofs, but utilizes low -slung roofs with extended eaves to highlight the comers of the street elevation and the main entry facing the plaza behind the building. Fully delineated elevations for all building sides have not been developed yet, but preliminary elevations and perspectives of the main building are provided in the conceptual plans. Figure 3- Tank Farm Road Elevation The steel -frame building will have infill wall framing with exterior surfaces of vertical and horizontal steel siding and stucco. The elevations show buildings to be in earth tones of tan, cream and gray. The applicant team will provide the Commission with a detailed presentation regarding the evolution of the project design at the meeting and will have more information on evolving decisions regarding proposed colors and materials including glazing. Sheet No. 6 includes a list of various design goals and guidelines and provides responses to how the proposed building design is compliant. Some goals and guidelines from Chapter 5 of the AASP that are noteworthy include: * Goal 5.9 "Buildings whose architectural character will contribute to the establishment of the Airport Area as an attractive, high quality business center." Guidelines for Goal 5.9 state that building design should be varied and distinctive, while being in harmony with context and local history. Guidelines also state an avoidance of repetitive and/or stock design solutions. File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 6 * Goal 5.10 `{Building amassing that adds visual interest, maintains human scale, and expresses building function." Guidelines for Goal 5.10 state that buildings articulation should reduce overall massing, create a play of shadow, provide visual interest and maintain a sense of scale. • Goal 5.12 "Architectural detailing that gives haildings human scale, visual interest and distinctiveness through the use of high quality finishes and materials that are harmoniously combined to unify individual buildings and to ensure a consistent level of design quality. " Guidelines call for varied roof planes, highlighting entries, and screening rooftop equipment. Staffs Analysis: The project architecture is distinctive and customized for the applicant and the site. The earth tones of building colors and the varied, materials provide a building design that fits well on this site and respects context. The building avoids looking boxy because of its unique footprint, the offsets in wall surfaces and varied height of building elements. The overall building massing is reduced through the use of multiple smaller masses and generous amounts of glazing Figure 4 -- Entry Driveway View One of the more distinctive elements of the design is the dramatic roof trellis on the northwest corner of the building near the main driveway to the site off of Tank Farm (see Figure 4 above). The trellis is characterized by dual support posts and outriggers. Another key element is the two-story colonnade heralding the building entry off the courtyard (see Figure 5 to the left). The entry feature includes vertical posts, horizontal cross members and extended roof eaves with rafter tails. File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 7 Parking Structure A four -level parking structure containing a total of 390 automobile spaces is proposed at the rear of the site (see Figure 6 below). A pedestrian bridge is shown from the second level to the balcony of the main structure. The bridge spans the surface parking lot that will be finished with a combination of pavers and decorative concrete finishes and is set aside for visitor parking next to the main outdoor plaza. The applicant elected to include the structure in plans to address existing employee parking deficiencies and to acconunodate' future company growth. Figure 6 — West 'View of Project showing Main Building & Proposed Parking Structure Staffs Analysis: In terms of the structure's design, plans are very preliminary. The location of the structure behind the main building and at the back of the site along with its overall height being lower than the offices will minimize its visibility from street views, The design of the new structure should be clearly subordinate to the main structure, but complement it in terms of colors, materials, and detailing. The uses of landscaping or metal siding on structure panels to complement those used on the main office building are two ideas. Figure 7 — Structure with Landscaping Elements 3.4 Other Site Improvements: Figure S — Structure with wooden "skin" a. Signage: Preliminary locations for signage are shown on the two ends of the Tank Farm elevation and over the plaza entry to the building, In general, signage appears appropriately scaled and integrated with building elements. However, the wall sign at the main driveway entry may need to be lowered or otherwise integrated with the building so that it is not over 25 feet in height. A sign program will be required either as a condition File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 8 or as a part of the approval of final plans. The sign program shall include information on the sizes, locations, colors, materials, and types and illumination of signage proposed for the building and the overall site. b. Lighting: Lighting locations and details are not yet shown on plans. With final review of the project, this information will be required for wall -mounted fixtures as well as landscape bollards and any pole lights. Lighting will need to comply with the City's Night Sky Preservation Ordinance. Of particular, concern will be the height and lighting levels of fixtures on the parking structure's roof deck. c. Landscaping: The key element of the landscaping plan is the plaza area behind the building. This has been carefully planned as an integral component of the MindBody business's operations and an extension of the interior space. Beyond everyday plaza uses as a place to relax an eat lunch, the company plans to utilize this space for fitness classes, group meetings and special events. The area has a unique "zen island" design with grassy mounds areas set within the hardscape to encourage both informal (using the grass) and formal (benches) seating. d. Trash and Storage Areas: An enclosure location is shown on the west side of the main project driveway just before the entry to the parking structure. Precise dimensions and design details, as well as the approval of the garage company, will be needed for final review. 4.0 OTHER DEPARTMENT COMMENTS The City's adopted Economic Development Strategic Plan (EDSP) made head of household job creation a priority for the City. This application is for expansion of a local company inside City limits that is creating head of household jobs in the Airport Area. The jobs that will be created and preserved with this expansion meet the definition of head of household jobs as set forth in the EDSP by offering benefits, career advancement opportunities and requiring a college education or specialized technical knowledge. Many employees are graduates of Cal Poly. With expansion projected annually through 2018, well beyond the expansion of the facility, 72% of all jobs added will meet the head of household job characteristics including salary. Information needs and concerns with the project design from the other departments are included in the directional items below. 5.0 RECOMMENDATION Continue the project to a date a date certain, May 20, 2013, with the following directional items: 1. Submit complete plans with all of the required information on the City's checklist for final architectural approval. File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 9 2. Include detailed information on pedestrian pathways, lighting, location of backflow prevention devices, and screening of mechanical equipment. 3. A sign program will be required either as a condition or as a part of the approval of final plans. The sign program shall include information on the sizes, locations, colors, materials, and types and illumination of signage proposed for the building and the overall site. The wall sign at the main driveway entry may need to be lowered or otherwise integrated with the building so that it is not over 25 feet in height. 4. Submit a revised traffic analysis to reflect the changes from surface parking to the parking structure. Additional review of the on -site circulation, connecting access driveway(s), and access into and out of the parking structure should be included in the final analysis. 5. Provide floor plans and elevations of the proposed parking structure. The design of the structure shall be subordinate to the main building, but complement it in terms of colors, materials, and detailing. The uses of landscaping or metal siding on structure panels to complement those used on the main office building are two ideas to soften the design. 6. Consider setting the building further back from the main access driveway to accommodate the potential for one additional travel lane in the future. If on -site circulation becomes congested, a dedicated right turn lane may provide significant relief at this intersection. Future signal timing changes to accommodate on -site congestion should not be expected. 7. Further lengthen the transition for the inbound traffic lane from Tank Farm Road. 8. Consistent with the recommendations of the traffic study, align the driveway aisle at the rear of the property with the adjoining property to the east. 9. Show specific proposals for bicycle parking. Bike parking shall be located as conveniently as most convenient auto parking and installed at highly visible locations that are as close to the main entry as possible. 10. Provide a utility plan that delineates the location of the property's existing and proposed water meter(s), water services, and sewer laterals to the points of connection at the City water and sewer mains. The site shall be plumbed for recycled water so that it may be used for irrigation when it is available in the future. 11. Provide preliminary plans that show and note the existing and proposed frontage improvements, street widening, utility undergrounding, proposed utilities, and lane assignments. 12. Details of the design of the proposed trash and recycling enclosure shall be submitted in File ARC-C 26-13; 651 Tank Farm Road (MindBody Headquarters 4-1-13) Page 10 both plan and elevation views. Plans shall include the size, capacity, and location of the enclosure, consistent with the City's Solid Waste Enclosure Standards. The final exterior finish and detailing of the enclosure shall coordinate with the design of the building. The applicant shall secure a letter from San Luis Garbage that the design is acceptable to them in terms of service standards. 13. Provide additional information in plans about sustainable project features. 14. Prepare a preliminary drainage and soils reports. 15. Submit requested information from Fire and Building regarding code compliance of plans. 7.0 ATTACHMENTS 1. Vicinity map 2. Project Plans 3. AASP Chapter 5 excerpts 4. MindBody Traffic Analysis dated 3-4-13 Included in ARC portfolios: 11" x 17" colored project plans w u LL LL 0 =1s 'AT,V LL =k = _ �, - f Attachment Z r � Yy� g0.j p4 y a n Lu N q qy VA �w di a � f 3 c M a u.� u M o V n 9 { N m �ii M0 z R C) 0 z 1� � 7= filmt. A At 4� L) x N z> o� �C O �U z T z H L6 LU 0 m Z ►WA 11 AVA I 00 L6 u o W J G]C LLJ 2 0 z 0 03 d z ►0 R V Q � E3 1 1 0 U d 0 m z ■u , < C:) —J C) 0 � CL M o LL -7 E L ........................ ..................... A LU 0 u z ►� --- I ----e ..0 J Q U w 0 U z 0 m a z K ►� z 0 u `W Y 1 0 r V I. +U Y 1 t L J u W ❑ u a 0 co z .0 �m u cc� LLI 0 u z 0 on 0 z k 49 u ck�I LU a ■q J Lli co a�5d3fi37°[5E.3 a w U Z ❑ 1 S �Mr.�i 5L o m 4 CL Lu z c d� LO T— J Q U W 0 U Y Z Attachment 3 Q � y N U 7b 11 O _r O w � T-o '� cd 'Lf a r rye. o • uI p O •= 'C7 c~d C v -Ce b FO dGj Cd F. 2i w blO u 4 y M L �" GCl Oto ` a� —• G c3 o, .d n w '++ 0. z O lu A O lu 'd • �nA .fl ch z 4 Co C iu ec `�, � ,� o v C v 'G s b0 C d 'b O rf' >" U ..U. v. C v 4 C 1a A u ,v d v C 4" C v aCi VI u M Nu cz w O 44 y 4'' y v h v —, c3 cd N 'C O v O C O . ? v v, 'd Li u v o V � as - cC i • � Or � .�-i � � (]., '�} O � 4. GA U i.. �-.��.• L"• �L •�. ...0 .0 y 4�, V) 'D o •� m O v v LLID a B MG r u r v rd O C _ v — b O O Vdd v -0 ❑ p-^ b C L c3 'd U --� LL C C +� (••; S 1 >tj rd Ito tn cy O CL+ "O3 O C jj�//j�� v i � p gam. �_ IA �_ 6vi '� � p'" y •G ..Li vvi � GJ ��+ C1i y ��„ "� � � L' +�i N� c v cam�.... o , tir -W Q� 'wy •� J, YJ {y ti in h Y.i $ do-G v w o 4 v u a ,; o 1-d Cl It d A W' any tr, C go 7•� "" v • cCd L's 6�) h ^d • � . • ��`. "0 SS.` O! • ^` S o Cd V1 r i •41 o O P C v =rJ A N m ,n I u es m o 64 Ct a•' �q q, 4 ` q 7g µ qyy, # ..w It ji "G w ' y 74 u 16 a h b N ^ r a. JR-161 Id r4 vC4 J� v Ziff fly y .4P�yiWJJ j� 4�1 -0{ • w Im Cti L !p ti a Gca .. aJ p" >E v u u L b On n A G a+ w O C4-1 w c.,,40 a �' bn u c -° ~n -0 v o u c }}o� .b C y _ u41 _ ru ~ ai w o v ` c ci .n w cu r a v a _C EJ r M bbc "d O .ram t�V Q N U O .�_ ?,ct .0 .0 G �- ro u C M L O W Ti O q� 4� z 4--� i1. 'd u cud O' .a � 4-1Ci U W w C �CC 4 '}' -b '^" u C4 Q -p N a. td C a: z u G i. Car O•' i V 0 'u ct cd .n 5n Q. 3 .:° 4-1 a c, E o bn o CA u co �r 0-1-1. Ei n. d u 147 kn w V') U-, v44, O u R t, o a H v `bon <Y tz 43 St 41 h ti a o � a g b0-11 h v s Cp o c �Cy! p b ofja to 14� Ss qu � ti ti � i��'+ �� �• ear, Y a�i o � � � � '+4 � � � � p��, �? � � � � ' V � t; 'ai o' ~v � � et � � 'xr tt � � � +�•+ Q Ct a, 4 � � .D I N a H z V ap � w cd 1�0 to 3114 •` u a 'd .0 y v-ti 4i in O R O 21 A FJ � %•I � L v h Qr In v C.,. `d �' Zi � • F� jy��L � �. � a♦+.��a Ca y�wi V ' � C � a ` ti v � .G � L•A ? it s-j y F• �a7 � t0 N Q yy L K [ g4 Jo Cr Id W U LR oY. u 9 � � a 17, 0 Zbb Aa' c�bg x o� •� o a 8� d .� u C c o a v Ex ro �. .r.. ?�. 0. cn ed r 43 � U 'o a Cb tO 'yG cw y v G a [S o cd� ro UA v U Ct 281 � cad CA C r�i �+ y Oo � � • V G � U I VJ U pyn r vUi ~ vn � .0.. CA ti '� ccei o v ti • U U cd L N 7 Cr Q C v �. �' ' rd � U � op 30 o /7 O 6J 6 vs 4 0 tZ� M IT it I-R Y � u s v s G u ° 41 y O i V n u .a41 y O O v CaA C. O N a 'U� '••' "C w c w. �v 72 to `0 G , bA v ti El O O Lt cd v ro C y v w c cu c w v cd o ' L4 u Cd d I'd 4 �] i a W �+ Y� U. v '° a s : a w v y O il a, Cl, b ct ; 7 O E w �- � 4i ' v, �y � cam, v L Q 'b � C ,� 1 i •v '.+' S.1 '� - [n .G.Jy LLyJ" O c V � �,,,_. � c7 ydy �j iu • 'y4,., t."o w h u � �. +.'� v. to V 1� �" rU+' � � �.; � O �+1 •"� • A �-+ . �q y �. F 4-1 O 1 ", ad 1U+ u U �' �..' i • ; J ... l� iv p �+ 4,1 cu toV GL sa u o c p4 O J s y�Lo C �' v `ram u d tom"' O V cC v. A C cd Zr a bh C 1 U p Cti cwd � 14 _ CL w ~' '�- y v i, p W c�- w 4, v G u0 rt bA ti n v ^cam U C w cd v- d dut w v w . C a c� 3 0 Q c v 42 co L7 � a. ' o u o u � t`"u bn .c a C L7 b w c v ai w v Q a w w V U � f-+ � � • �• ej 04 5 "+� � r• "'.-1 � L � ��.jy \�5 � at Qi Qj 6'� 1.� ` Fi v co 4 'C± G `�j • qq �, U F2 r C. U P+ Q ty • O 4a 4+ Obi 4-j Ile v U V J-+ ".� 41 � � Chi �+ � �••� � .� � �j 2 sti V ti H C �� ° to N 41 u U " co 40 A i .O d bib G. to a� v ce Lz, Cy ++ h w +a d 't1 v a•' %� > c� Q v g V -6 a 8 •� o � � 4F � � °� � � � OVA O • L~" u �' • Aa Way +�•� � '7 86 14. q i. •�s •-� '� it CC .� c� a> •.� �, � --� v� +� iC tVd yy 43 0 ° 0 .Q �? H w O w as Q `, �i [y •+�+ W u v G o kn V r vv a �° ;� � "�� y � .b � � • � • � 'fie I y 4 b o cd 3 eM [ Cz kz� cd A, y Q y v C O ay. tia O p 'O O cad cad 'T1 U 4-1 41 pFq o o 'b -[ cua d z a 0.I S qp y W , GG o u y cd a� cd cd C, ;Z.,cd y .A � 4 � c� •� —+ N C1 kA Rt 0 m C7 • N Ll N 11 H h v y Ca K C�0 o V N N O ^� � � i.� A� ' N .Z' • � � o a Zt .944 by `ti 79 mo m o zt o b4 o o by . o lzt sy ov A+ zt h N t, �, o +a v N C '� •�ZZ, U �+ cos �� ��� •� as Aoi o �S Si,� R ti .y W a+' 4 '1 v-. ' � rg z p a r 4 ,4i„' n O3 �•.a y may+ w �tl a lac . . R F4 h 8 13 w a A 2 C cti ' 611. 4H F Attachment 4 MEMORANDUM Date; March 4, 2013 To- Carol Florence, AICP From: Joe rernandez, PE, AICP Subject: Mind$ody'T'raffic Analysis This memorandum summarizes the focused traffic analysis conducted for the proposed 34indBody expansion in San Luis Obispo, CA. The purpose of the analysis was to determine the appropriate traffic control measures and lane configurations for the prima>y driveway access point, and to recommend changes to site access and circulation if necessary. KEY FINDINGS The primary driveway access point would require a traffic signal to provide acceptable traffic operations under both existing and Nture conditions. Exiting volumes would require two lanes, one left turn lane with a 100' pocket and one shared thxough/tight turn lane. A single inbound lane is adequate. The connection proposed between the new parking lot and the existing parking lots to the east should reworked to flow directly into an aisle of parking and minimize unnecessary turns (see Figure 2). As shown on Figure 2, the parking spaces along the primary driveway should be removed to nm+nimize conflicts between entering/exiting traffic near the intersection and parking operations. TRIP GENERATION AND DISTRIBUTION The new bt ilding will serve as an expansion of the MindBody business, replacing the existing uses on the site, Figure 1 shows the project trip distribution and assignment, with key assumptions discussed below. Trip Generation Table 1 shows the estimated trip generation for the new building. The building would generate 122 AM and 126 PM peak hour trips. The Single Tenant Office Building land use was selected as the most appropriate use for the proposed building. Number of i rips AhS PM Land Use Size Daily In Out Total In Out 'Total S le'7mant Officr Build .1 60 kst' 699 109 1.3 122 19 107 1.26 1, t311 rand Use GMe 715 2. 4F= thousand square feet. Daily taps use average rue, AM and Piet us(-' fittu] curve Cyuations. Source:'Trip Gentradon, 9th Edit an, fT l (2012) and Mr, 2013 Trip Dist"burton The project°s peak hour trips were assigned to Tank Farm Road, with 30% going to/from the west and 70% going to/from the east, These distribution percentages were developed by reviewing area travel patterns (via traffic counts) and by running a select -zone analysis in the City's Travel Den3and Model. (8o) 31f,-Ulol .vww.cc traoscottsgltilig com ANALYSIS RESULTS Traffic operations at the entrance driveway were analyzed for AM and PM peak hours under Existing Plus Project and Buildout Plus Project conditions. The key assulnprions and results are described below. Traffc Shifts The provision of a new controlled crossing (i.e. signal or roundabout) of Tank Farm Road would draw traffic from adjacent parking lots via the planned connection at the south end of the parking lot. This shifted traffic was estimated by observing turning patterns at the driveways serving the parcel immediately east of the Project site. Under buildout conditions, additional traffic shifts are expected due to the planned raised median on Broad Street south of 'Tank Fa rn Road, This median would restrict left turns to and from the driveways serving the adjacent parcel. Some of these drivers would shift to the projeces new driveway access point, while others would make a u-turn at the Broad Street/Tank Farm Road intersection. Exrsdng plus Project Caaditrons The existing traffic on Tank Farm Road was added to the projeces traffic and the shifted traffic discussed above to yield Existing plus Project Conditions. The traffic volumes at the driveway would warrant a signal based on the peak hour signal warrant (Section 4C.04 of the lkfanual on Urlifotm Traffic Control De6ces). Buildout plus Project Condirrons Buildout conditions, were developed using the City's Travel Demand model as applied to other recent area studies. Project traffic and shifted traffic were added to obtain Buildout plus Project traffic volumes- This scenario assumes that the rndustriA Way Extension will form the north leg of the intersection, and that Tank Farm Road will be widened to four lanes. Table 2 summarizes the analysis results for the project driveway. Deuided calculation sheets are included as an attachment. Stop control, Signal Controe Roundabout} Scenario Perk Hout Delay LOS Delay LOS Delay LOS Existing plus Project M i12.1 F 4.3 A 18.0 C 1'M >500 1' 12.0 B 41.4 E 13uildaut plus Project AM >500 F 166 B 21.6 C PM >500 P 21.3 C 90.9 F 1. Side street stops main street free. Avcrag�; delay per vchicle and 1:0S reported for wotst mrivemrot. 2. 11CM 2000 avetsRe delay per vdiide and LOS rcportcd, 3. HCM 2010 2verage delay pervehicleand 1-05 r omd. The City's Circulation Element calls for a minimum of LOS D operations. Undet side -street -stop control the intersection operates unacceptably under all scenarios, while under signal Control the intersection operates acceptably under all scenarios. Roundabout control results in unacceptable PXI operations under Existing and Buildout conditions. A traffic signal is the recommended alternative. ON -SITE ACCESS AND CIRCULATION Figure 2 summarizes recommended changes to on -site access circulation. Please do not hesitate to contact me if you have any questions or comments_ �rhvw.cCtranscansuluui*.cnan Figure 1; Traffic Volume Summary r ;-o-- 700(917) Tank Farm Rd. 11() $) 603(900)� 93(18)� 4 T � (A U) r. •- N r *-200(62 ) -*-1375(1250) 196(51) Tank Farm Rd 57(100) 20(1400)--0-- _ 93(18) 01 m �� rn A! N N MindBody Traffic Analysis XX(YY) = ,AM(PM) Peak Hour Traffic Volumes - - - - = Future Roadway (805) 316-0101 www.cctransconsuiring.com Ky March 2013 Figure 2; Circulation Recommendations InstallT'r'11-l-ic Sicn:ll - Eliminate parking for at least '. 100' from stop bar. Widen driveway to include two outbound lanes (one left, ,a-Q one shared through/right). MindBody Traffic Analysis Move access point or re -work parking to eliminate zig-zag movements. ;, ° • f (805)316-0101. www.ccrransconsulring.com • • = Vehicle Circulation .. • •. • . Pedestrian Circulation March 2013 Attachment 5 MEMORANDUM Date. May 10, 2013 To- Carol Florence, AICP 1`rom'- Joe Fernandez, PE, AICP Subject: Revised iVUndBody Traffic Analysis This memorandum summatizes the focused traffic analysis conducted for the proposed MindBody expansion in San Luis Obispo, CA. The analysis determines the appropriate traffic control measures and lane configurations for the primary driveway access point and estimates traffic and parking conditions with the prnjorr.. This updates the analysis dated March 4 2013, evaluating the revised site plan, the addition of a parking structure, and provides additional detail regarding the need for a traffic signal. KEY FINDINGS The primary driveway access point would require a traffic signal to pruvide acceptable traffic operations under both existing and future conditions. Exiting volumes would require two lanes, one 150' left turn Erne and one shared through/right turn lane. A single inbound lane is adequate. The driveway is approximately 800 feet from Broad Street, which provides adequate intersection spacing outside of d-ie influence area of the Tank Farm Road/Broad Street intersection. Site access and circulation is adequate as proposed. The pedestrian connection between the proposed building and the existing buildings should be clearly marred and direct. The proposed parking supply is adequate for the anticipated growth on the campus. TRIP GENERATION AND DISTRIBUTION The initial traffic analysis dated March 4, 2013 estimated trip generation based on the square footage of thct proposed building. While this is a standard approach fur estimating trips for office uses, it does not capture the effects of adding cmployees to existing office space, not does it capture the trips associated with the new parking structure. The current application notes that MindBody plans to add approximately 315 new employees to its campus by 2018. These employees wr}uld work in the two existing; buildings occupied by the company as well as the proposed 64,022 square foot building. In order to acCUminodate this growth, the existing; medical 'Lnd real estate offices on the site would be displaced; this would affect driveway volurnes serving die existing buildings, but would not affect the proposed driveway and therefore is not reflected in Table 1. The trip generation estimates in this revised analysis are based an the: employee count, not square footage, since it provides a more co-riservtiriveanalysis as described above. Figure 1 shows the trip distribution, assignment, and turning movement volumes at the study intersection. Additional on -site parking will eliminate the tweed for MindBody to provide off -site empluyee parking at the Airport Center. Field observations of the Airport Cenret parking area were conducted to estiniate the pear hoar traffic that would shift to the projec:r site if adequate parking was available. Ttip Generation Tablc: 1 shows the estimated vip generation associated wirh 3-15 new employees using the proposed driveway. The new employees would generate 176 AM and 173 PM peak hour trips. The Single Ttriant Office Building land use was selected as the most appropriate use far the proposed expansion. Table 1 also includes the grips generared by drivers who currently park at the Airport Center but would shift to the new structure driveway. This estimate was developed by counting the parking OCCLIpancy before and after the peal: hour to determine the number of vehicles that artive/depart during the peak bour- (KI15) 316-I.I 1 H I \V\ti�11',CSI C4{r15C:+ IIIr Lll tLRr.�,l'i�ITI Table I., Trip Generation at Proposvd Drivcwav t Nurnber ofTrips AM PM Land Use Size pally In Out Total In Out Total Sigg1t 7'0n-,1nt Uificc MlUi%- 3.15 employees 1166 157 19 176 26 147 173 AirNtrrc Center Pari uu* SNft3 150 30 i I 30 0 30 30 Total Trips Assigned to Drivewayl 1316 1 187 19 206 L(I 177 y03 1, D4111), 1011s twu it uni);L ratc, Alf And PNI use tituci CUMeq Ll Fl 0115, 2. IT12 I.aa(l l In [Jock 7I5 3. Bmutl ur 118r1111ix urcuptary counts; 109 .specs arc 17mvi(lcL.1 for Ml(tLIBLI(l)' Cmployces, micl the peak obscrval occup nnry was 77 Ydllrlc<. Soufcv: Trill Ckticindon, 9th r_dition, lTli (2012) liml CCXL; 2013 Trrp Distrrhvdon and Assignment The project's peak hour trips were assigned to Tank Farm Road with 30% going to/from the west and 70`Ye going to/from the east. These distribution percentages were developed by reviewing area travel patterns (-,na traffic counts) and by running a select -zone analysis in the City's Travel Demand Model. The rrips shown in Table 1 werc all assigned to the roadway network via the proposed driveway on Tank Farm Road. In reality, some of these trips would use the existing driveways serving the campus. This compensates for the fact that the 485-space structure would serve wore than 315 employees. ANALYSIS RESULTS Traffic operations at d7c entrance ddveway were anal'taed for AM and PM peak hours under Existing plus Project and Buildout plus Project conditions. The existing traffic on Tank Farm Road was added to the project's ttaffic and the shifted traffic discussed below} to yield Existing plus Project Conditions. No improvements were assumed along; Tank Farm Road at the project frontage under Existing plus Prr,ject, Conditions. Widening Tank Farm Road to four lanes at the project driveway would improve traffic operations under this scenario. Buildout conditions were developed using the City's Travel Demand Model as applied to other recent area studies. Project traffic and shifted traffic were added to obtain $tdldout plus Proiect traffit volutnes. This scenario assumes that the Industrial Way Extension will form the north leg of the intersection, and that Tank Farm Road will be widened to four lanes. Othcr key assumptions and results are described below, Ttafi`ic ,Shifts The provision of a new controlled crossing (i.e. signal Qr roundabout) of Tank Farm Road would draw traffic froin adjacent parking lots via the planned connection at the south end of the parking lot This shifted traffic was estimated by observing turning patterns at the driveways serving the parcel immediately east of the project site. Under huildour conditions, additional traffic shifts ate expected due to the planned raised median on Broad Street south of Tank Farm Road. This median would restrict left turns to and from the driveways serving; the adjacent parcel. Some of these drivers would shift to the project's new driveway access point, while: others would make a u-turn at the Broad Street/Tank Farm Road intersection. Table 2 summarizes the analysis results for the project driveway. Detailed calculatiun sheets are included as Attachment 1- Because stop control and the roundabout showed unacceptable LDS F operations in the March 4 analvsis, thev were excluded from this update. (;�(Ii) 316-111(11. WWNV.t.'rl r:11),,Cons ulting•co111 Table 2: Analys6 Results for Ptolect Drive way /Tardi, Fami Road intetsectio-n Scenario Peak Dour Delay LOST AM 15.5 B Existing plus Project PM 18.2 B AM 23,2 C Buildout plus Project PM 29.3 C 1, HCM 2000 avers a clela er,,,ehiele and L_OS reported with si nal control. The results show« in Table 2 reflect conditions with protected left turns on all approaches, which show a more conservative analysis than permissive phasing. The analysis does not assume that the .new signal would he coordinated with the signal at broad Street/Tank 1~ann Road, as there was minimal benefit to coordinating these signals and coordination on Tank Farm Read would preclude future coordination on Broad Street, which carries higher volumes. The City's Circulation Element calls for a mi.ninsum of LOS D operations. Under signal control the intersection operates acceptably under all scetiarios, SIGNAL WARRANT/ACCESS MANAGEMENT ANALYSIS The need for a traffic signal is determined based on criteria set forth in the Manual on Uniform Traffic Control Deviceh (MUTCD). The MUTCD includes nine warrants, and at In, one must be mer to justify the installation of a traffic signal. However, satisfaction of a warrant or warrants does not in itself require the installation of a signal, other factors must be considered in an enVoeering study evaluating the potential effects of a signal. The peak hour signal warrant (Warrant 3, Section 4C.04) is evaluated here for the intersection of Tank Farm Road and the project driveway. The MUTCO nores that this warrant is ottly applicable "in unusual. cases, such as office complexes... that attract or discharge large numbers of vehicles over a short time." The proposed office uses here meet these criteria, with more than 34°/b of the total. daily traffic expected during the AM and PM peak hours. The peal: hour signal warrant is met under Existing plus Project PM and Buildout plus Project PM conditions. The warrant calculation sheets are provided as Attachment 2. Numerous factors beyond signal warrants must be considered before installing a traffic signal, including the potenrial interaction between the planned signal and nearby signals. The.!lrcessAfanagemoil 11'knenal (Transportation Research Board, 2003) recommends that driveways be located outside of the functional Area of major intersections. The functional area includes the approaching and departing legs of the intersection where vehicles would be queuing, accelerating, or decelerating, and is illustrated at right. A review of the projected queues from the Physical Area 4 Functional Atea Tank Farm Ruad/Broad Street intersection show4 that the queues would not reach the proposed driveway. Similarly, the queues from the driveway are not expected to spill back to the `rank Farm Road/Broad Street intersection, The functional area of the proposed driveway would overlap a number of nearby driveways to the east and west. Sig-rializarion of the driveway would require turn prohibitions (such as conversion to right-in/right-nut only) at these driveways to prevent turning; conflicts. This would result in some vehicles making a u-turn at (805) 316-0101 kit\� u.ccrr mMct.rnxulll n�.r_�.� i�� the new signal to reach their final destination. Future redevelopmenr of the parcels between the project site and Santa Fe road should evaluate the potential to connect these parcels with a collector roadway linldng Santg Fe Road with the project driveway in suiniriary, the proposed driveway meets the peak hour signal warrant and is not expected to encroach into the Functional area of the Tank farm Road/Broad Street intersection. A signal is recornnhended at the driveway, with turn restrictions at nearby driveways. PAR JNG ANALYSIS The existing parking for serving the Mind5ody campus does not provide adequare parking to serve the parking demand, so some employees park off -site at the Airport Center parking lot and are shuttled to the campus. The proposed parking structure would address this parl€ing shortage and would accommodate the demand generated by future einployee growth so that the Airport Center parking and shuttle are not. needed. This parking -analysis summariness expected parking conditions from a campus -wide perspective. -Ex sting Parking, The existing supply is 319 spares (210 in the main campus, 109 in the Airport Center lot), and the peak observed demand is 285 spaces. There ate currently 409 employees occupying 108,000 squate feet of office space on the site. This corresponds to a parkin, dem,uid rate of 0.70 spaces per employee, or 2.64 spaces per 1,000 square feet. ITF's 1'roki��.g Gewremrm report (411, Edition, 2010) provides peal: parl6ng demand rates of .82 spaces per employee and 2.75 spaces per 1,000 square Feet for office uses in suburban locations. ITN's rate per 1,000 square feet is 4% higher than the observed demand, and .ITE's rate per employee is 1.7`%i, higher than the observed rate. The rattper cniployee is used ie) this analysis to estimate future dernand, as it is more conservative and accounts for the fact that it.. is difficult to find the .last remaining spaces in large parking lets. Future Parking The proposed project would add a 485,space parking structure to accommodate employee growth and existing employees who currently park off -site, resWring in a total future supply of 695 spaces. Based on the ITE peak demand equation, the future parking demand would be 602 spaces. Applying the existing parkin; demand rare of 0.70 spaces per employee yields a future peak demand of 510 spaces. The proposed parking supply is adequate, even when using a higher demand rate than is currently observed on the site: and allowing fora circulation facr.or. ON -SITE ACCESS AND CIRCULATION The tecomtrienclations Front the March 4 arialysis have been incorporated Into the latest site plan. The following rL!cornmeridations would improve on -site circuladon: • The pedestrian connection between the proposed building and the existing buildings should be clearly marked and direct. • The connection to the parking lot to the east sfnuld be designed to ensure adequate sight clistanee between cars exiting the parking structure and cars crossing from one parking lot to the other. • A connection to the parcel to d-ie west should be provided ar the south. end of the parking lot if/when that parcel redevelops to allow a coogolidated access point and minimize the number of driveways frondrig Tank Farm Road. Plcasc do .not hesitate to cehntact me if you have -,iny questions. WNkW.CCI"r:u]sCOOS IlI:jII' .r ,I II Enclosures: Figure 1: Traffic Volume Surrunary (805) 316-0101 ww%v.ccrrainseonSLiltitlg.crxiI Figure 1: Traffic Volume Summary r r 700(917) Tank Farm Rd. r 171(21) 603(900)� 116(20)---* a C4 r r (p l[] '�117(62) -*-1375(1250) ' Ink }Ij Farm lank Farm Rd 157(84) 20(1400)--0- 116(20) � rs � sv r3 MindBody Traffic Analysis XX(W = AM(PM) Peak Hour Traffic Volumes . = Future Roadway April 2013 (805) 316-0101 www.cctransconsulting.com •T 11 t19�� RESOLUTION NO. ####-13 A RESOLUTION OF THE SAN LUIS OBISPO ARCHITECTURAL REVIEW COMMISSION GRANTING FINAL DESIGN APPROVAL TO THE MINDBODY PROJECT CONTAINING A 59,248 SQUARE -FOOT OFFICE HEADQUARTERS BUILDING WITH THE POSSIBILITY OF A FUTURE ADDITION WITH UP TO 64,022 SQUARE FEET & A 373-SPACE, FOUR - LEVEL PARKING STRUCTURE FOR PROPERTY LOCATED AT 651 TANK FARM ROAD (ARC 26-13) WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis Obispo, California, on April 1, 2013, for conceptual review of Planning Application ARC 26-13, an office headquarters and parking structure for MindBody; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a public hearing in the Council Hearing Room of City Hall, 990 Palm Street, San Luis Obispo, California, on May 20, 2013, for the purpose of considering revised plans for final approval; and WHEREAS, notices of said public hearings were made at the time and in the manner required by law; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff at said hearings. NOW, THEREFORE, BE IT RESOLVED by the Architectural Review Commission of the City of San Luis Obispo as follows: SECTION 1. Findings. 1. As conditioned, the project's design is appropriate and will be compatible with surrounding development. 2. The proposed use conforms to the General Plan, Airport Area Specific Plan, and meets Zoning Regulations requirements. 3. The revised project design maintains consistency with the City's Community Design Guidelines and Chapter 5, Community Design, of the Airport Area Specific Plan with buildings whose architectural character will contribute to the establishment of the Airport Area as an attractive, high quality business center. 4. The ARC supports an exception to the City's Sign Regulations to allow a logo mounted above the plaza entry of the office building because the sign is for superior design, which will not result in visual clutter meeting the intent and purpose of the regulations, because the sign faces the entry plaza, rather than the street, and its design is more of an artistic element, than typical commercial copy. 5. Consistent with the Parking & Driveway Standards, the ARC has approved the use of compact spaces in the parking structure not to exceed 33% of the total spaces proposed Resolution No. ARC-####-]3 651 Tank Farm Road, ARC 26-13 Page 2 because it helps maximize the number of parking spaces available to employees in a private development which prevents the need for offsite parking and lessens impacts to adjacent properties. 6. The project is categorically exempt under Class 32, Infill Development Projects, Section 15332 of the CEQA Guidelines. SECTION 2. Action. The Architectural Review Commission hereby grants final approval to the MindBody project (ARC 26-13), with incorporation of the following conditions: Conditions: 1. Final project design and construction drawings shall be in substantial compliance with the project plans as amended and approved by the ARC. A separate, full-size sheet shall be included in working drawings submitted for a building permit that list all conditions of project approval as Sheet No. 2. Reference should be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping, or other conditions of approval must be approved by the Director or Architectural Review Commission, as deemed appropriate. 2. The color board for the project buildings presented at the meeting was supported by the Architectural Review Commission. Any modifications to the approved palette shall be reviewed and approved by the Community Development Director prior to issuance of a building permit. Building colors shall be shown on the building elevations approved as part of working drawings. 3. All stucco and plastered surfaces shall have a smooth hand -finished appearance to the satisfaction of the Community Development Director and not be a sprayed -on type of application. A sample of the finish shall be submitted prior to issuance of a building permit. 4. Plans shall clearly show the details of all windows and storefronts to the satisfaction of the Community Development Director. 5. The sign program for the project is approved subject to the following criteria: a. To coordinate with building architecture and the type of land use, all signs shall be fabricated of individual raised metal letters which are externally lit or have halo or backlit letters. b. No channel letters with plex faces or metal cabinet signs are allowed. c. A third wall sign at the northeast corner awning of the building may be approved by the Director if it is not larger than 30 square feet and meets the other approved sign program criteria. d. The Director may refer signage to the ARC if it seems excessive or out of character with the project. 6. Parking lot poles and fixtures shall be shown on building permit plans and not exceed 21 feet in height measured from the parking lot surface to the bottom of the fixture. The Resolution No. ARC-###4-13 651 Tank Farm Road, ARC 26-13 Page 3 selected fixture(s) shall be shielded to insure that light is directed downward consistent with the requirements of the City's Night Sky Preservation standards contained in Chapter 17.23 of the Zoning Regulations. Cut -sheets of fixture details shall be submitted with working drawings to confirm compliance with City standards. 7. Garage roof lights shall not exceed 12 feet in height from the approved finish grade to the top of the fixture. Illumination levels at the finish grade directly below the fixtures shall not exceed 10 footcandles. Roof light fixtures shall not be visible from any off -site location. 8. The locations of all wall -mounted lighting fixtures shall be clearly called out on building elevations included as part of working drawings. All wall -mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures, and cut -sheets shall be separately submitted for the project file of the proposed lighting fixtures. The selected fixture(s) shall be shielded to insure that light is directed downward consistent with the requirements of the City's Night Sky Preservation standards contained in Chapter 17.23 of the Zoning Regulations. Details of all exterior light fixtures, including any service area lights, need to be included as part of plans. A note shall be included on plans that "Lenses of exterior wall -mounted lights may be modified or shielding devices added after installation if the Community Development Director determines that they emit excessive glare." 9. Mechanical and electrical equipment shall be located internally to the building. With submittal of working drawings, the applicant shall include sectional views of the building, which clearly show the sizes of proposed condensers and other mechanical equipment to be placed on the roof to confirm that parapets and other roof features will adequately screen them. A line -of -sight diagram shall be included to confirm that proposed screening will be adequate. This condition applies to initial construction and later improvements. 10. Final design details for the proposed trash and recycling enclosures shall be included in working drawings for a building permit and shall be to the review and approval of the Community Development and Utilities Departments. The ultimate design shall be consistent with the Solid Waste Guidelines and coordinate with the exterior design of the buildings. Either stucco or a spilt -face block in colors to coordinate with the buildings could be used. 11. A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings. The legend for the landscaping plan shall include the sizes and species of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. 12. The location of any required backflow preventer and double-check assembly shall be shown on all site plans submitted for a building permit, including the landscaping plan. Construction plans shall also include a scaled diagram of the equipment proposed. Where possible, as determined by the Utilities Director, equipment shall be located inside the building within 20 feet of the front property line. Where this is not possible, as determined by the Utilities Director, the back flow preventer and double-check assembly shall be located in the street yard and screened using a combination of paint color, landscaping and, Resolution No. ARC-990-13 651 Tank Farm Road, ARC 26-13 Page 4 if deemed appropriate by the Community Development Director, a low wall. The size and configuration of such equipment shall be subject to review and approval by the Utilities and Community Development Directors. 13. The applicant shall provide for the professional, perpetual maintenance of all common area including private driveways, drainage, parking lot areas, walls and fences, lighting, and landscaping in a first class condition. 14. The overall site shall be maintained in a neat and orderly manner at all times. All plant materials shall be maintained and replaced as necessary. 15. With plans submitted for a building permit, provide fire -resistance rating for exterior walls requirements based on CBC Table 602 and maximum area of openings based on Fire Separation Distance of Parking Structure to Property Line in conformance with Table 705.8. 16. The specific art proposals for the project shall return to the ARC for review at a later date once developed by artists and approved by an art jury as overseen by the SLO Arts Council. Fire 17. Access shall be in accordance with Chapter 5 and Appendix D of the California Fire Code (CFC). Access roads shall have an unobstructed width of not less than 26 feet and an unobstructed vertical clearance of 13' 6". Access roads shall be designed and maintained to support the imposed loads of a 60,000 pound fire apparatus and shall be provided with a surface so as to provide all-weather driving capabilities. The permeable pavers shall support the above weight. The fire access around the buildings shall be posted "NO PARKING -FIRE LANE". 18. At least two fire hydrants capable of delivering a needed fire flow of 3625 gpm shall be located on -site so that no point of an exterior wall is more than 300 feet from a hydrant. One hydrant shall be within 40 feet of the pumper inlet of the parking garage, the second may be on the adjacent property so long as there is a recorded agreement and the existing hydrant provides coverage to within 300 feet of all exterior building walls. 19. Rooms or areas containing controls for air -handling systems, automatic fire -protection systems, or other diction, suppression or control elements shall be identified for use by the fire department and shall be located in the same area. A sign shall be provided on the door to the room or area stating "Fire Sprinkler Riser" and "Fire Alarm Control Panel". Fire sprinkler risers shall be located in a room with exterior door access. Show Riser room on floor plans. 20. An approved NFPA 13 system will be required for this project. Shop Drawings and Specifications shall be submitted for review and approval prior to installation. Fire main and all associated control valves shall be installed per NFPA 24 Standards and City Engineering standards. The Fire Department Connection shall be located along a fire apparatus access. Show location of backflow protection device and FDC on site plan. In Resolution No, ARC-####-] 3 651 Tank Farm Road, ARC 26-13 Page 5 addition, a combination fire standpipe will be required in each stairwell of the parking garage. Transportation 21. Long and short-term bicycle parking shall be provided on -site in accordance with Table 6.5 of the Zoning Regulations. Bicycle parking shall be installed at highly visible locations that are as close to the main entrance of the destination as possible and located at least as conveniently as the most convenient automobile parking space. Dimensioned locations and details of the short and long-term bicycle parking shall be provided on the project's construction plans including rack design, location, clearances and circulation for users in compliance with manufacturers' standards. A minimum four foot wide path of travel shall be provided to all bicycle parking spaces. 22. Traffic impact fees shall be paid for this development prior to building permit issuance. Credit for removal of the existing buildings will be applied based on the use and/or areas of the existing development. 23. The building plan submittal shall either show preservation of enough area to accommodate a dedicated right turn lane for the exiting driveway or be modified to construct the dedicated right turn lane as part of the project. 24. The applicant shall bond for design and construction of a traffic signal at the driveway including any associated road widening on the north side of Tank Farm. The applicant shall conduct a traffic signal warrant analysis 3 months after occupancy and every 12 months thereafter for up to five years or until the City determines signalization is warranted. The applicant may submit warrant analysis sooner and more frequently than required if they so desire. If and when in the City's reasonable judgment signalization is warranted the applicant shall design and install the traffic signal and other associated improvements. 25. If and when Signalization of the driveway occurs it may require turn restrictions for any other driveways within 350' of the signal. The extent and type of restrictions will be determined during design of the signal and shall include outreach to and input from the effected properties. Public Works 26. The architectural site plan, grading/drainage plan, and final landscape plans shall all be reconciled to show common information consistently. 27. City records show existing Certificates of Compliance for several underlying lots. It is expected that a LLA was processed in the County to adjust the boundaries of Tract 1993. Existing underlying property lines shall be adjusted or otherwise merged prior to building permit issuance. 28. The building plan submittal and improvement plans shall show compliance with the Airport Area Specific Plan (AASP) for the ultimate street section and undergrounding of overhead utility lines across the property frontage. New curb, gutter, and sidewalk, Resolution No. ARC-09H-13 651 Tank Farm Road, ARC 26-13 Page 6 driveway approach and street paveout are required as part of this development in accordance with the street sections approved in AASP and to the satisfaction of City. All existing and proposed utilities shall be shown for reference. The improvements shall be constructed in accordance with City Engineering Standards and Standard Specifications, 29. A separate public improvement plan may be required to show the extent and scope of work within the public right-of-way. A separate public improvement plan review fee shall be paid to the Public Works Department in accordance with the fee resolution in effect at the time of plan submittal. The required improvements may be completed under a standard encroachment permit. Record drawings shall be provided at the completion of the project. 30. The improvement plans shall clarify how the new driveway approach will tie into the existing developed property to the West. The plan may need to project the proposed grades and include additional off -site grades to clarify how the public sidewalk could transition and continue across the frontage of the adjoining property. 31. The street improvements and drainage calculations shall clarify that adequate curb capacity exists in Tank Farm Road to handle the proposed improved drainage. The plan and analysis shall clarify whether additional off -site improvements are required to convey the improved drainage. 32. The building plan submittal shall include a final drainage report and final plan details. The plan and report shall clarify the proposed water quantity and water quality improvements related to this project. The report and plan shall show and note compliance with the Waterway Management Plan Drainage Design Manual, City Engineering Standard 1010.13, Tier 3 Interim Low -Impact Development Standards, and the drainage provisions in Section 5 of the AASP. Additional passive drainage systems such as porous paving, vegetated swales and flush curbs/landscape depressions should be used where practical in -lieu of conventional collection and hard piped drainage improvements. 33. The final details of the proposed basin/infiltrator shall include the review and recommendations from the project soils engineer. The final design shall incorporate recommendations from the manufacture regarding sizing, access, maintenance, and cleaning. An O & M manual shall be provided in conjunction with the final approval of the system. A Private Stormwater Conveyance Agreement shall be recorded in a format provided by the City prior to final inspection approvals. 34. EPA Requirement: General Construction Activity Storm Water Permits are required for all storm water discharges associated with a construction activity where clearing, grading or excavations result in land disturbance of one or more acres. Storm water discharges of less than one acre, but which is part of a larger common plan of development or sale, also requires a permit. Permits are required until the construction is complete. To be covered by a General Construction Activity Permit, the owner(s) of land where construction activity occurs must submit a completed "Notice of Intent" (NOI) form, with the appropriate fee, to the State Regional Water Quality Control Board. An application is required to the State Board under their recently adopted Stormwater Multi - Application, Reporting, and Tracking System (SMARTS). 35. The building plan submittal shall include a copy of the Storm Water Pollution Prevention Plan (SWPPP) for reference. The building plan submittal shall include a complete erosion Resolution No. ARC-####-13 651 Tank Farm Road, ARC 26-13 Page 7 control plan in accordance with the SWPPP, Section 10 of the Waterway Management Plan, and City Engineering Standards. 36. Include reference to the WDID number on the grading and erosion control plans for reference. 37. The architectural site plan, grading/drainage plan, and final landscape plans shall agree. Any final direction from the ARC shall be incorporated into the respective plan sheets. 38. The final parking lot plans shall show and note compliance with the parking and driveway standards. The plan shall include all signing, striping, and directional signs in accordance with the Standards and to the satisfaction of the City. The parking summaries shall be updated on the cover sheet of the plans to include the final mix of parking spaces including accessible spaces, standard spaces, compact spaces, motorcycle spaces, and long- term/short-term bike parking. 39. The final parking structure plans shall include all pertinent signing, striping, and directional arrows in accordance with the parking and driveway standards and California Building Code. The parking layout, space striping, and bay widths shall conform to the parking and driveway standards unless exceptions are otherwise specifically approved. Some bay widths serving the Compact spaces do not comply with current standards. 40. The building plan submittal shall include a revised and detailed site circulation plan. The plan shall clarify the extent of any off -site improvements to provide for a better transition to the adjoining drive aisle. The plan should consider moving the circulation to the next southerly drive aisle located within Tract 1993 (Creekside Commercial) to better align with the existing exit lane assignments at Broad Street. 41. All required common driveway or access agreements shall be recorded prior to building permit issuance. It appears from the circulation plan for the secondary exit to Broad Street that vehicles will be crossing over three underlying properties. 42. The building plan submittal shall show the location of potential driveway connections for the improved property located to the West of the proposed parking lot, structure, and main drive aisle. The project shall include an easement offer or reciprocal access agreement to allow for future access to the main drive aisle and future signalized intersection. 43. City permit records indicate that the septic tanks were abandoned for both 651 and 675 Tank Farm. The plumbing code only requires the pumping and filling of tanks and not the removal of the tank or adjoining leach field. The demolition plans shall show any existing water well, septic tank, and leach field for reference. The demo plans and/or building plans shall include all pertinent plan notes related to the retention and/or abandonment of any existing private water well and private waste disposal system. The septic tank and/or leach fields shall be abandoned in accordance with recommendations from the soils engineer. Utilities 44. With plans submitted for a building permit, the following in formation shall be submitted: Resolution No. ARC-####-] 3 651 Tank Farm Road, ARC 26-13 Page 8 a. The applicant shall submit a plan that delineates the location of the property's existing and proposed water meter(s), water services, and sewer laterals to the points of connection at the City water and sewer mains. b. The project site is within the City's Water Reuse Master Plan area, however the City's recycled water distribution system may not be extended to the project's Tank Farm Road frontage for a few years. Applicant shall design to the standards described in the City's Procedures for Recycled Water Use so that recycled water may be used for irrigation of the site's landscape when it is available in the future. c. Utility Plan shall include 8-inch recycled water main in Tank Farm Road along the parcel's frontage. On motion by Commissioner , seconded by Commissioner and on the following roll call vote: AYES: NOES: REFRAIN: ABSENT: The foregoing resolution was passed and adopted this 20th day of May, 2013, Pam Ricci, Secretary Architectural Review Commission