Loading...
HomeMy WebLinkAbout12-11-2020 Caltrans Agreement No. 50LP291 - Grant Funds for California Blvd and Foothill Blvd Railroad CrossingSTATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 Unit Project ID Phase Subjob Object Amount FFY Encumbrance Doc No 3328 0521000061 S 049 $400,000.00 2020/2021 50LP291 Item Chapter Statutes Fiscal Year CONTRACT — FOOTHILL BLVD 2660-102-0890 6 2020 2020/2021 The funds as listed above are available for the period and purpose of the PROJECT NUMBER (FED ID) STPLR-7500(291) expenditure stated herein. CALTRANS ACCOUNTING ID: 0521000061 SERVICE CONTRACT: 50LP291 Caltrans Division of Local Assistance The numbers above shall be included with all invoices submitted to Caltrans Office of Federal Programs — Section Highway Railroad Grade Crossing Safety Program P.O. Box 942874, MS 1 (Section 130) Sacramento, CA 94274-0001 LOCAL AGENCY: City of San Luis Obispo Effective Date of Contract: December 11, 2020 ADDRESS: Public Works Or upon signature, whichever is later. Phone: 919 Palm Street Expiration Date of Contract: December 31, 2024 San Luis Obispo, CA 93401 The City of San Luis Obispo (hereinafter referred to as Local Agency), hereby agrees to do the work set forth herein for the State of California, Department of Transportation (hereinafter referred to as Caltrans) in accordance with all applicable laws including but not limited to, California Streets and Highways Code section 114(b) and California Government Code 14038 and regulations and the provisions of this form including the attached sheets and Exhibits A-E. This Agreement shall be effective the date defined herein or when executed by all parties, whichever is later and is subject to all the terms and conditions thereof. This agreement authorizes reimbursement of eligible costs incurred during the term of this agreement. The work is located in the City of San Luis Obispo at the grade crossing located at the intersection of Foothill Boulevard and the Union Pacific Railroad (hereinafter referred to as Railroad) tracks, identified as; California Public Utilities Commission (CPUC) No. 001E-247.15 / SLO-1022, Federal DOT No. 745352P. All work to be completed by Local Agency under the terms of this Contract is described in Exhibits A & B (hereinafter referred to as Project). Under this agreement, funding is authorized for work in phases, beginning with the Preliminary Engineering (PE) phase. Additional funding to complete this contract will only be provided through the execution of amendments for the subsequent phase(s) of work needed; Right of Way (RW), Utility Relocation (R/W-UTIL), and Construction (CON). Estimated Total Project Cost (Local Agency): $796,250.00 TOTAL AMOUNT OF CONTRACT $400,000.00 (Preliminary Engineering) It is expressly agreed that all persons engaged on this work are employees of the Local Agency and/or contractors hired by the Local Agency pursuant to its own policies and procedures and that none are employees of Caltrans. Further, Caltrans hereby agrees to the terms as above set forth, and hereby agrees to pay the actual allowable costs incurred up to the limit set forth herein; provided, that by mutual consent of the Local Agency and Caltrans, this contract may be modified or terminated at any time, noting that a contract amendment is necessary prior to undertaking any construction activities. IN WITNESS WHEREOF, the parties have duly executed this contract as of the dates shown below with the effective date shown above. CALIFORNIA DEPARTMENT OF TRANSPORTATION CITY OF SAN LUIS OBISPO Signature Name Title Date Bruce Roberts Caltrans Section 130 Program Manager Signature Name Title Date Derek Johnson City Manager STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 1. It is mutually understood between the parties that this contract may have been written before ascertaining the availability of congressional or legislative appropriation of funds, for the mutual benefit of both parties, in order to avoid program and fiscal delays that might occur if the contract were executed after appropriations are actually made. 2. This contract is valid and enforceable only if sufficient funds are made available to Caltrans by the United States Government or the California State Legislature for the purpose of this program. In addition, this contract is subject to any additional restrictions, limitations, conditions or any statute enacted by the Congress or the State Legislature that may affect the provisions, terms or funding of this contract in any manner. It is mutually agreed that if the Congress or the State Legislature does not appropriate sufficient funds for the program, this contract shall be amended to reflect any reduction of funds. 3. This service contract is for the elimination of hazards at Railroad -Highway intersections (crossings) with funds provided to Caltrans under Section 130, Title 23 USC. Said elimination of hazards is a cooperative effort between Caltrans, Local Agency, CPUC and Railroad. The CPUC has evaluated the railroad highway intersection and determined what improvements are necessary; Caltrans acts as a conduit for the federal funds to the Local Agency and the Railroad. The Local Agency and Railroad are responsible for building and maintaining the improvements as approved by the CPUC. 4. The work to be performed by the Local Agency is attached hereto as a part of Exhibit A and made a part hereof (hereinafter referred to as Scope of Work). The Scope of work is based on; an analysis of existing conditions, accident history, field diagnostic review to define initial mutually agreed upon recommendations of improvements best suited for railroad -highways grade crossing hazards eliminations for the specific location and is subject to revisions based on the completion of design, traffic engineering, signal pre-emption, or changed conditions, but only if approved by Caltrans and CPUC.. 5. The planned work items and an estimate of total project cost is attached hereto as Exhibit B and made a part hereof. 6. The existing conditions of the Project are documented in photographs and attached hereto as Exhibit C. 7. The total allowable costs reimbursable by Caltrans under this phase of the Service Contract, shall not exceed $400,000.00, for Preliminary Engineering (PE). 8. Each phase of work; Preliminary Engineering (PE), Right of Way (R/W), Utility Relocation (R/W- UTIL), and Construction (CON), will require an additional federal authorization through the issuance of an updated E-76 with a new funding sequence for the phase of work. Any unexpended prior obligations from the completed phase(s), will be used in conjunction with the required additional federal funds for the next phase of work. Authorization of federal funds will be performed by Caltrans, aligned with the project schedule and provided the state has sufficient Obligation Authority (OA) and available federal funds to undertake this action. 9. The reimbursement of federal funds is limited to the amounts approved on E-76 for either the Local Agency or Railroad. All Project costs must also comply with the E-76, attached hereto as STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 Exhibit D. Only work performed after the date of federal authorization is eligible for federal reimbursement, the Local Agency reimbursement rate is equal to; 100% of eligible costs. 10. When federal funds are not available for obligation, a local agency may request in writing authorization to proceed with the project (or project phase) under the Local Assistance advance construction procedures. Under local advance construction procedures, the local agency will use its own funds to perform work eligible for future federal reimbursement. The local agency must have sufficient local funds to pay for all project costs until such time as federal funds become available. 11. Local Agency will not proceed with any work on the Project, nor will Local Agency purchase any materials, until authorized through the execution of this contract and Caltrans' issuance of a Notice to Proceed (hereinafter referred to as NTP). Authorization and issuance of the NTP shall not be issued by Caltrans until sufficient State or Federal funds have been obligated for the projects. State liability pursuant to this contract is limited to the amount set forth in this contract 12. The Local Agency agrees to perform the Project work and to provide and furnish all necessary labor, materials, tools, and equipment required therefore, and to prosecute Project diligently to completion. Caltrans and Local Agency agree that the Project work as provided herein is pursuant to Federal rules and regulations and should adhere to all guidance and requirements for local federal - aid projects from the Caltrans Local Assistance Procedures Manual (LAPM). Local Agency agrees to perform its work in accordance with Federal Highway Administration (FHWA) FHWA- 1273, a true and correct copy of which is attached hereto as Exhibit E as may be amended or updated, as if those provisions were set forth fully herein. Caltrans is acting as a conduit for disbursement of Federal Surface Transportation Program funds for hazard elimination at railroad intersections on city streets, county roads and State Highways. 13. The Local Agency shall comply with the Buy America provisions set forth in 23 CFR 635.410 for the Project, for steel, iron and manufactured goods produced in the United States, subject to the conditions therein set forth. 14. Any person, company or corporation who performs construction work authorized under terms of this contract must have a valid and current California contractor's license. All authorized work performed by employees of Local Agency and any CPUC regulated public utility, City, County or Public Service District is not subject to the above contractor's license requirement. 15. Local Agency must coordinate Project work with the Railroad that owns or operates the tracks where the intersection is located. 16. Local Agency will secure all legally required and necessary permits and approvals before commencing Project construction. 17. Where Project work is in conjunction with work done by Railroad, Railroad will construct railroad track and signal work to its own standard specifications, Local Agency will not perform any work on the Railroad tracks or within railroad right of way without securing written permission from the railroad. Project work done within twenty-five feet of the centerline of the Railroad track may require a Railroad employee to protect the workers of Local Agency or its contractors. This provision is pursuant to federal law regulation and must be clearly agreed to in writing between Local Agency and Railroad before commencement of Project work at the railroad -highway intersection. STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 A copy of this agreement between Railroad and Local Agency shall be provided to Caltrans by Local Agency as soon as it is executed. 18. Caltrans will reimburse the Local Agency on the basis of actual cost, not to exceed the Project costs set forth herein. Any cost of the work determined by Caltrans to be not reimbursable, shall be borne and paid for solely and exclusively by Local Agency. Indirect overhead charges will not be allowed unless Local Agency has an Indirect Cost Rate Proposal approved by Caltrans' Audits and Investigations. 19. Any warning devices, medians, signs, pavement markings, structures or other improvements, which may be installed in conjunction with Project must be agreed upon between Railroad and the California Public Utilities Commission and the Local Agency must receive approval of a CPUC General Order 88-13, prior to commencing any construction activities and is responsible as the lead applicant from initiation through close-out. 20. Guidance, regulatory, warning and temporary traffic control signs, curb and pavement, or other markings and traffic signals installed or placed on any project constructed with federal funds shall conform to the Manual of Uniform Traffic Control Devices (MUTCD) and its California Supplement (CAMUTCD). Deviations from the Mandatory Standards for signs, markings, and traffic signals as defined and shown in the MUTCD and CAMUTCD are not permitted. 21. Local Agency invoice procedures shall conform to the California Prompt Payment Act (Gov. Code § 927 et seq.). Correspondence and/or invoices are to be mailed to: Caltrans Division of Local Assistance Office of Federal Programs Section 130, MS-1 P.O. Box 942874 Sacramento, CA 94274 Physical Address: California Department of Transportation Division of Local Assistance, 1200 N Street, Room 2400 Sacramento, California 95814. 22. Not more frequently than once a month, but at least quarterly, Local Agency will prepare and submit to Caltrans invoices for actual allowable costs incurred. Caltrans will review the invoice for compliance with this contract. Payment will be made by Caltrans to Local Agency within forty-five (45) days of the date of receipt of an invoice by Caltrans, unless disputed. Invoices which are determined not in compliance, or include unallowable costs, will be returned to Local Agency for correction of deficiencies, after which Local Agency will resubmit the invoice to Caltrans as prescribed above. 23. The Local Agency shall prepare and submit to Caltrans, not less than quarterly, a project status report that includes, at a minimum; a comprehensive summary of the overall project status, accomplishments to date, activities under way, risks, issues, planned activities and schedule updates. 24. The Local Agency, upon completion of the Project work, will provide to Caltrans a written declaration/notification that the Project has been final billed and ready to be closed. This declaration STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 shall be based upon actual allowable Project cost, Project Scope and Project cost limits set forth herein. Upon receipt of this declaration, Caltrans will pay all outstanding allowable invoiced Project costs. If upon final accounting, it is determined that Caltrans previously paid more than its share of said project, Local Agency shall refund the difference between Caltrans' share and the amount paid by Caltrans. All records of the Local Agency, its contractors and subcontractors are subject to audit by representatives of the State of California and Federal Highway Administration. Such records will be retained and made immediately available for inspection by Caltrans' Auditors for a period of three years from Caltrans' date of final payment of aforementioned final invoice. Further, Local Agency agrees to include a similar right of the State to audit records and interview staff in any subcontract related to performance of this Contract. (Gov. Code §8546.7, Pub. Contract Code §10115 et seq., CCR Title 2, Section 1896). 25 Local Agency agrees to pay prevailing wages for the work performed, pursuant to the California Labor Code § 1720, or any other applicable law. 26. All work to be done hereunder by Local Agency shall be done only by its employees on a force account basis, or by contractors, the cost thereof to be paid to Local Agency by Caltrans in the manner hereinafter set forth. 27. The Local Agency agrees that the 2 CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards shall be used to determine the allowable individual items of indirect cost. Local Agency agrees to comply with the applicable Federal procedures in accordance with Office of Management and Budget Circular 2 CFR 200. 28. All applicable portions of 23 CFR Part 140, Subpart I are by reference incorporated herein and made a part hereof. 29. Caltrans agrees to reimburse Local Agency for qualified insurance expenses as authorized by 23 CFR 646 et seq., and as set forth in the cost estimates or approved through amendment. 30. The Local Agency has 180 days after the expiration date of this contract to submit the final invoice to Caltrans for verification and payment. No compensation or reimbursement is payable for any cost or expense that is submitted on an invoice following 180 days after the expiration date of the contract. 31. In accordance with the California Public Utilities Commission General Orders, and in cooperation with the Railroad, the Local Agency shall maintain the Project improvements located in its right of way. 32. Subject to the availability of labor and material and securing the required and necessary permits and approvals of phase authorizations, it is the intent of the parties hereto that all construction work under this service contract shall be completed within the effective date of this contract, unless a time extension is requested by Local Agency and approved in writing by Caltrans. The expiration date of this contract is shown on the face sheet. Costs incurred after the expiration date of contract are unallowable and shall not be billed by the Local Agency to Caltrans. STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 33. AMENDMENT: No amendment or variation of the terms of this Contract shall be valid unless made in writing, signed by the parties and approved as required. No oral understanding or Agreement not incorporated in this Contract is binding on any of the parties. 34. ASSIGNMENT: This Contract is not assignable, in whole or in part, without the consent of Caltrans in the form of a formal written amendment. 35. AUDIT: Local Agency agrees that Caltrans or its designated representative shall have the right to review and to copy any records and supporting documentation pertaining to the performance of this Contract. Local Agency agrees to maintain such records for possible audit for a minimum of three (3) years after final payment, unless a longer period of records retention is stipulated. Local Agency agrees to allow the auditor(s) access to such records during normal business hours and to allow interviews of any employees who might reasonably have information related to such records. 36. INDEMNIFICATION: Local Agency agrees to indemnify, defend and save harmless the State, its officers, agents and employees from any and all claims and losses accruing or resulting to any and all contractors, subcontractors, suppliers, laborers, and any other person, firm or corporation furnishing or supplying work services, materials, or supplies in connection with the performance of this Contract, and from any and all claims and losses accruing or resulting to any person, firm or corporation who may be killed, injured or damaged except to the extent that such death injury or damage results from the sole or active negligence of Caltrans. 37. DISPUTES: Local Agency shall continue to perform under this Contract during any dispute. 38. TERMINATION FOR CAUSE: Caltrans may terminate this Contract and be relieved of any payments should the Local Agency fail to perform the requirements of this Contract at the time and in the manner herein provided. In the event of such termination Caltrans may proceed with the work in any manner deemed proper by Caltrans. All costs to Caltrans shall be deducted from any sum due the Local Agency under this Contract and the balance, if any, shall be paid to the Local Agency upon demand. 39. INDEPENDENT CONTRACTOR: Local Agency, and the agents and employees of Local Agency, in the performance of this Contract, shall act in an independent capacity and not as officers or employees or agents of Caltrans or State. 40. NON-DISCRIMINATION CLAUSE: During the performance of this Contract, Local Agency and its subcontractors shall not unlawfully discriminate, harass, or allow harassment against any employee or applicant for employment because of sex, race, color, ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition (cancer), age (over 40), marital status, and denial of family care leave. Contractor and subcontractors shall ensure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment. Contractor and subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code § 12990 (a-f) et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285 et seq.). The applicable regulations of the Fair Employment and Housing Commission implementing Government Code Section 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this Contract by reference and made a part hereof as if set forth in full. Contractor and its subcontractors shall give written notice of their obligations under this STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 clause to labor organizations with which they have a collective bargaining or other Agreement. Local Agency shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the Contract. 41. GOVERNING LAW: This contract is governed by and shall be interpreted in accordance with the laws of the State of California. 42. FORUM SELECTION CLAUSE: Sacramento County shall be used as the primary venue for any action arising from this contract, or an alternative location of competent jurisdiction within the State of California may be used, only if mutually agreed upon in writing. 43. ORDER OF PRECEDENCE; This Contract; Exhibit A, Scope of Work; Exhibit B, Cost Estimate; Exhibit C, Existing Conditions; Exhibit D, E-76, Exhibit E, FHWA-1273; are incorporated by reference and constitute the entire agreement between Caltrans and Local Agency. The documents listed in this paragraph shall be hereinafter referred to as the "Contract". In the event of a conflict between the contract documents, the controlling document shall be this Contract, then Exhibit D, Exhibit E, Exhibit A, Exhibit B, Exhibit C. In the event and to the extent any provisions contained in multiple documents address the same or substantially the same subject matter but do not actually conflict, the more recent provisions shall be deemed to have superseded provisions over any conflicting provisions defined in the body of the contract or its exhibits. 44. ANTITRUST CLAIMS: The Local Agency by signing this Contract hereby certifies that if these services or goods are obtained by means of a competitive bid, the Local Agency shall comply with the requirements of the Government Code Sections set out below: a. The Government Code Chapter on Antitrust claims contains the following definitions: 1. "Public purchase" means a purchase by means of competitive bids of goods, services, or materials by the State or any of its political subdivisions or public agencies on whose behalf the Attorney General may bring an action pursuant to subdivision (c) of Section 16750 of the Business and Professions Code. 2. "Public purchasing body" means the State or the subdivision or agency making a public purchase. Government Code Section 4550. b. In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder. Government Code Section 4552. c. If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, attributable to overcharges that were paid by the assignor but were not paid by the public body as part of the bid price, less the expenses incurred in obtaining that portion of the recovery. Government Code Section 4553. STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 d. Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action. See Government Code Section 4554. 45. CHILD SUPPORT COMPLIANCE ACT: "For any Contract in excess of $100,000, the Local Agency acknowledges in accordance with Public Contract Code 7110, that: a. The Local Agency recognizes the importance of child and family support obligations and shall fully comply with all applicable state and federal laws relating to child and family support enforcement, including, but not limited to, disclosure of information and compliance with earnings assignment orders, as provided in Chapter 8 (commencing with section 5200) of Part 5 of Division 9 of the Family Code; and b. The Local Agency, to the best of its knowledge is fully complying with the earnings assignment orders of all employees and is providing the names of all new employees to the New Hire Registry maintained by the California Employment Development Department." 46. UNENFORCEABLE PROVISION: In the event that any provision of this Contract is unenforceable or held to be unenforceable, then the parties agree that all other provisions of this Contract have force and effect and shall not be affected thereby. 47. PRIORITY HIRING CONSIDERATIONS: If this Contract includes services in excess of $200,000, the Contractor shall give priority consideration in filling vacancies in positions funded by the Contract to qualified recipients of aid under Welfare and Institutions Code Section 11200 in accordance with Public Contract Code Section 10353. Expiration of this Contract does not release any party hereto from any ongoing performance requirements agreed to herein. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Exhibit A Fed Xing ID: 745352P CPUC ID: 001E-247.151 SLO-1022 Scope of Work Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 Crossing Current Conditions: The crossing is very heavily used with a high ADT and high pedestrian use due to the close proximity to the Cal Poly San Luis Obispo campus. The campus is located east of the tracks and residential apartments and restaurants west of the tracks. There is a single UP Coast subdivision mainline track at the crossing. The crossing has 5 travel lanes (2 westbound and 3 eastbound), 2 bicycle lanes, and 2 sidewalks through the crossing. The sidewalks in the northwest and southwest quadrants are in poor condition. The sidewalks in the northeast and southeast quadrants were recently refurbished as part of the new bicycle path along California Blvd. The crossing has 2 Commission Standard 9 (flashing light signal assembly with automatic gates) warning devices. The Foothill and California Blvd intersection is signalized with railroad preemption. The intersection has a separate bicycle phase with bicycle signals. Local Agency Scope of Work: Reconstruct and install sidewalk: o Approximately 40 feet in the northeast quadrant o Approximately 40 feet in the northwest quadrant o Approximately 40 feet in the southeast quadrant o Approximately 50 feet in the southwest quadrant Install pedestrian channelization in all quadrants. Install detectable warning (tactile strips) on all sidewalk approaches. Relocate the bicycle curb ramp in the southeast quadrant to the southwest quadrant. Underground the existing overhead utilities in the southeast and southwest quadrants. Refurbish the asphalt transition approximately ten feet on each approach following the crossing panel replacement. Refresh or replace all pavement markings and signage: o From the track to the east to the intersection of California and Foothill. o From the track to the west to the railroad RXR advanced pavement markings. Install four exit swing gates one in each quadrant adjacent to the pedestrian gate in that quadrant. Modify traffic signal to utilize preemption time. All modifications shall be in accordance with the CAMUTCD, and CPUC General Orders. STATE OF CALIFORNIA Agency: San Luis Obispo DEPARTMENT OF TRANSPORTATION Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 Exhibit B Fed Xing ID: 745352P CPUC ID: 001E-247.151 SLO-1022 Cost Estimate Work Item Quantity Unit Unit Cost Total Detectable Warning Tiles 4 EA 7500 30000 Asphalt Concrete Overlay 100 TON 125 12500 Class2 Aggregate Base / Fill 500 TON 100 50000 Exit Swing Gates 4 EA 25000 100000 Sidewalk 1500 SF 100 150000 Curb & Gutter 170 LF 125 21250 Traffic Signal Modification 1 LS 50000 50000 Utilities Underground 1 LS 50000 50000 Striping & Signage 1 LS 25000 25000 Permit and Flagging Fees l LS 30000 30000 Mobilization l LS 20000 20000 Traffic Control l LS 30000 30000 Subtotal 568,750 Engineering 15% 85,313 Contingency 15% 85,313 Construction Administration & Inspection 10% 56,875 City Estimate $796,250 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Exhibit C Fed Xing ID: 745352P CPUC ID: 001E-247.151 SLO-1022 Existing Conditions East Approach Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION South Sidewalk North Sidewalk Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Exhibit D Fed Xing ID: 745352P CPUC ID: 001E-247.15 / SLO-1022 E-76 Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 AUTHORIZATION I AGREEMENT SUMMARY - (E-76( FEDERAL AID PROGRAM CALIFORNIA DEPARTMENT OF TRANSPORTATION OLA LOCATOR: OSSLO-O-SLO PROJECT LOCATION: PREFIX: STPLR CITY OF SAN LUIS OBISPO AT THE RAILROAD HIGHWAY GRADE CROSSING OF FOOTHILL BLVDAND UNION PACIFIC RAILROAD. PROJECT NO: 7500(291) TYPE OF WORK: SEO NO: 1 HIGHWAY RAILROAD GRACE CROSSING HAZARDS ELIMINATION WITH LOCAL PR@V AUTM/AGR€€ DATES: STATE PROJ NO: 0521000061 L.N FED RR NO'S: 74536 PE. AGENCY: SAN LUIS OBISPO PUC CODES: 001E- I ROUTE. PROD OVERSIGH7.ASSUMEDILOCAL AOMIN CON_ DISASTER NO: ENV STATUS I DT: SPR: TIP DATA RW STATUS I DT: MCS: MPO: SLOCOG INV RTE: OTH: FSTIP YR. 1&19 BEG MP'. STIP REF', END MP', FSTIP ID NO: 22300000718 BRIDGE NO: PROG COOS Z$50 LINE NO IMPV TYPE 10 15 FUNC SYS URBAN AREA URBIRURAL [1FIJ,1fQ FUNDING SUMMARY PHASE PROJECTCOST FEDERAL COST AC COST PE PREV. OBLIGATION $0.00 S0.00 $0,00 PE PE THIS REQUEST $2.000.000.00 $2,000.000.00 $0,00 PE SUBTOTAL $2.000.000.00 $2,000.440.00 $0,00 RW PREV, OBLIGATION 50.00 S0.00 $0,00 I RW THIS REQUEST $0.00 S0.00 $0,00 RW SUBTOTAL S0.00 S0.00 $0,00 CON PREV, OBLGATION $0.00 $0-00 $0,00 CON CON THIS REQU EST S0.00 S0.00 $0.00 CON SUBTOTAL $0.00 $0.00 $000 07H PREV, OBLIGATION S0.00 S0.00 $0,00 OTH OTH THIS REQUEST $0.00 $0.00 $0,00 07H SUBTOTAL S0.00 S0.00 $0,00 STATE REMARKS TOTAL. $2.000,000.00 $2,000,000.00 $0.00 12N212020 1st Sequence for Preliminary Engineering. Design and Estlmate prig I. conslruclion. This is a resubmittel of pmjeM 7500(274) but funded by phase. AUTHORIZATION AUTHORIZATION TO PROCEED WITH REQUEST: PRE PREPARED IN FADS BY: ROBERTS, BRUCE ON 2020-12-02 651-1262 FOR: REVIEWED IN FADS BY: ROBERTS. BRUCE ON 2020-12-02 651-1252 DOCUMENT TYPE: AAGR SUBMITTED IN FADS BY: ROBERTS. BRUCE ON 202(12-02 FOR CALTRANS PROCESSED IN FADS BY; SIGNATURE, NOT REQUIRED ON 2020.12.02 FOR FHWA E-76 AUTHORIZED DATE IN FMIS BY: GRACE REGIDOR ON 2020-12-11 11:51:15.0 Note: Local Agency funding is a portion of the total obligation STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION Exhibit E Fed Xing ID: 745352P CPUC ID: 001E-247.15 / SLO-1022 FHWA-1273 (12 pages) REQUIRED CONTRACT PROVISIONS FEDERAL -AID CONSTRUCTION CONTRACTS I. General II. Nondiscrimination III. Nonsegregated Facilities IV. Davis -Bacon and Related Act Provisions V. Contract Work Hours and Safety Standards Act Provisions VI. Subletting or Assigning the Contract VI 1. Safety: Accident Prevention VIII. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water Pollution Control Act X. Compliance with Governmentwide Suspension and Debarment Requirements XI. Certification Regarding Use of Contract Funds for Lobbying ATTACHMENTS A. Employment and Materials Preference for Appalachian Development Highway System or Appalachian Local Access Road Contracts (included in Appalachian contracts only) I. GENERAL 1. Form FHWA-1273 must be physically incorporated in each construction contract funded under Title 23 (excluding emergency contracts solely intended for debris removal). The contractor (or subcontractor) must insert this form in each subcontract and further require its inclusion in all lower tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services). The applicable requirements of Form FHWA-1273 are incorporated by reference for work done under any purchase order, rental agreement or agreement for other services. The prime contractor shall be responsible for compliance by any subcontractor, lower -tier subcontractor or service provider. Form FHWA-1273 must be included in all Federal -aid design - build contracts, in all subcontracts and in lower tier subcontracts (excluding subcontracts for design services, purchase orders, rental agreements and other agreements for supplies or services). The design -builder shall be responsible for compliance by any subcontractor, lower -tier subcontractor or service provider. Contracting agencies may reference Form FHWA-1273 in bid proposal or request for proposal documents, however, the Form FHWA-1273 must be physically incorporated (not referenced) in all contracts, subcontracts and lower -tier subcontracts (excluding purchase orders, rental agreements and other agreements for supplies or services related to a construction contract). 2. Subject to the applicability criteria noted in the following sections, these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework, station work, or by subcontract. Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 FHWA-1273 -- Revised May 1, 2012 3. A breach of any of the stipulations contained in these Required Contract Provisions may be sufficient grounds for withholding of progress payments, withholding of final payment, termination of the contract, suspension /debarment or any other action determined to be appropriate by the contracting agency and FHWA. 4. Selection of Labor: During the performance of this contract, the contractor shall not use convict labor for any purpose within the limits of a construction project on a Federal -aid highway unless it is labor performed by convicts who are on parole, supervised release, or probation. The term Federal -aid highway does not include roadways functionally classified as local roads or rural minor collectors. II. NONDISCRIMINATION The provisions of this section related to 23 CFR Part 230 are applicable to all Federal -aid construction contracts and to all related construction subcontracts of $10,000 or more. The provisions of 23 CFR Part 230 are not applicable to material supply, engineering, or architectural service contracts. In addition, the contractor and all subcontractors must comply with the following policies: Executive Order 11246, 41 CFR 60, 29 CFR 1625-1627, Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27, and 23 CFR Parts 200, 230, and 633. The contractor and all subcontractors must comply with: the requirements of the Equal Opportunity Clause in 41 CFR 60- 1.4(b) and, for all construction contracts exceeding $10,000, the Standard Federal Equal Employment Opportunity Construction Contract Specifications in 41 CFR 60-4.3. Note: The U.S. Department of Labor has exclusive authorityto determine compliance with Executive Order 11246 and the policies of the Secretary of Labor including 41 CFR 60, and 29 CFR 1625-1627. The contracting agency and the FHWA have the authority and the responsibility to ensure compliance with Title 23 USC Section 140, the Rehabilitation Act of 1973, as amended (29 USC 794), and Title VI of the Civil Rights Act of 1964, as amended, and related regulations including 49 CFR Parts 21, 26 and 27, and 23 CFR Parts 200, 230, and 633. The following provision is adopted from 23 CFR 230, Appendix A, with appropriate revisions to conform to the U.S. Department of Labor (US DOL) and FHWA requirements. 1. Equal Employment Opportunity: Equal employment opportunity (EEO) requirements not to discriminate and to take affirmative action to assure equal opportunity as set forth under laws, executive orders, rules, regulations (28 CFR 35, 29 CFR 1630, 29 CFR 1625-1627, 41 CFR 60 and 49 CFR 27) and orders of the Secretary of Labor as modified by the provisions prescribed herein, and imposed pursuant to 23 U.S.C. 140 shall constitute the EEO and specific affirmative action standards for the contractor's project activities under STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION this contract. The provisions of the Americans with Disabilities Act of 1990 (42 U.S.C. 12101 et seq.) set forth under 28 CFR 35 and 29 CFR 1630 are incorporated by reference in this contract. In the execution of this contract, the contractor agrees to comply with the following minimum specific requirement activities of EEO: a. The contractor will work with the contracting agency and the Federal Government to ensure that it has made every good faith effort to provide equal opportunity with respect to all of its terms and conditions of employment and in their review of activities under the contract. b. The contractor will accept as its operating policy the following statement: "It is the policy of this Company to assure that applicants are employed, and that employees are treated during employment, without regard to their race, religion, sex, color, national origin, age or disability. Such action shall include: employment, upgrading, demotion, or transfer, recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation, and selection for training, including apprenticeship, pre -apprenticeship, and/or on-the- job training." 2. EEO Officer: The contractor will designate and make known to the contracting officers an EEO Officer who will have the responsibility for and must be capable of effectively administering and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so. 3. Dissemination of Policy: All members of the contractor's staff who are authorized to hire, supervise, promote, and discharge employees, or who recommend such action, or who are substantially involved in such action, will be made fully cognizant of, and will implement, the contractor's EEO policy and contractual responsibilities to provide EEO in each grade and classification of employment. To ensure that the above agreement will be met, the following actions will be taken as a minimum: a. Periodic meetings of supervisory and personnel office employees will be conducted before the start of work and then not less often than once every six months, at which time the contractor's EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer. b. All new supervisory or personnel office employees will be given a thorough indoctrination by the EEO Officer, covering all major aspects of the contractor's EEO obligations within thirty days following their reporting for duty with the contractor. c. All personnel who are engaged in direct recruitment for the project will be instructed by the EEO Officer in the contractor's procedures for locating and hiring minorities and women. d. Notices and posters setting forth the contractor's EEO policy will be placed in areas readily accessible to employees, applicants for employment and potential employees. e. The contractor's EEO policy and the procedures to implement such policy will be brought to the attention of employees by means of meetings, employee handbooks, or other appropriate means. Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 4. Recruitment: When advertising for employees, the contractor will include in all advertisements for employees the notation: "An Equal Opportunity Employer." All such advertisements will be placed in publications having a large circulation among minorities and women in the area from which the project work force would normally be derived. a. The contractor will, unless precluded by a valid bargaining agreement, conduct systematic and direct recruitment through public and private employee referral sources likely to yield qualified minorities and women. To meet this requirement, the contractor will identify sources of potential minority group employees, and establish with such identified sources procedures whereby minority and women applicants may be referred to the contractor for employment consideration. b. In the event the contractor has a valid bargaining agreement providing for exclusive hiring hall referrals, the contractor is expected to observe the provisions of that agreement to the extent that the system meets the contractor's compliance with EEO contract provisions. Where implementation of such an agreement has the effect of discriminating against minorities or women, or obligates the contractor to do the same, such implementation violates Federal nondiscrimination provisions. c. The contractor will encourage its present employees to refer minorities and women as applicants for employment. Information and procedures with regard to referring such applicants will be discussed with employees. 5. Personnel Actions: Wages, working conditions, and employee benefits shall be established and administered, and personnel actions of every type, including hiring, upgrading, promotion, transfer, demotion, layoff, and termination, shall be taken without regard to race, color, religion, sex, national origin, age or disability. The following procedures shall be followed: a. The contractor will conduct periodic inspections of project sites to insure that working conditions and employee facilities do not indicate discriminatory treatment of project site personnel. b. The contractor will periodically evaluate the spread of wages paid within each classification to determine any evidence of discriminatory wage practices. c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. Where evidence is found, the contractor will promptly take corrective action. If the review indicates that the discrimination may extend beyond the actions reviewed, such corrective action shall include all affected persons. d. The contractor will promptly investigate all complaints of alleged discrimination made to the contractor in connection with its obligations under this contract, will attempt to resolve such complaints, and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant, such corrective action shall include such other persons. Upon completion of each investigation, the contractor will inform every complainant of all of their avenues of appeal. 6. Training and Promotion: a. The contractor will assist in locating, qualifying, and increasing the skills of minorities and women who are STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION applicants for employment or current employees. Such efforts should be aimed at developing full journey level status employees in the type of trade orjob classification involved. b. Consistent with the contractor's work force requirements and as permissible under Federal and State regulations, the contractor shall make full use of training programs, i.e., apprenticeship, and on-the-job training programs for the geographical area of contract performance. In the event a special provision for training is provided under this contract, this subparagraph will be superseded as indicated in the special provision. The contracting agency may reserve training positions for persons who receive welfare assistance in accordance with 23 U.S.C. 140(a). c. The contractor will advise employees and applicants for employment of available training programs and entrance requirements for each. d. The contractor will periodically review the training and promotion potential of employees who are minorities and women and will encourage eligible employees to apply for such training and promotion. 7. Unions: Ifthe contractor relies in whole or in part upon unions as a source of employees, the contractorwill use good faith efforts to obtain the cooperation of such unions to increase opportunities for minorities and women. Actions by the contractor, either directly or through a contractor's association acting as agent, will include the procedures set forth below: a. The contractor will use good faith efforts to develop, in cooperation with the unions, joint training programs aimed toward qualifying more minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying employment. b. The contractor will use good faith efforts to incorporate an EEO clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race, color, religion, sex, national origin, age or disability. c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information is within the exclusive possession of the labor union and such labor union refuses to furnish such information to the contractor, the contractor shall so certify to the contracting agency and shall set forth what efforts have been made to obtain such information. d. In the event the union is unable to provide the contractor with a reasonable flow of referrals within the time limit set forth in the collective bargaining agreement, the contractor will, through independent recruitment efforts, fill the employment vacancies without regard to race, color, religion, sex, national origin, age or disability, making full efforts to obtain qualified and/or qualifiable minorities and women. The failure of a union to provide sufficient referrals (even though it is obligated to provide exclusive referrals under the terms of a collective bargaining agreement) does not relieve the contractor from the requirements of this paragraph. In the event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246, as amended, and these special provisions, such contractor shall immediately notify the contracting agency. 8. Reasonable Accommodation for Applicants Employees with Disabilities: The contractor must be familiar Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 with the requirements for and comply with the Americans with Disabilities Act and all rules and regulations established there under. Employers must provide reasonable accommodation in all employment activities unless to do so would cause an undue hardship. 9. Selection of Subcontractors, Procurement of Materials and Leasing of Equipment: The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract. a. The contractor shall notify all potential subcontractors and suppliers and lessors of their EEO obligations under this contract. b. The contractor will use good faith efforts to ensure subcontractor compliance with their EEO obligations. 10. Assurance Required by49 CFR 26.13(b): a. The requirements of 49 CFR Part 26 and the State DOT's U.S. DOT -approved DBE program are incorporated by reference. b. The contractor or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR Part 26 in the award and administration of DOT -assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the contracting agency deems appropriate. 11. Records and Reports: The contractor shall keep such records as necessary to document compliance with the EEO requirements. Such records shall be retained for a period of three years following the date of the final payment to the contractor for all contract work and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the FHWA. a. The records kept by the contractor shall document the following: (1) The number and work hours of minority and non - minority group members and women employed in each work classification on the project, (2) The progress and efforts being made in cooperation with unions, when applicable, to increase employment opportunities for minorities and women, and (3) The progress and efforts being made in locating, hiring, training, qualifying, and upgrading minorities and women; b. The contractors and subcontractors will submit an annual report to the contracting agency each July for the duration of the project, indicating the number of minority, women, and non -minority group employees currently engaged in each work classification required by the contract work. This information is to be reported on Form FHWA-1391. The staffing data should represent the project work force on board in all or any part of the last payroll period preceding the end of July. If on-the-job training is being required by special provision, the contractor STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION will be required to collect and report training data. The employment data should reflect the work force on board during all or any part of the last payroll period preceding the end of July. III. NONSEGREGATED FACILITIES This provision is applicable to all Federal -aid construction contracts and to all related construction subcontracts of $10,000 or more. The contractor must ensure that facilities provided for employees are provided in such a manner that segregation on the basis of race, color, religion, sex, or national origin cannot result. The contractor may neither require such segregated use by written or oral policies nor tolerate such use by employee custom. The contractor's obligation extends further to ensure that its employees are not assigned to perform their services at any location, under the contractor's control, where the facilities are segregated. The term "facilities" includes waiting rooms, work areas, restaurants and other eating areas, time clocks, restrooms, washrooms, locker rooms, and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing provided for employees. The contractor shall provide separate or single -user restrooms and necessary dressing or sleeping areas to assure privacy between sexes. IV. DAVIS-BACON AND RELATED ACT PROVISIONS This section is applicable to all Federal -aid construction projects exceeding $2,000 and to all related subcontracts and lower -tier subcontracts (regardless of subcontract size). The requirements apply to all projects located within the right-of- way of a roadway that is functionally classified as Federal -aid highway. This excludes roadways functionally classified as local roads or rural minor collectors, which are exempt. Contracting agencies may elect to apply these requirements to other projects. The following provisions are from the U.S. Department of Labor regulations in 29 CFR 5.5 "Contract provisions and related matters" with minor revisions to conform to the FHWA- 1273 format and FHWA program requirements. 1. Minimum wages a. All laborers and mechanics employed or working upon the site of the work, will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis -Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 of paragraph 1.d. of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under paragraph 1.b. of this section) and the Davis -Bacon poster (WH-1321) shall be posted at all times by the contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. b.(1) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: (i) The work to be performed by the classification requested is not performed by a classification in the wage determination: and (ii) The classification is utilized in the area by the construction industry; and (iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (2) If the contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (3) In the event the contractor, the laborers or mechanics to be employed in the classification or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation ofthe contracting officer, to the Wage and Hour Administrator for determination. The Wage and Hour Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION will notify the contracting officer within the 30-day period that additional time is necessary. (4) The wage rate (including fringe benefits where appropriate) determined pursuant to paragraphs 1.b.(2) or 1.b.(3) of this section, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. c. Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. d. If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the contractor, that the applicable standards of the Davis -Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2. Withholding The contracting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the contractor under this contract, or any other Federal contract with the same prime contractor, or any other federally - assisted contract subject to Davis -Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the contracting agency may, after written notice to the contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3. Payrolls and basic records a. Payrolls and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis -Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis - Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. b.(1) The contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the contracting agency. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee e.g. , the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Division Web site at http:/Mww.dol.gov/esa/whd/forms/wh347instr.htm or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the contracting agency for transmission to the State DOT, the FHWA or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the contracting agency.. (2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (i) That the payroll for the payroll period contains the information required to be provided under §5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under §5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete, (ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3; (iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION (3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph 3.b.(2) o this section. (4) The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 231 of title 31 of the United States Code. c. The contractor or subcontractor shall make the records required under paragraph 3.a. of this section available for inspection, copying, or transcription by authorized representatives of the contracting agency, the State DOT, the FHWA, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the FHWA may, after written notice to the contractor, the contracting agency or the State DOT, take such action as maybe necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. 4. Apprentices and trainees a. Apprentices (programs of the USDOL). Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices tojourneymen on the job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. b. Trainees (programs of the USDOL). Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage ofthe journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. c. Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION d. Apprentices and Trainees (programs ofthe U.S. DOT). Apprentices and trainees working under apprenticeship and skill training programs which have been certified by the Secretary of Transportation as promoting EEO in connection with Federal -aid highway construction programs are not subject to the requirements of paragraph 4 ofthis Section IV. The straight time hourly wage rates for apprentices and trainees under such programs will be established by the particular programs. The ratio of apprentices and trainees to journeymen shall not be greater than permitted by the terms of the particular program. 5. Compliance with Copeland Act requirements. The contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this contract. 6. Subcontracts. The contractor or subcontractor shall insert Form FHWA-1273 in any subcontracts and also require the subcontractors to include Form FHWA-1273 in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR 5.5. 7. Contract termination: debarment. A breach of the contract clauses in 29 CFR 5.5 may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR 5.12. 8. Compliance with Davis -Bacon and Related Act requirements. All rulings and interpretations of the Davis - Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this contract. 9. Disputes concerning labor standards. Disputes arising out ofthe labor standards provisions ofthis contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning ofthis clause include disputes between the contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. 10. Certification of eligibility. a. By entering into this contract, the contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). b. No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis -Bacon Act or 29 CFR 5.12(a)(1). c. The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 V. CONTRACT WORK HOURS AND SAFETY STANDARDS ACT The following clauses apply to any Federal -aid construction contract in an amount in excess of $100,000 and subject to the overtime provisions of the Contract Work Hours and Safety Standards Act. These clauses shall be inserted in addition to the clauses required by 29 CFR 5.5(a) or 29 CFR 4.6. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. 1. Overtime requirements. No contractor or subcontractor contracting for any part ofthe contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in paragraph (1.) of this section, the contractor and any subcontractor responsible therefor shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1.) ofthis section, in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1.) of this section. 3. Withholding for unpaid wages and liquidated damages. The FHWA or the contacting agency shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally -assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2.) of this section. 4. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraph (1.) through (4.) ofthis section and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1.) through (4.) ofthis section. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION VI. SUBLETTING OR ASSIGNING THE CONTRACT This provision is applicable to all Federal -aid construction contracts on the National Highway System. 1. The contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price, excluding any specialty items designated by the contracting agency. Specialty items maybe performed by subcontract and the amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of work required to be performed by the contractor's own organization (23 CFR 635.116). a. The term "perform work with its own organization" refers to workers employed or leased by the prime contractor, and equipment owned or rented by the prime contractor, with or without operators. Such term does not include employees or equipment of a subcontractor or lower tier subcontractor, agents of the prime contractor, or any other assignees. The term may include payments for the costs of hiring leased employees from an employee leasing firm meeting all relevant Federal and State regulatory requirements. Leased employees may only be included in this term if the prime contractor meets all of the following conditions: (1) the prime contractor maintains control over the supervision ofthe day-to-day activities ofthe leased employees; (2) the prime contractor remains responsible for the quality of the work of the leased employees; (3) the prime contractor retains all power to accept or exclude individual employees from work on the project, and (4) the prime contractor remains ultimately responsible for the payment of predetermined minimum wages, the submission of payrolls, statements of compliance and all other Federal regulatory requirements. b. "Specialty Items" shall be construed to be limited to work that requires highly specialized knowledge, abilities, or equipment not ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in general are to be limited to minor components ofthe overall contract. 2. The contract amount upon which the requirements set forth in paragraph (1) of Section VI is computed includes the cost of material and manufactured products which are to be purchased or produced by the contractor under the contract provisions. 3. The contractor shall furnish (a) a competent superintendent or supervisor who is employed by the firm, has full authority to direct performance ofthe work in accordance with the contract requirements, and is in charge of all construction operations (regardless of who performs the work) and (b) such other of its own organizational resources (supervision, management, and engineering services) as the contracting officer determines is necessary to assure the performance of the contract. 4. No portion of the contract shall be sublet, assigned or otherwise disposed of except with the written consent of the contracting officer, or authorized representative, and such consent when given shall not be construed to relieve the contractor of any responsibility for the fulfillment ofthe contract. Written consent will be given only after the contracting agency has assured that each subcontract is Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 evidenced in writing and that it contains all pertinent provisions and requirements ofthe prime contract. 5. The 30% self -performance requirement of paragraph (1) is not applicable to design -build contracts; however, contracting agencies may establish their own self -performance requirements. VII. SAFETY: ACCIDENT PREVEN110N T h I s p r o v I s I o n I s applicable to all Federal -aid construction contracts and to all related subcontracts. 1. In the performance of this contract the contractor shall comply with all applicable Federal, State, and local laws governing safety, health, and sanitation (23 CFR 635). The contractor shall provide all safeguards, safety devices and protective equipment and take any other needed actions as it determines, or as the contracting officer may determine, to be reasonably necessary to protect the life and health of employees on the job and the safety of the public and to protect property in connection with the performance ofthe work covered by the contract. 2. It is a condition of this contract, and shall be made a condition of each subcontract, which the contractor enters into pursuant to this contract, that the contractor and any subcontractor shall not permit any employee, in performance of the contract, to work in surroundings or under conditions which are unsanitary, hazardous or dangerous to his/her health or safety, as determined under construction safety and health standards (29 CFR 1926) promulgated by the Secretary of Labor, in accordance with Section 107 ofthe Contract Work Hours and Safety Standards Act (40 U.S.C. 3704). 3. Pursuant to 29 CFR 1926.3, it is a condition of this contract that the Secretary of Labor or authorized representative thereof, shall have right of entry to any site of contract performance to inspect or investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under Section 107 ofthe Contract Work Hours and Safety Standards Act (40 U.S.C.3704). Vill. FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS T h i s p r o v i s i o n i s applicable to all Federal -aid construction contracts and to all related subcontracts. In order to assure high quality and durable construction in conformity with approved plans and specifications and a high degree of reliability on statements and representations made by engineers, contractors, suppliers, and workers on Federal - aid highway projects, it is essential that all persons concerned with the project perform their functions as carefully, thoroughly, and honestly as possible. Willful falsification, distortion, or misrepresentation with respect to any facts related to the project is a violation of Federal law. To prevent any misunderstanding regarding the seriousness ofthese and similar acts, Form FHWA-1022 shall be posted on each Federal -aid highway project (23 CFR 635) in one or more places where it is readily available to all persons concerned with the project: 18 U.S.C. 1020 reads as follows: STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION 'Whoever, being an officer, agent, or employee of the United States, or of any State or Territory, or whoever, whether a person, association, firm, or corporation, knowingly makes any false statement, false representation, or false report as to the character, quality, quantity, or cost of the material used or to be used, or the quantity or quality of the work performed or to be performed, or the cost thereof in connection with the submission of plans, maps, specifications, contracts, or costs of construction on any highway or related project submitted for approval to the Secretary of Transportation, or Whoever knowingly makes any false statement, false representation, false report or false claim with respect to the character, quality, quantity, or cost of any work performed or to be performed, or materials furnished or to be furnished, in connection with the construction of any highway or related project approved by the Secretary of Transportation; or Whoever knowingly makes any false statement or false representation as to material fact in any statement, certificate, or report submitted pursuant to provisions of the Federal -aid Roads Act approved July 1, 1916, (39 Stat. 355), as amended and supplemented; Shall be fined under this title or imprisoned not more than 5 years or both." IX. IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL WATER POLLUTION CONTROL ACT This provision is applicable to all Federal -aid construction contracts and to all related subcontracts. By submission oft his bid/proposal or the execution oft his contract, or subcontract, as appropriate, the bidder, proposer, Federal -aid construction contractor, or subcontractor, as appropriate, will be deemed to have stipulated as follows: 1. That any person who is or will be utilized in the performance of this contract is not prohibited from receiving an award due to a violation of Section 508 of the Clean Water Act or Section 306 of the Clean Air Act. 2. That the contractor agrees to include or cause to be included the requirements of paragraph (1) of this Section X in every subcontract, and further agrees to take such action as the contracting agency may direct as a means of enforcing such requirements. X. CERTIFICATION REGARDING DEBARMENT, SUSPENSION, INELIGIBILITY AND VOLUNTARY EXCLUSION This provision is applicable to all Federal -aid construction contracts, design -build contracts, subcontracts, lower -tier subcontracts, purchase orders, lease agreements, consultant contracts or any other covered transaction requiring FHWA approval or that is estimated to cost $25,000 or more — as defined in 2 CFR Parts 180 and 1200. 1. Instructions for Certification — First Tier Participants: a. By signing and submitting this proposal, the prospective first tier participant is providing the certification set out below. b. The inability of a person to provide the certification set out below will not necessarily result in denial of participation in this Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 covered transaction. The prospective first tier participant shall submit an explanation of why it cannot provide the certification set out below. The certification or explanation will be considered in connection with the department or agency's determination whether to enter into this transaction. However, failure of the prospective first tier participant to furnish a certification or an explanation shall disqualify such a person from participation in this transaction. c. The certification in this clause is a material representation of fact upon which reliance was placed when the contracting agency determined to enter into this transaction. If it is later determined that the prospective participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the contracting agency may terminate this transaction for cause of default. d. The prospective first tier participant shall provide immediate written notice to the contracting agency to whom this proposal is submitted if anytime the prospective first tier participant learns that its certification was erroneous when submitted or has become erroneous by reason of changed circumstances. e. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. "First Tier Covered Transactions" refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). f. The prospective first tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency entering into this transaction. g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transactions," provided by the department or contracting agency, entering into this covered transaction, without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. h. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (httos://www.eols.aov�, which is compiled by the General Services Administration. STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION i. Nothing contained in the foregoing shall be construed to require the establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of the prospective participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. j. Except for transactions authorized under paragraph (f) of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the department or agency may terminate this transaction for cause or default. 2. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion — First Tier Participants: a. The prospective first tier participant certifies to the best of its knowledge and belief, that it and its principals: (1) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency; (2) Have not within a three-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction, violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery, falsification or destruction of records, making false statements, or receiving stolen property; (3) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (a)(2) of this certification; and (4) Have not within a three-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. b. Where the prospective participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. 2. Instructions for Certification - Lower Tier Participants: (Applicable to all subcontracts, purchase orders and other lower tier transactions requiring prior FHWA approval or estimated to cost $25,000 or more - 2 CFR Parts 180 and 1200) a. By signing and submitting this proposal, the prospective lower tier is providing the certification set out below. b. The certification in this clause is a material representation of fact upon which reliance was placed when this transaction was entered into. If it is later determined that the prospective lower tier participant knowingly rendered an erroneous certification, in addition to other remedies available to the Federal Government, the department, or agency with which Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 this transaction originated may pursue available remedies, including suspension and/or debarment. c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its certification was erroneous by reason of changed circumstances. d. The terms "covered transaction," "debarred," "suspended," "ineligible," "participant," "person," "principal," and "voluntarily excluded," as used in this clause, are defined in 2 CFR Parts 180 and 1200. You may contact the person to which this proposal is submitted for assistance in obtaining a copy of those regulations. "First Tier Covered Transactions" refers to any covered transaction between a grantee or subgrantee of Federal funds and a participant (such as the prime or general contract). "Lower Tier Covered Transactions" refers to any covered transaction under a First Tier Covered Transaction (such as subcontracts). "First Tier Participant" refers to the participant who has entered into a covered transaction with a grantee or subgrantee of Federal funds (such as the prime or general contractor). "Lower Tier Participant" refers any participant who has entered into a covered transaction with a First Tier Participant or other Lower Tier Participants (such as subcontractors and suppliers). e. The prospective lower tier participant agrees by submitting this proposal that, should the proposed covered transaction be entered into, it shall not knowingly enter into any lower tier covered transaction with a person who is debarred, suspended, declared ineligible, or voluntarily excluded from participation in this covered transaction, unless authorized by the department or agency with which this transaction originated. f. The prospective lower tier participant further agrees by submitting this proposal that it will include this clause titled "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion -Lower Tier Covered Transaction," without modification, in all lower tier covered transactions and in all solicitations for lower tier covered transactions exceeding the $25,000 threshold. g. A participant in a covered transaction may rely upon a certification of a prospective participant in a lower tier covered transaction that is not debarred, suspended, ineligible, or voluntarily excluded from the covered transaction, unless it knows that the certification is erroneous. A participant is responsible for ensuring that its principals are not suspended, debarred, or otherwise ineligible to participate in covered transactions. To verify the eligibility of its principals, as well as the eligibility of any lower tier prospective participants, each participant may, but is not required to, check the Excluded Parties List System website (httos:L4mww.eols.aov!), which is compiled by the General Services Administration. h. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render in good faith the certification required by this clause. The knowledge and information of participant is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. i. Except for transactions authorized under paragraph a of these instructions, if a participant in a covered transaction knowingly enters into a lower tier covered transaction with a person who is suspended, debarred, ineligible, or voluntarily excluded from participation in this transaction, in addition to other remedies available to the Federal Government, the STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION department or agency with which this transaction originated may pursue available remedies, including suspension and/or debarment. Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion --Lower Tier Participants: 1. The prospective lower tier participant certifies, by submission of this proposal, that neither it nor its principals is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participating in covered transactions by any Federal department or agency. 2. Where the prospective lower tier participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. XI. CERTIFICATION REGARDING USE OF CONTRACT FUNDS FOR LOBBYING This provision is applicable to all Federal -aid construction contracts and to all related subcontracts which exceed $100,000 (49 CFR 20). 1. The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: a. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. 2. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 3. The prospective participant also agrees by submitting its bid or proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such recipients shall certify and disclose accordingly. Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION ATTACHM ENT A - EM PLOYM ENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS This provision is applicable to all Federal -aid projects funded under the Appalachian Regional Development Act of 1965. 1. During the performance of this contract, the contractor undertaking to do work which is, or reasonably may be, done as on -site work, shall give preference to qualified persons who regularly reside in the labor area as designated by the DOL wherein the contract work is situated, or the subregion, or the Appalachian counties of the State wherein the contract work is situated, except: a. To the extent that qualified persons regularly residing in the area are not available. b. For the reasonable needs of the contractor to employ supervisory or specially experienced personnel necessary to assure an efficient execution of the contract work. c. For the obligation of the contractor to offer employment to present or former employees as the result of a lawful collective bargaining contract, provided that the number of nonresident persons employed under this subparagraph (1c) shall not exceed 20 percent of the total number of employees employed by the contractor on the contract work, except as provided in subparagraph (4) below. 2. The contractor shall place a job order with the State Employment Service indicating (a) the classifications of the laborers, mechanics and other employees required to perform the contract work, (b) the number of employees required in each classification, (c) the date on which the participant estimates such employees will be required, and (d) any other pertinent information required by the State Employment Service to complete the job order form. The job order may be placed with the State Employment Service in writing or by telephone. If during the course of the contract work, the information submitted by the contractor in the original job order is substantially modified, the participant shall promptly notify the State Employment Service. 3. The contractor shall give full consideration to all qualified job applicants referred to him by the State Employment Service. The contractor is not required to grant employment to any job applicants who, in his opinion, are not qualified to perform the classification of work required. 4. If, within one week following the placing of a job order by the contractor with the State Employment Service, the State Employment Service is unable to refer any qualified job applicants to the contractor, or less than the number requested, the State Employment Service will forward a certificate to the contractor indicating the unavailability of applicants. Such certificate shall be made a part ofthe contractor's permanent project records. Upon receipt of this certificate, the contractor may employ persons who do not normally reside in the labor area to fill positions covered by the certificate, notwithstanding the provisions of subparagraph (1 c) above. 5. The provisions of 23 CFR 633.207(e) allow the contracting agency to provide a contractual preference for the use of mineral resource materials native to the Appalachian region. Agency: San Luis Obispo Project: Foothill Blvd Sheet 1 of 24 December 11, 2020 6. The contractor shall include the provisions of Sections 1 through 4 of this Attachment A in every subcontract for work which is, or reasonably may be, done as on -site work.