HomeMy WebLinkAbout05-25-2021 Subdivision Agreement Tract 3140 (1137 Peach St.)DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C SUBDIVISION AGREEMENT - TRACT 3140 THIS AGREEMENT is dated this day of `;'/ 202 I by and between GOSLO, LLC, a California limited liability company, herein referred to as "Subdivider," and the CITY OF SAN LUIS OBISPO, herein referred to as the "City." RECITALS REFERENCE IS HEREBY MADE to that certain proposed subdivision of real property in the City of San Luis Obispo, County of San Luis Obispo, State of California, a description of which is shown on the Final Map of Tract 3140, City of San Luis Obispo, California, as approved by the City Council on the day of , 202 The Subdivider desires that said Tract No. 3140 be accepted and approved as a Final Map pursuant to the Subdivision Regulations of the City of San Luis Obispo (Title 16 of the San Luis Obispo Municipal Code), and It is a condition of said regulations that the Subdivider agree to install the improvements as set forth on the plans therefore. TERMS AND CONDITIONS: In consideration of the foregoing, the Subdivider does hereby agree to construct and install the following subdivision improvements in accordance with said subdivision regulations, and in accordance with approved plans and specifications on file in the office of the City Engineer, City of San Luis Obispo, to wit: CURB, GUTTERS AND SIDEWALKS 2. STREET BASE AND SURFACING 3. WATER MAINS and SEWER MAINS, including sewer laterals to the property line and water services to the curb stop. DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C 4. LANDSCAPING 5. DRAINAGE STRUCTURES 6. ELECTRIC, GAS, TELEPHONE AND CABLE TELEVISION: In addition to the inspection and approval of such facilities by the City, each public utility shall be required to file a letter stating that the developer has properly installed all facilities to be provided by him, and that the said utility is prepared to provide service to residents upon request. 7. ANY & ALL OTHER IMPROVEMENTS shown on plans or required by project approvals. All of the above facilities shall be installed in the locations designated and to the plans and specifications on file and approved by said City. The lines and grades for all of said improvements shall be established by the Subdivider in accordance with said approved plans and specifications. The Subdivider agrees that the work of installing the above improvements shall begin within thirty (30) days from the date of recording of the final map, and that the work shall be completed within twelve (12) months of said recording date, unless an extension has been granted by the City, provided that if completion of said work is delayed by acts of God or labor disputes resulting in strike action, the Subdivider shall have an additional period of time equivalent to such period of delay in which to complete such work. Any extension of time hereunder shall not operate to release the surety on the Improvement Security filed pursuant to this agreement. In this connection, the surety waives the provisions of Section 2819 of the Civil Code of the State of California. No building permits will be issued nor occupancy granted after the expiration date of the agreement until completion and acceptance of all subdivision improvements unless specifically approved by the City. 2 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C The Subdivider does also agree to comply with the conditions established by the City Council and has paid the necessary fees as indicated on the attached Exhibits 1 and 2. The restoration of lost section corners and retracement of section lines within the Subdivision shall be in accordance with Article 5, paragraph 8771 et seq., of the Professional Land Surveyors Act, Chapter 15 of the Business and Professions Code of the State of California. The Subdivider attaches hereto, as an integral part hereof, and as security for the performance of this agreement, an instrument of credit or bond approved by and in favor of the City of San Luis Obispo, and conditional upon the faithful performance of this agreement. Said instrument of credit or bond is in the amount of $500,300 shown in Exhibit 2, which is the amount of the estimated cost of said improvements. Subdivider agrees to remedy any defects in the improvements arising from faulty workmanship or materials or defective construction of said improvements occurring within twelve (12) months after acceptance thereof. In accordance with Sections 66499.7 and 66499.9 of the Government Code of the State of California, upon final completion and acceptance of the work, City will release all but 10% of the improvement security, that amount being deemed sufficient to guarantee faithful performance by the Subdivider of his obligation to remedy any defects in the improvements arising within a period of one year following the completion and acceptance thereof. Completion of the work shall be deemed to have occurred on the date which the City Council shall, by resolution duly passed and adopted, accept said improvements according to said plans and specifications, and any approved modifications thereto. 3 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C Neither periodic nor progress inspections or approvals shall bind the City to accept said improvements or waive any defects in the same or any breach of this agreement. "AS -BUILT" record drawings are to be submitted within four weeks of completion of construction and prior to City acceptance of the public improvements. If the Subdivider fails to complete the work within the prescribed time, the Subdivider agrees that City may, at its option, declare the instrument of credit or bond which has been posted by Subdivider to guarantee faithful performance, forfeited and utilize the proceeds to complete said improvements, or city may complete said improvements and recover the full cost and expense thereof from the Subdivider or his surety. The Subdivider has deposited with the City a labor and materials surety in the amount of 50% ($250,150) of the above described subdivision improvements in accordance with State law. Said Subdivider shall pay an inspection fee for City to inspect the installation of said subdivision improvements, and to verify that they have been completed in accordance with the plans and specifications. If off -site dedication of property is necessary to facilitate the construction of the required subdivision improvements, the subdivider shall exhaust all avenues available to acquire said off -site dedication. In the event the subdivider is unable to acquire said property, the City may lend the subdivider its powers of condemnation to acquire the off -site dedication, including any necessary construction, slope, and drainage easements. The Subdivider shall pay for all costs incurred by the City to acquire the off -site dedication, including, but not limited to, all costs associated with condemnation M DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C through the condemnation process. Prior to proceeding with the condemnation process, the Subdivider shall deposit with the City all or a portion of the anticipated costs, as determined by the City Attorney, of the condemnation proceedings. The City does not and cannot guarantee that the necessary property rights can be acquired or will, in fact, be acquired. All necessary procedures of law would apply and would have to be followed. Title 16 of the San Luis Obispo Municipal Code, entitled "Subdivision," all plans and specifications on file with said City as a part of said Subdivision Map, and all other documents filed with the City by the Subdivider and approved by the City are hereby referred to for further particulars in interpreting and defining the obligations of the Subdivider under this agreement. Pursuant to Government Code Section 66474.9(b), the subdivider shall defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this subdivision, and all actions relating thereto, including but not limited to environmental review ("Indemnified Claims"). The City shall promptly notify the subdivider of any Indemnified Claim upon being presented with the Indemnified Claim and City shall fully cooperate in the defense against an Indemnified Claim. It is understood and agreed by and between the Subdivider and the City hereto that this agreement shall bind the heirs, executors, administrators, successors and assigns of the respective Parties to this agreement. It is agreed that the Subdivider will furnish copies of the successful bidder's contract unit prices and total bid prices for all of the improvements herein referred to. 5 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C IN WITNESS WHEREOF, this agreement has been executed by: CITY OF SAN LUIS OBISPO SUBDIVIDER GOSLO _LLC a %,na limited lia -ility company MAYOR Heidi Harmon ,�—�� ATTEST: CITY CLERK Teresa Purrington APPROVED AS TO FORM: CITY ATTORNEY Christine Dietrick , Manager �x,S� �.•�..�-� See Attached Notary Acknowledgment Certificate 7 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity ofthe individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of_n U J} On before me, f, Date I o t Here ,Insert Name ar6Title of the Officer personally appeared Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the personN whose name(4) is/atesubscribed to the within instrument and acknowledged to me that he/sZe/ttli�y-executed the same in his/1Tr/thnIF authorized capacity(l9k, and that by his/IXr/tA r signature(* on the instrument the person( -I, or the entity upon behalf of which the person(A) acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. T. COX < NryotaPublic -California WITNESS my hand and official seal. San Lu+s Obispo County n Commission x 2265076 0ait; y Coma. Expires Oct 29, 2022 Signature Place Notary Seal and/or Stamp Above Signat re of Notary Public LM A_u-_j. r_„ Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document:L�du1�lCc�i'�� Document Date: -i�:p Number of Pages: 10 + ik Signer(s) Other Than Nameld)Above: �— Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: ©2019 National Notary Association Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: .e, .4b DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C EXHIBIT 1 TRACT 3140 SUBDIVISION AGREEMENT 1. The Subdivider has deposited a monumentation guarantee in the amount of $2,000 to cover the installation of survey monuments in accordance with the approved map and payment for same. Said guarantee will be released to the Subdivider upon receipt by the City of a letter from the Engineer indicating that they have completed the work and have been paid. 2. Park fees shall be paid, as listed in the attached EXHIBIT 2. 3. Public improvement inspection fees shall be paid at time of encroachment permit issuance. 4. Water and sewer impact fees shall be paid at time of building permits through the Community Development Department per the fee schedule in effect at that time. 5. Transportation impact fees shall be paid at time of building permits through the Community Development Department per the fee schedule in effect at that time. 6. The subdivider shall comply with all requirements of Council Resolution 11162 (2020 Series) approving the tentative map. DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C EXHIBIT 2 TRACT 3140 - FEE AND BOND LIST 1137 Peach Street Amount Form Date Received Bond Release Status Bonds and Guarantees: Total Faithful Performance $500,300 Bond xxx Can be released upon City acceptance of improvements and deposit of one-year warranty surety. Labor & Materials (50% of total cost of $250,150 Bond xxx Can be released 90 days after improvements acceptance of improvements, if no claims. Civil Code Section 8412 Monument Guarantee $2,000 CD xxx Can be released upon verification that monuments have been set and surveyor has been paid. 10% Warranty Bond, CD, To be Can be released one-year after Letter of collected prior acceptance of improvements, if no Credit to release of defects. Faithful Performance Bond Fees: Map Check Fee $17,331.98 Check 10/30/20 Paid in full Improvement Plan Check Fee $9,011.40 (Improvement plan check fee calculated from fee schedule, based on cost of $70,000 for driveway apron, sidewalk, water infrastructure, and sewer tie in) Other typical fees to be collected with building permits Ener ov Improvement Inspection Fee $6,455.35 (Improvement Inspection fee calculated (Public) from fee schedule, based on cost of $70,000 for driveway apron, sidewalk, water infrastructure, and sewer tie in) Other typical fees to be collected with building permits ner ov Park Fees' $31,683.53 Check xxx (fee calculated 12/4/20) Affordable Housing Fee $21,875.00 Check xxx No affordable SFR planned (fee calculated 12/2/20) Water Impact Fee' To be collected with building permit Wastewater Impact Fee To be collected with building permit 1 All Impact Fees are adjusted annually (July 1) based on CPI. Credit given for demolished units. DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C Transportation Impact Fee' To be collected with building permit DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C COUNTY OF SAN LUIS OBISPO DEPARTMENT OF PUBLIC WORKS Standard Unit Costs for Project Security (Performance Bond) Project: Peach Street Prepared by: Derrick Bettale Firm Name: Above Grade Engineering, INC Date: February 17, 2021 PRICE INDEX BASELINE, 2011 CALTRANS INDEX = 84.0 4th Quarter 2017 PRICE INDEX = 145.1 -ENGINEER'S SEAL- Engi Dv��rewa� Wa,6I Ifto.S'� wG'nN� Z`�i� vb Fyt-f'h1;s rs l�o 2/17/2021 date 101 l ,+0 df55'% page 1 of 11 -RESULTS- Subtotal $241,378.40 Cost Index Factor 1.73 Adjusted Subtotal $416,894.98 i�%inflation (10%) 41,689.50 Administration {-20%=409/.j-(oYo) `=-$83,379.-00 Adjusted Subtotal — $54't;963 47 i :5D0,213.16 t�ntinmm�rv--(1(l% 1----TSA 1 Qr—ZA TOTAL SECURITY TO BE POSTED: (rounded to the nearest $$100) ,�, '500, 3� revised 9/1/1 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C SITE PREPARATION: SEC. 2-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL CLEARING AND GRUBBING $0.03 SF 20000 600.00 TREE REMOVAL CONCRETE REMOVAL CONCRETE REMOVAL GRIND HOT MIX ASPHALT S.W. C & G $300.00 $3.25 $10.00 $1.03 EA SF LF SF $4,250 5 600 100 1,500.00 1,950.00 1,000.00 - DISPOSAL OF HOT MIX ASPHALT $50.00 CY $360 - OTHER REMOVAL (SPECIFY) _ ABANDON WELL $1,650.00 EA _ ABANDON SEPTIC SYSTEM $500.00 EA _ DISPOSAL OF CLIII BASE $29.00 CY $360 _ EXCAVATION 0-1000 CY $22.00 CY $500 _ 1000-20000 CY $15.00 CY 1100 16,500.00 > 20000 CY $9.00 CY _ IMPORT 0-1000 CY $31.00 CY $500 _ 1000-20000 CY $22.00 CY _ > 20000 CY $12.00 CY - FINE GRADING $0.30 SF 20000 6,000.00 Subtotal 27, 550.00 page 2 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C ROADWAYS: SEC. 3-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL HOT MIX ASPHALT IN PLACE 2" $1.95 SF $800 _ HOT MIX ASPHALT IN PLACE HOT MIX ASPHALT IN PLACE 3" 4" $2.90 $3.70 SF SF $800 $800 200 800.00 _ HOT MIX ASPHALT IN PLACE 5" $4.90 SF $800 _ HOT MIX ASPHALT IN PLACE 6" $5.60 SF $800 _ HOT MIX ASPHALT IN PLACE CLASS II AGG. BASE 4" $135 $0.87 TON SF $800 _ _ CLASS II AGG. BASE 6" $1.30 SF _ CLASS II AGG. BASE 8" $1.75 SF 2001 350.00 CLASS II AGG. BASE 10" $2.10 SF - CLASS II AGG. BASE 12" $2.50 SF _ CLASS II AGG. BASE 18" $3.70 SF _ CLASS II AGG. BASE $35.00 TON _ CROSS GUTTER AND SPANDREL $17.00 SF _ GEOTEXTLE FABRIC $1.00 SF _ SEAL COAT/SLURRY SEAL $0.60 SF _ CHIP SEAL $2.00 SF _ SAW CUT CONCRETE $4.00 LF $250 60 250.00 SAW CUT HMA $2.17 LF $250 120 260.40 Subtotal 1,660.40 page 3 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C ROAD EDGES: SEC. 4-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL DRIVEWAY APPROACH - CONCRETE DRIVEWAY APPROACH $9.00 $5.50 SF SF 500 4,500.00 _ HANDICAP RAMP $13.00 SF _ CURB AND GUTTER CURB ONLY 6" 6" $22.00 $16.00 LF LF 20 440.00 _ HOT MIX ASPHALT DIKE $10.00 LF $800 - SIDEWALK GUARDRAIL $10.00 $40.00 SF LF 400 4,000.00 _ STREET TREE WELL $700.00 EA - DECOMPOSED GRANITE WALKWAY $1.50 SF $625 _ CONCRETE FLATWORK (ON -SITE) $10.00 SF 3820 38,200.00 CONCRETE PAVERS (ON -SITE) $10.00 SF 4435 44,350.00 Subtotal 91. 490. DO page 4 of 11 10 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C STORM DRAIN: SEC. 5-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL CURB INLET (SAND TRAP) OUTLET BASIN INLET BASIN CULVERT PIPE CULVERT PIPE 6" 24" $3,900 $1,700 $1,000 $20.00 $80.00 EA EA EA LF LF 1 1 8 415 3,900.00 1,700.00 8,000.00 8,300.00 _ CULVERT PIPE 30" $90.00 LF _ CULVERT PIPE 36" $105.00 LF _ CULVERT PIPE 48" $135.00 LF _ CULVERT PIPE 60" $150.00 LF _ HEADWALL (CALTRANS D89) 15"-36" PIPE $3,420.00 EA _ HEADWALL -WING TYPE (D89) 18"-60" $4,800.00 EA _ UNDERDRAIN (SIDEWALK) $1,500.00 EA - UNDERDRAIN (SIDEWALK) PIPE $500.00 EA 1 500.00 RIP -RAP DISSIPATER 0.25 TON, H-5 $150.00 CY - RIP -RAP DISSIPATER 0.5 TON, H-5 $160.00 CY _ RIP -RAP DISSIPATER 1 TON, H-5 $170.00 CY _ RIP -RAP DISSIPATER 2 TON, H-5 $180.00 CY _ OVERSIDE DRAIN, (CALTRANS) $320.00 EA _ CONCRETE V-DITCH (SLOPE) $40.00 LF - MANHOLE $4,500 EA - TIE TO EX. MANHOLE $2,000 EA _ UNDERGROUND BASIN STORMTECH $8.00 CF $500 300 2,400.00 Subtotal 24, 800.00 page 5 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C WATER SUPPLY: SEC. 6-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL WATER SERVICE AND METER BOX RAISE WATER METER WATER SERVICE LINE WATER MAIN 1" 8" $1,700.00 $400.00 $20.00 $58.00 EA EA LF LF 5 810 8,500.00 16,200.00 _ WATER MAIN 10" $68.00 LF _ WATER MAIN 12" $92.00 LF WATER MAIN 14' $106.00 LF _ WATER MAIN 16" $120.00 LF _ HOT TAP 6" $1,998.00 EA _ HOT TAP 8" $2,238.00 EA _ HOT TAP 10" $3,219.00 EA _ GATE VALVE 4" $514.00 EA _ GATE VALVE 6" $1,500.00 EA _ GATE VALVE 8" $2,056.00 EA _ FIRE HYDRANT $4,800.00 EA _ RELOCATE FIRE HYDRANT $2,280.00 EA _ BLOWOFF ASSEMBLY $2,000.00 EA _ AIR RELIEF VALVE 1" $1,550.00 EA _ AIR RELIEF VALVE 2" $2,370.00 EA _ AIR RELIEF VALVE WATER SAMPLING STATION 4" $5,285.00 $1,250.00 EA EA _ _ THRUST BLOCKS 6" $275.00 EA _ THRUST BLOCKS 8" $385.00 EA _ THRUST BLOCKS 10" $484.00 EA _ THRUST BLOCKS 12" $714.00 EA _ STEEL WATER TANK WELDED $1.50 PER GAL _ STEEL WATER TANK BOLTED $1.00 PER GAL _ Subtotal 24, 700.00 page 6 of 11 f, G DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C WASTEWATER DISPOSAL: SEC. 7-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL SEWER LATERAL, TIE IN SEWER LATERAL, TIE IN STEEP $1,350.00 $1,600.00 EA EA 1 1,350.00 _ SEWER CLEANOUT SEWER MAIN (BACKFILL TYPE) SEWER MAIN (BACKFILL TYPE) 6" NATIVE 8" NATIVE $1,500.00 $35.00 $50.00 EA LF LF 9 400 13,500.00 14,000.00 _ SEWER MAIN (BACKFILL TYPE) 6" IMPORT $40.00 LF _ SEWER MAIN (BACKFILL TYPE) 8" IMPORT $60.00 LF _ SEWER MAIN (BACKFILL TYPE) 12" IMPORT $75.00 LF _ SLURRY BACKFILL $19.00 LF _ MANHOLE TYPICAL $4,500.00 EA _ MANHOLE DROP $5,400.00 EA _ TIE TO EXISTING MANHOLE $2,000.00 EA _ FORCE MAIN 4" OR LESS $40.00 LF _ ADJUST MANHOLE COVER $535.00 EA _ Subtotal 28, 850.00 page 7 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C UTILITIES: SEC. 8-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL JOINT TRENCH GAS TRENCH $40.00 $24.00 LF LF 400 16,000.00 _ PIPE JACKING (BORING) SERVICE POLE TELEPHONE POLE 6" PIPE OR LESS RELOCATE RELOCATE $120.00 $1,000.00 $2,500.00 LF EA EA _ _ _ ELECTRIC POLE RELOCATE $6,000.00 EA _ JUNCTION POLE RELOCATE $9,000.00 EA _ UNDERGROUND + JP RELOCATE $15,000.00 EA _ INSTALL SIDEWALK GUY $1,300.00 EA _ STREET LIGHTS $5,000.00 EA _ GUY ANCHOR ONLY RELOCATE $1,800.00 EA _ GUY POLE AND ANCHOR RELOCATE $3,100.00 EA _ Subtotal 16,000,00 page 8 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C TRAFFIC CONTROL: SEC. 9-1 TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL TRAFFIC STRIPING THERMOPLASTIC $3.00 SF BULK _ TRAFFIC STRIPING PAINT $0.60 LF _ TRAFFIC STRIPING REMOVE STRIPING THERMOPLASTIC $1.20 $3.00 LF LF _ _ TRAFFIC MARKING $1.25 SF _ STOP + STREET NAME SIGNS STREET NAME SIGN ONLY $600.00 $300.00 EA EA _ _ BARRICADE METAL $1,300.00 EA _ BARRICADE WOOD $80.00 LF _ MARKERS AND DELINEATORS $32.00 EA _ CONSTRUCTION AREA SIGNS $400.00 EA _ TRAFFIC CONTROL % OF IMPV. 3% EA 397000 11,910.00 Subtotal 11, 910.00 page 9 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C EROSION CONTROL: SEC. 1.1.2.J & APP.B TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL SAND OR GRAVEL BAG $3.00 EA 100 300.00 JUTE MAT STRAW MAT $0.35 $0.28 SF SF _ _ STRAW BALE BARRIER $5.24 LF _ STRAW BALE INLET BARRIER SILT FENCE FIBER ROLLS FIBER MAT $3.53 $2.81 $1.96 $0.40 LF LF LF SF 1000 1000 _ 2,810.00 1,960.00 _ HYDROSEED $0.33 SF _ Subtotal 5,070.00 page 10 of 11 DocuSign Envelope ID: B8E506D8-5A4E-4861-944A-C4E2FF29222C MISCELLANEOUS TYPE UNIT COST UNIT MINIMUM QUANTITY TOTAL CHAIN LINK FENCE 6' NEW $35.00 LF _ OTHER FENCE LF _ GATE $721.00 EA _ LANDSCAPE AND IRRIGATION $2.00 SF $500 _ MONUMENT WELLS RETAINING WALLS RETAINING WALLS CMU/POURED GRAVITY $700.00 $38.00 $28.00 EA SF SF (FACE WALL) (FACE WALL) 246 _ 9,348.00 _ Subtotal 9348. 00 page 11 of 11