AGREEMENT
THIS AGREEMENT, made on , by and between the City
of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County,
California (hereinafter called the Owner) and Raminha Construction, Inc. (hereinafter
called the Contractor).
WITNESSETH:
That the Owner and the Contractor for the consideration stated herein agree as follows:
ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be
performed, shall provide and furnish all of the labor, materials, necessary tools,
expendable equipment, and all utility and transportation services required to complete all
the work of construction of
TERRACE HILL PIPELINE AND PRESSURE REDUCING VALVE RE HABILITATION
PROJECT, SPEC NO. 91425
in strict compliance with the plans and specifications therefor, including any and all
Addenda, adopted by the Owner, in strict compliance with the Contract Documents
hereinafter enumerated.
It is agreed that said labor, materials, tools, equipment, and services shall be furnished and
said work performed and completed under the direction and supervision and subject to the
approval of the Owner or its authorized representatives.
ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration
for the faithful performance of this Contract, subject to any additions or deductions as
provided in the Contract Documents, the contract prices as follows:
Item Item Unit of Estimated Item Price Total
No. Measure Quantity (in figures) (in figures)
1. 16" Ductile Iron Pressure
Reducing Valve Inlet Piping LS 1
(Bishop Street) $60,000 $60,000
2. 16" Ductile Iron Piping, STA LF 420 $325 $136,500 1+00 to STA 5+20.02
3. 1" Air Release and Vacuum EA 1 $5,500 $5,500 Valve
4. Pressure Reducing Valve LS 1 $107,000 $107,000 Station
5. Pipe & Appurtenances LS 1 $10,000 $10,000 Abandonment
12/09/2020