HomeMy WebLinkAbout8/25/2021 Item 4a, Corey/Bell - Staff Agenda CorrespondenceMemorandum DATE: August 24, 2021 TO: Planning Commission FROM: Tyler Corey, Deputy Director Community Development VIA: Kyle Bell, Associate Planner SUBJECT: Item #4a –ARCH-0587-2020, USE-0412-2021, AFFH-0413-2021, & EID-494- 2021 (279 Bridge Street) – Agenda Correspondence Staff Response Memo DISCUSSION Staff received a letter from the public regarding the environmental analysis of the project proposed at 279 Bridge Street, and determined it would be helpful to provide these questions and responses to all Commissioners and the public, as the responses offer clarification regarding the proposed project. CEQA Guidelines Section 15162 states that when a Mitigated Negative Declaration (MND) has been adopted for a project, no subsequent environmental review shall be prepared for the project unless the lead agency determines, on the basis of substantial evidence in the light of the whole record, one or more of the following: 1.Substantial changes are proposed in the project which will require major revisions of the previously adopted MND; 2.Substantial changes occur with respect to the circumstances under which the project is undertaken which will require major revisions of the previously adopted MND; or 3.New information of substantial importance, which was not known and could not have been known with the exercise of reasonable diligence at the time the previous MND was adopted. CEQA Guidelines Section 15164 states that the lead agency shall prepare an addendum to a previously adopted MND if some changes or additions are necessary but none of the conditions described in Section 15162 calling for preparation of a subsequent EIR/MND have occurred. The letter raises concerns regarding the project’s consistency with the original MND that was provided as Attachment 7 to the agenda report. The letter highlights specific questions from the initial study checklist under sections Hydrology and Transportation. Hydrology “Place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Map or other flood hazard delineation map?” Memo: 279 Bridge Street, PC Agenda Correspondence Memo Page 2 The original project included two residential units within the project above the ground floor (caretaker quarters), the MND identified that housing above the ground floor was less than significant. The proposed project provides all residential units above the ground floor consistent with the original project. The Hydrologic and Hydraulic Analysis, prepared by Monsoon Consultants (2021), did not identify any new impacts associated with hydrology or flooding (Attachment 1). The four proposed buildings improve upon the original design of the project because the buildings are designed using a flow-under concept, where there is an open path under the buildings to allow the free flow of storm water. The report concludes that the project as proposed will not adversely impact flood levels in the area. As stated in the Addendum, compliance with City standards will be sufficient to ensure that the proposed project does not endanger structures on this and other adjoining sites. Similar to the previously project, the proposed project is required to comply with the City’s Drainage Design Manual of the Waterway Management Plan, Post Construction Requirements for stormwater, and Floodplain Management Regulations (Zoning Regulations Chapter 17.78). Therefore, based on best management practices as established within existing regulations, the proposed project would not create any new impacts, would not increase the severity of any impact, and impacts would remain less than significant. Transportation “Conflict with adopted policies, plans, or programs regarding public transit, bicycle, or pedestrian facilities, or otherwise decrease the performance or safety of such facilities?” The proposed project will generate approximately 29 AM peak vehicle trips and 35 PM peak trips, which are still well within the available capacity of Bridge Street. The project was reviewed by the City’s Public Works Transportation Division, and was found to be consistent with the City’s Circulation Element and Active Transportation Plan, and would not decrease the performance or safety of such facilities such that a new impact would occur. Furthermore, as noted in the Addendum, in 2013, the State of California passed Senate Bill (SB) 743, which mandates that jurisdictions can no longer use LOS or other measures of automobile delay/congestion to evaluate transportation impacts under CEQA. The State then issued guidelines identifying vehicles miles traveled (VMT), which measures the total amount of driving over a given area, as the primary metric to be used for CEQA analysis of transportation impacts, with these changes becoming mandatory on July 1, 2020. The City of San Luis Obispo formally adopted VMT impact thresholds in June of 2020, and these thresholds are applied to projects as the primary metric for evaluating potential project impacts under CEQA. Based on the City’s Multimodal Transportation Impact Study Guidelines, adopted June of 2020, this project falls below the Thresholds of Significance for Mixed-use projects when analyzing the dominant use on the site. The VMT generated from the revised project would be 15% below baseline Regional (County) average Residential VMT per capita. The proposed project complies with the City’s Circulation Element and the Active Transportation Plan regarding public transit, bicycle, and pedestrian facilities, and will not decrease the performance or safety of such facilities. Therefore, no significant impact would occur, consistent with the original MND findings. Attachment 1 - Hydrologic and Hydraulic Analysis HYDROLOGIC & HYDRAULIC ANALYSIS FOR 279 BRIDGE STREET SAN LUIS OBISPO, CALIFORNIA February 4, 2021 Owner: Housing Authority of San Luis Obispo Contact: Michael Burke Phone: (805) 594-5330 Prepared by: Monsoon Consultants P.O. Box 151, San Luis Obispo, CA Phone: (805) 476-6168 TABLE OF CONTENTS 1 Introduction and Background ................................................................................................... 1 2 Watershed Description/Delineation ......................................................................................... 2 2.1 Meadow Creek Watershed .................................................................................................. 2 2.2 Onsite Watersheds ............................................................................................................... 2 3 Hydrologic Analysis ..................................................................................................................... 5 3.1 Meadow Creek Watershed .................................................................................................. 5 3.2 On-Site Watersheds ............................................................................................................. 5 4 Hydraulic Analysis ..................................................................................................................... 13 4.1 On-site Facilities ................................................................................................................. 13 4.2 Meadow Creek ................................................................................................................... 13 5 Geomorphic, Geotechnical and Structural Analysis of Existing and Proposed Drainage Improvements ............................................................................................................................... 16 6 Risk Assessment/Impacts Discussion ........................................................................................ 16 7 Enhancement/Mitigation .......................................................................................................... 16 8 Unusual or Special Conditions .................................................................................................. 16 9 Conclusions ............................................................................................................................... 16 LIST OF FIGURES FIGURE 1: LOCATION MAP FIGURE 2: MEADOW CREEK WATERSHED FIGURE 3: ULITMATE ON-SITE WATERSHEDS FIGURE 4: PERMEABLE PAVEMENT SECTION FIGURE 5: BIORETENTION DETAIL FIGURE 6: PRE-DEVELOPMENT SCHEMATIC FIGURE 7: POST-DEVELOPMENT SCHEMATIC FIGURE 8: HEC-RAS SECTION LOCATIONS LIST OF TABLES TABLE 1: CREEK FLOW RATES TABLE 2: ON-SITE WATERSHED DESCRIPTION TABLE 3: SCM DESCRIPTION TABLE 5: PRE AND POST DEVELOPMENT COMPARISON TABLE 6: HEC-RAS SUMMARY TABLE LIST OF APPENDICES APPENDIX I: HYDROCAD REPORTS APPENDIX II: HEC-RAS REPORTS Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 1 1 Introduction and Background This is a hydrologic and hydraulic report for 279 Bridge Street. The project proposes four buildings totaling about 36,000 square feet on a 2.72-acre site zoned “Manufacturing”. The project is located in an A0 flood zone with a sheet flow up to 2’ deep. The project is adjacent to Tract 2560 – the Bridge Street subdivision…which has completed all its flood control related improvements. Except for the access bridge the site is currently vacant and primarily covered with non-native annual grasses with an average slope of less than two percent. It is bordered to the north with the Meadow Creek riparian corridor and on the south with an ephemeral swale. There is an existing red bricked parking area on the north section of the site where access is taken from Bridge Street. This parking area is currently leased to the adjacent property owned by King Ventures. Access is from Bridge Street over a new Con-Span culvert installed by the previous owner of the property. The previous owner constructed the culvert, improvements on the north side of the creek and construction of basic access, permeable pavement parking area and a fire department turn- around on the south side of the bridge. This project is development of the remainder of the project on the south side of the bridge. There are two drainage related issues covered by this report; on -site drainage and mitigation, and the impact of the project on the water surface profile of Meadow Creek. Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 2 Figure 1 Location Map 2 Watershed Description/Delineation 2.1 Meadow Creek Watershed The Meadow Creek watershed is shown in Figure 2 below. Included in the watershed are portions of developed areas within the city and steep terrain of the mountains east of the city and southerly of the project. 2.2 Onsite Watersheds The on-site watersheds or drainage management areas, when developed, will be a mix of hard surfaced roofs and paving, permeable pavement and landscaping. The overall on-site watersheds are shown in Figure 3 below. Site Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 3 Figure 2 Meadow Creek Watershed Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 4 Figure 3 Ultimate On-Site Watersheds Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 5 3 Hydrologic Analysis 3.1 Meadow Creek Watershed The Meadow Creek watershed hydrology has been well documented in the drainage reports for Tract 2560. The flow rates in Meadow Creek are summarized in the table below. Table 1 Creek flow rates 3.2 On-Site Watersheds Because runoff from the onsite watershed must be detained to facilitate mitigation of increased runoff and the potential for increased pollution in the watershed , the computer program HydroCad is used to analyze the runoff as it travels through the various systems. For this analysis the TR-55 method using the SCS Urban Hydrograph and rainfall hyetographs from the Waterway Management plan are used to develop the results. A range of storms is analyzed…from the 2 - year through the 100-year storm. Curve Numbers (CN’s) used in the analysis are: • Hard Surface - 98 • Landscaping - 74 • Pre-development - 83 • Used CN of 98 for porous paving – all the runoff from the porous paving goes into the gravel layer below…the porosity is dealt with in the gravel storage. Flow Rate at Bridge Ret freq Q (cfs) 2-yr 320 10-yr 586 25-yr 747 50-yr 867 100-yr 972 Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 6 This project will be developed with a mix of hard-surfaces, permeable paving and landscaping. Three types of storage facilities are used to mitigate peak run-off and water quality issues; storage in a gravel layer underneath permeable paving, storage in a detention basin and storage in a bio-swale. The storage in bio-swale is not considered in the peak run-off analysis. The porous paving section is shown in Figure 4 below. Figure 4 Permeable Pavement Section Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 7 Figure 5 Bioretention Detail Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 8 Table 2 On-Site Watershed description DMAsArea (sq ft)Surface typeCurve Number (CN)Drains to1 2400 Basin 1 2236 ROOF 98 SCM1 2 1433 LS 74 SCM1 3 276 ROOF 98 SCM1 4 2862 ROOF 98 SCM1 5 666 CONC 98 SCM1 6 2117 ROOF 98 SCM5 7 1715 ROOF 98 SCM4 8 3575 ROOF 98 SCM5 9 1525 ROOF 98 SCM2 10A 134 CONC 98 SCM2 10B 248 LS 74 SCM2 11 1699 LS 74 SCM2 12 346 LS 74 SCM5 13 1250 ROOF 98 SCM2 14 287 CONC 98 SCM5 15A 2710 AC 98 SCM4a 15B 1504 CONC 98 SCM4b 16 141 LS 74 SCM4 17 1747 PERM PAV 98 SCM4a 18 998 PERM PAV 98 SCM6 19 78 LS 74 SCM9 20 1262 ROOF 98 SCM4 21 252 CONC 98 SCM4 22 133 LS 74 SCM6 23 153 ROOF 98 SCM6 24 105 LS 74 SCM9 25 1113 ROOF 98 SCM4 26 646 ROOF 98 SCM4 27 4847 ROOF 98 SCM9 28 4427 ROOF 98 SCM9 29 1306 CONC 98 SCM9 30 1327 ROOF 98 SCM7 31 2135 ROOF 98 SCM7 32 6063 ROOF 98 SCM6 33 1661 LS 74 SCM6 34 526 ROOF 98 OFFSITE Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 9 Table 2 On-Site Watershed description (continued) DMAsArea (sq ft)Surface typeCurve Number (CN)Drains to1 2400 Basin 35 1772 ROOF 98 SCM8 36 507 ROOF 98 SD SYSTEM 37A 1245 CONC 98 SD SYSTEM 37B 69 LS 74 SD SYSTEM 38 421 ROOF 98 SCM8 39 299 LS 74 SCM8 40 2046 LS 74 SD SYSTEM 41A 266 CONC 98 SCM7 41B 316 LS 74 SCM7 42 927 PERM PAV 98 SCM8 43 4333 PERM PAV 98 SCM4 44 6443 LS 74 OFFSITE 45 1017 LS 74 OFFSITE 46A 99 CONC 98 OFFSITE 46B 427 LS 74 OFFSITE 47 1129 LS 74 OFFSITE 48 196 LS 74 SCM4 49 1615 PERM PAV 98 SCM2 50 1154 PERM PAV 98 SCM5 51 1302 PERM SURF 98 SCM7 52 2114 LS 74 SCM1 Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 10 Table 3 SCM description The schematics for the HydroCad model for pre- and post-development are shown in Figures 6 and 7 respectively. The runoff rate from the entire site for the various storms for both the predevelopment and post development conditions are summarized below. The complete HydroCad report is in the appendix to this report. Table 3 Pre- and Post-Development Comparison Area (sq ft)Surface typeCurve Number (CN)Drains toSCMAreadepth below perfstotal depthbottom elevSCM sq ft inches inches 1 2400 Basin 2 1672 Porus Pavers 12 16 162.65 3 1008 Porus Pavers 6 10 164.86 4A 1775 Porus Pavers 6 10 163.65 4B 4584 Porus Pavers 6 10 162.61 5 2136 Porus Pavers 8 12 161.67 6 2979 Porus Pavers 8 12 164.38 7 1302 Porus Pavers 12 16 164.55 8 1567 Porus Pavers 6 10 164.65 9 2480 Porus Pavers 18 22 163.51 Ret FreqPredevelopmentpostdevelopmentchangeyrs cfs cfs 2 1.35 0.36 -73% 10 2.54 1.37 -46% 25 3.24 1.93 -40% 50 3.82 2.18 -43% 100 4.29 2.37 -45% Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 11 Figure 6 Predevelopment Schematic Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 12 Figure 6 Post-development Schematic Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 13 4 Hydraulic Analysis 4.1 On-site Facilities On-site storm drains are localized as part of the BMP’s and handle minor flows leaving these facilities. There are no drains proposed to carry surface water to the BMP’s. No further analysis is necessary. 4.2 Meadow Creek A ConSpan bridge, constructed by the previous owner, provides site access over Meadow Creek. No further creek improvements are proposed with the project. HEC-RAS is used to demonstrate the project development will not adversely impact the flood levels. It is important to note the site is located in an A0 zone with up to 2’ of sheet flow. The rules related to A0 zones apply to flood mitigation requirements. Although the resulting calculated water surface profiles closely reflect the A0 flood levels, they are not the defining values used for compliance with City and FEMA regulations. Three of the four proposed buildings are built using a flow-under concept…there is an open path under these buildings to allow the free flow of storm water. To compare pre/post development flood levels the cross sections in the predevelopment model are replaced with cross sections that reflect the proposed topography including areas blocked by the slab-on-grade portion of the three buildings and the independent slab-on-grade building. The cross section locations are shown in Figure 7. Sections below the culvert downstream of this project are not shown. Table 6 below shows the comparison of the pre-development and post-development conditions. The results show the final water surface elevation is, at most, 0.09’ (1.1”) above the pre- development water surface at only 1 section…section 1427. Increases at a few other sections are limited to 0.03’ (1/3”) or less. It is important to note the “obstructions” by buildings with slab-on-grade constructions has virtually no impact on the water surface profile. This is because the water surface profile through the project is virtually flat…a lake. Adding “obstructions” in a “lake” does not increase the water surface. The complete HEC-RAS reports are in the appendix to this report. Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 14 Figure 7 HEC-RAS Section locations Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 15 Table 4 HEC-RAS Summary Table River Sta Profile Plan Q Total Min Ch El W.S. Elev Crit W.S.E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width (cfs)(ft)(ft)(ft)(ft)(ft/ft)(ft/s)(sq ft)(ft) 1535 PF 1 PreDev 972 163.5 167.99 167.99 168.55 0.012067 6.99 185.66 149.59 1535 PF 1 PostDev 972 163.5 167.24 167.43 0.005258 3.94 292.5 286.38 1491 PF 1 PreDev 972 161.3 167.14 167.24 0.001756 3.05 427.18 292.26 1491 PF 1 PostDev 972 161.7 167.14 167.29 0.001985 3.49 340.92 194.54 1460 PF 1 PreDev 972 161.3 167.09 167.19 0.001388 3.02 438.91 260.63 1460 PF 1 PostDev 972 161.3 167.10 167.22 0.001498 3.14 365.71 224.52 1427 PF 1 PreDev 972 161.25 166.83 167.1 0.0041 4.67 271.75 186.8 1427 PF 1 PostDev 972 161.25 166.92 167.14 0.003309 4.24 277 204.36 1376 PF 1 PreDev 972 161.2 166.83 166.93 0.001477 3.04 433.12 244.65 1376 PF 1 PostDev 972 161.2 166.83 166.99 0.002165 3.68 329.98 217.25 1354 PF 1 PreDev 972 161 166.83 163.9 166.9 0.00083 2.55 514.4 257.39 1354 PF 1 PostDev 972 161 166.86 163.9 166.94 0.000761 2.45 487.19 212.71 1330 Culvert 1307 PF 1 PreDev 972 161 166.80 166.86 0.000878 1.73 533.35 211.21 1307 PF 1 PostDev 972 161 166.82 166.88 0.000651 2.33 541.84 243.27 1285 PF 1 PreDev 972 159.5 166.81 166.84 0.000255 1.68 809.35 465 1285 PF 1 PostDev 972 159.5 166.80 166.87 0.000634 2.46 581.54 424.14 1234 PF 1 PreDev 972 159.5 166.80 166.82 0.000276 1.61 861.65 463.1 1234 PF 1 PostDev 972 159.5 166.80 166.83 0.000312 1.71 820.02 456.49 1179 PF 1 PreDev 972 159 166.80 166.81 0.000146 1.31 1102.17 525.47 1179 PF 1 PostDev 972 159 166.80 166.82 0.00021 1.57 992.52 518.14 1132 PF 1 PreDev 972 159 166.77 166.8 0.00024 1.72 772.47 481.56 1132 PF 1 PostDev 972 159 166.76 166.8 0.00032 1.98 724.26 506.81 1096 PF 1 PreDev 972 158 166.78 162.81 166.79 0.0001 1.08 1205.3 412.85 1096 PF 1 PostDev 972 158 166.78 162.42 166.79 0.000119 1.21 1138.02 412.81 1058 Culvert 1027 PF 1 PreDev 972 158 166.04 166.06 0.000166 1.45 1032.64 445.99 1027 PF 1 PostDev 972 158 166.04 166.06 0.000166 1.45 1032.64 445.99 1016 PF 1 PreDev 972 158 166.05 166.06 0.000135 1.08 1209.09 517.03 1016 PF 1 PostDev 972 158 166.05 166.06 0.000135 1.08 1209.09 517.03 1000 PF 1 PreDev 972 157 166.03 166.06 0.000185 1.3 794.14 314.13 1000 PF 1 PostDev 972 157 166.03 166.06 0.000185 1.3 794.14 314.13 870 PF 1 PreDev 972 157 165.99 166.03 0.000221 2.25 688.61 280.47 870 PF 1 PostDev 972 157 165.99 166.03 0.000221 2.25 688.61 280.47 740 PF 1 PreDev 972 157.2 166.00 162.39 166.01 0.000041 1.04 1484.26 351.73 740 PF 1 PostDev 972 157.2 166.00 162.39 166.01 0.000041 1.04 1484.26 351.73 Hydrologic & Hydraulic Analysis for 279 Bridge Street Page | 16 5 Geomorphic, Geotechnical and Structural Analysis of Existing and Proposed Drainage Improvements Structural analysis of the ConSpan culvert was provided by the manufacturer with project construction plans for phase 1. There are no geomorphic or geotechnical issues. 6 Risk Assessment/Impacts Discussion There are three obvious potential risks and impacts; the 100-year flood, the potential increase to flood levels and the potential for pollutants to enter the runoff. These are discussed below. 7 Enhancement/Mitigation BMP’s are proposed to mitigate increased runoff from the site and the potential increase in pollutant load in the runoff. To mitigate the increase in runoff, storm water detention and infiltration are proposed. Water is stored in surface bioretention ponds and bioswales located adjacent to buildings. Infiltration is also achieved with permeable paving located in parking areas and in the surface bioretention. Details of the enhancement and mitigation measures are contained in a separate report. 8 Unusual or Special Conditions The project is located in an A0 flood zone with a depth up to 2’ and with groundwater encountered at a minimum depth of six feet below the existing grade per project soils report prepared by Beacon Geotechnical, Inc dated April 25, 2014. 9 Conclusions The project as proposed will not adversely impact flood levels in the area. The BMP’s proposed to mitigate the increased pollutant load and peak runoff limitations meet the requirements for these facilities. Appendix I HydroCad Reports Pre-development Post-development T1 DMA 12345_52 T2 DMA 9_10_11_13_49 T4a 15a_20_21_17 T4B 7_16_25_26_43_48_15b T5 6_8_12_14_50 T6 15_22_23_32_33 T7 31_31_41_51 T8 35_38_39_42 T9 19_24_24_28_29 Site Site Total Routing Diagram for PreDevelopment Prepared by Keith V Crowe, PE, Printed 2/3/2021 HydroCAD® 10.00-22 s/n 04223 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ PreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 2HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (sq‐ft) CN Description (subcatchment‐numbers) 2,236 83 DMA1  (T1) 134 83 DMA10A  (T2) 248 83 DMA10B  (T2) 1,699 83 DMA11  (T2) 346 83 DMA12  (T5) 1,250 83 DMA13  (T2) 287 83 DMA14  (T5) 1,504 83 DMA15B  (T4B) 2,710 83 DMA15a  (T4a) 141 83 DMA16  (T4B) 1,747 83 DMA17  (T4a) 998 83 DMA18 Perm Pav  (T6) 78 83 DMA19  (T9) 1,433 83 DMA2  (T1) 1,262 83 DMA20  (T4a) 252 83 DMA21  (T4a) 133 83 DMA22  (T6) 153 83 DMA23  (T6) 105 83 DMA24  (T9) 1,113 83 DMA25  (T4B) 646 83 DMA26  (T4B) 4,847 83 DMA27  (T9) 4,427 83 DMA28  (T9) 1,306 83 DMA29  (T9) 276 83 DMA3  (T1) 1,327 83 DMA30  (T7) 2,135 83 DMA31  (T7) 6,063 83 DMA32  (T6) 1,661 83 DMA33  (T6) 1,772 83 DMA35  (T8) 421 83 DMA38  (T8) 299 83 DMA39  (T8) 2,862 83 DMA4  (T1) 266 83 DMA41A  (T7) 316 83 DMA41B  (T7) 927 83 DMA42 PERM PAv  (T8) 4,333 83 DMA43 PERM PAV  (T4B) 196 83 DMA48  (T4B) 1,615 83 DMA49 Perm Pav  (T2) 666 83 DMA5  (T1) 1,154 83 DMA50 PERM PAV  (T5) Area (sq‐ft) CN Description (subcatchment‐numbers) 2,114 83 DMA52  (T1) 1,302 83 DMA54 PERM PAV  (T7) 2,117 83 DMA6  (T5) 1,715 83 DMA7  (T4B) 3,575 83 DMA8  (T5) 1,525 83 DMA9  (T2) Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 3HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.19 cfs @ 12.29 hrs,  Volume= 1,351 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 2,236 83 DMA1 * 1,433 83 DMA2 * 276 83 DMA3 * 2,862 83 DMA4 * 666 83 DMA5 * 2,114 83 DMA52 9,587 83 Weighted Average 9,587 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.13 cfs @ 12.29 hrs,  Volume= 912 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,525 83 DMA9 * 134 83 DMA10A * 248 83 DMA10B * 1,699 83 DMA11 * 1,250 83 DMA13 * 1,615 83 DMA49 Perm Pav 6,471 83 Weighted Average 6,471 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4a: 15a_20_21_17 Runoff = 0.12 cfs @ 12.29 hrs,  Volume= 842 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 4HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,710 83 DMA15a * 1,747 83 DMA17 * 1,262 83 DMA20 * 252 83 DMA21 5,971 83 Weighted Average 5,971 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.19 cfs @ 12.29 hrs,  Volume= 1,360 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,715 83 DMA7 * 1,504 83 DMA15B * 141 83 DMA16 * 1,113 83 DMA25 * 646 83 DMA26 * 4,333 83 DMA43 PERM PAV * 196 83 DMA48 9,648 83 Weighted Average 9,648 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.15 cfs @ 12.29 hrs,  Volume= 1,054 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 5HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 83 DMA6 * 3,575 83 DMA8 * 346 83 DMA12 * 287 83 DMA14 * 1,154 83 DMA50 PERM PAV 7,479 83 Weighted Average 7,479 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.18 cfs @ 12.29 hrs,  Volume= 1,270 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 998 83 DMA18 Perm Pav * 133 83 DMA22 * 153 83 DMA23 * 6,063 83 DMA32 * 1,661 83 DMA33 9,008 83 Weighted Average 9,008 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.11 cfs @ 12.29 hrs,  Volume= 754 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,327 83 DMA30 * 2,135 83 DMA31 * 266 83 DMA41A * 316 83 DMA41B * 1,302 83 DMA54 PERM PAV 5,346 83 Weighted Average 5,346 100.00% Pervious Area Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 6HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.07 cfs @ 12.29 hrs,  Volume= 482 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,772 83 DMA35 * 421 83 DMA38 * 299 83 DMA39 * 927 83 DMA42 PERM PAv 3,419 83 Weighted Average 3,419 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.22 cfs @ 12.29 hrs,  Volume= 1,517 cf,  Depth= 1.69ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 78 83 DMA19 * 105 83 DMA24 * 4,847 83 DMA27 * 4,427 83 DMA28 * 1,306 83 DMA29 10,763 83 Weighted Average 10,763 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 7HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 0.00% Impervious,  Inflow Depth = 1.69ʺ    for  2‐year event Inflow = 1.35 cfs @ 12.29 hrs,  Volume= 9,542 cf Primary = 1.35 cfs @ 12.29 hrs,  Volume= 9,542 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 8HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.36 cfs @ 12.29 hrs,  Volume= 2,249 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 2,236 83 DMA1 * 1,433 83 DMA2 * 276 83 DMA3 * 2,862 83 DMA4 * 666 83 DMA5 * 2,114 83 DMA52 9,587 83 Weighted Average 9,587 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.24 cfs @ 12.29 hrs,  Volume= 1,518 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,525 83 DMA9 * 134 83 DMA10A * 248 83 DMA10B * 1,699 83 DMA11 * 1,250 83 DMA13 * 1,615 83 DMA49 Perm Pav 6,471 83 Weighted Average 6,471 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4a: 15a_20_21_17 Runoff = 0.22 cfs @ 12.29 hrs,  Volume= 1,401 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 9HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,710 83 DMA15a * 1,747 83 DMA17 * 1,262 83 DMA20 * 252 83 DMA21 5,971 83 Weighted Average 5,971 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.36 cfs @ 12.29 hrs,  Volume= 2,263 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,715 83 DMA7 * 1,504 83 DMA15B * 141 83 DMA16 * 1,113 83 DMA25 * 646 83 DMA26 * 4,333 83 DMA43 PERM PAV * 196 83 DMA48 9,648 83 Weighted Average 9,648 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.28 cfs @ 12.29 hrs,  Volume= 1,754 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 10HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 83 DMA6 * 3,575 83 DMA8 * 346 83 DMA12 * 287 83 DMA14 * 1,154 83 DMA50 PERM PAV 7,479 83 Weighted Average 7,479 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.34 cfs @ 12.29 hrs,  Volume= 2,113 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 998 83 DMA18 Perm Pav * 133 83 DMA22 * 153 83 DMA23 * 6,063 83 DMA32 * 1,661 83 DMA33 9,008 83 Weighted Average 9,008 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.20 cfs @ 12.29 hrs,  Volume= 1,254 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,327 83 DMA30 * 2,135 83 DMA31 * 266 83 DMA41A * 316 83 DMA41B * 1,302 83 DMA54 PERM PAV 5,346 83 Weighted Average 5,346 100.00% Pervious Area Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 11HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.13 cfs @ 12.29 hrs,  Volume= 802 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,772 83 DMA35 * 421 83 DMA38 * 299 83 DMA39 * 927 83 DMA42 PERM PAv 3,419 83 Weighted Average 3,419 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.40 cfs @ 12.29 hrs,  Volume= 2,524 cf,  Depth= 2.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 78 83 DMA19 * 105 83 DMA24 * 4,847 83 DMA27 * 4,427 83 DMA28 * 1,306 83 DMA29 10,763 83 Weighted Average 10,763 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 12HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 0.00% Impervious,  Inflow Depth = 2.81ʺ    for  10‐year event Inflow = 2.54 cfs @ 12.29 hrs,  Volume= 15,877 cf Primary = 2.54 cfs @ 12.29 hrs,  Volume= 15,877 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 13HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.46 cfs @ 12.29 hrs,  Volume= 3,047 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 2,236 83 DMA1 * 1,433 83 DMA2 * 276 83 DMA3 * 2,862 83 DMA4 * 666 83 DMA5 * 2,114 83 DMA52 9,587 83 Weighted Average 9,587 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.31 cfs @ 12.29 hrs,  Volume= 2,057 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,525 83 DMA9 * 134 83 DMA10A * 248 83 DMA10B * 1,699 83 DMA11 * 1,250 83 DMA13 * 1,615 83 DMA49 Perm Pav 6,471 83 Weighted Average 6,471 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4a: 15a_20_21_17 Runoff = 0.29 cfs @ 12.29 hrs,  Volume= 1,898 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 14HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,710 83 DMA15a * 1,747 83 DMA17 * 1,262 83 DMA20 * 252 83 DMA21 5,971 83 Weighted Average 5,971 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.46 cfs @ 12.29 hrs,  Volume= 3,066 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,715 83 DMA7 * 1,504 83 DMA15B * 141 83 DMA16 * 1,113 83 DMA25 * 646 83 DMA26 * 4,333 83 DMA43 PERM PAV * 196 83 DMA48 9,648 83 Weighted Average 9,648 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.36 cfs @ 12.29 hrs,  Volume= 2,377 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 15HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 83 DMA6 * 3,575 83 DMA8 * 346 83 DMA12 * 287 83 DMA14 * 1,154 83 DMA50 PERM PAV 7,479 83 Weighted Average 7,479 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.43 cfs @ 12.29 hrs,  Volume= 2,863 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 998 83 DMA18 Perm Pav * 133 83 DMA22 * 153 83 DMA23 * 6,063 83 DMA32 * 1,661 83 DMA33 9,008 83 Weighted Average 9,008 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.26 cfs @ 12.29 hrs,  Volume= 1,699 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,327 83 DMA30 * 2,135 83 DMA31 * 266 83 DMA41A * 316 83 DMA41B * 1,302 83 DMA54 PERM PAV 5,346 83 Weighted Average 5,346 100.00% Pervious Area Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 16HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.16 cfs @ 12.29 hrs,  Volume= 1,087 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,772 83 DMA35 * 421 83 DMA38 * 299 83 DMA39 * 927 83 DMA42 PERM PAv 3,419 83 Weighted Average 3,419 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.51 cfs @ 12.29 hrs,  Volume= 3,421 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 78 83 DMA19 * 105 83 DMA24 * 4,847 83 DMA27 * 4,427 83 DMA28 * 1,306 83 DMA29 10,763 83 Weighted Average 10,763 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 17HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 0.00% Impervious,  Inflow Depth = 3.81ʺ    for  25‐year event Inflow = 3.24 cfs @ 12.29 hrs,  Volume= 21,514 cf Primary = 3.24 cfs @ 12.29 hrs,  Volume= 21,514 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 18HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.54 cfs @ 12.29 hrs,  Volume= 3,641 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 2,236 83 DMA1 * 1,433 83 DMA2 * 276 83 DMA3 * 2,862 83 DMA4 * 666 83 DMA5 * 2,114 83 DMA52 9,587 83 Weighted Average 9,587 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.36 cfs @ 12.29 hrs,  Volume= 2,458 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,525 83 DMA9 * 134 83 DMA10A * 248 83 DMA10B * 1,699 83 DMA11 * 1,250 83 DMA13 * 1,615 83 DMA49 Perm Pav 6,471 83 Weighted Average 6,471 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4a: 15a_20_21_17 Runoff = 0.34 cfs @ 12.29 hrs,  Volume= 2,268 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 19HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,710 83 DMA15a * 1,747 83 DMA17 * 1,262 83 DMA20 * 252 83 DMA21 5,971 83 Weighted Average 5,971 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.54 cfs @ 12.29 hrs,  Volume= 3,664 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,715 83 DMA7 * 1,504 83 DMA15B * 141 83 DMA16 * 1,113 83 DMA25 * 646 83 DMA26 * 4,333 83 DMA43 PERM PAV * 196 83 DMA48 9,648 83 Weighted Average 9,648 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.42 cfs @ 12.29 hrs,  Volume= 2,841 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 20HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 83 DMA6 * 3,575 83 DMA8 * 346 83 DMA12 * 287 83 DMA14 * 1,154 83 DMA50 PERM PAV 7,479 83 Weighted Average 7,479 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.51 cfs @ 12.29 hrs,  Volume= 3,421 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 998 83 DMA18 Perm Pav * 133 83 DMA22 * 153 83 DMA23 * 6,063 83 DMA32 * 1,661 83 DMA33 9,008 83 Weighted Average 9,008 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.30 cfs @ 12.29 hrs,  Volume= 2,030 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,327 83 DMA30 * 2,135 83 DMA31 * 266 83 DMA41A * 316 83 DMA41B * 1,302 83 DMA54 PERM PAV 5,346 83 Weighted Average 5,346 100.00% Pervious Area Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 21HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.19 cfs @ 12.29 hrs,  Volume= 1,299 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,772 83 DMA35 * 421 83 DMA38 * 299 83 DMA39 * 927 83 DMA42 PERM PAv 3,419 83 Weighted Average 3,419 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.61 cfs @ 12.29 hrs,  Volume= 4,088 cf,  Depth= 4.56ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 78 83 DMA19 * 105 83 DMA24 * 4,847 83 DMA27 * 4,427 83 DMA28 * 1,306 83 DMA29 10,763 83 Weighted Average 10,763 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 22HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 0.00% Impervious,  Inflow Depth = 4.56ʺ    for  50‐year event Inflow = 3.82 cfs @ 12.29 hrs,  Volume= 25,710 cf Primary = 3.82 cfs @ 12.29 hrs,  Volume= 25,710 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 23HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.61 cfs @ 12.29 hrs,  Volume= 3,791 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 2,236 83 DMA1 * 1,433 83 DMA2 * 276 83 DMA3 * 2,862 83 DMA4 * 666 83 DMA5 * 2,114 83 DMA52 9,587 83 Weighted Average 9,587 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.41 cfs @ 12.29 hrs,  Volume= 2,559 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,525 83 DMA9 * 134 83 DMA10A * 248 83 DMA10B * 1,699 83 DMA11 * 1,250 83 DMA13 * 1,615 83 DMA49 Perm Pav 6,471 83 Weighted Average 6,471 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4a: 15a_20_21_17 Runoff = 0.38 cfs @ 12.29 hrs,  Volume= 2,361 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 24HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,710 83 DMA15a * 1,747 83 DMA17 * 1,262 83 DMA20 * 252 83 DMA21 5,971 83 Weighted Average 5,971 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.61 cfs @ 12.29 hrs,  Volume= 3,815 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,715 83 DMA7 * 1,504 83 DMA15B * 141 83 DMA16 * 1,113 83 DMA25 * 646 83 DMA26 * 4,333 83 DMA43 PERM PAV * 196 83 DMA48 9,648 83 Weighted Average 9,648 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.47 cfs @ 12.29 hrs,  Volume= 2,957 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 25HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 83 DMA6 * 3,575 83 DMA8 * 346 83 DMA12 * 287 83 DMA14 * 1,154 83 DMA50 PERM PAV 7,479 83 Weighted Average 7,479 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.57 cfs @ 12.29 hrs,  Volume= 3,562 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 998 83 DMA18 Perm Pav * 133 83 DMA22 * 153 83 DMA23 * 6,063 83 DMA32 * 1,661 83 DMA33 9,008 83 Weighted Average 9,008 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.34 cfs @ 12.29 hrs,  Volume= 2,114 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,327 83 DMA30 * 2,135 83 DMA31 * 266 83 DMA41A * 316 83 DMA41B * 1,302 83 DMA54 PERM PAV 5,346 83 Weighted Average 5,346 100.00% Pervious Area Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 26HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.22 cfs @ 12.29 hrs,  Volume= 1,352 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,772 83 DMA35 * 421 83 DMA38 * 299 83 DMA39 * 927 83 DMA42 PERM PAv 3,419 83 Weighted Average 3,419 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.68 cfs @ 12.29 hrs,  Volume= 4,256 cf,  Depth= 4.75ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 78 83 DMA19 * 105 83 DMA24 * 4,847 83 DMA27 * 4,427 83 DMA28 * 1,306 83 DMA29 10,763 83 Weighted Average 10,763 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PredevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPreDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 27HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 0.00% Impervious,  Inflow Depth = 4.75ʺ    for  100‐year event Inflow = 4.29 cfs @ 12.29 hrs,  Volume= 26,768 cf Primary = 4.29 cfs @ 12.29 hrs,  Volume= 26,768 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs T1 DMA 12345_52 T2 DMA 9_10_11_13_49 T4a 15a_17_20_21 T4B 7_16_25_26_43_48_15b T5 6_8_12_14_50 T6 15_22_23_32_33 T7 31_31_41_51 T8 35_38_39_42 T9 19_24_24_28_29 1 SCM 1 2 SCM 2 Flat 4a SCM 4a flat 4B SCM 4b flat 5a SCM5 Flat 6a SCM6 Flat 7 SCM 7 flat 8 SCM8 flat 9 SCM9 Site Site Total Routing Diagram for PostDevelopment Prepared by Keith V Crowe, PE, Printed 2/3/2021 HydroCAD® 10.00-22 s/n 04223 © 2018 HydroCAD Software Solutions LLC Subcat Reach Pond Link Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ PostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 2HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (sq‐ft) CN Description (subcatchment‐numbers) 2,236 98 DMA1  (T1) 134 98 DMA10A  (T2) 248 74 DMA10B  (T2) 1,699 74 DMA11  (T2) 346 74 DMA12  (T5) 1,250 98 DMA13  (T2) 287 98 DMA14  (T5) 1,504 98 DMA15B  (T4B) 2,710 98 DMA15a  (T4a) 141 74 DMA16  (T4B) 1,747 98 DMA17  (T4a) 998 98 DMA18 Perm Pav  (T6) 78 74 DMA19  (T9) 1,433 74 DMA2  (T1) 1,262 98 DMA20  (T4a) 252 98 DMA21  (T4a) 133 74 DMA22  (T6) 153 98 DMA23  (T6) 105 74 DMA24  (T9) 1,113 98 DMA25  (T4B) 646 98 DMA26  (T4B) 4,847 98 DMA27  (T9) 4,427 98 DMA28  (T9) 1,306 98 DMA29  (T9) 276 98 DMA3  (T1) 1,327 98 DMA30  (T7) 2,135 98 DMA31  (T7) 6,063 98 DMA32  (T6) 1,661 74 DMA33  (T6) 1,772 98 DMA35  (T8) 421 98 DMA38  (T8) 299 74 DMA39  (T8) 2,862 98 DMA4  (T1) 266 98 DMA41A  (T7) 316 74 DMA41B  (T7) 927 74 DMA42 PERM PAv  (T8) 4,333 98 DMA43 PERM PAV  (T4B) 196 74 DMA48  (T4B) 1,615 98 DMA49 Perm Pav  (T2) 666 98 DMA5  (T1) 1,154 98 DMA50 PERM PAV  (T5) Area (sq‐ft) CN Description (subcatchment‐numbers) 2,114 74 DMA52  (T1) 1,302 98 DMA54 PERM PAV  (T7) 2,117 98 DMA6  (T5) 1,715 98 DMA7  (T4B) 3,575 98 DMA8  (T5) 1,525 98 DMA9  (T2) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 3HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.24 cfs @ 12.29 hrs,  Volume= 1,736 cf,  Depth= 2.17ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 2,236 98 DMA1 * 1,433 74 DMA2 * 276 98 DMA3 * 2,862 98 DMA4 * 666 98 DMA5 * 2,114 74 DMA52 9,587 89 Weighted Average 3,547 37.00% Pervious Area 6,040 63.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.17 cfs @ 12.29 hrs,  Volume= 1,268 cf,  Depth= 2.35ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,525 98 DMA9 * 134 98 DMA10A * 248 74 DMA10B * 1,699 74 DMA11 * 1,250 98 DMA13 * 1,615 98 DMA49 Perm Pav 6,471 91 Weighted Average 1,947 30.09% Pervious Area 4,524 69.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 4HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T4a: 15a_17_20_21 Runoff = 0.19 cfs @ 12.28 hrs,  Volume= 1,526 cf,  Depth= 3.07ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 2,710 98 DMA15a * 1,747 98 DMA17 * 1,262 98 DMA20 * 252 98 DMA21 5,971 98 Weighted Average 5,971 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.30 cfs @ 12.28 hrs,  Volume= 2,376 cf,  Depth= 2.96ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,715 98 DMA7 * 1,504 98 DMA15B * 141 74 DMA16 * 1,113 98 DMA25 * 646 98 DMA26 * 4,333 98 DMA43 PERM PAV * 196 74 DMA48 9,648 97 Weighted Average 337 3.49% Pervious Area 9,311 96.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.23 cfs @ 12.28 hrs,  Volume= 1,842 cf,  Depth= 2.96ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 5HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 98 DMA6 * 3,575 98 DMA8 * 346 74 DMA12 * 287 98 DMA14 * 1,154 98 DMA50 PERM PAV 7,479 97 Weighted Average 346 4.63% Pervious Area 7,133 95.37% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.26 cfs @ 12.29 hrs,  Volume= 1,908 cf,  Depth= 2.54ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 998 98 DMA18 Perm Pav * 133 74 DMA22 * 153 98 DMA23 * 6,063 98 DMA32 * 1,661 74 DMA33 9,008 93 Weighted Average 1,794 19.92% Pervious Area 7,214 80.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.17 cfs @ 12.28 hrs,  Volume= 1,317 cf,  Depth= 2.96ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 6HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 1,327 98 DMA30 * 2,135 98 DMA31 * 266 98 DMA41A * 316 74 DMA41B * 1,302 98 DMA54 PERM PAV 5,346 97 Weighted Average 316 5.91% Pervious Area 5,030 94.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.09 cfs @ 12.29 hrs,  Volume= 619 cf,  Depth= 2.17ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Area (sf) CN Description * 1,772 98 DMA35 * 421 98 DMA38 * 299 74 DMA39 * 927 74 DMA42 PERM PAv 3,419 89 Weighted Average 1,226 35.86% Pervious Area 2,193 64.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.34 cfs @ 12.28 hrs,  Volume= 2,751 cf,  Depth= 3.07ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 2‐year  Rainfall=3.30ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 7HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 78 74 DMA19 * 105 74 DMA24 * 4,847 98 DMA27 * 4,427 98 DMA28 * 1,306 98 DMA29 10,763 98 Weighted Average 183 1.70% Pervious Area 10,580 98.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Pond 1: SCM 1 Inflow Area = 9,587 sf, 63.00% Impervious,  Inflow Depth = 2.17ʺ    for  2‐year event Inflow = 0.24 cfs @ 12.29 hrs,  Volume= 1,736 cf Outflow = 0.01 cfs @ 23.35 hrs,  Volume= 1,074 cf,  Atten= 95%,  Lag= 663.7 min Discarded = 0.01 cfs @ 23.35 hrs,  Volume= 1,074 cf Primary = 0.00 cfs @ 0.00 hrs,  Volume= 0 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.59ʹ @ 23.35 hrs   Surf.Area= 4,210 sf    Storage= 1,220 cf Plug‐Flow detention time= 861.0 min calculated for 1,074 cf (62% of inflow) Center‐of‐Mass det. time= 713.9 min ( 1,558.6 ‐ 844.7 ) Volume Invert Avail.Storage Storage Description #1 160.50ʹ1,039 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,154 cf Overall   x 25.0% Voids #2 162.50ʹ3,850 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,888 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 160.50 2,077 0 0 162.50 2,077 4,154 4,154 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 162.50 2,077 0 0 163.00 2,400 1,119 1,119 163.50 2,728 1,282 2,401 164.00 3,065 1,448 3,850 Device Routing     Invert Outlet Devices #1 Primary 163.50ʹ12.0ʹ long  x 8.0ʹ breadth Broad‐Crested Rectangular Weir    Head (feet)  0.20  0.40  0.60  0.80  1.00  1.20  1.40  1.60  1.80  2.00  2.50  3.00  3.50  4.00  4.50  5.00  5.50    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 8HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Coef. (English)  2.43  2.54  2.70  2.69  2.68  2.68  2.66  2.64  2.64  2.64  2.65  2.65  2.66  2.66  2.68   2.70  2.74    #2 Discarded 160.50ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 23.35 hrs   HW=162.59ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.00 cfs @ 0.00 hrs  HW=160.50ʹ   (Free Discharge) 1=Broad‐Crested Rectangular Weir  ( Controls 0.00 cfs) Summary for Pond 2: SCM 2 Flat Inflow Area = 6,471 sf, 69.91% Impervious,  Inflow Depth = 2.35ʺ    for  2‐year event Inflow = 0.17 cfs @ 12.29 hrs,  Volume= 1,268 cf Outflow = 0.02 cfs @ 15.35 hrs,  Volume= 954 cf,  Atten= 88%,  Lag= 183.7 min Discarded = 0.00 cfs @ 15.35 hrs,  Volume= 655 cf Primary = 0.02 cfs @ 15.35 hrs,  Volume= 300 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.72ʹ @ 15.35 hrs   Surf.Area= 1,672 sf    Storage= 713 cf Plug‐Flow detention time= 725.2 min calculated for 954 cf (75% of inflow) Center‐of‐Mass det. time= 615.4 min ( 1,447.0 ‐ 831.6 ) Volume Invert Avail.Storage Storage Description #1 162.65ʹ1,170 cf 13.27ʹW x 126.00ʹL x 1.75ʹH Prismatoid 2,926 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.65ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 15.35 hrs   HW=163.72ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.02 cfs @ 15.35 hrs  HW=163.72ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.02 cfs @ 1.32 fps) Summary for Pond 4a: SCM 4a flat Inflow Area = 5,971 sf,100.00% Impervious,  Inflow Depth = 3.07ʺ    for  2‐year event Inflow = 0.19 cfs @ 12.28 hrs,  Volume= 1,526 cf Outflow = 0.13 cfs @ 12.38 hrs,  Volume= 1,525 cf,  Atten= 28%,  Lag= 5.7 min Discarded = 0.00 cfs @ 12.38 hrs,  Volume= 726 cf Primary = 0.13 cfs @ 12.38 hrs,  Volume= 799 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.36ʹ @ 12.38 hrs   Surf.Area= 1,776 sf    Storage= 501 cf Plug‐Flow detention time= 401.0 min calculated for 1,525 cf (100% of inflow) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 9HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Center‐of‐Mass det. time= 400.7 min ( 1,167.4 ‐ 766.7 ) Volume Invert Avail.Storage Storage Description #1 163.65ʹ888 cf 12.00ʹW x 148.00ʹL x 1.25ʹH Prismatoid 2,220 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 164.15ʹ4.0ʺ Vert. Orifice/Grate   X 2 rows with 12.0ʺ cc spacing C= 0.900    #2 Discarded 163.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.38 hrs   HW=164.36ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.13 cfs @ 12.38 hrs  HW=164.36ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.13 cfs @ 2.31 fps) Summary for Pond 4B: SCM 4b flat Inflow Area = 15,619 sf, 97.84% Impervious,  Inflow Depth = 2.44ʺ    for  2‐year event Inflow = 0.41 cfs @ 12.30 hrs,  Volume= 3,175 cf Outflow = 0.09 cfs @ 13.29 hrs,  Volume= 3,173 cf,  Atten= 77%,  Lag= 59.4 min Discarded = 0.01 cfs @ 13.29 hrs,  Volume= 1,839 cf Primary = 0.08 cfs @ 13.29 hrs,  Volume= 1,334 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.27ʹ @ 13.29 hrs   Surf.Area= 4,588 sf    Storage= 1,206 cf Plug‐Flow detention time= 480.2 min calculated for 3,173 cf (100% of inflow) Center‐of‐Mass det. time= 479.7 min ( 1,286.5 ‐ 806.7 ) Volume Invert Avail.Storage Storage Description #1 162.61ʹ2,294 cf 62.00ʹW x 74.00ʹL x 1.25ʹH Prismatoid 5,735 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.11ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.61ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 13.29 hrs   HW=163.27ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.08 cfs @ 13.29 hrs  HW=163.27ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.08 cfs @ 2.02 fps) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 10HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond 5a: SCM5 Flat Inflow Area = 7,479 sf, 95.37% Impervious,  Inflow Depth = 2.96ʺ    for  2‐year event Inflow = 0.23 cfs @ 12.28 hrs,  Volume= 1,842 cf Outflow = 0.10 cfs @ 12.44 hrs,  Volume= 1,718 cf,  Atten= 55%,  Lag= 9.7 min Discarded = 0.01 cfs @ 12.44 hrs,  Volume= 890 cf Primary = 0.10 cfs @ 12.44 hrs,  Volume= 828 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.51ʹ @ 12.44 hrs   Surf.Area= 2,136 sf    Storage= 721 cf Plug‐Flow detention time= 497.7 min calculated for 1,718 cf (93% of inflow) Center‐of‐Mass det. time= 457.2 min ( 1,236.5 ‐ 779.3 ) Volume Invert Avail.Storage Storage Description #1 161.67ʹ1,213 cf 46.22ʹW x 46.22ʹL x 1.42ʹH Prismatoid 3,034 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 162.34ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 161.67ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.44 hrs   HW=162.51ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.10 cfs @ 12.44 hrs  HW=162.51ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.10 cfs @ 2.13 fps) Summary for Pond 6a: SCM6 Flat Inflow Area = 9,008 sf, 80.08% Impervious,  Inflow Depth = 2.54ʺ    for  2‐year event Inflow = 0.26 cfs @ 12.29 hrs,  Volume= 1,908 cf Outflow = 0.04 cfs @ 14.43 hrs,  Volume= 1,734 cf,  Atten= 85%,  Lag= 128.8 min Discarded = 0.01 cfs @ 14.43 hrs,  Volume= 1,176 cf Primary = 0.03 cfs @ 14.43 hrs,  Volume= 558 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.14ʹ @ 14.43 hrs   Surf.Area= 2,980 sf    Storage= 909 cf Plug‐Flow detention time= 642.2 min calculated for 1,734 cf (91% of inflow) Center‐of‐Mass det. time= 591.8 min ( 1,408.7 ‐ 816.9 ) Volume Invert Avail.Storage Storage Description #1 164.38ʹ1,693 cf 20.00ʹW x 149.00ʹL x 1.42ʹH Prismatoid 4,232 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.05ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.38ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 11HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Discarded OutFlow  Max=0.01 cfs  @ 14.43 hrs   HW=165.14ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.03 cfs @ 14.43 hrs  HW=165.14ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.03 cfs @ 1.55 fps) Summary for Pond 7: SCM 7 flat Inflow Area = 5,346 sf, 94.09% Impervious,  Inflow Depth = 2.96ʺ    for  2‐year event Inflow = 0.17 cfs @ 12.28 hrs,  Volume= 1,317 cf Outflow = 0.04 cfs @ 12.63 hrs,  Volume= 1,073 cf,  Atten= 74%,  Lag= 20.7 min Discarded = 0.00 cfs @ 12.63 hrs,  Volume= 546 cf Primary = 0.04 cfs @ 12.63 hrs,  Volume= 527 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.66ʹ @ 12.63 hrs   Surf.Area= 1,302 sf    Storage= 576 cf Plug‐Flow detention time= 557.9 min calculated for 1,073 cf (81% of inflow) Center‐of‐Mass det. time= 464.7 min ( 1,244.0 ‐ 779.3 ) Volume Invert Avail.Storage Storage Description #1 164.55ʹ911 cf 21.70ʹW x 60.00ʹL x 1.75ʹH Prismatoid 2,279 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.55ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.55ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.63 hrs   HW=165.66ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.04 cfs @ 12.63 hrs  HW=165.66ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.04 cfs @ 1.66 fps) Summary for Pond 8: SCM8 flat Inflow Area = 3,419 sf, 64.14% Impervious,  Inflow Depth = 2.17ʺ    for  2‐year event Inflow = 0.09 cfs @ 12.29 hrs,  Volume= 619 cf Outflow = 0.01 cfs @ 17.60 hrs,  Volume= 619 cf,  Atten= 90%,  Lag= 318.5 min Discarded = 0.00 cfs @ 17.60 hrs,  Volume= 562 cf Primary = 0.00 cfs @ 17.60 hrs,  Volume= 56 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.18ʹ @ 17.60 hrs   Surf.Area= 1,568 sf    Storage= 334 cf Plug‐Flow detention time= 708.1 min calculated for 619 cf (100% of inflow) Center‐of‐Mass det. time= 707.9 min ( 1,552.6 ‐ 844.7 ) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 2‐year  Rainfall=3.30ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 12HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Volume Invert Avail.Storage Storage Description #1 164.65ʹ1,098 cf 14.00ʹW x 112.00ʹL x 1.75ʹH Prismatoid 2,744 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.15ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 17.60 hrs   HW=165.18ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.00 cfs @ 17.60 hrs  HW=165.18ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.00 cfs @ 0.92 fps) Summary for Pond 9: SCM9 Inflow Area = 10,763 sf, 98.30% Impervious,  Inflow Depth = 3.07ʺ    for  2‐year event Inflow = 0.34 cfs @ 12.28 hrs,  Volume= 2,751 cf Outflow = 0.23 cfs @ 12.39 hrs,  Volume= 2,751 cf,  Atten= 32%,  Lag= 6.1 min Discarded = 0.01 cfs @ 12.39 hrs,  Volume= 525 cf Primary = 0.22 cfs @ 12.39 hrs,  Volume= 2,226 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.80ʹ @ 12.39 hrs   Surf.Area= 2,480 sf    Storage= 290 cf Plug‐Flow detention time= 38.0 min calculated for 2,751 cf (100% of inflow) Center‐of‐Mass det. time= 37.9 min ( 804.6 ‐ 766.7 ) Volume Invert Avail.Storage Storage Description #1 163.51ʹ2,232 cf 16.00ʹW x 155.00ʹL x 2.25ʹH Prismatoid 5,580 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.51ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 163.51ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.39 hrs   HW=163.80ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.22 cfs @ 12.39 hrs  HW=163.80ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.22 cfs @ 2.76 fps) Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 85.68% Impervious,  Inflow Depth = 1.03ʺ    for  2‐year event Inflow = 0.36 cfs @ 12.46 hrs,  Volume= 5,829 cf Primary = 0.36 cfs @ 12.46 hrs,  Volume= 5,829 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 13HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.42 cfs @ 12.29 hrs,  Volume= 2,708 cf,  Depth= 3.39ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 2,236 98 DMA1 * 1,433 74 DMA2 * 276 98 DMA3 * 2,862 98 DMA4 * 666 98 DMA5 * 2,114 74 DMA52 9,587 89 Weighted Average 3,547 37.00% Pervious Area 6,040 63.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.30 cfs @ 12.29 hrs,  Volume= 1,938 cf,  Depth= 3.59ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,525 98 DMA9 * 134 98 DMA10A * 248 74 DMA10B * 1,699 74 DMA11 * 1,250 98 DMA13 * 1,615 98 DMA49 Perm Pav 6,471 91 Weighted Average 1,947 30.09% Pervious Area 4,524 69.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 14HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T4a: 15a_17_20_21 Runoff = 0.30 cfs @ 12.28 hrs,  Volume= 2,171 cf,  Depth= 4.36ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 2,710 98 DMA15a * 1,747 98 DMA17 * 1,262 98 DMA20 * 252 98 DMA21 5,971 98 Weighted Average 5,971 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.48 cfs @ 12.28 hrs,  Volume= 3,416 cf,  Depth= 4.25ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,715 98 DMA7 * 1,504 98 DMA15B * 141 74 DMA16 * 1,113 98 DMA25 * 646 98 DMA26 * 4,333 98 DMA43 PERM PAV * 196 74 DMA48 9,648 97 Weighted Average 337 3.49% Pervious Area 9,311 96.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.37 cfs @ 12.28 hrs,  Volume= 2,648 cf,  Depth= 4.25ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 15HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 98 DMA6 * 3,575 98 DMA8 * 346 74 DMA12 * 287 98 DMA14 * 1,154 98 DMA50 PERM PAV 7,479 97 Weighted Average 346 4.63% Pervious Area 7,133 95.37% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.43 cfs @ 12.28 hrs,  Volume= 2,857 cf,  Depth= 3.81ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 998 98 DMA18 Perm Pav * 133 74 DMA22 * 153 98 DMA23 * 6,063 98 DMA32 * 1,661 74 DMA33 9,008 93 Weighted Average 1,794 19.92% Pervious Area 7,214 80.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.27 cfs @ 12.28 hrs,  Volume= 1,893 cf,  Depth= 4.25ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 16HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 1,327 98 DMA30 * 2,135 98 DMA31 * 266 98 DMA41A * 316 74 DMA41B * 1,302 98 DMA54 PERM PAV 5,346 97 Weighted Average 316 5.91% Pervious Area 5,030 94.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.15 cfs @ 12.29 hrs,  Volume= 966 cf,  Depth= 3.39ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Area (sf) CN Description * 1,772 98 DMA35 * 421 98 DMA38 * 299 74 DMA39 * 927 74 DMA42 PERM PAv 3,419 89 Weighted Average 1,226 35.86% Pervious Area 2,193 64.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.54 cfs @ 12.28 hrs,  Volume= 3,914 cf,  Depth= 4.36ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 10‐year  Rainfall=4.60ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 17HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 78 74 DMA19 * 105 74 DMA24 * 4,847 98 DMA27 * 4,427 98 DMA28 * 1,306 98 DMA29 10,763 98 Weighted Average 183 1.70% Pervious Area 10,580 98.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Pond 1: SCM 1 Inflow Area = 9,587 sf, 63.00% Impervious,  Inflow Depth = 3.39ʺ    for  10‐year event Inflow = 0.42 cfs @ 12.29 hrs,  Volume= 2,708 cf Outflow = 0.01 cfs @ 24.08 hrs,  Volume= 1,578 cf,  Atten= 97%,  Lag= 707.4 min Discarded = 0.01 cfs @ 24.08 hrs,  Volume= 1,578 cf Primary = 0.00 cfs @ 0.00 hrs,  Volume= 0 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.97ʹ @ 24.08 hrs   Surf.Area= 4,460 sf    Storage= 2,093 cf Plug‐Flow detention time= 1,021.9 min calculated for 1,578 cf (58% of inflow) Center‐of‐Mass det. time= 880.1 min ( 1,699.0 ‐ 818.9 ) Volume Invert Avail.Storage Storage Description #1 160.50ʹ1,039 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,154 cf Overall   x 25.0% Voids #2 162.50ʹ3,850 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,888 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 160.50 2,077 0 0 162.50 2,077 4,154 4,154 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 162.50 2,077 0 0 163.00 2,400 1,119 1,119 163.50 2,728 1,282 2,401 164.00 3,065 1,448 3,850 Device Routing     Invert Outlet Devices #1 Primary 163.50ʹ12.0ʹ long  x 8.0ʹ breadth Broad‐Crested Rectangular Weir    Head (feet)  0.20  0.40  0.60  0.80  1.00  1.20  1.40  1.60  1.80  2.00  2.50  3.00  3.50  4.00  4.50  5.00  5.50    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 18HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Coef. (English)  2.43  2.54  2.70  2.69  2.68  2.68  2.66  2.64  2.64  2.64  2.65  2.65  2.66  2.66  2.68   2.70  2.74    #2 Discarded 160.50ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 24.08 hrs   HW=162.97ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.00 cfs @ 0.00 hrs  HW=160.50ʹ   (Free Discharge) 1=Broad‐Crested Rectangular Weir  ( Controls 0.00 cfs) Summary for Pond 2: SCM 2 Flat Inflow Area = 6,471 sf, 69.91% Impervious,  Inflow Depth = 3.59ʺ    for  10‐year event Inflow = 0.30 cfs @ 12.29 hrs,  Volume= 1,938 cf Outflow = 0.11 cfs @ 12.48 hrs,  Volume= 1,622 cf,  Atten= 62%,  Lag= 11.7 min Discarded = 0.00 cfs @ 12.48 hrs,  Volume= 666 cf Primary = 0.11 cfs @ 12.48 hrs,  Volume= 956 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.83ʹ @ 12.48 hrs   Surf.Area= 1,672 sf    Storage= 791 cf Plug‐Flow detention time= 468.2 min calculated for 1,622 cf (84% of inflow) Center‐of‐Mass det. time= 391.1 min ( 1,199.6 ‐ 808.5 ) Volume Invert Avail.Storage Storage Description #1 162.65ʹ1,170 cf 13.27ʹW x 126.00ʹL x 1.75ʹH Prismatoid 2,926 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.65ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.48 hrs   HW=163.83ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.11 cfs @ 12.48 hrs  HW=163.83ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.11 cfs @ 2.19 fps) Summary for Pond 4a: SCM 4a flat Inflow Area = 5,971 sf,100.00% Impervious,  Inflow Depth = 4.36ʺ    for  10‐year event Inflow = 0.30 cfs @ 12.28 hrs,  Volume= 2,171 cf Outflow = 0.23 cfs @ 12.37 hrs,  Volume= 2,170 cf,  Atten= 25%,  Lag= 5.2 min Discarded = 0.00 cfs @ 12.37 hrs,  Volume= 735 cf Primary = 0.22 cfs @ 12.37 hrs,  Volume= 1,435 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.44ʹ @ 12.37 hrs   Surf.Area= 1,776 sf    Storage= 562 cf Plug‐Flow detention time= 299.1 min calculated for 2,170 cf (100% of inflow) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 19HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Center‐of‐Mass det. time= 298.6 min ( 1,056.5 ‐ 757.9 ) Volume Invert Avail.Storage Storage Description #1 163.65ʹ888 cf 12.00ʹW x 148.00ʹL x 1.25ʹH Prismatoid 2,220 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 164.15ʹ4.0ʺ Vert. Orifice/Grate   X 2 rows with 12.0ʺ cc spacing C= 0.900    #2 Discarded 163.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.37 hrs   HW=164.44ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.22 cfs @ 12.37 hrs  HW=164.44ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.22 cfs @ 2.75 fps) Summary for Pond 4B: SCM 4b flat Inflow Area = 15,619 sf, 97.84% Impervious,  Inflow Depth = 3.73ʺ    for  10‐year event Inflow = 0.68 cfs @ 12.30 hrs,  Volume= 4,851 cf Outflow = 0.32 cfs @ 12.54 hrs,  Volume= 4,846 cf,  Atten= 54%,  Lag= 14.1 min Discarded = 0.01 cfs @ 12.54 hrs,  Volume= 1,882 cf Primary = 0.30 cfs @ 12.54 hrs,  Volume= 2,965 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.51ʹ @ 12.54 hrs   Surf.Area= 4,588 sf    Storage= 1,651 cf Plug‐Flow detention time= 341.9 min calculated for 4,845 cf (100% of inflow) Center‐of‐Mass det. time= 341.6 min ( 1,132.5 ‐ 790.9 ) Volume Invert Avail.Storage Storage Description #1 162.61ʹ2,294 cf 62.00ʹW x 74.00ʹL x 1.25ʹH Prismatoid 5,735 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.11ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.61ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.54 hrs   HW=163.51ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.30 cfs @ 12.54 hrs  HW=163.51ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.30 cfs @ 3.49 fps) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 20HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond 5a: SCM5 Flat Inflow Area = 7,479 sf, 95.37% Impervious,  Inflow Depth = 4.25ʺ    for  10‐year event Inflow = 0.37 cfs @ 12.28 hrs,  Volume= 2,648 cf Outflow = 0.26 cfs @ 12.38 hrs,  Volume= 2,521 cf,  Atten= 31%,  Lag= 5.9 min Discarded = 0.01 cfs @ 12.38 hrs,  Volume= 900 cf Primary = 0.25 cfs @ 12.38 hrs,  Volume= 1,621 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.67ʹ @ 12.38 hrs   Surf.Area= 2,136 sf    Storage= 852 cf Plug‐Flow detention time= 360.9 min calculated for 2,521 cf (95% of inflow) Center‐of‐Mass det. time= 331.3 min ( 1,098.8 ‐ 767.5 ) Volume Invert Avail.Storage Storage Description #1 161.67ʹ1,213 cf 46.22ʹW x 46.22ʹL x 1.42ʹH Prismatoid 3,034 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 162.34ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 161.67ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.38 hrs   HW=162.67ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.25 cfs @ 12.38 hrs  HW=162.67ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.25 cfs @ 2.92 fps) Summary for Pond 6a: SCM6 Flat Inflow Area = 9,008 sf, 80.08% Impervious,  Inflow Depth = 3.81ʺ    for  10‐year event Inflow = 0.43 cfs @ 12.28 hrs,  Volume= 2,857 cf Outflow = 0.20 cfs @ 12.44 hrs,  Volume= 2,677 cf,  Atten= 54%,  Lag= 9.4 min Discarded = 0.01 cfs @ 12.44 hrs,  Volume= 1,197 cf Primary = 0.19 cfs @ 12.44 hrs,  Volume= 1,480 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.31ʹ @ 12.44 hrs   Surf.Area= 2,980 sf    Storage= 1,106 cf Plug‐Flow detention time= 443.9 min calculated for 2,676 cf (94% of inflow) Center‐of‐Mass det. time= 407.8 min ( 1,204.7 ‐ 796.9 ) Volume Invert Avail.Storage Storage Description #1 164.38ʹ1,693 cf 20.00ʹW x 149.00ʹL x 1.42ʹH Prismatoid 4,232 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.05ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.38ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 21HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Discarded OutFlow  Max=0.01 cfs  @ 12.44 hrs   HW=165.31ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.19 cfs @ 12.44 hrs  HW=165.31ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.19 cfs @ 2.59 fps) Summary for Pond 7: SCM 7 flat Inflow Area = 5,346 sf, 94.09% Impervious,  Inflow Depth = 4.25ʺ    for  10‐year event Inflow = 0.27 cfs @ 12.28 hrs,  Volume= 1,893 cf Outflow = 0.22 cfs @ 12.36 hrs,  Volume= 1,647 cf,  Atten= 18%,  Lag= 4.5 min Discarded = 0.00 cfs @ 12.36 hrs,  Volume= 551 cf Primary = 0.21 cfs @ 12.36 hrs,  Volume= 1,096 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.83ʹ @ 12.36 hrs   Surf.Area= 1,302 sf    Storage= 668 cf Plug‐Flow detention time= 391.6 min calculated for 1,647 cf (87% of inflow) Center‐of‐Mass det. time= 324.1 min ( 1,091.6 ‐ 767.5 ) Volume Invert Avail.Storage Storage Description #1 164.55ʹ911 cf 21.70ʹW x 60.00ʹL x 1.75ʹH Prismatoid 2,279 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.55ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.55ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.36 hrs   HW=165.83ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.21 cfs @ 12.36 hrs  HW=165.83ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.21 cfs @ 2.72 fps) Summary for Pond 8: SCM8 flat Inflow Area = 3,419 sf, 64.14% Impervious,  Inflow Depth = 3.39ʺ    for  10‐year event Inflow = 0.15 cfs @ 12.29 hrs,  Volume= 966 cf Outflow = 0.04 cfs @ 12.70 hrs,  Volume= 965 cf,  Atten= 76%,  Lag= 25.0 min Discarded = 0.00 cfs @ 12.70 hrs,  Volume= 578 cf Primary = 0.03 cfs @ 12.70 hrs,  Volume= 387 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.24ʹ @ 12.70 hrs   Surf.Area= 1,568 sf    Storage= 373 cf Plug‐Flow detention time= 495.8 min calculated for 965 cf (100% of inflow) Center‐of‐Mass det. time= 495.6 min ( 1,314.6 ‐ 818.9 ) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 10‐year  Rainfall=4.60ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 22HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Volume Invert Avail.Storage Storage Description #1 164.65ʹ1,098 cf 14.00ʹW x 112.00ʹL x 1.75ʹH Prismatoid 2,744 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.15ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.70 hrs   HW=165.24ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.03 cfs @ 12.70 hrs  HW=165.24ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.03 cfs @ 1.57 fps) Summary for Pond 9: SCM9 Inflow Area = 10,763 sf, 98.30% Impervious,  Inflow Depth = 4.36ʺ    for  10‐year event Inflow = 0.54 cfs @ 12.28 hrs,  Volume= 3,914 cf Outflow = 0.33 cfs @ 12.40 hrs,  Volume= 3,914 cf,  Atten= 38%,  Lag= 6.9 min Discarded = 0.01 cfs @ 12.40 hrs,  Volume= 537 cf Primary = 0.33 cfs @ 12.40 hrs,  Volume= 3,377 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.95ʹ @ 12.40 hrs   Surf.Area= 2,480 sf    Storage= 435 cf Plug‐Flow detention time= 33.4 min calculated for 3,913 cf (100% of inflow) Center‐of‐Mass det. time= 33.4 min ( 791.3 ‐ 757.9 ) Volume Invert Avail.Storage Storage Description #1 163.51ʹ2,232 cf 16.00ʹW x 155.00ʹL x 2.25ʹH Prismatoid 5,580 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.51ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 163.51ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.40 hrs   HW=163.95ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.33 cfs @ 12.40 hrs  HW=163.95ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.33 cfs @ 3.76 fps) Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 85.68% Impervious,  Inflow Depth = 2.11ʺ    for  10‐year event Inflow = 1.37 cfs @ 12.42 hrs,  Volume= 11,881 cf Primary = 1.37 cfs @ 12.42 hrs,  Volume= 11,881 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 23HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.52 cfs @ 12.29 hrs,  Volume= 3,551 cf,  Depth= 4.45ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 2,236 98 DMA1 * 1,433 74 DMA2 * 276 98 DMA3 * 2,862 98 DMA4 * 666 98 DMA5 * 2,114 74 DMA52 9,587 89 Weighted Average 3,547 37.00% Pervious Area 6,040 63.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.36 cfs @ 12.29 hrs,  Volume= 2,515 cf,  Depth= 4.66ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,525 98 DMA9 * 134 98 DMA10A * 248 74 DMA10B * 1,699 74 DMA11 * 1,250 98 DMA13 * 1,615 98 DMA49 Perm Pav 6,471 91 Weighted Average 1,947 30.09% Pervious Area 4,524 69.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 24HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T4a: 15a_17_20_21 Runoff = 0.35 cfs @ 12.28 hrs,  Volume= 2,718 cf,  Depth= 5.46ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 2,710 98 DMA15a * 1,747 98 DMA17 * 1,262 98 DMA20 * 252 98 DMA21 5,971 98 Weighted Average 5,971 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.57 cfs @ 12.28 hrs,  Volume= 4,297 cf,  Depth= 5.34ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,715 98 DMA7 * 1,504 98 DMA15B * 141 74 DMA16 * 1,113 98 DMA25 * 646 98 DMA26 * 4,333 98 DMA43 PERM PAV * 196 74 DMA48 9,648 97 Weighted Average 337 3.49% Pervious Area 9,311 96.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.44 cfs @ 12.28 hrs,  Volume= 3,331 cf,  Depth= 5.34ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 25HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 98 DMA6 * 3,575 98 DMA8 * 346 74 DMA12 * 287 98 DMA14 * 1,154 98 DMA50 PERM PAV 7,479 97 Weighted Average 346 4.63% Pervious Area 7,133 95.37% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.51 cfs @ 12.28 hrs,  Volume= 3,668 cf,  Depth= 4.89ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 998 98 DMA18 Perm Pav * 133 74 DMA22 * 153 98 DMA23 * 6,063 98 DMA32 * 1,661 74 DMA33 9,008 93 Weighted Average 1,794 19.92% Pervious Area 7,214 80.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.32 cfs @ 12.28 hrs,  Volume= 2,381 cf,  Depth= 5.34ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 26HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 1,327 98 DMA30 * 2,135 98 DMA31 * 266 98 DMA41A * 316 74 DMA41B * 1,302 98 DMA54 PERM PAV 5,346 97 Weighted Average 316 5.91% Pervious Area 5,030 94.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.18 cfs @ 12.29 hrs,  Volume= 1,267 cf,  Depth= 4.45ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Area (sf) CN Description * 1,772 98 DMA35 * 421 98 DMA38 * 299 74 DMA39 * 927 74 DMA42 PERM PAv 3,419 89 Weighted Average 1,226 35.86% Pervious Area 2,193 64.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.64 cfs @ 12.28 hrs,  Volume= 4,899 cf,  Depth= 5.46ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 25‐year  Rainfall=5.70ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 27HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 78 74 DMA19 * 105 74 DMA24 * 4,847 98 DMA27 * 4,427 98 DMA28 * 1,306 98 DMA29 10,763 98 Weighted Average 183 1.70% Pervious Area 10,580 98.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Pond 1: SCM 1 Inflow Area = 9,587 sf, 63.00% Impervious,  Inflow Depth = 4.45ʺ    for  25‐year event Inflow = 0.52 cfs @ 12.29 hrs,  Volume= 3,551 cf Outflow = 0.01 cfs @ 24.11 hrs,  Volume= 1,677 cf,  Atten= 98%,  Lag= 709.3 min Discarded = 0.01 cfs @ 24.11 hrs,  Volume= 1,677 cf Primary = 0.00 cfs @ 0.00 hrs,  Volume= 0 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.29ʹ @ 24.11 hrs   Surf.Area= 4,669 sf    Storage= 2,888 cf Plug‐Flow detention time= 1,047.1 min calculated for 1,677 cf (47% of inflow) Center‐of‐Mass det. time= 876.5 min ( 1,686.5 ‐ 809.9 ) Volume Invert Avail.Storage Storage Description #1 160.50ʹ1,039 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,154 cf Overall   x 25.0% Voids #2 162.50ʹ3,850 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,888 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 160.50 2,077 0 0 162.50 2,077 4,154 4,154 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 162.50 2,077 0 0 163.00 2,400 1,119 1,119 163.50 2,728 1,282 2,401 164.00 3,065 1,448 3,850 Device Routing     Invert Outlet Devices #1 Primary 163.50ʹ12.0ʹ long  x 8.0ʹ breadth Broad‐Crested Rectangular Weir    Head (feet)  0.20  0.40  0.60  0.80  1.00  1.20  1.40  1.60  1.80  2.00  2.50  3.00  3.50  4.00  4.50  5.00  5.50    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 28HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Coef. (English)  2.43  2.54  2.70  2.69  2.68  2.68  2.66  2.64  2.64  2.64  2.65  2.65  2.66  2.66  2.68   2.70  2.74    #2 Discarded 160.50ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 24.11 hrs   HW=163.29ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.00 cfs @ 0.00 hrs  HW=160.50ʹ   (Free Discharge) 1=Broad‐Crested Rectangular Weir  ( Controls 0.00 cfs) Summary for Pond 2: SCM 2 Flat Inflow Area = 6,471 sf, 69.91% Impervious,  Inflow Depth = 4.66ʺ    for  25‐year event Inflow = 0.36 cfs @ 12.29 hrs,  Volume= 2,515 cf Outflow = 0.26 cfs @ 12.38 hrs,  Volume= 2,196 cf,  Atten= 28%,  Lag= 5.6 min Discarded = 0.00 cfs @ 12.38 hrs,  Volume= 682 cf Primary = 0.25 cfs @ 12.38 hrs,  Volume= 1,514 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.98ʹ @ 12.38 hrs   Surf.Area= 1,672 sf    Storage= 887 cf Plug‐Flow detention time= 372.0 min calculated for 2,196 cf (87% of inflow) Center‐of‐Mass det. time= 307.1 min ( 1,107.2 ‐ 800.1 ) Volume Invert Avail.Storage Storage Description #1 162.65ʹ1,170 cf 13.27ʹW x 126.00ʹL x 1.75ʹH Prismatoid 2,926 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.65ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.38 hrs   HW=163.98ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.25 cfs @ 12.38 hrs  HW=163.98ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.25 cfs @ 2.92 fps) Summary for Pond 4a: SCM 4a flat Inflow Area = 5,971 sf,100.00% Impervious,  Inflow Depth = 5.46ʺ    for  25‐year event Inflow = 0.35 cfs @ 12.28 hrs,  Volume= 2,718 cf Outflow = 0.26 cfs @ 12.37 hrs,  Volume= 2,716 cf,  Atten= 26%,  Lag= 5.4 min Discarded = 0.00 cfs @ 12.37 hrs,  Volume= 745 cf Primary = 0.26 cfs @ 12.37 hrs,  Volume= 1,971 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.48ʹ @ 12.37 hrs   Surf.Area= 1,776 sf    Storage= 591 cf Plug‐Flow detention time= 253.2 min calculated for 2,716 cf (100% of inflow) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 29HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Center‐of‐Mass det. time= 253.0 min ( 1,006.8 ‐ 753.8 ) Volume Invert Avail.Storage Storage Description #1 163.65ʹ888 cf 12.00ʹW x 148.00ʹL x 1.25ʹH Prismatoid 2,220 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 164.15ʹ4.0ʺ Vert. Orifice/Grate   X 2 rows with 12.0ʺ cc spacing C= 0.900    #2 Discarded 163.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.37 hrs   HW=164.48ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.26 cfs @ 12.37 hrs  HW=164.48ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.26 cfs @ 2.94 fps) Summary for Pond 4B: SCM 4b flat Inflow Area = 15,619 sf, 97.84% Impervious,  Inflow Depth = 4.82ʺ    for  25‐year event Inflow = 0.81 cfs @ 12.30 hrs,  Volume= 6,268 cf Outflow = 0.39 cfs @ 12.53 hrs,  Volume= 6,260 cf,  Atten= 52%,  Lag= 13.7 min Discarded = 0.01 cfs @ 12.53 hrs,  Volume= 1,927 cf Primary = 0.37 cfs @ 12.53 hrs,  Volume= 4,334 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.63ʹ @ 12.53 hrs   Surf.Area= 4,588 sf    Storage= 1,869 cf Plug‐Flow detention time= 286.1 min calculated for 6,260 cf (100% of inflow) Center‐of‐Mass det. time= 285.2 min ( 1,071.0 ‐ 785.8 ) Volume Invert Avail.Storage Storage Description #1 162.61ʹ2,294 cf 62.00ʹW x 74.00ʹL x 1.25ʹH Prismatoid 5,735 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.11ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.61ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.53 hrs   HW=163.63ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.37 cfs @ 12.53 hrs  HW=163.63ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.37 cfs @ 4.28 fps) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 30HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond 5a: SCM5 Flat Inflow Area = 7,479 sf, 95.37% Impervious,  Inflow Depth = 5.34ʺ    for  25‐year event Inflow = 0.44 cfs @ 12.28 hrs,  Volume= 3,331 cf Outflow = 0.30 cfs @ 12.39 hrs,  Volume= 3,200 cf,  Atten= 33%,  Lag= 6.2 min Discarded = 0.01 cfs @ 12.39 hrs,  Volume= 911 cf Primary = 0.29 cfs @ 12.39 hrs,  Volume= 2,289 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.72ʹ @ 12.39 hrs   Surf.Area= 2,136 sf    Storage= 899 cf Plug‐Flow detention time= 301.5 min calculated for 3,200 cf (96% of inflow) Center‐of‐Mass det. time= 276.6 min ( 1,039.0 ‐ 762.4 ) Volume Invert Avail.Storage Storage Description #1 161.67ʹ1,213 cf 46.22ʹW x 46.22ʹL x 1.42ʹH Prismatoid 3,034 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 162.34ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 161.67ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.39 hrs   HW=162.72ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.29 cfs @ 12.39 hrs  HW=162.72ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.29 cfs @ 3.35 fps) Summary for Pond 6a: SCM6 Flat Inflow Area = 9,008 sf, 80.08% Impervious,  Inflow Depth = 4.89ʺ    for  25‐year event Inflow = 0.51 cfs @ 12.28 hrs,  Volume= 3,668 cf Outflow = 0.30 cfs @ 12.41 hrs,  Volume= 3,481 cf,  Atten= 42%,  Lag= 7.4 min Discarded = 0.01 cfs @ 12.41 hrs,  Volume= 1,224 cf Primary = 0.29 cfs @ 12.41 hrs,  Volume= 2,258 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.43ʹ @ 12.41 hrs   Surf.Area= 2,980 sf    Storage= 1,250 cf Plug‐Flow detention time= 362.1 min calculated for 3,481 cf (95% of inflow) Center‐of‐Mass det. time= 331.6 min ( 1,120.8 ‐ 789.2 ) Volume Invert Avail.Storage Storage Description #1 164.38ʹ1,693 cf 20.00ʹW x 149.00ʹL x 1.42ʹH Prismatoid 4,232 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.05ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.38ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 31HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Discarded OutFlow  Max=0.01 cfs  @ 12.41 hrs   HW=165.43ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.29 cfs @ 12.41 hrs  HW=165.43ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.29 cfs @ 3.32 fps) Summary for Pond 7: SCM 7 flat Inflow Area = 5,346 sf, 94.09% Impervious,  Inflow Depth = 5.34ʺ    for  25‐year event Inflow = 0.32 cfs @ 12.28 hrs,  Volume= 2,381 cf Outflow = 0.26 cfs @ 12.36 hrs,  Volume= 2,134 cf,  Atten= 19%,  Lag= 4.6 min Discarded = 0.00 cfs @ 12.36 hrs,  Volume= 558 cf Primary = 0.25 cfs @ 12.36 hrs,  Volume= 1,577 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.88ʹ @ 12.36 hrs   Surf.Area= 1,302 sf    Storage= 690 cf Plug‐Flow detention time= 325.8 min calculated for 2,134 cf (90% of inflow) Center‐of‐Mass det. time= 268.1 min ( 1,030.5 ‐ 762.4 ) Volume Invert Avail.Storage Storage Description #1 164.55ʹ911 cf 21.70ʹW x 60.00ʹL x 1.75ʹH Prismatoid 2,279 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.55ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.55ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.36 hrs   HW=165.88ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.25 cfs @ 12.36 hrs  HW=165.88ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.25 cfs @ 2.91 fps) Summary for Pond 8: SCM8 flat Inflow Area = 3,419 sf, 64.14% Impervious,  Inflow Depth = 4.45ʺ    for  25‐year event Inflow = 0.18 cfs @ 12.29 hrs,  Volume= 1,267 cf Outflow = 0.12 cfs @ 12.40 hrs,  Volume= 1,266 cf,  Atten= 37%,  Lag= 6.7 min Discarded = 0.00 cfs @ 12.40 hrs,  Volume= 597 cf Primary = 0.11 cfs @ 12.40 hrs,  Volume= 669 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.34ʹ @ 12.40 hrs   Surf.Area= 1,568 sf    Storage= 431 cf Plug‐Flow detention time= 399.8 min calculated for 1,266 cf (100% of inflow) Center‐of‐Mass det. time= 399.4 min ( 1,209.4 ‐ 809.9 ) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 25‐year  Rainfall=5.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 32HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Volume Invert Avail.Storage Storage Description #1 164.65ʹ1,098 cf 14.00ʹW x 112.00ʹL x 1.75ʹH Prismatoid 2,744 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.15ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.40 hrs   HW=165.34ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.11 cfs @ 12.40 hrs  HW=165.34ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.11 cfs @ 2.21 fps) Summary for Pond 9: SCM9 Inflow Area = 10,763 sf, 98.30% Impervious,  Inflow Depth = 5.46ʺ    for  25‐year event Inflow = 0.64 cfs @ 12.28 hrs,  Volume= 4,899 cf Outflow = 0.38 cfs @ 12.40 hrs,  Volume= 4,899 cf,  Atten= 41%,  Lag= 7.2 min Discarded = 0.01 cfs @ 12.40 hrs,  Volume= 551 cf Primary = 0.37 cfs @ 12.40 hrs,  Volume= 4,348 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.03ʹ @ 12.40 hrs   Surf.Area= 2,480 sf    Storage= 513 cf Plug‐Flow detention time= 31.8 min calculated for 4,899 cf (100% of inflow) Center‐of‐Mass det. time= 31.7 min ( 785.5 ‐ 753.8 ) Volume Invert Avail.Storage Storage Description #1 163.51ʹ2,232 cf 16.00ʹW x 155.00ʹL x 2.25ʹH Prismatoid 5,580 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.51ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 163.51ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.40 hrs   HW=164.03ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.37 cfs @ 12.40 hrs  HW=164.03ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.37 cfs @ 4.27 fps) Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 85.68% Impervious,  Inflow Depth = 3.01ʺ    for  25‐year event Inflow = 1.93 cfs @ 12.39 hrs,  Volume= 16,989 cf Primary = 1.93 cfs @ 12.39 hrs,  Volume= 16,989 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 33HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.60 cfs @ 12.29 hrs,  Volume= 4,171 cf,  Depth= 5.22ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 2,236 98 DMA1 * 1,433 74 DMA2 * 276 98 DMA3 * 2,862 98 DMA4 * 666 98 DMA5 * 2,114 74 DMA52 9,587 89 Weighted Average 3,547 37.00% Pervious Area 6,040 63.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.41 cfs @ 12.28 hrs,  Volume= 2,937 cf,  Depth= 5.45ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,525 98 DMA9 * 134 98 DMA10A * 248 74 DMA10B * 1,699 74 DMA11 * 1,250 98 DMA13 * 1,615 98 DMA49 Perm Pav 6,471 91 Weighted Average 1,947 30.09% Pervious Area 4,524 69.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 34HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T4a: 15a_17_20_21 Runoff = 0.40 cfs @ 12.28 hrs,  Volume= 3,116 cf,  Depth= 6.26ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 2,710 98 DMA15a * 1,747 98 DMA17 * 1,262 98 DMA20 * 252 98 DMA21 5,971 98 Weighted Average 5,971 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.65 cfs @ 12.28 hrs,  Volume= 4,939 cf,  Depth= 6.14ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,715 98 DMA7 * 1,504 98 DMA15B * 141 74 DMA16 * 1,113 98 DMA25 * 646 98 DMA26 * 4,333 98 DMA43 PERM PAV * 196 74 DMA48 9,648 97 Weighted Average 337 3.49% Pervious Area 9,311 96.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.50 cfs @ 12.28 hrs,  Volume= 3,829 cf,  Depth= 6.14ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 35HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 98 DMA6 * 3,575 98 DMA8 * 346 74 DMA12 * 287 98 DMA14 * 1,154 98 DMA50 PERM PAV 7,479 97 Weighted Average 346 4.63% Pervious Area 7,133 95.37% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.59 cfs @ 12.28 hrs,  Volume= 4,261 cf,  Depth= 5.68ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 998 98 DMA18 Perm Pav * 133 74 DMA22 * 153 98 DMA23 * 6,063 98 DMA32 * 1,661 74 DMA33 9,008 93 Weighted Average 1,794 19.92% Pervious Area 7,214 80.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.36 cfs @ 12.28 hrs,  Volume= 2,737 cf,  Depth= 6.14ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 36HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 1,327 98 DMA30 * 2,135 98 DMA31 * 266 98 DMA41A * 316 74 DMA41B * 1,302 98 DMA54 PERM PAV 5,346 97 Weighted Average 316 5.91% Pervious Area 5,030 94.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.21 cfs @ 12.29 hrs,  Volume= 1,488 cf,  Depth= 5.22ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Area (sf) CN Description * 1,772 98 DMA35 * 421 98 DMA38 * 299 74 DMA39 * 927 74 DMA42 PERM PAv 3,419 89 Weighted Average 1,226 35.86% Pervious Area 2,193 64.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.73 cfs @ 12.28 hrs,  Volume= 5,616 cf,  Depth= 6.26ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 50‐year  Rainfall=6.50ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 37HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 78 74 DMA19 * 105 74 DMA24 * 4,847 98 DMA27 * 4,427 98 DMA28 * 1,306 98 DMA29 10,763 98 Weighted Average 183 1.70% Pervious Area 10,580 98.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Pond 1: SCM 1 Inflow Area = 9,587 sf, 63.00% Impervious,  Inflow Depth = 5.22ʺ    for  50‐year event Inflow = 0.60 cfs @ 12.29 hrs,  Volume= 4,171 cf Outflow = 0.02 cfs @ 24.04 hrs,  Volume= 1,774 cf,  Atten= 96%,  Lag= 705.1 min Discarded = 0.01 cfs @ 24.04 hrs,  Volume= 1,750 cf Primary = 0.01 cfs @ 24.04 hrs,  Volume= 24 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.50ʹ @ 24.04 hrs   Surf.Area= 4,807 sf    Storage= 3,448 cf Plug‐Flow detention time= 1,060.1 min calculated for 1,774 cf (43% of inflow) Center‐of‐Mass det. time= 862.2 min ( 1,669.6 ‐ 807.3 ) Volume Invert Avail.Storage Storage Description #1 160.50ʹ1,039 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,154 cf Overall   x 25.0% Voids #2 162.50ʹ3,850 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,888 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 160.50 2,077 0 0 162.50 2,077 4,154 4,154 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 162.50 2,077 0 0 163.00 2,400 1,119 1,119 163.50 2,728 1,282 2,401 164.00 3,065 1,448 3,850 Device Routing     Invert Outlet Devices #1 Primary 163.50ʹ12.0ʹ long  x 8.0ʹ breadth Broad‐Crested Rectangular Weir    Head (feet)  0.20  0.40  0.60  0.80  1.00  1.20  1.40  1.60  1.80  2.00  2.50  3.00  3.50  4.00  4.50  5.00  5.50    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 38HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Coef. (English)  2.43  2.54  2.70  2.69  2.68  2.68  2.66  2.64  2.64  2.64  2.65  2.65  2.66  2.66  2.68   2.70  2.74    #2 Discarded 160.50ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 24.04 hrs   HW=163.50ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.00 cfs @ 24.04 hrs  HW=163.50ʹ   (Free Discharge) 1=Broad‐Crested Rectangular Weir  (Weir Controls 0.00 cfs @ 0.13 fps) Summary for Pond 2: SCM 2 Flat Inflow Area = 6,471 sf, 69.91% Impervious,  Inflow Depth = 5.45ʺ    for  50‐year event Inflow = 0.41 cfs @ 12.28 hrs,  Volume= 2,937 cf Outflow = 0.30 cfs @ 12.38 hrs,  Volume= 2,617 cf,  Atten= 28%,  Lag= 5.5 min Discarded = 0.00 cfs @ 12.38 hrs,  Volume= 694 cf Primary = 0.29 cfs @ 12.38 hrs,  Volume= 1,922 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.04ʹ @ 12.38 hrs   Surf.Area= 1,672 sf    Storage= 926 cf Plug‐Flow detention time= 332.5 min calculated for 2,617 cf (89% of inflow) Center‐of‐Mass det. time= 272.7 min ( 1,070.1 ‐ 797.4 ) Volume Invert Avail.Storage Storage Description #1 162.65ʹ1,170 cf 13.27ʹW x 126.00ʹL x 1.75ʹH Prismatoid 2,926 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.65ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.38 hrs   HW=164.03ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.29 cfs @ 12.38 hrs  HW=164.03ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.29 cfs @ 3.37 fps) Summary for Pond 4a: SCM 4a flat Inflow Area = 5,971 sf,100.00% Impervious,  Inflow Depth = 6.26ʺ    for  50‐year event Inflow = 0.40 cfs @ 12.28 hrs,  Volume= 3,116 cf Outflow = 0.29 cfs @ 12.38 hrs,  Volume= 3,114 cf,  Atten= 28%,  Lag= 5.6 min Discarded = 0.00 cfs @ 12.38 hrs,  Volume= 753 cf Primary = 0.29 cfs @ 12.38 hrs,  Volume= 2,361 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.52ʹ @ 12.38 hrs   Surf.Area= 1,776 sf    Storage= 619 cf Plug‐Flow detention time= 232.5 min calculated for 3,114 cf (100% of inflow) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 39HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Center‐of‐Mass det. time= 232.0 min ( 984.1 ‐ 752.0 ) Volume Invert Avail.Storage Storage Description #1 163.65ʹ888 cf 12.00ʹW x 148.00ʹL x 1.25ʹH Prismatoid 2,220 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 164.15ʹ4.0ʺ Vert. Orifice/Grate   X 2 rows with 12.0ʺ cc spacing C= 0.900    #2 Discarded 163.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.38 hrs   HW=164.52ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.29 cfs @ 12.38 hrs  HW=164.52ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.29 cfs @ 3.27 fps) Summary for Pond 4B: SCM 4b flat Inflow Area = 15,619 sf, 97.84% Impervious,  Inflow Depth = 5.61ʺ    for  50‐year event Inflow = 0.91 cfs @ 12.30 hrs,  Volume= 7,300 cf Outflow = 0.42 cfs @ 12.55 hrs,  Volume= 7,286 cf,  Atten= 54%,  Lag= 15.1 min Discarded = 0.01 cfs @ 12.55 hrs,  Volume= 1,956 cf Primary = 0.41 cfs @ 12.55 hrs,  Volume= 5,330 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.70ʹ @ 12.55 hrs   Surf.Area= 4,588 sf    Storage= 2,000 cf Plug‐Flow detention time= 261.1 min calculated for 7,284 cf (100% of inflow) Center‐of‐Mass det. time= 260.0 min ( 1,044.5 ‐ 784.5 ) Volume Invert Avail.Storage Storage Description #1 162.61ʹ2,294 cf 62.00ʹW x 74.00ʹL x 1.25ʹH Prismatoid 5,735 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.11ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.61ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.55 hrs   HW=163.70ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.41 cfs @ 12.55 hrs  HW=163.70ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.41 cfs @ 4.70 fps) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 40HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond 5a: SCM5 Flat Inflow Area = 7,479 sf, 95.37% Impervious,  Inflow Depth = 6.14ʺ    for  50‐year event Inflow = 0.50 cfs @ 12.28 hrs,  Volume= 3,829 cf Outflow = 0.33 cfs @ 12.39 hrs,  Volume= 3,695 cf,  Atten= 35%,  Lag= 6.4 min Discarded = 0.01 cfs @ 12.39 hrs,  Volume= 919 cf Primary = 0.32 cfs @ 12.39 hrs,  Volume= 2,776 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.77ʹ @ 12.39 hrs   Surf.Area= 2,136 sf    Storage= 940 cf Plug‐Flow detention time= 275.0 min calculated for 3,695 cf (97% of inflow) Center‐of‐Mass det. time= 252.3 min ( 1,012.5 ‐ 760.2 ) Volume Invert Avail.Storage Storage Description #1 161.67ʹ1,213 cf 46.22ʹW x 46.22ʹL x 1.42ʹH Prismatoid 3,034 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 162.34ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 161.67ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.39 hrs   HW=162.77ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.32 cfs @ 12.39 hrs  HW=162.77ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.32 cfs @ 3.71 fps) Summary for Pond 6a: SCM6 Flat Inflow Area = 9,008 sf, 80.08% Impervious,  Inflow Depth = 5.68ʺ    for  50‐year event Inflow = 0.59 cfs @ 12.28 hrs,  Volume= 4,261 cf Outflow = 0.34 cfs @ 12.41 hrs,  Volume= 4,069 cf,  Atten= 43%,  Lag= 7.5 min Discarded = 0.01 cfs @ 12.41 hrs,  Volume= 1,245 cf Primary = 0.33 cfs @ 12.41 hrs,  Volume= 2,824 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.49ʹ @ 12.41 hrs   Surf.Area= 2,980 sf    Storage= 1,320 cf Plug‐Flow detention time= 325.8 min calculated for 4,069 cf (95% of inflow) Center‐of‐Mass det. time= 298.0 min ( 1,084.6 ‐ 786.5 ) Volume Invert Avail.Storage Storage Description #1 164.38ʹ1,693 cf 20.00ʹW x 149.00ʹL x 1.42ʹH Prismatoid 4,232 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.05ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.38ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 41HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Discarded OutFlow  Max=0.01 cfs  @ 12.41 hrs   HW=165.49ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.33 cfs @ 12.41 hrs  HW=165.49ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.33 cfs @ 3.76 fps) Summary for Pond 7: SCM 7 flat Inflow Area = 5,346 sf, 94.09% Impervious,  Inflow Depth = 6.14ʺ    for  50‐year event Inflow = 0.36 cfs @ 12.28 hrs,  Volume= 2,737 cf Outflow = 0.28 cfs @ 12.36 hrs,  Volume= 2,488 cf,  Atten= 21%,  Lag= 4.8 min Discarded = 0.00 cfs @ 12.36 hrs,  Volume= 562 cf Primary = 0.28 cfs @ 12.36 hrs,  Volume= 1,926 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.91ʹ @ 12.36 hrs   Surf.Area= 1,302 sf    Storage= 711 cf Plug‐Flow detention time= 297.9 min calculated for 2,488 cf (91% of inflow) Center‐of‐Mass det. time= 244.4 min ( 1,004.6 ‐ 760.2 ) Volume Invert Avail.Storage Storage Description #1 164.55ʹ911 cf 21.70ʹW x 60.00ʹL x 1.75ʹH Prismatoid 2,279 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.55ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.55ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.36 hrs   HW=165.91ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.28 cfs @ 12.36 hrs  HW=165.91ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.28 cfs @ 3.21 fps) Summary for Pond 8: SCM8 flat Inflow Area = 3,419 sf, 64.14% Impervious,  Inflow Depth = 5.22ʺ    for  50‐year event Inflow = 0.21 cfs @ 12.29 hrs,  Volume= 1,488 cf Outflow = 0.16 cfs @ 12.37 hrs,  Volume= 1,487 cf,  Atten= 25%,  Lag= 5.2 min Discarded = 0.00 cfs @ 12.37 hrs,  Volume= 613 cf Primary = 0.15 cfs @ 12.37 hrs,  Volume= 874 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.38ʹ @ 12.37 hrs   Surf.Area= 1,568 sf    Storage= 457 cf Plug‐Flow detention time= 355.2 min calculated for 1,487 cf (100% of inflow) Center‐of‐Mass det. time= 354.8 min ( 1,162.1 ‐ 807.3 ) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 50‐year  Rainfall=6.50ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 42HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Volume Invert Avail.Storage Storage Description #1 164.65ʹ1,098 cf 14.00ʹW x 112.00ʹL x 1.75ʹH Prismatoid 2,744 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.15ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.37 hrs   HW=165.38ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.15 cfs @ 12.37 hrs  HW=165.38ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.15 cfs @ 2.44 fps) Summary for Pond 9: SCM9 Inflow Area = 10,763 sf, 98.30% Impervious,  Inflow Depth = 6.26ʺ    for  50‐year event Inflow = 0.73 cfs @ 12.28 hrs,  Volume= 5,616 cf Outflow = 0.41 cfs @ 12.41 hrs,  Volume= 5,616 cf,  Atten= 43%,  Lag= 7.5 min Discarded = 0.01 cfs @ 12.41 hrs,  Volume= 562 cf Primary = 0.41 cfs @ 12.41 hrs,  Volume= 5,054 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.10ʹ @ 12.41 hrs   Surf.Area= 2,480 sf    Storage= 582 cf Plug‐Flow detention time= 31.0 min calculated for 5,615 cf (100% of inflow) Center‐of‐Mass det. time= 31.1 min ( 783.1 ‐ 752.0 ) Volume Invert Avail.Storage Storage Description #1 163.51ʹ2,232 cf 16.00ʹW x 155.00ʹL x 2.25ʹH Prismatoid 5,580 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.51ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 163.51ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.41 hrs   HW=164.10ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.41 cfs @ 12.41 hrs  HW=164.10ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.41 cfs @ 4.68 fps) Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 85.68% Impervious,  Inflow Depth = 3.67ʺ    for  50‐year event Inflow = 2.18 cfs @ 12.39 hrs,  Volume= 20,729 cf Primary = 2.18 cfs @ 12.39 hrs,  Volume= 20,729 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 43HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T1: DMA 12345_52 Runoff = 0.67 cfs @ 12.29 hrs,  Volume= 4,327 cf,  Depth= 5.42ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 2,236 98 DMA1 * 1,433 74 DMA2 * 276 98 DMA3 * 2,862 98 DMA4 * 666 98 DMA5 * 2,114 74 DMA52 9,587 89 Weighted Average 3,547 37.00% Pervious Area 6,040 63.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T2: DMA 9_10_11_13_49 Runoff = 0.46 cfs @ 12.28 hrs,  Volume= 3,043 cf,  Depth= 5.64ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,525 98 DMA9 * 134 98 DMA10A * 248 74 DMA10B * 1,699 74 DMA11 * 1,250 98 DMA13 * 1,615 98 DMA49 Perm Pav 6,471 91 Weighted Average 1,947 30.09% Pervious Area 4,524 69.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 44HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Subcatchment T4a: 15a_17_20_21 Runoff = 0.45 cfs @ 12.28 hrs,  Volume= 3,215 cf,  Depth= 6.46ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 2,710 98 DMA15a * 1,747 98 DMA17 * 1,262 98 DMA20 * 252 98 DMA21 5,971 98 Weighted Average 5,971 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T4B: 7_16_25_26_43_48_15b Runoff = 0.72 cfs @ 12.28 hrs,  Volume= 5,099 cf,  Depth= 6.34ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,715 98 DMA7 * 1,504 98 DMA15B * 141 74 DMA16 * 1,113 98 DMA25 * 646 98 DMA26 * 4,333 98 DMA43 PERM PAV * 196 74 DMA48 9,648 97 Weighted Average 337 3.49% Pervious Area 9,311 96.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T5: 6_8_12_14_50 Runoff = 0.56 cfs @ 12.28 hrs,  Volume= 3,953 cf,  Depth= 6.34ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 45HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 2,117 98 DMA6 * 3,575 98 DMA8 * 346 74 DMA12 * 287 98 DMA14 * 1,154 98 DMA50 PERM PAV 7,479 97 Weighted Average 346 4.63% Pervious Area 7,133 95.37% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T6: 15_22_23_32_33 Runoff = 0.66 cfs @ 12.28 hrs,  Volume= 4,410 cf,  Depth= 5.87ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 998 98 DMA18 Perm Pav * 133 74 DMA22 * 153 98 DMA23 * 6,063 98 DMA32 * 1,661 74 DMA33 9,008 93 Weighted Average 1,794 19.92% Pervious Area 7,214 80.08% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T7: 31_31_41_51 Runoff = 0.40 cfs @ 12.28 hrs,  Volume= 2,826 cf,  Depth= 6.34ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 46HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 1,327 98 DMA30 * 2,135 98 DMA31 * 266 98 DMA41A * 316 74 DMA41B * 1,302 98 DMA54 PERM PAV 5,346 97 Weighted Average 316 5.91% Pervious Area 5,030 94.09% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T8: 35_38_39_42 Runoff = 0.24 cfs @ 12.29 hrs,  Volume= 1,543 cf,  Depth= 5.42ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Area (sf) CN Description * 1,772 98 DMA35 * 421 98 DMA38 * 299 74 DMA39 * 927 74 DMA42 PERM PAv 3,419 89 Weighted Average 1,226 35.86% Pervious Area 2,193 64.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Subcatchment T9: 19_24_24_28_29 Runoff = 0.81 cfs @ 12.28 hrs,  Volume= 5,795 cf,  Depth= 6.46ʺ Runoff by SCS TR‐20 method, UH=SCS, Weighted‐CN, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs San_Luis_Obispo D 100‐year  Rainfall=6.70ʺ Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 47HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Area (sf) CN Description * 78 74 DMA19 * 105 74 DMA24 * 4,847 98 DMA27 * 4,427 98 DMA28 * 1,306 98 DMA29 10,763 98 Weighted Average 183 1.70% Pervious Area 10,580 98.30% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry,  Summary for Pond 1: SCM 1 Inflow Area = 9,587 sf, 63.00% Impervious,  Inflow Depth = 5.42ʺ    for  100‐year event Inflow = 0.67 cfs @ 12.29 hrs,  Volume= 4,327 cf Outflow = 0.03 cfs @ 20.13 hrs,  Volume= 1,930 cf,  Atten= 96%,  Lag= 470.7 min Discarded = 0.01 cfs @ 20.13 hrs,  Volume= 1,751 cf Primary = 0.01 cfs @ 20.13 hrs,  Volume= 180 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.50ʹ @ 20.13 hrs   Surf.Area= 4,808 sf    Storage= 3,452 cf Plug‐Flow detention time= 1,013.7 min calculated for 1,930 cf (45% of inflow) Center‐of‐Mass det. time= 836.8 min ( 1,639.5 ‐ 802.7 ) Volume Invert Avail.Storage Storage Description #1 160.50ʹ1,039 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,154 cf Overall   x 25.0% Voids #2 162.50ʹ3,850 cf Custom Stage Data (Prismatic) Listed below (Recalc) 4,888 cf Total Available Storage Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 160.50 2,077 0 0 162.50 2,077 4,154 4,154 Elevation Surf.Area Inc.Store Cum.Store (feet) (sq‐ft) (cubic‐feet) (cubic‐feet) 162.50 2,077 0 0 163.00 2,400 1,119 1,119 163.50 2,728 1,282 2,401 164.00 3,065 1,448 3,850 Device Routing     Invert Outlet Devices #1 Primary 163.50ʹ12.0ʹ long  x 8.0ʹ breadth Broad‐Crested Rectangular Weir    Head (feet)  0.20  0.40  0.60  0.80  1.00  1.20  1.40  1.60  1.80  2.00  2.50  3.00  3.50  4.00  4.50  5.00  5.50    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 48HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Coef. (English)  2.43  2.54  2.70  2.69  2.68  2.68  2.66  2.64  2.64  2.64  2.65  2.65  2.66  2.66  2.68   2.70  2.74    #2 Discarded 160.50ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 20.13 hrs   HW=163.50ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.01 cfs @ 20.13 hrs  HW=163.50ʹ   (Free Discharge) 1=Broad‐Crested Rectangular Weir  (Weir Controls 0.01 cfs @ 0.16 fps) Summary for Pond 2: SCM 2 Flat Inflow Area = 6,471 sf, 69.91% Impervious,  Inflow Depth = 5.64ʺ    for  100‐year event Inflow = 0.46 cfs @ 12.28 hrs,  Volume= 3,043 cf Outflow = 0.33 cfs @ 12.38 hrs,  Volume= 2,723 cf,  Atten= 29%,  Lag= 5.7 min Discarded = 0.00 cfs @ 12.38 hrs,  Volume= 691 cf Primary = 0.32 cfs @ 12.38 hrs,  Volume= 2,032 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.08ʹ @ 12.38 hrs   Surf.Area= 1,672 sf    Storage= 956 cf Plug‐Flow detention time= 315.6 min calculated for 2,723 cf (89% of inflow) Center‐of‐Mass det. time= 259.1 min ( 1,052.7 ‐ 793.6 ) Volume Invert Avail.Storage Storage Description #1 162.65ʹ1,170 cf 13.27ʹW x 126.00ʹL x 1.75ʹH Prismatoid 2,926 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.65ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.38 hrs   HW=164.08ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.32 cfs @ 12.38 hrs  HW=164.08ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.32 cfs @ 3.70 fps) Summary for Pond 4a: SCM 4a flat Inflow Area = 5,971 sf,100.00% Impervious,  Inflow Depth = 6.46ʺ    for  100‐year event Inflow = 0.45 cfs @ 12.28 hrs,  Volume= 3,215 cf Outflow = 0.32 cfs @ 12.38 hrs,  Volume= 3,213 cf,  Atten= 30%,  Lag= 5.8 min Discarded = 0.00 cfs @ 12.38 hrs,  Volume= 750 cf Primary = 0.31 cfs @ 12.38 hrs,  Volume= 2,463 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.56ʹ @ 12.38 hrs   Surf.Area= 1,776 sf    Storage= 648 cf Plug‐Flow detention time= 222.6 min calculated for 3,212 cf (100% of inflow) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 49HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Center‐of‐Mass det. time= 222.4 min ( 973.6 ‐ 751.2 ) Volume Invert Avail.Storage Storage Description #1 163.65ʹ888 cf 12.00ʹW x 148.00ʹL x 1.25ʹH Prismatoid 2,220 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 164.15ʹ4.0ʺ Vert. Orifice/Grate   X 2 rows with 12.0ʺ cc spacing C= 0.900    #2 Discarded 163.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.38 hrs   HW=164.56ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.31 cfs @ 12.38 hrs  HW=164.56ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.31 cfs @ 3.57 fps) Summary for Pond 4B: SCM 4b flat Inflow Area = 15,619 sf, 97.84% Impervious,  Inflow Depth = 5.81ʺ    for  100‐year event Inflow = 1.01 cfs @ 12.30 hrs,  Volume= 7,562 cf Outflow = 0.45 cfs @ 12.57 hrs,  Volume= 7,550 cf,  Atten= 55%,  Lag= 16.3 min Discarded = 0.01 cfs @ 12.57 hrs,  Volume= 1,948 cf Primary = 0.44 cfs @ 12.57 hrs,  Volume= 5,602 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 163.77ʹ @ 12.57 hrs   Surf.Area= 4,588 sf    Storage= 2,128 cf Plug‐Flow detention time= 250.6 min calculated for 7,548 cf (100% of inflow) Center‐of‐Mass det. time= 249.7 min ( 1,031.0 ‐ 781.3 ) Volume Invert Avail.Storage Storage Description #1 162.61ʹ2,294 cf 62.00ʹW x 74.00ʹL x 1.25ʹH Prismatoid 5,735 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.11ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 162.61ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.57 hrs   HW=163.77ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.44 cfs @ 12.57 hrs  HW=163.77ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.44 cfs @ 5.07 fps) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 50HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Summary for Pond 5a: SCM5 Flat Inflow Area = 7,479 sf, 95.37% Impervious,  Inflow Depth = 6.34ʺ    for  100‐year event Inflow = 0.56 cfs @ 12.28 hrs,  Volume= 3,953 cf Outflow = 0.36 cfs @ 12.39 hrs,  Volume= 3,820 cf,  Atten= 36%,  Lag= 6.6 min Discarded = 0.01 cfs @ 12.39 hrs,  Volume= 917 cf Primary = 0.35 cfs @ 12.39 hrs,  Volume= 2,904 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 162.82ʹ @ 12.39 hrs   Surf.Area= 2,136 sf    Storage= 982 cf Plug‐Flow detention time= 262.7 min calculated for 3,819 cf (97% of inflow) Center‐of‐Mass det. time= 241.3 min ( 1,000.2 ‐ 758.9 ) Volume Invert Avail.Storage Storage Description #1 161.67ʹ1,213 cf 46.22ʹW x 46.22ʹL x 1.42ʹH Prismatoid 3,034 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 162.34ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 161.67ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.39 hrs   HW=162.82ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.35 cfs @ 12.39 hrs  HW=162.82ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.35 cfs @ 4.03 fps) Summary for Pond 6a: SCM6 Flat Inflow Area = 9,008 sf, 80.08% Impervious,  Inflow Depth = 5.87ʺ    for  100‐year event Inflow = 0.66 cfs @ 12.28 hrs,  Volume= 4,410 cf Outflow = 0.36 cfs @ 12.41 hrs,  Volume= 4,219 cf,  Atten= 45%,  Lag= 7.7 min Discarded = 0.01 cfs @ 12.41 hrs,  Volume= 1,239 cf Primary = 0.36 cfs @ 12.41 hrs,  Volume= 2,981 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.54ʹ @ 12.41 hrs   Surf.Area= 2,980 sf    Storage= 1,378 cf Plug‐Flow detention time= 311.4 min calculated for 4,218 cf (96% of inflow) Center‐of‐Mass det. time= 285.3 min ( 1,068.7 ‐ 783.5 ) Volume Invert Avail.Storage Storage Description #1 164.38ʹ1,693 cf 20.00ʹW x 149.00ʹL x 1.42ʹH Prismatoid 4,232 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.05ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.38ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 51HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Discarded OutFlow  Max=0.01 cfs  @ 12.41 hrs   HW=165.54ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.36 cfs @ 12.41 hrs  HW=165.54ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.36 cfs @ 4.08 fps) Summary for Pond 7: SCM 7 flat Inflow Area = 5,346 sf, 94.09% Impervious,  Inflow Depth = 6.34ʺ    for  100‐year event Inflow = 0.40 cfs @ 12.28 hrs,  Volume= 2,826 cf Outflow = 0.31 cfs @ 12.37 hrs,  Volume= 2,578 cf,  Atten= 23%,  Lag= 5.0 min Discarded = 0.00 cfs @ 12.37 hrs,  Volume= 561 cf Primary = 0.31 cfs @ 12.37 hrs,  Volume= 2,017 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.95ʹ @ 12.37 hrs   Surf.Area= 1,302 sf    Storage= 731 cf Plug‐Flow detention time= 283.0 min calculated for 2,578 cf (91% of inflow) Center‐of‐Mass det. time= 232.3 min ( 991.2 ‐ 758.9 ) Volume Invert Avail.Storage Storage Description #1 164.55ʹ911 cf 21.70ʹW x 60.00ʹL x 1.75ʹH Prismatoid 2,279 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.55ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.55ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.37 hrs   HW=165.95ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.31 cfs @ 12.37 hrs  HW=165.95ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.31 cfs @ 3.52 fps) Summary for Pond 8: SCM8 flat Inflow Area = 3,419 sf, 64.14% Impervious,  Inflow Depth = 5.42ʺ    for  100‐year event Inflow = 0.24 cfs @ 12.29 hrs,  Volume= 1,543 cf Outflow = 0.18 cfs @ 12.37 hrs,  Volume= 1,542 cf,  Atten= 24%,  Lag= 5.1 min Discarded = 0.00 cfs @ 12.37 hrs,  Volume= 608 cf Primary = 0.18 cfs @ 12.37 hrs,  Volume= 934 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 165.40ʹ @ 12.37 hrs   Surf.Area= 1,568 sf    Storage= 469 cf Plug‐Flow detention time= 340.3 min calculated for 1,542 cf (100% of inflow) Center‐of‐Mass det. time= 339.9 min ( 1,142.7 ‐ 802.7 ) Bridge Street PostdevelopmentD:\!Monsoon\Bridge Street 2\Hydrocad\ San_Luis_Obispo D 100‐year  Rainfall=6.70ʺPostDevelopment   Printed  2/3/2021Prepared by Keith V Crowe, PE Page 52HydroCAD® 10.00‐22  s/n 04223  © 2018 HydroCAD Software Solutions LLC Volume Invert Avail.Storage Storage Description #1 164.65ʹ1,098 cf 14.00ʹW x 112.00ʹL x 1.75ʹH Prismatoid 2,744 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 165.15ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 164.65ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.00 cfs  @ 12.37 hrs   HW=165.40ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.00 cfs) Primary OutFlow  Max=0.18 cfs @ 12.37 hrs  HW=165.40ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.18 cfs @ 2.54 fps) Summary for Pond 9: SCM9 Inflow Area = 10,763 sf, 98.30% Impervious,  Inflow Depth = 6.46ʺ    for  100‐year event Inflow = 0.81 cfs @ 12.28 hrs,  Volume= 5,795 cf Outflow = 0.45 cfs @ 12.41 hrs,  Volume= 5,795 cf,  Atten= 45%,  Lag= 7.8 min Discarded = 0.01 cfs @ 12.41 hrs,  Volume= 559 cf Primary = 0.44 cfs @ 12.41 hrs,  Volume= 5,236 cf Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Peak Elev= 164.17ʹ @ 12.41 hrs   Surf.Area= 2,480 sf    Storage= 653 cf Plug‐Flow detention time= 30.6 min calculated for 5,795 cf (100% of inflow) Center‐of‐Mass det. time= 30.5 min ( 781.7 ‐ 751.2 ) Volume Invert Avail.Storage Storage Description #1 163.51ʹ2,232 cf 16.00ʹW x 155.00ʹL x 2.25ʹH Prismatoid 5,580 cf Overall   x 40.0% Voids Device Routing     Invert Outlet Devices #1 Primary 163.51ʹ4.0ʺ Vert. Orifice/Grate    C= 0.900    #2 Discarded 163.51ʹ0.110 in/hr Exfiltration over Surface area   Conductivity to Groundwater Elevation = 100.00ʹ    Discarded OutFlow  Max=0.01 cfs  @ 12.41 hrs   HW=164.17ʹ   (Free Discharge) 2=Exfiltration  ( Controls 0.01 cfs) Primary OutFlow  Max=0.44 cfs @ 12.41 hrs  HW=164.17ʹ   (Free Discharge) 1=Orifice/Grate  (Orifice Controls 0.44 cfs @ 5.07 fps) Summary for Pond Site: Site Total Inflow Area = 67,692 sf, 85.68% Impervious,  Inflow Depth = 3.88ʺ    for  100‐year event Inflow = 2.37 cfs @ 12.39 hrs,  Volume= 21,886 cf Primary = 2.37 cfs @ 12.39 hrs,  Volume= 21,886 cf,  Atten= 0%,  Lag= 0.0 min Routing by Stor‐Ind method, Time Span= 0.00‐48.00 hrs, dt= 0.01 hrs Appendix II HEC-RAS Report Pre-development Post-development BridgeStreet2.rep                         HEC‐RAS HEC‐RAS 5.0.5 June 2018                            U.S. Army Corps of Engineers                            Hydrologic Engineering Center                                  609 Second Street                                        Davis, California                     X     X  XXXXXX    XXXX        XXXX       XX      XXXX             X     X  X        X    X       X   X     X  X    X             X     X  X        X            X   X    X    X   X             XXXXXXX  XXXX     X       XXX  XXXX     XXXXXX    XXXX             X     X  X        X            X  X     X    X        X             X     X  X        X    X       X   X    X    X        X             X     X  XXXXXX    XXXX        X    X   X    X   XXXXX ******************************************************************************** PROJECT DATA Project Title: Bridge Street 2 Project File : BridgeStreet2.prj Run Date and Time:  Project in English units ******************************************************************************** PLAN DATA Plan Title:  Plan File :             Geometry Title: Two Bridges            Geometry File : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.g02            Flow Title    : 100yr            Flow File     : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.f02 Plan Summary Information: Number of:  Cross Sections =   17    Multiple Openings  =    0             Culverts       =    2    Inline Structures  =    0             Bridges        =    0    Lateral Structures =    0 Computational Information     Water surface calculation tolerance  =  0.01      Critical depth calculation tolerance =  0.01      Maximum number of iterations         =  20  Page 1 BridgeStreet2.rep     Maximum difference tolerance         =  0.3      Flow tolerance factor                =  0.001  Computation Options     Critical depth computed only where necessary     Conveyance Calculation Method: At breaks in n values only     Friction Slope Method:         Average Conveyance     Computational Flow Regime:     Subcritical Flow ******************************************************************************** FLOW DATA Flow Title: 100yr Flow File : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.f02 Flow Data (cfs) ************************************************************* * River           Reach           RS      *            PF 1 * * Meadow Creek    Bridge St Neighb1535    *             972 * ************************************************************* Boundary Conditions ******************************************************************************************************** * River           Reach           Profile          *            Upstream                 Downstream    * ******************************************************************************************************** * Meadow Creek    Bridge St NeighbPF 1             *              Critical              Known WS = 166 * ******************************************************************************************************** ******************************************************************************** GEOMETRY DATA Geometry Title: Two Bridges Geometry File : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.g02 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1535     INPUT Description:  Station Elevation Data    num=      10      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ******************************************************************************** Page 2 BridgeStreet2.rep      976     172     996     164    1000   163.5    1004     164    1019     167     1064     167    1108   167.2    1136     168    1237     169    1258   169.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      976     .04     976    .045    1019     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            976    1019               44      44      44             .1       .3 CROSS SECTION OUTPUT  Profile #PF 1   *********************************************************************************************** * E.G. Elev (ft)         *  167.43  * Element                *  Left OB *  Channel * Right OB * * Vel Head (ft)          *    0.19  * Wt. n‐Val.             *   0.040  *   0.045  *   0.040  * * W.S. Elev (ft)         *  167.24  * Reach Len. (ft)        *   44.00  *   44.00  *   44.00  * * Crit W.S. (ft)         *          * Flow Area (sq ft)      *  210.61  *   64.61  *   17.28  * * E.G. Slope (ft/ft)     *0.005258  * Area (sq ft)           *  210.61  *   64.61  *   17.28  * * Q Total (cfs)          *  972.00  * Flow (cfs)             *  702.01  *  254.56  *   15.43  * * Top Width (ft)         *  286.38  * Top Width (ft)         *  166.38  *   29.49  *   90.51  * * Vel Total (ft/s)       *    3.32  * Avg. Vel. (ft/s)       *    3.33  *    3.94  *    0.89  * * Max Chl Dpth (ft)      *    3.74  * Hydr. Depth (ft)       *    1.27  *    2.19  *    0.19  * * Conv. Total (cfs)      * 13405.1  * Conv. (cfs)            *  9681.6  *  3510.7  *   212.9  * * Length Wtd. (ft)       *   44.00  * Wetted Per. (ft)       *  179.68  *   30.61  *   90.51  * * Min Ch El (ft)         *  163.50  * Shear (lb/sq ft)       *    0.38  *    0.69  *    0.06  * * Alpha                  *    1.10  * Stream Power (lb/ft s) *    1.28  *    2.73  *    0.06  * * Frctn Loss (ft)        *    0.13  * Cum Volume (acre‐ft)   *    3.83  *    4.11  *    5.87  * * C & E Loss (ft)        *    0.01  * Cum SA (acres)         *    2.42  *    0.72  *    3.04  * *********************************************************************************************** Warning: Divided flow computed for this cross‐section. Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is less than 0.7 or greater than           1.4.  This may indicate the need for additional cross sections. CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1491     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      700     170     715     165     725     163     727     163     737     165      745   166.2     787   166.4     808   166.4     829   166.6     842   166.6      866   167.6     929   165.8     972   167.3     985   166.3    1000   161.3 Page 3 BridgeStreet2.rep     1017   162.3    1024   162.3    1040   169.3    1092   169.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      700     .04     972    .045    1040     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            972    1040               31      31      31             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1460     INPUT Description:  Station Elevation Data    num=      13      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      734   168.3     751   162.3     755   162.2     768   165.3     854   166.3      960   167.3     972   167.3     985   166.3    1000   161.3    1017   162.3     1024   162.3    1040   169.3    1092   169.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      734     .04     985    .045    1040     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            985    1040               33      33      33             .1       .3 Ineffective Flow     num=       1    Sta L   Sta R    Elev  Permanent      734     742               F CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1427     INPUT Description:  Station Elevation Data    num=      14      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      750  167.75     762  165.75     767  162.25     781  165.75     891  166.75 Page 4 BridgeStreet2.rep      972  167.75     984  167.75     996  161.75    1000  161.25    1006  161.75     1008  162.75    1023  163.75    1035  168.75    1136  168.75 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      750     .04     984    .045    1035     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            984    1035               51      51      51             .1       .3 Ineffective Flow     num=       1    Sta L   Sta R    Elev  Permanent      750     762               F CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1376     INPUT Description:  Station Elevation Data    num=      20      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      755     190     755     164     763     162     772     165     780   163.8      785   164.9     875     166     963     167     984     167     988     166      998     162    1000   161.2    1015     162    1026     163    1039     168     1114     169    1154     168    1161   168.3    1161   167.8    1182   168.4 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      755     .04     988    .045    1039     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            988    1039               22      22      22             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1354     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev Page 5 BridgeStreet2.rep ********************************************************************************      752     190     752     164     762     162     771     165     783   164.1      788     165     883     166     970     167     977     167     986     161     1014     161    1024     163    1034     168    1038     169    1071     169     1153     168    1159   168.2    1159   167.7    1177   168.2 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      752     .04     977    .045    1034     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            977    1034               47      47      47             .1       .3 CULVERT                 RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1330     INPUT Description:  Distance from Upstream XS =       3 Deck/Roadway Width        =      32 Weir Coefficient          =     2.6 Upstream  Deck/Roadway Coordinates     num=      11      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      883     166     160     925   166.2     160     940   167.2     160      962  167.24     160     987  171.63     160    1000   172.5     160     1013  171.63     160    1023  170.52     160    1034  169.52     160     1051   168.7     160    1156     168     160 Upstream Bridge Cross Section Data Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      752     190     752     164     762     162     771     165     783   164.1      788     165     883     166     970     167     977     167     986     161     1014     161    1024     163    1034     168    1038     169    1071     169     1153     168    1159   168.2    1159   167.7    1177   168.2 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      752     .04     977    .045    1034     .04 Page 6 BridgeStreet2.rep Bank Sta: Left   Right    Coeff Contr.   Expan.            977    1034             .1       .3 Downstream  Deck/Roadway Coordinates     num=      12      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      863   163.5     160     879     165     160     925   166.2     160      940   167.2     160     962  167.24     160     987  171.63     160     1000   172.5     160    1013  171.63     160    1023  170.52     160     1034  169.52     160    1051   168.7     160    1156     168     160 Downstream Bridge Cross Section Data Station Elevation Data    num=      15      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      828     190     828     164     838     162     847     164     852     165      863   163.5     879     165     984     166     986     161    1014     161     1032     165    1044     168    1156     168    1168     167    1186   167.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      828     .04     852    .045    1044     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            852    1044             .1       .3 Upstream Embankment side slope              =       0 horiz. to 1.0 vertical Downstream Embankment side slope            =       0 horiz. to 1.0 vertical Maximum allowable submergence for weir flow =     .98 Elevation at which weir flow begins         =         Energy head used in spillway design         =         Spillway height used in design              =         Weir crest shape                            = Broad Crested Number of Culverts =  1  Culvert Name     Shape      Rise    Span Culvert #1  Conspan Arch    5.75      28 FHWA Chart # 60‐ Span/Rise ratio approximate 2:1 FHWA Scale # 1 ‐ 0 degree wing wall angle Solution Criteria = Highest U.S. EG Culvert Upstrm Dist  Length    Top n  Bottom n  Depth Blocked  Entrance Loss Coef   Exit Loss Coef                   3      31     .015     .015        0                   .3               .6 Upstream   Elevation =  161.05             Centerline Station =  1000  Downstream Elevation =  161  Page 7 BridgeStreet2.rep            Centerline Station =  1000  CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1307     INPUT Description:  Station Elevation Data    num=      15      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      828     190     828     164     838     162     847     164     852     165      863   163.5     879     165     984     166     986     161    1014     161     1032     165    1044     168    1156     168    1168     167    1186   167.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      828     .04     852    .045    1044     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            852    1044               22      22      22             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1285     INPUT Description:  Station Elevation Data    num=      18      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      722   170.5     737   166.5     782   165.5     793     165     802   164.5      832   163.5     924   164.5     966   164.5     977   163.5     989   159.5     1004   159.5    1014   164.5    1024   165.5    1138   168.5    1145   170.5     1158   166.5    1203     166    1803     172 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      722     .04     977    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            977    1014               51      51      51             .1       .3 Page 8 BridgeStreet2.rep Ineffective Flow     num=       2    Sta L   Sta R    Elev  Permanent      737     795   190.5       T     1247    1417   190.5       T CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1234     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      733     167     764     165     778   161.2     784   161.2     795     164      834     164     890   164.7     969     166     977   163.5     989   159.5     1000   159.5    1004   159.5    1014   164.5    1024   165.5    1138   168.5     1145   170.5    1158   166.5    1203     166    1803     172 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      733     .04     969    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            969    1014               55      55      55             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1179     INPUT Description:  Station Elevation Data    num=      18      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      739     167     786     165     805     161     811     161     823     163      856   163.7     913     164     981     164     989     159    1000     159     1004     159    1014     164    1024     165    1138     168    1145     170     1158     166    1203   165.5    1803   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************ Page 9 BridgeStreet2.rep      739     .04     981    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            981    1014               47      47      47             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1132     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      784     164     795     162     800     161     805     161     817     163      883     164     960     164     966     164     977     163     989     159     1000     159    1004     159    1014     164    1024     165    1138     168     1145     170    1158     166    1203   165.5    1803   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      784     .04     977    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            977    1014               36      36      36             .1       .3 Ineffective Flow     num=       3    Sta L   Sta R    Elev  Permanent      737     802     190       T      844     911     190       T     1247    1417     190       T CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1096     INPUT Description:  Station Elevation Data    num=      10      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      744     167     800     164     821   160.6     827   160.6     841     163      979   163.5     995     158    1000     158    1014     164    1161   166.5 Page 10 BridgeStreet2.rep Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      744     .04     979    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            979    1014               69      69      69             .1       .3 CULVERT                 RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1058     INPUT Description:  Distance from Upstream XS =      13 Deck/Roadway Width        =      40 Weir Coefficient          =     2.6 Upstream  Deck/Roadway Coordinates     num=      24      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      753     170     150     773  169.33     150     790  168.45     150      790  167.95     150     830   166.5     150     830     167     150      842   166.9     150     853  167.05     150     853  166.65     150      864  166.85     150     969  166.85     150     989  167.77     150     1000  167.89     150    1018  167.23     150    1032  166.58     150     1053  165.85     150    1203  165.85     150    1219  165.59     150     1229   165.2     150    1229   164.7     150    1247   165.2     150     1265   164.7     150    1265   165.2     150    1865     170     150 Upstream Bridge Cross Section Data Station Elevation Data    num=      10      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      744     167     800     164     821   160.6     827   160.6     841     163      979   163.5     995     158    1000     158    1014     164    1161   166.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      744     .04     979    .045    1014     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            979    1014             .1       .3 Downstream  Deck/Roadway Coordinates Page 11 BridgeStreet2.rep     num=      26      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      783   167.9     150     802   166.8     150     818   166.2     150      835  166.12     150     836   166.4     150     880   166.4     150      903   166.2     150     969   166.7     150     969   166.7     150      987     167     150     991   167.2     150    1000   167.4     150     1009   167.6     150    1016   167.8     150    1018     168     150     1048   166.3     150    1065   165.8     150    1092   165.7     150     1138   165.5     150    1187   165.3     150    1197   165.2     150     1197   164.7     150    1215   165.2     150    1233   164.7     150     1233   165.2     150    1833     170     150 Downstream Bridge Cross Section Data Station Elevation Data    num=      18      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      833     171     854     162     867     161     895     164     901   164.5      941     165     972     165     981   164.7     986     158    1014     158     1029   163.5    1046     163    1060     163    1143     164    1159     165     1236     165  1236.1   165.5    1836   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      833     .04     981    .045    1029     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            981    1029             .1       .3 Upstream Embankment side slope              =       1 horiz. to 1.0 vertical Downstream Embankment side slope            =       1 horiz. to 1.0 vertical Maximum allowable submergence for weir flow =     .95 Elevation at which weir flow begins         =         Energy head used in spillway design         =         Spillway height used in design              =         Weir crest shape                            = Broad Crested Number of Culverts =  2  Culvert Name     Shape      Rise    Span Culvert #2           Box    2.67    3.75 FHWA Chart # 8 ‐ flared wingwalls FHWA Scale # 1 ‐ Wingwall flared 30 to 75 deg. Solution Criteria = Highest U.S. EG Culvert Upstrm Dist  Length    Top n  Bottom n  Depth Blocked  Entrance Loss Coef   Exit Loss Coef                  15      32     .012     .012        0                   .5                1 Upstream   Elevation =  161.5  Page 12 BridgeStreet2.rep            Centerline Station =  792  Downstream Elevation =  161.2             Centerline Station =  867  Culvert Name     Shape      Rise    Span Culvert #1  Conspan Arch     5.1      28 FHWA Chart # 61‐ Span/Rise ratio approximate 4:1 FHWA Scale # 2 ‐ 45 degree wing wall angle Solution Criteria = Highest U.S. EG Culvert Upstrm Dist  Length    Top n  Bottom n  Depth Blocked  Entrance Loss Coef   Exit Loss Coef                   6      40     .012      .03        0                   .2                1 Upstream   Elevation =  158             Centerline Station =  1000  Downstream Elevation =  158             Centerline Station =  1000  CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1027     INPUT Description:  Station Elevation Data    num=      18      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      833     171     854     162     867     161     895     164     901   164.5      941     165     972     165     981   164.7     986     158    1014     158     1029   163.5    1046     163    1060     163    1143     164    1159     165     1236     165  1236.1   165.5    1836   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      833     .04     981    .045    1029     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            981    1029               11      11      11             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1016     INPUT Description:  Page 13 BridgeStreet2.rep Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      863     173     890     161     896     160     917     161     927     162      967     165     973     165     980     164     991     162     996     158     1007     158    1011     162    1023     163    1045   163.5    1075     163     1158     164    1241     164  1241.1   164.5    1840   170.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      863     .04     980    .045    1023     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            980    1023               16      16      16             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1000     INPUT Description: DS Limit Station Elevation Data    num=      16      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      865     173     892     161     919     160     925     160     933     162      952     163     974   164.5     988     163    1000     157    1010     158     1017     162    1024   162.5    1060     163    1100     164    1166     164     1251     170 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      865     .04     974    .045    1024     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            974    1024              130     130     130             .1       .3 Ineffective Flow     num=       2    Sta L   Sta R    Elev  Permanent     1076    1191     190       T     1336    1516     190       T CROSS SECTION           RIVER: Meadow Creek     Page 14 BridgeStreet2.rep REACH: Bridge St Neighb   RS: 870      INPUT Description: thru ironworks bldg Station Elevation Data    num=      11      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      984  172.26     997   157.5    1003     157    1014   161.8    1034   162.6     1075   163.1    1201   163.4    1207  162.99    1227   163.1    1249  162.44     1270   163.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      984     .04     984     .03    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            984    1014              131     131     131             .1       .3 Ineffective Flow     num=       1    Sta L   Sta R    Elev  Permanent     1124    1209     190       T CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 740      INPUT Description: Cl BeeBee st extended Station Elevation Data    num=      15      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      970   174.9     991   165.2     995   157.2    1000   157.5    1008   157.7     1021   161.9    1051   162.4    1126   162.4    1199   162.3    1211   162.7     1216   162.2    1222  161.52    1241  161.81    1259  161.11    1341   161.8 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      970     .04     991     .03    1021     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            991    1021                0       0       0             .1       .3 ******************************************************************************** SUMMARY OF MANNING'S N VALUES  Page 15 BridgeStreet2.rep River:Meadow Creek     ***************************************************************** *     Reach      *   River Sta.   *   n1    *   n2    *   n3    * ***************************************************************** *Bridge St Neighb*    1535        *      .04*     .045*      .04* *Bridge St Neighb*    1491        *      .04*     .045*      .04* *Bridge St Neighb*    1460        *      .04*     .045*      .04* *Bridge St Neighb*    1427        *      .04*     .045*      .04* *Bridge St Neighb*    1376        *      .04*     .045*      .04* *Bridge St Neighb*    1354        *      .04*     .045*      .04* *Bridge St Neighb*    1330        *Culvert  *        *        * *Bridge St Neighb*    1307        *      .04*     .045*      .04* *Bridge St Neighb*    1285        *      .04*     .045*      .04* *Bridge St Neighb*    1234        *      .04*     .045*      .04* *Bridge St Neighb*    1179        *      .04*     .045*      .04* *Bridge St Neighb*    1132        *      .04*     .045*      .04* *Bridge St Neighb*    1096        *      .04*     .045*      .04* *Bridge St Neighb*    1058        *Culvert  *        *        * *Bridge St Neighb*    1027        *      .04*     .045*      .04* *Bridge St Neighb*    1016        *      .04*     .045*      .04* *Bridge St Neighb*    1000        *      .04*     .045*      .04* *Bridge St Neighb*    870         *      .04*      .03*      .04* *Bridge St Neighb*    740         *      .04*      .03*      .04* ***************************************************************** ******************************************************************************** SUMMARY OF REACH LENGTHS River: Meadow Creek     ***************************************************************** *     Reach      *   River Sta.   *  Left   * Channel *  Right  * ***************************************************************** *Bridge St Neighb*    1535        *       44*       44*       44* *Bridge St Neighb*    1491        *       31*       31*       31* *Bridge St Neighb*    1460        *       33*       33*       33* *Bridge St Neighb*    1427        *       51*       51*       51* *Bridge St Neighb*    1376        *       22*       22*       22* *Bridge St Neighb*    1354        *       47*       47*       47* *Bridge St Neighb*    1330        *Culvert  *         *         * *Bridge St Neighb*    1307        *       22*       22*       22* *Bridge St Neighb*    1285        *       51*       51*       51* *Bridge St Neighb*    1234        *       55*       55*       55* *Bridge St Neighb*    1179        *       47*       47*       47* *Bridge St Neighb*    1132        *       36*       36*       36* *Bridge St Neighb*    1096        *       69*       69*       69* *Bridge St Neighb*    1058        *Culvert  *         *         * Page 16 BridgeStreet2.rep *Bridge St Neighb*    1027        *       11*       11*       11* *Bridge St Neighb*    1016        *       16*       16*       16* *Bridge St Neighb*    1000        *      130*      130*      130* *Bridge St Neighb*    870         *      131*      131*      131* *Bridge St Neighb*    740         *        0*        0*        0* ***************************************************************** ******************************************************************************** SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS River: Meadow Creek     ******************************************************* *     Reach      *   River Sta.   * Contr.  * Expan.  * ******************************************************* *Bridge St Neighb*    1535    *       .1*       .3* *Bridge St Neighb*    1491    *       .1*       .3* *Bridge St Neighb*    1460    *       .1*       .3* *Bridge St Neighb*    1427    *       .1*       .3* *Bridge St Neighb*    1376    *       .1*       .3* *Bridge St Neighb*    1354    *       .1*       .3* *Bridge St Neighb*    1330    *Culvert  *         * *Bridge St Neighb*    1307    *       .1*       .3* *Bridge St Neighb*    1285    *       .1*       .3* *Bridge St Neighb*    1234    *       .1*       .3* *Bridge St Neighb*    1179    *       .1*       .3* *Bridge St Neighb*    1132    *       .1*       .3* *Bridge St Neighb*    1096    *       .1*       .3* *Bridge St Neighb*    1058    *Culvert  *         * *Bridge St Neighb*    1027    *       .1*       .3* *Bridge St Neighb*    1016    *       .1*       .3* *Bridge St Neighb*    1000    *       .1*       .3* *Bridge St Neighb*    870     *       .1*       .3* *Bridge St Neighb*    740     *       .1*       .3* ******************************************************* Profile Output Table ‐ Standard Table 1 ********************************************************************************************************************************************************************* * Reach            * River Sta   * Profile * Q Total * Min Ch El * W.S. Elev * Crit W.S. * E.G. Elev * E.G. Slope * Vel Chnl * Flow Area * Top Width * Froude # Chl * *                  *             *         *   (cfs) *      (ft) *      (ft) *      (ft) *      (ft) *    (ft/ft) *   (ft/s) *   (sq ft) *      (ft) *              * ********************************************************************************************************************************************************************* * Bridge St Neighb * 1535        * PF 1    *  972.00 *    163.50 *    167.24 *           *    167.43 *   0.005258 *     3.94 *    292.50 *    286.38 *         0.47 * * Bridge St Neighb * 1491        * PF 1    *  972.00 *    161.70 *    167.14 *           *    167.29 *   0.001985 *     3.49 *    340.92 *    194.54 *         0.31 * * Bridge St Neighb * 1460        * PF 1    *  972.00 *    161.30 *    167.10 *           *    167.22 *   0.001498 *     3.14 *    365.71 *    224.52 *         0.28 * * Bridge St Neighb * 1427        * PF 1    *  972.00 *    161.25 *    166.92 *           *    167.14 *   0.003309 *     4.24 *    277.00 *    204.36 *         0.40 * * Bridge St Neighb * 1376        * PF 1    *  972.00 *    161.20 *    166.83 *           *    166.99 *   0.002165 *     3.68 *    329.98 *    217.25 *         0.33 * * Bridge St Neighb * 1354        * PF 1    *  972.00 *    161.00 *    166.86 *    163.90 *    166.94 *   0.000761 *     2.45 *    487.19 *    212.71 *         0.20 * * Bridge St Neighb * 1330        *         * Culvert *           *           *           *           *            *          *           *           *              * Page 17 BridgeStreet2.rep * Bridge St Neighb * 1307        * PF 1    *  972.00 *    161.00 *    166.82 *           *    166.88 *   0.000651 *     2.33 *    541.84 *    243.27 *         0.18 * * Bridge St Neighb * 1285        * PF 1    *  972.00 *    159.50 *    166.80 *           *    166.87 *   0.000634 *     2.46 *    581.54 *    424.14 *         0.18 * * Bridge St Neighb * 1234        * PF 1    *  972.00 *    159.50 *    166.80 *           *    166.83 *   0.000312 *     1.71 *    820.02 *    456.49 *         0.13 * * Bridge St Neighb * 1179        * PF 1    *  972.00 *    159.00 *    166.80 *           *    166.82 *   0.000210 *     1.57 *    992.52 *    518.14 *         0.11 * * Bridge St Neighb * 1132        * PF 1    *  972.00 *    159.00 *    166.76 *           *    166.80 *   0.000320 *     1.98 *    724.26 *    506.81 *         0.14 * * Bridge St Neighb * 1096        * PF 1    *  972.00 *    158.00 *    166.78 *    162.42 *    166.79 *   0.000119 *     1.21 *   1138.02 *    412.81 *         0.08 * * Bridge St Neighb * 1058        *         * Culvert *           *           *           *           *            *          *           *           *              * * Bridge St Neighb * 1027        * PF 1    *  972.00 *    158.00 *    166.04 *           *    166.06 *   0.000166 *     1.45 *   1032.64 *    445.99 *         0.10 * * Bridge St Neighb * 1016        * PF 1    *  972.00 *    158.00 *    166.05 *           *    166.06 *   0.000135 *     1.08 *   1209.09 *    517.03 *         0.08 * * Bridge St Neighb * 1000        * PF 1    *  972.00 *    157.00 *    166.03 *           *    166.06 *   0.000185 *     1.30 *    794.14 *    314.13 *         0.10 * * Bridge St Neighb * 870         * PF 1    *  972.00 *    157.00 *    165.99 *           *    166.03 *   0.000221 *     2.25 *    688.61 *    280.47 *         0.16 * * Bridge St Neighb * 740         * PF 1    *  972.00 *    157.20 *    166.00 *    162.39 *    166.01 *   0.000041 *     1.04 *   1484.26 *    351.73 *         0.07 * ********************************************************************************************************************************************************************* Profile Output Table ‐ Standard Table 2 **************************************************************************************************************************************************** * Reach            * River Sta   * Profile * E.G. Elev * W.S. Elev * Vel Head * Frctn Loss * C & E Loss * Q Left * Q Channel * Q Right * Top Width * *                  *             *         *      (ft) *      (ft) *     (ft) *       (ft) *       (ft) *  (cfs) *     (cfs) *   (cfs) *      (ft) * **************************************************************************************************************************************************** * Bridge St Neighb * 1535        * PF 1    *    167.43 *    167.24 *     0.19 *       0.13 *       0.01 * 702.01 *    254.56 *   15.43 *    286.38 * * Bridge St Neighb * 1491        * PF 1    *    167.29 *    167.14 *     0.15 *       0.05 *       0.01 * 333.00 *    639.00 *         *    194.54 * * Bridge St Neighb * 1460        * PF 1    *    167.22 *    167.10 *     0.12 *       0.07 *       0.01 * 345.08 *    626.92 *         *    224.52 * * Bridge St Neighb * 1427        * PF 1    *    167.14 *    166.92 *     0.22 *       0.13 *       0.02 * 304.15 *    667.85 *         *    204.36 * * Bridge St Neighb * 1376        * PF 1    *    166.99 *    166.83 *     0.17 *       0.03 *       0.03 * 296.76 *    675.24 *         *    217.25 * * Bridge St Neighb * 1354        * PF 1    *    166.94 *    166.86 *     0.07 *            *            * 350.33 *    621.67 *         *    212.71 * * Bridge St Neighb * 1330        *         *   Culvert *           *          *            *            *        *           *         *           * * Bridge St Neighb * 1307        * PF 1    *    166.88 *    166.82 *     0.06 *       0.01 *       0.00 * 411.08 *    555.16 *    5.77 *    243.27 * * Bridge St Neighb * 1285        * PF 1    *    166.87 *    166.80 *     0.06 *       0.02 *       0.01 * 439.67 *    457.75 *   74.58 *    424.14 * * Bridge St Neighb * 1234        * PF 1    *    166.83 *    166.80 *     0.03 *       0.01 *       0.00 * 513.23 *    406.98 *   51.79 *    456.49 * * Bridge St Neighb * 1179        * PF 1    *    166.82 *    166.80 *     0.02 *       0.01 *       0.00 * 532.43 *    333.62 *  105.95 *    518.14 * * Bridge St Neighb * 1132        * PF 1    *    166.80 *    166.76 *     0.04 *       0.01 *       0.01 * 382.32 *    471.40 *  118.28 *    506.81 * * Bridge St Neighb * 1096        * PF 1    *    166.79 *    166.78 *     0.01 *            *            * 529.95 *    321.70 *  120.35 *    412.81 * * Bridge St Neighb * 1058        *         *   Culvert *           *          *            *            *        *           *         *           * * Bridge St Neighb * 1027        * PF 1    *    166.06 *    166.04 *     0.02 *       0.00 *       0.00 * 219.56 *    475.25 *  277.19 *    445.99 * * Bridge St Neighb * 1016        * PF 1    *    166.06 *    166.05 *     0.01 *       0.00 *       0.00 * 331.15 *    237.29 *  403.56 *    517.03 * * Bridge St Neighb * 1000        * PF 1    *    166.06 *    166.03 *     0.02 *       0.03 *       0.00 * 466.97 *    335.09 *  169.94 *    314.13 * * Bridge St Neighb * 870         * PF 1    *    166.03 *    165.99 *     0.04 *       0.01 *       0.01 *        *    352.30 *  619.70 *    280.47 * * Bridge St Neighb * 740         * PF 1    *    166.01 *    166.00 *     0.01 *            *            *   0.08 *    217.87 *  754.05 *    351.73 * **************************************************************************************************************************************************** Page 18 BridgeStreet2.rep                         HEC‐RAS HEC‐RAS 5.0.5 June 2018                            U.S. Army Corps of Engineers                            Hydrologic Engineering Center                                  609 Second Street                                        Davis, California                     X     X  XXXXXX    XXXX        XXXX       XX      XXXX             X     X  X        X    X       X   X     X  X    X             X     X  X        X            X   X    X    X   X             XXXXXXX  XXXX     X       XXX  XXXX     XXXXXX    XXXX             X     X  X        X            X  X     X    X        X             X     X  X        X    X       X   X    X    X        X             X     X  XXXXXX    XXXX        X    X   X    X   XXXXX ******************************************************************************** PROJECT DATA Project Title: Bridge Street 2 Project File : BridgeStreet2.prj Run Date and Time:  Project in English units ******************************************************************************** PLAN DATA Plan Title:  Plan File :             Geometry Title: Final Configuration            Geometry File : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.g03            Flow Title    : 100yr            Flow File     : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.f02 Plan Summary Information: Number of:  Cross Sections =   17    Multiple Openings  =    0             Culverts       =    2    Inline Structures  =    0             Bridges        =    0    Lateral Structures =    0 Computational Information     Water surface calculation tolerance  =  0.01      Critical depth calculation tolerance =  0.01      Maximum number of iterations         =  20  Page 1 BridgeStreet2.rep     Maximum difference tolerance         =  0.3      Flow tolerance factor                =  0.001  Computation Options     Critical depth computed only where necessary     Conveyance Calculation Method: At breaks in n values only     Friction Slope Method:         Average Conveyance     Computational Flow Regime:     Subcritical Flow ******************************************************************************** FLOW DATA Flow Title: 100yr Flow File : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.f02 Flow Data (cfs) ************************************************************* * River           Reach           RS      *            PF 1 * * Meadow Creek    Bridge St Neighb1535    *             972 * ************************************************************* Boundary Conditions ******************************************************************************************************** * River           Reach           Profile          *            Upstream                 Downstream    * ******************************************************************************************************** * Meadow Creek    Bridge St NeighbPF 1             *              Critical              Known WS = 166 * ******************************************************************************************************** ******************************************************************************** GEOMETRY DATA Geometry Title: Final Configuration Geometry File : d:\!Monsoon\Bridge Street 2\newer Hec\BridgeStreet2.g03 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1535     INPUT Description:  Station Elevation Data    num=      27      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ******************************************************************************** Page 2 BridgeStreet2.rep      688     175     701     170     713     165     717     164     723   163.5      729     164     731     165     735   165.5     741     167     741   166.5      796     166  825.25   166.2     881   166.3     881   166.8     889   166.8      927   169.3     939     172     984     170     996     164    1000   163.5     1004     164    1019     167    1064     167    1108   167.2    1136     168     1237     169    1258   169.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      688     .04     984    .045    1019     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            984    1019               44      44      44             .1       .3 Blocked Obstructions     num=       7    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      741   743.5     180     755   757.5     180     792   794.5     180      826   828.5     180     838   840.5     180     860   862.5     180      889     927     180 CROSS SECTION OUTPUT  Profile #PF 1   *********************************************************************************************** * E.G. Elev (ft)         *  167.43  * Element                *  Left OB *  Channel * Right OB * * Vel Head (ft)          *    0.19  * Wt. n‐Val.             *   0.040  *   0.045  *   0.040  * * W.S. Elev (ft)         *  167.24  * Reach Len. (ft)        *   44.00  *   44.00  *   44.00  * * Crit W.S. (ft)         *          * Flow Area (sq ft)      *  210.61  *   64.61  *   17.28  * * E.G. Slope (ft/ft)     *0.005258  * Area (sq ft)           *  210.61  *   64.61  *   17.28  * * Q Total (cfs)          *  972.00  * Flow (cfs)             *  702.01  *  254.56  *   15.43  * * Top Width (ft)         *  286.38  * Top Width (ft)         *  166.38  *   29.49  *   90.51  * * Vel Total (ft/s)       *    3.32  * Avg. Vel. (ft/s)       *    3.33  *    3.94  *    0.89  * * Max Chl Dpth (ft)      *    3.74  * Hydr. Depth (ft)       *    1.27  *    2.19  *    0.19  * * Conv. Total (cfs)      * 13405.1  * Conv. (cfs)            *  9681.6  *  3510.7  *   212.9  * * Length Wtd. (ft)       *   44.00  * Wetted Per. (ft)       *  179.68  *   30.61  *   90.51  * * Min Ch El (ft)         *  163.50  * Shear (lb/sq ft)       *    0.38  *    0.69  *    0.06  * * Alpha                  *    1.10  * Stream Power (lb/ft s) *    1.28  *    2.73  *    0.06  * * Frctn Loss (ft)        *    0.13  * Cum Volume (acre‐ft)   *    3.83  *    4.11  *    5.87  * * C & E Loss (ft)        *    0.01  * Cum SA (acres)         *    2.42  *    0.72  *    3.04  * *********************************************************************************************** Warning: Divided flow computed for this cross‐section. Warning: The conveyance ratio (upstream conveyance divided by downstream conveyance) is less than 0.7 or greater than           1.4.  This may indicate the need for additional cross sections. CROSS SECTION           RIVER: Meadow Creek     Page 3 BridgeStreet2.rep REACH: Bridge St Neighb   RS: 1491     INPUT Description:  Station Elevation Data    num=      21      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      721     170     734     165     746     163     759     166     760     166      800   166.4     800   166.9     804     167     826     167     859   166.4      883   166.3     924   166.4     924   166.9     946     168     947   168.4      985     168    1000   161.7    1017   162.3    1024   162.3    1040   169.3     1092   169.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      721     .04     985    .045    1040     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            985    1040               31      31      31             .1       .3 Blocked Obstructions     num=       6    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      760  760.25     180     774   776.5     180     804     826     180      859     883     180     889   891.5     180     921   923.5     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1460     INPUT Description:  Station Elevation Data    num=      21      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      734   168.3     751   162.3     755   162.2     772  166.66     772  166.16      791   166.4     791   166.9     808   166.8     850   166.5     904   166.5      914   166.6     914   167.1     924     168     960   167.3     972   167.3      985   166.3    1000   161.3    1017   162.3    1024   162.3    1040   169.3     1092   169.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      734     .04     985    .045    1040     .04 Page 4 BridgeStreet2.rep Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            985    1040               33      33      33             .1       .3 Ineffective Flow     num=       1    Sta L   Sta R    Elev  Permanent      734     742               F Blocked Obstructions     num=       6    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      772   774.5     180     786   788.5     180     850   852.5     180      873   875.5     180     896   898.5     180     926   928.5     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1427     INPUT Description:  Station Elevation Data    num=      23      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      750  167.75     762  165.75     767  162.25     781  165.75     792     166      792  166.16     847   166.2     854   166.2     854   166.7     880     167      934   166.5     945   166.6     945   167.1     963   167.4     972  167.75      984  167.75     996  161.75    1000  161.25    1006  161.75    1008  162.75     1023  163.75    1035  168.75    1136  168.75 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      750     .04     984    .045    1035     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            984    1035               51      51      51             .1       .3 Ineffective Flow     num=       1    Sta L   Sta R    Elev  Permanent      750     762               F Blocked Obstructions     num=       7    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      792   794.5     180     810   812.5     180     835   837.5     180      845   847.5     180     880   882.5     180     902   904.5     180      932   934.5     180 CROSS SECTION           Page 5 BridgeStreet2.rep RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1376     INPUT Description:  Station Elevation Data    num=      29      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      755     190     755     164     763     162     772     165   779.5   165.6    804.5     166   823.5   166.2   860.5   166.2   865.5   166.2   865.5   166.6    876.5   166.6   904.5   166.9   908.5   166.9   908.5   166.4   969.5   166.6    977.5   166.6   977.5   167.1     984     167     988     166     998     162     1000   161.2    1015     162    1026     163    1039     168    1114     169     1154     168    1161   168.3    1161   167.8    1182   168.4 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      755     .04     988    .045    1039     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            988    1039               22      22      22             .1       .3 Blocked Obstructions     num=       5    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      805     824     180     830   832.5     180     840   842.5     180      876     904     180     904   906.5     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1354     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      752     190     752     164     762     162     771     165     783   164.1      788     165     883     166     970     167     977     167     986     161     1014     161    1024     163    1034     168    1038     169    1071     169     1153     168    1159   168.2    1159   167.7    1177   168.2 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      752     .04     977    .045    1034     .04 Page 6 BridgeStreet2.rep Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            977    1034               47      47      47             .1       .3 Blocked Obstructions     num=       6    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      798   800.5     180     812   814.5     180     838   840.5     180      848   850.5     180     887   922.5     180     950   952.5     180 CULVERT                 RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1330     INPUT Description:  Distance from Upstream XS =       3 Deck/Roadway Width        =      32 Weir Coefficient          =     2.6 Upstream  Deck/Roadway Coordinates     num=      11      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      883     166     160     925   166.2     160     940   167.2     160      962  167.24     160     987  171.63     160    1000   172.5     160     1013  171.63     160    1023  170.52     160    1034  169.52     160     1051   168.7     160    1156     168     160 Upstream Bridge Cross Section Data Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      752     190     752     164     762     162     771     165     783   164.1      788     165     883     166     970     167     977     167     986     161     1014     161    1024     163    1034     168    1038     169    1071     169     1153     168    1159   168.2    1159   167.7    1177   168.2 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      752     .04     977    .045    1034     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            977    1034             .1       .3 Blocked Obstructions     num=       6    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************ Page 7 BridgeStreet2.rep      798   800.5     180     812   814.5     180     838   840.5     180      848   850.5     180     887   922.5     180     950   952.5     180 Downstream  Deck/Roadway Coordinates     num=      12      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      863   163.5     160     879     165     160     925   166.2     160      940   167.2     160     962  167.24     160     987  171.63     160     1000   172.5     160    1013  171.63     160    1023  170.52     160     1034  169.52     160    1051   168.7     160    1156     168     160 Downstream Bridge Cross Section Data Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************    758.5     165   775.5     162   791.5     165   819.5     165   896.5   165.8    901.5   166.1   901.5   165.6   918.5   165.8   918.5   166.4   943.5   166.5      948   166.5     984     166     986     161    1014     161    1032     165     1044     168    1156     168    1168     167    1186   167.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************    758.5     .04     984    .045    1032     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            984    1032             .1       .3 Blocked Obstructions     num=       6    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      820   822.5     180     834   836.5     180     857   859.5     180      878   880.5     180     886   888.5     180   918.5   943.5     180 Upstream Embankment side slope              =       0 horiz. to 1.0 vertical Downstream Embankment side slope            =       0 horiz. to 1.0 vertical Maximum allowable submergence for weir flow =     .98 Elevation at which weir flow begins         =         Energy head used in spillway design         =         Spillway height used in design              =         Weir crest shape                            = Broad Crested Number of Culverts =  1  Culvert Name     Shape      Rise    Span Culvert #1  Conspan Arch    5.75      28 FHWA Chart # 60‐ Span/Rise ratio approximate 2:1 FHWA Scale # 1 ‐ 0 degree wing wall angle Page 8 BridgeStreet2.rep Solution Criteria = Highest U.S. EG Culvert Upstrm Dist  Length    Top n  Bottom n  Depth Blocked  Entrance Loss Coef   Exit Loss Coef                   3      31     .015     .015        0                   .3               .6 Upstream   Elevation =  161.05             Centerline Station =  1000  Downstream Elevation =  161             Centerline Station =  1000  CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1307     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************    758.5     165   775.5     162   791.5     165   819.5     165   896.5   165.8    901.5   166.1   901.5   165.6   918.5   165.8   918.5   166.4   943.5   166.5      948   166.5     984     166     986     161    1014     161    1032     165     1044     168    1156     168    1168     167    1186   167.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************    758.5     .04     984    .045    1032     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            984    1032               22      22      22             .1       .3 Blocked Obstructions     num=       6    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      820   822.5     180     834   836.5     180     857   859.5     180      878   880.5     180     886   888.5     180   918.5   943.5     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1285     INPUT Description:  Station Elevation Data    num=      20      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ******************************************************************************** Page 9 BridgeStreet2.rep      722   170.5     737   166.5     782   165.5     793     165     802   164.5      810     165     835   164.5     912     164     935     166     957   166.8      982     166     989   159.5    1004   159.5    1014   164.5    1024   165.5     1138   168.5    1145   170.5    1158   166.5    1203     166    1803     172 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      722     .04     982    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            982    1014               51      51      51             .1       .3 Ineffective Flow     num=       2    Sta L   Sta R    Elev  Permanent      737     795   190.5       T     1247    1417   190.5       T Blocked Obstructions     num=       4    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      835   837.5     180     848   850.5     180     912     922     180      957     982     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1234     INPUT Description:  Station Elevation Data    num=      24      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      733     167     764     165     778   161.2     784   161.2     795     164      804   164.5     804   163.9     832   164.2     882   164.5     882     165      888     165     935   165.7     969     166     977   163.5     989   159.5     1000   159.5    1004   159.5    1014   164.5    1024   165.5    1138   168.5     1145   170.5    1158   166.5    1203     166    1803     172 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      733     .04     969    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            969    1014               55      55      55             .1       .3 Blocked Obstructions     num=       3    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev Page 10 BridgeStreet2.rep ************************************************************************      836   838.5     180     861   863.5     180     883   885.5     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1179     INPUT Description:  Station Elevation Data    num=      25      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      739     167     786     165     805     161     811     161     823     164      828     164     833   162.5     843   162.5     843     164     855     164      905   164.5     905     165     912     165     941   165.2     981     164      989     159    1000     159    1004     159    1014     164    1024     165     1138     168    1145     170    1158     166    1203   165.5    1803   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      739     .04     981    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            981    1014               47      47      47             .1       .3 Blocked Obstructions     num=       3    Sta L   Sta R    Elev   Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************************************      859   861.5     180     885   887.5     180     907   909.5     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1132     INPUT Description:  Station Elevation Data    num=      25      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      713     167     784     164     795     162     800     161     805     161      812     163     814     164     819     164     824   162.5     834   162.5      834     164     880     165     917     165     966     164     977     163      989     159    1000     159    1004     159    1014     164    1024     165     1138     168    1145     170    1158     166    1203   165.5    1803   171.5 Page 11 BridgeStreet2.rep Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      713     .04     977    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            977    1014               36      36      36             .1       .3 Ineffective Flow     num=       3    Sta L   Sta R    Elev  Permanent      737     802     190       T      844     911     190       T     1247    1417     190       T Blocked Obstructions     num=       2    Sta L   Sta R    Elev   Sta L   Sta R    Elev ************************************************      850   852.5     180     880     917     180 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1096     INPUT Description:  Station Elevation Data    num=      13      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      744     167     800     164     821   160.6     827   160.6     844     163      847     164     938     164     973     164     995     158    1000     158     1005     158    1014     164    1161   166.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      744     .04     973    .045    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            973    1014               69      69      69             .1       .3 CULVERT                 RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1058     INPUT Page 12 BridgeStreet2.rep Description:  Distance from Upstream XS =      13 Deck/Roadway Width        =      40 Weir Coefficient          =     2.6 Upstream  Deck/Roadway Coordinates     num=      24      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      753     170     150     773  169.33     150     790  168.45     150      790  167.95     150     830   166.5     150     830     167     150      842   166.9     150     853  167.05     150     853  166.65     150      864  166.85     150     969  166.85     150     989  167.77     150     1000  167.89     150    1018  167.23     150    1032  166.58     150     1053  165.85     150    1203  165.85     150    1219  165.59     150     1229   165.2     150    1229   164.7     150    1247   165.2     150     1265   164.7     150    1265   165.2     150    1865     170     150 Upstream Bridge Cross Section Data Station Elevation Data    num=      13      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      744     167     800     164     821   160.6     827   160.6     844     163      847     164     938     164     973     164     995     158    1000     158     1005     158    1014     164    1161   166.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      744     .04     973    .045    1014     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            973    1014             .1       .3 Downstream  Deck/Roadway Coordinates     num=      26      Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord     Sta Hi Cord Lo Cord ************************************************************************      783   167.9     150     802   166.8     150     818   166.2     150      835  166.12     150     836   166.4     150     880   166.4     150      903   166.2     150     969   166.7     150     969   166.7     150      987     167     150     991   167.2     150    1000   167.4     150     1009   167.6     150    1016   167.8     150    1018     168     150     1048   166.3     150    1065   165.8     150    1092   165.7     150     1138   165.5     150    1187   165.3     150    1197   165.2     150     1197   164.7     150    1215   165.2     150    1233   164.7     150     1233   165.2     150    1833     170     150 Downstream Bridge Cross Section Data Page 13 BridgeStreet2.rep Station Elevation Data    num=      18      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      833     171     854     162     867     161     895     164     901   164.5      941     165     972     165     981   164.7     986     158    1014     158     1029   163.5    1046     163    1060     163    1143     164    1159     165     1236     165  1236.1   165.5    1836   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      833     .04     981    .045    1029     .04 Bank Sta: Left   Right    Coeff Contr.   Expan.            981    1029             .1       .3 Upstream Embankment side slope              =       1 horiz. to 1.0 vertical Downstream Embankment side slope            =       1 horiz. to 1.0 vertical Maximum allowable submergence for weir flow =     .95 Elevation at which weir flow begins         =         Energy head used in spillway design         =         Spillway height used in design              =         Weir crest shape                            = Broad Crested Number of Culverts =  2  Culvert Name     Shape      Rise    Span Culvert #2           Box    2.67    3.75 FHWA Chart # 8 ‐ flared wingwalls FHWA Scale # 1 ‐ Wingwall flared 30 to 75 deg. Solution Criteria = Highest U.S. EG Culvert Upstrm Dist  Length    Top n  Bottom n  Depth Blocked  Entrance Loss Coef   Exit Loss Coef                  15      32     .012     .012        0                   .5                1 Upstream   Elevation =  161.5             Centerline Station =  792  Downstream Elevation =  161.2             Centerline Station =  867  Culvert Name     Shape      Rise    Span Culvert #1  Conspan Arch     5.1      28 FHWA Chart # 61‐ Span/Rise ratio approximate 4:1 FHWA Scale # 2 ‐ 45 degree wing wall angle Solution Criteria = Highest U.S. EG Culvert Upstrm Dist  Length    Top n  Bottom n  Depth Blocked  Entrance Loss Coef   Exit Loss Coef                   6      40     .012      .03        0                   .2                1 Upstream   Elevation =  158             Centerline Station =  1000  Downstream Elevation =  158  Page 14 BridgeStreet2.rep            Centerline Station =  1000  CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1027     INPUT Description:  Station Elevation Data    num=      18      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      833     171     854     162     867     161     895     164     901   164.5      941     165     972     165     981   164.7     986     158    1014     158     1029   163.5    1046     163    1060     163    1143     164    1159     165     1236     165  1236.1   165.5    1836   171.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      833     .04     981    .045    1029     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            981    1029               11      11      11             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1016     INPUT Description:  Station Elevation Data    num=      19      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      863     173     890     161     896     160     917     161     927     162      967     165     973     165     980     164     991     162     996     158     1007     158    1011     162    1023     163    1045   163.5    1075     163     1158     164    1241     164  1241.1   164.5    1840   170.5 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      863     .04     980    .045    1023     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan. Page 15 BridgeStreet2.rep            980    1023               16      16      16             .1       .3 CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 1000     INPUT Description: DS Limit Station Elevation Data    num=      16      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      865     173     892     161     919     160     925     160     933     162      952     163     974   164.5     988     163    1000     157    1010     158     1017     162    1024   162.5    1060     163    1100     164    1166     164     1251     170 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      865     .04     974    .045    1024     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            974    1024              130     130     130             .1       .3 Ineffective Flow     num=       2    Sta L   Sta R    Elev  Permanent     1076    1191     190       T     1336    1516     190       T CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 870      INPUT Description: thru ironworks bldg Station Elevation Data    num=      11      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      984  172.26     997   157.5    1003     157    1014   161.8    1034   162.6     1075   163.1    1201   163.4    1207  162.99    1227   163.1    1249  162.44     1270   163.3 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************ Page 16 BridgeStreet2.rep      984     .04     984     .03    1014     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            984    1014              131     131     131             .1       .3 Ineffective Flow     num=       1    Sta L   Sta R    Elev  Permanent     1124    1209     190       T CROSS SECTION           RIVER: Meadow Creek     REACH: Bridge St Neighb   RS: 740      INPUT Description: Cl BeeBee st extended Station Elevation Data    num=      15      Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev     Sta    Elev ********************************************************************************      970   174.9     991   165.2     995   157.2    1000   157.5    1008   157.7     1021   161.9    1051   162.4    1126   162.4    1199   162.3    1211   162.7     1216   162.2    1222  161.52    1241  161.81    1259  161.11    1341   161.8 Manning's n Values        num=       3      Sta   n Val     Sta   n Val     Sta   n Val ************************************************      970     .04     991     .03    1021     .04 Bank Sta: Left   Right    Lengths: Left Channel   Right     Coeff Contr.   Expan.            991    1021                0       0       0             .1       .3 ******************************************************************************** SUMMARY OF MANNING'S N VALUES  River:Meadow Creek     ***************************************************************** *     Reach      *   River Sta.   *   n1    *   n2    *   n3    * ***************************************************************** *Bridge St Neighb*    1535        *      .04*     .045*      .04* *Bridge St Neighb*    1491        *      .04*     .045*      .04* *Bridge St Neighb*    1460        *      .04*     .045*      .04* *Bridge St Neighb*    1427        *      .04*     .045*      .04* *Bridge St Neighb*    1376        *      .04*     .045*      .04* *Bridge St Neighb*    1354        *      .04*     .045*      .04* *Bridge St Neighb*    1330        *Culvert  *        *        * *Bridge St Neighb*    1307        *      .04*     .045*      .04* *Bridge St Neighb*    1285        *      .04*     .045*      .04* Page 17 BridgeStreet2.rep *Bridge St Neighb*    1234        *      .04*     .045*      .04* *Bridge St Neighb*    1179        *      .04*     .045*      .04* *Bridge St Neighb*    1132        *      .04*     .045*      .04* *Bridge St Neighb*    1096        *      .04*     .045*      .04* *Bridge St Neighb*    1058        *Culvert  *        *        * *Bridge St Neighb*    1027        *      .04*     .045*      .04* *Bridge St Neighb*    1016        *      .04*     .045*      .04* *Bridge St Neighb*    1000        *      .04*     .045*      .04* *Bridge St Neighb*    870         *      .04*      .03*      .04* *Bridge St Neighb*    740         *      .04*      .03*      .04* ***************************************************************** ******************************************************************************** SUMMARY OF REACH LENGTHS River: Meadow Creek     ***************************************************************** *     Reach      *   River Sta.   *  Left   * Channel *  Right  * ***************************************************************** *Bridge St Neighb*    1535        *       44*       44*       44* *Bridge St Neighb*    1491        *       31*       31*       31* *Bridge St Neighb*    1460        *       33*       33*       33* *Bridge St Neighb*    1427        *       51*       51*       51* *Bridge St Neighb*    1376        *       22*       22*       22* *Bridge St Neighb*    1354        *       47*       47*       47* *Bridge St Neighb*    1330        *Culvert  *         *         * *Bridge St Neighb*    1307        *       22*       22*       22* *Bridge St Neighb*    1285        *       51*       51*       51* *Bridge St Neighb*    1234        *       55*       55*       55* *Bridge St Neighb*    1179        *       47*       47*       47* *Bridge St Neighb*    1132        *       36*       36*       36* *Bridge St Neighb*    1096        *       69*       69*       69* *Bridge St Neighb*    1058        *Culvert  *         *         * *Bridge St Neighb*    1027        *       11*       11*       11* *Bridge St Neighb*    1016        *       16*       16*       16* *Bridge St Neighb*    1000        *      130*      130*      130* *Bridge St Neighb*    870         *      131*      131*      131* *Bridge St Neighb*    740         *        0*        0*        0* ***************************************************************** ******************************************************************************** SUMMARY OF CONTRACTION AND EXPANSION COEFFICIENTS River: Meadow Creek     ******************************************************* *     Reach      *   River Sta.   * Contr.  * Expan.  * Page 18 BridgeStreet2.rep ******************************************************* *Bridge St Neighb*    1535    *       .1*       .3* *Bridge St Neighb*    1491    *       .1*       .3* *Bridge St Neighb*    1460    *       .1*       .3* *Bridge St Neighb*    1427    *       .1*       .3* *Bridge St Neighb*    1376    *       .1*       .3* *Bridge St Neighb*    1354    *       .1*       .3* *Bridge St Neighb*    1330    *Culvert  *         * *Bridge St Neighb*    1307    *       .1*       .3* *Bridge St Neighb*    1285    *       .1*       .3* *Bridge St Neighb*    1234    *       .1*       .3* *Bridge St Neighb*    1179    *       .1*       .3* *Bridge St Neighb*    1132    *       .1*       .3* *Bridge St Neighb*    1096    *       .1*       .3* *Bridge St Neighb*    1058    *Culvert  *         * *Bridge St Neighb*    1027    *       .1*       .3* *Bridge St Neighb*    1016    *       .1*       .3* *Bridge St Neighb*    1000    *       .1*       .3* *Bridge St Neighb*    870     *       .1*       .3* *Bridge St Neighb*    740     *       .1*       .3* ******************************************************* Page 19