HomeMy WebLinkAboutSocioeconomic Impacts from Nuclear Power PlantSocioeconomic Impacts from Nuclear Power Plant Closure and Decommissioning Host Community ExpEriEnCEs, BEst praCtiCEs and rECommEndations OCTOBER 2020 | THE NUCLEAR DECOMMISSIONING COLLABORATIVE, INC. disclaimer this report, and any related content, was prepared by the Nuclear Decommissioning collaborative (collaborative) using Federal funds under award eD18hDQ3030014 from the u.s. economic Development Administration (eDA), u.s. Department of commerce. the collaborative is helping eDA identify and develop best practices to assist communities affected by the loss of jobs and tax revenue due to nuclear power plant closures. the statements, findings, conclusions, and recommendations are those of the collaborative and do not necessarily reflect the views of eDA or the u.s. Department of commerce. Socioeconomic Impacts from Nuclear Power Plant Closure and Decommissioning: Host Community Experiences, Best Practices and Recommendations 2020, the Nuclear Decommissioning collaborative, inc. All rights reserved. No portion of this report may be repro- duced in any form without permission from the publisher, except as permitted by u.s. copyright law. For permissions contact: Info@decommissioningcollaborative.com the online version of this document includes web links indicated by text in blue italics) to cited reference material. about the Nuclear decommissioNiNg collaborative We are the nation’s nuclear decommissioning clearinghouse. As a nonprofit corporation, we bring together people and resources to provide guidance and strategy as you move through your decommissioning journey. We take the mystery out of the decommissioning of nuclear power plants to produce better, and more equitable outcomes, for all stakeholders. the Nuclear Decommissioning collaborative is a 501(c)3 nonprofit organization. DesigN: David gerratt/NonprofitDesign.com cover image: © istockphoto.com/Allkindza Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning i iii Preface 1 executive Summary 3 chapter 1: Background and context Setting 3 Introduction 4 Report Overview 5 chapter 2: nuclear plant operation, closure, and decommissioning 5 Nuclear Plant Operation 6 Nuclear Plant Closure 6 Nuclear Plant Decommissioning 11 Chapter Summary 12 chapter 3: Socioeconomic impacts of closure and decommissioning 12 Socioeconomic Impacts of Closure and Decommissioning 16 Socioeconomic Impacts of Plant Decommissioning 17 Chapter Summary 18 chapter 4: closure and decommissioning — impacts and responses 18 Introduction 19 Phase I — Closure Acknowledgement 20 Phase II — Preliminary Impact Assessment 21 Phase III — The Decommissioning Learning Curve 27 Phase IV — Partnership Development 28 Phase V — Planning and Execution 31 Chapter Summary 33 chapter 5: Best practices and recommendations 33 The Host Community Experience 35 The Host State Experience 37 The National Perspective 38 Chapter Summary Contents 39 chapter 6: opportunities for Future work 39 The Plant — Community Relationship 39 Longitudinal Examination of Economic Development Efforts 39 The Opportunity Costs of Stranded Assets 39 Community Engagement Models 39 Property Stewardship Models 40 references 40 Media 40 Reports 41 Legislation and Regulations and Associated Reference Material 42 appendix a — eda Summary report (June 25, 2018) 50 appendix B — eda Summary report (august 9, 2019) 60 appendix c — nrc neima meetings ii Contents Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning iii exeCutive summary Preface in 2005, the electric Power research institute ePri) published a report documenting the lessons learned in the decommissioning of the maine Yankee nuclear power station.1 As part of the introduction, the authors observed that while the report’s original focus was to be on “nuts and bolts” issues, another layer of considerations, so called “soft areas” emerged as being significant and which influenced, “. . .the effective conduct of the overall decommissioning project.” these “soft areas” included issues such as stakeholder engagement and local/state regula- tory interaction: issues that may have originally been viewed as tangentially related to the decommissioning process as defined by the u.s. Nuclear regulatory commission (Nrc). our efforts build upon ePri’s work as we delve further into these “soft areas.” in particu- lar, we focus on the often-overlooked socio- economic impacts of closure and decommission- ing and explore ways in which host communities have responded to job loss and a corresponding reduction in tax revenues. We also examine more deeply how stakeholders (at the local, state and federal levels) view the process of nuclear plant closure and decommissioning, and how this evolving understanding is shaping their ability and desire to improve project out- comes by playing a more constructive role in the decommissioning process. 1 electric Power research institute, (2005). The Maine Yankee Decommissioning Experience Report—Detailed Experiences 1997–2004. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 1 exeCutive summary Executive Summary Opposite: © Jack Freer/Overland Photography the operation of a typical nuclear plant annu- ally contributes at least $400m of economic impact to the plant’s host region as well as being a key source of economic livelihood for over one thousand plant employees and contrac- tors. in addition, the presence of nuclear plant employees and their families strengthens host community capacity through their participation in a wide range of civic, cultural and volunteer opportunities. over the next several decades, all nuclear power plants that currently operate will close and be decommissioned under the jurisdiction of the u.s. Nuclear regulatory commission (Nrc) with the cost to complete this decommissioning effort estimated to be approximately $100b. Despite the large sums of money involved in decommissioning, the socioeconomic impacts to host communities resulting from plant closure are swift, severe and lasting. many highly skilled workers and their families relocate, procurement of local goods and services is significantly reduced, tax payments to local towns plummets and hous- ing values erode. these impacts occur at every nuclear power plant, but the effects are felt more deeply in rural communities where most plants are located. For more than 20 years, plant host communi- ties across the country have repeated these dy- namics. in response to this resulting uncertainty and the associated socioeconomic hardships, host communities have undertaken various attempts at recovery. however, a series of factors continue to hamper these recovery efforts including: Limited resources for economic development economic recovery planning can be a re- source intensive effort requiring consider- able investments of time, funding and local capacity. All three of these elements are in short supply once plant closure takes place. Steep learning curve Nuclear power plant closure and decommis- sioning is particularly complex and is often referred to as a “once in a lifetime experience.” roles and responsibilities of local and state stakeholders are unclear, opportunities for meaningful community engagement are generally limited and there are few resources to support peer-to-peer learning and collaboration at a national level. Socioeconomic impacts of operating plants are not well understood At the host community level as well as from a national perspective, the socioeconomic impacts of plant operation vs. closure are not well articulated. A centralized informa- tion database would improve policymaking. The long-term presence of spent nuclear fuel hinders economic development the presence of spent nuclear fuel at decommissioned power plants represents a significant and ongoing barrier to economic recovery. The lack of a coordinated federal framework with limited focus on socioeconomic impacts mitigating socioeconomic impacts from nuclear power plant closure is largely outside the jurisdiction of the u.s. Nuclear regulatory commission (Nrc), the primary federal entity that regulates decommission- ing. While recent federal appropriations encourage increased coordination between the Department of commerce and the Department of energy, the federal response to these host communities would benefit from increased interagency collaboration. 2 executive Summary As more nuclear power plants come off-line, the socioeconomic impacts from plant closure will continue to mount on host communities. With this realization, the plight of nuclear closure communities has begun to receive increased attention. At the national level, modest amounts of federal funding have been recently appropri- ated to support economic development planning; states have begun to increase their role in the closure and decommissioning process; and, host communities are seeking opportunities to have greater control over their economic future in the wake of plant closure. well before a plant is scheduled to close, is a reasonable and prudent community investment. State perspective in concert with local entities developing economic mitigation plans prior to plant closure, states have a similar incentive to anticipate closure and develop their own policies. Areas of influence that a state may have on decommissioning range from final radiological cleanup levels and the provision of economic impact mitigation funds to defining the role of host communities and advisory boards in the decommissioning process. Without prior action in advance of plant closure, the role of states is generally limited. National perspective the $100b required to decommission the current nuclear fleet was (and will be) derived largely from ratepayers. in this context and to ensure that those same ratepayers may realize maximum benefit from decommissioning, the improved coor- dination of federal agencies focusing on additional research, efficient deployment of resources and the provision of planning assistance would be a demonstrable benefit to host communities. the establishment of a national network of nuclear closure communities, modeled after similar coor- dinating entities in the Doe (the energy communities Alliance) and the DoD (the office of economic Adjustment), would also improve the effectiveness of the federal response. in addition to these above recommendations, opportunities for additional research and knowl- edge development exist in the following areas: i) improving our understanding of the socio- economic relationship between the plant and the host community; (ii) creation of a more robust longitudinal) understanding of the efficacy of various economic development efforts; (iii) increased appreciation of the local opportunity costs associated with stranded assets due to the presence of spent nuclear fuel; (iv) improvements to the practice of community engagement; and, v) exploration of property stewardship models possibly through a land trust) to facilitate repositioning of decommissioned sites to their highest and best use. As more nuclear power plants come off-line, the socioeconomic impacts from plant closure will continue to mount on host communities. With this realization, the plight of nuclear closure communities has begun to receive increased attention. these emerging efforts (at the local, state and federal levels) would, however, benefit from increased alignment and coordination towards the goal of implementing decommissioning proj- ects that produce outcomes that are of greater benefit to the host community. With that goal in mind, this report examined the socioeconomic aspects of closure and decommissioning with a focus on the host community experience. through a combination of stakeholder interviews and research, we developed a more complete picture of what it means to close and decommission a nuclear power plant. With this more robust definition in hand, we then highlighted lessons learned and provided recommendations to improve project outcomes. We group observations and recommendations into three perspectives from the local, state and national level. Key findings include: Local perspective early planning for post-closure economic recovery at the community, county and regional level neither accelerates nor pre- cipitates the decision to close the plant. the economic recovery process is long, challenging and heavily dependent upon the host community to galvanize and sus- tain action. identification of economic development barriers (e.g., presence of spent nuclear fuel, lack of planning resources) and the design of economic recovery plans, Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 3 Chapter One Background and Context Setting 2 A list of NRC meetings is found in Appendix C. 3 Interviewees were asked a series of exploratory questions to allow each interviewee to describe their decommissioning experience in their own terms. Responses where then synthesized and incorporated into report findings. Host Community Nuclear Power Plant Operational Status Wiscasset, ME Maine Yankee Decommissioned (2005) Oak Harbor, OH Davis-Besse Operational (since 1978) Plymouth, MA Pilgrim Decommissioning (closed 2019) San Luis Obispo, CA Diablo Canyon 1 & 2 Operational (since 1985 & 1986) Covert Township, MI Palisades Operational (since 1971) Haddam Neck, CT Connecticut Yankee Decommissioned (2007) Zion, IL Zion Decommissioning (closed 1998) Mineral, VA North Anna 1 & 2 Operational (since 1978 & 1980) Crystal River, FL Crystal River Decommissioning (closed 2013) TABLE 1 Nuclear Communities Interviewed IntroductionAsthesocioeconomic impacts of nuclear power plant closure have begun to gain greater visibility, the United States Congress directed the Economic Development Administra- tion (EDA) to engage on this matter more fully. Pursuant to the Explanatory Statement accompa- nying the Consolidated Appropriations Act, 2018 P.L. 115-141), EDA prepared a summary report addressing their work to help identify and develop best practices to assist communities affected by loss of tax revenue and job loss due to nuclear power plant closures. This report is found in Appendix A. In 2019, pursuant to Senate Report 115-275, which accompanied the Consolidated Appro- priations Act, 2019 (P.L. 116-6), and working in coordination with the Department of Energy, EDA prepared and submitted a subsequent report describing existing resources and funding oppor- tunities for which affected communities may be eligible. This report is found in Appendix B. In conjunction with the preparation of the 2019 report, EDA entered into a Cooperative Agreement with The Nuclear Decommissioning Collaborative to support communities impacted by nuclear power plant closures. Key deliverables associated with this cooperative agreement included: (i) education and awareness building; ii) the provision of technical assistance to nuclear closure communities; and, (iii) additional research accompanied by stakeholder interviews. This report is the final deliverable from the Coopera- tive Agreement and highlights lessons learned and best practices so as to better support host communities through their nuclear plant closure and decommissioning process. With respect to the research and stakeholder interview process, the authors of this report con- ducted three forms of inquiry: a review of published literature and media reports exploring energy plant closures in general and nuclear power plant closures in particular; attendance at a series of meetings in 2019 that were sponsored by the NRC regarding community engagement in decommissioning;2 and, telephone interviews with stakeholders from nuclear power plant host communities.3 Interviews with 27 decommissioning stake- holders took place from December of 2019 through April of 2020. Interviewees consisted of commu- nity leaders, economic development professionals, industry representatives and local elected officials. Interviewees were chosen from the nine nuclear power plant host communities listed below rep- resenting decommissioned, decommissioning and operational reactors across the country. List of host communities and their associated nuclear power plants that participated in stakeholder interviews. 4 chapter one •bAcKgrouND AND coNtext settiNg it is clear that the closure and decommission- ing landscape is complex and that each host community has its own distinct experience. in this context, the authors of this report fully recognize that it is not possible to capture all the various nuances with a limited sample size. We also rec- ognize that not every nuclear closure community was represented. Nevertheless, common themes emerged from the interviews with sufficient regularity and consistency that general obser- vations and conclusions were developed and are included herein. Chapter 3—Socioeconomic Impacts of Closure and Decommissioning¸ utilizes the results of the project research and stakeholder interviews to illustrate the various socioeconomic impacts to host communities arising from plant closure and decommissioning. having established a common understanding of the closure and decommissioning process and the associated socioeconomic ramifications, Chapter 4—Closure and Decommissioning: Impact and Responses then examines how various communities have responded to these challenges and opportunities. Again, using research results and observations from stake- holder interviews, community actions are mapped against a common framework. Chapter 5—Recommendations synthesizes community responses, highlights lessons learned and develops a series of recommendations. this chapter is then followed by Chapter 6— Suggestions for Future Work. this document summarizes general observa- tions and findings regarding the socioeconomic impacts resulting from the closure and decom- missioning of nuclear power plants across the country over the past 20 years. to that end, this single report does not intend to reflect all stake- holder experiences or community responses. Nor does it attempt to address issues such as fuel storage, radiological remediation or other technical aspects of decommissioning. it is clear that the closure and decommissioning landscape is complex and that each host community has its own distinct experience. Nevertheless, common themes emerged from the interviews with sufficient regularity and consistency that general observations and conclusions were developed and are included herein. report overview Following this introduction, Chapter 2—Plant Operation, Closure and Decommissioning pres- ents an overview of the history of nuclear power plant operation and closure over the past 20 years. this chapter also reviews key aspects and issues associated with the decommissioning process and the applicable Nrc regulations. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 5 Chapter two Nuclear Plant Operation, Closure and Decommissioning nuclear plant operationthefirstcommercialnuclearpower plant in the united states, the shippingport Atomic Power station in shippingport, Pennsylvania, came online in 1958. since then, nearly 100 com- mercial reactors have entered operations under the jurisdiction of the u.s. Nuclear regulatory commission (Nrc), producing approximately 20% of the nation’s electricity needs. As a result, the united states is currently home to the world’s largest fleet of commercial nuclear power gener- ating stations. the nation’s newest nuclear power plants, vogtle electric generating units 3 and 4 in Wayne county, georgia, are scheduled to commence operations in the early 2020s. the operation of a nuclear power plant pro- vides a significant and ongoing economic stimu- lus to the host community and the surrounding region. First, the construction of a nuclear plant is typically a multi-year, multi-billion-dollar effort resulting in the creation of thousands of construc- tion and engineering jobs along with significant secondary and tertiary economic impacts to nearby towns and regions. second, as the operation of a nuclear power plant provides ongoing baseline energy to the electrical grid, so too does the plant provide ongoing baseline employment and economic opportunity. A typical nuclear plant annually con- tributes at least $400m of gross regional product grP) and accounts for the direct employment of up to 2,000 workers (employees and contractors).4 As nuclear power plants are often located in rural areas, this concentrated and sizeable number of jobs tends to magnify the plant’s local economic development contribution. in addition, nuclear plant workers are highly skilled with commen- surate wages that often outpace regional pay scales. For instance, employees at the Pilgrim Nuclear Power station (Pilgrim) earned an aver- age salary of $100,000 per year: 50% higher than the average annual salary for the host state of massachusetts.5 in parallel, host communities often report that nuclear power plant operations account for a critical portion of local tax revenues. the operation of Zion Nuclear Power station Zion) provided the city of Zion, illinois with approximately 50% of its tax base. similarly, the maine Yankee nuclear power plant (maine Yankee) provided over 90% of the tax base for its host community of Wiscasset, maine. the ongoing operation of a nuclear power plant helps support a symbiotic socioeconomic relationship between the plant operator and the host community. Accordingly, over the operational lifespan of a typical power plant, 4 brattle group, (2018). Impacts of Announced Nuclear Retirements in Ohio and Pennsylvania; D. murphy and m. berkman. 5 cooper, J.c., (2014). The Pilgrim Nuclear Power Station Study A Socio-Economic Analysis and Closure Transition Guide Book, university of massachusetts Amherst. The Shippingport Atomic Power Station was the nation’s first commercial nuclear power plant. barring new construction or government subsidies, the u.s. nuclear fleet will continue to shrink, with this rate of contraction governed by two forces: the term of the plant’s operating license and under-lying electricity market conditions. 6 chapter two •NucleAr PlANt oPerAtioN, closure AND DecommissioNiNg 6 Nrc regulations, 10 c.F.r., Part 20 subpart e, and Parts 50.75, 50.82, 51.53, and 51.95. 7 When announcing the closure of the Pilgrim Nuclear Power station, plant owners cited three factors supporting their decision, “poor market conditions, reduced revenues and increased operational costs.” mand, F. (2015, october 4), Entergy to close Pilgrim Nuclear Power Station by 2019, The Patriot Ledger. 8 cooper, m., (2013). Renaissance in Reverse: Competition Pushes Aging U.S. Nuclear Reactors to the Brink of Economic Abandonment. vermont law school. 9 s&P global Platts, (2020, march 5). growth in u.s. decommissioning market depends on federal, state policies. Nucleonics Week, volume 61/Number 10/page 8. 10 10 c.F.r. § 50.2. both parties tend to settle into a period of mutually beneficial stability. nuclear plant Closure in 1989, colorado’s Fort saint vrain nuclear reactor was the first commercial nuclear power plant to close, after 10 years of operation. since then, more than 20 additional plants have ceased op- eration and entered the decommissioning process as governed by the Nrc.6 the average operational life span of these plants has been 26 years. barring new construction or government subsidies, the u.s. nuclear fleet will continue to shrink, with this rate of contraction governed by two forces: the term of the plant’s operating license and under- lying electricity market conditions. forces has caused the premature closure (in advance of Nrc license expiration) of several nuclear power plants across the country. examples of these premature plant closures include indian Point Nuclear generating units 2 and 3 (indian Point), New York; and, Pilgrim in massachusetts.7 As a result of ongoing economic pressures combined with scheduled license expiration, it may be reasonably expected that the u.s. nuclear fleet may experience upwards of 20 plant closures through 2050.8 For instance, s&P global Platts recently reported that upcoming rule changes to the Federal energy regulatory commission capacity market auction could result in 13 units joining the list of nuclear power plants that are at a “high-risk” of early shut-down.9 these plants include: Exelon—Illinois braidwood-1 and -2 byron-1 and -2 Dresden-2 and -3 lasalle-1 and -2 PSEG—New Jersey salem hope creek-1 and -2 Energy Harbor (former FirstEnergy Solutions)—Ohio Perry Davis-besse While the future rate of nuclear power plant closures is unpredictable, what is certain is that all nuclear power plants will eventually close and all will enter the Nrc’s decommissioning process. nuclear plant Decommissioning regulatory setting Federal regulations the term “decommissioning” describes a multi- step process governed by the Nrc. While it is a complex undertaking, the goal of decommission- ing is straightforward and defined as, “. . .the safe removal of a facility from service and reduction of residual radioactivity to a level that permits termination of the Nrc license.”10 in 2014, after recognizing that the current de- commissioning process may benefit from updated regulations, the Nrc initiated a rulemaking effort First, as each plant’s operating license expires, the license holder (or licensee) has the option to renew the plant’s Nrc license for an additional 20 years. this license renewal process is a complex, costly and multi-year investment. some licensees may choose the renewal path thus extending the lifespan beyond the initial 20-year license period. examples of plants that have received one or more license renewals include the Kewaunee Power station (Kewaunee) in Wisconsin and New Jersey’s oyster creek generating station oyster creek). second, continued plant operation calls for the plant to provide a reasonable return on investment, or to put it simply, the plant needs to make money. of late, and for the foreseeable future, the profit- ability of certain nuclear power plants is under mounting pressure due to the combination of relatively high operating costs (which increase as the plant continues to age) combined with the availability of lower cost options for generating electricity. the presence of these competitive Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 7 to take a fresh look at the emerging decommis- sioning landscape and revise regulations accord- ingly. Preliminary indications are that this rulemaking will generally focus on emergency preparedness, security and administrative matters. socioeconomic impacts associated with closure and decommis- sioning do not appear to be included in the rule- making effort. this rulemaking was to be com- plete by December 2019. As of June 2020, this rulemaking remains a work in progress. in managing the decommissioning process, Nrc is supported by other agencies including the Department of homeland security, Federal emer- gency management Agency (FemA). in particular, FemA is to “. . . take the Federal lead role in off- site emergency planning and preparedness activi- ties and to review and assess offsite emergency plans and preparedness for adequacy.”11 state and Local Decommissioning regulations the role of the state is generally influenced by the regulatory setting under which the plant generated electricity (i.e., a regulated or non-regulated utility). For those states with a regulated utility marketplace, the public utilities commission (or equivalent) exerts a degree of influence over certain plant permits and approvals. For instance, vermont provides an example of a state with a degree of regulatory authority over decommissioning. in particular, entergy, the licensee for the vermont Yankee Nuclear Power station (vermont Yankee) was required to obtain a certificate of Public good (cPg) from the state’s Public utility com- mission to enable the transfer of its Nrc operat- ing license to the decommissioning contractor Northstar). the public cPg process allowed the state to exert a modest degree of influence and enforcement over the performance of the decom- missioning project. other states, for instance massachusetts, have little regulatory oversight of the decommissioning process. states have, however, played a role in devel- oping radiological cleanup standards. in the mid- 1990s, the Nrc established the radiological clean- up standards for the release of a decommissioned site through what was called an “enhanced par- ticipatory rulemaking” where state governments and other interests collaborated with the Nrc on standard development. the state role in the cleanup standards is limited to providing Decommissioning Funding Decommissioning a commercial nuclear power plant is a capital-intensive effort. estimated total project costs to complete decommissioning can exceed $3b in the case of larger plants, such as california’s Diablo canyon Power Plant (Diablo canyon), and $1b project costs are common for smaller plants. in 2018, the total cost for decom- missioning the remaining u.s. nuclear power fleet was estimated to be approximately $96b.14 Nrc regulations govern how the licensee develops the necessary financial assurance 10 c.F.r. § 50.75) to support decommissioning. According to the callan institute, there are two 11 Memorandum of Understanding between the Department of homeland security/Federal emergency management Agency, and Nuclear regulatory commission regarding radiological emergency response, Planning, and Preparedness, 2015. 12 A millirem (mrem) is one thousandth of a rem and defines absorbed radiation dose. As a rem is a large dose of radiation, mrem is often used for dosages commonly experienced, such as the amount of radiation received from medical x-rays and natural background sources. 13 10 cFr 50.82(a)(3). 14 callan institute, (2019). 2019 Nuclear Decommissioning Funding Study. Decommissioning a commercial nuclear power plant is a capital-intensive effort. estimated total project costs to complete decommissioning can exceed 3b in the case of larger plants and $1b project costs are common for smaller plants. comments and advice to the Nrc through the Nrc rulemaking process. Although the Nrc regulations for radiological cleanup standards preempt any state cleanup standards, a state does have the authority to set cleanup standards for the period of time after the Nrc Part 50 license is terminated and the plant is decommissioned. For example, massachusetts has established a 10 mrem12 standard that must be met after the Nrc Part 50 license has been terminated. With respect to the involvement of local regulatory authorities, these actions are generally limited to traditional issues such as the issuance of building permits and other administrative functions. the Decommissioning process Nrc regulations state that decommissioning i.e. termination of the Nrc license) must be completed within 60 years from the permanent cessation of operations.13 completion of license termination is driven by two inter-related elements: the availability of funds to support decommis- sioning; and, the selection of a decommissioning option. 8 chapter two •NucleAr PlANt oPerAtioN, closure AND DecommissioNiNg process was utilized in 2018 at vermont Yankee when the decommissioning contractor and licensee, Northstar was granted permission to use $20m of NDt funds for spent fuel management.16 in 2019, a similar exemption was granted to holtec Decommissioning international permitting the use of approximately $470m in NDt funds for spent fuel management and site restoration at Pilgrim.17 Decommissioning options to achieve decommissioning objectives, the licensee generally has two options:• DECON: A method of decommissioning, in which structures, systems, and components that contain radioactive contamination are removed from a site and safely disposed at a commercially operated low-level waste dis- posal facility, or decontaminated to a level that permits the site to be released for unre- stricted use shortly after it ceases operation.18 the Zion Nuclear Power station in illinois is an example of a plant undergoing DecoN. • SAFSTOR: A method of decommissioning in which a nuclear facility is placed and main- tained in a condition that allows the facility to be safely stored and subsequently decontami- nated deferred decontamination) to levels that permit release for unrestricted use.19 Nrc 15 ibid. 16 vermont Yankee Nuclear Power station—Issuance of Exemption From 10 CFR 50.82(A)(8)(I)(A) (L-2018-Lle-0007), 2018. 17 Nuclear regulatory commission No. 50-293, Holtec Decommissioning International, LLC Pilgrim Nuclear Power Station Exemption, 2019. 18 Nrc, DECON. 19 Nrc, SAFSTOR. approaches to securing financial assurance. the largest category of licensees (accounting for approximately 70% of plant owners) are tradi- tional regulated utilities that are authorized by the Nrc to collect money from their customers during the life of the plant and place those funds in a nuclear decommissioning trust (NDt). the remaining 30% of the licensees are required to provide financial assurance through prepaid decommissioning fund and/or another form of guarantee.15 however, regardless of the manner in which the NDt is created, the NDt is essentially the only source of funds available to decommis- sion a plant. through 10 c.F.r. § 50.82, the Nrc also governs how NDt funds are spent in the decom- missioning process and specifically allows with- drawals that are for “. . . expenses for legitimate decommissioning activities consistent with the definition of decommissioning in §50.2.” how- ever, Nrc regulations do not specifically define legitimate decommissioning activities.” in gen- eral, activities associated with spent fuel manage- ment, site restoration and non-hazardous waste management outside of Nrc license termination activities may not be deemed legitimate. should a licensee seek a more refined definition ofa legitimate decommissioning activity,” the Nrc provides for an exemption process. such a Steel canisters that will be used to temporarily store spent nuclear fuel above ground. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 9 regulations allow for a maximum 50 years of sAFstor. the Kewaunee Power station in Wisconsin is an example of a plant currently employing the sAFstor approach. in general, if there are sufficient funds available in the NDt to support a decommissioning program, the licensee tends to select the DecoN option. however, if NDt funds are insufficient to support near-term decommissioning efforts, sAFstor is employed with the expectation that the NDt balance will grow over time to allow DecoN to be implemented. Whether the DecoN or sAFstor option is selected, Nrc regulations require decommissioning to be complete within 60 years of plant closure. this allows for a maximum of 50 years for sAFstor followed by a 10-year DecoN effort. it is generally assumed that 10 years is sufficient to accomplish DecoN because after the expiration of the 50-year sAFstor period the radiation hazards at the plant would have reduced through natural processes allowing for a relatively expedited DecoN process. Whether sAFstor or DecoN are employed, the main steps and regulatory filings associated with decommissioning are briefly summarized below.20 transition from operation to Decommissioning once a licensee has closed a nuclear power plant, the licensee submits a series of written notices to the Nrc concerning permanent closure, removal of nuclear fuel from the reactor vessel and other transitional changes. Within two years after sub- mitting the certification of permanent closure, the licensee must also submit a Post-shutdown Decommissioning Activities report (PsDAr) to the Nrc. this report provides a description of the planned decommissioning activities, a sched- ule for their completion, and an estimate of the expected project costs. in concert with report submittals, the Nrc typically holds at least one public meeting to review the licensee’s decom- missioning plans but does not approve the PsDAr. rather, the Nrc requests public com- ment and may provide comments back to the licensee on the PsDAr. major Decommissioning activities Ninety days following Nrc’s receipt of the PsDAr, the licensee may begin major decommissioning activities (e.g., permanent removal of major reac- tor components and mechanical systems) without 20 Paraphrased from Nrc, Backgrounder on Decommissioning Nuclear Power Plants. specific Nrc approval. if any of these activities results in a material change to environmental or financial requirements, then the licensee is required to submit a license amendment request, which would provide an opportunity for an Nrc adjudicatory hearing before the Nrc’s Atomic safety and licensing board Panel (AslbP). License termination activities Within two years of the expected request for license termination, the owner is required to submit a license termination plan (ltP) which addresses a variety of environmental, end-use, dismantlement and financial matters associated with decommissioning. most ltPs envision releas- ing the site to the public for unrestricted use, meaning any residual radiation would be below Nrc’s limits of 25 mrem annual exposure and there would be no further regulatory controls by the Nrc. submittal and review of the ltP is subject to public comment but also to a possible adjudicatory hearing before the AslbP. Decommissioning and spent nuclear Fuel one byproduct of nuclear power plant operation is the creation of nuclear waste. With respect to the management of this waste, the Department of energy is singularly responsible for the ulti- mate disposition of spent nuclear fuel (sNF) from the operation of commercial reactors. in 1987, congress amended the Nuclear Waste Policy Act (NWPA) of 1982 to designate a site in Nevada (Yucca mountain) as the only site to be characterized as a permanent repository for the nation’s sNF. Spent nuclear fuel stored in a water-filled fuel pool at a reactor facility. in the 30-plus years since the 1987 NWPA amendments, the united states has not imple- mented a functioning nuclear waste management program. No commercial sNF has been disposed of at Yucca mountain or at any other site. As a result, sNF from commercial nuclear power plants remains adjacent to the reactor from which it was generated. this fuel is temporarily stored in either spent fuel pools and/or in what are known as independent Fuel storage installations (isFsi) within dry casks as shown below. At total of 80,000 mtu21 of sNF is stored in pools or in dry casks at isFsis across the country, 10 chapter two •NucleAr PlANt oPerAtioN, closure AND DecommissioNiNg of which approximately 14,000 mtu is stored at plants that have entered, or are scheduled to enter, the decommissioning process. the distribution of this sNF is shown on the following table.22 National political dynamics call into question the viability of the Yucca mountain site for the permanent disposal of sNF. this indicates that sNF from commercial nuclear reactors will likely remain at its current location (adjacent to its reactor site) for several decades. there are, however, two license applications for separate consolidated interim storage facilities currently being reviewed by the Nrc. one of these facilities would be located in southeastern New mexico with the other situated western texas. if either, or both, of these facilities receives an Nrc license and becomes operational, they could begin receiving sNF in the mid- to late-2020s. the sequence in which this waste is transported to either of these storage facilities (i.e., from which operating and/or decommissioned plants) remains to be resolved along with the issue of ultimate disposal. Decommissioning Business models in the 1990s, during the initial phase of nuclear power plant decommissioning and prior to the deregulation of energy markets, the decommis- sioning process was generally undertaken by the utility that owned and operated the plant. this was the case for plants such as the Yankee rowe Nuclear Power station (Yankee rowe) and the connecticut Yankee Nuclear Power Plant (con- necticut Yankee). in these instances, work scopes and regulatory filings were generally developed in-house, and while certain segments of the phys- ical decommissioning were subcontracted out to specialized firms, the decommissioning effort was managed and directed by plant ownership utilizing in-house staff. this approach continued until Zion began its decommissioning program in 2010. For this plant, a new business model emerged involving the transfer of the Nrc facility license from the plant owner (exelon generation) to a decommissioning contractor (Zion solutions). specifically, for the purposes of decommissioning, the Nrc license, the NDt and all improvements (except the switch- yard) were transferred to Zion solutions along with a lease of the site’s real property. Following completion of field activities, the real property lease will be terminated (site control reverts back to exelon) 21 mtu = metric tons of uranium. 22 Department of energy, (2019). Spent Nuclear Fuel and High-Level Radioactive Waste Inventory Report, FCRD-NFST-2013-000263, Rev. 6 . Note: Quantities do not reflect ongoing sNF transfers. Plant Name Spent Nuclear Fuel Stored on Site (MTU) Spent Fuel Pool Dry Cask ISFSI Big Rock Point (MI)—58 Connecticut Yankee (CT)—414 Crystal River—3 (FL)—582 Diablo Canyon—1 & 2 (CA)669 799 Dresden—1 (IL)—91 Duane Arnold (IA)372 221 Fort Calhoun (NE)—465 Fort St. Vrain (CO)—15 Humboldt Bay (CA)—29 Indian Point—1, 2 & 3 (NY)992 569 Kewaunee (WI)—519 La Crosse (WI)—38 Maine Yankee (ME)—542 Millstone – 1 (CT)526 — Oyster Creek (NJ)436 367 Palisades (MI)208 512 Pilgrim (MA)422 205 Rancho Seco (CA)—228 San Onofre—1, 2 and 3 (CA)674 935 Three Mile Island—1 (PA)703 — Trojan (OR)—359 Vermont Yankee (VT)—704 Yankee Rowe (MA)—127 Zion—1 and 2 (IL)—1,019 totals 5,002 8,798 tAble 2 Spent Nuclear Fuel Stored at Nuclear Reactors Spent nuclear fuel presently stored adjacent to nuclear reactors that have entered, or are scheduled to enter, the decommissioning process. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 11 and the Nrc license will be transferred back to exelon along with possession of the isFsi and sNF. building from the Zion solutions model, a new decommissioning contractual arrangement has recently emerged whereby all plant assets (site property, physical plant, the NDt and sNF) are transferred, in their entirety, to a third-party de- commissioning contractor. under this model, the original plant owner divests all interests and obli- gations while the decommissioning contractor assumes all responsibility for completing the decommissioning process (i.e., termination of the Nrc license) as well as responsibility for, and control of, the NDt. this approach is underway at multiple sites including the former vermont Yankee site (where Northstar is the decommis- sioning contractor) and the former oyster creek site (being decommissioned by holtec Decom- missioning international). public engagement in Decommissioning given the socioeconomic and radiological dimen- sions of the decommissioning process, these projects are of increasing interest to residents of the nearby host community and region. As such, decommissioning projects see a continued desire, especially on behalf of host communities, for increased public engagement. While not mandated by Nrc, most licensees have instituted a forum for stakeholder dialogue commonly referred to as a community Advisory board (cAb). these cAbs generally consist of multiple stakeholders who meet on a regular basis in a public setting. cAbs tend not to have decision- making authority and generally serve as sounding boards and opportunities for stakeholders to hear reports as to progress and to engage with regula- tors and the licensee regarding decommissioning progress.23 however, some cAbs, such as vermont Yankee’s Nuclear Decommissioning Advisory Panel, are legislatively enabled, have a specific mandate and a limited degree of authority. in addition to cAb engagement efforts, the Nrc often holds public hearings and comment periods regarding key decommissioning report submittals and project milestones. 23 For a comprehensive resource on community engagement in decommissioning, see black Diamond consultants, inc., (2005). The Maine Yankee Decommissioning Advisory Panel, A Model for Public Participation in Nuclear Projects. A report by the maine Yankee community Advisory Panel on Decommissioning. given the socioeconomic and radiological dimensions of the decommissioning process, these projects are of increasing interest to residents of the nearby host community and region. As such, decommissioning projects see a continued desire, especially on behalf of host communities, for increased public engagement. Chapter summary this chapter reviewed the general lifecycle of a nuclear power plant from operation through to closure and decommissioning. With regard to de- commissioning, we discussed the role of the Nrc, the process by which plants decommission and the evolving business models being developed to accomplish this task. this chapter also reviewed the issue of spent nuclear fuel and its long-term presence on former plant sites as well as the matter of community engagement. With the development of this baseline understanding, this report now takes a closer look at some of the “soft areas” originally highlighted in the 2005 ePri report with an emphasis on the socioeco- nomic impacts brought about by plant closure and decommissioning. Chapter three Socioeconomic Impacts of Closure and Decommissioning 24 cooper, (2014). 25 Kewaunee county economic Development, (2013). Views of the Future Kewaunee, Manitowoc and Brown Counties Wisconsin, USA. 26 roland-host, D.W., et al, (2019). Prospective Closure of the Diablo Canyon Nuclear Power Plant—Economic Impact Assessment, university of california berkeley. tAble 3 Employee Reduction Phases in Nuclear Plant Closure Announcement Closure Hot Fuel Cool Fuel ISFSI Onwards Normal operational employment at the power plant. operational total as the plant goes offline. reductions represent employee retirement or relocation after announcement. Workforce reductions after plant ceases to produce electric- ity. Plant operations limited to managing spent fuel including hot fuel” recently removed from reactor. Workforce after all hot fuel has sufficiently cooled for dry storage with the remainder in pool storage. Workforce after all fuel has been prepared for dry cask storage in on-site isFsis. 12 chapter three •socioecoNomic imPActs oF closure AND DecommissioNiNg socioeconomic impacts of plant ClosureAsdescribedpreviously, the operation of a nuclear power plant provides substantial socioeconomic value to a host community and surrounding region with annual economic impacts measured in the hundreds of millions of dollars. in parallel, the closure of a nuclear power plant presents a similarly significant blow to local and regional economics. these negative impacts are illustrated below: Direct and indirect Job Loss An operating nuclear power plant directly employs hundreds of highly skilled and well-paid workers and often a similar number of contractors. once closure has occurred, staffing reductions typically follow a predictable pattern as the intensity of plant operations declines in phases as discussed on the table below and illustrated on the asso- ciated graph on the next page.24 With these staffing reductions, impacts to host communities are soon to follow. For example, the closure of Kewaunee has meant the loss of approximately 650 jobs representing a direct annual impact to labor income of over $70m. When indirect business-to-business activity is included along with the effect that these lost wages have on the regional economy, the total annual economic impact of plant closure is esti- mated to be over $630m to the surrounding re- gion.25 similar economic impact figures have been developed for other plants with a 2019 report by uc berkeley estimating the annual economic loss from the closure of Diablo canyon at $800m.26 reduction of tax or municipal payments in addition to the loss of direct and indirect jobs, plant closure has a significant impact on municipal operating budgets through reductions in tax payments as discussed below. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 13 This graph illustrates typical employment reductions associated with plant closure. Figure 1 Typical Employee Reduction Patterns Over Time Expressed as a Percentage 100 90 80 70 60 50 40 30 20 10 0 Announcement Closure Year 0 Hot Fuel Year 1–2 Cool Fuel Year 3–6 ISFSI Year 6+ 27 Indian Point Closure Task Force, (2018). Annual Report. 28 PA Strategies, (2001), Economic and Property Tax Impact Analysis: A Report Analyzing the Economic Impact of the Maine Yankee Decommissioning and Future Economic Projections with Site Development. Fiscal Year Ending In Unit 2 PILOT Payments— Percentage Reduction Unit 3 PILOT Payments— Percentage Reduction 2020 0 0 2021 30 0 2022 60 30 2023 90 60 2024 90 90 tAble 4 Entergy PILOT Agreements with Taxing Jurisdictions Reduction in PILOT payments over time in conjunction with Indian Point unit closures. example Case—wiscasset, maine maine Yankee operated in Wiscasset, maine for 25 years until its closure in 1997. During its operation, the plant employed over 500 workers most of whom lived within 20 miles of the plant. At the time of its closing, the plant contributed $12 million annually in local taxes, covering 90% of the Wiscasset’s municipal budget for schools, fire protection, and other public services. example Case—indian point energy Center, new york entergy’s indian Point energy center (iPec), is a nuclear power facility that hosts two reactors: indian Point 2 (iP2) and indian Point 3 (iP3). During full operation, approximately 950 full-time workers were employed at the site. entergy has separate payment-in-lieu-of-taxes (Pilot) agree- ments with various entities adjacent to the plant including the town of cortlandt, the village of buchanan, the hendrick hudson central school District (hhscD) and Westchester county. total annual Pilot payments to these entities were approximately $33m in tax Year 2015–2016 accounting for significant proportions of local operating budgets. For example, Pilot funds accounted for 31% of the hhscD’s annual budget and 42% of revenues for the village of buchanan. As a result of plant closure, reduction in Pilot payments (for each unit) were negotiated between entergy and New York state reducing payments by approximately 90% through 2024 as shown on the following table.27 implications of tax and municipal payment reductions Facing a reduction in tax revenues from a closed plant, host communities typically revert to in- creasing the local tax rate as a means to offset revenue shortfalls. upon closure, Wiscasset’s state valuation dropped approximately 35% and other towns within the county saw their county tax increase 56% to cover increased costs of county government and the loss of maine Yankee from Wiscasset’s tax base.28 With respect to iPec, the village of buchanan recently announced tax increases of 40%. 14 chapter three •socioecoNomic imPActs oF closure AND DecommissioNiNg An increase in the local tax rate carries its own set of negative consequences. take for example the city of Zion, illinois. As a result of the closure of the Zion plant, the city saw a marked decrease in tax revenues similar to that to Wiscasset, maine and the communities surrounding iPec. Accord- ingly, the city increased local taxes to offset a portion of this revenue shortfall. this increased local tax rate, however, continues to hinder Zion’s ability to attract new businesses. reduction in emergency management payments For the purposes of emergency management planning, the Nrc defines a Plume exposure emergency Planning Zones (ePZ) as an area with- in a 10-mile radius of the plant. Predetermined pro- tective action plans are in place for this ePZ and are designed to avoid or reduce dose from the potential exposure of radioactive materials.29 During plant operation, plant operators typically support emergency-related activities within this ePZ through cash contributions, equipment supply, first responder training and infrastructure maintenance. in conjunction with plant shut-down, licensees have successfully argued to the Nrc that the corresponding reduction in risk (resulting from a decrease in the performance of certain plant operations) warrants a reduction in the 10-mile ePZ. Accordingly, the decrease in the size of ePZ results in a parallel decrease in local funding to the first-responder community. this reduction in funding has caused a series of disagreements between decommissioning representatives and the local first responder community at multiple plants. outmigration of workforce and reduction in Local Community Capacity the domestic nuclear industry faces a long-term shortage in the supply of a qualified workforce. Accordingly, there is healthy market for those specialized workers whose jobs have been made redundant as a result of plant closure. this leads to a strong demand for highly skilled and well- paid workers to relocate but as discussed below, there are other factors to consider when examin- ing workforce reduction from plant closure. one way to understand the change that occurs to this workforce upon plant closure is to consider workers in three basic categories. First, there are those workers with generalized skills: (e.g., accounting, electricians, and security). these are workers who may be likely to seek local re-employment as they possess transferrable skills and experience. second, there are the work- ers who are specialized to the nuclear industry and in high demand. As has been seen across the country, recent plant closure announcements are followed by reports of hiring incentives to nuclear workers to other facilities. in parallel, owners of the soon-to-be-closed plant offer incentives to retain sufficient staffing to ensure safe plant operation through closure. this dynamic is sup- ported by a notable spike in wages using data from the bureau of labor statistics’ Quarterly census of employment and Wages for closing plants in the year leading up to closure.30 the final workforce category relates to worker retirements. the u.s. nuclear fleet is aging, and its workforce has been aging in parallel. With few new plants built in the past three decades, and the closure rate increasing, increased numbers of the nuclear workforce are tracking towards retire- ment. Accordingly, there is a subset of workers who do not relocate to a new opportunity and choose retirement or semi-retirement. the main employment dynamic associated with closure is, therefore, the loss of both jobs and workers from the labor force, not a massive uptick in long-term unemployment. As the rate of closure increases across the country, it will be important to pay attention to changes in these dynamics as they are highly determined by local employment opportunities, the nature of the nuclear workforce, and opportunities for those workers nationwide. New conditions, such as a widespread rise in unemployment or major changes in the energy sector, may alter these dynamics. the exodus of many workers from the location of the closing plant also includes the removal of these individuals and their families from local civic life. many nuclear plants are sited in rural locations where social capital and volunteerism are critical to the survival of volunteer fire depart- ments, anti-poverty programs, youth sports, and small towns that rely heavily upon volunteers. the loss of nuclear households often means the loss of a highly educated working spouse—a school principal, class parent, small business owner. therefore, the talent drain from nuclear plant closure extends beyond those individual exiting workers. 29 Nrc, Emergency Planning Zones. 30 see u.s. bureau of labor statistics, Quarterly Census of Employment and Wages. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 15 Depressed housing valuations Worker outmigration may place downward pressure on real estate values as discussed below. reduced housing Demand the outmigration of employees upon plant clo- sure can release a large number of housing units into the market over a relatively short period of time. Whether there is sufficient uptake of this inventory is dependent upon two main factors, the first of which is baseline demand for housing in that region. Where there is population loss and low wages such as rural sites, homes may languish on the market. second, as employees tend to draw from a wide region, the housing stock released into the market is spread across many sub-markets with local variables that make it difficult to identify major overall impacts. how- ever, within individual sub-markets, these impacts may be significant. increase in vacancy rates With a short-term release of homes into the hous- ing market, there may be a rise in vacancy rates. vacancies may persist if there is a lack of demand from high-wage households, which can occur in a region that lacks sufficient job opportunities to offset the loss of hundreds of highly paid pro- fessional and skilled positions at the plant. high vacancy rates will typically depress home values over time. in the post-closure era, when tax revenues are already dropping, decreasing sale prices will depress assessments. this dynamic will promote a long-term downward spiral in local revenues. potential increase in valuation Due to reduced stigma opponents of nuclear power point to an improve- ment in the perception of communities as a result of plant closure, due to a reduction in nuclear- related stigma. this dynamic is assumed to confer additional value upon communities and proper- ties but may be offset by the perception of lower economic vitality. As with any change to real estate values, understanding this potential effect would require research that controls for other variables, explicitly examines consumer choice drivers, and utilizes a timeframe sufficient to assess valuation changes before and after closure. the combination of reduced revenues, the outmigration of nuclear households and a depressed housing market presents a significant challenge to town officials, economic development planners and the wider community. Burdens to Community morale the combination of reduced revenues, the out- migration of nuclear households and a depressed housing market presents a significant challenge to town officials, economic development planners and the wider community. in the face of these forces, feelings of denial, despair and resignation are not uncommon amongst members of nuclear closure communities. Furthermore, the negative impact of this dynamic is accentuated due to the fact that there is a pressing need for economic planning and action at precisely the same time that local coffers and capacities are being depleted. 31 Domestic licensing of Production and utilization Facilities, 10 c.F.r. § 50.2. 32 Nrc, (2002). NUREG-0586, Supplement 1 Volume 1, Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities, Supplement 1 Regarding the Decommissioning of Nuclear Power Reactors, Main Report, Appendices A through M Final Report. nrC’s Consideration of socioeconomic impacts from plant Closure this chapter has, up to this point, reviewed the generalized socioeconomic impacts stemming from the closure of a commercial nuclear power plant. the emphasis on the term “closure” in this discussion is purposefully distinct from “decom- missioning.” recall that decommissioning is defined by theNrc as, “. . . the safe removal of a facility from service and reduction of residual radioactivity to a level that permits termination of the Nrc license.”31 With respect to these regulations, the socioeconomic impacts of plant closure are not of significant concern. this distinction is illustrated in the 2002 generic environmental impact statement on Decommissioning of Nuclear Facilities, supple- ment 1 (geis). the geis is the foundational docu- ment that defines what impacts are to be formally considered by the Nrc and the licensee in the pursuit of decommissioning.32 the geis does acknowledge impacts of closure, specifically mentioning, “…impacts to the following public services occur as a result of plant closure: trans- portation, public safety, social services, public utilities, and tourism and recreation.” However, the GEIS closes the door on consideration of these impacts: “Impacts related to the decision to permanently cease operations are outside the scope of this Supplement.” As noted previously, the geis was last revised in 2002, several years before this recent upsurge in the level of decommissioning activity. to implement those mitigating strategies unless these impacts relate to a public health and safety issue. the Nrc’s approach to implementation of NePA in the decommissioning arena has been to issue a generic eis. the geis, although developed long before much of the pertinent decommission- ing activity has taken place, attempts to identify the typical environmental impacts (including socioeconomic impacts) that may result from decommissioning. if the particular impact is found to be sufficiently generic, then it does not require consideration through a site-specific decommis- sioning eis or eA. additional Dimensions of socioeconomic impacts As discussed, socioeconomic impacts of decom- missioning have been considered by the Nrc as referenced in the geis. typically, these generic findings when applied to an actual site result in the conclusion that socioeconomic impacts of decommissioning are insignificant. however, a recent study uc berkeley conclud- ed that the economic stimulus provided by the planned decommissioning of Diablo canyon was material. specifically, “Previous studies have only considered the negative shocks, whereas we take account of how decommissioning expenditures will substantially offset economic losses attribut- able to plant closure.” the degree to how sub- stantial the offset may be is subject to debate, but as stated above, a revision of the geis may prove beneficial to better incorporate current realities as well as new research and experiences. in any event, while the performance of a large- scale decommissioning project carries with it sub- stantial economic aspects, evaluating the socio- economic impacts of decommissioning warrants additional consideration of the following issues. temporary nature of the Decommissioning workforce Nuclear plant employees live and work in the host region. however, decommissioning con- tractors tend to employ their own labor, often bringing them into a project on a limited basis. these worker living situations are temporary, as opposed to permanent, and a portion of wages may be transferred back to their per- manent residence thereby reducing positive impacts to the local economic economy. 33 Atomic energy Act sec. 276 (42 usc 2022). the objectives of the National environmental Policy Act are not only to inform the Nrc decision- making process but also to inform the public of what types of environmental impacts might result from an Nrc action. socioeconomic impacts of plant Decommissioning in contrast to the socioeconomic impacts of plant closure, this section reviews similar impacts as they pertain to plant decommissioning. nrC’s Consideration of socioeconomic impacts from plant Decommissioning there are two primary elements to the Nrc’s authority. one is the authority to protect public health and safety under the Atomic energy Act.33 there is, however, another element in the Nrc’s regulatory structure for decommissioning: the requirements based on the National environmen- tal Policy Act (NePA) to consider the environ- mental impacts from decommissioning, including socioeconomic impacts. these requirements have been codified in the Nrc regulations in 10 cFr Part 52 and apply to the Nrc, as well as to a licensee or license applicant. the trigger for im- plementing these requirements is the preparation by the Nrc of an environmental impact statement eis) or an environmental Assessment (eA). the objectives of NePA are not only to inform the Nrc decision-making process but also to in- form the public of what types of environmental impacts might result from an Nrc action. Note that, unlike the Nrc public health and safety requirements, which establish substantive requirements to be complied with, NePA is a process” statute (i.e., as long as the required environmental information is developed and pre- sented in what has been termed a “hard look” at environmental impacts, the requirements of NePA have been met). the Nrc also must iden- tify mitigating strategies for the environmental impacts but has no obligation to require a licensee 16 chapter three •socioecoNomic imPActs oF closure AND DecommissioNiNg Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 17 potential Changes to Local procurement practices During operation,many plants dedicated a portion of their procurement to local goods and services. this was viewed as good busi- ness practice as the operating utility had a long-term presence in the community. For example, during the operation of Yankee rowe, the utility procured goods and services from 125 small businesses in 12 communities in the host county.34 Due to its specialized business nature however, decommissioning generally involves a greater proportion of non- local business expenditures and contractors. Without the ability for local or state entities to enforce local hire and procurement provisions, NDt funds may be spent in a way that has less relative benefit to the region than those expenditures during plant operation. Chapter summary this chapter reviewed the socioeconomic impacts of closure and decommissioning. the range of impacts include job loss, worker migra- tion, decrease in tax payments, depressed hous- ing markets and challenges to a community’s morale. this chapter also discussed the difference between impacts from closure as compared to decommissioning and reviewed Nrc jurisdiction over these matters. in general, closure impacts were found to be widespread but fell outside regardless as to whether impacts arise from closure or decommissioning, the body of knowledge surrounding the socioeconomic dimensions of a nuclear power plant’s final phases is incomplete. there is a significant and burgeoning need for the planning, economic development and research community to strengthen our understanding of these complex issues. 34 mullin, John r. and Kotval, Zenia, The Closing of the Yankee Rowe Nuclear Power Plant: The Impact on a New England Community (1997). Journal of the American Planning Association. 25. the purview of the Nrc while decommissioning impacts are more limited and within Nrc jurisdiction. regardless as to whether these impacts arise from closure or decommissioning, the body of knowledge surrounding the socioeconomic dimensions of a nuclear power plant’s final phas- es is incomplete. to that end, there is a significant and burgeoning need for the planning, economic development and research community to strengthen our understanding of these complex issues. in that context, this need is partially met in the next chapter as we take a closer look at closure- related impacts and the associated community responses. Chapter Four Closure and Decommissioning— Impacts and Responses 18 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses introductionAhostcommunity’s response to the closure of a nuclear power plant is similar to that of communities that experience the closure of a coal plant or manufacturing facility: the eco- nomic impact is realized, a community becomes organized and plans are made to mitigate the fiscal loss. building on that basic model by includ- ing experiences from nuclear closure communities across the country, we have developed a similar process to illustrate the phased journey that a typical nuclear host community may experience as it seeks to recover from the socioeconomic impacts stemming from plant closure. this five-phased process is illustrated below. With this planning model as a general guide, and drawing from stakeholder interviews and project research, this chapter explores host com- munity responses to nuclear power plant closure. i. closure acknowledgment ii. preliminary impact assessment iii. the decommissioning learning curve iv. partnership development v. planning and execution recognizing and accepting the eventuality and/or reality of closure. early understanding of the impact of closure on local/regional quality of life and how a community may respond. initial engagement with traditional decommissioning stakeholders. experiences the Decommissioning learning curve. coalition building and creation of common interests to pursue shared outcomes. creating and implementation of integrated economic development strategies. Figure 2 Nuclear Host Community Economic Recovery Process This graphic is a conceptual depiction of the process that communities generally follow as they respond to the closure of a nuclear power plant. While the phases are displayed in a linear fashion, each community designs its own response based on its unique experiences and circumstances—theirs is a context-sensitive process that mirrors individual needs and aspirations. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 19 phase i—Closure acknowledgement Discussion the closure of a nuclear power plant generally results from a business decision made by the operating utility. in some instances, public dis- course surrounding potential plant closure may precede by years the final closure decision. subsequent to that closure decision, actual plant closure may occur months or years later. such was the case for indian Point which was the focus of years of public discourse regarding its operational future when in January 2017, it was announced that closure for unit 2 would take place in 2020 and in 2021 for unit 3. this dynamic remains rel- evant today as nuclear power plants in Pennsyl- vania, illinois, ohio and elsewhere are the subject of ongoing public dialogue and policy discussions surrounding plant closure. in other instances, the announcement of plant closure may be relatively unexpected as was the case of Kewaunee in Wisconsin. Prior to closure, the plant was experiencing a period of strong reliability and performance, but its profitability was being eroded due to market conditions. As a result, on october 22, 2012, Dominion Power, which had purchased the plant five years before, announced a closure date of may 2013 providing employees and community stakeholders with seven months of advance notice. this example of a short timeline illustrates how unpredictable closure can be. While the nature of the host community’s response to a pending or potential closure varies, one common reaction displayed is that of avoid- ance: specifically, an initial reluctance to acknowl- edge the inevitability of closure and the associated economic impacts. in some instances, this reluc- tance results in the ongoing unwillingness of community members and elected officials to publicly discuss the possibility of closure, as if verbalizing the potential end of a plant’s operating life will accelerate the pace, or increase the like- lihood, of closure. this reluctance to acknowledge the inevitability of closure is understandable. the plant likely oper- ated for approximately 30 years in the community, provided an ongoing level of high economic secu- rity, and the plant’s workforce was fully integrated into local civic, social and cultural identities. the idea that this period of stability may soon end is, therefore, resisted. Discussion of plant closure is sometimes further complicated by political divisions over nuclear power which has polarized some communities, consuming limited internal capacity as the community enters its closure phase. Not until the hurdle of denial is overcome can a community move forward. this is illustrated by the following examples of several host com- munities who early on acknowledged that plant closure was a reality and took strategic measures to mitigate potential impacts. While there are a variety of host community responses to a pending or potential closure, one common reaction is that of avoidance: specifically, an initial reluctance to acknowledge the inevitability of closure and the associated economic impacts. example Case—Closure acknowledgement s outhwest michigan planning Commission the Palisades Power Plant (Palisades) has operated on the shores of lake michigan since 1971 and its current operating license is scheduled to expire in 2031. in 2017, the plant owners an- nounced plans for a premature closure scheduled for 2022. the plant is located in an economic Develop- ment District (eDD) in which the southwest michigan Planning commission (sWmPc) is the managing entity. An eDD is a multi-jurisdictional entity, commonly composed of multiple counties and in certain cases even cross-state borders. eDDs help lead the locally based, regionally driven economic development planning process that leverages the involvement of the public, private and non-profit sectors to establish a strategic blueprint (i.e., an economic develop- ment roadmap) for regional collaboration.35 in response to this impending closure, local agencies in the surrounding region launched a series of initiatives to lay the foundation for economic development planning. in particular, the sWmPc is spearheading the Palisades eco- nomic recovery Action Plan to, “. . . implement a comprehensive economic recovery strategy for the benefit of southwest michigan in the wake of the upcoming closure of the Palisades Nuclear Power station.”36 central to the Action Plan’s effectiveness is its commitment to “deep and persistent public engagement…[to] create a central hub for reliable 35 For more information see eDA, Economic Development Districts. 36 southwest michigan Planning commission, (2020). Palisades Economic Recovery Action Plan. information on all the formal events surrounding the plant closure and the economic recovery strategy.” Key constituents targeted by the Action Plan include: School districts Philanthropic organizations Events and organizations who rely on volunteers Local government service recipients Local businesses Residents and visitors units because the jobs base, tax revenues, philan- thropic reach and community engagement of the nuclear power plant extend across a broad region. At the same time, there may be one principal unit most at risk due to closure because of their reliance upon the plant revenues (e.g., an indi- vidual town, a school district, a library). example Cases the indian point task Force in 2017, three years before the first of two units at iPec were to close, the governor of New York announced the formation of the indian Point task Force (task Force) to provide insights into socio- economic dimensions of the facility closure and subsequent decommissioning. the task Force was convened by the New York state Depart- ment of Public service with a broad and inclusive membership consisting of representatives from the governor’s office, state elected officials, local and county representatives, labor and various state agencies. early work of the task Force focused on issues pertaining to local taxes, employment, energy reliability as well as decommissioning and site reuse. the task Force also researched various legislative options to mitigate socioeconomic impacts and produced a thorough inventory of state programs that may be of assistance. in parallel, the economic relationship between iPec and the surrounding region became well-defined thus forming the basis for a range of remedial measures and policies. these measures included phased reduction in Pilot allocations over four years for each reactor and the creation of the 30m electricity generation Facility cessation mitigation Program.37 the southeast vermont economic Development strategy planning Group vermont Yankee was the focus of significant public discourse and litigation in the years lead- ing up to the 2013 announcement that the plant would close in 2014. During that pre-announce- ment window, the southeast vermont economic Development strategies grassroots planning group (seveDs) formed the multi-stakeholder Post-vermont Yankee task Force to examine the plant’s role in the local and regional economy. their 2012 report identified the following expected impacts of plant closure: 20 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses For those communities that currently host a nuclear power plant, many have yet to develop a sufficiently detailed understanding as to the integrated nature of the nuclear power plant’s contribution to the local economy. by serving as trusted source of information and by building awareness across a broad stakeholder base, sWmPc is a good example of a local entity taking the early leadership role to build the alli- ances and networks necessary for effective eco- nomic and community development planning. phase ii—preliminary impact assessment Discussion—understanding the plant’s economic role in the host Community once there is a general understanding that a nuclear power plant will close, the next phase communities enter into is a period of assessment. given the relatively large fiscal and socioeconomic contribution that most nuclear power plants have on their host community, it may be reasonable to assume that the nature and extent of this fiscal impact is already well understood. however, research indicates that the opposite is generally true: namely, that for those communities that currently host a nuclear power plant, many have yet to develop a sufficiently detailed understand- ing as to the integrated nature of the nuclear power plant’s contribution to the local economy. one of the complications in assembling this knowledge base is that the “host community” remains difficult to define. the municipal host is usually not the only beneficiary of economic gains. As the following examples illustrate, stake- holders come from a diverse range of geographic 37 For more information see: New York state, Electricity Generation Facility Cessation Mitigation Program. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 21 1. Job losses: over 1,000 direct and indirect jobs would be permanently lost. 2. Significant GDP decline: major impacts on local retailers as a result of a decrease in discretionary spending on local goods and services. 3. Major declines in real estate value: the report estimated a valuation reduction between 5% and 10% from pre-closure levels. 4. Major declines in human capital: As high- capacity workers left the region, the quality of health care and education, and the viability of non-profit organizations, would be jeopardized. 5. Major declines in state and local tax revenue: As vermont Yankee and its employees paid property taxes, sales and income taxes, sig- nificant reductions in those revenue streams to state and local governments were forecasted.38 the advanced development (several years before closure was announced) of this fiscal knowledge base provided the local community and the state with greater understanding as to the relationship between vermont Yankee and the local/regional economies. As with the case of indian Point, the report provided elected officials with the baseline information necessary to develop policies and requirements regarding state oversight of even- tual decommissioning. the report and advocacy by regional stakeholders informed negotiations between vermont and entergy, leading to one of the nation’s largest nuclear power plant economic mitigation funds. san Luis obispo County, California in the fall of 2016, california senate bill 968 monning) was enacted which called for an eco- nomic assessment of the “adverse and beneficial economic impacts, and the net economic effects, for the county of san luis obispo and the sur- rounding regions, that could occur if the [Diablo canyon Nuclear Power Plant] were to temporarily or permanently shut down….”40 this legislation, enacted two years prior to closure announcement and eight years before closure of the first unit, was undertaken at the urging of local advocates who engaged elected officials and statewide legislators to work together to address socio- economic issues. phase iii—the Decommissioning Learning Curve once a host community recognizes the impend- ing closure of a nuclear power station and com- bines this realization with an understanding of the potential socioeconomic impacts associated with closure, they embark upon what we refer to as the Decommissioning learning curve. For most community members as well as local and state officials, the decommissioning of a nuclear power plant is a once-in-a-lifetime undertaking; to that end, the learning curve is steep. in that context, this section highlights the following six key obser- vations typically experienced by stakeholders along their learning curve journey: 1. the scope of Decommissioning is Narrowly Defined 2. lack of sufficient resources to support socioeconomic Planning 3. A singular Focus on site redevelopment in spite of the Presence of sNF 4. limited opportunities for Public engagement 5. realization of the broader Disconnection between host community Needs and the current regulatory Framework 6. the Need for improved coordination between Federal Agencies to support Decommissioning host communities 38 Post—vermont Yankee task Force of the southeast vermont economic Development strategy Planning group, (2012). Windham County Post- Vermont Yankee Economic Mitigation and Growth. 39 Senate Bill 968, 2015–2016, ch. 674, 2016 cal. stat. For most community members as well as local and state officials, the decommissioning of a nuclear power plant is a once-in-a-lifetime undertaking; to that end, the learning curve is steep. the Decommissioning scope is narrowly Defined recall that the goal of decommissioning, as defined by theNrc, is limited to actions intended to accomplish license termination. using this defi- nition, the socioeconomic issues, dynamics and impacts associated with plant closure have little substantive requirements requiring action by the Nrc or the licensee. in parallel, the licensee (plant owner or decommissioning contractor) follows the same set of federal regulations and is also reluctant (some would say statutorily discouraged) from materially addressing issues that do not contribute to license termination (e.g., socio- economic matters). 22 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses the fact that closure-related socioeconomic impacts, measured in the hundreds of millions of dollars, are not considered relevant under current Nrc regulations is an important realization for current host communities. Lack of sufficient resources to support socioeconomic planning stakeholder interviews indicate that, in the wake of plant closure, a lack of resources is the over- whelming obstacle preventing communities from moving forward in economic planning and recovery. there are two key dimensions to these resource needs: human capital and fiscal resources. human Capital For several reasons, host communities often face early difficulties in the creation of economic development responses to the closure and decom- missioning of a nuclear power plant. First, the closure decision is generally made without con- sidering local interests and planning needs. second, the closure and decommissioning pro- cess is an entirely new and unfamiliar phenomenon. As such, there are few resources available to regional or state economic development entities to become skilled in nuclear power plant closure, its implications and the development of response strategies. third, the long-term presence of the nuclear power plant, and its benefits to local budgets, has in some cases obviated the need for the host community to participate in coor- dinated regional economic development efforts. Local Responses local entities have sought to mitigate economic losses by applying a tax to the “value” of the sNF stored at the site. taxing the value of a shut- down plant is also a potential option for a host community but this is generally prone to differing perspectives between the plant owners and the host community. For instance, during its opera- tion Kewaunee was valued at approximately 460m. Following closure, the host community the town of carlton) attempted to continue taxing the plant at this rate but the plant owners rejected this valuation. A settlement was reached that set the market value of the plant at zero and the fair market value of “personal property” at the site of approximately $1m.41 State Responses some states have also risen to the challenge to assist host communities with funding that ad- dresses the broad, long-term economic impacts. For example, regarding california’s Diablo can- yon, the state passed senate bill 1090 in 2018. the bill directed the california Public utilities commission to approve the $85m settlement negotiated between the plant operator (Pacific gas and electric or Pg&e) and seven local cities who argued that Pg&e’s initial mitigation plans were inadequate. of the $85m settlement, $75m is planned to offset property tax losses by the san luis obispo school District, the county and 69 other special districts. the remaining $10m would be used for economic development efforts in thecounty and surrounding cities. Also, as mentioned previously, New York created the $30m electricity generation Facility cessation mitigation Program. in parallel, vermont secured $10m from entergy to establish the Windham county economic Development Program that over five years has invested to create or retain over 700 jobs, with $42m of positive economic impact to date.42 The Federal Response one of the Federal government’s resources is eDA who has, for several years, worked with com- munities suffering from economic loss due to the closure of a nuclear power plant. Areas of support include the provision of technical assistance along with grants to support a wide range of economic development activities. While eDA’s mandate is there are few resources available to regional or state economic development entities to become skilled in nuclear power plant closure, its implications and the development of response strategies. Fiscal resources Nrc’s definition of decommissioning also governs how nuclear decommissioning trust (NDt) funds may be spent. While current Nrc regulations allow for up to 3% of NDt funds to support “plan- ning” purposes, the definition of those planning purposes is limited to activities that advance license termination.40 Nrc does not presently support the use of NDt funds for the purposes of socioeconomic mitigation planning. 40 10 c.F.r. § 50.82(a)(8)(ii). 41 schneider, D., (2017, January 20). Kewaunee nuke plant is due $12M in tax refunds, Green Bay Press Gazette. 42 state of vermont, Wyndham County Economic Development Program. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 23 quite broad when it comes to assisting economi- cally distressed communities, and its resources dedicated to these communities is limited ($15m in FY2020), eDA can be an important partner to host communities. a singular Focus on site redevelopment and the presence of snF For those stakeholders who are associated with a decommissioned or soon-to-be-decommissioned plant, a majority express a strong belief that redevelopment of the former plant site is a fruitful pathway to economic recovery. on the surface, this is a reasonable expectation as the plant site has been the source of considerable economic value for decades. in addition, nuclear power plants have existing electricity transmission infra- structure and are adjacent to water (used for plant cooling during operation) all of which makes them appear desirable from a commercial or industrial redevelopment perspective. At present however, near-term site redevelopment tends not to be the most promising source of economic development for the following reasons. the presence of spent nuclear Fuel sNF from a commercial nuclear reactor will remain hazardous to human health and the environment for approximately 300,000 years. Also recall that sNF is likely to remain at its current location for decades. While the current above-ground storage of sNF in dry casks has a demonstrated safety record, the ongoing pres- ence of sNF carries with it a certain degree of negative stigma along with liability and regula- tory considerations that discourage redevelop- ment. Put simply, “precedent indicates that spent fuel storage on the site of the dismantled plant will preclude redevelopment.”43 in this context, it is worth noting that the only reason that maine Yankee, connecticut Yankee and Yankee rowe remain in business (as operators of isFsis) is the continued presence of sNF at these sites. had the federal government met its obligation to remove sNF beginning in 1998, the sites would have been available for repurposing. 43 Wyndham regional commission, et al, (2016). When People and Money Leave (and the Plant Stays)—Lessons Learned from the Closure of the Vermont Yankee Power Station: A Tri-Region Experience. The aerial photo- graph shows the site of the former Connecticut Yankee nuclear power plant. The independent spent fuel storage installation (ISFSI) is the rectangular shape on the bottom right of the photo. Lack of redevelopment incentive or site Control the presence of sNF notwithstanding, site rede- velopment is further hobbled by the fact that redevelopment is not part of decommissioning contractor’s business model or skillset. As such, the potential for site redevelopment appears to be an afterthought. the same may be said for utilities that have retained title to decommissioned plant sites: they are in the business of generating electricity and site redevelopment is not a core competency. rather, redevelopment of a site adjacent to stored sNF is generally seen as an unnecessary business risk. the utilities themselves are not in the business of redevelopment, which is why the long-term site ownership becomes problematic in terms of future economic activity. take for example the former connecticut Yankee site. the utility owns and manages the site per Nrc regulations until such time that the sNF is removed offsite for disposal, thereby allowing for Nrc license termi- nation. the total site area is 525 acres of which approximately five acres is dedicated tosNF storage. According to a local official, while there is some interest in utilizing the remaining prop- erty for commercial purposes (a solar power installation) there has not been sufficient interest to move this plan forward. Lengthy Decommissioning timeframes and schedule uncertainty current Nrc regulations require that decommis- sioning be complete within 60 years from the cessation of operations. While those responsible for project execution may work to complete decommissioning on an accelerated timeframe in some instances perhaps as soon as 10 years from start of project activities), the 60-year schedule for completion remains a possibility. this degree of schedule uncertainty makes redevelopment planning problematic. Conservation as a site reuse option Discussion of site reuse options would be incom- plete without mention of the option of non- commercial land uses, in particular, the potential for conservation or passive recreation. to that end, three brief examples are discussed. Maine Yankee maine Yankee closed in 1997 after 25 years of operation on the shores of maine’s back river. the operational portion of the plant site encompassed less than 10% of the plant’s 820 acres. Decommis- sioning was substantially completed in 2005. in conjunction with decommissioning, 200 acres of the original property were released from the plant’s operating license and donated to a local nonprofit conservation organization (thechewon- ki Foundation), and 400 acres was sold to the town of Wiscasset which subsequently trans- ferred this property to a private developer. Diablo Canyon Pg&e’s Diablo canyon is situated on california’s central coast with san luis obispo county. the plant’s operating license encompasses over 900 acres of property while the power-producing portion of the plant is approximately 12 acres in size. Pg&e’s total land holdings associated with the Diablo canyon facility total over 12,000 acres the majority of which are deeded as conservation land. the site’s two reactors are scheduled for premature closure in 2024 and 2025 and com- munity-based organizations (including the hour- glass Project) are actively working with Pg&e and the california Public utility commission to develop comprehensive land conservation mea- sures in support of closure and decommissioning. a Focus on redevelopment Distracts from more promising near-term efforts in its most optimistic context, site redevelopment could begin no sooner than within 10 years once decommissioning efforts have begun. the impli- cation of this is that even the most ambitious site redevelopment will occur after a period of local economic uncertainty or decline. in addition, the ongoing presence of sNF in this scenario is a virtual certainty. combined with the fact that the host community does not own the site and has little control over its ultimate fate, site redevelopment and associated economic gain remains an unlikely proposition. in the meantime, as discussed in section 4.6 and quite distinct from site redevelopment, host communities have a range of other opportunities under their direct control that may more expedi- tiously spur local and regional economic growth. Limited opportunities for public engagement As host communities continue along the Decom- missioning learning curve, there is an ongoing desire to engage with stakeholders to more fully explore opportunities, resources and collective actions. recall the point made previously that community Advisory boards (cAbs) are often the standard vehicle for community engagement, and that maine Yankee’s community Advisory Panel cAP) provided a good example of the licensee and host community working together in the 24 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 25 pursuit of common objectives. specifically, key elements of the maine Yankee cAP included:44 The CAP was politically very diverse and represented a broad cross-section of the community including elected officials; Funding was made available to help the cAP navigate through the process; CAP members worked to develop and maintain mutual trust from the outset; The CAP always had dinner together before the meetings as that connection “made it hard to demonize the other.” this commitment to collaboration set the tone for how the cAP functioned; and, The CAP welcomed community involvement. the feeling was that there was value in con- cerns and fears being manifest early with the moto “embrace it—don’t run from it” being a constant theme. research of current cAb practices indicates that in some instances, cAbs are viewed as separate from the local community or town infrastructure. in some cases, the cAb was derided as having the appearance of a “tool” of the federal decom- missioning process with little impact or com- mu-nication with county government, planning, economic development or other local entities. in these cases, the cAbs were not seen as effective and created friction within the communities. Not all decommissioning projects have decided to implement a cAb. in particular, Duke energy’s crystal river Nuclear Power Plant (crystal river), which was shut down in 2009 and retired in 2013, is currently in the decommissioning process. in considering its engagement options at crystal river, Duke energy has chosen to create an infor- mal stakeholder group rather than a formal cAb. in a statement to the press, a Duke spokeswoman said that, “based on statistically valid data and input from our community, forming a formal advisory board was not necessary for us and was not the best avenue to meet the needs of our community.”45 44 maine Yankee community Advisory Panel on Decommissioning, (2005). 45 bates, m., (2019, october 8). Decommissioning Meeting Set for Thursday, Citrus County Chronicle. 46 Nuclear energy innovation and modernization Act of 2019, s.512—115th congress (2017–2018), Public law No: 115-439 (2019). When it comes to socioeconomic issues, cAbs closely align their role with the current regulatory framework, which means that socioeconomic issues tend to remain unaddressed in theses engagement opportunities. in response to increased attention to the importance of meaningful public engagement in decommissioning, the Nuclear energy innovation and modernization Act (NeimA) was enacted in 2019.46 specifically, section 108 of NeimA called for the Nrc to identify best practices for “estab- lishing and operating local community advisory boards to foster communication and information exchange between a decommissioning licensee and the local community.” to satisfy its NeimA obligations, the Nrc held a series of 10 public meetings and two webinars in 2019 to solicit public input on the matter of community advisory boards. the findings ofNrc’s engagement on the matter of cAbs were published in July of 2020.47 A review of public comments submitted to the Nrc as part of the NeimA process indicates that many stakeholders view current cAbs as having departed significantly from the spirit and form of maine Yankee’s successful cAP. specifically, many commenters view current cAbs as industry- sponsored communication vehicles, with little opportunity for meaningful two-way dialogue. Additional comments include a desire for greater community influence in the design and function of cAbs, along with access to resources to enable third-party validation of key decommissioning efforts. in parallel, many comments call for addi- tional opportunities to broaden the conversation to include socioeconomic impact mitigation and other issues that are outside of the Nrc’s current definition of decommissioning. the challenge to maintain ongoing commu- nication is sometimes further complicated when the nuclear power plant is sold and/or decommis- sioning rights are contracted to another entity. in some of these cases, while ongoing commu- nication with the utility was positive prior to license transfer, once the transaction took place, communication with the decommissioning con- tractor was reduced in both frequency and quality. given the variation from site to site, it is not the purpose of this report to prescribe the com- position of engagement processes that will work everywhere. however, when it comes to socio- economic issues, cAbs closely align their role with the current regulatory framework, which means that socioeconomic issues tend to remain unaddressed in theses engagement opportunities. in any event, certain decommissioning con- tractors and project stakeholders are indepen- dently seeking ways to foster more meaningful engagement and communication methods as a means of improving project outcomes, but this is not currently the norm. realization of the Broader Disconnection Between host Community needs and the Current regulatory Framework towards the end of the Decommissioning learn- ing curve, host community stakeholders begin to realize that there is a fundamental conflict between their needs and desires (both process and resource-related) and the confines of the current federal regulatory framework. this dis- cord is best illustrated in the following diagram. 26 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses Figure 3 Decommissioning Perspectives 10 CFR 50.2 expectation management Brand and reputation protection end use ngos local community influence decreased trust local Job loss State vs. Federal cleanup Standards SnF third party transfer employee retraining process transparency congressional delegations twitter media State oversight costs litigation All Other Stakeholders 10 CFR 50.2 NRC and Licensee Collateral Issues Much of the conflict surrounding decommissioning projects stems from how various stakeholders define the term decommissioning. The NRC and licensee have a narrow definition defined by statute while other project stakeholders seek a broader definition that includes so-called collateral issues. 47 Nrc, (2020). Best Practices for Establishment and Operation of Local Community Advisory Boards Associated With Decommissioning Activities at Nuclear Power Plants: A report for the senate committee on environment and Public Works and the house committee on energy and commerce. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 27 on the left, the green box illustrates how decommissioning is viewed by the Nrc and the licensee as described in 10 c.F.r. § 50.2. the image on the right depicts how decom- missioning is viewed by the rest of the stakeholder community. it is in this disparity where the inher- ent and ongoing conflict resides. Put simply, two stakeholders (the Nrc and the licensee) are con- fined by regulation to manage the decommission- ing process under the narrowly defined terms. in contrast, the stakeholder community seeks a broader conversation to address what are known as collateral issues (i.e., socioeconomic impact mitigation, access to resources and process trans- parency). this conflict is a common feature at any number of decommissioning-related meetings. one feature of the right-hand side diagram is illustrated by the box’s dashed border and the arrows of influence. these indicate that collateral issues have a direct influence on the pursuit of decommissioning outcomes. this influence can be negative: if collateral issues are poorly managed, there is the increased risk of litigation, reputational damage and the distraction of senior executives away from their day-to-day decommissioning obligations. the influence may also be positive: if collateral issues are adequately addressed, decommissioning stakeholders may seek to work collaboratively with the licensee thus decreasing overall project risk. in this setting, the degree to which certain collateral issues are, or are not, addressed by the licensee, becomes a business decision. Decades of experience in other industrial sectors (extractives, petrochemical and non- nuclear energy generation) suggests strongly that the strategic management of collateral issues is a best practice and results in harmonized efforts between the project proponent and host commu- nity with positive impacts to project cost and schedule. the degree to which these lessons may be adopted by the nuclear decommissioning industry remains to be seen. the opportunity for improved Coordination Between Federal agencies to support host Communities As host communities approach the end of the Decommissioning learning curve, they have experienced a variety of realizations including: There is no common understanding amongst the general stakeholder community of the process for closure and decommissioning and key steps along the way; There is no clear understanding of how the community may meaningfully engage with the licensee regarding decommissioning objectives; The role of state governments in the decommissioning process is highly variable and to that end, the understanding as to Who is in charge” differs by topic area and from state-to-state; and, There are insufficient resources available to assist host communities through the decommissioning process. in this context, host communities often turn to the federal government for assistance and guidance. As we have discussed, socioeconomic impact mitigation is outside of Nrc’s jurisdiction. And while the presence of spent nuclear fuel remains and impediment to economic develop- ment, federal action on this matter is slow to develop. other federal agencies may be able to provide specific support depending on the location of the plant (for instance, the u.s. Department of Agriculture has programs that may be suitable for plants in rural settings). in addition, u.s. economic Development Admin- istration, the Department of housing and urban Development and the Department of labor have programs that may also be applicable to nuclear closure communities.48 in this context, there is an opportunity to coordinate access to federal resources so as to efficiently provide support to host communities and such efforts are in their initial stages. Never- theless, access to these federal resources will rely almost entirely on local stakeholders to leverage skills and experience. this need to strategically invest in partnerships and collaboration is dis- cussed more thoroughly in the following section. phase iv—partnership Development With the realizations described in the previous section, host communities soon understand that they face a significant resource deficit to allow for effective participation in closure and decommis- sioning processes. this resource deficit has two components: financial and capacity. to that end, some host communities have attempted to over- come this deficit by investing in the formation of coalitions and partnerships. such is the case of the community surrounding Diablo canyon located in san luis obispo, california. 48 see Appendix b for a description of applicable federal programs. 28 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses Case examples the hourglass project— Diablo Canyon, California Diablo canyon is owned and operated by Pg&e and employs over 1,200 workers. in 2016, the plant owners announced that the plant’s two reactors would be closing in 2024 and 2025 when the two licenses were due to expire. As one of the largest employers in the region, the closure of Diablo canyon represents the potential for a significant negative impact to the county of san luis obispo. in addition, Pg&e’s holdings associated with the Diablo canyon prop- erty total over 12,000 acres of california’s central coast. As such, the fate of this natural resource is also of considerable regional interest. in response to closure of Diablo canyon and other regional economic changes, a coalition of business and civic leaders came together to form a region-wide economic development “action-tank” named the hourglass Project. vermont yankee Local impacts working Group Another example of partnership development is the vermont Yankee local impacts Working group which was formed in conjunction with the 2012 seveDs Post-vermont Yankee task force report discussed previously.50 the Working group led to additional research, planning, and mitigation projects carried forward by seveDs, regional economic development and planning organiza- tions from the three affected counties invermont, New hampshire and massachusetts. these efforts were supported by academic institutions in ver- mont and massachusetts. one of vermont’s early successes was increasing issue visibility regarding the potential closure of vermont Yankee and related impacts. in particular, regional partners held a one-day conference in 2014 at landmark college with a cross section of over 50 public and private stakeholders, including entergy and key federal representatives. this unique event focused on understanding closure-based socioeconomic issues and opportunities. As with the hourglass Project, the vermont Yankee tri-state collaboration resulted in the de- velopment of baseline information combined with increased visibility and political capital that paved the way for legislative action regarding the role of the state in decommissioning projects, as well as regional economic development projects. phase v—planning and execution the final phase in the community-based process is that of planning and execution. As an integrator of federal economic development resources, eDA can support nuclear host communities as they transition through the closure and decommission- ing process. this support is in the form of direct grants and the provision of technical assistance and guidance as discussed below. Comprehensive economic Development strategy A key component of planning is reflected in a comprehensive economic Development strategy ceDs): a strategy-driven plan for regional eco- nomic development. such plans are designed to build capacity and guide the economic prosperity and resiliency of an area or region and are pro- duced as part of a regionally-owned planning process.51 ceDs are also instrumental documents that facilitate a community’s access to federal funding opportunities through eDA. the hourglass Project engaged with hundreds of stakeholders around a variety of issues and options regarding the Diablo canyon facility. they have worked at multiple scales, bringing together municipal, county and state officials, private sector leadership, research universities, and regional economic development organizations. beginning in 2018 and building on its focus as a champion of regional economic development, the hourglass Project engaged with hundreds of stakeholders around a variety of issues and options regarding the Diablo canyon facility. they have worked at multiple scales, bringing together municipal, county and state officials, private sec- tor leadership, research universities, and regional economic development organizations. the hour- glass Project has managed to raise over $1m in both public and philanthropic funding to support their efforts and are positioned to play an active role in the eventual decommissioning of the Diablo canyon facility. in particular, the broad stakeholder support for the hourglass Project generates significant political capital thereby allowing them to serve as a leading community- based organization to enter into negotiations with Pg&e regarding land-use, economic devel- opment goals and other decommissioning issues.49 49 For more information visit the hourglass Project’s website. 50 Post—vermont Yankee task Force, (2012). 51 eDA, Comprehensive Economic Development Strategy. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 29 An important element in the development of the ceDs is the sWot Analysis, which invites participants to consider the region’s strengths, Weaknesses, opportunities, and threats in the years to come. in those instances where a host community to a nuclear power plant is not yet included in a ceDs, this is a valuable chance to bring the plant into the public dialogue as one of several items for consideration. Where host com- munities are already served by a ceDs, the ceDs steering committee can use the existing annual reporting mechanism to bring the host commu- nity’s relationship to the power plant into focus if it has not done so already. regional economic Diversification summits52 Another example of federal resources are regional economic Diversification summits (reDs) which provide the opportunity for eDA to respond directly to locally identified economic develop- ment strategies and priorities. through the reDs process, eDA’s economic Development represen- tatives, specialists, integrators and other key personnel can leverage their collective expertise and network relationships to help distressed com- munities implement priority projects and achieve critical economic development objectives. the eventual investments resulting from the reDs process are intended to complement each other in such a way as to maximize the overall benefit to, and the economic potential of, the community or region where they are made. reDs are designed to catalyze project implementation. the common objectives for each reDs include: 1. strengthen relationships Among Federal, state, regional, local stakeholders: engage inter-governmental and cross-sector stake- holders and potential funders in a focused, action-oriented dialogue about the resources necessary to implement priority projects. 2. remove obstacles and expand Access to resources for economic Diversification: iden- tify effective steps that both Federal agencies and program applicants can take to reduce or eliminate the obstacles that make it difficult for applicants to secure the necessary resources for project implementation. 3. Achieve optimal resource Alignment: Work with community and regional stakeholders to coordinate project resources, align various program requirements, and otherwise leverage Federal and other investments for maximum benefit. 4. Project Action Plans and outcome evaluation metrics: establish agreement among inter- governmental and cross-sector partners to continue collaborating in support of imple- menting reDs priority projects. establish imple- mentation Plans and identify Next steps for specific project teams and actions that align with the reDs objectives. 52 reDs discussion borrows from the internal eDA report: regional integration events Planning and implementation guide (rev. July 2019). A REDS is an EDA-supported event that is a valuable tool to coalesce local, state and federal agencies and spur economic development. 30 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses Case examples plymouth, massachusetts in 2014, moody’s investors service released a report entitled, “u.s. Nuclear and coal-Fired Power Plant retirements to Jolt some local govern- ments.”53 the purpose of the report was to iden- tify the 10 local governments across the country with the highest levels of credit exposure in the event of a power plant closure or downsizing. in the town of Plymouth, which was identified as one of the at-risk communities despite holding a general obligation bond rating of Aa2 (high qual- ity and very low credit risk), the report generated some concern and raised a number of questions. later that year, the town’s Department of Planning & Development, with support from the old colony Planning council (ocPc), the regional planning agency serving Plymouth, engaged the university of massachusetts Amherst’s center for economic Development and the institute for Nu- clear host communities (iNhc) to assess the so- cioeconomic impact of Pilgrim. the result of that effort, “the Pilgrim Nuclear Power station study: a socio-economic Analysis and closure transition guide book” was developed in early 2015, six months before the plant announced its intent to close in 2019.54 by January 2016, the town had formed a Working group to coordinate engage- ment and a Nuclear matters committee was formed to provide operational advice to the town’s select board.55 strategy to prepare for the economic and fiscal consequences of the plant’s shutdown. the final report, issued in June 2018, “provides an economic base and market conditions analysis, fiscal impact modeling, and related services for a new economic development strategy for the town.”57 the report includes 11 goals for the town’s post-nuclear era, as well as an implementation framework to bring those goals to bear with respect to recruitment, retention, marketing, and asset development. the implementation of early pre-planning and knowledge development programs facilitated a reDs in the fall of 2019. specifically, the reDs was sponsored by the ocPc and focused on three core areas: Water and Wastewater expansion, traffic and transit solutions; and, Advancing Workforce Development. Participants in the reDs event were drawn from a wide variety of entities including: Local Greater Brockton Workforce Board Town of Kingston Old Colony Planning Council Town of Plymouth The Plymouth Foundation South Shore Workforce Board State Institute for Policy Analysis and Regional engagement at bridgewater state university University of Massachusetts at Dartmouth’s economic Development Massachusetts Department of Career Services Massachusetts Development Finance Agency Massachusetts Department of Transportation Federal Department of Transportation Economic Development Administration Small Business Association this reDs is a good example of a local initiative establishing an action/outcome-oriented agenda identifying the appropriate individuals who can take some measure of responsibility for oversee- ing the ongoing progress of individual project teams after the summit concludes. 53 moody’s, (2014, June 18). US nuclear and coal-fired power plant retirements to jolt some local governments. 54 cooper, (2014). 55 Plymouth board of selectmen, (2016). Entergy Task Force Update. 56 institute for Nuclear host communities, (2016). Pilgrim Station Phase II: Community Guidebook for Closure Response Prepared for the Town of Plymouth and Old Colony Regional Planning Commission. 57 rKg Associates, inc., (2018). Economic Development Strategy Plymouth County, Massachusetts. A well-organized reDs establishes an action/ outcome-oriented agenda identifying the appro- priate individuals who can take some measure of responsibility for overseeing the ongoing progress of individual project teams after the summit concludes. in october 2016, a second phase of the project with the iNhc produced a community guidebook for closure response to enable town officials to become “local experts,” providing a base of knowledge and recommendations in key areas.56 in 2017, the town secured the services of rKg Associates to develop an economic development Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 31 san Luis obispo County, California in June 2016, Pg&e submitted a proposal to the california Public utilities commission for its ap- proval of Pg&e’s intent to retire Diablo canyon’s two reactors in 2024 and 2025.58 county officials, municipal officials, and business and economic development advocacy groups began to discuss possible ways forward. the consortium coalesced around the need for an ambitious regional economic planning process and worked toward securing a blend of funding from municipal, federal, charitable, and business resources to support the work. in July 2018, six months after the cPuc approved Pg&e’s timeline for shutting down Diablo canyon, the eDA announced a $200,000 grant through its economic Adjustment Assis- tance program “to fund a feasibility study to determine the economic impact of recent severe storms and flooding and the closure of a nuclear power plant.”59 this grant was awarded to the economic vitality corporation of san luis obispo county, the county’s economic development and business resource services provider. As the scope of the project emerged, however, the extent of the plant’s impacts on neighboring counties came into view. With communities fifty miles to the north and south of san luis obispo within the plant’s sphere of socioeconomic influ- ence, the parties agreed to shift the project to the newly formed hourglass Project. this broader geography, reaching from camp roberts in southern monterey county down to vandenburg Air Force base in central santa barbara county, also necessitated a shift in focus. With additional funding from the state of california, as well as san luis obispo county, the hourglass Project has subsequently embarked on the central coast Jobs roadmap and Action Plan.60 the project, which began in April 2019, has yielded its first deliverable: an extensive public opinion survey that provides a portrait of the cen- tral coast’s workforce. one of the key findings is that labor shortages across the central coast could easily worsen in the next few years, further con- straining the local economy. the hourglass Project is now putting the finishing touches on its action plan for regional job creation and expects to release the plan at the upcoming reAch 2030 summit.61 in the meantime, california state university at san luis obispo (cal Poly slo), the region’s major public university, has leveraged the eDA’s resources effectively to complement thehour- glass Project’s ongoing work. in september 2017, cal Poly slo received a $500,000 award through the regional innovation strategies’ i6 challenge competition.62 the award accounted for slightly less than half the total investment required “to fund the coast innovation lab & Accelerator program, which will create a regional entrepre- 58 Joint Proposal of Pacific Gas and Electric Company, et al to retire Diablo canyon Nuclear Power Plant at expiration of the current operating licenses and replace it with a Portfolio of ghg Free resources, 2016. 59 eDA, 2018 Grants. 60 hourglass Project, (2020). Losing Hope, Struggling to Get By and Likely to Leave—A Portrait of the Central Coast Workforce. 61 slo chamber of commerce, (2020). What’s next for the Hourglass Project? 62 eDA, 2017 Grants. 63 eDA, Grants. by expanding entrepreneurial infrastructure . . . the region hopes to counter the impending effects of the closure of the nuclear power plant. neurial ecosystem in the county of san luis obispo, a predominately rural area in central coast of california.” in announcing the award, the eDA noted that “by expanding entrepreneurial infrastructure and promoting commercialization of products and concurrent development of potential new companies, the region hopes to counter the impending effects of the closure of a nuclear power plant.” most recently, cal Poly slo was awarded 6,745,200 from eDA to support the expansion of the cal Poly technology Park.63 the Disaster supplemental Funding will cover approximately 60 percent of the project cost, which will construct a 30,000-square-foot building and install supporting infrastructure to help fill the critical need for capacity in the area, which will lead to the creation of new industries and jobs throughout the region and help contribute to the economic resilience in the face of future natural disasters.” it is expected that this investment will help create 150 jobs and leverage $20m in private investment. Chapter summary in this chapter, we illustrated the phases of learn- ing and action that a host community experiences as they realize, encounter and respond to the socioeconomic impacts of a nuclear power plant closure. 32 chapter Four •closure AND DecommissioNiNg—imPActs AND resPoNses in Phase I—Closure Acknowledgement, we described the dynamic whereby host communi- ties may first resist the notion of plant closure, preferring instead to hold on to the belief that the plant will continue to operate and continue to provide local and regional economic opportunity. even when faced with the stark inevitability of closure, local officials are often slow to acknowl- edge the impending economic disruption. only after they overcome the hurdle of denial may pro- ductive assessment and planning begin. the work of the southwest michigan Planning commission a offers a strong example of a local community entity taking early action to develop awareness and forming the needed partnerships to begin to address the need for economic revitalization. engagement and the limited degree of public influence on decommissioning activities; (vi) the fundamental disconnect between how the nuclear industry and its regulator view decommissioning as compared to the common perspective of local, state and regional stakeholders; and, (vi) the opportunity for improved federal agency coordination to assist host communities miti- gate socioeconomic impacts. in addition to the experiences of plant host communities already mentioned, this section also included a detailed discussion of maine Yankee’s cAb process to further illustrate item (iv) above. With a more thorough understanding of the decommissioning process developed through the previous three phases, many host communities soon realize that they suffer from two key deficits: lack of planning resources and a parallel deficit in internal capacity to launch economic recovery efforts. in response, host communities then enter Phase IV—Partnership Development, where the critical mass of networks and relationships is cultivated to overcome both deficits. the work of the hourglass Project in san luis obispo county and the vermont Yankee local impacts Working group both offer instructive examples of local organizations coalescing diverse stakeholder groups to focus on the economic recovery needed in the wake of plant closure. the final step in the community-based plan- ning process, Phase V—Planning and Execution, is focused on the targeted implementation of economic development strategies in conjunction with nuclear power plant closure. host communi- ties in this phase may take advantage of various programs and resources offered by the federal government, including those from eDA. First, a ceDs or a ceDs-like report is an important com- ponent in a host community’s ability to access federal funds through eDA. second, a reDs event creates the opportunity for local, state and fed- eral agencies to collaborate on closure-related economic development initiatives. this chapter highlighted the experiences of california’s hour- glass Project as well as those stakeholders asso- ciated with Pilgrim in Plymouth, massachusetts. in particular, the work of officials local to the Pilgrim plant was discussed relative to a reDs that was held in 2019, the result of which saw increasing collaboration between a wide variety of local, state and federal agencies. many host communities soon realize that they suffer from two key deficits: lack of planning resources and a parallel deficit in internal capacity to launch economic recovery efforts. Awareness building creates the foundation for Phase II—Impact Assessment, where host communities may begin to develop a deeper understanding of the socioeconomic relationship between the plant’s operation and the surround- ing region. such efforts involve the combined efforts of multiple stakeholders from local, regional and state jurisdictions, some of whom may realize for the first time the degree of influence that an operating plant has on the surrounding economy. impact assessments in New York (indian Point), vermont Yankee (vermont) and Diablo canyon california) were conducted at the urging of local stakeholders. these reports provided foundational data from which state economic development policies were then created. During Phase III—The Decommissioning Learning Curve, project stakeholders begin to appreciate the depth and breadth of the decom- missioning process and soon understand that the learning curve is both steep and long. Key realizations along the learning curve include: (i) the degree to which economic impacts are, and are not, considered in decommissioning; (ii) the lack of planning resources available to host com- munities; (iii) the difficulties associated with site redevelopment due to the presence of nuclear waste; (iv) the challenges associated with public Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 33 Chapter Five Best Practices and Recommendations At the beginning of this report, we make mention of the fact that nuclear power plant closure and decommissioning has been underway in this country for over 20 years and that each plant closure brings with it a unique set of circumstances and experiences. We also state that in this context it would be unwise to expect that a series of generalized findings would find universal applicability. Nevertheless, and with these expectations and limitations in mind, this section offers a series of observations, best prac- tices and recommendations based on the docu- mented experiences of a range of closure and decommissioning projects. the following discussion is divided into three categories: local/regional, state and national. Absent are recommendations focused specifically on the decommissioning industry itself (i.e., nuclear power utilities and/or decommissioning contractors) as the scope of this report was designed to address community and public sec- tor issues. having said that, the central role of the nuclear power utility and decommissioning contractor cannot be overstated, and it would be advantageous for all stakeholders to utilize the findings herein and opportunities for greater collaboration towards common objectives. the host Community experience Develop the Knowledge Base Navigating through the poorly understood pro- cess of decommissioning is difficult for any set of stakeholders, and this is made all the more difficult in the absence of a firm understanding of the plant’s socioeconomic relationship to the host community. experience has demonstrated that those host communities who develop this knowledge base, in advance of closure, are in a better position to weather the inevitable socioeconomic storm. examples from New York indian Point) and vermont (vermont Yankee) help illustrate these points. realize that Chronic resource Constraints are a Given A community that faces a plant closure quickly realizes a wide range of deficits, whether they be financial, or a lack of familiarity with the fun- damentals of the closure and decommissioning process. given the complexity of the situation and the significant economic toll of plant closure, operating in a form of deficit-mode is character- ized by host communities as “the new normal.” there is no need to single out a community that has uniquely experienced this phenomenon: it is universal across the nuclear power plant closure landscape. appreciate strength in numbers of people) Planning for economic recovery requires new partnerships and coalitions. it takes time to bring these stakeholders together, particularly given the need to operate at multiple scales and across many disciplines and perspectives. Furthermore, the definition of a host community may include not only the municipal location of the plant itself, but the region from which its employees are drawn, and the communities which benefit from plant-related taxes or other payments. in addition, planning networks often grow to include state and federal officials who, at the outset, may not fully appreciate their relationship to the closure and decommissioning of a nuclear power plant. communities in michigan (Palisades) and New York (indian Point) provide good examples of coalition building. undertake recovery as a self-Directed outcome closure-related socioeconomic impacts generally fall outside of Nrc jurisdiction. this reality com- bined with the absence of a coordinated and integrated federal response places the recovery burden squarely on the host community and surrounding region. While recent efforts have resulted in modest federal funding to support host communities experiencing this transition, navigating the application process and securing funding remains a local responsibility. chapter 4 used examples from massachusetts (Pilgrim) and again from california (Diablo canyon) to demonstrate this reality. approach site-reuse as Component of a Larger strategy the potential redevelopment of a former nuclear power plant, while tantalizing, is fundamentally constrained by multiple liability, regulatory and practical considerations that will take at least a decade (and most probably longer) to resolve. While not abandoning the potential opportunities of site redevelopment, host communities are well- advised to invest in more near-term economic development strategies which can be initiated at any time, such as: Redevelopment of a different,high-value or high-capacity property Regional business growth and job creation to replace layoffs at the plant Talent attraction and workforce development Sector diversification strategies Marketing and recruitment Continue to highlight the presence of economic Development Barriers increase access to Funding resources the lack of funds to facilitate economic develop- ment planning is a major obstacle to community revitalization. recall from the previous discussion that NePA is a “process statute” and that this process focus does not diminish the usefulness of, for example, identifying the economic impacts on a community from decommissioning, as well as ways to mitigate those impacts. in addition, Nrc’s regulations pertaining to the preparation of a draft eis allow for “…consideration of the economic, technical, and other benefits and costs of the proposed action and alternatives.”64 [em- phasis added] As there is potential for an update to the 2002 geis, these economic considerations may see additional attention. 34 chapter Five •best PrActices AND recommeNDAtioNs on a related front, there is increased attention being paid to the potential for a portion of NDts to be used for economic development purposes. As the majority of NDts were funded by ratepayers, these same ratepayers view NDts as a justifiable source of funds for economic development plan- ning, in much the same way as the licensee uses 3% of the NDt for decommissioning planning. local access to NDt funds, perhaps capped at 1%–2% of the total value of the NDt, could be provided to a qualifying community-based not- for-profit entity or state authority. such funds could be made available starting five years before scheduled license termination or on the date that the licensee has notified theNrc of its intent to permanently cease operations. reinvigoration of a Federal spent nuclear Fuel management program the presence of sNF at former plants is due to the absence of a federal program for the disposal of this waste. this results in ongoing hardship to every community that seeks to redevelop this property and spur local economic development. A functioning federal spent fuel management program will be of demonstrable value in assist- ing local communities implementing restorative economic development. realize all plants will Close and all Communities will experience Loss except for the newly constructed plants at the vogtle site, most of the currently operating com- mercial nuclear power plants are forecast to come off-line on the next 20 to 30 years. these plant closures represent an annual loss measured in the billions of dollars to regional economies through- out the country. given current market conditions, the rate of closure (and associated economic impacts) may well increase. the journey along the Decommissioning learning curve takes several years. only after its completion may community stakeholders coalesce and begin to develop positive traction to affect the needed change. Planning for this eventuality is best undertaken today to allow host communities to develop the knowledge base, form partnerships and create economic resiliency strategies so that the effects of plant closure can be mitigated. Planning neither accelerates nor precipitates plant closure and the information gleaned during the information gathering process is of high value in developing forward-thinking strategies and policies. the 64 10 c.F.r. Part 51.71 Draft environmental impact statement—contents. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 35 For those states that host a nuclear power plant that has yet to close, learning from peers as to the risks and rewards of various engagement strategies is a task best undertaken in the near term so as to allow for the development of appropriate policies. benefits of this “plan early” dynamic are illus- trated below. the host state experience the role of state government in the closure and decommissioning of a nuclear power plant is gen- erally not at the forefront of legislative agendas. When it is, the focus is typically safety and energy supply. Nevertheless, once a plant announces closure, states undergo a learning curve not dis- similar to that of a host community. to be able to respond in a timely fashion to constituent demands stemming from nuclear power plant closure, the following state actions are recommended: Clarify state roles, responsibilities and expectations states across the country have chosen a variety of approaches regarding engagement in the closure and decommissioning process. in this dis- cernment process, some states have had ample opportunity to deliberate and choose an optimal course of action whereas others have had to behave in a more reactionary mode due to sched- ule pressures. For those states that host a nuclear power plant that has yet to close, learning from peers as to the risks and rewards of various engagement strategies is a task best undertaken in the near term so as to allow for the develop- ment of appropriate policies. Areas of policy development may include radiological cleanup standards, level of interaction with the Nrc, oversight of NDt funds and leveraging decom- missioning efforts to spur local and regional economic development. there is currently no structured opportunity for this learning to occur. Nor is there a standard method for state agencies and officials who will be involved in plant closure to become informed about the socioeconomic impacts and how their decisions may negatively or positively shape op- portunities for host communities to fully recover. Nonetheless, it is important that state officials understand how nuclear closure and decommis- sioning differ from processes with which they are familiar, such as the redevelopment of brown- fields sites. it is equally important to understand the event not just in terms of state-level impacts like energy supply or state tax losses, but in terms of outmigration of households or decreases to the local tax base. the state can play a critical role in supporting communities through a strategic planning and implementation process that will have positive economic outcomes at state, regional and local levels. Figure 4 Economic Recovery Scenarios Host Community Economic Well- BeingPlant-Related Economic Impact Economic Recovery Early Planning) Economic Recovery Late Planning)Plant Closure Benefits Realized Sooner As this figure indicates, communities that develop economic recovery plans prior to closure realize earlier and greater economic benefits than those communities that wait until plant closure to begin recovery planning. 36 chapter Five •best PrActices AND recommeNDAtioNs explore state-Driven economic Development programs closure creates a moment of clarity about coming change, but that moment passes. understanding that local and regional officials may suffer from a lack of capacity, it behooves states to consider their responsibility for both supporting (with funding and expertise) and even requiring some of the best practices, from economic analysis to strategic plan creation. up to and including the point of closure, there is a potential window to negotiate mutual benefits between the plant operator and state in a manner that can also benefit the host com- munities. this negotiation often occurs under time pressure, but with the deeper understanding of the host communities’ needs and goals in hand, there is an opportunity to leverage closure negotiations into an expansion of the local recovery toolkit. Build Closure-specific Fluency via eDa university Centers and other higher education programs With a learning curve as steep as that for nuclear power plant decommissioning, states should con- sider utilizing the resources of higher education and, where available, eDA university centers. research institutes, academic programs, and departmental affiliates can provide a variety of technical assistance services to build knowledge and capacity at local, regional, and state levels. borrowing from eDA’s website:65 eDA’s university center economic Develop- ment Program makes the resources of univer- sities available to the economic development community. institutions of higher education have extensive resources, including specialized research, outreach, technology transfer, and commercialization capabilities, as well as recognized faculty expertise and sophisticated laboratories. the eDA-supported university center (uc) program is specifically designed to marshal the resources located within colleges and universities to support regional economic development strategies in regions of chronic and acute economic distress. the ucs, which eDA considers long-term partners in economic development, are required to devote the ma- jority of their funding to respond to technical assistance requests originating from organiza- tions located in the economically distressed portions of their service regions. in massachusetts, for example, undergraduate and graduate students, as well as faculty and university-affiliated research staff, have been engaged in economic and community develop- ment research on nuclear power plant closure and decommissioning for several years. engagements with clark university, the center for economic Development at the university of massachusetts Amherst, the university of massachusetts Donahue institute, the conway school, and Worcester Polytechnic institute have produced literature reviews, impact assessments, input-output analy- ses, feasibility studies, and community-scale closure resources of benefit to a variety of stakeholders in New england. establish practices around Community advisory Boards while plants remain operational to date, nearly all nuclear plant closure announce- ments have led to the convening of some sort of cAb to serve as an outlet for information-sharing about the plant’s decommissioning plans from the plant operator, to solicit input from the public, and augment the existing public input require- ments of the Nrc. cAbs are often the primary way for relevant local and state entities to regu- larly meet with one another and with the public. Answers to questions such as, “Who convenes these panels?” “What is in their charter?” and, Which organizations/communities are repre- sented?” vary from one state to the next. states may wish to consider working with plant operators to establish practices and/or funding mechanisms around cAbs during the operational life of the plant to establish precedent and shorten the decommissioning learning curve. it is also worth considering the establishment of neutral funding mechanisms for these engagements so that cAbs with a diverse stakeholder group do not “belong” to any one entity on the panel. this approach can take advantage of 10 cFr 50.75 (f)(3), which requires each power reactor licensee to submit to the Nrc preliminary decommissioning cost estimates at or about five years before a projected end of operations. Although these cost estimates are very pre- liminary, they will provide cAP members an opportunity to familiarize themselves and the public with the size and scale of that process, and the parallel economic development scenarios. 65 eDA, University Centers. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 37 the national perspective Nuclear power plants are scattered across states, varied in size, ownership structure, and design. in fact, nuclear power plants and the contexts in which they operate can feel so disparate that the question is often raised as to whether there is truly a shared experience that unites nuclear host communities. Yet once a plant announces closure, similarities become clear. Nuclear power plants do not resemble regular plant closures, possessing as they do highly specialized and highly paid workforces. As highlighted in earlier chapters, a lack of re- search, planning and recovery frameworks makes responding to nuclear power plant closure more difficult when compared to potentially similar brownfields projects which benefit from a cadre of experienced professionals and robust federal programs. special conditions in nuclear power plant decommissioning because of Nrc regula- tions and Doe fuel-management responsibilities create unique circumstances requiring a set of planning tools, the development of which is still in its infancy. using the lessons and observations from this report, host communities and states can improve socioeconomic outcomes in conjunction with plant closure. however, this requires a considerable degree of ground-up organizing and multi-level collaboration. in order to ensure every community can respond to nuclear power plant closure in a timely and strategic manner, federal agencies may wish to consider fostering a supportive framework that ensures all stakeholders have ready access to knowledge, resources, networks and expertise. establish a national network of nuclear Closure Communities those stakeholders that are currently experi- encing decommissioning are developing a rich knowledge base that is of high value to those stakeholders who will follow in their footsteps. At present, there is no systematic approach to capturing and retaining this knowledge and as such, its long-term utility is limited. cataloging emerging knowledge and codifying it in a manner that will be useful to stakeholders in future de- commissioning projects will improve efficiencies of future projects and result in improved outcomes. to that end, a national network of nuclear closure communities would serve to coordinate and align the various federal resources that may be brought to bear to support nuclear closure communities and would be modeled after the energy com- munities Alliance66 or the office ofeconomic Adjustment that supported the brAc process.67 Key components of the network would be: Facilitation of peer networking and peer learning Offering stakeholder training e.g., Decommissioning boot camp) Uniting a broad base of local,regional,state and national stakeholders Provision of technical assistance to Nuclear closure communities Education and Outreach Building the Knowledge Base through research and conferences Development and Support of a Community of Practice (including consulting resources) using the lessons and observations from this report, host communities and states can improve socioeconomic outcomes in conjunction with plant closure. however, this requires a considerable degree of ground-up organizing and multi-level collaboration. prioritize knowledge building Nuclear closure communities require assistance accessing resources, from basic education about the socioeconomic impacts of closure to targeted capacity building, to reliable help with economic studies and access to planning resources. in addi- tion to the creation of the nuclear closure com- munity network outlined above, there is a need to invest in knowledge-building through govern- ment and university partnerships to improve expertise in this area. examples include university knowledge centers and national research partners such as the international economic Development council and the National Association of Develop- ment organizations. identify resources to pursue scenario-based planning for sites site restoration and site reuse discussions must be guided by scenarios built from the ground up and according to the community’s vision. embracing a goal of full economic recovery for every host community would require a conversa- tion about what long term resources, planning 66 For more information on the energy communities Alliance, visit their website. 67 For more information on the brAc process and the role of the office of economic Adjustment, visit their website. and regulatory change would be adequate to support complete site restoration (using the brAc model as a guide). unfortunately, in most areas, the skillset and frameworks to pursue projects of such regulatory complexity, on a multi-decade timeline, is not embedded in local or regional agencies. For this same reason, brownfields, ePA superfund68 and brAc projects have long benefited from federal leadership. Chapter summary recognizing the highly individualized nature of the decommissioning experience, this chapter nevertheless attempted to coalesce and synthesize the experiences of a number of host communities into a series of best practices and recommenda- tions. in doing so, this discussion touched on the local, state and federal dimensions of nuclear plant closure and decommissioning. on the local front, early planning for post- closure economic recovery at the community, county and regional level neither accelerates nor precipitates the decision to close the plant. the economic recovery process is long, challenging and heavily dependent upon the host community to galvanize and sustain action. identification of economic development barriers (e.g., presence of spent nuclear fuel, lack of planning resources) and the design of economic recovery plans, well before a plant is scheduled to close, is a reason- able and prudent community investment. At the state level, states have an incentive to anticipate closure and develop their own policies. Areas of influence that a state may have on decommissioning range from final radiological cleanup levels and the provision of economic impact mitigation funds to defining the role of host communities and advisory boards in the decommissioning process. Without prior action in advance of plant closure, the role of states is generally limited. the $100b required to decommission the current nuclear fleet was (and will be) derived largely from ratepayers. in this context and to ensure that those same ratepayers may derive maximum benefit from decommissioning, the improved coordination of federal agencies focus- ing on additional research, efficient deployment of resources and the provision of planning assis- tance would be a demonstrable benefit to host communities. the establishment of a national net- work of nuclear closure communities, modeled after similar coordinating entities in the Doe the energy communities Alliance) and the DoD the office of economic Adjustment), would also improve the effectiveness of the federal response. implementation of these recommendations will advance the practice of nuclear plant decommis- sioning and serve to strengthen host communities. there remains, however, the need for additional data and information to more fully inform the process. these opportunities for additional research are discussed in the following chapter. 38 chapter Five •best PrActices AND recommeNDAtioNs 68 ePA, Superfund. early planning for post-closure economic recovery at the community, county and regional level neither accelerates nor precipitates the decision to close the plant. the economic recovery process is long, challenging and heavily dependent upon the host community to galvanize and sustain action. sustained and integrated multi-agency support to nuclear Closure Communities the recovery timeline for a typical host commu- nity responding to the closure of a nuclear power plant is measured in decades with annual regional economic losses of at least $400m. many of these closure communities have been experiencing these severe economic losses for years. While much can be accomplished through local, regional and state partnerships supported by federal agencies and their integrators, the very nature of the nuclear closure process involves a timeframe that is poorly matched with the political life cycles of local officials. to better leverage two major assets—lead time to closure and the current revenues from an operating plant— communities would benefit from more integrated intervention and sustained commitment over several years. the combination of a coordinated multi-agency response effort in conjunction with nuclear closure-specific resources will yield positive dividends in this regard. CoviD-19 Considerations this report was written during the coviD-19 pan- demic and during a time of significant economic turmoil. in conjunction with the widespread eco- nomic disruption related to the pandemic, these nuclear host communities have experienced, and will continue to suffer from, closure-related impacts to their long-term well-being. the com- bination of these two forces increases the need for federal support and focused relief efforts. Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 39 Chapter six Opportunities for Additional Learning the closure and decommissioning of nuclear power plants represents a $100b undertaking that will span the next several decades. given the long timeframes and significant expenditures of funds, most of which are derived from ratepayers, it would appear both reasonable and prudent to increase our collective understanding of the closure and decommissioning process so as to improve policies and promote positive outcomes that serve to strengthen the economic stand- ing of host communities. the authors of this report rec- ognize that this document is but a small first step on the path towards increasing our understanding of the socioeconomic impacts of nuclear power plant closure and decommissioning. to that end, the decommission- ing ecosystem would benefit from the following areas of research and knowledge development. the plant—Community relationship the socioeconomic relationship between an operating nuclear power plant and its host community is highly variable. it is also incomplete. this inadequate data set undermines the ability to develop effective state and national policies. Additional research is needed to objectively define this socioeconomic relationship. Longitudinal examination of economic Development efforts this report discussed the experiences of a limited number of host communities during a snapshot in time. What is absent are in-depth analyses of these experi- ences across timeframes (multiple years) to allow for more the development of more robust findings. in this context, longitudinal and statistically significant surveys are recommended to create a more complete data set. the opportunity Costs of stranded assets All decommissioned nuclear power plants currently house spent nuclear fuel and the presence of this waste hinders site redevelopment. the opportunity cost associated with a host community’s inability to derive economic benefit from the decommissioned plant site has not been calculated on a systematic basis. Nationally, this opportunity cost is estimated to be in the hundreds of millions of dollars. Additional research is recommended to collect develop accurate data from which more effective policies may be developed. Community engagement models A recurring theme from research and stakeholder inter- views was a general dissatisfaction, on behalf of commu- nity members, with community engagement as it pertains to decommissioning. While this finding is common to many complex energy infrastructure projects, the associ- ated research into improving the stakeholder experience is lacking. given that decommissioning will occur over the next several decades, investment in the development of more constructive engagement models may pave the way for more efficient completion of decommissioning projects along with more equitable outcomes. property stewardship models the nation’s nuclear utilities control approximately 50,000 acres of property associated with plant opera- tion, the majority of which is undeveloped open space. At the same time, due to liability and regulatory consid- erations, the presence of sNF hinders site repurposing. given the long timeframes in question combined with the large amount of property to be surplussed during the decommissioning process, there may be an oppor- tunity for a land trust to facilitate site repositioning. such a trust may bundle various decommissioned sites, and through economies of scale, secure cost-effective liability and risk mitigation measures so as to allow these sites to be returned to their highest and best uses (from natural resource conservation to commercial or industrial devel- opment). The RACER Trust is an example of a land trust that has been successful in repositioning former industrial sites and their experience, and that of other land trusts, warrants additional investigation and analysis. Chapter seven References 40 reFerenceS media bates, m., (2019, october 8). Decommissioning Meeting Set for Thursday, Citrus County Chronicle. mand, F., (2015, october 4). Entergy to close Pilgrim Nuclear Power Station by 2019, The Patriot Ledger. moody’s, (2014, June 18). US nuclear and coal-fired power plant retirements to jolt some local governments. s&P global Platts, (2020, march 5). growth in us decommissioning market depends on federal, state policies. Nucleonics Week, volume 61/Number 10/page 8. schneider, D., (2017, January 20). Kewaunee nuke plant is due $12M in tax refunds, Green Bay Press Gazette. reports black Diamond consultants, inc., (2005). The Maine Yankee Decommissioning Advisory Panel, A Model for Public Participation In Nuclear Projects A Report by The Maine Yankee Community Advisory, Panel on Decommissioning. brattle group, (2018). Impacts of Announced Nuclear Retirements in Ohio and Pennsylvania; D. murphy and m. berkman. callan institute, (2019). 2019 Nuclear Decommissioning Funding Study. cooper, J.c., (2014). The Pilgrim Nuclear Power Station Study A Socio-Economic Analysis and Closure Transition Guide Book, university of massachusetts Amherst. Department of energy, (2019). Spent Nuclear Fuel and High-Level Radioactive Waste Inventory Report, FCRD- NFST-2013-000263, Rev. 6. . electric Power research institute, (2005). The Maine Yankee Decommissioning Experience Report—Detailed Experiences 1997–2004. hourglass Project, (2020). Losing Hope, Struggling to Get By and Likely to Leave—A Portrait of the Central Coast Workforce. indian Point closure task Force, (2018). Annual Report. institute for Nuclear host communities, (2016). Pilgrim Station Phase II: Community Guidebook for Closure Response Prepared for the Town of Plymouth and Old Colony Regional Planning Commission. Kewaunee county economic Development, (2013). Views of the Future Kewaunee, Manitowoc and Brown Counties Wisconsin, USA. maine Yankee community Advisory Panel on Decom- missioning (2005). The Maine Yankee Decommissioning Advisory Panel: A Model for Public Participation in Nuclear Projects. mullin, John r. and Kotval, Zenia, The Closing of the Yankee Rowe Nuclear Power Plant: The Impact on a New England Community, (1997).Journal of the American Planning Association. 25. Nrc, (2002). NUREG-0586, Supplement 1 Volume 1, Generic Environmental Impact Statement on Decom- missioning of Nuclear Facilities, Supplement 1 Regarding the Decommissioning of Nuclear Power Reactors, Main Report, Appendices A through M Final Report. PA strategies, (2001). economic and Property tax impact Analysis: A report Analyzing the economic impact of the maine Yankee Decommissioning and Future economic Projections with site Development. Plymouth board of selectmen, (2016), Entergy Task Force Update. Post—vermont Yankee task Force of the southeast vermont economic Development strategy Planning group, 2012). Windham County Post- Vermont Yankee Economic Mitigation and Growth. rKg Associates, inc., (2018). Economic Development Strategy Plymouth County, Massachusetts. roland-host, D.W. et al, (2019). Prospective Closure of the Diablo Canyon Nuclear Power Plant—Economic Impact Assessment, university of california berkeley. slo chamber of commerce, (2020). What’s Next for the Hourglass Project? Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 41 southwest michigan Planning commission, (2020). Palisades economic recovery Action Plan. Wyndham regional commission, et al, (2016). When People and Money Leave (and the Plant Stays)—Lessons Learned from the Closure of the Vermont Yankee Power Station: A Tri-Region Experience. Legislation and regulations and associated reference material Federal Atomic energy Act sec. 276 (42 usc 2022). Domestic licensing of Production and utilization Facilities, 10 c.F.r. § 50.2. 10 c.F.r. Part 51.71 Draft environmental impact statement—contents. eDA, Comprehensive Economic Development Strategy. eDA, Economic Development Districts. eDA, Grants. eDA, University Centers. eDA, 2018 Grants. eDA, 2017 Grants. ePA, Superfund. Nrc, Agency Activities in Response to a Portion of the Nuclear Energy Innovation and Modernization Act. Nrc, Backgrounder on Decommissioning Nuclear Power Plants. Nrc, Decommissioning Regulations, 10 c.F.r., Part 20 subpart e, and Parts 50.75, 50.82, 51.53, and 51.95. Nrc, DECON. Nrc, Emergency Planning Zones. Nrc, SAFSTOR. Nuclear energy innovation and modernization Act of 2019, s.512—115th congress (2017-2018), Public law No: 115-439, (2019). u.s. bureau of labor statistics, Quarterly Census of Employment and Wages. state Legislation and programs New York state, Electricity Generation Facility Cessation Mitigation Program. Senate Bill 968, 2015–2016. ch. 674, 2016 cal. stat. state of vermont, Wyndham County Economic Development Program. regulatory actions and submittals Joint Proposal of Pacific Gas and Electric Company, et al to retire Diablo canyon Nuclear Power Plant at expiration of the current operating licenses and replace it with a Portfolio of ghg Free resources, 2016. Memorandum of Understanding between the Department of homeland security/Federal emergency management Agency, and Nuclear regulatory commission regarding radiological emergency response, Planning, And Preparedness, 2015. Nuclear regulatory commission No. 50-293 Holtec Decommissioning International, LLC Pilgrim Nuclear Power Station Exemption, 2019. vermont Yankee Nuclear Power station—Issuance of Exemption From 10 CFR 50.82(A)(8)(I)(A) L-2018-Lle-0007), 2018. 42 appendix a •eDA summArY rePort (JuNe 25, 2018) appenDix a EDA Summary Report pursuant to the expLanatory statement aCCompanyinG the ConsoLiDateD appropriations aCt, 2018 (p.L. 115-141) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 43 44 appendix a •eDA summArY rePort (JuNe 25, 2018) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 45 46 appendix a •eDA summArY rePort (JuNe 25, 2018) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 47 48 appendix a •eDA summArY rePort (JuNe 25, 2018) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 49 50 appendix B •eDA summArY rePort (August 9, 2019) appenDix B EDA Summary Report pursuant to senate report 115-275, whiCh aCCompanieD the ConsoLiDateD appropriations aCt, 2019 (p.L. 116-6) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 51 52 appendix B •eDA summArY rePort (August 9, 2019) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 53 54 appendix B •eDA summArY rePort (August 9, 2019) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 55 56 appendix B •eDA summArY rePort (August 9, 2019) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 57 58 appendix B •eDA summArY rePort (August 9, 2019) Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 59 60 appendix c •Nrc NeimA meetiNgs nrC neima meetings 69 Meeting Date Location Web Link to Meeting Summary August 8, 2019 Webinar*view meeting summary August 21, 2019 Palisades*view meeting summary August 26, 2019 humboldt bay view meeting summary August 27, 2019 Diablo canyon view meeting summary August 29, 2019 san onofre view meeting summary september 10, 2019 vermont Yankee*view meeting summary september 11, 2019 Pilgrim*view meeting summary september 24, 2019 Kewaunee view meeting summary september 26, 2019 Zion view meeting summary october 2, 2019 indian Point*view meeting summary october 3, 2019 oyster creek view meeting summary october 10, 2019 crystal river view meeting summary November 19, 2019 Webinar*view Webinar slides 69 Nrc, Agency Activities in response to a Portion of the Nuclear energy innovation and modernization Act Denotes meeting attended by collaborative staff. appenDix C NRC NEIMA Meetings Socioeconomic impactS From nuclear power plant cloSure and decommiSSioning 61 this paGe intentionaLLy LeFt BLanK Socioeconomic Impacts from Nuclear Power Plant Closure and Decommissioning Host Community ExpEriEnCEs, BEst praCtiCEs and rECommEndations the operation of a typical nuclear plant annually contributes at least $400m of economic impact to the plant’s host region as well as being a key source of economic livelihood for over one thousand plant employees and contractors. in addition, the presence of nuclear plant employees and their families strengthens host community capacity through their participation in a wide range of civic, cultural and volunteer opportunities. the socioeconomic impacts of plant closure are severe and swift. many highly skilled workers and their families relocate, procurement of local goods and services is significantly reduced, tax payments to local towns plummets and housing values erode. these impacts occur at every nuclear power plant, but the effects are felt more deeply in rural communities where most plants are located. A series of factors continue to hamper host community recovery efforts including: limited resources available to host communities for economic development planning; the decommissioning process is complex and is accompanied by a steep learning curve; the long-term presence of spent nuclear fuel hinders economic development;and, the lack of a coordinated federal framework to facilitate host community economic recovery. over the next several decades, all currently operating nuclear power plants will close, representing a total annual reduction in gross regional product of approximately $25b. given the scale of this impact, there is both the need and opportunity to strengthen policy, process and performance to improve economic outcomes of host communities recovering from plant closure. this report is offered with that goal in mind. through a combination of stakeholder interviews and research, we have developed a more complete picture of what it means to close and decommission a nuclear power plant with a focus on the host community experience. by doing so, we provide all project stakeholders with additional tools and information to improve project outcomes and catalyze economic recovery. August 2020 | the NucleAr DecommissioNiNg collAborAtive, iNc.