HomeMy WebLinkAboutEst_14619_from_Toste_Construction_1560 - signed 8-27-20217044, 4I0c.
SEALING & ASPHALT MAINTENANCE
2651 GREEN PLACE
ARROYO GRANDE, CA 93420
LICENSE NO. 879465
DI #A000001378
P (805) 473-0884 F (805) 473-0970
PROPOSAL
m PROPOSAL#
14619
EMAILED FAXED
TO: PROJECT:
CITY OF SAN LUIS OBISPO
879 MORRO ST.
SAN LUIS OBISPO, CA 93401
TEMP LOADING ZONES
DOWNTTOWN SLO
MISC. LOCATIONS
PHONE FAX CUSTOMER E-MAIL
805.781.7553 afuchs@slocity.org
DESCRIPTION UNIT CITY RATE TOTAL:
REMOVE EXISTING SIGN EA 6 100.00 600.00
INSTALL CITY PROVIDED SIGN ON EXISTING POST EA 2 200.00 400.00
PROVIDE & INSTALL NEW PUBLIC LOADING ZONE SIGN ON EXISTING EA 8 250.00 2,000.00
PUNCH POST
INSTALL NEW PUNCH POST AND ANCHOR IN CONCRETE EA 4 175.00 700.00
PAINT CURB LF 400 0.90 360.00
PRICE BASED ON PREVAILING WAGE RATES.
PRICE BASED ON THE CITY OF SLO TO PROVIDE PAY STATION SIGN
FOR INSTALL.
PRICE COVERS LISTED ITEMS ONLY
PRICE BASED ON WORK TO BE DONE IN ONE MOVE IN.
EXCLUSIONS: THERMOPLASTIC STRIPING, PROVIDING SIGNS,
PERMITS & FEES, AS -BUILT DRAWINGS, PUBLIC NOTIFICATION
NOTICES, REMOVAL OR BLACKING OUT EXISTING STRIPING.
WE PROPOSE HEREBY TO FURNISH MATERIAL & LABOR - COMPLETE IN TOTAL: $4 060.00ACCORDANCEWITHTHEABOVESPECIFICATIONSFORTHESUMOF: 7
NOTE: UNLESS NOTED, ESTIMATE IS BASED ON NORMAL WORKING HOURS DURING A NORMAL WORK WEEK & IS SUBJECT TO CHANGE FOR NIGHT & WEEKEND
WORK WE REQUIRE 30 DAYS NOTIFICATION PRIOR TO SCHEDULING. NOTIFICATIONS WITH LESS THAN 30 DAYS ARE SUBJECT TO AVAILABILITY.
EXCLUSIONS: TOSTE CONSTRUCTION IS NOT RESPONSIBLE FOR CURING PERIOD DUE TO WEATHER CONDITIONS TOSTE CONSTRUCTION WILL NOT BE HELD
RESPONSIBLE FOR DAMAGES TO SEALING OR STRIPING AFTER INSTALLATION, AND IS NOT RESPONSIBLE FOR SURFACE PIPES OR ELECTRICAL WIRES THAT ARE NOT
ISTALLED TO CODE WHICH IS 12-18" FROM THE SURFACE OF THE SOIL PRICE AND SCHEDULING OF THIS CONTRACT IS SUBJECT TO CHANGE WITHOUT NOTICE DUE
TO: UNEXPECTED OIL INCREASES. TOSTE CONSTRUCTION WILL NOT ACCEPT ANY LIABILITY FOR ANY LAWSUITS ARISING FROM AN ADA OR HANDICAP ACCESS
ISSUE OR COMPLIANCE. OWNER WILL BE RESPONSIBLE IN KEEPING PEDESTRIANS, VEHICLES, AND ANIMALS FROM TRESPASSING ON AREAS DURING CURING
PERIOD. WORK DELAYS CAUSED BY PROPERTY OWNERS, TENANTS, LEASEES, OR ANY MANAGERS OR EMPLOYEES MAY INCUR ADDED FEES FOR ADDITIONAL TRIPS
MADE TO COMPLETE THE PROJECT. OUR WARRANTY DOES NOT INCLUDE OIL SPOTS, CRACKS, OR STRUCTURALLY DAMAGED AREAS,
IN ANY LITIGATION OR ARBITRATION ARISING OUT OF THIS PROPOSAL ITS PERFORMANCE, THE COURT OR ARBITRATOR SHALL AWARD REASONABLE COSTS AND
EXPENSES, INCLUDING ATTORNEYS FEES, TO THE PREVAILING PARTY. *WE ARE A NON -UNION COMPANY*
PAYMENT: ENTIRE AMOUNT IS TO BE PAID UPON PROGRESS BILLING. IF NOT PAID WITHIN 30 DAYS, LEGAL ACTION & ATTORNEYS FEES TO BE PAID BY DEFENDANT
INTEREST CHARGED AT 1.5%MONTHLY. PLEASE NOTE: THIS PROPOSAL IS VOID IF NOT ACCEPTED WITHIN 30 DAYS.
ALI MATFRERIAL IS GUARANTEED 11) BE AS SVRlFIFTJ, ALI_ WORD TO BF, ACCEPTANCE OF PROPOSAL: THE ABOVE PRICES, SPECIFICATION AND CONDITIONS
C1AtP1.F.TFD IN A PROFFSSIIJNAL NJANNER ACCORDING 11) %TANDART] ARE SATISFACTORY AND ARE HEREBY ACCEPTED. YOU ARE AUTHORIZED TO DO
PRACTICES, ANY ALI ERAI ION OR DEVIATION FROM ABOVE SPECIFICAT10N5 THE WORK AS SPECIFIED. PAYMENT WILL BE MADE AS OUTLINED ABOVE.
INVOLVING EN—HRA COST WILL BE E:J FI TTFO ONLY I POT WRITTEN ORDERS. SIGNATURE OF ACC PTANC E:
AND WHJ_ 01 71NIE AN FXTRA CHARGEOVER AND ABOVETILE ESTINI/V E ALL AGREEMENT
S I'I IN I Iti1;Lj\'I" I 4-ON STRIKES, ACCIDENTS OR DELAYS BEY1IND OLTR
CONTW II c Plt'NER T:O C'ARIRY FIRI? AN17.OTHER NF',C'FSSARY INSI:ItANCI_
01-I: lti c IRKI'.RS ARE FULLY COVERED BY WORKER'S comll:NSATION
INSURANCE. AUTHORIZED SIGNATURE:
DATE OF AC 'EPTANC'E: TONY TOSTE
PRESIDENT FOR
TOSTE CONSTRUCTION,
INC.