HomeMy WebLinkAbout07-19-2021 ARC PresentationsArchitectural Review Commission
Regular Meeting
July 19, 2021
•All attendees enter the meeting muted.
•You can rename yourself by following
the steps below.
•When Public Comment is called for an
item you would like to speak on,please
raise your virtual hand.
•When your name is called,you will be
moved to a Panelist.After a brief
moment,you will be able to unmute your
mic and turn on your video (optional).
•Please state your first and last name and
address (optional)for the record.
•After providing your comments you will
be moved back to an Attendee.
Directions for Public Comment
PUBLIC COMMENT FOR ITEMS
NOT ON THE AGENDA
•If you would like to speak on items
NOT ON THE AGENDA,please
raise your virtual hand.
•When your name is called,you will
be moved to a Panelist.
•Before you begin speaking,unmute
your mic and turn on your video.
Please state your First and Last
name and address (optional)for
the record.
•After you complete your comments,
you will be moved back to an
Attendee.
Public Comment
At this time,people may address the Commission on items not on the agenda.
Items raised are generally referred to staff and,if action by the Commission is
necessary,may be scheduled for a future meeting.
Item #1
CONSIDERATION OF MINUTES
1.Minutes of the Architectural Review Commission
meeting of June 16,2021.
__________________________________________________
Recommendation:
Approve the minutes of the Regular Meeting of the Architectural
Review Commission meeting of June 16,2021.
Item #2
PUBLIC HEARING ITEM
279 Bridge St.(ARCH-0587-2020)
2.Development review of a mixed-use project consisting of 94 residential units and
924 square feet of commercial space,with a 24%density bonus.The project
includes a request for an affordable housing concession regarding the Edge
Conditions standards for open space orientation and window placement for
properties that are along transition zones.An Addendum to the previously adopted
Mitigated Negative Declaration has been prepared (ER#0286-2014).Project
address:279 Bridge Street;Case#:ARCH-0587-2020,USE-0412-2021,&AFFH-
0413-2021;Zone:M-zone;Housing Authority of San Luis Obispo,
owner/applicant.Staff Presentation By:
Kyle Bell,Associate Planner
Recommendation:
Review the proposed project in terms of its consistency with the Community Design
Guidelines (CDG)and applicable City Standards and provide comments and
recommendations to the Planning Commission.
279 Bridge Street
Affordable Housing Mixed-Use
ARCH-0587-2020
Review of an affordable mixed-use project consisting of 94
residential units and 924 square feet of commercial space, with
a 24% density bonus. The project includes a request for an
affordable housing concession regarding the Edge Conditions
standards for open space orientation and window placement for
properties that are along transition zones.
August 3, 2020
Applicant: HASLO
Recommendation
Provide comments regarding consistency with the
Community Design Guidelines and recommend
direction on the projects design to the Planning
Commission.
3
Previous Reviews
4
May 1, 2017, the ARC approved a manufacturing
development project consisting of 23,297 square feet of
commercial space, including a caretaker’s unit.
September 9, 2019, the ARC reviewed and recommend
approval of a revised design of the project that consisted of
19,267 square feet of commercial space and 18 residential
units.
September 25, 2019, the PC approved the revised project.
Site Plan
5
Building Design
6
Focused Design Review
7
Staff has identified several discussion items for consideration
by the ARC related to consistency with Community Design
Guidelines:
▪Context of the site
▪Neighborhood compatibility
▪General design objectives, building setbacks
▪Site Planning
▪Scale
▪Upper-Level Open Space Orientation and Windows.
Edge Conditions
8
Edge Conditions
9
Recommendation
Provide comments regarding consistency with the
Community Design Guidelines and recommend
direction on the projects design to the Planning
Commission.
Edge Conditions –Phase 1 Elevations
11
Edge Conditions –Phase 2 & 3 Elevations
12
Terraza Project
13
Original Project
1)Construction of three commercial shell buildings in the Manufacturing
zone:
Building A: 8,332 square foot (including mezzanine level)
Building B: 9,957 square foot
Building C: 3,380 square foot (including 1,718 square foot caretakers residence)
14
Original Project
15
Other Discussion Items
1.Outdoor Unpaved Yard
a)Relocate, resize, or remove for compatibility with adjacent residential uses
2.Outdoor Decks Adjacent to Residential
a)Discuss appropriateness of outdoor decks
3.Caretakers Dwelling (1,718 square foot 2-bedroom residence)
1.Must be accessory to primary use and used for a caretaker employed on the site.
2.Potentially resize to be more of a traditional caretakers residence.
Revised Project
16
Building A: 8,736 square feet (manufacturing shell)
Building B:31,726 square feet (7,200 sf commercial, 16 residential units)
Building C: 6,850 square feet (3,421 sf commercial, two residential units)
Revised Project
17
•Revise plans to show additional screening of rear parking area
•Applicant response: Additional trees along southern property boundary
Terraza Project
18
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021 EX.A
AERIAL VIEW
PROJECT OVERVIEW
• Phased Mixed-Use project in
manufacturing zone
• Affordable Housing with multi-
family and senior living, plus
commercial manufacturing shell
• Buildings are elevated above the
flood zone with podium design
over parking
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021 EX.B
Consider the context
• Neighboring residences to the west
and south are contemporary and
industrial in style
• Neighboring residences to the east
are separated by visual barriers
• Surrounding industrial buildings
are large in scale
• Surrounding materials include
corrugated metal, stucco, horizontal
wood and vertical standing seam in
varying colors
architectural context:
This project responds to the
architectural context through the
majority use of metal siding and
stucco in a warm color palette to
compliment the natural colors of the
hillside, only utilzing cool colors as
accents to differentiate the project’s
uses.
CORRUGATED METAL SIDING AND ROLL-UP
DOORS AT ADJACENT LIVE-WORK UNITS
1 ADJACENT LINEAR WAREHOUSE WITH
INDUSTRIAL FINISHES AND WINDOW
STYLES
2 NEIGHBORING CONTEMPORARY
RESIDENCES WITH REPETITIVE ELEMENTS,
PARKING BELOW, 2-STORY RESIDENCE
ABOVE WITH ROOFTOP DECK
3
2 1
SOUTH st
BRIDGE ST
3
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021 EX.C
SITE PLANNING
BUILDING SETBACKS:
• Project’s apparent scale is smaller
than surrounding industrial buildings
and provides substantial setbacks
of <20ft from R-2 uses to respect
neighbor’s privacy and views
• Smallest setback provided is 12ft
and is adjacent to M-PD zone,
compliant with zoning regulations
• Creek setbacks vary from 34-40ft,
well above the min. 20ft.
• Buildings are elevated above the
flood zone with podium design over
parking
• Meandering paths planned in
the creek setback for pedestrian
enjoyment
CREEK SETBACKs:NOPARKINGNOPARKINGM M
NO
PARKING
EV CAPABLE
STD
EV CAPABLE
VAN
EV CAPABLEVANEV READYSTD.EV CAPABLEVANEV CAPABLESTD.EV READYNO
PARKING
EV READY
VAN >>>>>>EV CAPABLEEV READYCOMPACTEV READYMM
EV CAPABLEEV CAPABLE EV CAPABLE EV CAPABLE COMPACT
EV CAPABLEEV READY
EV READY
EV CAPABLE
EV CAPABLE
PHASE 2
FAMILY (30)
PHASE 3
FAMILY (32)
PHASE 1
SENIOR (32)
S81°00'57"W 203.
4
4
'
M
S78°21'43"E
4
8
5
.
1
0
'
M N0°27'10"E 326.95'MS77°08'13"W
2
2
1
.
0
7
'
M
24'-5"
SETBACK
24'-5"SETBACK21'-5"SETBACK25'-1"
SETBACK
24'-0"SETBACK36'-3"SETBACK26'-9"
SETBACK
12'-0"
SETBACK CREEKSETBACKDRAINAGEEASEMENTCREEKSETBACKDRAINAGEEASEMENT12'-10"SETBACK15'-0"SETBACK23'-10"SETBACK
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021 EX.D
SITE PLANNING cont.
open space and natural
features:
• Project is providing pedestrian
connection over the bridge
• This connection provides access to
the Meadow Park and South Hills
Open Space trails
• Central courtyards are provided at
each building
• Parking complies at each phase &
bike parking exceeds requirements
• Pavers are provided in the parking
areas and the drive aisle for best
stormwater design and long term
maintenance.
• Wider drive aisle and a fire truck
turnaround provided. Secondary
site egress is not required with
fewer less than 100 units
PARKING AND DRIVEWAYS:PHASE 1 & 2
COURTYARD
PHASE 1 & 2
FROM BRIDGE
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021 EX.E
neighborhood
compatibility
edge conditions and privacy:
windows
balconies
• Project’s setbacks are larger than
required by Zoning Regulations
• The need for window offsets at
further distances becomes less
relevant in providing privacy
• The proposed project’s finish
floors vary from those in adjacent
residential buildings, creating
natural vertical offsets and
reducing line of sights
• The livability of smaller units
benefit from the addition of
balconies
• Balconies assist in the articulation
of long lengths of the building,
breaking up the apparent mass
and scale
• The Housing Authority of San Luis
Obispo’s property managment does
an excellent job managing tenant
balconies
KEY PLAN
1
2
3 4
1
2
3
4
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021
SCALE & MASS:
• Pushes and pulls in the build
facade along with balconies provide
articulation along lengths of the
building to break up apparent
mass and scale
• No length of building is longer
than 40ft without providing a plane,
material and color change
BUILDING PLANNING
EX.F
phase 1a southeast corner
539 Marsh Street
San Luis Obispo, CA
805.541.1010
info@tenoverstudio.com
BRIDGE STREET APARTMENTS
279 BRIDGE STREET, SAN LUIS OBISPO, CA
DATE: 07/19/2021 EX.G
VIEW FROM bridge entry
Item #3
COMMENT & DISCUSSION
3.Staff Updates and Agenda Forecast
Senior Planner Shawna Scott will provide an update of
upcoming projects and the agenda forecast.
ADJOURNMENT
The next Regular Meeting of the
Architectural Review Commission
has been rescheduled to
Monday, August 2, 2021 at 5:00 p.m.
via teleconference
The Regular Meeting of the
Architectural Review
Commission
will resume shortly
*Recess in Progress*