Loading...
HomeMy WebLinkAboutPRE-0229-2021_ProjectPlans_3.31.21A1March 29, 20211422 MONTEREY ST. PRE-APPLICATION MEETING Items to Address 1. What is our Approval Process and projected possible timeline. 2. What type of Environmental Reviews will we be subject to – this is an infill project – exempt from CEQA? 3. What potential mitigations and offsite improvements are predicted or triggered? 4. What type of initial and or additional studies would be needed? ( i.e. Noise, Traffic, ....) 5. How to address building over the Culvert 6. Applicable Design Guidelines 7. Staff reaction to scale, massing, density, architectural style/detail, setbacks and HEIGHT, parking solution, small scale buildings on Palm, loss of trees...... 8. Proportion of commercial to residential - See Context Sections on A6. 9. Clarity on determination of “zone boundary” as even with back of adjacent lots. STATS 1.42 ACRES .25 ACRES R-2 ZONE 1.17 ACRES C-R ZONE APN: 001-137-015 & 013 ZONING: MIXED HEIGHT: R-2 35 FEET C-R 45 FEET SETBACKS R-2 20’ FRONT, 5 TO 15 SIDE AND REAR C-R 0’ ALL, EXCEPT - 10’ TO 23’ ADJACENT TO R-2 5’ TO 10’ ADJACENT TO “O” DENSITY: 12 AND 36 DU/ACRES SLOMC = 45.12 DU’S BASE DENSITY PARKING REQUIRED: MULTI FAMILY 1 PER STUDIO/1BED, 2 PER 2BED/3BED NO GUEST SENIOR: .5 SPACES/ UNIT RETAIL: 1 PER 300SF RESTAURANT 1 PER100 SF PARKING REDUCTIONS: 20% FOR SHARED USE Attendants: Design Team: 1. RRM: Lenny Grant, Scott Martin, David Gibbs, Jake Minnick 2. HASLO: Michael Burke 3. Jim Rendler City Staff Departments to invite: 1. Planning 2. Building 3. Engineering 4. Public Works 5. Fire 6. Arborist-Street Tree 0 20 40 80 1” = 40’-0”11 X 17 SHEETA2March 29, 20211422 MONTEREY ST. EXISTING CONDITIONS STATS 1.42 ACRES .25 ACRES R-2 ZONE 1.17 ACRES C-R ZONE APN: 001-137-015 & 013 ZONING: MIXED HEIGHT: R-2 35 FEET C-R 45 FEET SETBACKS R-2 20’ FRONT, 5 TO 15 SIDE AND REAR C-R 0’ ALL, EXCEPT - 10’ TO 23’ ADJACENT TO R-2 5’ TO 10’ ADJACENT TO “O” DENSITY: 12 AND 36 DU/ACRES SLOMC = 45.12 DU’S BASE DENSITY PARKING REQUIRED: MULTI FAMILY 1 PER STUDIO/1BED, 2 PER 2BED/3BED NO GUEST SENIOR: .5 SPACES/ UNIT RETAIL: 1 PER 300SF RESTAURANT 1 PER100 SF PARKING REDUCTIONS: 20% FOR SHARED USE SECTION A SECTION B SECTION C SECTION D FRANK’S DOCTOR’S OFFICE SPLASH CAFEPETIT SOLEILMAMA GANACHE SINGLE FAMILY SINGLE FAMILY RESIDENCERESIDENCE SINGLE FAMILY SINGLE FAMILY RESIDENCERESIDENCE SINGLE FAMILY SINGLE FAMILY RESIDENCERESIDENCE ADUADU ADUADU ADUADU COMMERCIAL COMMERCIAL PARKING LOTPARKING LOT COMMERCIAL COMMERCIAL PARKING LOTPARKING LOT COMMERCIAL COMMERCIAL PARKING LOTPARKING LOT COMMERCIAL COMMERCIAL PARKING LOTPARKING LOT COMMERCIAL COMMERCIAL PARKING LOTPARKING LOT COMMERCIAL COMMERCIAL MULTI-TENANT MULTI-TENANT SPACESPACE COMMERCIAL COMMERCIAL CCB BREWERYCCB BREWERY COMMERCIAL COMMERCIAL MULTI-TENANT MULTI-TENANT SPACESPACE UNUSEDUNUSED PARKING LOT PARKING LOT SINGLE FAMILY SINGLE FAMILY RESIDENCERESIDENCE THE BUTLER 0 20 40 80 1” = 40’-0”11 X 17 SHEETA3March 29, 20211422 MONTEREY ST. PROPOSED SITE PLAN RETAIL/FLEX 3,500 SF RETAIL 2,400 SFCOMMON 4,000 SF RETAIL PLAZA RETAIL PLAZA RES. COURTYARD +2’ GROUND FLOOR UNITS +3’ FF GROUND FLOOR 39 SPACES SECOND FLOOR SIM.DRIVE AT 3RD FLOORDRIVE AT 2ND FLOORGROUND FLOOR UNITS +3’ FF RES. COURTYARD +2’6 GARAGES6 GARAGESSECTION A SECTION B SECTION C SECTION D STATS GROUND FLOOR: COMMON SPACE 4,000 SF FLEX SPACE 3,500 SF RETAIL/REST. 2,400 SF MULTI FAMILY BUILDING (5 STORIES) 13 3BED UNITS 13 2BED UNITS 20 1BED UNITS 2 STUDIOS 48 TOTAL UNITS DUPLEX (ASSUME COUNT TOWARD MF %) 4 TOTAL 1 BED UNITS SENIOR: 30 1BED UNITS 29 STUDIOS 59 TOTAL SENIOR UNITS TOTAL PROJECT DOORS: 111 RETAIL: 3,500 SF RESTAURANT 2,400 SF PARKING REQ’D: 12 RETAIL SPACES 24 RESTAURANT SPACES 30 SENIOR SPACES 78 MULTI-FAMILY 144 SPACES 20% REDUCTION = 115 SPACES PARKING PROVIDED: 12 GARAGES UNDER DUPLEXES 37 SPACES IN STRUCTURE LEVEL 1 37 SPACES IN STRUCTURE LEVEL 2 42 SPACES IN STRUCTURE LEVEL 3 128 SPACES DENSITY: = APPROX 75DU’S = 66% BONUSSECTION FSECTION F 0 20 40 80 1” = 40’-0”11 X 17 SHEETA4March 29, 20211422 MONTEREY ST. PROPOSED PALM STREET LEVEL COURTYARD BELOW FAMILY PROJECT SENIOR PROJECT COURTYARD BELOW THIRD FLOOR 42 SPACESDRIVE AT 3RD FLOORDUPLEXDUPLEXDRIVE AT 2ND FLOORSECTION A SECTION FSECTION FSECTION B SECTION C SECTION D STATS GROUND FLOOR: COMMON SPACE 4,000 SF FLEX SPACE 3,500 SF RETAIL/REST. 2,400 SF MULTI FAMILY BUILDING (5 STORIES) 13 3BED UNITS 13 2BED UNITS 20 1BED UNITS 2 STUDIOS 48 TOTAL UNITS DUPLEX (ASSUME COUNT TOWARD MF %) 4 TOTAL 1 BED UNITS SENIOR: 30 1BED UNITS 29 STUDIOS 59 TOTAL SENIOR UNITS TOTAL PROJECT DOORS: 111 RETAIL: 3,500 SF RESTAURANT 2,400 SF PARKING REQ’D: 12 RETAIL SPACES 24 RESTAURANT SPACES 30 SENIOR SPACES 78 MULTI-FAMILY 144 SPACES 20% REDUCTION = 115 SPACES PARKING PROVIDED: 12 GARAGES UNDER DUPLEXES 37 SPACES IN STRUCTURE LEVEL 1 37 SPACES IN STRUCTURE LEVEL 2 42 SPACES IN STRUCTURE LEVEL 3 128 SPACES DENSITY: = APPROX 75DU’S = 66% BONUS 0 20 40 80 1” = 40’-0”11 X 17 SHEETA5March 29, 20211422 MONTEREY ST. SITE SECTIONS EXISTING SECTION A PROPOSED SECTION A EXISTING SECTION B PROPOSED SECTION B EXISTING SECTION C PROPOSED SECTION C EXISTING SECTION D PROPOSED SECTION D 0 20 40 80 1” = 40’-0”11 X 17 SHEETA6March 29, 20211422 MONTEREY ST. CONTEXT SECTIONS PROPOSED SECTION F PROPOSED SECTION C WITH ADJACENT CONTEXT PLAZA PLAZA CALIFORNIA BLVD. MONTEREY ST. PALM ST. RAILROAD FRANK’SCOMMERCIALCOMMERCIALCOMMERCIAL COMMERCIAL TWO STORY COMMERCIAL SENIOR HOUSINGFAMILY HOUSINGFAMILY HOUSING SENIOR HOUSING SINGLE FAMILY RESIDENCE WITH ADU A7March 29, 20211422 MONTEREY ST. UNIT MIX PROGRAM MODEL RETAIL/FLEX 3,500 SF RETAIL 2,400 SF COMMON 4,000 SF RETAIL PLAZA RETAIL PLAZA RES. COURTYARD +2’ RES. COURTYARD +2’ FAMILY PROJECT SENIOR PROJECT A8March 29, 20211422 MONTEREY ST. UNIT MIX PROGRAM MODEL COMMON 4,000 SF FAMILY PROJECT SENIOR PROJECT T H I R D F L O O R 4 2 S P A C E S DRIVE A T 3 R D F L O O R DUPLEX (E) SFR (E) SFR APROXIM E N T L Y 1 1 0’ F R O M (E) SFR DUPLEX DRIVE AT 2 N D F L O O R A9March 29, 20211422 MONTEREY ST. CHARACTER AND CONTEXT IMAGES UPPER MONTEREY ST CONTEXT DOWNTOWN SLO CONTEXT A10March 29, 20211422 MONTEREY ST. SAN LUIS OBISPO CONTEXT INSPIRATIONAL IMAGERY CHARACTER AND CONTEXT IMAGES A11March 29, 20211422 MONTEREY ST. CONCEPT SKETCH