Loading...
HomeMy WebLinkAbout10/27/2021 Item 3a, FingerDear Planning Commission members, These comments are regarding the Bullock Ranch project. You have a once -ever opportunity in front of you for a development to connect (or block) the primary north -south multiuse trail in SLO. However, this is in jeopardy because the Bullock Ranch project is proposing to move the motor vehicle path into the trail location and move the trail into railroad right-of-way. As discussed by staff, railroad encroachment may not be approved, and this could lead to "deeming construction of the bike path to be infeasible". Instead, the trail and road alignments should be considered jointly. It is not ok to put the road where the bike trail belongs and just not build the bike trail. The problem is NOT with the bike trail location, but with the road location. The priority for both modes of transportation should be equal. The conditions of approval need to be re -written so that if "right-of-way negotiations with UPRR are unproductive" then the developer is responsible for revising the roadway and bike path alignments. Sincerely, Helene Finger, PE F.ASCE 21 SHADING LEGEND m srRe„ION s � e ePa,hia9ao�„,�ees� a Pwe=�e. � anomoo Lrsecn A C O a o' / lo �a BULLOCK m .„m Ikk �. .e, b. ------------------------ --- ----- .. — -----------------------------------------------------e -- _ RAILROAD § n;� g m an nva, IN:uI t lE '3 , m1— 11.z Bullock PRanch vesting Tentative Tract 3136 Preliminary Street Improvement Plan C-1