HomeMy WebLinkAboutHighland Bike Slot Bid _dkalCity of San Luis Obispo, Public Works, 919 Palm Street, San Luis Obispo, CA, 93401-3218, 805.781.7200, slocity.org
CITY OF SAN LUIS OBISPO
STATE OF CALIFORNIA
BID PROPOSAL
The City of San Luis Obispo is inviting bids for construction of a bike slot in the median on Highland
Street at Chorro Street. Please return your bid to Jennifer Rice at 919 Palm St. by 3:00 PM on
Wednesday, July 20, 2016. Bid may be submitted via fax to 805-781-7198, via email at
jrice@slocity.org, or in person at 919 Palm Street.
1. General Work Description
Construct two cuts in the median to allow bicycle access. Work to include demolition, curb work,
installation of A/C, installation of Shamrock Green STREETBONDCL, thermoplastic markings and
traffic signs per provided plan.
2. Plans and Specifications
The work embraced herein shall be done in accordance with the 2016 City of San Luis Obispo,
Department of Public Works, Standard Specifications and Engineering Standards, in conjunction
with the 2010 State of California, Department of Transportation Standard Specifications and
Standard Plans, the current California MUTCD, and the provided plan sheet.
Special Provisions for Bike Lane Coating:
A durable epoxy modified, acrylic, water based coating specifically designed for application on
asphalt pavements, such as Shamrock Green STREETBONDCL or approved equal shall be installed
by manufacture certified installer per manufacture's specifications as shown on the plans.
Bike lane coating shall conform to the following federal highway administration (FHWA)
requirements for green painted bike lanes.
A. The daytime chromaticity coordinates for the color used for green colored pavement shall be as
follows:
1 2 3 4
X Y X Y X Y X Y
.230 .754 .266 .500 .367 .500 .444 .555
The daytime luminance factor (y) shall be at least 7, but no more than 35.
B. The nighttime chromaticity coordinates for the color used for green colored pavement shall be as
follows:
1 2 3 4
X Y X Y X Y X Y
.230 .754 .336 .540 .450 .500 .479 .520
Prior to installation the contractor shall submit a color sample and manufacturer specifications
indicating compliance with the FHWA requirements as indicated above.
3. General Conditions
The contractor will be responsible for all material and labor to perform this work. The contractor
will be required to pull a no-fee Encroachment Permit and submit a traffic control plan for approval
before starting work.
Work hours will be restricted to the hours of 9:00 AM and 4:00 PM Monday thru Friday.
Total working days is hereby established as 10 working days.
After award and execution of the contract, the Contractor shall provide the City with a work
schedule within one week of award of purchase order.
4. Estimated Quantities and Pricing
Item Item Unit of Estimated Item Price Total
No. SS(1) Description Measure Quantity (in figures) (in figures)
1 15, 51,
56, 73, Bike Slot Installation LS* 1 -----
Bid Total $
Company Name:
* Quantities shown on contract document are for bidding purposes and actual quantities may be more or less. Lump sum
price is for a finished product as depicted in the contract documents and as directed by the engineer to conform to field
conditions.
(1) refers to section in the Standard Specifications, with modifications in the Special Provisions, that describe
required work.
If you have any questions prior to submitting your proposal please call Jennifer Rice at 805-781-
7058.
6/20/16
D-KAL Engineering, Inc.
$ 24,775.00
24,775.00
Bidder Acknowledgements
By signing below, the bidder acknowledges and confirms that this bid is based on the information
contained in all contract documents.
Licensed in accordance with an act providing for the registration of contractors, License No. ,
Expiration Date .
The above statement is made under penalty of perjury, and any bid not containing this information
"will be considered non-responsive and will be rejected” by the City.
Signature of Bidder
(Print Name and Title of Bidder)
Business Name (DBA):
Owner/Legal Name:
Indicate One: Sole-proprietor Partnership Corporation
List Partners/Corporate Officers:
Name Title
Name Title
Name Title
Business Address
Street Address
Mailing Address
City, State, Zip Code
Phone Number
Fax Number
Email Address
Date
Garrett Loughran | Secretary
David Loughran | President
Garrett Loughran | Secretary
D-KAL Engineering, Inc
D-KAL Engineering, Inc
538 Country Lane, San Luis Obispo, CA 93401
P.O. Box 1919, San Luis Obispo, CA 93406
P.O. Box 1919, San Luis Obispo, CA 93406
as above
805-543-7758
805-543-7759
info@dkaleng.com
07/25/16
653307
07/31/2018