HomeMy WebLinkAboutItem 6b. Review of Mixed Use Project 600 Tank Farm Road (2) Item 6b Department: Community Development Cost Center: 4003 For Agenda of: 2/1/2022 Placement: Public Hearing Estimated Time: 60 Minutes FROM: Michael Codron, Community Development Director Prepared By: John Rickenbach, Contract Planner SUBJECT: REVIEW OF MIXED-USE PROJECT INCLUDING 280 RESIDENTIAL UNITS & 12,500 SF OF COMMERCIAL, WITH ASSOCIATED EXCEPTIONS, SPECIFIC PLAN AMENDMENT, VESTING TENTATIVE PARCEL MAP, GENERAL PLAN AMENDMENT & REZONE, & ASSOCIATED FINAL ENVIRONMENTAL IMPACT REPORT. RECOMMENDATION 1. Adopt a Resolution (Attachment A) entitled, “A Resolution of the City Council of the San Luis Obispo, California, approving the 600 Tank Farm mixed -use development project, consisting of 280 residential units and 12,500 square feet of commercial/office space, including a creek setback exception, specific plan amendments, general plan map amendment, rezoning, and vesting common interest tentative parcel map #21 - 0015; and certifying the Final Environmental Impact Report for the project, as represented in the City Council agenda report and attachments dated February 1, 2022 (600 Tank Farm Road, PR-0005-2021, ARCH-0406-2021; SBDV-0407-2021; GENP-0814-2019; SPEC-0407-2020; EID-0608-2020).” 2. Introduce an Ordinance (Attachment B) entitled, “An Ordinance of the City Council of the City of San Luis Obispo, California, approving a rezone for property at 600 Tank Farm Road. The project includes amending the Zoning Map to change the zoning designation of the associated properties from Business Park (BP -SP) to Commercial Services (C-S-SP), respectively, and making associated text amendments to the Airport Area Specific Plan to be consistent with the 600 Tank Farm mixed -use development plan including adoption of a Final Environmental Impact Report , as represented in the City Council staff report and attachments dated February 1, 2022 (600 Tank Farm: PR-0005-2021, GENP-0814-2019, SPEC-0407-2020, EID-0608- 2020).” 3. Adopt a Resolution (Attachment C) entitled, “A Resolution of the City Council of the City of San Luis Obispo, California, approving a reimbursement agreement with Covelop, Inc. for specific infrastructure costs that are beyond the 600 Tank Farm mixed-use development project’s fair share requirements , as represented in the City Council agenda report and attachments dated February 1, 2022 (600 Tank Farm Road, PR-0005-2021, ARCH-0406-2021; SBDV-0407-2021; GENP-0814-2019; SPEC-0407-2020; EID-0608-2020) 4. . Page 217 of 495 Item 6b REPORT-IN-BRIEF The applicant, Covelop, Inc., proposes a new mixed-use development consisting of 280 residential units and up to 12,500 square feet of commercial-service/office uses within the Airport Area Specific Plan (AASP) area. The 11.7-acre project site is located at 600 Tank Farm Road, 130 feet northeast of the intersection of Tank Farm Road and Santa Fe Road, in the southern portion of the City of San Luis Obispo , and west of Acacia Creek. The project includes various off-site transportation improvements located in areas south and west of the parcel boundary to facilitate the project, including construction of a new roundabout at the Tank Farm Road and Santa Fe Road intersection , and advanced planning and design to lead towards construction of a future shared -use pedestrian/bike path on Tank Farm Road (to be constructed in the future by the City or others). Figure 1 shows the project site location. The project includes a mix of residential unit types including one-bedroom, two-bedroom, and three-bedroom units. The project developers are required to install significant onsite and offsite transportation improvements to serve the project and implement City plans. A reimbursement agreement is recommended to ensure these priority improvements are constructed in a timely manner. The reimbursements would come from multiple sources, including Local Revenue Measure1 for the City’s fair share, Transportation Impact Fee (TIF) credits for on-site development, and from TIF fees paid by neighboring projects that benefit from these infrastructure improvements, such as the 650 Tank Farm Road project and the Northwest Corner site (both at the building permit review phase). In addition, funding for the City’s share of the reimbursements would be allocated from the City’s Strategic Infrastructure Investment Fund and future Capital Improvement Plan budget allocations. These reimbursements are recommended based on the high priority of the transportation improvements to be installed. 1 Staff will be recommending the allocation of approximately $1.5 million in one time funding from Measure G to support housing and infrastructure consistent with the Revenue Enhancement Oversight Commission’s (REOC) funding priorities. The REOC is scheduled to consider the recommendation in late January 2021. Figure 1. Project Site Location Page 218 of 495 Item 6b The applicant has requested several design exceptions to various City standards supported by the Planning Commission related to creek setback requirements, a reduction in parking requirements, and fence heights. These requests are described more fully in the Discussion section of this report. The Tree Committee (September 2021) and the Architectural Review Commission (October 2021) reviewed the proposed project and recommended the Planning Commission find the project consistent with the City Tree Regulations, Airport Area Specific Plan (AASP), Community Design Guidelines (CDG), and other applicable City standards. On November 17, 2021, the Planning Commission reviewed the project and associated Final Environmental Impact Report (FEIR) and recommended certification of the FEIR and approval of the proposed project to the City Council based on the findings and conditions as outlined in the Draft Resolution (Attachment A), including minor modifications to Conditions 68 and 115, which address design elements intended to improve the safety and functionality of pedestrian circulation. Finally, the project will be providing more affordable housing than required by the City’s Inclusionary Housing Ordinance. The following table highlights the requirement for affordable housing and the additional Moderate Income – For Sale units that will be integrated into the project. The additional affordable housing was negotiated by City staff to address City Council direction for a significant affordable housing component when the Council authorized staff to process the entitlements. The additional affordable housing with the significant infrastructure improvements to be delivered by the project are in line with City affordable housing and infrastructure related Major City Goals. Table 1. Affordable Housing Requirements Site Details Proposed Required Affordable Units 11 Moderate-Income Units 1 Unit (Residential: build 5% low5 - and 10% moderate income ADUs, but not less than 1 ADU per project; Table 2A Adjustment Factor of 0 based on Ave. Unit Size <1,100 sq. ft.) 2 Units (Commercial: build 2 affordable units per acre (0.86 acres), but not less than 1 affordable unit per project) Page 219 of 495 Item 6b DISCUSSION Background & Project Details The applicant, Covelop, Inc., proposes a new mixed-use development consisting of 280 residential units and up to 12,500 square feet of commercial-service/office uses within the Airport Area Specific Plan (AASP) area. The project site is Road, 130 feet northeast of the intersection of Tank Farm Road and Santa Fe Road, in the southern portion of the City of San Luis Obispo, and west of Acacia Creek. The project site comprises of two parcels (Assessor Parcel Numbers [APN] 053-421-002 and 053-421-006) totaling approximately 11.7 acres. The project includes various off-site transportation improvements located in areas south and west of the parcel boundary to facilitate the project, totaling approximately 1.0 acre. The total project site area is 12.7 acres. The 280 residential units include shared public and private open spaces, common yards, and a 2,250-square foot clubhouse building with a 2,800 -square foot private patio area. The project includes a mix of residential unit types including, one-bedroom, two-bedroom, and three-bedroom units. Balconies and outdoor activity areas would be located on the north and east faces of the buildings to minimize exposure to vehicle noise from Tank Farm Road and aircraft flyovers from the San Luis Obispo County Regional Airport located south of the project site. The applicant’s project description (Attachment D) includes several requests for exceptions from various City development standards, as summarized below:  An exception is requested to allow a paved bike/pedestrian trail within the 35 -foot creek setback, in accordance with § 17.70.030.G.2.c;  An exception is requested to allow portions of Buildings 14, 19, and 21, to encroach within the creek setback to allow a 30-foot setback, where a 35-foot setback is normally required, in accordance with § 17.70.030.G.4;  An exception is requested to allow portions of Buildings 4, 8, 14, 19, and 21, to encroach within the upper-story creek setback2 to allow a 30-foot setback where a 45-foot setback is normally required, in accordance with § 17.70.030.G.4  An exception is requested to allow ground floor residential uses along Santa Fe Road on the ground floor within the first 50 feet of Buildings 7 and 9, in accordance with § 17.70.130.D.1.a;  A fence height exception is requested to allow a retaining wall with a maximum height of 15 feet, where 8 feet is normally the standard, in accordance with § 17.70.070.H; and  A 6.8 percent parking reduction is requested to reduce the required parking from 467 vehicle spaces to 435 spaces, in accordance with AASP Standards 5.4.5, 5.4.6, and 5.4.7. 2 Zoning Regulations § 17.70.030.E.3 Additional Upper Story Setbacks. Where the zone allows more than two stories, an additional 10-foot step back (upper story building setback) shall be provided beginning at the third story level. The upper story step back shall be provided along all building elevations with creek-facing frontage. Page 220 of 495 Item 6b These requests were evaluated in the Planning Commission (PC) agenda report (PC Report & Minutes 11.17.21), and were supported by the PC in its public hearing of November 17, 2021. The project includes a total of 25 three-story buildings and one single-story clubhouse, consisting of six building types. As shown in Figure 2, there are four residential building types proposed (shown as “Type A,” “Type B,” “Type C“, and “Type D”), and one mixed use building type (“Type E”) and the one clubhouse structure (“Type F”) (Attachment E, Project Plans). Table 2 below summarizes the unit types by size and distribution within the project site. Table 2. Project Characteristics To facilitate the project, the following entitlements are required: a General Plan Map Amendment, a Specific Plan Amendment to the AASP, a rezone of the property, a Vesting Common Interest Tentative Parcel Map, and Major Development Review. Approval of these entitlements would allow a final development plan (consistent with the granted entitlements). Unit Type Size (sf) Units Residential Area (sf) Non-Residential Area (sf) Acres (net) Units/Acre Townhomes and Cluster Units 750-1,450 140 154,000 n/a 6.5 21 Stacked Flats 600-925 100 85,700 n/a 2.9 34 Mixed Use (studio and 1-bed) 450-625 40 21,500 12,500 1.5 26 Total 450-1,450 280 261,200 12,500 10.9 25.7 sf = square feet Figure 2. Architectural Site Plan Page 221 of 495 Item 6b The proposed General Plan Map Amendment would change the land use designation of the property from Business Park (BP) to Services and Manufacturing (SM). This change is necessary to accommodate the zone change from Business Park (BP -SP) to Commercial Services (C-S-SP) within the AASP. Under the AASP and Zoning Regulations, the BP zone does not allow for residential densities; the zone change associated with the AASP text amendments would allow for a mixed -use development to occur within the property. The proposed Specific Plan Amendment to the AASP would include the following text amendments to address the mixed-use development (See Attachment B, Draft Ordinance Exhibit B), and associated site improvements specific to the project site: 1. Change the site’s land use designation from BP-SP to C-S-SP with the Specific Plan Overlay, which is necessary to allow the proposed mixed-use development; 2. Amendment to allow a mixed-use development specific to the property at 600 Tank Farm within the C-S-SP zone; 3. Amend all AASP tables and text to reflect the addition of 280 residential units, and 12,500 square feet of commercial-service/office space for the project site; 4. Modify the road section figures to reflect modifications to Tank Farm Road and Santa Fe Road consistent with traffic projections and full buildout of the circulation system; 5. Describe necessary setback of improvements and buildings to delineated wetland areas in conformance with project Biological Assessments; 6. Update applicable figures and graphics to reflect the changes in land use designations and circulations systems. A small portion on the east side of the property delineating a portion of Acacia Creek is within the Conservation Open Space (C/OS) zone, and this designation will remain unchanged. The Vesting Common Interest Tentative Parcel Map (SLO 21-0015) proposes to divide the two existing parcels into 11 common interest parcels (ranging in size from 0.44 to 1.90 acres) to establish 280 airspace condominiums (Attachment F). Page 222 of 495 Item 6b The project is planned to be constructed in two phases. Phase 1 would include 124 multifamily residential units on the central portion of the project site, the completion of Santa Fe Road along the project frontage, completion of the shared -use bicycle/pedestrian path along Acacia Creek connecting bicycles and pedestrians from Tank Farm Road to Damon-Garcia Sports Complex, construction of the Tank Farm Road/Santa Fe Road (west) roundabout (north, west and east legs with two westbound lanes and one eastbound lane), and the completion of frontage improvements along Tank Farm Road. Phase 2 would include 116 multifamily residential units, 40 mixed-use units, 12,500 square feet of commercial-service/office space, and remaining project improvements. The conceptual phasing plan has been provided on Sheet C2 of the project plans and is shown below in Figure 3, for quick reference. Transportation Improvements Proposed to be Constructed with the Project. The project would be required to construct several transportation improvements envisioned in the City’s General Plan Circulation Element, AASP and Active Transportation Plan (ATP), either as required mitigation or as conditions of approval per the circulation recommendations identified in the focused transportation impact study prepared for the project (refer to Attachment A, Draft Resolution for specific requirements). Improvements to be constructed by the project include: Figure 3. Conceptual Phasing Plan Page 223 of 495 Item 6b 1. Widening of Tank Farm Road along the project frontage on north side of street (provides two westbound auto lanes, landscaped parkway, westboun d protected bike lanes, and sidewalk). 2. Construction of a portion of the Santa Fe Road Extension north of Tank Farm Road (includes two travel lanes, landscaped parkway, northbound protected bike lane, southbound striped bike lane, and sidewalk on east side) 3. Construction of a roundabout at the intersection of Tank Farm Road and Santa Fe Road 4. Construction of the Acacia Creek Bikeway, a shared-use bicycle/pedestrian path along the western bank of Acacia Creek, connecting from the Damon Garcia Path network to Sante Fe and Tank Farm Roads. These improvements are included in the City’s list of Transportation Capital Projects in the General Plan Circulation Element and Active Transportation Plan , are shown in the AASP and are included in the project description. Stormwater runoff from these improvements would be directed to a planned retention basin at the northwest corner of the proposed roundabout. The anticipated area within which these required improvements would be constructed is identified in Final EIR Section 2, Project Description, Figure 2-2 on Page 2-3. Contribution Towards Other Transportation Improvements. In addition to constructing several transportation improvements, the project applicant would be providing a fair share contribution to several other high-priority transportation improvements identified in the General Plan Circulation Element, AASP and ATP. Through participation in the Citywide Transportation Impact Fee Program, the project would be contributing financially towards future widening of Tank Farm Road west of Santa Fe Road (to provide two lanes in each direction, a landscaped median, and shared-use pedestrian/bicycle paths), capacity and pedestrian/bicycle improvements at the Broad Street/Tank Farm Road intersection, and the Prado Road Interchange and Extension (between Higuera and Broad Streets). Further, the project applicant would be required to initiate focused planning and design work for a future shared-use pedestrian/bicycle path along Tank Farm Road from Santa Fe Road west to Innovation Way (4,700 feet west of Santa Fe Road), as identified in the City’s ATP and the CEQA Transportation Impact Analysis Memorandum and Multimodal Transportation Impact Study (included as Appendix B to the Final EIR). This requirement would be implemented through Condition No. 118 (Tank Farm Road Shared -Use Path), which articulates the intent for the applicant to provide preliminary design and planning analysis for the shared-use pedestrian/bicycle path, and a Reimbursement Agreement detailing the specific requirements of the applicant to support the future improvement. The goal of Conditions No. 113 (Transportation Impact Fees) and 114 (Reimbursement for Public Improvements) require a Reimbursement Agreement to advance planning of the shared-use pedestrian/bicycle path to a point where design details and right-of-way needs are determined to a sufficient level to allow the City or others can take this on as a capital improvement project in the near future. Page 224 of 495 Item 6b Previous Council or Advisory Body Action On April 21, 2020, the City Council approved the initiation of the project and authorized the issuance of a Request for Proposals (RFP) for the preparation of an Environmental Impact Report (EIR) for the project (Council Initiation and Minutes of 4.21.20). The Council also authorized the processing of an application for a Development Agreement (DA). A DA was expected to be necessary to accomplish additional affordable housing for the project and cover the significant issues surrounding the reimbursement for infrastructure expenditures. However, following initial negotiations, it was determined that both issue areas could be addressed without the need for a DA. While a Development Agreement can be an effective tool for accomplishing complicated project entitlements and to negotiate public benefits beyond those required by policy or law, in this case, the normal discretionary review process along with the reimbursement agreement were sufficient for accomplishing City Council direction provided at project initiation. Through 2020, the project was conceptually reviewed by the Architectural Review Commission (ARC), Active Transportation Committee (ATC) and Planning Commission (PC). Following conceptual review, the applicant revised the project in response to advisory body comments, and the revised project was analyzed in a Draft EIR and is the project now under consideration. A more detailed evaluation of the comments and recommendations from the initial City Council hearing and preliminary review by the ARC, ATC, Tree Committee (TC), Airport Land Use Commission (ALUC), and PC are summarized in Attachment G (Previous Council and Advisory Body Action and Comment Summary). After the City Council authorization, the project has been reviewed in draft or revised form ten times, as listed below. Council Initiation and Conceptual Review  April 21, 2020 - Council Initiation Report & Minutes  July 16, 2020 - Conceptual ATC Report & Minutes  August 17, 2020 - Conceptual ARC Report & Minutes  September 23, 2020 - Conceptual PC Report & Minutes EIR Scoping and Draft Review  December 9, 2020 - PC EIR Scoping & Minutes  July 14, 2021 - PC Draft EIR Review & Minutes Previous Advisory Body Review  August 18, 2021 – Airport Land Use Commission (ALUC) Report & Minutes  September 27, 2021 - TC Report & Minutes  October 4, 2021 - ARC Report & Minutes  November 17, 2021 - PC Report & Minutes Page 225 of 495 Item 6b As summarized in the PC Agenda Report from November 17, 2021, the applicant modified the project to reflect comments and recommendations from the ARC. The PC reviewed the revised the project and recommended approval to the City Council with minor modification to Conditions 68 and 115 but not otherwise recommending changes to the project. The modifications are as follows:  Condition 68. Revisions shown in strikeout or underlined text: “Unless otherwise waived by the City, the use of pervious pavers or alternate paving materials as visual cues for pedestrians should be expanded to include some of the more extensive parking areas serving the commercial lease spaces, common area/Club House, the central pedestrian crossroads area, and the northerly shared parking area on Lots 9 and 11 and the central area.”  Condition 115. Revisions shown in underlined text: “Tank Farm Road Frontage Improvements. Project applicant shall reconstruct the Tank Farm Road project frontage to current City Engineering Standards. Unless otherwise approved by the Public Works Director, plans submitted for Public Improvement Plans shall include widening the northern side of Tank Farm to a cross section that substantially conforms with the Airport Area Specific Plan and Active Transportation Plan, which includes the following typical cross section elements on the north half of the street: 5’ sidewalk / 7’ protected bike lane / 9’ parkway / curb and gutter / two westbound 12’-13’ auto lanes / raised median / one existing eastbound auto lane / existing eastbound bike lane. Designs shall be developed in coordination with the frontage improvements currently in development for the adjacent 650 Tank Farm Road development to ensure that appropriate geometric transitions. Improvements shall be approved or substantially approved to the satisfaction o f the Public Works and Community Development Departments prior to issuance of any building permits and improvements shall be completed prior to issuance of first occupancy permits.” Reimbursement Agreement Details The project will be constructing over $5 Million in infrastructure that is eligible for either credits against the project’s own Transportation Impact Fee requirement, or direct reimbursement from various sources. Attachment B of Exhibit 4 in the reimbursement agreement identifies the overall costs for public infrastructure to be constructed by the project and subject to reimbursement, as follows: Page 226 of 495 Item 6b The General Fund share of the reimbursement is $2.25 Million, which represents costs that exceed the developer’s fair share and cannot legally be reimbursed through the City’s Traffic Impact Fee program. This funding is recommended to be appropriated from the City’s Strategic Infrastructure Investment fund. A total of $715,000 from this fund was already appropriated as part of the 2021 -23 Financial Plan for the Tank Farm/Santa Fe Roundabout, which will support the initial design development phase of the project. The reimbursement agreement would then require staff to recommend appropriation of an additional $1.5 Million as part of either the 2021-22 Mid-Year Budget Review (to be presented to the City Council on February 15, 2022) or the 2021-23 Financial Plan Supplement (to be presented to the City Council in June 2022). If the Council appropriates the additional funding at that time, then the project could move forward into the construction phase once the infrastructure permits are issued. The reimbursement agreement is recommended for approval because it will result in the delivery of one of the most important transportation improvement projects iden tified in the City’s General Plan. The reimbursement agreement is a mutually beneficial agreement that allows the housing project to move forward without realizing significant carrying costs and uncertainty that would be the result if reimbursement for the se extra costs was not available in the near term. The infrastructure costs, if not appropriately reimbursed, would delay both the delivery of housing and important transportation infrastructure. Such projects are identified as “Partnership Projects” in the City’s Capital Improvement Plan and include important public benefits. Staff is recommending that the City Council adopt a resolution approving the proposed reimbursement agreement. Uses Santa Fe Road (Area 3)1 Tank Farm Road (Area 4)2 Acacia Creek Bike Path3 Tank Farm Bike Path PSE4 Total Design $ 30,306.93 $ 262,682.72 $ 36,024.83 $ 189,750.00 $ 518,764.49 Rights of Way $ 37,375.00 $ 525,500.00 $ - $ 562,875.00 Direct Expense $ 316,159.86 $ 2,837,596.79 $ 475,468.73 $ 3,691,275.04 Contingency $ 40,409.24 $ 350,243.63 $ 62,049.67 $ 37,950.00 $ 490,652.54 Total $ 424,251.02 $ 3,976,023.14 $ 573,543.23 $ 227,700.00 $ 5,201,517.39 Sources General Fund $ 254,550.61 $ 1,560,656.94 $ 376,005.65 $ 68,310.00 $ 2,259,523.21 Offsite Paid TIF5 $ 120,555.17 $ 1,715,876.15 $ 159,390.00 $ 1,995,821.32 $ 197,537.58 $ 197,537.58 Onsite TIF (Credits) $ 49,145.24 $ 699,490.05 $ 748,635.29 Total $ 424,251.02 $ 3,976,023.14 $ 573,543.23 $ 227,700.00 $ 5,201,517.39 4 30% of Costs from GF 1 60% of cost from GF; Balance from TIF 2 30% of Direct and Indirect Project Cost from GF; 100% of ROW from GF 3 100% of Non-Project Contributions from GF 5 Projected Fees from 660 Tank Farm and 3985 Broad Street Retail Pads Plusn 100% from 650 Tank Farm Road Direct Project Contribution Page 227 of 495 Item 6b Policy Context The proposed project must conform to the standards and limitations of the General Plan, AASP, and any applicable aspects of the Zoning Regulations, and Engineering Standards not otherwise addressed in the AASP that apply to the overall development plan approval including the subdivision component. The PC evaluated the project including recommendations provided by the ARC, and recommended that the Council find the project to be consistent with all applicable policies, related to the following regulatory framework:  General Plan  Airport Area Specific Plan  Zoning Regulations  Subdivision Regulations  Airport Land Use Plan  Affordable Housing Requirements The PC report from the November 17, 2021 hearing, provided an in depth analysis of the projects consistency with the regulatory framework, please see Section 4.0 of the PC Report and associated attachments. Project Statistics Table 3 summarizes the project’s consistency with key policy requirements in the context of various aspects of the proposed project design. Table 3. Project Characteristics and Requirements Site Details Proposed Allowed/Required* Density (net area 10.84 acres) 256.88 density units 24 du/ac (260 density units) Setbacks Street Setback (Buildings) Street Setback (Parking Lots) Side Yard (Parking Lots) 16 feet 10 feet 5 feet 16 feet 10 feet 5 feet Creek Setback Pathways Structures Upper-Story Step Backs 2 feet 30 feet 30 feet 35 feet 35 feet 45 feet Maximum Height of Structures Occupied Un-occupied 36 feet 46 feet 36 feet 46 feet Fence Heights 15 feet (max) 8 feet Floor Area Ratio 0.60 0.60 Max Lot Coverage 65.6% 90% Affordable Housing 11 units (moderate income) 3 units or In-lieu fees Public Art On-site (differed) On-site or In-lieu fee Page 228 of 495 Item 6b Table 3. Project Characteristics and Requirements Site Details Proposed Allowed/Required* Vehicle and Bicycle Parking Total # Parking Spaces EV Parking (Ready) EV Parking (Capable) Bicycle Parking Short Term Long Term Motorcycle Parking 435 (6.8% reduction) 48 117 63 563 23 467 48 117 63 563 23 *2019 Zoning Regulations; Airport Area Specific Plan (updated May 2021) PUBLIC ENGAGEMENT Consistent with the City’s Public Engagement and Noticing (PEN) Manual and the City’s Municipal Code, the project was noticed in compliance with the City’s notification requirements for Development Projects for each public hearing associated wi th the project. Newspaper legal advertisements were posted in the New Times ten days prior to the hearing. Additionally, postcards were sent to both tenants and owners of properties within 300 feet of the project site ten days before the hearing. CONCURRENCE The City’s review of the project involved all City departments in the development review process. Various conditions of approval from these departments were included in the Resolution related to the project approval, based on those conditions set for th in the Planning Commission Resolution related to this action, as modified as a result of Planning Commission recommendations. ENVIRONMENTAL REVIEW A Draft Environmental Impact Report (EIR) was prepared under the California Environmental Quality Act (CEQA) and circulated for a 50 -day public review period that began on June 15, 2021 and ended on August 3, 2021. In addition, a public meeting was held on Wednesday July 14, 2021, at a Planning Commission meeting to receive public comments on the Draft EIR. The City of San Luis Obispo received nine comment letters on the Draft EIR and five public comments during the public meeting. A Final EIR was prepared that addressed the comments, and responses to comments received are provided in Chapter 8 of the Final EIR. While there were several relatively minor changes in the Final EIR, none resulted in new impacts, or increased the severity of previously i dentified impacts. None of the clarifying information in the Final EIR warranted recirculation of the Draft EIR pursuant to CEQA. Page 229 of 495 Item 6b One impact (Impact HAZ-3) was found to be significant and unavoidable. The project would contribute to new pedestrian demand along Tank Farm Road west of the project site, which does not have dedicated pedestrian facilities. The potential increase in pedestrian demand would result in a potential hazard to pedestrians. The applicant will be required to reduce this impact by funding and installing interim signage along Tank Farm Road west of Santa Fe Road to highlight potential safety hazards to pedestrians along this connection. The signage shall remain in place until the future shared -use pedestrian/bicycle path along the north side of Tank Farm Road between Santa Fe Road and Innovation Way is constructed and open to the public , an improvement that is out of the control of the project applicant because it requires the consent and cooperation of the neighboring property owner. With that said, as noted above, the applicant will be conducting preliminary engineering and environmental review for a future shared -use path, which will expedite the potential for this to be constructed by the City or others as a future project. The Final EIR, including responses to comments on the Draft EIR, maybe be found at the following link: https://www.slocity.org/government/department-directory/community- development/documents-online/environmental-review-documents/-folder-2187 FISCAL IMPACT Budgeted: No Budget Year: 2021-22 Funding Identified: No Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund $N/A $ $ $ State Federal Fees Other: Total $ $ $ $ There will be no net fiscal impact related to approving the proposed project. To budget and appropriate the necessary Eligible Fees to provide reimbursements, including, but not limited to timely appropriation of General Fund amounts, and reservation of any Citywide Traffic Impact fees paid by Benefitting Properties. To this end, the City has appropriated $715,000 in the 2021-2023 Financial Plan that will cover design and the Tank Farm Bike Path Plans, Specifications and Estimates, and the City Manager presently intends to recommend that the City, subject to the City Council’s discretion in the exercise of its budgeting authority, appropriate at least an additional $1,544,600 during or prior to adoption of the 2022 Supplement to the Financial Plan to cover the costs of needed rights of way. No previously unanticipated fiscal impacts would occur as a result of this action. Page 230 of 495 Item 6b ALTERNATIVES 1. Continue consideration of the application to a future date. The Council may continue its review of the project to a date certain hearing if additional time or information is needed to make a decision. If additional information is needed, direction should be provided to staff so that it can be presented at that subsequent hearing. The Council may direct staff and the applicant to make specific changes to the project. Direction on changes should be specific and preferably within the scope of the environmental document prepared for the project. Changes beyond the scope of the IS/MND prepared for the project would require additional environmental review and delay the project entitlement process. 2. Deny the project. The Council may deny the project, based on findings of inconsistency with California State Law, the City’s General Plan, AASP, Zoning Regulations, Subdivision Regulations, or other policy documents. ATTACHMENTS A - Draft Council Resolution (Major Development Review, Tentative Parcel Map, General Plan Map Amendment, and FEIR) B - Draft Ordinance (AASP Text Amendments and Rezoning) C - Draft Resolution (Approving Reimbursement Agreement) D - Project Description (ARCH-0407-2021) E - Project Plans (ARCH-0407-2021 F - Vesting Common Interest Tentative Parcel Map #21-0015 G - Previous Council and Advisory Body Action and Comment Summary Page 231 of 495 Page 232 of 495 R _____ RESOLUTION NO. ______ (2022 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING THE 600 TANK FARM MIXED-USE DEVELOPMENT PROJECT, CONSISTING OF 280 RESIDENTIAL UNITS AND 12,500 SQUARE FEET OF COMMERCIAL/OFFICE SPACE, INCLUDING A CREEK SETBACK EXCEPTION, SPECIFIC PLAN AMENDMENTS, GENERAL PLAN MAP AMENDMENT, REZONING, AND VESTING COMMON INTEREST TENTATIVE PARCEL MAP #21 - 0015; AND CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT FOR THE PROJECT AS REPRESENTED IN THE CITY COUNCIL AGENDA REPORT AND ATTACHMENTS DATED FEBRUARY 1, 2022 (600 TANK FARM ROAD, PR-0005-2021, ARCH- 0406-2021; SBDV-0407-2021; GENP-0814-2019; SPEC-0407-2020; EID- 0608-2020) WHEREAS, the City Council of the City San Luis Obispo conducted a web based teleconference hearing on April 21, 2020, authorizing the initiation of the project and issuance of a request for proposals for preparation of an Environmental Impact Repor t for the project, pursuant to a proceeding instituted under GENP-0814-2019, Covelop Inc., applicant; and WHEREAS, the Active Transportation Committee of the City of San Luis Obispo conducted a web based teleconference hearing on July 16, 2020, and provid ed recommended direction on the conceptual designs of the proposed mixed -use development, pursuant to a proceeding instituted under ARCH-0216-2020, Covelop Inc., applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a web based teleconference hearing on August 17, 2020, and provided recommended direction on the conceptual designs of the proposed mixed -use development, pursuant to a proceeding instituted under ARCH-0216-2020, Covelop Inc., applicant; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web based teleconference hearing on September 23, 2020, and provided direction on the conceptual designs of the proposed mixed-use development, pursuant to a proceeding instituted under ARCH-0216-2020, Covelop Inc., applicant; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web based teleconference hearing on December 9, 2020, for the purposes of reviewing the scope of the Environmental Impact Report, pursuant to a proceeding instituted under GENP-0814-2019, SPEC-0407-2020, and EID-0608-2020, Covelop Inc., applicant; and Page 233 of 495 Resolution No. ______ (2022 Series) Page 2 R _____ WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web based teleconference hearing on July 14, 2021, received public testimony and provided input on the Draft Environmental Impact Report, pursuant to a proceeding instituted under ARCH-0406-2021, SBDV-0407-2021, GENP-0814-2019, SPEC-0407- 2020, and EID-0608-2020, Covelop Inc., applicant; and WHEREAS, the Airport Land Use Commission of the County of San Luis Obispo, upon receipt of a formal referral from the City of San Luis Obispo, conducted a web based teleconference hearing on August 18, 2021, and determined consistency with the San Luis Obispo County Regional Airport Land Use Plan subject to conditions, pursuant to a proceeding instituted under PR-0005-2020, Covelop Inc., applicant; and WHEREAS, the Tree Committee of the City of San Luis Obispo conducted a web based teleconference hearing on September 27, 2021, and provided recommendations for consideration by the Planning Commission including a recommendation of consistency with the City’s Tree Regulations, pursuant to a proceeding instituted under ARCH-0406-2021, Covelop Inc., applicant; and WHEREAS, the Architectural Review Commission of the City of San Luis Obispo conducted a web based teleconference hearing on October 4, 2021, and recommended approval of the project to the Planning Commission based on consistency with the Community Design Guidelines and Airport Area Specific Plan (AASP) Design Standards and Guidelines, including recommended directional items pursuant to a proceedin g instituted under ARCH-0406-2021, Covelop Inc., applicant; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web based teleconference hearing on November 17, 2021, pursuant to a proceeding instituted under ARCH-0406-2021, SBDV-0407-2021, GENP-0814-2019, SPEC-0407- 2020, and EID-0608-2020, Covelop Inc., applicant; and WHEREAS, the City Council of the City of San Luis Obispo conducted a web based teleconference hearing on February 1, 2022, pursuant to a proceeding instituted under ARCH-0406-2021, SBDV-0407-2021, GENP-0814-2019, SPEC-0407-2020, and EID-0608-2020, Covelop Inc., applicant; and WHEREAS, the City Council of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at said hearing; and WHEREAS, notices of said public hearings were made at the time and in the manner required by law; and Page 234 of 495 Resolution No. ______ (2022 Series) Page 3 R _____ NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of San Luis Obispo to certify the Final Environmental Impact Report (EIR), and to approve the General Plan Map Amendment, Rezone, Airport Area Specific Plan Amendment, Vesting Common Interest Tentative Parcel Map, and Major Development Review for the 600 Tank Farm Mixed Use Project. This resolution is based on the following findings, California Environmental Quality Act (CEQA) findings and Statement of Overriding Considerations, mitigation measures, and conditions: SECTION 1. Findings. The City Council does hereby certify the 600 Tank Farm Mixed Use EIR and approve the project, inclusive of applications ARCH-0406-2021; SBDV-0407-2021; GENP-0814-2019; SPEC-0407-2020; EID-0608-2020, a Specific Plan Amendment, General Plan Amendment/Rezoning, Vesting Common Interest Tentative Tract Map, and Final EIR, based on the following findings: General Plan Map Amendment and Airport Area Specific Plan Amendments Findings 1. The Airport Area Specific Plan (AASP) as amended is consistent with policy direction for the area included in the General Plan, and in particular with the following General Plan policies: Policy LUE Policy 1.5 Jobs/Housing Relationship, because the project provides additional housing opportunities at a location close to major employers and multimodal transportation facilities; LUE Policy 2.2.6 and 2.2.7, which promote quality neighborhoods and infill development, because the project is located within walking distance to MindBody Headquarters, SESLOC Credit Union, other nearby employers as well as retail uses and other services of the Marigold Shopping Center; and Circulation Element policies 3.1.7 Transit Service Access, 4.1.1 Bicycle Use, and 5.1.2 Sidewalks and Paths, because SLO Transit Routes 1 and 3 provide service to the project site area and because the project would provide improvements to bicyclist and pedestrian facilities in the project area. 2. The AASP Amendment, General Plan Map Amendment, and Rezone allow the implementation of the 600 Tank Farm Road Mixed -Use Project by: a. Updating the City’ s General Plan and Specific Plan land use maps from Business Park to Services Manufacturing to reflect the development pattern included in the 600 Tank Farm Mixed-Use development plan; b. Rezoning the site from Business Park (BP-SP) to Commercial Services (C- S-SP) to be consistent with the General Plan, Specific Plan, and development plan. 3. As conditioned, the County of San Luis Obispo Airport Land Use Commission, on August 18, 2021, found the proposed project to be consistent with the Airport Land Use Plan. 4. The proposed General Plan Map Amendment and AASP Amendments will not conflict with easements for access through the property. Page 235 of 495 Resolution No. ______ (2022 Series) Page 4 R _____ Development Review Findings 5. The project will not be detrimental to the health, safety, and welfare of persons living or working at the site or in the vicinity because the project will be compatible with site constraints and the scale and character of the neighborhood. 6. The proposed project is consistent with Land Use Element Policy 2.3.6 “Housing and Businesses” and 3.8.5 “Mixed Uses” because future development facilitated by the proposed project would provide residential dwellings within a commercial district near neighborhood commercial centers, major activity nodes and transit opportunities. Housing at this location is compatible with proposed and existing commercial and residential uses on adjacent properties. 7. The project is consistent with Conservation and Open Space Element Policy 4.4.3 because the project promotes higher-density, compact housing to achieve more efficient use of public facilities and services and to improve the jobs/housing balance. 8. As conditioned, the project design maintains consistency with the City’s Community Design Guidelines and Chapter 5 (Community Design) of the AASP through articulation, massing, and a mix of color/finish materials that are compatible with the neighborhood and complementary to other development within the immediate vicinity. The project design is consistent with the Community Design Guidelines by providing a variety of architectural treatments that add visual interest and articulation to the building design that complements the design and scale of the existing structures in the surrounding neighborhood (CDG, Chapter 5.4). 9. The proposed height, mass and scale of the project will not negatively alter the overall character of the neighborhood or the street’s appearance because the development is designed in a manner that does not deprive reasonab le solar access to adjacent properties. The project incorporates vertical and horizontal wall plan offsets, which provide a high-quality and aesthetically pleasing architectural design. Mixed-use Project Findings 10. As conditioned, the project is consistent with the Zoning Regulations for Mixed- Use Projects (Section 17.70.130), because the proposed building design complies with objective design criteria and performance standards for mixed -use development by providing internal compatibility between the different uses in terms of noise, hours of operation, vehicle and pedestrian circulation, access, and use of open space. Page 236 of 495 Resolution No. ______ (2022 Series) Page 5 R _____ Creek Setback Exception Findings 11. The location and design of the Buildings 4, 8, 14, 19, and 21, and the proposed bike/pedestrian path receiving the exception will minimize impacts to scenic resources, water quality, and riparian habitat, including opportunities for wildlife habitation, rest, and movement, because the project includes the implementation of Mitigation Measures BIO-1(a) through BIO-2(e). 12. As conditioned, the exceptions for portions of Buildings 14, 19, and 21 to reduce the setback requirement to 30 feet, where 35 feet is normally required, and for portions of the upper story setbacks for Buildings 4, 8, 14, 19, and 21 to reduce the setback requirement to 30 feet, where 45 feet is normally required, as well as the proposed bike path within the creek setback will not limit the City’s design options for providing flood control measures that are needed to achieve adopted City flood policies. 13. The exceptions will not prevent the implementation of City-adopted plans, nor increase the adverse environmental effects of implementing such plans because the proposed bike/pedestrian path is designed in accordance with the Active Transportation Plan. 14. There are circumstances applying to the site, such as a greater creek setback requirement than other properties in the vicinity, that would deprive the property of privileges enjoyed by other property in the vicinity with the same zoning. 15. The exceptions will not constitute a grant of special privilege because the bike/pedestrian path is envisioned with the Active Transportation Plan to provide a connection to the Damien Garcia Sports Fields, and the exceptions for Buildings 4, 8, 14, 19, and 21 are considered minor. 16. The exception will not be detrimental to the public welfare or injurious to other property in the area of the project or downstream, because the project includes the implementation of Mitigation Measures BIO-1(a) through BIO-2(e). 17. A larger creek setback within the project design is not possible without a substantial project redesign that could adversely affect site circulation, safety, functionality, and the provision of housing consistent with City goals. Placement of Residential Units Along Street Frontage Findings 18. The allowance of ground-floor residential units within the first 50 feet of floor area adjacent to the street for Buildings 3, 7, and 9, will not negatively alter the overall character of the neighborhood or the streets appearance because primary commercial activities in the neighborhood are oriented toward the intersection of Tank Farm Road and Santa Fe Road. 19. The majority of residential uses within the project are outside the 60 -decbel noise contour from Tank Farm Road or are otherwise shielded by the commercial mixed use structure adjacent to Tank Farm Road. Page 237 of 495 Resolution No. ______ (2022 Series) Page 6 R _____ 20. Those residences within the structures adjacent to Santa Fe Road can meet state and local interior noise standard of 45 decibels through a project design that that includes building materials and windows that attenuate noise to achieve this standard. 21. The residential units within the project would enhance the pedestrian environment, in that those residents would be adjacent to commercial development, which encourages walking to such services, rather than taking a vehicle to a similar commercial establishment elsewhere in the City. Moreover, front doors that face the street would encourage direct pedestrian access to Santa Fe Road, which is consistent with the City‘s goal of providing multimodal transportation facilities. Fence Height Exception Findings 22. As conditioned, the proposed height of 15 feet for the retaining wall along the west property line between the Santa Fe Road cul-de-sac and Building 26 is acceptable because the fence provides adequate security and safety for circulation of the site due to the drop in grade. 23. As conditioned, the proposed fence’s design, placement, and materials are consistent with the Community Design Guidelines because it is of the same quality as adjacent structures and fences in the vicinity. 24. No public purpose is served by strict compliance with the City’s fence height standards because the retaining walls will not create a visible or tangible obstruction between properties or the public right -of-way because the retaining walls are predominantly visible from within the project site that provides necessary access and circulation for the project. 25. As conditioned, the fences will not have any sight distance impacts for vehicles entering and exiting properties since there is a dequate clearance between the retaining walls and the entrances to the street. Parking Reduction Findings 26. The proposed 6.8 percent vehicle parking reduction is appropriate for the site because the project is located within a quarter mile of a regularly scheduled transit stop, consistent with AASP Standard 5.4.5 which qualifies for a reduction up to 10 percent. 27. As conditioned, the project qualifies for a 6.8 percent parking reduction in accordance with Zoning Regulations Section 17.72.050.C and the Institute of Transportation Engineers Parking Demand, where the peak hours of use will not overlap or coincide to the degree that peak demand for parking spaces from all uses or projects will be greater than the total supply of spaces. Page 238 of 495 Resolution No. ______ (2022 Series) Page 7 R _____ Vesting Common Interest Tentative Parcel Map Findings 28. As conditioned, the proposed subdivision, together with the provisions for design and improvement, is consistent with the General Plan, including compatibility with objectives, policies, general land uses, and programs specified in the General Plan and the AASP because Housing Element Program 6.13 specifically identifies the project site as appropriate for rezoning to provide for higher-density or mixed-use housing as compatible with other projects in the vicinity. 29. The design of the project is consistent with the City’s Clean Energy Choice Program that provides for future natural heating, or cooling opportunities. 30. As conditioned, the applicant has agreed to an indemnification clause to defend, indemnify and hold harmless the City and/or its agents, officer s and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this project, and all actions relating thereto, including but not limited to environmental review (“Indemnified Claims”).The site is physically suited for the type and density allowed in the Service Commercial zone (C-S-SP) within the Specific Plan overlay, because the adjacent property at 650 Tank Farm is also zoned C -S-SP and provides for a similar mixed-use development project. 31. The design of the tentative map is not likely to cause serious health problems, substantial environmental damage, or substantially and unavoidably injure fish or wildlife or their habitat, since the subdivision will occur on a previously developed site within an urbanized area and, approval of this subdivision does not include variances or exceptions from applicable design standards set forth in the Subdivision Regulations. 32. The project will not be detrimental to the health, safety, or welfare of those living or working on the site and vicinity since it has been found in conformance with development standards and the Airport Area Specific Plan (AASP), and the project will be compatible with site constraints and the scale and character of the site and the surrounding neighborhood. 33. As conditioned, the design of the subdivision will not conflict with easements for access through, or use of property within, the proposed subdivision since any existing easements will remain in place following the subdivision and will be applicable to the newly-created parcels; and code requirements require the recordation of new easements and the relocation of utilities wherever necessary to the satisfaction of the Community Development Director and Public Works Department Director. 34. As conditioned, the proposed subdivision will not be detrimental to the health, safety, or welfare of those working or residing in the vicinity. The property is not subject to fault rupture or landslide hazards. As a Common Interest Subdivision, the project is subject to architectural review and enforcement of relevant building and safety codes. Page 239 of 495 Resolution No. ______ (2022 Series) Page 8 R _____ 35. The project is consistent with Housing Element Policies 6.1 and 7.4 because the project supports the development of more housing in accordance with the assigned Regional Housing Needs Allocation and establishes a new neighborhood, with pedestrian and bicycle linkages that provide direct, convenient and safe access to adjacent neighborhoods consistent with the AASP. SECTION 2. California Environmental Quality Act (CEQA) Findings, Mitigation Measures, and Mitigation Monitoring Program. Based upon all the evidence, the City Council certifies the Final Environmental Impact Report (FEIR) (State Clearing House #2020110426), subject to the following CEQA findings in support of all entitlements related to the 600 Tank Farm Mixed Use project: 1. The 600 Tank Farm Mixed Use Final Environmental Impact Report (Final EIR) was prepared in accordance with the California Environmental Quality Act (CEQA) and the State CEQA Guidelines, adequately addressing impacts associated with the project. 2. The proposed project is consistent with the requirements of the 600 Tank Farm Mixed Use FEIR as proposed based on the CEQA Findings and Statement of Overriding Considerations, and prepared consistent with CEQA Guidelines Sections 15091 and 15093, and this approval incorporates those FEIR mitigation measures as applicable to Vesting Common Interest Tentative Parcel Map #21 - 0015, as detailed below, and described more fully in the attached CEQA Findings of Fact and Statement of Overriding Considerations (Exhibit A) and Mitigation, Monitoring, and Reporting Program (Exhibit B). 3. All potentially significant effects were analyzed adequately in the referenced FEIR, and reduced to the extent feasible, provided identified mitigation measures are incorporated into the project and the mitigation monitoring program (refer to Exhibit B, Mitigation Monitoring and Reporting Program). SECTION 3. Action. The project conditions of approval do not include mandatory code requirements. Code compliance will be verified during the plan check process, which may include additional requirements applicable to the project. The City Council hereby approves the project to the City Council with incorporation of the following conditions: Planning Division 1. Final project design and construction drawings submitted for a building permit shall be in substantial compliance with the project plans approved by the Planning Commission (ARCH-0406-2021). A separate, full-size sheet shall be included in working drawings submitted for a building permit that lists all conditions and code requirements of project approval listed as sheet number 2. Reference shall be made in the margin of listed items as to where in plans requirements are addressed. Any change to approved design, colors, materials, landscaping, or other conditions of approval must be approved by the Director or Architectural Review Commission, as deemed appropriate. Page 240 of 495 Resolution No. ______ (2022 Series) Page 9 R _____ 2. Plans submitted for a building permit shall incorporate the design considerations as described at the ARC hearing on October 4, 2021, the final designs of the proposed project shall be modified to incorporate the following items, subject to the satisfaction of the Community Development Director: a. Provide one more color scheme for Building A types. b. Incorporate balcony railings that provide more privacy; 66%-75% solid panels to screen views. c. On the Building B rear elevation provide white garage doors rather than gray to blend in more. d. Provide more planting or other visual indicators for pedestrians and traffic calming (referencing the red arrow shown on sheet A10 descending from Santa Fe Road) e. Use landscaping to reduce massing of Building E. f. Provide well thought out pedestrian-scale elements. 3. Plans submitted for a building permit shall call out the colors and materials of all proposed building surfaces and other improvements. Colors and materials shall be consistent with the color and material board submitted with Major Development (Architectural) Review application. The project shall avoid repetition of design color schemes, such that adjacent townhomes or buildings of a similar layout use different color schemes. The applicant shall also note the use of smooth f inish stucco on the building plans to the satisfaction of the Community Development Director. 4. Plans submitted for a building permit shall include recessed window details or equivalent shadow variation, and all other details including but not limited to awnings and railings. Plans shall indicate the type of materials for the window frames and mullions, their dimensions, and colors. Plans shall include the materials and dimensions of all lintels, sills, surrounds recesses and other related window features. Plans shall demonstrate the use of high-quality materials for all design features that reflect the architectural style of the project and are compatible with the neighborhood character, to the approval of the Community Development Director. 5. Plans submitted for a building permit shall include a revised railing system for the balconies that provides a design that visually obscures views of storage on the balconies and provides additional privacy between existing and new residential units, subject to the satisfaction of the Community Development Director. 6. The property owner shall be responsible for maintaining and updating the current parking calculation for the commercial component of the project upon the submittal of Planning and Building permits for tenant changes or improvements, and/or each business license, to ensure the site does not become under-parked. 7. All surface parking spaces must be available for common use and not exclusively assigned to any individual use, required residential parking may be reserve d, but commercial parking must be made available for guests or overflow from residences. Page 241 of 495 Resolution No. ______ (2022 Series) Page 10 R _____ 8. Plans submitted for a building permit shall clearly depict the location of all required short and long-term bicycle parking for all intended uses, plans submitted for construction permits shall include bicycle lockers or interior space within each residential unit or parking area for the storage of at least two bicycle per residential unit. Short-term bicycle racks such as “Peak Racks” shall be installed in close proximity to, and visible from, the main entry into the buildings (inverted “U” rack designs shall not be permitted). Sufficient detail shall be provided about the placement and design of bike racks and lockers to demonstrate compliance with relevant Engineering Standards and Community Design Guidelines, to the satisfaction of the Public Works and Community Development Directors. 9. Plans submitted for building permit shall include a photometric plan, demonstrating compliance with maximum light intensity standards not to exceed a maintained value of 10 foot-candles. The locations of all lighting, including bollard style landscaping or path lighting, shall be included in plans submitted for a building permit. All wall-mounted lighting fixtures shall be clearly calle d out on building elevations included as part of working drawings. All wall-mounted lighting shall complement building architecture. The lighting schedule for the building shall include a graphic representation of the proposed lighting fixtures and cut -sheets on the submitted building plans. The selected fixture(s) shall be shielded to ensure that light is directed downward consistent with the requirements of the City’s Night Sky Preservation standards contained in Chapter §17.70.100 of the Zoning Regulations. 10. Mechanical and electrical equipment shall be located internally to the buildings. With submittal of working drawings, the applicant shall include sectional views of the buildings, which clearly show the sizes of any proposed condensers and other mechanical equipment. If any condensers, transformers, or other mechanical equipment are to be ground mounted or placed on the roof, plans submitted for a building permit shall confirm that these features will be adequately screened. A line-of-sight diagram may be required to confirm that proposed screening will be adequate. This condition applies to initial construction and later improvements. 11. The storage area for trash and recycling cans shall be screened from the public right-of-way consistent with §17.70.200 of the Zoning Regulations. The subject property shall be maintained in a clean and orderly manner at all times; free of excessive leaves, branches, and other landscape material. The applicant shall be responsible for the clean-up of any landscape material in the public right-of-way. 12. A final landscaping plan, including irrigation details and plans, shall be submitted to the Community Development Department along with working drawings. The legend for the landscaping plan shall include the sizes and speci es of all groundcovers, shrubs, and trees with corresponding symbols for each plant material showing their specific locations on plans. Landscaping plans shall include the following information, at a minimum: Page 242 of 495 Resolution No. ______ (2022 Series) Page 11 R _____ a. The species, diameter at breast height, location, and condition of all existing trees; b. Identification of trees that will be retained, removed, or relocated; c. Location and size of plant and tree species proposed to be planted; d. The location of proposed utilities, driveways, street tree locations, a nd the size and species of proposed street trees; and e. A reclaimed water irrigation plan. 13. Plans submitted for construction permits shall include elevation and detail drawings of all walls and fences. Fences, walls, and hedges will comply with the development standards described in the Zoning Regulations (§17.70.070 – Fences, Walls, and Hedges), except those identified in the Wall Height Exception attached to the staff report dated November 17, 2021. Walls and fences should remain as low as possible, long expanses of fence or wall surfaces shall be offset and architecturally designed to prevent monotony. Evergreen ivy shall be planted along the downslope side of all retaining walls that exceed 6 -feet in height, planting of ivy shall be spaced out at a minimum of every 15 feet along the retaining walls, to the satisfaction of the Community Development Director. 14. The location of any required backflow preventer and double -check assembly shall be shown on all site plans submitted for a building permit, including the landscaping plan. Construction plans shall also include a scaled diagram of the equipment proposed. Where possible, as determined by the Utilities Director, equipment shall be located inside the building within 20 feet of the front property line. Where this is not possible, as determined by the Utilities Director, the back - flow preventer and double-check assembly shall be located in the street yard and screened using a combination of paint color, landscaping and, if deemed appropriate by the Community Development Director, a low wall. The size and configuration of such equipment shall be subject to review and approval by the Utilities and Community Development Directors. 15. Prior to building permit issuance, the applicant shall submit an application and receive approval for the installation of public art as part of the project or pay the in - lieu fee (Municipal Code §17.32.030.E.5.b.(ii).(g)). Public art shall be installed prior to occupancy of the project, to the satisfaction of the Community Development Director. 16. The design of proposed structures will incorporate noise attenuating construction techniques that reduces noise exposure to acceptable levels. Exposure in outdoor activity areas must not exceed 60 dB and indoor exposure must not exceed 45 dB consistent with the City’s Noise Ordinance. Plans submitted for construction permits must clearly indicate and describe noise attenuation measures, techniques, and materials, and demonstrates their compliance with noise levels limits. Page 243 of 495 Resolution No. ______ (2022 Series) Page 12 R _____ 17. Prior to building occupancy, the owner of the property shall provide a Residential Noise Notice in writing for residential occupants stating that the property is located within a commercial zone in an urban-type environment and that noise levels may be higher than a strictly residential area. 18. Plans submitted for a building permit shall ensure consistency with the Airport Land Use Commission’s (ALUC) conditions from the August 18, 2021 hearing. Any increase in the number of dwelling units or commercial square footage shall be referred to the ALUC for determination of consistency with the Airport Land Use Plan (ALUP). The project is subject to the following ALUC conditions; a. The average density/intensity for the site shall not exceed 75 persons per acre. b. The densest portion of the site (southwest 1 acre containing the two mixed- use buildings) shall have an intensity not to exceed 150 persons per acre. c. The maximum height limit of structures on the Project site shall not exceed 36 feet for any occupied structures, and 46 feet for any non-occupied architectural features. The construction plans for the proposed dwelling shall be submitted via FAA Form 7460-1 to the Air Traffic Division of the FAA regional office having jurisdiction over San Luis Obispo County at least 45 days before proposed construction or application for a building permit, to determine compliance with the provisions of FAR Part 77. d. The Project shall comply with all noise policies as required by the ALUP. e. No structure, landscaping, apparatus, or other feature, whethe r temporary or permanent in nature shall constitute an obstruction to air navigation or a hazard to air navigation, as defined by the ALUP. f. Any use is prohibited that may entail characteristics which would potentially interfere with the takeoff, landing, or maneuvering of aircraft at the Airport, including: • Creation of electrical interference with navigation signals or radio communication between the aircraft and airport; • Lighting which is difficult to distinguish from airport lighting; • Glare in the eyes of pilots using the airport; • Uses which attract birds and create bird strike hazards; • Uses which produce visually significant quantities of smoke; and • Uses which entail a risk of physical injury to operators or passengers of aircraft (e.g., exterior laser light demonstrations or shows). g. Avigation easements shall be recorded for each property developed within the Project site prior to the issuance of any building permit or land use permit. h. All owners, potential purchasers, occupants (whether as owners or renters), and potential occupants (whether as owners or renters) shall receive full and accurate disclosure concerning the noise, safety, or overflight impacts associated with Airport operations prior to entering any contractual obligation to purchase, lease, rent, or otherwise occupy any property or properties within the Airport area. Page 244 of 495 Resolution No. ______ (2022 Series) Page 13 R _____ 19. Any new proposed signage in addition to the monument sign shall be reviewed by the Planning Division to ensure appropriateness for the site and compliance with the Sign Regulations. Signage shall coordinate with building architecture and the type of land use. The Director may refer additional signage to the ARC if it seems excessive or out of character with the project. Housing Programs – Community Development Department 20. Prior to the issuance of construction permits, the city and the project owners shall enter into an Affordable Housing Agreement, to be recorded in the office of the county recorder. The agreement shall specify mechanisms or procedures to assure the continued affordability and availability of 11 units (three studios, six 1 - bedrooms, and two 2-bedroom units) to moderate income households that is of the same size, appearance and basic quality as the market-rate units, to the satisfaction of the Community Development Director. Engineering Division – Public Works/Community Development 21. The development project plans shall be in accordance with the approved tentative map and any mitigation measures or conditions of approval related to Vesting Common Interest Tentative Parcel Map SLO 21-0015 (SBDV-0407-2021) and the certified Final EIR and approved Mitigation Monitoring and Reporting Program. 22. The public and subdivision improvements related to this development shall be approved or substantially approved to the satisf action of the Public Works and Community Development Departments prior to building permit issuance for the development project. 23. Construction and/or improvement phasing, if proposed, shall be approved to the satisfaction of the directors of Community Development, Public Works, and Utility Departments. 24. Final roadway alignment shall be substantially in conformance with the AASP, Active Transportation Plan, and City Engineering Standards except where the applicant has requested and been granted a formal design exception by the Public Works Director or designee. 25. A separate public improvement/subdivision improvement plan application, review fee, and inspection fee will be required in accordance with the Engineering fee schedule in effect at the time of plan submittal. The plans and supporting documents shall be in accordance with the codes and standards in effect at the time of application. 26. A separate demolition permit will be required for the removal of any existing non - exempt structures, if applicable. Page 245 of 495 Resolution No. ______ (2022 Series) Page 14 R _____ 27. The improvement plans and building plan submittals shall include a complete topographic survey and/or existing site development plans showing all existing structures, site improvements, utilities, water wells, private waste disposal systems, tanks, and trees, if applicable. The plan shall clarify the limits of the demolitions and improvements to remain. 28. The plans shall include a complete tree summary show the diameter and species of all trees. The plans shall clarify the trees to remain and the trees to be removed. Trees to remain may require a tree preservation plan per City Engineering Standards. 29. Invasive plant species, if discovered along the Acacia Creek corridor or on site shall be removed or eradicated to the satisfaction of the Planning Division and Natural Resources Manager. 30. Agency permits required for any work within the creek corridor shall be secured prior to commencing with any demolitions, grading, and construction within the jurisdictional areas. Any jurisdictional permits and/or authorizations and/or authorizations from the Army Corps of Engineers, California Department of Fish and Wildlife, U.S. Fish and Wildlife Service, or Regional Water Quality Control Board required for the drainage, site improvements, street and road improvements shall be issued prior to plan approval and/or commencing with work within the respective waterways. Permit conditions shall be reflected on the approved plans and/or development submittal supporting documents. 31. A SWPPP and Waste Discharger Identification Number (WDID) shall be issued and referenced on the grading, erosion control, and stormwater control plan sheets prior to plan approval and permit issuance. 32. The site development plan and grading plan shall show and honor the entitled design for the pedestrian and emergency vehicle access across Acacia Creek to 650 Tank Farm Road. 33. A reciprocal access agreement with 650 Tank Farm Road shall be recorded to provide continuity for the pedestrian/bikeway accessways. The agreement shall be recorded in junction with the parcel map recordation and/or prior to building permit issuance for the development project. 34. Unless an alternate design is approved by the Planning Division and the Public Works/Transportation Division, the proposed bike and pedestrian walks and pathways shall be designed and constructed of Portland Cement Concrete per City Engineering Standards. 35. The final site and stairway designs shall verify that required handrail extensions will not project into walkways and the bikeway or required 2’ shoulder areas. 36. The limits of demolitions, culvert removal, rubble removal, and creek cleaning/restoration in the area of the existing Acacia Creek crossing and access easement shall be approved to the satisfaction of the City Biologist and Natural Resources Manager. Page 246 of 495 Resolution No. ______ (2022 Series) Page 15 R _____ 37. Depending upon project timing through this corridor of Tank Farm Road, off -site improvements currently proposed with the mixed-use development located at 650 Tank Farm Road may be required to accommodate motor vehicle, bike, and pedestrian circulation improvements and their transitions to the existing improvements. 38. The applicant/developer may request that the City support a private reimbursement agreement for certain off -site improvements or infrastructure oversizing that are considered to be in excess of those required to support the proposed development. 39. If applicable for any off-site improvements, the limits of improvements within the creek corridors required for the Tank Farm Road widening shall be approved by the Public Works Director in collaboration with the City Biologist and Natural Resources Manager. Additional silt and debris removal may be required within the culverts and at their downstream outlets. 40. The development plans, building plans, grading/drainage plans, and public improvement plans shall show and note compliance with the City’s Drainage Design Manual, Floodplain Management Regulations, and Post Construction Stormwater Regulations (PCRs). 41. The project plans and reports shall show that the new structures will be located outside of the Special Flood Hazard Area (SFHA) and shall be constructed with finish floors at least 1’ above any established Base Flood Elevation(s). A Conditional Letter of Map Revision (CLOMR) shall be processed and approved prior to grading or placement of fill within the SFHA. The final Letter of Map Revision (LOMR) shall be processed within 6 months after the completion of grading and shall be finally approved prior to building permit issuance for any structures located within the existing and unamended SFHA. 42. The grading and drainage plan and associate reports shall evaluate the run -on from the adjoining “flower mound”. The plan and analysis shall evaluate how any run-on will be collected and conveyed to a non-erosive outlet. 43. The grading and drainage plan shall evaluate the run-off from the development improvements, including any run-off from the partial/interim development of Santa Fe, Tank Farm Road, and the round-a-bout. The analysis shall include both water quantity and water quality treatment. 44. This project site shall include the private and public improvements related to this common plan for evaluation of the PCRs. All off-site altered or replaced impervious surfaces related to the development of the Santa Fe extension, round -a-bout improvements, and Tank Farm Road improvements shall be included as Drainage Management Areas (DMAs) with appropriate water quality treatment and retention strategies. Temporary basins or Storm Water Control Measures (SCMs) may be proposed. Page 247 of 495 Resolution No. ______ (2022 Series) Page 16 R _____ 45. Any off-site easements or easement agreements required for the proposed improvements and SCM’s shall be recorded prior to plan approvals. A separate grading permit and encroachment permits may be required from the County of San Luis Obispo for work or construction staging that occurs outside the city limits or within the County public right-of-way. 46. An Operation and Maintenance Manual will be required with the improvement and building permit application submittals. A separate Private Stormwater Conveyance Agreement shall be recorded prior to approvals. 47. Unless specifically approved by the Public Works Department all stormwater control measures (SCMs) shall be located on private property and shall be maintained by the property owner, a Property Owner Association, or Homeowner Association. 48. Any SCMs approved for location within an existing or future public right -of-way may require an encroachment and maintenance agreement with the city and/or County unless the City or County agree to any maintenance. 49. Walls, fences, and wall-fence combinations shall meet the wall height requirements in the zoning code and community design guidelines to the satisfaction of the Planning Division, unless a Fence Height Exception is approved pursuant to the City Zoning Regulations. Tiered walls and/or off -site grading may be required to eliminate walls or reduce the wall height in the area of the “flower mound” along the tract boundary at lots 5 and 7. 50. All site retaining walls shall be evaluated for areas needing fall protection fencing/guardrails or privacy fencing that would increase the height of the wall- fence combination. 51. Access controls for the proposed new bridge across Acacia Creek shall be approved to the satisfaction of the Fire Department and shall be in accordance with City Engineering Standards. An offsite easement or license agreement may be required from the property owner at 650 Tank Farm to construct or improve any required emergency access or proposed construction access across the adjoining parcel. 52. Unless a phased construction plan is approved by the Community Development Department, all access roads, required secondary access, fire department access, and any required fire hydrant installations shall be completed prior to commencing with combustible construction. 53. Any required or proposed secondary access road(s) shall comply with City Standards and guidelines, ADA standards, and the California Fire and Building codes. Page 248 of 495 Resolution No. ______ (2022 Series) Page 17 R _____ 54. The developer shall exhaust reasonable efforts to complete the final design and construction of the off-site improvements to the ultimate plan to limit the amount of throw away improvements. Phased, partial, or temporary improvements may be considered and shall be approved to the satisfaction of the Public Works and Community Development Departments. Temporary improvements may include water quality treatment BMPs. 55. An offsite easement or license agreement may be required from Chevron to construct the proposed Tank Farm and Santa Fe improvements. 56. Offers of dedication will be required for any Tank Farm Road widening, round -a- bout construction, Santa Fe Road construction, cul-de-sac improvements, grading, drainage, and slope easements. 57. The Tank Farm Road improvements shall conform to any existing endorsed and entitled designs and/or built-out improvements or shall provide for a reasonable transition to the existing unimproved sections to the satisfaction of the Public Works Department. 58. Except as set forth herein, all public improvements, including any off -site improvements, shall be designed, and completed to the satisfaction of the Public Works Department, Utilities Department and Fire Department. Public Improvements shall be in substantial conformance with the Airport Area Specific Plan (AASP), Active Transportation Plan, and City Standard Specifications and Engineering Standards, except where the project applicant and/or the City have requested and been granted a formal design exception. Where conflicts occur between the AASP and other adopted City Standards, plans or policies, final determination shall be provided by the City Engineer. 59. Unless stated otherwise in these conditions of approval, th e public improvements related to this development shall be approved or substantially approved to the satisfaction of the Public Works and Community Development Departments prior to issuance of any building permits and improvements shall be completed prior to issuance of first occupancy permits. Prior to approval of any deferrals, the project applicant shall demonstrate that the construction of the required improvements is impractical to the satisfaction of the Community Development and Public Works Directors. 60. Plans submitted for a building permit should include a phased improvement plan with alternate designs and transitions, subject to the satisfaction of the Public Works and Community Development Directors. Page 249 of 495 Resolution No. ______ (2022 Series) Page 18 R _____ 61. The project applicant shall be responsible fo r acquiring any off-site dedication/acquisition of property for public right-of-way purposes necessary to facilitate orderly development of the public improvements required to be constructed by the applicant as described herein. The project applicant shall work with the City and the landowner(s) to acquire the necessary rights -of-way. In the event the applicant is unable to acquire said rights-of-way, the City Council may consider lending the applicant its powers of condemnation to acquire the off -site right-of-way dedication, including any necessary slope and drainage easements. If condemnation is required, the applicant shall agree to pay all costs associated with the off-site right-of-way acquisition (including attorney fees and court costs). It should be noted that some right-of-way acquisition may require coordination with and approval by the County of San Luis Obispo. 62. With respect to any off-site improvements, prior to the approval of the development improvement plans or the filing of the Parcel Map, th e developer/subdivider shall either: a. Clearly demonstrate their right to construct the improvements by showing access to, title or interest in the property in a form acceptable to the City Engineer; or, b. Demonstrate, in writing, that the subdivider has exhau sted all reasonable efforts to acquire interest to the subject property and request that the City assist in acquiring the property required for the construction of such improvements and exercise its power of eminent domain in accordance with Government Code Section 66462.5 to do so, if necessary. Subdivider shall also enter into an agreement with the City to pay all costs of such acquisition including, but not limited to, all costs associated with condemnation. Said agreement shall be in a form acceptable to the City Engineer and the City Attorney. If condemnation proceedings are required, the subdivider shall submit, in a form acceptable to the City Engineer, the following documents regarding the property to be acquired: i. Property legal description and sketch stamped and signed by a Licensed Land Surveyor or Civil Engineer authorized to practice land surveying in the State of California. ii. Preliminary title report including chain of title and litigation guarantee; iii. Appraisal of the property by a City approv ed appraiser. In the course of obtaining such appraisal, the property owner(s) must be given an opportunity to accompany the appraiser during any inspection of the property or acknowledge in writing that they knowingly waived the right to do so; iv. Copies of all written correspondence with off -site property owners including purchase summary of formal offers and counter offers to purchase at the appraised price. v. Prior to submittal of the aforementioned documents for City Engineer approval, the Subdivider shall deposit with the City all or a portion of the anticipated costs, as determined by the City Attorney, of the condemnation proceedings. The City does not and cannot guarantee that the necessary property rights can be acquired or will, in fact, be acquired. A ll necessary procedures of law would apply and would have to be followed. Page 250 of 495 Resolution No. ______ (2022 Series) Page 19 R _____ 63. All public utilities including water, recycled water, sewer, and public storm drain systems shall comply with City Engineering Standards. The final line and grade for all public utilities shall be approved to the satisfaction of the Public Works and Utilities departments. 64. The improvement plans shall show the water, fire, and recycled water service connections, meters, and backflow prevention devices designed per City Engineering Standards. The services shall remain perpendicular to the main/street rights-of-way until they reach their respective meters or backflow prevention device. Changes in direction to serve the private on-sight system shall occur on private property and not within the respective public rights-of-way. 65. The improvement plan submittal shall include a sewer system analysis to establish the sizing, line, and grade for the public sewer main extension in Santa Fe to the satisfaction of the Public Works and Utilities departments. The analysis shall consider the proposed sewer depth needed to provide adequate gravity service to adjoining parcels in accordance with any Specific Plan, Sewer Master Plan, and previously submitted area tentative map designs as required for orderly development. The depth design should also consider construction and future maintenance costs by limiting the depth to what is needed to serve a defined sewer basin. 66. Street naming of the private streets and site addressing shall be established through the building permit and subdivision mapping and improvement plan review processes in accordance with City guidelines. 67. The parking and site development shall show and note compliance with the City’s Parking and Driveway Standards, Community Design Guidelines, and the AASP. 68. Unless otherwise waived by the City, the use of pavers or alternate paving materials as visual cues for pedestrians should be expanded to include some of the more extensive parking areas serving the commercial lease spaces, common area/Club House, the central pedestrian crossroads area, and the northerly shared parking area on Lots 9 and 11 and the central area. 69. The final property line locations, site development, and building plans shall show and note compliance with the California Building Code for building setbacks, exterior wall protection, eave projections, openings, and access/egress. The final development for the club house building Type F/#10 on Lot 6 shall be evaluated for the proposed 2’-8” property line setback to the satisfaction of the Fire Marshal/Building Official. 70. The existing access easements shall be abandoned or quit-claimed, where necessary, prior to parcel map recordation or approval of the site development plans. 71. Mailbox unit (MBUs) shall be provided on -site to the satisfaction of the Postal Service and the City Planning Division. The number and location shall consider access, convenience, and circulation requirements. Page 251 of 495 Resolution No. ______ (2022 Series) Page 20 R _____ 72. Private site lighting shall be provided per City Engineering Standards. 73. The development/improvement plan submittal shall include a complete construction phasing plan in accordance with the conditions of approval, City codes, and standards. A truck circulation plan and construction management and staging plan shall be included with the improvement pla n submittal. General truck routes shall be submitted for review and acceptance by the City. The engineer of record shall provide a summary of the extent of cut and fill with estimates on the yards of import and export material. The summary shall include ro ugh grading, utility trench construction, road construction, AC paving, concrete delivery, and vertical construction loading estimates on the existing public roadways. The developer shall either; I) complete roadway deflection testing before and after construction to the satisfaction of the City Engineer and shall complete repairs to the pre-construction condition, or 2) shall pay a roadway maintenance fee in accordance with City Engineering Standards and guidelines, or 3) shall propose a pavement repair/replacement program to the satisfaction of the City Engineer. 74. Separate utilities, including water, sewer, gas, electricity, telephone, and cable TV shall be served to each proposed lot to the satisfaction of the Public Works Department and serving utility companies. All public and private sewer mains shall be shown on the development/improvement plans and shall be constructed per the City’s adopted codes and City Engineering Standards unless a waiver or alternate standard is otherwise approved by the City. The plans shall clearly delineate and distinguish the difference between public and private improvements. 75. All new wire utilities shall be placed underground. The underground placement shall be completed without a net increase in utility poles located within the public right-of-way unless specifically approved to the satisfaction of the Public Works and Community Development Departments. 76. The existing overhead wire services and service poles that are located on this parcel and along the Tank Farm Road frontage shall be removed or services placed underground within the limits and standards of the supplying utility companies. 77. City recycled water or another non-potable water source, shall be used for construction water (dust control, soil compaction, etc.). An ann ual Construction Water Permit is available from the City's Utilities Department for the use of recycled water. Recycled water is readily available near the intersection of Tank Farm Road and Orcutt Road. 78. The proposed tree removals are supported with the co mpensatory tree plantings shown on the plans provided with the Planning Commission Agenda Report on November 17, 2021, and as reviewed by the Tree Committee. The final tree species, mix, and specimen size for all street trees and on -site trees shall be approved by the Planning Division and City Arborist. All street trees shall be planted per City Engineering Standards. Street trees, including parkway trees and landscaping shall be irrigated and maintained by the developer, property owner, or HOA. Page 252 of 495 Resolution No. ______ (2022 Series) Page 21 R _____ Engineering Division – Vesting Common Interest Parcel Map Conditions 79. The subdivision, required improvements, conditions, and mitigation measures shall be in general conformance with the approved development project per ARCH-0406-2021. 80. Unless otherwise approved for deferral or partial deferral by the City, park land and park improvement fees shall be paid prior to map recordation or building permit issuance, whichever occurs first. 81. Any easements including but not limited to provisions for all public and private utilities, access, grading, drainage, open space, slope banks, construction, public and private streets, pedestrian and bicycle facilities, common driveways, and maintenance of the same shall be shown on the parcel map and/or sha ll be recorded separately prior map recordation. Said easements may be provided for in part or in total as blanket easements. 82. The parcel map and improvement plans shall show the extent of all existing and proposed on-site and off-site offers of dedication. Subdivision improvement plans and or preliminary designs may be required for any deferred improvements so that dedication limits can be established. These improvements may include but are not limited to road construction and widening, grading and drainage improvements, utility easements, utility undergrounding, bridges/culverts, bike bridges, transit stops, bikeways, pedestrian paths, and intersection improvements. 83. The parcel map and improvement plans shall show and label the separate access easements to and through the property to the east known as 650 Tank Farm. 84. The subdivider shall dedicate a 10’ wide street tree easement and 15’ wide public utility easement (P.U.E.) across the Tank Farm Road frontage of each parcel. Said easements shall be adjacent to and contiguous with all public right-of-way lines bordering each parcel. Additional site-specific utility easements may be required by PG&E or other wire utilities related to the required undergrounding and service requirements for the development. 85. The preliminary PG&E memo shall be reviewed and endorsed by the City and the engineer of record prior to final designs. Unless otherwise approved for deferral, the final PG&E handout package(s) for all undergrounding along the southerly and northerly map boundaries along with the development specific service requirements shall be reviewed and approved by both the engineer of record and the City. 86. Access rights shall be dedicated to the City along the Tank Farm Road and Santa Fe Road frontages except at approved driveway locations. Said dedications shall be shown and labeled on the parcel map. 87. The developer shall include any other out-of-tract offers of dedication related to the need for public utility extensions related to orderly development of the AASP that are not otherwise located within a public street. Page 253 of 495 Resolution No. ______ (2022 Series) Page 22 R _____ 88. All private improvements shall be owned and maintained by the individual property owners, Homeowners Association, and/or a Property Owner’s Association as applicable. A common area maintenance agreement or other guiding agreement shall be provided in conjunction with the parcel map submittal. Private improvements include but are not limited to streets, drive aisles, parking lot improvements, sidewalks, private pedestrian/bike paths, private sewer mains/laterals, water services, fire services, reclaimed water services, drainage systems, detention basin(s), site lighting, landscape, landscape irrigation, and common areas. 89. A separate easement-agreement shall be processed in a format approved by the Utilities Department for any future access and maintenance of on-site public water meters that are served off of a private mainline system 90. A notice of requirements or other agreement acceptable to the City may need to be recorded in conjunction with the parcel map to clarify development restrictions, fee payments, conditions of development, and references to any pertinent conditions of approval related to this map and/or off -site requirements. 91. Off-site improvements, easements and/or dedications may be required to facilitate through street construction and transitions to the existing roadway, access, cul -de- sac, round-a-bout, and public water, recycled water and sewer main extensions beyond the map boundary and in accordance with the AASP. 92. Unless specifically approved by the City, all public and private subdivision improvements shall be approved prior to map recordation and/or building permit issuance, whichever occurs first. Subdivision sureties and a subdivision agreement shall be provided for all subdivision improvements if the map will record prior to completion of the improvements. 93. Unless phased or interim improvements are approved by the City, all pertinent public and private subdivision improvements shall be completed prior to building permit and building permit final inspection approvals/occupancy, respectively. 94. With respect to any off-site improvements, prior to filing of the Parcel Map, the subdivider shall either: a. Clearly demonstrate their right to construct the improvements by showing access to, title or interest in the property in a form acceptable to the City Engineer; or, b. Demonstrate, in writing, that the subdivider has exhausted all reasonable efforts to acquire interest to the subject property and request that the City assist in acquiring the property required for the construction of such improvements and exercise its power of eminent domain in accordance with Government Code Section 66462.5 to do so, if necessary. Subdivider shall also enter into an agreement with the City to pay all costs of such acquisition including, but not limited to, all costs associated with condemnation. Said agreement shall be in a form acceptable to the City Engineer and the City Page 254 of 495 Resolution No. ______ (2022 Series) Page 23 R _____ Attorney. If condemnation proceedings are required, the subdivider shall submit, in a form acceptable to the City Engineer, the following documents regarding the property to be acquired: i. Property legal description and sketch stamped and signed by a Licensed Land Surveyor or Civil Engineer authorized to practice land surveying in the State of California; ii. Preliminary title report including chain of title and litigation guarantee; iii. Appraisal of the property by a City approved appraiser. In the course of obtaining such appraisal, the property owner(s) must be given an opportunity to accompany the appraiser during any inspection of the property or acknowledge in writing that they knowingly waived the right to do so; iv. Copies of all written correspondence with off-site property owners including purchase summary of formal offers and counter offers to purchase at the appraised price. v. Prior to submittal of the aforementioned documents for City Engineer approval, the Subdivider shall deposit with the City all or a portion of the anticipated costs, as determined by the City Attorney, of the condemnation proceedings. The City does not and cannot guarantee that the necessary property rights can be acquired or will, in fact, be acqu ired. All necessary procedures of law would apply and would have to be followed. 95. All public streets shall conform to City Engineering Standards and AASP including curb, gutter, and sidewalk, driveway approaches, and curb ramps as approved by the City Engineer. Where conflicts occur between the City Engineering Standards and concepts identified in the AASP and/or this project approval, a final determination on design shall be provided by the City Engineer. 96. Final roadway alignment shall be consistent with the AASP, Bike Plan, and City Engineering Standards except where the applicant has requested and been granted a formal design exception. 97. The on-site drive aisles and parking areas shall comply with the Parking and Driveway Standards and soils engineer recommendations. 98. The improvement plans shall include all final line -of-sight analysis at applicable intersections to the satisfaction of the Public Works Department. Fence heights and plantings in the areas of control shall be reviewed in conjunction with the analysis. A separate recorded declaration, covenant, agreement or Notice of Requirements for private property owner maintenance of sight lines may be required. 99. Any jurisdictional permits and/or authorizations from the Army Corps of Engineers, California Department of Fish and Wildlife, U.S. Fish and Wildlife Service, or Regional Water Quality Control Board required for the drainage, site improvements, street and road improvements shall be issued prior to plan approval and/or commencing with work within the respective waterways. Page 255 of 495 Resolution No. ______ (2022 Series) Page 24 R _____ 100. The map submittal shall clarify the limits and ext ent of the private access rights shown and referenced on the tentative map and preliminary report. The easements shall be terminated, quit-claimed, or otherwise adjusted prior to map recordation. 101. The subdivider shall install public street lighting and all associated facilities including but not limited to conduits, sidewalk vaults, fusing, wiring and luminaires along all public streets and intersections per City Engineering Standards. 102. Private site lighting shall be provided per City Engineering Standards. Unless otherwise waived by the City or an alternate method of pathway lighting is approved, the creek walk/bikeway from the northerly tract boundary to/through the campus to the adjoining public street(s) shall include pathway lighting per City Engineering Standards and the City’s Bike Plan. 103. Improvement plans for the entire subdivision, including any off -site improvements shall be approved or substantially approved to the satisfaction of the Public Works Department, Utilities Department, and Fire Department prior to map recordation and prior to building permit issuance. 104. The improvement plans shall clearly show all existing structures, site improvements, utilities, water wells, septic tanks, leach fields, gas and wire services, etc. The plan shall include the proposed disposition of the improvements and any proposed phasing of the removal and demolition. Any above grade or buried structures and utilities affected by the proposed lot lines shall be removed and receive final inspection approvals prior to map recordation. 105. A separate demolition permit is required from the building division for building demolitions, if applicable. A separate permit is required from SLO County Environmental Health and a plumbing permit from the City of SLO for the abandonment of any water wells, if applicable. 106. The improvement plan submittal shall include a complete construction phasing plan in accordance with the conditions of approval, City codes, and s tandards. A truck circulation plan and construction management and staging plan shall be included with the improvement plan submittal. General truck routes shall be submitted for review and acceptance by the City. The engineer of record shall provide a summary of the extent of cut and fill with estimates on the yards of import and export material. The summary shall include rough grading, utility trench construction, road construction, AC paving, concrete delivery, and vertical construction loading estimates on the existing public roadways. The developer shall either; 1) complete roadway deflection testing before and after construction to the satisfaction of the City Engineer and shall complete repairs to the pre - construction condition, or 2) shall pay a roadway maintenance fee in accordance with City Engineering Standards and guidelines, or 3) shall propose a pavement repair/replacement program to the satisfaction of the City Engineer prior to acceptance of the subdivision improvements. Page 256 of 495 Resolution No. ______ (2022 Series) Page 25 R _____ 107. Separate utilities, including water, sewer, gas, electricity, telephone, and cable TV shall be served to each lot to the satisfaction of the Public Works Department and serving utility companies. All public and private sewer mains shall be shown on the public improvement plans and shall be constructed per City Engineering Standards unless a waiver or alternate standard is otherwise approved by the City. The plans shall clearly delineate and distinguish the difference between public and private improvements. Gas service is not required as a condition of the subdivision if the applicant has documented the limits or absence of buildings proposing mixed-fuel options. 108. City recycled water or another non-potable water source, shall be used for construction water (dust control, soil compaction, etc.). An annual Construction Water Permit is available from the City’s Utilities Department. Recycled water is readily available near the intersection of Tank Farm Road and Orcutt Road. 109. Final grades and alignments of all public and/or private water, sewer and storm drains shall be approved to the satisfaction of the Public Works Director and Utilities Department. The final location, configuration, and sizing of service laterals and meters shall be approved in conjunction with the review of the building plans, fire sprinkler plans, and/or public improvement plans. 110. The improvement plans shall show the location of all domestic and landscape water meters. The plan shall include service lateral sizes and meter sizes. Sizing calculations may be required to justify service and meter sizing. Water impact fees related to the irrigation water meter(s) for any public or private irrigation meter shall be paid prior to approval of the subdivision improvement plans and commencement with construction for each construction phase. 111. The final pathway design, location, access controls, and construction shall be approved by the Planning Division, Public Works Department, and Parks and Recreation Department. A separate use or license agreement may be required if not otherwise covered within the property maintenance documentation or CCRs. 112. The public and private improvements are all considered part of the project site and are subject to the Post Construction Stormwater Regulations as a common plan. Stormwater Control Measures (SCMs) shall be located on private property unless specifically allowed within the public rights -of-way by the Public Works Department. If allowed, they shall be privately maintained under an encroachment agreement unless certain and limited SCMs are approved for maintenance by the City or County of San Luis Obispo. Page 257 of 495 Resolution No. ______ (2022 Series) Page 26 R _____ Transportation Division – Public Works 113. Transportation Impact Fees. Prior to issuance of building permits, the project applicant shall pay all required transportation impact fees, including participation in the Citywide Transportation Impact Fee Program and the County’s Highway 227 Impact Fee Program. Payment of Citywide Transportation Impact Fees may be deferred to issuance of first occupancy permits and total fees due may be reduced to reflect approved fee credits pursuant to the terms of an approved Credit and Reimbursement Agreement. 114. Reimbursement for Public Improvements. Project applicant may be eligible for reimbursement for costs related to planning, design and construction of eligible public improvements. A Public Credit/Reimbursement Agreement must be obtained prior to building permit issuance to maintain eligibility for financial reimbursement and shall be subject to approval by the City Council. 115. Tank Farm Road Frontage Improvements. Project applicant shall reconstruct the Tank Farm Road project frontage to current City Engineering Standards. Unless otherwise approved by the Public Works Director, plans submitted for Public Improvement Plans shall include widening the northern side of Tank Farm to a cross section that substantially conforms with the Airport Area Specific Plan and Active Transportation Plan, which includes the following typical cross section elements on the north half of the street: 5’ sidewalk / 7’ protected bike lane / 9’ parkway / curb and gutter / two westbound 12’-13’ auto lanes / raised median / one existing eastbound auto lane / existing eastbound bike lane. Designs shall be developed in coordination with the frontage improvements currently in development for the adjacent 650 Tank Farm Road development to ensure that appropriate geometric transitions. Improvements shall be approved or substantially approved to the satisfaction of the Public Works and Community Development Departments prior to issuance of any building permits and improvements shall be completed prior to issuance of first occupancy permits. 116. Tank Farm/Santa Fe Roundabout. Project applicant shall be responsible for constructing a roundabout at the intersection of Tank Farm Road & Santa Fe Road (west). Unless otherwise approved by the Public Works Director, plans submitted for Public Improvement Plans shall include both the near-term and ultimate layout for the roundabout, with the near-term configuration reflecting improvements to be constructed by the project applicant and the ultimate configuration to reflect remaining improvements to be constructed at a future date by the City or others. Near-term roundabout improvements shall include the following geometrics: a. Landscaped center island with mountable truck apron. b. Two continuous auto lanes approaching and continuing through the roundabout in the westbound direction, tapering back down to a single lane on Tank Farm Road west of the intersection. c. One continuous lane approaching and continuing through the roundabout in the eastbound direction. Page 258 of 495 Resolution No. ______ (2022 Series) Page 27 R _____ d. One approach lane and one departure lane at the north leg of the roundabout. e. No south leg of the roundabout. f. Concrete curb/gutter and separated bicycle and pedestrian facilities to be constructed as permanent improvements along the northwest and northeast quadrants of the roundabout, including the north leg within the functional area of the roundabout. g. Temporary improvements along the southern extent of the roundabout, which may include an asphalt berm and asphalt shoulder/bike lane. All ADA curb ramps at the roundabout shall be constructed in concrete. h. Consistent with design guidance per the City’s Active Transportation Plan, installation of Rapid Rectangular Flashing Beacons (RRFBs) shall be considered at the crosswalks on the east and west legs of the intersection. Ultimate improvements, which shall be included in roundabout design drawings, but are not required to be constructed by the project applicant include: a. Widening to provide two continuous auto lanes approaching and continuing through the roundabout in the eastbound direction. b. Permanent construction of separated bicycle and pedestrian facilities on the southwest and southeast quadrants of the roundabout. c. Construction of the south leg of the roundabout. Roundabout designs shall be developed in coordination with the frontage improvements currently in development for the adjacent 650 Tank Farm Road development to ensure that appropriate geometric transitions are provided approaching/departing the roundabout. Improvements shall be approved or substantially approved to the satisfaction of the Public Works and Community Development Departments prior to issuance of any building permits and improvements shall be completed prior to issuance of first occupancy permits. Applicable costs incurred by the applicant in designing and constructing this public improvement shall be eligible for reimbursement pursuant to the terms of an approved Public Credit/Reimbursement Agreement. 117. Santa Fe Road Extension. Project applicant shall be responsible for constructing a portion of the Santa Fe Road Extension north of Tank Farm Road, extending approximately 570 feet north of Tank Farm Road. Unless otherwise approved by the Public Works Director, plans submitted for Public Improvement Plans shall include the following typical cross section elements listed from east to west: 5’ sidewalk / 7’ protected bike lane / 9’ parkway / curb and gutter / two 12’ auto lanes / 6.5’ bike lane / 2’ shoulder. The northern terminus of the proposed Santa Fe Road Extension may be constructed as an interim cul-de-sac or in the ultimate configuration, a single-lane roundabout. If constructed as an interim cul-de-sac, the project applicant shall provide preliminary design concepts for a future single-lane roundabout. Page 259 of 495 Resolution No. ______ (2022 Series) Page 28 R _____ Cul-de-sac plans should be designed to minimize potential throw-away work to a reasonable extent, and final project property boundaries and right -of-way dedications shall honor the anticipated footprint required to accommodate the future roundabout to the satisfaction of the Public Works Director. Improvements shall be approved or substantially approved to the satisfaction of the Public Works and Community Development Departments prior to issuance of an y building permits and improvements shall be completed prior to issuance of first occupancy permits. Applicable costs incurred by the applicant in designing and constructing this public improvement shall be eligible for reimbursement pursuant to the terms of an approved Public Credit/Reimbursement Agreement. 118. Tank Farm Road Shared-Use Path. The project applicant shall provide planning and preliminary engineering support for a proposed shared -use bicycle/pedestrian path along Tank Farm Road, as identified in the City’s Active Transportation Plan, extending from the new Tank Farm/Santa Fe Road Roundabout west to either Innovation Way or Old Windmill Lane, with detailed path alignment and extents to be confirmed in coordination with the City Public Works Departm ent. Planning and design for the Tank Farm Shared-Use Path are to be developed at a sufficient level of detail to provide for an accurate determination of construction quantities, necessary rights-of-way acquisition, and grading to a level sufficient to conduct a project-level environmental assessment. Such level of detail is described as a “65% level of detail” and is equivalent to Caltrans specifications and requirements for a Plans, Specifications and Estimates (“PS&E”) and as contained and described in Chapter 2, Section 2-1 through Section 2-2, of Caltrans’ Plans Preparation Manual, and in accordance with the City’s Improvement Standards and Standard Specifications. The project applicant shall provide environmental documentation that summarizes relevant environmental analysis/concerns provided in previous environmental reviews conducted to date (including the Project EIR and the Chevron EIR), describe level of CEQA review anticipated to be required, and provide applicable technical studies to support the City’s subsequent preparation of a formal CEQA document. The engineering design shall provide horizontal and vertical alignments, identify utility conflicts, drainage strategy, grading needs, storm drainage solutions, and demonstrate compliance with Regional Board and Drainage Design Manual Post Construction Storm Water regulations, and the approach to creek/stream crossings. There shall be a rights of way analysis which shall define the right -of- way needed to construct the path, provide ROW exhibits and legal descriptions to help guide future negotiations between the City and property owner(s). This level of design requires a physical survey of the property, environmental studies such as biology, soils, wetlands, cultural resources, and other, and a detailed set of plans with accurate vertical and horizontal design elements, structural calculations, and accurate survey data. Finally, the work shall include an engineer’s Opinion of Probable Cost (OPIC). Page 260 of 495 Resolution No. ______ (2022 Series) Page 29 R _____ Unless otherwise approved by the Public Works Directo r, notable deliverables include the following: a. Three alternative alignments and approaches for consideration and review by the City. The City shall participate in the selection of these three alternatives. These alternatives will be at a “schematic” level of detail with general horizontal and vertical locations. After City comments (which may include City Advisory body involvement to be managed by the City), the three alternatives shall be refined and resubmitted to the City for selection of one alternative. The relevant technical studies shall be submitted to the City at this stage to inform City review, and for their comment and approval by the City. b. A refined alignment shall be presented to the City which reflects the further development of the selected alternative. The level of detail shall be sufficient to estimate construction quantities, structural design elements, rights of way for the improvement, construction elements, earthwork calculations and balance, and utility locations. An OPIC shall be prepared. This plan set shall be submitted for City review and comment. City shall provide plan check comments in a consistent, non-contradictory format for all relevant departments and reviewers (Planning, Utilities, Engineering, Natural Resources, etc.). c. An environmental assessment and initial study shall be prepared based on the selected alignment. The assessment shall include relevant technical studies, evaluation of each environmental subject area contained in the most current version of Appendix G of the CEQA Guidelines, analysis of the compliance with the City’s VMT regulations for transportation construction projects, and compliance with city development policies and regulations that have been adopted for the purpose of environmental impact regulation and mitigation. d. A final set of plans shall be prepared with the form and content in Section 1.1 of Division 1010 of the Engineering Standards. A final OPIC shall be prepared. No plan check or final permit is anticipated. Unless otherwise approved by the Public Works Director, all work required by the project applicant under this condition shall be completed prior to issuance of 1st occupancy permits. Applicable costs incurred by the applicant in preparing this work shall be eligible for reimbursement pursuant to the terms of an approved Public Credit/Reimbursement Agreement. 119. Acacia Creek Shared-Use Path. The project applicant shall construct the Acacia Creek Shared-use Path, as identified in the City’s Active Transportation Plan, with an alignment generally following the west bank of Acacia Creek connecting Santa Fe Road northeast to the Damon-Garcia Sports Park internal path network, approximately 200 feet north of the project’s northern property line. Unless otherwise approved by the Public Works Director, improvement plans shall include a 12-foot-wide concrete path section per City Engineering Standard 7040 (Option 2), 2-foot clear shoulders, applicable path signage, striping, high-visibility markings at driveway crossings, path lighting, and installation of a security gate on City Page 261 of 495 Resolution No. ______ (2022 Series) Page 30 R _____ property at the boundary between the project site and the Damon Garcia Sports Fields. Details for the security gate shall be approved to the satisfaction of the City Public Works and Parks and Recreation Departments. The Acacia Creek shared-use path shall be privately maintained by the HOA, private property owner(s), or property association. The pathway shall remain open and usable as a site amenity and for potential circulation to the Damon Garcia Sports Fields. The City shall reserve the right to control hours accessing the Damon Garcia Sports Fields via this path. Temporary closures of the path by the HOA or others shall be approved at the discretion of the City. The path shall be included in the maintenance documents related to the proposed subdivision or in conjunction with the approval of the development permits. A private easement/agreement or blanket easement will be required to allow for the shared use. Path improvements shall be approved or substantially approved to the satisfaction of the Public Works and Community Development Departments prior to issuance of any building permits and improvements shall be completed prior to issuance of first occupancy permits. Applicable costs incurred by the applicant in designing and constructing this public improvement shall be eligible for reimbursement pursuant to the terms of an approved Public Credit/Reimbursement Agreement. 120. Street Lighting. Unless otherwise approved by the Public Works Director, improvement plans shall include the installation of public street lighting and all associated facilities including but not limited to conduits, sidewalk vaults, fusing, wiring and luminaires along the north side of Tank Farm Road and east side of Santa Fe Road (along the project frontages) and within the Tank Farm/Santa Fe Roundabout consistent with City Engineering Standards and best practice design guidance for roundabout lighting design. Existing street lighting shall be shown on the improvement plans for reference and will be consi dered in establishing the required spacing, location, number, and type of fixtures. 121. Shared-Use Path Lighting. Unless otherwise approved by the Public Works Director, improvement plans shall include the installation of shared -use path lighting along the extent of the Acacia Creek path and at the interface between project site and pedestrian/bicycle/emergency vehicle only connection to the adjacent 650 Tank Farm site. Path lighting design shall utilize City Standard path lighting per Standard Plan 7905 (or City-approved equivalent solar product) and all associated facilities including but not limited to conduits, sidewalk vaults, fusing, and wiring. Path lighting shall be oriented in a manner that minimizes potential light spillover into the Acacia Creek riparian area and may require backlight shields. Page 262 of 495 Resolution No. ______ (2022 Series) Page 31 R _____ 122. Access to 650 Tank Farm Property. Unless otherwise approved by the Public Works Director, improvement plans shall include adequate access control measures, such as removable bollards, signage, pavement markings and lighting per City Engineering Standards at the interface between the project site and the planned pedestrian/bicycle/emergency access only connection to the adjacent 650 Tank Farm site. Access control measures shall be approved to the satisfaction of the City Public Works and Fire Departments. 123. On-Site Bicycle Parking. Short-term bicycle parking shall consist of Peak “high-low staggered style” racks or City-approved equivalent. Short-term and long-term bicycle parking shall comply with applicable design policies per the City’s Active Transportation Plan. Short-term bike racks shall be located as close as practical to the commercial business entry doors, club house entry, and the outdoor recreation areas. 124. On-Site Auto Parking. a. Plans submitted for building permit shall demonstrate that all on -site auto parking stalls conform with City Engineering Standards 2210-2260, including addition of wheel stops where parking stalls front pedestrian walkways to avoid vehicle encroachment into sidewalk space. b. On-site improvement plans shall demonstrate that all on-site auto parking located along the site access driveways from Tank Farm Road and Santa Fe Road are set back a minimum of 36 feet from the adjacent street, measured from the face of curb, unless otherwise approved by the Public Works Director. 125. Intersection/Driveway Sight Distance. Improvement plans shall demonstrate that all landscaping, entry signage/monuments or other vertical features exceeding 36 inches in height are located clear of applicable sight distance triangles at site access driveways/intersections per City Engineering Standards. A separate recorded declaration, covenant, agreement, or Notice of Requirements for private property owner or HOA maintenance of sight lines may be required. 126. Pedestrian Connectivity. Unless otherwise approved by the Public Works Director, the project applicant shall be responsible for constructing the following pedestrian access improvements prior to issuance of first occupancy permits, unless completed sooner by others (i.e., 650 Tank Farm and/or Northwest Corner developments): a. Install pedestrian signal and crosswalk at the east leg of the Tank Farm/Mindbody signalized intersection. b. Provide a continuous pedestrian connection along Tank Farm Road between the 600 Tank Farm site and the intersection of Tank Farm/Broad. If frontage improvements required by the adjacent 650 Tank Farm Road development and 660 Tank Farm Road Development (Northwest Corner) have not yet been constructed, a temporary pedestrian path of travel using asphalt concrete may be accepted to the satisfaction of the City Engineer. Page 263 of 495 Resolution No. ______ (2022 Series) Page 32 R _____ 127. Transit Stop. Prior to issuance of first building permits, Project applicant shall provide payment of $25,000 to the City for installation of a future transit stop by other property owners within the vicinity of the 600 Tank Farm development. The ultimate location of this transit stop shall be confirmed by SLO Transit and the City Public Works Department and based on guidance in the City’s Active Transportation Plan and Short-Range Transit Plan. Fire Department 128. All access roads less than 26 feet in width, unobstructed, shall be posted as Fire lane-No Parking”. 129. Buildings containing 2 or less dwelling units shall have NFPA 13D fire sprinkler systems. 130. Buildings containing 3 or more dwelling units shall have NFPA 13 fire sprinkler systems and standpipes in the stairwells. Floor control valves shall be collocated in a fire sprinkler riser room with exterior door access. Utilities Department – Vesting Common Interest Parcel Map Conditions 131. The proposed utility infrastructure shall comply with the latest engineering design standards effective at the time the building permit is obtained and shall have reasonable alignments needed for maintenance of public infrastructure along public roads. 132. Due to shallow groundwater in this area heat fused HDPE sewer lateral(s) shall be installed per the engineering design standards and connected into the existing sewer main. 133. If commercial uses in the project include food preparation, provisions for grease interceptors and FOG (fats, oils, and grease) storage within solid waste enclosure(s) shall be provided with the design. These types of facilities shall also provide an area to wash floor mats, equipment, and trash cans. The wash area shall be drained to the sanitary sewer, and an environmental compliance permit shall be filed prior to issuance of occupancy permit. 134. The project’s commercial and residential uses shall be metered separately. All residential units are to be individually metered with a private m eter after the City’s master public service meter per MC 16.20.020. Privately owned sub -meters may be provided for residential apartments upon approval of the Utilities Director. The CCR’s for the property/homeowner association shall require that the sub -meters be read by the association (or P/HOA contracted service) and each billed according to water use. 135. Building permit submittal shall clarify size of existing and proposed water services and water meters for the project. Page 264 of 495 Resolution No. ______ (2022 Series) Page 33 R _____ 136. The project shall install an 8” HDPE sewer main and manholes within Santa Fe Road approximately 760 feet near the western boundary of the project’s frontage improvements. 137. Any Existing well(s) shall be destroyed per County Health Requirements and the California Department of Water Resources Standard Bulletin 74-81 and 74-90. 138. Water service meter(s) shall be adequately sized to serve the project’s proposed units. Residential units shall be separately metered from the non - residential/commercial units, and service lines shall not cross parce l boundaries per MC 13.04.120 139. The project shall extend the existing 12” public water main within Tank Farm Road approximately 750 feet near the southern part of the project’s frontage improvements. 140. The project shall install an 8” public water main within Santa Fe Road approximately 760 feet near the western boundary of the project’s frontage improvements. 141. The project shall install an 8” recycled water main within Tank Farm Road approximately 750 feet near the southern part of the project’s frontage improvements. 142. The project shall install an 8” recycled water main within Santa Fe Road approximately 760 feet near the western boundary of the project’s frontage improvements. 143. The subdivision map must include a common interest parcel to include all the landscape areas under one parcel if the private irrigation currently crosses parcel boundaries. The blanket easement statement must comply with MC 16.01.010 and 16.10.020. 144. Recycled water shall be used for major construction activities, such as grading and dust control as required under Prohibited Water Uses; Chapter 17.07.070.C of the City’s Municipal Code. Recycled water is available through the City’s Construction Water Permit program. 145. Projects having landscape areas greater than 500 square feet shall provide a Maximum Applied Water Allowance calculation as required by the Water Efficient Landscape Standards; Chapter 17.87 of the City’s Municipal Code. 146. Projects generating more than two cubic yards of total waste shall comply with AB 1826, and local waste management ordinance to reduce greenhouse gas emissions. 147. Commercial and residential refuse services shall be separate unless a letter of agreement between the tenants and a Conditional Exception Application from the City’s Development Standards for Solid Waste Services are provided to the City with the building permit submittal. Page 265 of 495 Resolution No. ______ (2022 Series) Page 34 R _____ 148. The project will be required to provide a plan for the disposal, storage, and collection of solid waste material for both the residential and commercial components of the project. The development of the plan shall be coordinated with San Luis Garbage Company. The plan must be submitted for approval by the City's Solid Waste Coordinator. 149. Trash enclosure(s) shall conform the requirements by the San Luis Garbage Company and refuse bins shall be sized to provide a reasonable level of service. Separate refuse bins shall be accommodated within the site for the three (3) waste streams, trash, recycling, and organics. 150. Driveways and access routes to all refuse receptacles shall be designed to accommodate the size and weight of the garbage trucks; a written confirmation from the San Luis Garbage Company shall be included in the building permit plans for the proposed project. Page 266 of 495 Resolution No. ______ (2022 Series) Page 35 R _____ Indemnification 151. The applicant shall with counsel selected by the City, defend, indemnify and hold harmless the City and/or its agents, officers and employees from any claim, action or proceeding against the City and/or its agents, officers or employees to attack, set aside, void or annul, the approval by the City of this project, and all actions relating thereto, including but not limited to environmental review (“Indemnified Claims”). The City shall promptly notify the applicant of any Indemnified Claim upon being presented with the Indemnified Claim and the City shall fully cooperate in the defense against an Indemnified Claim . On motion by______________, seconded by ______________, and on the following roll call vote: AYES: NOES: ABSENT: The foregoing resolution was passed and adopted this ___ day of __________ 2022. ___________________________ Mayor Erica A. Stewart ATTEST: __________________________ Teresa Purrington City Clerk APPROVED AS TO FORM: ___________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. ___________________________ Teresa Purrington City Clerk Page 267 of 495 Page 268 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Exhibit B Response to Comments 1 Exhibit B Mitigation Monitoring and Reporting Program This document is the Mitigation Monitoring and Reporting Program (MMRP) for the 600 Tank Farm Residential Mixed-Use Project, proposed in the City of San Luis Obispo, California; State Clearinghouse No. 2020110426. Public Resources Code Section 21081.6(a)(1) requires that a Lead Agency adopt an MMRP before approving a project in order to mitigate or avoid significant impacts that have been identified in an EIR. The purpose of the MMRP is to ensure that the required mitigation measures identified in the Final EIR are implemented as part of the overall project development process. In addition to ensuring implementation of mitigation measures, the MMRP provides guidance to agency staff and decision-makers during project implementation and identifies the need for enforcement action before irreversible environmental damage occurs. Where an impact was identified to be less than significant in the Final EIR, no mitigation measures were required. The proposed project involves zoning-level entitlements: a General Plan Map Amendment, a rezone of the property, a Specific Plan Amendment to the AASP, Conceptual Site Plan, and Major Development Review for a 11.1-acre property in the City of San Luis Obispo. The following table summarizes the mitigation measures for each issue area identified in the Final EIR for the project. Specifically, the table identifies each mitigation measure; the action required for the measure to be implemented; the time at which the monitoring is to occur; the monitoring conditions; and the agency or party responsible for ensuring that the monitoring is performed. In addition, the table includes columns for compliance verification. Page 269 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 2 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments Air Quality AQ-3(a) Valley Fever Suppression Measures The project developer and contractor(s) shall prepare a Construction Valley Fever Plan to ensure the implementation of the following measures during construction activities to reduce impacts related to Valley Fever. a. Project construction activities shall implement standard SLOAPCD dust control measures described in SLOAPCD’s 2012 CEQA Air Quality Handbook. SLOAPCD dust control measures for projects with a grading area greater than 4 acres or that are located within 1,000 feet of any sensitive receptor include watering of the grading site and dirt stockpiles, vegetation and chemical soil stabilizer use on disturbed soil areas, early roadway paving, construction vehicle speed control, minimum freeboard for hauling vehicles, and vehicle wheel washing. b. If peak daily wind speeds exceed 15 mph or peak daily temperatures exceed 95 degrees Fahrenheit for three consecutive days, additional dust suppression measures (such as additional water or the application of additional soil stabilizer) shall be implemented prior to and immediately following ground disturbing activities. The additional dust suppression shall continue until winds are 10 mph or lower and outdoor air temperatures are below a peak daily temperature of 90 degrees for at least two consecutive days. c. The project developer(s) shall notify the San Luis Obispo County Public Health Department and the City not more than 60 nor less than 30 days before construction activities commence to allow the San Luis Obispo County Public Health Department opportunity to provide educational outreach to community members and medical providers, as well as enhanced disease surveillance in the area both during and after construction activities involving grading. d. Prior to any project grading activity, the project construction contractor(s) shall prepare and implement a worker training program that describes potential health hazards associated with Valley Fever, common symptoms, proper safety procedures to minimize health hazards, and notification procedures if suspected work-related symptoms are identified during construction, including the fact that certain ethnic groups and immune-compromised persons are at greater risk of becoming ill with Valley Fever. The objective of the training shall be to ensure the workers are aware of the danger associated with Valley Fever. The worker training program shall be included in the standard in-person training for project workers and shall identify safety measures to be implemented by construction contractors during construction. Prior to initiating any grading, the project developer shall provide the City and the San Luis Obispo County Public Health Department with copies of all educational training material for review and approval. No later than 30 days after any new employee or employees begin work, the project developer shall submit evidence to the City that each employee has acknowledged receipt of the training (e.g., sign-in sheets with a statement verifying receipt and understanding of the training). e. The developer shall work with a medical professional, in consultation with the San Luis Obispo County Public Health Department, to develop an educational handout for on-site workers and surrounding residents within 1,000 feet of the project site that includes the following information on Valley Fever: The project developer shall submit the Construction Valley Fever Plan to the City and SLOAPCD for review prior to the issuance of grading permits for the first project phase. The developer shall submit proof that San Luis Obispo County Public Health Department has been notified prior to commencement of construction activities; a worker training program has been conducted; and the educational handout has been mailed to existing residences within three miles of the project site. The City shall verify compliance with the Construction Valley Fever Plan during the grading phases of project construction. The City shall also verify notification of the San Luis Obispo County Public Health Department, implementation of the worker training program, and mailing of the educational handout via developer-submitted materials. City of San Luis Obispo Page 270 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 3 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments ƒ Potential sources/causes ƒ Common symptoms ƒ Options or remedies available should someone be experiencing these symptoms ƒ The location of available testing for infection x Prior to construction permit issuance, this handout shall have been created by the developer and reviewed by the City. No less than 30 days prior to any surface disturbance (e.g., grading, filling, trenching) work commencing, this handout shall be mailed to all existing residences within three miles of the project site. AQ-3(b) Naturally Occurring Asbestos Air Toxics Control Measure Compliance Consistent with the requirements of the NOA ATCM, the project developer shall file an exemption request form with SLOAPCD including the geologic evaluation documenting the conclusion that no serpentine is present at depths where proposed grading/excavation would occur. The project developer shall comply with SLOAPCD requirements associated with the exception, if granted, or with subsequent SLOAPCD requirements resulting from the exemption request, which may include additional geologic evaluation, dust mitigation, or air monitoring. The project developer shall submit the exemption request form and geologic evaluation to SLOAPCD for review prior to the issuance of grading permits for the first project phase. The project developer shall submit to the City SLOAPCD’s concurrence with the exception and any subsequent SLOAPCD requirements resulting from the exception request prior to the issuance of grading permits for the first project phase. Any subsequent requirements identified by SLOAPCD that would be required to be implemented during project construction (e.g., dust mitigation or air monitoring) shall be printed on all grading plans. The City shall verify compliance with the requirements of the NOA ATCM by confirming SLOAPCD receipt of the exemption request and SLOAPCD’s concurrence with the exception or any subsequent SLOAPCD requirements resulting from the exception request. City of San Luis Obispo; SLOAPCD Biological Resources BIO-1(a) Construction Best Management Practices The applicant shall ensure the following general wildlife Best Management Practices (BMPs) are required for construction activities for the project: ƒ Ground disturbance shall be limited to the minimum necessary to complete construction activities. Construction limits of disturbance shall be flagged. All equipment and material storage, parking, staging and other support areas shall be identified prior to issuance of a grading permit. Areas of special biological concern within or adjacent to construction limits shall have highly visible orange construction fencing installed between said area and the limits of disturbance. ƒ All project construction activities shall occur during daylight hours (i.e., between sunrise and sunset) and during dry weather conditions. Night lighting shall be prohibited. ƒ Upon completion of construction all excess materials and debris shall be removed from the project construction area and disposed of appropriately. ƒ The work area shall remain clean. All food-related trash items shall be enclosed in sealed containers and removed from the site weekly. ƒ Pets and firearms shall be prohibited at the construction site. ƒ All refueling, maintenance, and staging of equipment and vehicles shall occur at least 100 feet from Acacia Creek and in a location where a spill would not drain toward aquatic habitat. A plan must be in place for prompt and effective response to any accidental spills prior to the onset of work activities. All workers shall be informed of the appropriate measures to take should an accidental spill occur. These measures shall be implemented during grading and construction activities. The applicant shall provide monthly maintenance reports during construction to the City compliance monitoring staff to document compliance with the above measures. The applicant shall notify the City immediately if a chemical or hazardous material occurs. City staff will spot check for compliance during construction. City of San Luis Obispo Page 271 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 4 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments ƒ To control sedimentation during and after project implementation, appropriate erosion control BMPs (e.g., use of coir rolls, jute netting, etc.) shall be implemented to minimize adverse effects to Acacia Creek. No plastic monofilament netting shall be utilized on site. ƒ All equipment operating within aquatic habitat shall be in good conditions and free of leaks. Spill containment shall be installed under all equipment staged within stream areas and extra spill containment and clean up materials shall be located in close proximity for easy access. ƒ At the end of each workday, excavations shall be secured with cover or a ramp provided to prevent wildlife entrapment. ƒ All trenches, pipes, culverts or similar structures shall be inspected for animals prior to burying, capping, moving, or filling. Stockpiles of chemicals, drums, bagged materials, and other hazardous materials such as propane, acetylene shall have pallets and/or secondary containment. Should a material spills occur, City compliance monitoring staff shall be informed of the spill and materials and/or contaminants shall be cleaned from the project construction area and recycled or disposed of to the satisfaction of the City and in accordance with all applicable local, State, and federal regulations. BIO-1(b) Worker Environmental Awareness Program Training Prior to the initiation of construction activities (including staging and mobilization), a qualified biologist shall provide all personnel associated with project construction with a Worker Environmental Awareness Program (WEAP) training. The training will aid workers in recognizing special status resources that may occur in the project area. The specifics of this program shall include identification of the sensitive species and habitats, a description of the regulatory status and general ecological characteristics of sensitive resources, and review of the limits of construction and avoidance measures required to reduce impacts to biological resources within the work area. A fact sheet conveying this information shall also be prepared for distribution to all contractors, their employers, and other personnel involved with construction of the project. All employees shall sign a form provided by the trainer documenting they have attended the WEAP and understand the information presented to them. Fact sheets shall be reviewed and approved by the City prior to conducting the training. The required notification and an attendance log that includes the names and signatures of all personnel that have received the training shall be provided to the City upon completion of the training. The applicant shall notify City compliance monitoring staff of the date and time the training is scheduled so that City staff may attend. City compliance monitoring staff shall review fact sheets prior to conducting the training. The required notification and an attendance log that includes the names and signatures of all personnel that have received the training shall be provided to City compliance monitoring staff prior to the start of grading or construction activities. The City shall review training materials, notification, and attendance log and provide confirmation of compliance with the conditions outlined in the measure. City of San Luis Obispo BIO-1(c) Updated Surveys for Infrastructure Improvement Parcels Within the portions of the study area not currently owned by the applicant, but where improvements are required to facilitate the project, the applicant shall conduct updated surveys of sensitive species habitats (including special status plant species, CRLF, wetland habitat, and VPFS habitat) within the appropriate season immediately prior to the onset of any ground disturbances associated with project-related construction activities to evaluate the current occupancy of suitable habitat for sensitive species and to refine the final habitat mitigation replacement acreages. Updated surveys for federally listed species shall be completed per the timing and methodology specified by resource agency protocol. Results of the survey(s) shall be documented and results communicated to City compliance monitoring staff and applicable agencies prior to issuance of grading permits. The City shall review the survey results and provide confirmation of compliance with the conditions outlined in the measure. City of San Luis Obispo Page 272 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 5 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments If special status plant species are identified during the updated survey(s), the species shall be incorporated into Special Status Plant Species Mitigation Plan in accordance with BIO-1(e). The plan shall provide a minimum ratio of 2:1 (number of acres/individuals restored to number of acres/individuals impacted) for impacts to any special status plant species with California Rare Plant Rank (CRPR) of 1 or 2 and a minimum ratio of 1:1 for special status plant species with CRPR 3 or 4. If a federally and/or state listed plant species is identified during the surveys, the applicant shall avoid all impacts to the species. If avoidance is infeasible, the applicant shall consult with the City and the United States Fish and Wildlife Service and/or California Department of Fish and Wildlife, as applicable, for authorization of take. If CRLF is identified during the survey(s), BIO-1(f) shall be implemented during project construction of the study area not currently owned by the applicant to ensure no take of individual CRLF. If VPFS are identified during the survey(s), BIO-1(d) shall be implemented during project construction of the study area not currently owned by the applicant to ensure no take of individual VPFS. If vernal marsh or other season wetland habitat is identified during the survey(s) and impacts to season wetland habitat cannot be avoided, a formal jurisdictional delineation shall be completed for the feature(s). Impacts to the habitat shall be included in the Habitat Mitigation and Monitoring Plan as detailed in BIO-2(b). BIO-1(d) Vernal Pool Fairy Shrimp Mitigation Plan If VPFS are present within the study area and may be impacted by project-related construction, a Vernal Pool Fairy Shrimp Mitigation Plan shall be prepared which provides a minimum ratio of 1:1 (number of acres restored to number of acres impacted) for impacts to VPFS. The plan shall identify the specific mitigation sites and can be prepared in conjunction with the Habitat Mitigation and Monitoring Plan (BIO-2[b]). The plan shall include, at a minimum, the following components: ƒ Description of the project/impact site (i.e., location, responsible parties, areas to be impacted); ƒ Goal(s) of the compensatory mitigation project [area(s) of vernal pool fairy shrimp habitat to be established and/or preserved; ƒ Description of the proposed compensatory mitigation receiver site(s) (location and size, ownership status, existing conditions of the compensatory mitigation site); the receiver site(s) shall be at least the size as the area currently occupied by the current population to ensure the replacement ratio is achieved; ƒ Implementation plan for the compensatory mitigation site (rationale for expecting implementation success, responsible parties, schedule, site preparation, planting plan); ƒ Maintenance activities during the monitoring period, as appropriate (activities, responsible parties, schedule); ƒ Monitoring plan for the compensatory mitigation site, (performance standards, target acreages to be established, and/or preserved, annual monitoring reports); ƒ Success criteria based on the goals and measurable objectives; The Vernal Pool Fairy Shrimp Mitigation Plan shall be prepared by the applicant and shall be submitted to the City compliance monitoring staff for review and approval prior to approval of grading and construction permits. The applicant shall be responsible for documenting compliance with the Vernal Pool Fairy Shrimp Mitigation Plan as stipulated by the plan. All reporting will be submitted to the City for review and approval. The replacement populations shall be monitored by a qualified biologist for 5 years. City of San Luis Obispo Page 273 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 6 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments ƒ An adaptive management program and remedial measures to address negative impacts to restoration efforts; ƒ Notification of completion of compensatory mitigation and agency confirmation; and x Contingency measures (initiating procedures, alternative locations for contingency compensatory mitigation, funding mechanism). BIO-1(e) Special Status Plant Mitigation Plan A Special Status Plant Mitigation Plan shall be prepared by a qualified botanist approved by the City, which will provide a minimum ratio of 2:1 (number of acres/individuals restored to number of acres/individuals impacted) for impacts to Congdon’s tarplant and a minimum ratio of 1:1 for Cambria morning-glory. If project construction has not occurred by January 1, 2024, seasonally timed botanical surveys shall be conducted to determine the current extent of the special status plant species populations on site. The plan shall identify the specific mitigation sites and can be prepared in conjunction with the Habitat Mitigation and Monitoring Plan (BIO-2[b]). The plan shall include, at a minimum, the following components: ƒ Description of the project/impact site (i.e., location, responsible parties, areas to be impacted by habitat type); ƒ Goal(s) of the compensatory mitigation project [area(s) of special status plant species to be established and/or preserved; ƒ Description of the proposed compensatory mitigation receiver site(s) (location and size, ownership status, existing conditions of the compensatory mitigation site); the receiver site(s) shall be at least twice the size as the area currently occupied by the rare plant occurrences to ensure the replacement ratio is achieved. ƒ Implementation plan for the compensatory mitigation site (rationale for expecting implementation success, responsible parties, schedule, site preparation, planting plan [container sizes, seeding rates, etc.]); ƒ Maintenance activities during the monitoring period, including weed removal and irrigation as appropriate (activities, responsible parties, schedule); ƒ Monitoring plan for the compensatory mitigation site, (performance standards, target acreages to be established, and/or preserved, annual monitoring reports); ƒ Success criteria based on the goals and measurable objectives; ƒ An adaptive management program and remedial measures to address negative impacts to restoration efforts; ƒ Notification of completion of compensatory mitigation and agency confirmation; and ƒ Contingency measures (initiating procedures, alternative locations for contingency compensatory mitigation, funding mechanism). The Special Status Plant Mitigation Plan shall be prepared by the applicant and shall be submitted to City compliance monitoring staff for review and approval by the City prior to approval of grading and construction permits. The applicant will be responsible for documenting compliance with the Special Status Plant Mitigation Plan as stipulated by the plan. All reporting will be submitted to the City for review and approval. The replacement populations shall be monitored by a qualified biologist for 5 years. City of San Luis Obispo BIO-1(f) California Red-Legged Frog Impact Avoidance and Minimization A qualified biologist(s) shall conduct a pre-construction survey for CRLF within 48 hours prior to the initial onset of initial ground or vegetation disturbing activities. All potentially suitable habitat for CRLF shall be surveyed during the daytime and again after dark. The surveys shall include all areas where project construction activities will occur, as well as a 300-foot buffer upstream and downstream of the Results of the survey(s) shall be communicated to the City compliance monitoring staff immediately upon completion. The applicant shall submit the results report for the pre-construction surveys within one week of completing the surveys. The applicant shall consult with a qualified biologist The City shall review the survey results and provide confirmation of compliance with the conditions outlined in the measure. City of San Luis Obispo Page 274 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 7 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments project boundary in Acacia Creek. If no individuals are found during the pre-construction survey, work may proceed with monitoring as described below. If CRLF is found and the individual is likely to be injured or killed by work activities, all work must stop and the individual will be allowed to move out of harm’s way of its own volition then the applicant/developer shall comply with all relevant requirements of the FESA prior to resuming project activities. A qualified biologist(s) shall monitor the removal of material and debris piles that may contain cover for CRLF. If CRLF is identified within the construction area during project construction, ground-disturbing activities shall immediately cease, and the individual will be allowed to move out of harm’s way of its own volition before work activities may begin. If the individual does not move out of harm’s way, the USFWS shall be notified and consulted. Ground-disturbing activities shall commence following guidance from the USFWS and the City. No CRLF shall be captured, handled, or relocated without approval by the USFWS. if relocations are employed, and the applicant must provide the City with documentation of the effort and summary of the results within one week. BIO-1(g) Southwestern Pond Turtle and Western Spadefoot Impact Avoidance and Minimization A qualified biologist(s) shall conduct a pre-construction survey for southwestern pond turtle and western spadefoot within 48 hours prior to the initial onset of initial ground or vegetation disturbing activities. All potentially suitable habitat for southwestern pond turtle, western spadefoot toad within the study area where project-related activities would occur shall be surveyed. If southwestern pond turtle or western spadefoot is found and the individual is likely to be injured or killed by work activities, all work must stop and the individual will be allowed to move out of harm’s way of its own volition before work activities may begin. Individuals may be relocated out of harm’s way by a qualified biologist, if present, before work activities begin. The biologist(s) must relocate the any pond turtle or western spadefoot the shortest distance possible to a location that contains suitable habitat that is not likely to be affected by activities associated with the project. A qualified biologist(s) shall monitor the removal of material and debris piles that may contain cover for southwestern pond turtle and western spadefoot. If southwestern pond turtle or western spadefoot is found and the individual is likely to be injured or killed by work activities, all work must stop and the individual will be allowed to move out of harm’s way of its own volition before work activities may begin. Individuals may be relocated out of harm’s way by a qualified biologist, if present, before work activities begin. The biologist(s) must relocate the any pond turtle or western spadefoot the shortest distance possible to a location that contains suitable habitat that is not likely to be affected by activities associated with the project. Results of pre-construction survey(s) shall be communicated to the City immediately upon completion. The applicant shall submit the results report for the pre-construction surveys within one week of completing the surveys. The applicant shall consult with a qualified biologist if relocations are employed. The relocations must be conducted by a qualified biologist, and the applicant must provide the City with documentation of the effort and summary of the results within one week. The City shall review the survey results and provide confirmation of compliance with the conditions outlined in the measure. City of San Luis Obispo BIO-1(h) American Badger Impact Avoidance and Minimization A qualified biologist(s) shall conduct a pre-construction survey for potential American badger dens within one week prior to the initial onset of initial ground or vegetation disturbing activities. The survey shall be conducted within all project work areas and a 50-foot buffer. Any potential dens/burrows found shall be identified with flagging or stakes, as feasible, and a 50-foot no-work buffer shall be flagged. If any potential American badger dens are found that cannot be avoided by the 50-foot buffer area, a Results of pre-construction survey(s) shall be communicated to the City immediately upon completion. The applicant shall submit the results report for the pre-construction surveys within one week of completing the surveys. The applicant shall consult with a qualified biologist if passive exclusion methods are employed, and the applicant must provide the City with documentation of the effort and summary of the results within one week. The City shall review the survey results and provide confirmation of compliance with the conditions outlined in the measure. The City shall review the applicant’s methodology and rationale for passive exclusions prior to implementation of the exclusion. The City shall ensure the avoidance buffers are established and maintained as needed. City of San Luis Obispo Page 275 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 8 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments qualified biologist will monitor the dens and employ wildlife trail cameras and/or a tracking medium around dens and monitored daily for at least three days to determine whether they are currently occupied by badgers. If the den is determined not to be occupied by a badger or other special status wildlife species, construction may commence. No dens with young shall be disturbed, and no work shall be conducted within 50 feet of maternal dens until they have left the den. Any occupied badger den that is being used by a single adult with no young that cannot be avoided shall be blocked incrementally by placing sticks or debris over the entrance for three to five days, to discourage the individual from using the den. Only after the badger has left the den, as determined by the qualified biologist implementing the wildlife camera and/or tracking medium methods, can the den be concluded as unoccupied and the work proceed within the no-work buffer. BIO-1(i) Pallid Bat and Townsend’s Big-Eared Bat Impact Avoidance and Minimization The applicant shall ensure the following actions are implemented to avoid and minimize potential impacts to special status bat species: Within one week prior to construction activities, including tree removal, a qualified biologist shall conduct a survey of the trees proposed to be removed within the construction area to determine if roosting bats are present during the non-breeding season (November through March). If a colony of bats is found roosting in any tree or structure, further surveys shall be conducted sufficient to determine the species present and the type of roost (day, night, maternity, etc.). If the bats are not part of an active maternity colony, passive exclusion measures may be implemented with approval from the City in consultation with CDFW. Exclusions shall occur outside the breeding season (typically May through August) and winter hibernation (typically December through February). If bats are roosting in tree cavities in the construction area during the daytime but are not part of an active maternity colony, then exclusion measures must include one-way valves that allow bats to get out but are designed so that the bats may not re-enter the roost cavity. Results of pre-construction survey(s) shall be communicated to the City immediately upon completion. The applicant shall submit the results report for the pre-construction surveys within one week of completing the surveys. The applicant shall consult with a qualified biologist if passive exclusion methods are employed, and the applicant must provide the City with documentation of the effort and summary of the results within one week. The City shall review the survey results and provide confirmation of compliance with the conditions outlined in the measure. The City shall review the applicant’s methodology and rationale for passive exclusions prior to implementation of the exclusion. City of San Luis Obispo BIO-1(j) Burrowing Owl Impact Avoidance and Minimization The following measures shall be implemented in order to avoid and minimize impacts to burrowing owl. a. Not more than 30 days prior to initiation of ground-disturbing activities, and again within 24 hours of the initiation of ground-disturbing activities associated with construction, a City-approved biologist shall conduct a take avoidance survey of the construction area and surrounding areas to a distance of 150 meters, in accordance with the methods outlined in the Mitigation Methods – Pre-construction and Appendix D Surveys for Take Avoidance of the California Department of Fish and Game (CDFG; now CDFW) Staff Report on Burrowing Owl Mitigation (CDFG 2012). The pre-construction survey will cover all areas within 150 meters of the portion of the site where construction is scheduled to start. Areas within 150 meters that are not accessible due to property access restrictions shall be surveyed using binoculars. Surveys will be phased, based on the grading and construction schedule, such that they are Results of pre-construction survey(s) shall be communicated to the City immediately upon completion. The applicant shall submit the results report for the pre-construction surveys within one week of completing the surveys. A report on the implementation of impact avoidance measures used shall be included on all grading and construction plans prior to grading. A report on the implementation of impact avoidance measures implemented shall be submitted to City and CDFW upon completion of the construction project. If passive relocation is required, the Burrowing Owl Exclusion Plan must be submitted and approved by Planning and Development prior to conducting exclusion activities. The applicant shall retain a qualified City- and CDFW-approved biologist to monitor all construction activities as warranted to ensure compliance. The approved biologist shall submit monitoring reports to the City and CDFW for review. City of San Luis Obispo; CDFW Page 276 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 9 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments conducted not more than 30 days before the start of ground disturbing activities in new areas. If grading and/or construction activities in portions of the site cease for a period of 14 days, those portions of the site will be resurveyed for burrowing owls prior to the resumption of grading and/or construction activities. If no occupied (breeding or wintering) burrowing owl burrows are identified, no further mitigation would be required. If occupied burrows are identified on the site or within 150 meters of the Project disturbance area, one of the following actions shall be taken: 1) permanent avoidance of the burrow or 2) establishment of a temporary avoidance buffer followed by passive relocation and compensatory mitigation for loss of habitat in conjunction with the measures below: Site-specific, no-disturbance buffer zones shall be established and maintained between Project activities and occupied burrows, using the distances recommended in the CDFW guidelines (CDFG 2012) or as otherwise determined appropriate by the City-approved biologist in consultation with CDFW. During the non-breeding season, if an occupied burrow cannot be avoided, and the burrow is not actively in use as a nest, the burrowing owls can be excluded from burrows in accordance with an approved Burrowing Owl Exclusion Plan, which shall be prepared and submitted for approval by CDFW prior to passive relocation of any burrowing owls. The Burrowing Owl Exclusion Plan shall be based on the recommendations made in the CDFG Staff Report on Burrowing Owl Mitigation (CDFG 2012) and shall include the following information for each proposed passive relocation: a. Confirmation by site surveillance that the burrow(s) is empty of burrowing owls and other species; b. Identification of type of scope to be used and appropriate timing of scoping; c. Occupancy factors to look for and what shall guide determination of vacancy and excavation timing; d. Methods for burrow excavation; e. Removal of other potential owl burrow surrogates or refugia on site; f. Methods for photographic documentation of the excavation and closure of the burrow; g. Monitoring of the site to evaluate success and, if needed, to implement remedial measures to prevent subsequent owl use to avoid take; h. Methods for assuring the impacted site shall continually be made inhospitable to burrowing owls and fossorial mammals; and i. Method(s) for compensatory mitigation for burrow loss. BIO-1(k) Nesting Birds and Loggerhead Shrike Impact Avoidance and Minimization Construction activities shall be initiated outside of the typical avian nesting period, between February 1 and August 31, if feasible. All initial site and vegetation disturbance shall be limited to the time period between September 1 and January 31, if feasible. If initial ground disturbing activities and vegetation removal occurs between February 1 and August 31, nesting bird surveys shall be conducted by a qualified biologist for the entire construction area plus a 250-foot buffer within one week Results of pre-construction survey(s) shall be communicated to the City immediately upon completion. The applicant shall submit the results report for the pre-construction surveys within one week of completing the surveys. Buffer reduction requests must be submitted to the City for approval prior to implementation of a reduced buffer. The City shall review the survey results and provide confirmation of compliance with the conditions outlined in the measure. The City shall ensure the avoidance buffers are established and maintained as needed. City of San Luis Obispo Page 277 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 10 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments prior to initial ground disturbance activities or removal of vegetation. Surveys shall continue to be conducted within the timeframes specified above until all vegetation removal activities are completed. If surveys do not locate nesting birds, construction activities may be conducted. If nesting birds are located, no construction activities shall occur within 50 feet of nests of passerine species, including loggerhead shrike, 250 feet of nests of raptor species until chicks are fledged. Any changes in buffer extent shall be made in consultation with the City. The buffer will be delineated with flagging, and no work shall take place within the buffer area until the young have left the nest, as determined by the qualified biologist. BIO-2(a) Jurisdictional Delineation If impacts to seasonal wetland habitat cannot be avoided, the applicant shall retain a qualified biologist to complete a jurisdictional delineation. The jurisdictional delineation shall determine the extent of the jurisdiction of the USACE, RWQCB, and CDFW. The jurisdictional delineation shall be conducted in accordance with the requirement set forth by each agency. The results shall be a preliminary jurisdictional delineation report that shall be submitted to the implementing agency/agencies, USACE, RWQCB, and/or CDFW, as appropriate, for review and approval as part of the permitting process. The applicant shall submit the jurisdictional delineation report to the City prior to approval of grading and construction permits. The City shall ensure that the jurisdictional delineation report has been completed. City of San Luis Obispo BIO-2(b) Prepare a Habitat Mitigation and Monitoring Plan A Habitat Mitigation and Monitoring Plan (HMMP) shall be prepared which will provide a minimum 2:1 ratio (number of acres/individuals restored to number of acres/individuals impacted) for temporary and permanent impacts to vernal marsh. The HMMP will identify the specific mitigation sites and can be prepared in conjunction with the Special Status Plant Mitigation Plan. The HMMP will be implemented immediately following project completion. The HMMP shall include, at a minimum, the following components: ƒ Description of the project/impact site (i.e., location, responsible parties, areas to be impacted by habitat type); ƒ Goal(s) of the compensatory mitigation project [type(s) and area(s) of habitat to be established, restored, enhanced, and/or preserved; specific functions and values of habitat type(s) to be established, restored, enhanced, and/or preserved]; ƒ Description of the proposed compensatory mitigation site (location and size, ownership status, existing functions and values of the compensatory mitigation site); ƒ Implementation plan for the compensatory mitigation site (rationale for expecting implementation success, responsible parties, schedule, site preparation, planting plan [including plant species to be used, container sizes, seeding rates, etc.]); ƒ Maintenance activities during the monitoring period, including weed removal and irrigation as appropriate (activities, responsible parties, schedule); ƒ Monitoring plan for the compensatory mitigation site, including no less than quarterly monitoring for the first year (performance standards, target functions and values, target acreages to be established, restored, enhanced, and/or preserved, annual monitoring reports); The HMMP shall be prepared by the developer/applicant and shall be submitted for review and approval by the City prior to the approval of grading and construction permits. The applicant shall send annual documentation to the City demonstrating compliance with the HMMP requirements and status of mitigation area. The City shall review and approve the HMMP for compliance prior to issuance of the grading permits and onset of construction. The replacement habitat shall be monitored by a qualified biologist for 5 years. City of San Luis Obispo Page 278 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 11 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments ƒ Success criteria based on the goals and measurable objectives; said criteria to be, at a minimum, at least 80 percent survival of container plants and 80 percent relative cover by vegetation type; ƒ An adaptive management program and remedial measures to address negative impacts to restoration efforts; ƒ Notification of completion of compensatory mitigation and agency confirmation; and ƒ Contingency measures (initiating procedures, alternative locations for contingency compensatory mitigation, funding mechanism). BIO-2(c) Agency Coordination Impacts to wetlands as a result of the project are anticipated to require permits from CDFW, USACE, and/or RWQCB. The applicant shall comply with all applicable state and federal permitting requirements. The applicant shall obtain and produce for the City correspondence from applicable state and federal agencies indicating compliance of the proposed development with state and federal laws. The applicant shall submit copies of correspondence and/or permits (as applicable) with applicable agencies to the City prior to approval of grading and construction permits. The City shall confirm that the applicant has obtained all necessary permits and approvals. City compliance staff shall monitor and inspect to ensure that required measures are implemented during grading and construction of the project. City of San Luis Obispo BIO-2(d). Wetland Mitigation Impacts to federal and state wetlands (as defined by the Clean Water Act Section 404 and the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State) shall be mitigated at a minimum ratio of 2:1 (acres of wetlands created to acres of wetlands permanently impacted) to meet the performance standard of no net loss of wetland habitat. The mitigation program shall be developed by a qualified biologist and be incorporated into and conform with the requirements for the Habitat Mitigation and Monitoring Plan. The mitigation shall be implemented for no less than five years after construction or until the local jurisdiction and/or the permitting authority (e.g., USACE) has determined that restoration has been successful. The applicant shall submit the HMMP to the City as well as the USACE, RWQCB, and/or CDFW (depending upon the agencies permitting authority over the project) for review and approval prior to issuance of grading permits. The applicant shall send annual documentation to the City demonstrating compliance with the HMMP requirements and status of mitigation area. The City shall review and approve the HMMP for compliance prior to issuance of the grading permits and onset of construction. The replacement habitat shall be monitored by a qualified biologist for 5 years. City of San Luis Obispo; and USACE, RWQCB, and/or CDFW BIO-2(e) Jurisdictional Areas Best Management Practices During Construction The following best management practices shall be required for grading and construction within jurisdictional areas or wetlands where impacts are authorized. In addition, the measures shall be required at locations where construction occurs within 100 feet from jurisdictional areas or wetlands. ƒ Access routes, staging, and construction areas shall be limited to the minimum area necessary to achieve the project goal and minimize impacts to other waters (federal and state) including locating access routes and ancillary construction areas outside of jurisdictional areas. ƒ To control erosion and sediment runoff during and after project implementation, appropriate erosion control materials shall be deployed and maintained to minimize adverse effects on jurisdictional areas in the vicinity of the project. ƒ Project activities within the jurisdictional areas should occur during the dry season (typically between May 1 and September 30) in any given year, or as otherwise directed by the regulatory agencies. Deviations from this work window can be made with permission from the relevant regulatory agencies. ƒ During construction, no litter or construction debris shall be placed within jurisdictional areas. All such debris and waste shall be picked up daily and properly disposed of at an appropriate site. These measures shall be implemented during grading and construction and shall be included on all land use, grading, and building plans. The applicant shall provide the City with documentation of compliance with the above measures in monthly reports. City compliance staff shall periodically inspect to ensure compliance. City of San Luis Obispo Page 279 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 12 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments ƒ All project-generated debris, building materials, and rubbish shall be removed from jurisdictional areas and from areas where such materials could be washed into them. ƒ Raw cement, concrete or washings thereof, asphalt, paint or other coating material, oil or other petroleum products, or any other substances which could be hazardous to aquatic species resulting from project-related activities, shall be prevented from contaminating the soil and/or entering jurisdictional areas. All refueling, maintenance, and staging of equipment and vehicles shall occur at least 100 feet from bodies of water and in a location where a potential spill would not drain directly toward aquatic habitat (e.g., on a slope that drains away from the water source). Prior to the onset of work activities, a plan must be in place for prompt and effective response to any accidental spills. All workers shall be informed of the importance of preventing spills and of the appropriate measures to take should an accidental spill occur. Cultural Resources CUL-1(a) Construction Monitoring Treatment Plan A Construction Monitoring Treatment Plan shall be developed and implemented to ensure that any new discoveries are adequately recorded, evaluated, and if, significant, mitigated. The Construction Monitoring Treatment Plan shall provide the following: a. All ground disturbances within 200 feet of the top of bank of Acacia Creek shall be monitored by a qualified archaeologist and Native American observer and all ground disturbance within 50 feet of the mapped boundaries of Feature 26 and Feature 27 shall be monitored by a qualified archaeologist. b. Procedures for notifying the City and other involved or interested parties in case of a new discovery. The qualified archaeologist and/or Native American observer shall have the authority to temporarily halt or redirect construction in the vicinity of any potentially significant discovery to allow for adequate recordation and evaluation. c. Preparation and approval of a plan that identifies procedures that shall be used to record, evaluate, and mitigate unanticipated discoveries with a minimum of delay. d. Procedures that shall be followed in case of discovery of human remains. In the event that isolated human remains are encountered, consultation with the most likely Native American descendant, pursuant to Public Resources Code section 5097.97 and 5097.98, shall apply. e. Results of the monitoring program shall be documented in a technical report after completion of all ground disturbances. The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. Prior to issuance of grading permits, the Applicant shall submit to the City Construction Monitoring Treatment Plan prepared by a qualified archaeologist. The City shall review and approve the City Construction Monitoring Treatment Plan. City permit compliance staff shall confirm monitoring by the qualified archaeologist and Native American representative and City grading inspectors shall spot check fieldwork. The qualified archaeologist and Native American representative shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo CUL-1(b) Archaeological Monitoring Within 200 Feet of Acacia Creek Top of Bank All construction-related ground disturbances, including clearing/grubbing, within 200 feet of the top of bank of Acacia Creek shall be monitored by a qualified archaeologist and a Native American representative. Depending on the type of work, multiple teams of monitors may be necessary to observe construction activities occurring in separate areas. In the event that archaeological remains are The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. Prior to issuance of grading permits, the Applicant shall submit to the City a contract or Letter of Commitment with a qualified archaeologist and Native American representative. The City shall review and approve the selected archaeologist to ensure they meet The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. Prior to issuance of grading permits, the Applicant shall submit to the City a contract or Letter of Commitment with a qualified archaeologist and Native American representative. The City shall review and approve the selected City of San Luis Obispo Page 280 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 13 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments encountered during construction, City of San Luis Obispo staff shall be notified and all work within 50 feet of the find shall be halted until the find is evaluated by a qualified archaeologist and appropriate mitigation, if necessary, is implemented. If archaeological remains are identified, the resource shall be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA and further treatment measures including but not limited to avoidance consistent with City of San Luis Obispo General Plan Policies, Phase 2 Subsurface Archaeological Resource Evaluation (SARE), or Phase 3 Archaeological Data Recovery Excavation (ADRE) may be required. Work within 50 feet of the find shall not resume until authorization is received from the City. appropriate professional qualification standards, consistent with the ARPP Guidelines. archaeologist to ensure they meet appropriate professional qualification standards, consistent with the ARPP Guidelines. CUL-1(c) Archaeological Monitoring Within 50 feet of Feature 26 and Feature 27 All construction-related ground disturbances, including clearing/grubbing, within 50 feet of the mapped boundaries of Feature 26 and Feature 27 shall be monitored by a qualified archaeologist. In the event that archaeological remains are encountered during construction, City of San Luis Obispo staff shall be notified and all work within 50 feet of the find shall be halted until the find is evaluated by a qualified archaeologist and appropriate mitigation, if necessary, is implemented. If archaeological remains are identified, the resource shall be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA and further treatment measures including but not limited to avoidance consistent with City of San Luis Obispo General Plan Policies, Phase 2 Subsurface Archaeological Resource Evaluation (SARE), or Phase 3 Archaeological Data Recovery Excavation (ADRE) may be required. Work within 50 feet of the find shall not resume until authorization is received from the City. The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. Prior to issuance of grading permits, the Applicant shall submit to the City a contract or Letter of Commitment with a qualified archaeologist and Native American representative. The City shall review and approve the selected archaeologist to ensure they meet appropriate professional qualification standards, consistent with the ARPP Guidelines. City permit compliance staff shall confirm monitoring by the City-approved archaeologist and Native American representative and City grading inspectors shall spot check fieldwork. The City-approved archaeologist and Native American representative shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo CUL-1(d) Unanticipated Discovery of Historical or Archaeological Resources In the event prehistoric or historic-period materials not identified during the ARI prepared for the project are encountered during construction-related ground disturbances, ground-disturbing activities within 50 feet of the discovery shall be halted, and a qualified archaeologist shall be contacted to determine if materials are isolated finds or part of a larger archaeological deposit. If the discovery is prehistoric, a Native American representative shall be contacted to participate in the evaluation of the discovery. Appropriate City of San Luis Obispo staff shall also be notified. Prehistoric materials may include chert flaked stone tools (e.g., projectile points, knives, scrapers) or toolmaking debris; culturally darkened soil (midden) containing artifacts or shellfish remains; and stone milling equipment (e.g., mortars, pestles, handstones). Historic-period materials might include stone, concrete, wood or adobe building foundations, corrals, and walls; filled wells or privies; mining features; and deposits of metal, glass, and/or ceramic refuse. If an archaeological site is identified, the resource should be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA and further treatment measures including but not limited to avoidance consistent with City of San Luis Obispo General Plan Policies, Phase 2 Subsurface Archaeological Resource Evaluation (SARE), or Phase 3 Archaeological Data Recovery Excavation (ADRE) may be required. Work within 50 feet of the discovery shall not resume until authorization is received from the City. The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. Prior to issuance of grading permits, the Applicant shall submit to the City a contract or Letter of Commitment with a qualified archaeologist and Native American representative. The City shall review and approve the selected archaeologist to ensure they meet appropriate professional qualification standards, consistent with the ARPP Guidelines. City permit compliance staff shall confirm monitoring by the City-approved archaeologist and Native American representative and City grading inspectors shall spot check fieldwork. The City-approved archaeologist and Native American representative shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo Page 281 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 14 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments CUL-2(a) Unanticipated Discovery of Tribal Cultural Resources In the event that a resource of Native American origin is identified during construction, the City of San Luis Obispo staff shall contact all California Native American tribe(s) that have expressed interest in the project and begin or continue consultation procedures with any tribe or tribes that request consultation. If an archaeological site is identified, the resource should be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA. If the City, in consultation with local Native Americans, determines that the resource is a tribal cultural resource and the proposed project would have a potentially significant impact to the resource, a tribal cultural resource mitigation plan shall be prepared and implemented in accordance with State guidelines (PRC Sections 21080.3.2, 21080.3.3, 21084.3) and in consultation with Native American groups. The mitigation plan may include but would not be limited to avoidance, capping in place, excavation and removal of the resource, interpretive displays, sensitive area signage, or other mutually agreed upon measures. This condition shall be printed on all building and grading plans. City permit compliance staff shall check plans prior to issuance of grading permits, and City compliance monitoring staff shall spot check in the field throughout grading and construction. City of San Luis Obispo Geology and Soils GEO-1(a) Paleontological Monitoring Prior to issuance of grading permits and the commencement of ground disturbing activities on the project site that are greater than six feet in depth, a qualified professional paleontologist shall be retained to conduct paleontological monitoring during such ground disturbing activities. The Qualified Paleontologist shall have knowledge of the local paleontology and shall be familiar with paleontological procedures and techniques. Prior to the commencement of construction activities, an orientation meeting shall be conducted by the Qualified Paleontologist, general contractor, subcontractor, and construction workers associated with earth disturbing activities. The orientation meeting shall describe the potential of exposing paleontological resources, the types of materials may be encountered, and directions on the steps that shall be taken if such a find is encountered. Ground disturbing construction activities (including grading, trenching, drilling with an auger greater than 3 feet in diameter, and other excavation) within previously undisturbed sediments at depths greater than six feet shall be monitored on a full-time basis. Monitoring shall be supervised by the Qualified Paleontologist and shall be conducted by a qualified paleontological monitor, who is defined as an individual who meets the minimum qualifications per standards set forth by the SVP (2010), which includes a B.S. or B.A. degree in geology or paleontology with one year of monitoring experience and knowledge of collection and salvage of paleontological resources. If the Qualified Paleontologist determines that full-time monitoring is no longer warranted, he or she may recommend reducing monitoring to periodic spot-checking or cease entirely. Full-time monitoring shall be reinstated if any new ground disturbances are required at a depth of six feet or greater, and reduction or suspension would need to be reconsidered by the Qualified Paleontologist. Ground-disturbing activity that does not exceed six feet in depth within Quaternary alluvium would not require paleontological monitoring. Prior to issuance of grading permits, the Applicant shall submit to the City a contract or Letter of Commitment with a Qualified Paleontologist. The City shall review and approve the Qualified Paleontologist to ensure they meet appropriate professional qualification standards, consistent with the SVP standards. Prior to issuance of grading permits, the Applicant shall submit to the City the required Paleontological Monitoring Plan prepared by a Qualified Paleontologist. The City shall review and approve the Paleontological Monitoring Plan. The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. City permit compliance staff shall check plans prior to issuance of grading permits. City permit compliance staff shall confirm monitoring by the Qualified Paleontologist and City grading inspectors shall spot check in the field throughout grading and construction. The Qualified Paleontologist shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo Page 282 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 15 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments GEO-1(b) Fossil Discovery, Preparation, and Curation In the event that a paleontological resource is discovered, the monitor shall have the authority to temporarily divert construction equipment around the find until it is assessed for scientific significance and collected. Once salvaged, significant fossils shall be identified to the lowest possible taxonomic level, prepared to a curation-ready condition, and curated in a scientific institution with a permanent paleontological collection along with all pertinent field notes, photos, data, and maps. Curation fees are assessed by the repository and are the responsibility of the project owner. Prior to issuance of grading permits, the Applicant shall submit to the City the required Paleontological Monitoring Plan prepared by a Qualified Paleontologist. The City shall review and approve the Paleontological Monitoring Plan. The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. City permit compliance staff shall check plans prior to issuance of grading permits. City permit compliance staff shall confirm monitoring by the Qualified Paleontologist and City grading inspectors shall spot check in the field throughout grading and construction. The Qualified Paleontologist shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo GEO-1(c) Paleontological Monitoring Plan Prior to the start of ground-disturbing activities, a Paleontological Monitoring Plan shall be prepared and submitted to the City for review and approval. The Plan shall be prepared by a Qualified Paleontologist and shall address the following: ƒ Procedures for Paleontological Monitoring; ƒ Procedures for the paleontologist to make and implement recommendations as to whether or not monitoring should be required on a full-time basis; ƒ Procedures for the paleontological monitor to temporarily redirect construction away from an area if paleontological resources are encountered during grading or excavation in order to assess the significance of the find; and ƒ Procedures for the handling of collected resources, including preparation to the point of identification. Prior to issuance of grading permits, the Applicant shall submit to the City the required Paleontological Monitoring Plan prepared by a Qualified Paleontologist. The City shall review and approve the Paleontological Monitoring Plan. The conditions for monitoring and treatment of discoveries shall be printed on all building and grading plans. City permit compliance staff shall check plans prior to issuance of grading permits. City permit compliance staff shall confirm monitoring by the Qualified Paleontologist and City grading inspectors shall spot check in the field throughout grading and construction. The Qualified Paleontologist shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo GEO-1(d) Final Paleontological Mitigation Report At the conclusion of laboratory work and museum curation, a final report shall be prepared describing the results of the paleontological mitigation monitoring efforts associated with the project. The report shall include a summary of the field and laboratory methods, an overview of the project geology and paleontology, a list of taxa recovered (if any), an analysis of fossils recovered (if any) and their scientific significance, and recommendations. The report shall be submitted to the City and the designated museum repository. Applicant shall submit to the City and the designated museum repository the required Paleontological Mitigation Report at the conclusion of laboratory work and museum curation. City permit compliance staff shall check plans prior to issuance of grading permits. The Qualified Paleontologist shall ensure that actions consistent with this mitigation measure are implemented in the event of any inadvertent discovery. City of San Luis Obispo Hazards, Hazardous Materials, and Safety HAZ-1(a) Soil Management Plan Prior to issuance of any grading permits for the planned roundabout and frontage improvements along Tank Farm Road and the future alignment of Santa Fe Road, a contaminated soil assessment shall be completed in the portions of land to be graded for the identified improvements. Soil samples shall be collected under the supervision of a professional geologist or environmental professional to determine the presence or absence of contaminated soil in these areas. The sampling density shall be in accordance with guidance from San Luis Obispo County Environmental Health Services (EHS), so as to define the area of contaminated soil that may be disturbed by grading activities. Laboratory analysis of soil samples shall be analyzed for the presence of petroleum hydrocarbons, VOCs, and heavy metals in accordance with applicable US EPA Test Methods. If soil sampling indicates the presence of hydrocarbon contamination, metal concentrations, or other contaminants exceeding applicable environmental The contaminated soils assessment and SMP, if necessary, shall be submitted and approved by City compliance monitoring staff and County EHS prior to the issuance of project grading permits. As applicable, the City shall ensure implementation of the SMP according to the measures included therein and as approved by County EHS. City of San Luis Obispo Page 283 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 16 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments screening levels as provided by the EHS, the soil assessment shall identify the area of contaminated soil that may be disturbed by grading activities. An Environmental Site Assessment (ESA) shall be prepared detailing the soil sampling, analysis, and findings and submitted to the EHS for review. If concentrations of contaminants exceed the EHS-provided environmental screening levels, the applicant shall prepare and implement a Soil Management Plan (SMP). The SMP shall be reviewed and approved by EHS prior to issuance of grading permits. The plan shall communicate information to project construction workers about environmental conditions and will present measures to mitigate potential risks to the environment, construction workers, and other nearby receptors from potential exposure to hazardous substances that may be associated with unknown conditions or unexpected underground structures, and known contaminated soil or groundwater encountered during construction activities. The SMP shall be updated and the updated recommendations shall be followed if the following occurs: ƒ A change in project site uses; ƒ Receipt of additional information pertaining to project site environmental conditions; ƒ Updated chemical toxicity information for contaminants detected at the project site based on revised regulatory screening levels; or, ƒ New legal or regulatory soil management requirements applicable to the project site. HAZ-1(b) Discovery of Contaminated Soils Should petroleum hydrocarbon- and volatile organic compound (VOC)-contaminated soil, metal concentrations exceeding applicable screening criteria, or other hazardous materials be discovered during construction activities, SLOAPCD must be notified as soon as possible and no later than 48 hours after affected material is discovered to determine if a SLOAPCD Permit will be required. In addition, the following measures shall be implemented immediately on discovery of contaminated soil: ƒ Covers on soil stockpiles shall be maintained in place at all times in areas not actively involved in soil addition or removal; ƒ Contaminated soil shall be covered with at least six inches of packed uncontaminated soil or a non-permeable hydrocarbon barrier. If a hydrocarbon barrier is used, no headspace shall be allowed where vapors could accumulate; ƒ Covered piles shall be designed and installed without openings to minimize erosion due to wind or water; ƒ Criteria pollutant emissions from excavation and haul trips associated with removing contaminated soil shall be quantified and mitigated if total emissions would exceed applicable SLOAPCD construction phase thresholds; ƒ During soil excavation, odors shall be minimized to avoid public nuisance; and, ƒ Clean soil shall be segregated from contaminated soil. The notification and permitting determination requirements shall be directed to the SLOAPCD Engineering & Compliance Division. The conditions for discovery of contaminated soils shall be printed on all building and grading plans. City grading inspectors shall spot check fieldwork. City of San Luis Obispo Page 284 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 17 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments HAZ-3(a) Tank Farm Road Interim Pedestrian Safety Signage The project applicant shall fund and install interim signage along Tank Farm Road west of Santa Fe Road to highlight potential safety hazards to pedestrians along this connection. The signage shall be designed and installed consistent with applicable City Engineering Standards to the satisfaction of the Public Works Director. The signage shall remain in place until the future shared-use pedestrian/bicycle path along the north side of Tank Farm Road between Santa Fe Road and Innovation Way is constructed and open to the public. The applicant shall submit public improvement plans that detail the proposed sign installations for review and approval by the City prior to issuance of any building permits. The signs shall be installed prior to issuance of any occupancy permits. Construction of the required improvements may require coordination with and an encroachment permit from San Luis Obispo County. The City shall verify that the applicant installs the improvements in accordance with approved design plans. City of San Luis Obispo Noise N-1(a) Construction-Related Noise Reduction Measures The applicant shall apply the following measures during construction of the project site: ƒ Electrical Power. Electrical power, rather than diesel equipment, shall be used to run compressors and similar power tools and to power temporary structures, such as construction trailers or caretaker facilities. ƒ Equipment Staging. All stationary equipment (e.g., air compressors, portable generators) shall be staged as far away from sensitive receptors as feasible. ƒ Equipment Idling. Construction vehicles and equipment shall not be left idling for longer than five minutes when not in use. ƒ Workers’ Radios. All noise from workers’ radios shall be controlled to a point that they are not audible at sensitive receptors near construction activity. ƒ Smart Back-up Alarms. Mobile construction equipment shall have smart back-up alarms that automatically adjust the sound level of the alarm in response to ambient noise levels. Alternatively, back-up alarms shall be disabled and replaced with human spotters to ensure safety when mobile construction equipment is moving in the reverse direction. ƒ Temporary Sound Barriers. During the site preparation, grading, building, and paving phases of construction, temporary sound barriers shall be installed and maintained facing noise-sensitive receptors within 300 feet of the project site (e.g., residences at the neighboring mobile home park). Temporary sound barriers typically consist of construction fence batted with light sound blankets. Temporary sound barriers shall, at a minimum, block the line of sight between the engines of diesel-powered construction equipment (typically 3 feet above grade) and adjacent windows at sensitive receptors and shall be placed as close to the source equipment as feasible. Such barriers shall be field tested to reduce noise by at least 10 dBA at sensitive receptors. (A sound barrier can achieve a 5 dBA noise level reduction when it is tall enough to break the line-of-sight from the source equipment to the sensitive receptor, and it can achieve an approximate 1 dBA additional noise level reduction for each 2 feet of height after it breaks the line of sight ([FHWA] 2011). Mobile sound barriers may be used as appropriate to attenuate construction noise near the source equipment. ƒ Disturbance Coordinator. The applicant shall designate a disturbance coordinator who shall be responsible for responding to any local complaints about construction noise. The noise disturbance coordinator shall determine the cause of the noise complaint (e.g., starting too early, bad muffler) and Construction plans shall note construction hours, truck routes, and required noise reduction measures, and shall be submitted to the City for approval prior to grading and building permit issuance for each project phase. Noise reduction measures shall be identified and described for submittal to the City for review and approval prior to building or grading permit issuance. They shall be adhered to for the duration of the project. The applicant shall provide and post signs stating these restrictions at construction site entries. Signs shall be posted prior to commencement of construction and maintained throughout construction. The Community Development Department shall confirm that construction noise reduction measures are incorporated in plans prior to approval of grading/building permit issuance. All construction workers shall be briefed at a pre-construction meeting on construction hour limitations and how, why, and where measures are to be implemented. A workday schedule will be adhered to for the duration of construction for all phases. City staff shall ensure compliance throughout all construction phases. Building inspectors and permit compliance staff shall periodically inspect the site for compliance with activity schedules and respond to complaints. City of San Luis Obispo Page 285 of 495 City of San Luis Obispo 600 Tank Farm Road Mixed-Use Project Mitigation Monitoring and Reporting Program Response to Comments 18 Mitigation Measure Plan Requirements and Timing Monitoring Responsible Agency or Party Compliance Verification Initial Date Comments shall require that reasonable measures warranted to correct the problem be implemented. A telephone number for the disturbance coordinator shall be conspicuously posted at the construction site. N-1(b) Neighboring Property Owner Notification and Construction Noise Complaints The contractor shall inform residents and business operators at properties within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. Proof of mailing the notices shall be provided to the Community Development Department before the City issues a zoning clearance. Signs shall be in place before beginning of and throughout grading and construction activities. Noise-related complaints shall be directed to the City’s Community Development Department. Schedule and neighboring property owner notification mailing list shall be submitted 10 days prior to initiation of any earth movement. A workday schedule will be adhered to for the duration of construction for all phases. City staff shall ensure compliance throughout all construction phases. Building inspectors and permit compliance staff shall periodically inspect the site for compliance with activity schedules and respond to complaints. City of San Luis Obispo Page 286 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 1 EXHIBIT A SECTION 1. ENVIRONMENTAL DETERMINATION The City Council of the City of San Luis Obispo (City) considers and relies on the Final Environmental Impact Report (EIR; State Clearinghouse Number 2020110426) for the proposed 600 Tank Farm Residential Mixed-Use Project (Project) in determining to approve the Project, amend the General Plan Map, rezone the property, and amend the Airport Area Specific Plan (AASP). The Project includes a General Plan Amendment, Zoning Amendment, AASP Amendment, Conceptual Site Plan, and Major Development Review to allow for development of the 11.1-acre site. The Final EIR consists of the Draft EIR with changes in response to public comments, written responses to comments received on the Draft EIR, identification of persons and agencies that commented on the Draft EIR, a Mitigation Monitoring and Reporting Program (MMRP), and technical appendices. The City Council has received, reviewed, considered, and relied on the information contained in the Final EIR, as well as information provided at hearings and submissions of testimony from official participating agencies, the public, and other agencies and organizations. Section 15091 of the State CEQA Guidelines (14 California Code of Regulations [CCR]) and Section 21081 of the Public Resources Code require a Lead Agency to adopt findings for each significant environmental impact disclosed in an EIR. Specifically, for each significant impact, the Lead Agency must find that: • Changes or alterations have been required in, or incorporated into, the project to avoid or substantially lessen the significant environmental effects identified in the Final EIR; • Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by that agency; or • Specific economic, social, legal, technological, or other considerations, including provision of employment opportunities for highly trained workers, make the mitigation measures or project alternatives identified in the Final EIR infeasible. The California Code of Regulations, Title 14, Section 15091(b) requires that the City’s findings be supported by substantial evidence in the record. Accordingly, the Lead Agency’s record consists of the following: • Documentary and oral evidence, testimony and staff comments and responses received and reviewed by the Lead Agency during public review and the public hearings on the 600 Tank Farm Residential Mixed-Use Project. • The City of San Luis Obispo 600 Tank Farm Residential Mixed-Use Project Final Environmental Impact Report (September 2021). The Final EIR, AASP, and other portions of the administrative record are available for review at: City of San Luis Obispo Community Development Department 919 Palm Street San Luis Obispo, CA 93401 Contact: Shawna Scott (805) 781-7176 Page 287 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 2 In addition to making a finding for each significant impact, if the Lead Agency approves a project without mitigating all the significant impacts, it must prepare a statement of overriding considerations, in which it balances the benefits of the project against the unavoidable environmental risks. The statement of overriding considerations must explain the social, economic, or other reasons for approving the project despite its environmental impacts (14 CCR 15093, Pub. Res. Code 21081). This document contains the findings and statement of overriding considerations for the approval of the Project and reflects the City’s independent judgment. This document incorporates by reference the Final EIR. Having received, reviewed and considered the foregoing information, as well as all information in the record, the City Council of the City of San Luis Obispo hereby makes these Findi ngs pursuant to, and in accordance with, Section 21081 of the Public Resources Code. Page 288 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 3 SECTION 2. PROJECT DESCRIPTION A. PROJECT OBJECTIVES The Final EIR objectives for the Project include: Develop an economically feasible plan that is consistent with, and implements, policies within the City’s General Plan and AASP. Establish a complete internally and externally “linked” mixed use community with amenities such as neighborhood parks and commercial goods and services that can serve the neighborhood. Provide a variety of housing opportunities for a wide range of socioeconomic groups and affordability levels, and at average unit sizes that are below current City averages. Develop a Project with the maximum number of units permitted by the underlying zoning, approximately 280 residential units, with approximately 261,200 square feet of total residential floor space and 12,500 square feet of commercial floor space. Develop the Acacia Creek frontage in a manner that provides that area as a Project amenity without jeopardizing the creek’s biological resources or riparian qualities. Implement the City-planned Tank Farm Road/Santa Fe Road (west) roundabout and infrastructure improvements to improve traffic flow and safety for all road users in a manner that does not exceed the level of impact fees generated on-site over the buildout of the project. Provide a well-connected internal network of bicycle paths, pedestrian sidewalks, open space buffers, private parks, and spaces for recreational activities, including development of a shared- use bicycle/pedestrian path between Tank Farm Road and Damon-Garcia Sports Fields within the 35’ creek setback, and protected bike lanes consistent with the Active Transportation Plan. Provide City-identified roadway network improvements that meet current and long-term traffic projections with preference for non-vehicular traffic modes. Market and orient the project to the surrounding employers to reduce vehicle miles travelled and to maximize the use of non-vehicular traffic modes. Develop a project that complies with the safety, noise and overflight policies of the City’s Airport Overlay Zone and the San Luis Obispo County Airport Land Use Plan. B. PROPOSED PROJECT The project entitlements would change the land use designation from Business Park to Service Commercial with the Specific Plan overlay (C-S-SP), which would allow a mixed-use project providing up to 280 residential units and commercial-service/office uses defined in AASP Table 4.3. The project site would be developed at a density of 25.7 units per acre, with shared public and private open spaces, common yards, and a recreation center with a community building. The proposed residential development would include a mix of one-bedroom, two-bedroom, and three-bedroom units as detailed in Table 1. Balconies and outdoor activity areas would be located on the north and east faces of the buildings to minimize exposure to vehicle noise from Tank Farm Road and aircraft flyovers from the San Luis Obispo County Regional Airport. The proposed zoning would allow for up to 12,500 square feet of commercial- service/office space, which would be located in Buildings 1 and 2 shown in Figure 1. Page 289 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 4 Table 1. Project Characteristics Unit Type1 Size (sf) Units Residential Area (sf) Non-Residential Area (sf) Acres (net) Units/Acre2 Townhomes and Cluster Units 750-1,450 140 154,000 n/a 6.5 21.5 Stacked Flats 600-925 100 85,700 n/a 2.9 34.5 Mixed Use (studio and 1-bed) 450-625 40 21,500 12,500 1.5 26.7 Total 450-1,450 280 261,200 12,500 10.9 25.7 sf = square feet The project also includes a 2,250-square foot clubhouse building with a 2,800-square foot patio area. The clubhouse building would provide meeting areas, an indoor game area, a common lounge, administrative office area, and a community kitchen. The building would also serve as a temporary sales office and an administrative building during project sales and construction. The project’s required creek setbacks, common areas and open space in the northwest corner of the project site would result in 20 percent of the site being landscaped common open space, including play areas, tot lots, and landscape parkways. Bike and pedestrian trips would be facilitated by a proposed connection to the 650 Tank Farm Road property and extension of the onsite shared-use path to the shared- use path at the Damon-Garcia Sports Fields to the north. The proposed project is requesting a minimum setback of approximately 10 feet from the average top of bank for a bicycle/pedestrian path to connect to Damon-Garcia Sports Fields (and an average shared-use path of 20 feet) and a minor exception for a maximum 10-foot encroachment into the setback for portions of Buildings 14 and 21 from the average top of bank. The project would be required to contribute its fair share toward transportation improvements envisioned in the General Plan Circulation Element and shown in the AASP. Transportation improvements funded or constructed by this project include widening Tank Farm Road along the project frontage (provides two westbound auto lanes, protected bike lanes, curb/gutter, sidewalk and parkway on the north side of the street), construction of a roundabout at the intersection of Tank Farm Road and Santa Fe Road (west), and construction of a portion of the Santa Fe Road Extension north of Tank Farm Road (including two travel lanes, sidewalks and protected bike lanes on the east side). Stormwater runoff from these improvements would be directed to a planned retention basin located at the northwest corner of the proposed roundabout. In addition to the transportation improvements included in the project, the project applicant would be required to provide preliminary planning and engineering support for a future shared-use pedestrian/bicycle path along Tank Farm Road from Santa Fe Road west to Innovation Way (4,700 feet west of Santa Fe Road), as identified in the City’s Active Transportation Plan. These elements of the Project are further described in the Final EIR, which is available at the following link: https://www.slocity.org/government/department-directory/community-development/documents- online/environmental-review-documents/-folder-2187 Page 290 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 5 Figure 1. Project Site Plan TANK FARM ROAD Page 291 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 6 SECTION 3. ENVIRONMENTAL IMPACT REPORT A. BACKGROUND The Final EIR was prepared in compliance with CEQA and the State CEQA Guidelines. In accordance with Section 15121 of the State CEQA Guidelines, the purpose of the Final EIR is to serve as an informational document for the public and City decision makers. Pursuant to CEQA Guidelines Section 15182, “where a public agency has prepared an EIR on a specific plan after January 1, 1980, a residential project undertaken pursuant to and in conformity to that specific plan is exempt from CEQA,” as long as the residential project is within the scope of the EIR, no new or more severe environmental effects would occur, and no new mitigation measures are required for the residential project. In accordance with Section 15105 of the State CEQA Guidelines, the Draft EIR was circulated for a 50- day public review period that began June 5, 2021 and concluded on August 3, 2021. The City held a Planning Commission Hearing public workshop on July 14, 2021 to receive public testimony in the form of verbal comments on the Draft EIR. Responses to each written and verbal comment that the City received are included in Section 8.0, Response to Comments of the Final EIR. The Draft EIR and Response to Comments collectively comprise the Final EIR for the Project. B. IMPACT ANALYSIS Four categories of impacts are identified in the Final EIR: • No impact would result when no change in the environment would occur; no mitigation would be required. • A less than significant impact is an adverse impact that does not meet or exceed the applicable significance criteria thresholds for a particular resource. Generally, no mitigation measures are required for less than significant impacts; only compliance with standard regulatory conditions would be required. However, mitigation may still be recommended should the lead or responsible agency deem it appropriate to reduce the impact to the maximum extent feasible, as long as there is rough proportionality between the environmental impacts caused by the project and the mitigation measures imposed on the project. • A less than significant impact with mitigation is an adverse impact that would cause a substantial adverse effect that meets or exceeds the applicable significance criteria thresholds for a particular resource, but which can be reduced to a less than significant level through successful implementation of identified mitigation measures. • A significant and unavoidable impact would cause a substantial adverse effect on the environment that meets or exceeds the applicable significance criteria thresholds for a particular resource, and no feasible mitigation measures would be available to reduce the impact to a less than significant level. Determinations of significance levels in the Final EIR are made based on impact significance criteria and State CEQA Guidelines for each environmental resource. Page 292 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 7 SECTION 4. FINDINGS FOR LESS THAN SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROJECT The findings below are for impacts that are adverse, but would not result in significant effects on the natural or human environment. The City Council concludes that the following impacts would result in adverse but less than significant effects on the natural or human environment. The impacts identified in this section are considered in the same sequence in which they appear in the Final EIR. A. AIR QUALITY 1. Impact AQ-1: The Project would be consistent with the SLOAPCD Clean Air Plan growth assumptions because it would be consistent with the population projections, it would result in a net reduction in regional vehicle miles traveled (VMT) and regional residential VMT and not exceed the Clean Air Plan VMT projections for the project site, and the project is consistent with the Land Use Strategies and Transportation Control Measures in the Clean Air Plan. Therefore, impacts would be less than significant (Refer to page 4.1-13 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Impact AQ-2: Emissions associated with Project construction and operation would not exceed applicable SLOAPCD thresholds for local or regional emissions. Therefore, impacts would be less than significant (Refer to page 4.1-15 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 3. Cumulative Air Quality Impacts: The Project would be within the population projections of the SLOAPCD Clean Air Plan and because the Project would be substantially consistent with transportation control measures and land use strategies provided in the Clean Air Plan, the Project would not contribute considerably to a potential Clean Air Plan consistency impact. Impacts associated with CO hotspots or TACs tend to be localized to individual project sites and the immediate vicinity. As a result, the project-level evaluations of these pollutants consider the cumulative nature of these pollutants. Because the Project would not result in or be exposed to concentrations of localized pollutants that would exceed applicable SLOAPCD thresholds, the Project would not expose sensitive receptors to a cumulatively considerable impact associated with CO hotspots, TACs, or valley fever (Refer to page 4.1-21 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. Page 293 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 8 B. BIOLOGICAL RESOURCES 1. Impact BIO-3: The Project site has low suitability for wildlife movement due to the existing level of disturbance and human activity. Also, the Project would not affect the movement of native fish because no project elements would directly affect the Acacia Creek channel. Due to the existing low- quality and limited wildlife movement habitat and the existing baseline of human presence within the vicinity of the Project site, wildlife movement would not be significantly diminished. Therefore, impacts would be less than significant (Refer to page 4.2-35 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Impact BIO-4: The Project would be required to comply with the City’s Tree Ordinance and the Tree Regulations in Chapter 12.24 of the San Luis Obispo Municipal Code, which require compensatory tree planting for any existing trees removed. Zoning Regulations section 17.70.030 stipulates that an exception to the creek setback requirements may be considered where substantiated evidence is available that a project will result in better implementation of other Zoning Regulations or General Plan policies while allowing reasonable use of the site. The encroachment area would not significantly degrade the riparian corridor. The Project proposes an increase in the riparian setback elsewhere along the corridor, with a riparian setback that averages approximately 40 feet. Therefore, impacts would be less than significant. (Refer to page 4.2-35 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. C. ENERGY 1. Impact E-1: Temporary Project construction would comply with state measures to reduce the inefficient, wasteful, or unnecessary consumption of energy. The use of energy to construct the Project would not be unnecessary because the intention of the project is to provide additional housing. Project operation would include energy efficiency measures including the installation of solar panels and an all-electric design in compliance with the City’s Clean Energy Choice Program. As a result, energy consumption resulting from the proposed built environment would not be wasteful, inefficient, or unnecessary. Therefore, impacts would be less than significant (Refer to page 4.4-10 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Impact E-2: The Project includes energy efficiency measures to achieve net-zero energy requirements in the City’s Clean Energy Choice Program for New Buildings and the applicant has committed to providing electricity through Central Coast Community Energy’s community choice energy program. The proposed bicycle and pedestrian facilities and access would encourage the use of alternative transportation modes, which would reduce VMT and associated fuel consumption. Therefore, the Project would not conflict with or obstruct implementation of the City’s 2020 Climate Page 294 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 9 Action Plan or Clean Energy Choice Program for New Buildings, or any other applicable plans for renewable energy and impacts would be less than significant. (Refer to page 4.4-13 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 3. Cumulative Energy Impacts: The City’s Clean Energy Choice Program for New Buildings, which includes incentives and local amendments to the 2019 California Energy Code, and new iterations of the California Building Energy Efficiency Standards and CALGreen would require increasingly more efficient appliances and building materials that reduce energy consumption in cumulative development in the City of San Luis Obispo in addition to the Project. In addition, county-wide vehicle fuel efficiency is anticipated to continue improving through implementation of the existing Pavley regulations under AB 1493, and implementation of the San Luis Obispo Council of Governments 2019 Regional Transportation Plan would reduce per capita VMT. As a result, the Project would not have a cumulatively considerable contribution to a significant cumulative impact related to the wasteful, inefficient, and unnecessary consumption of energy resources (Refer to page 4.4-13 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than cumulatively significant effect. D. GREENHOUSE GAS EMISSIONS 1. Impact GHG-1: The Project would generate temporary GHG emissions primarily as a result of operation of construction equipment on-site as well as from vehicles transporting construction workers to and from the project site. Operation of the project would generate GHG emissions associated with area sources (e.g., landscape maintenance), energy and water usage, vehicle trips, and wastewater and solid waste generation. However, the Project would be consistent with the City of San Luis Obispo’s 2020 CAP because project GHG emissions would be less GHG intensive than development anticipated for the existing General Plan land use designation for the site and would be consistent with the City’s CEQA GHG Emissions Analysis Compliance Checklist. Therefore, the Project’s potential impact associated with GHG emissions and greenhouse has reduction plan consistency would be less than significant. (Refer to page 4.5-15 of the Final EIR). a. Mitigation: None Required. The Draft EIR included Mitigation Measure GHG-1(a) which would have required the project applicant to prepare and implement a Greenhouse Gas Reduction Program. This mitigation was found to reduce the project’s GHG emissions. However, the Draft EIR determined that, due to limited GHG emissions reductions that would be achievable through on-site GHG reduction measures and limits on the use of off-site reduction credits and/or carbon offsets, it would be speculative to determine that Mitigation Measure GHG-1(a) would reduce the Project’s GHG emissions below the applicable threshold of significance and concluded that the GHG impact would remain significant and unavoidable. During preparation of the Final EIR, City staff reviewed the methodology used to determine the project’s consistency with the Climate Action Plan and the basis for determining the potential buildout of the existing General Plan land use designation. As a result, Impact GHG-1 was revised to include a comparison of the proposed project’s GHG emissions to the potential GHG Page 295 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 10 emissions estimated from development anticipated for the existing General Plan land use designation, and in compliance with the Climate Action Plan methodology for projects which would result in new development with lower GHG intensity than development anticipated for the existing land use designation, the project was evaluated using the CEQA GHG Emissions Analysis Compliance Checklist. With these revisions, Draft EIR Mitigation Measure GHG-1(a) was rejected because it was found to no longer be required to ensure the Project would be consistent with the City’s Climate Action Plan. Therefore, no mitigation is required to reduce the Project’s impacts associated with GHG emissions. b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Cumulative Greenhouse Gas Emission Impacts: The geographic scope for related projects considered in the cumulative impact analysis for GHG emissions is global because the impacts of climate change are experienced on a global scale regardless of the location of GHG emission sources. Therefore, GHG emissions and climate change are, by definition, cumulative impacts. The Project is consistent with the City’s 2020 CAP. Impacts from the proposed project would therefore not be cumulatively considerable. (Refer to page 4.5-21 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. E. HAZARDS AND HAZARDOUS MATERIALS 1. Impact HAZ-2: In conjunction with the City’s LUCE update process completed in 2014, the LUE and associated Airport Safety Zones were developed with the updated safety and hazards considerations identified in the 2014 Airport Land Use Compatibility Report. With the Airpo rt Land Use Commission’s adoption of the updated Airport Land Use Plan in 2021, the project site is not located within identified Aviation Safety Areas/Airport Safety Zones. Because the project site is not located within an identified Aviation Safety Area in the City’s adopted LUE or an Airport Safety Zone that limits residential development in the ALUC’s adopted ALUP, and because the Project does not include any components that would pose risks to air navigation, or otherwise expose people or workers to airport related risks, no substantial aviation-related safety hazard to residents or commercial employees or patrons within the project site are expected to occur as result of the Project and impacts would be less than significant. (Refer to page 4.6-17 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 3. Cumulative Hazards and Hazardous Materials Impacts: Overall, hazards and hazardous materials impacts associated with individual developments are site specific in nature and must be addressed on a case-by-case basis. Since hazards and hazardous materials are required to be examined as part of the permit application and environmental review process, potential impacts associated with individual projects will be adequately addressed prior to permit approval. Therefore, cumulative hazardous material impacts would be less than significant. Cumulative projects area also within the ALUP Safety Areas, thereby potentially exposing persons to risk of airport safety hazards. These primarily include residential units and commercial development projects near the airport as well as Specific Plans and Specific Plan amendments, including the San Luis Ranch Specific Plan and Airport Area Specific Plan projects. However, these projects are subject to review of airport-related hazards during Page 296 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 11 the environmental review process and by the ALUC, which would ensure that development does not impose an aviation-related hazard on structures or people. Potential impacts associated with transportation hazards would be site-specific and would not have corresponding cumulative effects. Therefore, cumulative impacts would be less than significant. (Refer to page 4.6-22 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than cumulatively significant impact. F. HYDROLOGY AND WATER QUALITY 1. Impact HWQ-1: Project construction activities would not directly affect Acacia Creek because the Project does not include physical improvements to the creek. Both phases of Project construction would be required to comply with the requirements of the Construction General Permit, which requires preparation and implementation of a SWPPP. The SWPPP would detail Erosion Control, Sediment Control, and Good Housekeeping BMPs to be implemented during project construction to minimize erosion, retain sediment on site, control flooding, and reduce pollutant discharge to stormwater to a less than significant level. Implementation of BMPs in compliance with City and Phase II MS4 Permit drainage and water quality requirement would ensure that operational impacts related to on- or off-site erosion or siltation, flooding, and additional sources of polluted runoff would support stormwater runoff for the Project. Therefore, potential erosion, flooding, and associated water quality impacts would be less than significant. (Refer to page 4.7-13 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Impact HWQ-2: The Project does not involve grading or placement of structures within Acacia Creek channel that could impede or redirect flood flows. The eastern portion of the Project site is within an existing 100-year flood zone. However, creek setbacks and compliance with FEMA and City regulations would ensure that the Project would not place structures within a 100-year flood hazard area which could impede or redirect flood flows. In addition, with retention BMPs in compliance with City and Phase II MS4 Permit requirements, the Project would not increase discharge to Acacia Creek beyond the allowable 5 percent increase for the 2-year through 100-year storm event. Therefore, the Project would not substantially alter or increase flood flows or change the morphology of Acacia Creek downstream of the project site and impacts would be less than significant. (Refer to page 4.7-17 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 3. Cumulative Hydrology and Water Quality Impacts: Compliance with NPDES and local water quality requirements and City drainage design guidelines would minimize potentially significant cumulative impacts. All projects that disturb one acre or more of soil must comply with the requirements of the Construction General Permit. Additionally, all projects that would create and/or replace 5,000 square feet or more of impervious surface would be required to comply with the Phase II MS4 Permit. The Project, as well as other cumulative development in City, would be required to prepare a hydrology report and implement drainage facilities to minimize hydrologic impacts Page 297 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 12 consistent with applicable City design guidelines. Compliance with the Construction General Permit, the City drainage design guidelines, and the Phase II MS4 requirements would ensure that each individual project would incorporate BMPs and other drainage facilities designed to address drainage and surface water quality protection. As a result, cumulative impacts to water quality, drainage, flooding, and sedimentation would be adverse, but less than significant (Refer to page 4.7-18 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than cumulatively significant impact. G. LAND USE AND PLANNING 1. Impact LU-1: The Project would be potentially consistent with all applicable General Plan and AASP policies that minimize environmental effects such as water quality, scenic quality, archaeological resource protection, and wildlife habitat protection. The required off-site transportation improvements, including the roundabout and frontage improvements along Tank Farm Road as well as the future alignment of Santa Fe Road are anticipated in the General Plan Circulation Element. Therefore, the proposed transportation improvements are consistent with the City’s General Plan and AASP. With City approval of the proposed rezone, the proposed mixed-use development would be consistent with allowed uses in the C-S-SP zone. The ALUC reviewed the Project in August 2021 and determined that development facilitated under the proposed AASP Amendment and rezone would be consistent with the ALUP. Therefore, the Project would not conflict with applicable policies or regulations relating to environmental effects in the General Plan, AASP, Municipal Code, or ALUP and impacts would be less than significant. (Refer to page 4.8-5 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Cumulative Land Use and Planning Impacts: Potential environmental impacts from land use conflicts are addressed on a case-by-case basis as individual projects are reviewed by city decision- makers for consistency with adopted policies. Much of the anticipated cumulative development is the City is planned within adopted specific plan areas and would be required to comply with buildout densities and policies within the respective specific plans. Projects within the ALUP would be subject to review and oversight by the ALUC, which would ensure compliance with the safety measures and standards in the ALUP. In addition, residential projects would be subject to the growth management policy established in Land Use Element Policy 1.11.2. Implementation of the City’s General Plan policies and development standards and those in other adopted plans that relate to land use would minimize cumulative land use impacts. Therefore, cumulative land use impacts would be less than significant. (Refer to page 4.8-7 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than cumulatively significant impact. Page 298 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 13 H. NOISE 1. Impact N-2: Rooftop-mounted HVAC equipment on new buildings on the Project site would not exceed standards in Section 17.76.100.B of the City’s Municipal Code or the City’s maximum allowable noise exposure level. In addition, new vehicle trips would not increase ambient transportation-related noise by 1 dBA or more. Therefore, the Project would not result in an exceedance of the FTA’s criteria for significant increases in traffic noise. Impacts would be less than significant. (Refer to page 4.9-19 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Impact N-3: The greatest anticipated source of vibration during general Project construction activities would be from vibratory rollers, which may be used within approximately 200 feet of the nearest off-site structures. However, vibration levels at nearby structures would be lower than the strictest FTA construction vibration damage criterion and would not exceed Caltrans’ recommended criterion for distinctly perceptible vibration from transient sources. Therefore, temporary impacts associated with rollers (and other potential vibration-generating construction equipment) would be less than significant. (Refer to page 4.9-21 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 3. Cumulative Noise Impacts: On-site Operational Noise. Most cumulative projects are not located close enough to the project site that operational noise would impact the same sensitive receivers. 650 and 660 Tank Farm Road are located in proximity to the project site and their noise sources would be typical of multi-family residential and commercial developments, and they would not generate noise levels at sensitive receptors that exceed ambient noise levels from transportation sources. It is anticipated that nearby cumulative projects would produce similar noise levels from HVAC equipment at adjacent property lines. In this case, cumulative noise levels from on-site operational equipment would not approach existing ambient noise levels from transportation sources. Therefore, cumulative projects, even those near the project site, would not cause cumulative on-site operational noise impacts. Vehicle Trip Noise. Cumulative projects, including the proposed project, would generate new vehicle trips that result in a permanent increase in traffic noise. However, the project by itself would not cause a detectable change in existing traffic noise levels on road segments with nearby sensitive receptors. Similarly, the cumulative project at 650 Tank Farm Road would not increase traffic volumes on nearby roadway segments by more than 4.6 percent, which would have a negli gible effect on traffic noise. Based on the scale of trip generation by nearby cumulative projects, it is not anticipated that these projects would combine to increase traffic noise to a perceptible extent. Furthermore, the project would not considerably contribute to a cumulative increase in traffic noise. (Refer to page 4.9-21 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the Project would have an adverse, but less than cumulatively significant impact. Page 299 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 14 I. UTILITIES AND SERVICE SYSTEMS 1. Impact U-1: Existing water conveyance and wastewater treatment infrastructure would have adequate capacity to serve the Project. The project would not require new or expanded off-site water and wastewater treatment, stormwater drainage facilities, electrical power, natural gas, or telecommunication facilities. In addition, the construction of required utility connections would occur on the project site and adjacent Tank Farm Road right-of-way and are accounted for in the discussion of temporary construction impacts. Therefore, the project would not result in a significant impact associated with the need for new or expanded utility facilities. (Refer to page 4.10-10 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 2. Impact U-2: The Project would be required to obtain a Construction Water Permit which would utilize recycled water for construction activities. The Project’s water demand would represent an increase of approximately 1 percent in the City’s projected water demand and would consume approximately 3.5 percent of the City’s available water supply. The City currently has sufficient existing municipal water supply to provide water to the Project. In addition, WWME Policy A 5.2.5 requires new development to pay its proportionate share of water supplies, expanded treatment, and distribution system capacity. Therefore, the potential impact to water supply would be less than significant. (Refer to page 4.10-11 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect. 3. Impact U-3: The proposed roundabout and frontage improvements along Tank Farm Road and the future alignment of Santa Fe Road would not result in a long-term increase in wastewater demand. The City has sufficient existing wastewater treatment capacity to serve the Project’s estimated wastewater generation. The WRRF is currently undergoing construction to increase available capacity, which is estimated to be completed in 2024. WWME Policy B 2.2.3 requires new development to pay its proportionate share of expanded treatment and collection system capacity and upgrades. Therefore, the potential impact to wastewater capacity would be less than significant. (Refer to page 4.10-12 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than significant effect 4. Cumulative Utility and Service System Impacts: The City has available water supplies that exceed estimated buildout demand, and the project would not contribute substantially to an increase in water demand that would exceed the City’s overall potable water supply. Therefore, the Project would not contribute considerably to a cumulative water supply impact. The City has adequate wastewater treatment capacity to serve the anticipated the estimated buildout demand, and the Project would be required to comply with WWME Policy B 2.2.3, which requires new development to pay its proportionate or “fair share” of expanded treatment and collection system capacity and upgrades. Therefore, the Project would not contribute considerably to a cumulative wastewater capacity impact. Individual projects would be subject to the stormwater capture and treatment requirements of the Page 300 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 15 applicable MS4 Permit and the City’s Drainage Master Plan and stormwater regulations, which would reduce potential impacts to stormwater drainage facilities. Therefore, the potential cumulative impacts to stormwater/drainage facilities would be less than significant. Future development, including the proposed project, would be subject to applicable local, regional, State, and federal policies regarding energy efficiency, and, the Project would not require additional electricity substations. Therefore, the Project’s contribution to cumulative impacts on energy facilities would not be cumulatively considerable. The Project would include telecommunications connections to existing lines and systems, as service providers exist for the project site and vicinity. Therefore, the Project’s contribution to cumulative impacts on energy facilities would not be cumulatively considerable. (Refer to page 4.10-13 of the Final EIR). a. Mitigation: None Required b. Finding: The City finds that the impact would have an adverse, but less than cumulatively significant impact. Page 301 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 16 SECTION 5. FINDINGS FOR SIGNIFICANT ENVIRONMENTAL EFFECTS OF THE PROJECT THAT HAVE BEEN MITIGATED TO A LESS THAN SIGNIFICANT LEVEL The findings below are for impacts that would result in potentially significant effects on the natural and/or human environment, but could be reduced to a less than significant level through feasible changes or alterations to the Project or implementation of mitigation measures. When approving a project with impacts that are less than significant with mitigation, the decision-makers must make findings that changes or alterations to the project have been incorporated that reduce the impacts to a less than significant level. This section presents the Project’s significant environmental impacts and feasible mitigation measures. Section 15091 of the State CEQA Guidelines (14 California Code of Regulations [CCR]) and Section 21081 of the Public Resources Code require a Lead Agency to make findings for each significant environmental impact disclosed in an EIR. Specifically, for each significant impact, the Lead Agency must find that: • Changes or alterations have been required in, or incorporated into, the project to avoid or substantially lessen the significant environmental effects identified in the Final EIR; • Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by that agency; or • Specific economic, social, legal, technological, or other considerations, including provision of employment opportunities for highly trained workers, make the mitigation measures or project alternatives identified in the Final EIR infeasible. Each of these findings must be supported by substantial evidence in the administrative record. This section identifies impacts that can be fully avoided or reduced to a less than significant level through the incorporation of feasible mitigation measures into the Project. The impacts identified in this section are considered in the same sequence in which they appear in the Final EIR. A. AIR QUALITY 1. Impact AQ-3: The Project would not expose sensitive receptors to substantial CO concentrations, and localized air quality impacts related to CO hot spots would be less than significant. Project construction activities, including grading and construction vehicle traffic, could generate substantial localized quantities of dust and expose sensitive receptors to potential health hazards associated with the Coccidioides fungus, and this impact would be potentially significant. In addition, the proposed grading and excavation has the potential to encounter serpentine rock that may contain Naturally Occurring Asbestos at locations on the property other than those tested, this impact would be potentially significant. (Refer to page 4.1-17 of the Final EIR). a. Mitigation: The following mitigation measures are required to reduce impacts to sensitive receptors to substantial pollutant concentrations as a result of development of the Project. - Mitigation Measure AQ-3(a) Valley Fever Suppression Measures. The project developer and contractor(s) shall prepare a Construction Valley Fever Plan to ensure the implementation of the following measures during construction activities to reduce impacts related to Valley Fever. Page 302 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 17 a. Project construction activities shall implement standard SLOAPCD dust control measures described in SLOAPCD’s 2012 CEQA Air Quality Handbook. SLOAPCD dust control measures for projects with a grading area greater than 4 acres or that are located within 1,000 feet of any sensitive receptor include watering of the grading site and dirt stockpiles, vegetation and chemical soil stabilizer use on disturbed soil areas, early roadway paving, construction vehicle speed control, minimum freeboard for hauling vehicles, and vehicle wheel washing. b. If peak daily wind speeds exceed 15 mph or peak daily temperatures exceed 95 degrees Fahrenheit for three consecutive days, additional dust suppression measures (such as additional water or the application of additional soil stabilizer) shall be implemented prior to and immediately following ground disturbing activities. The additional dust suppression shall continue until winds are 10 mph or lower and outdoor air temperatures are below a peak daily temperature of 90 degrees for at least two consecutive days. c. The project developer(s) shall notify the San Luis Obispo County Public Health Department and the City not more than 60 nor less than 30 days before construction activities commence to allow the San Luis Obispo County Public Health Department opportunity to provide educational outreach to community members and medical providers, as well as enhanced disease surveillance in the area both during and after construction activities involving grading. d. Prior to any project grading activity, the project construction contractor(s) shall prepare and implement a worker training program that describes potential health hazards associated with Valley Fever, common symptoms, proper safety procedures to minimize health hazards, and notification procedures if suspected work-related symptoms are identified during construction, including the fact that certain ethnic groups and immune-compromised persons are at greater risk of becoming ill with Valley Fever. The objective of the training shall be to ensure the workers are aware of the danger associated with Valley Fever. The worker training program shall be included in the standard in-person training for project workers and shall identify safety measures to be implemented by construction contractors during construction. Prior to initiating any grading, the project developer shall provide the City and the San Luis Obispo County Public Health Department with copies of all educational training material for review and approval. No later than 30 days after any new employee or employees begin work, the project developer shall submit evidence to the City that each employee has acknowledged receipt of the training (e.g., sign-in sheets with a statement verifying receipt and understanding of the training). e. The developer shall work with a medical professional, in consultation with the San Luis Obispo County Public Health Department, to develop an educational handout for on- site workers and surrounding residents within 1,000 feet of the project site that includes the following information on Valley Fever: ▪ Potential sources/causes ▪ Common symptoms ▪ Options or remedies available should someone be experiencing these symptoms ▪ The location of available testing for infection Prior to construction permit issuance, this handout shall have been created by the developer and reviewed by the City. No less than 30 days prior to any surface disturbance (e.g., grading, filling, trenching) work commencing, this handout shall be mailed to all existing residences within three miles of the project site Page 303 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 18 — Mitigation Measure AQ-3(b) Naturally Occurring Asbestos Air Toxics Control Measure Compliance. Consistent with the requirements of the NOA ATCM, the project developer shall file an exemption request form with SLOAPCD including the geologic evaluation documenting the conclusion that no serpentine is present at depths where proposed grading/excavation would occur. The project developer shall comply with SLOAPCD requirements associated with the exception, if granted, or with subsequent SLOAPCD requirements resulting from the exemption request, which may include additional geologic evaluation, dust mitigation, or air monitoring. b. Finding: The City finds that the Mitigation Measure AQ-3(a) and AQ-3(b) would reduce impacts to sensitive receptors to a less than significant level by requiring implementation of protective measures to reduce health hazards associated with the Coccidioides fungus and complying with SLOAPCD requirements for Naturally Occurring Asbestos. B. BIOLOGICAL RESOURCES 1. Impact BIO-1: The proposed disturbance footprint on the Project site would impact the entirety of the occurrences of Cambria morning-glory and Congdon’s tarplant. The proposed road and infrastructure improvements to Tank Farm Road would likely impact the historic population of Congdon’s tarplant within the project area south of Tank Farm Road. Project impacts to the on-site occurrences of these special status plant species would be potentially significant. The Project also has the potential to impact special-status animal species that have the potential to occur within the project site based on the presence of suitable habitat. These species include Vernal pool fair shrimp, California red-legged frog, western spadefoot, southwestern pond turtle, American badger, pallid bat, Townsend’s big-eared bat, burrowing owl, and loggerhead shrike. Suitable nesting habitat is also present for special status nesting bird species. Impacts to special status plant and animal species are potentially significant. (Refer to page 4.2-19 of the Final EIR). a. Mitigation: The following mitigation measures are required to reduce Project construction and operational impacts to sensitive plant and animal species. — Mitigation Measure BIO-1(a) Construction Best Management Practices. The applicant shall ensure the following general wildlife Best Management Practices (BMPs) are required for construction activities for the project: • Ground disturbance shall be limited to the minimum necessary to complete construction activities. Construction limits of disturbance shall be flagged. All equipment and material storage, parking, staging and other support areas shall be identified prior to issuance of a grading permit. Areas of special biological concern within or adjacent to construction limits shall have highly visible orange construction fencing installed between said area and the limits of disturbance. • All project construction activities shall occur during daylight hours (i.e., between sunrise and sunset) and during dry weather conditions. Night lighting shall be prohibited. • Upon completion of construction all excess materials and debris shall be removed from the project construction area and disposed of appropriately. • The work area shall remain clean. All food-related trash items shall be enclosed in sealed containers and removed from the site weekly. • Pets and firearms shall be prohibited at the construction site. • All refueling, maintenance, and staging of equipment and vehicles shall occur at least 100 feet from Acacia Creek and in a location where a spill would not drain toward aquatic Page 304 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 19 habitat. A plan must be in place for prompt and effective response to any accidental spills prior to the onset of work activities. All workers shall be informed of the appropriate measures to take should an accidental spill occur. • To control sedimentation during and after project implementation, appropriate erosion control BMPs (e.g., use of coir rolls, jute netting, etc.) shall be implemented to minimize adverse effects to Acacia Creek. No plastic monofilament netting shall be utilized on site. • All equipment operating within aquatic habitat shall be in good conditions and free of leaks. Spill containment shall be installed under all equipment staged within stream areas and extra spill containment and clean up materials shall be located in close proximity for easy access. • At the end of each workday, excavations shall be secured with cover or a ramp provided to prevent wildlife entrapment. • All trenches, pipes, culverts or similar structures shall be inspected for animals prior to burying, capping, moving, or filling. Stockpiles of chemicals, drums, bagged materials, and other hazardous materials such as propane, acetylene shall have pallets and/or secondary containment. Should a material spills occur, City compliance monitoring staff shall be informed of the spill and materials and/or contaminants shall be cleaned from the project construction area and recycled or disposed of to the satisfaction of the City and in accordance with all applicable local, State, and federal regulations — Mitigation Measure BIO-1(b) Worker Environmental Awareness Program Training. Prior to the initiation of construction activities (including staging and mobilization), a qualified biologist shall provide all personnel associated with project construction with a Worker Environmental Awareness Program (WEAP) training. The training will aid workers in recognizing special status resources that may occur in the project area. The specifics of this program shall include identification of the sensitive species and habitats, a description of the regulatory status and general ecological characteristics of sensitive resources, and review of the limits of construction and avoidance measures required to reduce impacts to biological resources within the work area. A fact sheet conveying this information shall also be prepared for distribution to all contractors, their employers, and other personnel involved with construction of the project. All employees shall sign a form provided by the trainer documenting they have attended the WEAP and understand the information presented to them. Fact sheets shall be reviewed and approved by the City prior to conducting the training. The required notification and an attendance log that includes the names and signatures of all personnel that have received the training shall be provided to the City upon completion of the training. The applicant shall notify City compliance monitoring staff of the date and time the training is scheduled so that City staff may attend. — Mitigation Measures BIO-1(c) Updated Surveys for Infrastructure Improvement Parcels. Within the portions of the study area not currently owned by the applicant, but where improvements are required to facilitate the project, the applicant shall conduct updated surveys of sensitive species habitats (including special status plant species, CRLF, wetland habitat, and VPFS habitat) within the appropriate season immediately prior to the onset of any ground disturbances associated with project-related construction activities to evaluate the current occupancy of suitable habitat for sensitive species and to refine the final habitat mitigation replacement acreages. Updated surveys for federally listed species shall be completed per the timing and methodology specified by resource agency protocol. Page 305 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 20 If special status plant species are identified during the updated survey(s), the species shall be incorporated into Special Status Plant Species Mitigation Plan in accordance with BIO-1(e). The plan shall provide a minimum ratio of 2:1 (number of acres/individuals restored to number of acres/individuals impacted) for impacts to any special status plant species with California Rare Plant Rank (CRPR) of 1 or 2 and a minimum ratio of 1:1 for special status plant species with CRPR 3 or 4. If a federally and/or state listed plant species is identified during the surveys, the applicant shall avoid all impacts to the species. If avoidance is infeasible, the applicant shall consult with the City and the United States Fish and Wildlife Service and/or California Department of Fish and Wildlife, as applicable, for authorization of take. If CRLF is identified during the survey(s), BIO-1(f) shall be implemented during project construction of the study area not currently owned by the applicant to ensure no take of individual CRLF. If VPFS are identified during the survey(s), BIO-1(d) shall be implemented during project construction of the study area not currently owned by the applicant to ensure no take of individual VPFS. If vernal marsh or other season wetland habitat is identified during the survey(s) and impacts to season wetland habitat cannot be avoided, a formal jurisdictional delineation shall be completed for the feature(s). Impacts to the habitat shall be included in the Habitat Mitigation and Monitoring Plan as detailed in BIO-2(b). — Mitigation Measure BIO-1(d) Vernal Pool Fairy Shrimp Mitigation Plan. If VPFS are present within the study area and may be impacted by project-related construction, a Vernal Pool Fairy Shrimp Mitigation Plan shall be prepared which provides a minimum ratio of 1:1 (number of acres restored to number of acres impacted) for impacts to VPFS. The plan shall identify the specific mitigation sites and can be prepared in conjunction with the Habitat Mitigation and Monitoring Plan (BIO-2[b]). The plan shall include, at a minimum, the following components: • Description of the project/impact site (i.e., location, responsible parties, areas to be impacted); • Goal(s) of the compensatory mitigation project [area(s) of vernal pool fairy shrimp habitat to be established and/or preserved; • Description of the proposed compensatory mitigation receiver site(s) (location and size, ownership status, existing conditions of the compensatory mitigation site); the receiver site(s) shall be at least the size as the area currently occupied by the current population to ensure the replacement ratio is achieved; • Implementation plan for the compensatory mitigation site (rationale for expecting implementation success, responsible parties, schedule, site preparation, planting plan); • Maintenance activities during the monitoring period, as appropriate (activities, responsible parties, schedule); • Monitoring plan for the compensatory mitigation site, (performance standards, target acreages to be established, and/or preserved, annual monitoring reports); • Success criteria based on the goals and measurable objectives; • An adaptive management program and remedial measures to address negative impacts to restoration efforts; Page 306 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 21 • Notification of completion of compensatory mitigation and agency confirmation; and • Contingency measures (initiating procedures, alternative locations for contingency compensatory mitigation, funding mechanism). — Mitigation Measure BIO-1(e) Special Status Plant Mitigation Plan. A Special Status Plant Mitigation Plan shall be prepared by a qualified botanist approved by the City, which will provide a minimum ratio of 2:1 (number of acres/individuals restored to number of acres/individuals impacted) for impacts to Congdon’s tarplant and a minimum ratio of 1:1 for Cambria morning-glory. If project construction has not occurred by January 1, 2024, seasonally timed botanical surveys shall be conducted to determine the current extent of the special status plant species populations on site. The plan shall identify the specific mitigation sites and can be prepared in conjunction with the Habitat Mitigation and Monitoring Plan (BIO-2[b]). The plan shall include, at a minimum, the following components: • Description of the project/impact site (i.e., location, responsible parties, areas to be impacted by habitat type); • Goal(s) of the compensatory mitigation project [area(s) of special status plant species to be established and/or preserved; • Description of the proposed compensatory mitigation receiver site(s) (location and size, ownership status, existing conditions of the compensatory mitigation site); the receiver site(s) shall be at least twice the size as the area currently occupied by the rare plant occurrences to ensure the replacement ratio is achieved. • Implementation plan for the compensatory mitigation site (rationale for expecting implementation success, responsible parties, schedule, site preparation, planting plan [container sizes, seeding rates, etc.]); • Maintenance activities during the monitoring period, including weed removal and irrigation as appropriate (activities, responsible parties, schedule); • Monitoring plan for the compensatory mitigation site, (performance standards, target acreages to be established, and/or preserved, annual monitoring reports); • Success criteria based on the goals and measurable objectives; • An adaptive management program and remedial measures to address negative impacts to restoration efforts; • Notification of completion of compensatory mitigation and agency confirmation; and • Contingency measures (initiating procedures, alternative locations for contingency compensatory mitigation, funding mechanism). — Mitigation Measure BIO-1(f) California Red-Legged Frog Impact Avoidance and Minimization. A qualified biologist(s) shall conduct a pre-construction survey for CRLF within 48 hours prior to the initial onset of initial ground or vegetation disturbing activities. All potentially suitable habitat for CRLF shall be surveyed during the daytime and again after dark. The surveys shall include all areas where project construction activities will occur, as well as a 300-foot buffer upstream and downstream of the project boundary in Acacia Creek. If no individuals are found during the pre-construction survey, work may proceed with monitoring as described below. If CRLF is found and the individual is likely to be injured or killed by work activities, all work must stop and the individual will be allowed to move out of harm’s way of its own volition then the applicant/developer shall comply with all relevant requirements of the FESA prior to resuming project activities. Page 307 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 22 A qualified biologist(s) shall monitor the removal of material and debris piles that may contain cover for CRLF. If CRLF is identified within the construction area during project construction, ground-disturbing activities shall immediately cease, and the individual will be allowed to move out of harm’s way of its own volition before work activities may begin. If the individual does not move out of harm’s way, the USFWS shall be notified and consulted. Ground-disturbing activities shall commence following guidance from the USFWS and the City. No CRLF shall be captured, handled, or relocated without approval by the USFWS. — Mitigation Measure BIO-1(g) Southwestern Point Turtle and Western Spadefoot Impact Avoidance and Minimization. A qualified biologist(s) shall conduct a pre-construction survey for southwestern pond turtle and western spadefoot within 48 hours prior to the initial onset of initial ground or vegetation disturbing activities. All potentially suitable habitat for southwestern pond turtle, western spadefoot toad within the study area where project-related activities would occur shall be surveyed. If southwestern pond turtle or western spadefoot is found and the individual is likely to be injured or killed by work activities, all work must stop and the individual will be allowed to move out of harm’s way of its own volition before work activities may begin. Individuals may be relocated out of harm’s way by a qualified biologist, if present, before work activities begin. The biologist(s) must relocate the any pond turtle or western spadefoot the shortest distance possible to a location that contains suitable habitat that is not likely to be affected by activities associated with the project. A qualified biologist(s) shall monitor the removal of material and debris piles that may contain cover for southwestern pond turtle and western spadefoot. If southwestern pond turtle or western spadefoot is found and the individual is likely to be injured or killed by work activities, all work must stop and the individual will be allowed to move out of harm’s way of its own volition before work activities may begin. Individuals may be relocated out of harm’s way by a qualified biologist, if present, before work activities begin. The biologist(s) must relocate the any pond turtle or western spadefoot the shortest distance possible to a location that contains suitable habitat that is not likely to be affected by activities associated with the project. — Mitigation Measure BIO-1(h) American Badger Impact Avoidance and Minimization. A qualified biologist(s) shall conduct a pre-construction survey for potential American badger dens within one week prior to the initial onset of initial ground or vegetation disturbing activities. The survey shall be conducted within all project work areas and a 50-foot buffer. Any potential dens/burrows found shall be identified with flagging or stakes, as feasible, and a 50-foot no-work buffer shall be flagged. If any potential American badger dens are found that cannot be avoided by the 50-foot buffer area, a qualified biologist will monitor the dens and employ wildlife trail cameras and/or a tracking medium around dens and monitored daily for at least three days to determine whether they are currently occupied by badgers. If the den is determined not to be occupied by a badger or other special status wildlife species, construction may commence. No dens with young shall be disturbed, and no work shall be conducted within 50 feet of maternal dens until they have left the den. Any occupied badger den that is being used by a single adult with no young that cannot be avoided shall be blocked incrementally by placing sticks or debris over the entrance for three to five days, to discourage the individual from using the den. Only after the badger has left the den, as determined by the qualified biologist implementing the wildlife camera and/or tracking medium methods, can the den be concluded as unoccupied and the work proceed within the no-work buffer. Page 308 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 23 — Mitigation Measure BIO-1(i) Pallid Bat and Townsend’s Big-Eared Bat Impact Avoidance and Minimization. The applicant shall ensure the following actions are implemented to avoid and minimize potential impacts to special status bat species: Within one week prior to construction activities, including tree removal, a qualified biologist shall conduct a survey of the trees proposed to be removed within the construction area to determine if roosting bats are present during the non-breeding season (November through March). If a colony of bats is found roosting in any tree or structure, further surveys shall be conducted sufficient to determine the species present and the type of roost (day, night, maternity, etc.). If the bats are not part of an active maternity colony, passive exclusion measures may be implemented with approval from the City in consultation with CDFW. Exclusions shall occur outside the breeding season (typically May through August) and winter hibernation (typically December through February). If bats are roosting in tree cavities in the construction area during the daytime but are not part of an active maternity colony, then exclusion measures must include one-way valves that allow bats to get out but are designed so that the bats may not re-enter the roost cavity. — Mitigation Measure BIO-1(j) Burrowing Owl Impact Avoidance and Minimization. The following measures shall be implemented in order to avoid and minimize impacts to burrowing owl: a. Not more than 30 days prior to initiation of ground-disturbing activities, and again within 24 hours of the initiation of ground-disturbing activities associated with construction, a City-approved biologist shall conduct a take avoidance survey of the construction area and surrounding areas to a distance of 150 meters, in accordance with the methods outlined in the Mitigation Methods – Pre-construction and Appendix D Surveys for Take Avoidance of the California Department of Fish and Game (CDFG; now CDFW) Staff Report on Burrowing Owl Mitigation (CDFG 2012). The pre-construction survey will cover all areas within 150 meters of the portion of the site where construction is scheduled to start. Areas within 150 meters that are not accessible due to property access restrictions shall be surveyed using binoculars. Surveys will be phased, based on the grading and construction schedule, such that they are conducted not more than 30 days before the start of ground disturbing activities in new areas. If grading and/or construction activities in portions of the site cease for a period of 14 days, those portions of the site will be resurveyed for burrowing owls prior to the resumption of grading and/or construction activities. If no occupied (breeding or wintering) burrowing owl burrows are identified, no further mitigation would be required. If occupied burrows are identified on the site or within 150 meters of the Project disturbance area, one of the following actions shall be taken: 1) permanent avoidance of the burrow or 2) establishment of a temporary avoidance buffer followed by passive relocation and compensatory mitigation for loss of habitat in conjunction with the measures below: Site-specific, no-disturbance buffer zones shall be established and maintained between Project activities and occupied burrows, using the distances recommended in the CDFW guidelines (CDFG 2012) or as otherwise determined appropriate by the City- approved biologist in consultation with CDFW. During the non-breeding season, if an occupied burrow cannot be avoided, and the burrow is not actively in use as a nest, the burrowing owls can be excluded from burrows in accordance with an approved Burrowing Owl Exclusion Plan, which shall Page 309 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 24 be prepared and submitted for approval by CDFW prior to passive relocation of any burrowing owls. The Burrowing Owl Exclusion Plan shall be based on the recommendations made in the CDFG Staff Report on Burrowing Owl Mitigation (CDFG 2012) and shall include the following information for each proposed passive relocation: a. Confirmation by site surveillance that the burrow(s) is empty of burrowing owls and other species; b. Identification of type of scope to be used and appropriate timing of scoping; c. Occupancy factors to look for and what shall guide determination of vacancy and excavation timing; d. Methods for burrow excavation; e. Removal of other potential owl burrow surrogates or refugia on site; f. Methods for photographic documentation of the excavation and closure of the burrow; g. Monitoring of the site to evaluate success and, if needed, to implement remedial measures to prevent subsequent owl use to avoid take; h. Methods for assuring the impacted site shall continually be made inhospitable to burrowing owls and fossorial mammals; and i. Method(s) for compensatory mitigation for burrow loss. — Mitigation Measure BIO-1(k) Nesting Birds and Loggerhead Shrive Impact Avoidance and Minimization. Construction activities shall be initiated outside of the typical avian nesting period, between February 1 and August 31, if feasible. All initial site and vegetation disturbance shall be limited to the time period between September 1 and January 31, if feasible. If initial ground disturbing activities and vegetation removal occurs between February 1 and August 31, nesting bird surveys shall be conducted by a qualified biologist for the entire construction area plus a 250-foot buffer within one week prior to initial ground disturbance activities or removal of vegetation. Surveys shall continue to be conducted within the timeframes specified above until all vegetation removal activities are completed. If surveys do not locate nesting birds, construction activities may be conducted. If nesting birds are located, no construction activities shall occur within 50 feet of nests of passerine species, including loggerhead shrike, 250 feet of nests of raptor species until chicks are fledged. Any changes in buffer extent shall be made in consultation with the City. The buffer will be delineated with flagging, and no work shall take place within the buffer area until the young have left the nest, as determined by the qualified biologist. b. Finding: The City finds that implementation of mitigation measures BIO-1(a) through BIO-1(k) would minimize potential impacts to special status species and ensure that the project would comply with COSE Policies 7.3.1, Protected Species, and 7.3.2 Species of Local Concern. With implementation of mitigation, Project impacts would be reduced to a less than significant level. 2. Impact BIO-2: Development of the Project site and study area where project-related activities would occur would result in direct impacts to 0.12 acre of vernal marsh, a sensitive natural community associated with the potentially jurisdictional wetlands identified on the applicant-owned parcel, as well as the portion of the project site south of Tank Farm Road. Therefore, the Project could result in direct impacts to approximately 0.12 acre of wetland where the basin containing the wetland is Page 310 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 25 proposed to be reconfigured and impacts are potentially significant. (Refer to page 4.2-31 of the Final EIR). a. Mitigation: The following mitigation would be required to reduce impacts to sensitive natural communities and State or federally protected wetlands to a less than significant level. — Mitigation Measure BIO-2(a) Jurisdictional Delineation. If impacts to seasonal wetland habitat cannot be avoided, the applicant shall retain a qualified biologist to complete a jurisdictional delineation. The jurisdictional delineation shall determine the extent of the jurisdiction of the USACE, RWQCB, and CDFW. The jurisdictional delineation shall be conducted in accordance with the requirement set forth by each agency. The results shall be a preliminary jurisdictional delineation report that shall be submitted to the implementing agency/agencies, USACE, RWQCB, and/or CDFW, as appropriate, for review and approval as part of the permitting process: — Mitigation Measure BIO-2(b) Prepare a Habitat Mitigation and Monitoring Plan. A Habitat Mitigation and Monitoring Plan (HMMP) shall be prepared which will provide a minimum 2:1 ratio (number of acres/individuals restored to number of acres/individuals impacted) for temporary and permanent impacts to vernal marsh. The HMMP will identify the specific mitigation sites and can be prepared in conjunction with the Special Status Plant Mitigation Plan. The HMMP will be implemented immediately following project completion. The HMMP shall include, at a minimum, the following components: • Description of the project/impact site (i.e., location, responsible parties, areas to be impacted by habitat type); • Goal(s) of the compensatory mitigation project [type(s) and area(s) of habitat to be established, restored, enhanced, and/or preserved; specific functions and values of habitat type(s) to be established, restored, enhanced, and/or preserved]; • Description of the proposed compensatory mitigation site (location and size, ownership status, existing functions and values of the compensatory mitigation site); • Implementation plan for the compensatory mitigation site (rationale for expecting implementation success, responsible parties, schedule, site preparation, planting plan [including plant species to be used, container sizes, seeding rates, etc.]); • Maintenance activities during the monitoring period, including weed removal and irrigation as appropriate (activities, responsible parties, schedule); • Monitoring plan for the compensatory mitigation site, including no less than quarterly monitoring for the first year (performance standards, target functions and values, target acreages to be established, restored, enhanced, and/or preserved, annual monitoring reports); • Success criteria based on the goals and measurable objectives; said criteria to be, at a minimum, at least 80 percent survival of container plants and 80 percent relative cover by vegetation type; • An adaptive management program and remedial measures to address negative impacts to restoration efforts; • Notification of completion of compensatory mitigation and agency confirmation; and • Contingency measures (initiating procedures, alternative locations for contingency compensatory mitigation, funding mechanism) Page 311 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 26 — Mitigation Measure BIO-1(c) Agency Coordination. Impacts to wetlands as a result of the project are anticipated to require permits from CDFW, USACE, and/or RWQCB. The applicant shall comply with all applicable state and federal permitting requirements. The applicant shall obtain and produce for the City correspondence from applicable state and federal agencies indicating compliance of the proposed development with state and federal laws. — Mitigation Measure BIO-2(d) Wetland Mitigation. Impacts to federal and state wetlands (as defined by the Clean Water Act Section 404 and the State Wetland Definition and Procedures for Discharges of Dredged or Fill Material to Waters of the State) shall be mitigated at a minimum ratio of 2:1 (acres of wetlands created to acres of wetlands permanently impacted) to meet the performance standard of no net loss of wetland habitat. The mitigation program shall be developed by a qualified biologist and be incorporated into and conform with the requirements for the Habitat Mitigation and Monitoring Plan. The mitigation shall be implemented for no less than five years after construction or until the local jurisdiction and/or the permitting authority (e.g., USACE) has determined that restoration has been successful. — Mitigation Measure BIO-2(e) Jurisdictional Areas Best Management Practices During Construction. The following best management practices shall be required for grading and construction within jurisdictional areas or wetlands where impacts are authorized. In addition, the measures shall be required at locations where construction occurs within 100 feet from jurisdictional areas or wetlands: • Access routes, staging, and construction areas shall be limited to the minimum area necessary to achieve the project goal and minimize impacts to other waters (federal and state) including locating access routes and ancillary construction areas outside of jurisdictional areas. • To control erosion and sediment runoff during and after project implementation, appropriate erosion control materials shall be deployed and maintained to minimize adverse effects on jurisdictional areas in the vicinity of the project. • Project activities within the jurisdictional areas should occur during the dry season (typically between May 1 and September 30) in any given year, or as otherwise directed by the regulatory agencies. Deviations from this work window can be made with permission from the relevant regulatory agencies. • During construction, no litter or construction debris shall be placed within jurisdictional areas. All such debris and waste shall be picked up daily and properly disposed of at an appropriate site. • All project-generated debris, building materials, and rubbish shall be removed from jurisdictional areas and from areas where such materials could be washed into them. • Raw cement, concrete or washings thereof, asphalt, paint or other coating material, oil or other petroleum products, or any other substances which could be hazardous to aquatic species resulting from project-related activities, shall be prevented from contaminating the soil and/or entering jurisdictional areas. All refueling, maintenance, and staging of equipment and vehicles shall occur at least 100 feet from bodies of water and in a location where a potential spill would not drain directly toward aquatic habitat (e.g., on a slope that drains away from the water source). Prior to the onset of work activities, a plan must be in place for prompt and effective response to any accidental spills. All workers shall be informed of the importance of preventing spills and of the appropriate measures to take should an accidental spill occur. Page 312 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 27 b. Finding: The City finds that implementation of Mitigation Measure BIO-2(a) through BIO-2(c) would reduce project impacts on sensitive natural communities to a less than significant level by requiring a qualified biologist to delineate the extent of features, require regulatory agency permitting to ensure compliance with regulations and the preparation of a HMMP would provide compensatory mitigation to offset impacts to vernal marsh habitat. Mitigation Measure BIO-2(d) would require State or federal wetlands to be mitigated at a minimum ratio of 2:1 to ensure no net loss of wetland habitat and Mitigation Measure BIO-2(e) would ensure best management practices are followed during construction within the wetland features. The City finds that this impact would be reduced to a less than significant level. 3. Cumulative Biological Resource Impacts: Cumulative biological resource impacts in the City and surrounding areas include conversion of portions of City properties from undeveloped to developed uses, with resultant loss of open space and habitat, and regional increases in impervious surfaces and pollutant loading in the San Luis Obispo Creek watershed, night light, noise, and traffic associated with the increase in regional development. The Project, in conjunction with other nearby planned, pending, and potential future projects would have the potential to adversely impact biological resources (Refer to page 4.2-36 of the Final EIR). a. Mitigation: Cumulative impacts are addressed on a project-by-project basis through site-specific investigations and surveys as well as appropriate mitigation. Mitigation Measures BIO-1(a) through BIO-1(k) described under Item B.1.a above and Mitigation Measures BIO-2(a) through BIO-2(e) described under Item B.2.a above are required to reduce cumulative impacts to biological resources: b. Finding: The City finds that implementation of Mitigation Measures BIO-1(a) through BIO-1(k) include sufficient measures to reduce impacts to sensitive species, and implementation of Mitigation Measures BIO-2(a) through BIO-2(e) require a habitat mitigation and monitoring project and wetland mitigation which would reduce impacts to sensitive plant communities and protected wetlands. The City finds that implementation of these mitigation measures would reduce the project’s contribution to cumulative biological resources impacts to a less than significant level. C. CULTURAL AND TRIBAL CULTURAL RESOURCES 1. Impact CUL-1. One archaeological site, the Unocal (Union Oil Company) Tank Farm (CA-SLO- 2617H) was found eligible for listing and has two contributing features (Feature 26 and Feature 27) that appear to be within the project site and could be impacted by project construction activities. Acacia Creek is adjacent to the Project site on the east, and the City ARPPG identifies areas within 200 feet of the top of bank of Acacia Creek as sensitive areas and Native American tribal contacts requested cultural examinations of the area. Therefore, Project construction impacts near Acacia Creek are potentially significant. The Project also has the potential for unanticipated discoveries of cultural resources during ground disturbance. Therefore, impacts to historical and archaeological resources are potentially significant. (Refer to page 4.3-19 of the Final EIR). a. Project Mitigation: The following mitigation measures are required to reduce potential construction related impacts to historical and archaeological resources. — Mitigation Measure CUL-1(a) Construction Monitoring Treatment Plan. A Construction Monitoring Treatment Plan shall be developed and implemented to ensure that any new Page 313 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 28 discoveries are adequately recorded, evaluated, and if, significant, mitigated. The Construction Monitoring Treatment Plan shall provide the following: a. All ground disturbances within 200 feet of the top of bank of Acacia Creek shall be monitored by a qualified archaeologist and Native American observer and all ground disturbance within 50 feet of the mapped boundaries of Feature 26 and Feature 27 shall be monitored by a qualified archaeologist. b. Procedures for notifying the City and other involved or interested parties in case of a new discovery. The qualified archaeologist and/or Native American observer shall have the authority to temporarily halt or redirect construction in the vicinity of any potentially significant discovery to allow for adequate recordation and evaluation. c. Preparation and approval of a plan that identifies procedures that shall be used to record, evaluate, and mitigate unanticipated discoveries with a minimum of delay. d. Procedures that shall be followed in case of discovery of human remains. In the event that isolated human remains are encountered, consultation with the most likely Native American descendant, pursuant to Public Resources Code section 5097.97 and 5097.98, shall apply. e. Results of the monitoring program shall be documented in a technical report after completion of all ground disturbances. — Mitigation Measure CUL-1(b) Archaeological Monitoring Within 200 feet of Acacia Creek Top of Bank. All construction-related ground disturbances, including clearing/grubbing, within 200 feet of the top of bank of Acacia Creek shall be monitored by a qualified archaeologist and a Native American representative. Depending on the type of work, multiple teams of monitors may be necessary to observe construction activities occurring in separate areas. In the event that archaeological remains are encountered during construction, City of San Luis Obispo staff shall be notified and all work within 50 feet of the find shall be halted until the find is evaluated by a qualified archaeologist and appropriate mitigation, if necessary, is implemented. If archaeological remains are identified, the resource shall be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA and further treatment measures including but not limited to avoidance consistent with City of San Luis Obispo General Plan Policies, Phase 2 Subsurface Archaeological Resource Evaluation (SARE), or Phase 3 Archaeological Data Recovery Excavation (ADRE) may be required. Work within 50 feet of the find shall not resume until authorization is received from the City. — Mitigation Measure CUL-1(c) Archaeological Monitoring Within 50 feet of Feature 26 and Feature 27. All construction-related ground disturbances, including clearing/grubbing, within 50 feet of the mapped boundaries of Feature 26 and Feature 27 shall be monitored by a qualified archaeologist. In the event that archaeological remains are encountered during construction, City of San Luis Obispo staff shall be notified and all work within 50 feet of the find shall be halted until the find is evaluated by a qualified archaeologist and appropriate mitigation, if necessary, is implemented. If archaeological remains are identified, the resource shall be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA and further treatment measures including but not limited to avoidance consistent with City of San Luis Obispo General Plan Policies, Phase 2 Subsurface Archaeological Resource Evaluation Page 314 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 29 (SARE), or Phase 3 Archaeological Data Recovery Excavation (ADRE) may be required. Work within 50 feet of the find shall not resume until authorization is received from the City. — Mitigation Measure CUL-1(d) Unanticipated Discovery of Historical or Archaeological Resources. In the event prehistoric or historic-period materials not identified during the ARI prepared for the project are encountered during construction-related ground disturbances, ground-disturbing activities within 50 feet of the discovery shall be halted, and a qualified archaeologist shall be contacted to determine if materials are isolated finds or part of a larger archaeological deposit. If the discovery is prehistoric, a Native American representative shall be contacted to participate in the evaluation of the discovery. Appropriate City of San Luis Obispo staff shall also be notified. Prehistoric materials may include chert flaked stone tools (e.g., projectile points, knives, scrapers) or toolmaking debris; culturally darkened soil (midden) containing artifacts or shellfish remains; and stone milling equipment (e.g., mortars, pestles, handstones). Historic-period materials might include stone, concrete, wood or adobe building foundations, corrals, and walls; filled wells or privies; mining features; and deposits of metal, glass, and/or ceramic refuse. If an archaeological site is identified, the resource should be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA and further treatment measures including but not limited to avoidance consistent with City of San Luis Obispo General Plan Policies, Phase 2 Subsurface Archaeological Resource Evaluation (SARE), or Phase 3 Archaeological Data Recovery Excavation (ADRE) may be required. Work within 50 feet of the discovery shall not resume until authorization is received from the City. b. Finding: The City finds that Mitigation Measures CUL-1(a) and CUL-1(c) would reduce impacts to Features 26 and 27 by requiring a treatment plan for construction activities and archaeological monitoring within 50 feet of the resources. The City finds that Mitigation Measures CUL -1(b) would reduce impacts to potential resources near Acacia Creek to a less than significant level by requiring archaeological monitoring within 200 feet of the Top of Bank. In addition, the City finds that Mitigation Measure CUL-1(d) would reduce impacts to unanticipated cultural resources by requiring construction activities halt in the event of an unanticipated discovery until the find can be assessed by a qualified archaeologist, consistent with City of San Luis Obispo General Plan Policy COS 3.5.6. 2. Impact CUL-2. San Luis Obispo County has a long history of Native American occupation and, therefore, ground-disturbing activities have the potential to uncover previously unknown tribal cultural resources. During project ground disturbing activities such as grading and surface excavation, there is potential for encountering previously undiscovered cultural resources of Native American origin that could be considered tribal cultural resources. Therefore, impacts to tribal cultural resources would be potentially significant. (Refer to page 4.3-23 of the Final EIR). a. Mitigation: Mitigation Measures CUL-1(b) and CUL-1(d) described under Item C.1.a above as well as following mitigation measure are required to reduce potential impacts to tribal cultural resources. — Mitigation Measure CUL-2(a) Unanticipated Discovery of Tribal Cultural Resources. In the event that a resource of Native American origin is identified during construction, the City of San Luis Obispo staff shall contact all California Native American tribe(s) that have expressed interest in the project and begin or continue consultation procedures with any tribe or tribes that request consultation. If an archaeological site is identified, the resource should be evaluated for significance under City Archaeological Resource Preservation Program Guidelines (ARPPG) and CEQA. If the City, in consultation with local Native Americans, Page 315 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 30 determines that the resource is a tribal cultural resource and the proposed project would have a potentially significant impact to the resource, a tribal cultural resource mitigation plan shall be prepared and implemented in accordance with State guidelines (PRC Sections 21080.3.2, 21080.3.3, 21084.3) and in consultation with Native American groups. The mitigation plan may include but would not be limited to avoidance, capping in place, excavation and removal of the resource, interpretive displays, sensitive area signage, or other mutually agreed upon measures. b. Finding: The City finds that Mitigation Measure CUL-1(b) addresses archaeological monitoring within 200 feet of the top of bank of Acacia Creek, and Mitigation Measure CUL-1(d) addresses the potential for unanticipated discovery of historical or archaeological resources during project construction activities. In addition, the City finds that Mitigation Measure CUL-2(a) would reduce impacts to unidentified tribal resources by requiring native American consultation and an evaluation of the resource. The City finds that Mitigation Measures CUL-1(b), CUL-1(d), and CUL-2(a) would reduce impacts to tribal resources to a less than significant level. 3. Cumulative Cultural and Tribal Cultural Resource Impacts. The California State Archaeological Task Force has estimated that a large percentage of archaeological sites in the state have been destroyed. The project, in conjunction with other nearby planned, pending, and potential future projects would have the potential to adversely impact cultural resources. (Refer to page 4.3-25 of the Final EIR). a. Mitigation: Mitigation Measures CUL-1(a) through CUL-1(d) described under Item C.1.a above and Mitigation Measure CUL-2(a) described under Item C.2.a above would be required to reduce potential cumulative impacts to cultural and tribal cultural resources. b. Finding: The City finds that implementation of Mitigation Measure CUL-1(a) through CUL-1(d) and CUL-2(a) include sufficient measures to reduce the project’s impacts to identified cultural resources as well as unanticipated historical, archaeological, or tribal cultural resources to a less than significant level. Because cumulative projects would be reviewed separately and undergo environmental review on a case-by-case basis, the City finds that implementation of these mitigation measures would reduce the project’s contribution to cumulative cultural and tribal cultural resources impacts to a less than significant level. D. GEOLOGY AND SOILS 1. Impact GEO-4.11.6: The Project site contains Quaternary (Holocene) alluvial deposits mapped at the surface, which are generally too young to contain fossilized material, and are assigned a low paleontological sensitivity. However, based on regional geologic mapping these Holocene sediments may grade into older buried Pleistocene alluvium in which scientifically significant fossils have a higher potential to occur. Therefore, there is the potential for Project construction and implementation to impact paleontological resources. (Refer to page 4.11-6 of the Final EIR). a. Mitigation: The following mitigation measures are required to reduce impacts to paleontological resources to a less than significant level. — Mitigation Measure GEO-1(a) Paleontological Monitoring. Prior to issuance of grading permits and the commencement of ground disturbing activities on the project site that are greater than six feet in depth, a qualified professional paleontologist shall be retained to conduct paleontological monitoring during such ground disturbing activities. The Qualified Page 316 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 31 Paleontologist shall have knowledge of the local paleontology and shall be familiar with paleontological procedures and techniques. Prior to the commencement of construction activities, an orientation meeting shall be conducted by the Qualified Paleontologist, general contractor, subcontractor, and construction workers associated with earth disturbing activities. The orientation meeting shall describe the potential of exposing paleontological resources, the types of materials may be encountered, and directions on the steps that shall be taken if such a find is encountered. Ground disturbing construction activities (including grading, trenching, drilling with an auger greater than 3 feet in diameter, and other excavation) within previously undisturbed sediments at depths greater than six feet shall be monitored on a full-time basis. Monitoring shall be supervised by the Qualified Paleontologist and shall be conducted by a qualified paleontological monitor, who is defined as an individual who meets the minimum qualifications per standards set forth by the SVP (2010), which includes a B.S. or B.A. degree in geology or paleontology with one year of monitoring experience and knowledge of collection and salvage of paleontological resources. If the Qualified Paleontologist determines that full-time monitoring is no longer warranted, he or she may recommend reducing monitoring to periodic spot-checking or cease entirely. Full- time monitoring shall be reinstated if any new ground disturbances are required at a depth of six feet or greater, and reduction or suspension would need to be reconsidered by the Qualified Paleontologist. Ground-disturbing activity that does not exceed six feet in depth within Quaternary alluvium would not require paleontological monitoring. — Mitigation Measure GEO-1(b) Fossil Discovery, Preparation, and Curation. In the event that a paleontological resource is discovered, the monitor shall have the authority to temporarily divert construction equipment around the find until it is assessed for scientific significance and collected. Once salvaged, significant fossils shall be identified to the lowest possible taxonomic level, prepared to a curation-ready condition, and curated in a scientific institution with a permanent paleontological collection along with all pertinent field notes, photos, data, and maps. Curation fees are assessed by the repository and are the responsibility of the project owner. — Mitigation Measure GEO-1(c) Paleontological Monitoring Plan. Prior to the start of ground-disturbing activities, a Paleontological Monitoring Plan shall be prepared and submitted to the City for review and approval. The Plan shall be prepared by a Qualified Paleontologist and shall address the following: • Procedures for Paleontological Monitoring; • Procedures for the paleontologist to make and implement recommendations as to whether or not monitoring should be required on a full-time basis; • Procedures for the paleontological monitor to temporarily redirect construction away from an area if paleontological resources are encountered during grading or excavation in order to assess the significance of the find; and • Procedures for the handling of collected resources, including preparation to the point of identification. — Mitigation Measure GEO-1(d) Final Paleontological Mitigation Report. At the conclusion of laboratory work and museum curation, a final report shall be prepared describing the Page 317 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 32 results of the paleontological mitigation monitoring efforts associated with the project. The report shall include a summary of the field and laboratory methods, an overview of the project geology and paleontology, a list of taxa recovered (if any), an analysis of fossils recovered (if any) and their scientific significance, and recommendations. The report shall be submitted to the City and the designated museum repository. b. Finding: The City finds that the implementation of Mitigation Measure GEO-1(a) through GEO- 1(d) would reduce impacts related to paleontological resources during construction by requiring paleontological monitoring an approved monitoring plan, provisions to follow if resources are discovered, and a final report that would document the results of the paleontological mitigation monitoring efforts associated with the Project. The City finds that this impact would be reduced to a less than significant level. E. HAZARDS AND HAZARDOUS MATERIALS 2. Impact HAZ-1: There are no listed hazardous material sites/facilities or active clean ups were identified on the site. The Preliminary Soil Sampling Assessment did not identify exceedances of SWRCB, U.S. EPA, or DTSC action levels for total petroleum hydrocarbons for both diesel and motor oil. However, the soil testing results detected metals above screening levels, including arsenic, cobalt, nickel, vanadium, and zinc. None of the detected metal concentrations exceed risk-based action levels that would require remediation. Therefore, potential impacts associated with hazardous materials that may be encountered during construction of the proposed residential development on the 600 Tank Farm Road property would be less than significant. However, ground disturbing activities during construction of the planned transportation infrastructure improvements could expose construction workers and/or the public to hazardous materials in on-site soil via direct contact or inhalation of dust particles and could result in a health risk to people which would be potentially significant. (Refer to page 4.6-14 of the Final EIR). a. Mitigation: The following mitigation measures are required to reduce risk of hazardous material exposure during construction to a less than significant level. — Mitigation Measure HAZ-1(a) Soil Management Plan. Prior to issuance of any grading permits for the planned roundabout and frontage improvements along Tank Farm Road and the future alignment of Santa Fe Road, a contaminated soil assessment shall be completed in the portions of land to be graded for the identified improvements. Soil samples shall be collected under the supervision of a professional geologist or environmental professional to determine the presence or absence of contaminated soil in these areas. The sampling density shall be in accordance with guidance from San Luis Obispo County Environmental Health Services (EHS), so as to define the area of contaminated soil that may be disturbed by grading activities. Laboratory analysis of soil samples shall be analyzed for the presence of petroleum hydrocarbons, VOCs, and heavy metals in accordance with applicable US EPA Test Methods. If soil sampling indicates the presence of hydrocarbon contamination, metal concentrations, or other contaminants exceeding applicable environmental screening levels as provided by the EHS, the soil assessment shall identify the area of contaminated soil that may be disturbed by grading activities. An Environmental Site Assessment (ESA) shall be prepared detailing the soil sampling, analysis, and findings and submitted to the EHS for review. If concentrations of contaminants exceed the EHS-provided environmental screening levels, the applicant shall prepare and implement a Soil Management Plan (SMP). The SMP shall be Page 318 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 33 reviewed and approved by EHS prior to issuance of grading permits. The plan shall communicate information to project construction workers about environmental conditions and will present measures to mitigate potential risks to the environment, construction workers, and other nearby receptors from potential exposure to hazardous substances that may be associated with unknown conditions or unexpected underground structures, and known contaminated soil or groundwater encountered during construction activities. The SMP shall be updated and the updated recommendations shall be followed if the following occurs: • A change in project site uses; • Receipt of additional information pertaining to project site environmental conditions; • Updated chemical toxicity information for contaminants detected at the project site based on revised regulatory screening levels; or, • New legal or regulatory soil management requirements applicable to the project site. — Mitigation Measure HAZ-1(b) Discovery of Contaminated Soils. Should petroleum hydrocarbon- and volatile organic compound (VOC)-contaminated soil, metal concentrations exceeding applicable screening criteria, or other hazardous materials be discovered during construction activities, SLOAPCD must be notified as soon as possible and no later than 48 hours after affected material is discovered to determine if a SLOAPCD Permit will be required. In addition, the following measures shall be implemented immediately on discovery of contaminated soil: • Covers on soil stockpiles shall be maintained in place at all times in areas not actively involved in soil addition or removal; • Contaminated soil shall be covered with at least six inches of packed uncontaminated soil or a non-permeable hydrocarbon barrier. If a hydrocarbon barrier is used, no headspace shall be allowed where vapors could accumulate; • Covered piles shall be designed and installed without openings to minimize erosion due to wind or water; • Criteria pollutant emissions from excavation and haul trips associated with removing contaminated soil shall be quantified and mitigated if total emissions would exceed applicable SLOAPCD construction phase thresholds; • During soil excavation, odors shall be minimized to avoid public nuisance; and, • Clean soil shall be segregated from contaminated soil. b. Finding: The City finds that the implementation of Mitigation Measure HAZ-1(a) and Mitigation Measure HAZ-1(b) would reduce impacts related to hazardous material exposure during transportation infrastructure construction by requiring a contaminated soil assessment and soil management plan, along with provisions to follow consistent with SLOAPCD requirements if concentration of hazardous materials are discovered. The City finds that this impact would be reduced to a less than significant level. F. NOISE 1. Impact N-1: Construction activity on the Project site and off-site roadway modifications would temporarily increase ambient noise levels at noise-sensitive receptors in the vicinity. The exposure of Phase 1 residences to estimated noise levels of up to 79 dBA Leq from construction near the eastern boundary of the project site would result in a 9-dBA exceedance of the long-term standard of 70 dBA. Page 319 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 34 In addition, noise levels reaching 75 dBA Leq at future multi-family residences at 650 Tank Farm Road would exceed the long-term standard of 70 dBA by 5 dBA. Project construction activities would be required to adhere to the City’s allowed hours of construction, which would protect residents from nighttime noise that could disturb people during normal sleeping hours. However, construction activity during daytime hours would still result in a potentially significant impact from temporary increases in ambient noise. a. Mitigation: The following mitigation measures are required to reduce construction-generated noise levels to a less than significant level. — Mitigation Measure N-1(a) Construction-Related Noise Reduction Measures. The applicant shall apply the following measures during construction of the project site: • Electrical Power. Electrical power, rather than diesel equipment, shall be used to run compressors and similar power tools and to power temporary structures, such as construction trailers or caretaker facilities. • Equipment Staging. All stationary equipment (e.g., air compressors, portable generators) shall be staged as far away from sensitive receptors as feasible. • Equipment Idling. Construction vehicles and equipment shall not be left idling for longer than five minutes when not in use. • Workers’ Radios. All noise from workers’ radios shall be controlled to a point that they are not audible at sensitive receptors near construction activity. • Smart Back-up Alarms. Mobile construction equipment shall have smart back-up alarms that automatically adjust the sound level of the alarm in response to ambient noise levels. Alternatively, back-up alarms shall be disabled and replaced with human spotters to ensure safety when mobile construction equipment is moving in the reverse direction. • Temporary Sound Barriers. During the site preparation, grading, building, and paving phases of construction, temporary sound barriers shall be installed and maintained facing noise-sensitive receptors within 300 feet of the project site (e.g., residences at the neighboring mobile home park). Temporary sound barriers typically consist of construction fence batted with light sound blankets. Temporary sound barriers shall, at a minimum, block the line of sight between the engines of diesel-powered construction equipment (typically 3 feet above grade) and adjacent windows at sensitive receptors and shall be placed as close to the source equipment as feasible. Such barriers shall be field tested to reduce noise by at least 10 dBA at sensitive receptors. (A sound barrier can achieve a 5 dBA noise level reduction when it is tall enough to break the line-of-sight from the source equipment to the sensitive receptor, and it can achieve an approximate 1 dBA additional noise level reduction for each 2 feet of height after it breaks the line of sight ([FHWA] 2011). Mobile sound barriers may be used as appropriate to attenuate construction noise near the source equipment. • Disturbance Coordinator. The applicant shall designate a disturbance coordinator who shall be responsible for responding to any local complaints about construction noise. The noise disturbance coordinator shall determine the cause of the noise complaint (e.g., starting too early, bad muffler) and shall require that reasonable measures warranted to correct the problem be implemented. A telephone number for the disturbance coordinator shall be conspicuously posted at the construction site. — Mitigation Measure N-1(b) Neighboring Property Owner Notification and Construction Noise Complaints. The contractor shall inform residents and business operators at properties Page 320 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 35 within 300 feet of the project site of proposed construction timelines and noise complaint procedures to minimize potential annoyance related to construction noise. Proof of mailing the notices shall be provided to the Community Development Department before the City issues a zoning clearance. Signs shall be in place before beginning of and throughout grading and construction activities. Noise-related complaints shall be directed to the City’s Community Development Department. b. Finding: The City finds that with implementation of Mitigation Measure N-1(a), construction noise levels would be reduced by approximately 10 dBA Leq. and construction noise at the nearest sensitive receptors would not exceed 70 dBA Leq, consistent with City standards for construction noise. The City finds that Mitigation Measure N-1(b) would allow affected receptors to report potential exceedances, providing contractors with the opportunity to implement additional specific noise reduction measures on an as-needed basis during construction. The City finds that construction noise impacts would be reduced to a less than significant level. Page 321 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 36 SECTION 6. SIGNIFICANT UNAVOIDABLE ENVIRONMENTAL EFFECTS OF THE PROPOSED PROJECT FOR WHICH SUFFICIENT MITIGATION IS NOT AVAILABLE The findings below are for impacts that would result in potentially significant effects on the natural or human environment that could not be lessened to a less than significant level through changes or alternations in the project or implementation of mitigation measures. To approve a project resulting in significant and unavoidable impacts, the CEQA Guidelines require decision makers to make findings of overriding consideration that "... specific legal, technological, economic, social, or other considerations make infeasible the mitigation measures or alternatives identified in the EIR...". This section presents the Project’s significant and unavoidable environmental impacts after feasible mitigation measures have been considered. Section 15091 of the State CEQA Guidelines (14 California Code of Regulations [CCR]) and Section 21081 of the Public Resources Code require a Lead Agency to make findings for each significant environmental impact disclosed in an EIR. Specifically, for each significant impact, the Lead Agency must find that: • Changes or alterations have been required in, or incorporated into, the project to avoid or substantially lessen the significant environmental effects identified in the Final EIR; • Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by that agency; or • Specific economic, social, legal, technological, or other considerations, including provision of employment opportunities for highly trained workers, make the mitigation measures or project alternatives identified in the Final EIR infeasible. Each of these findings must be supported by substantial evidence in the administrative record. This section identifies significant impacts that can be reduced, but not to a less than significant level, through the incorporation of feasible mitigation measures into the Project, and which, therefore, remain significant and unavoidable, as identified in the Final EIR. The impacts identified in this section are considered in the same sequence in which they appear in the Final EIR. Where adoption of feasible mitigation measures is not effective in avoiding an impact or reducing it to a less-than-significant level, the feasibility of adopting alternatives to the proposed Project is considered in Section 7 of this document. A. HAZARDS AND HAZARDOUS MATERIALS 1. Impact HAZ-3: The proposed entitlements and planned roundabout and frontage improvements along Tank Farm Road and the future alignment of Santa Fe Road also would be designed consistent with applicable City guidelines and standards in the City’s Engineering Standards and Access Management Policies and ALUP safety requirements. The traffic added by the Project to the Broad Street/Industrial Way intersection represents a marginal increase in the total traffic volume entering this intersection and would not substantially increase hazards at this location. There are currently no dedicated pedestrian facilities or controlled crossings along either side of Tank Farm Road between the Project site and the recently constructed collector Street (Innovation Way). By generating additional pedestrian demand, the Project would increase the propensity for pedestrians to walk along the roadway shoulder or cross at inappropriate locations along Tank Farm Road—a high traffic speed/volume arterial roadway—which may result in hazards to pedestrian safety along this roadway segment. The addition of Project-generated pedestrian trips would exacerbate the potential safety hazard, which would be a potentially significant impact. Page 322 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 37 a. Mitigation: The Draft EIR included Mitigation Measure HAZ-3(a) which would have required the project applicant to take specific actions to facilitate the future construction of a shared-use pedestrian/bicycle pathway along the north side of Tank Farm Road from Santa Fe Road west to Innovation Way (4,700 feet west of Santa Fe Road), as identified in the City’s Active Transportation Plan. This mitigation was found to partially offset the project’s contribution towards pedestrian operations and safety impacts along this segment of Tank Farm Road. However, the Draft EIR determined that, due to the potential right-of-way/jurisdiction authority constraints, construction of the planned shared-use pedestrian/bicycle path along Tank Farm Road west of Santa Fe Road would not be a viable mitigation strategy in conjunction with the proposed project and concluded that the pedestrian safety impact would remain significant and unavoidable. During preparation of the Final EIR, City staff reviewed the potential right-of-way/jurisdiction authority constraints associated with Draft EIR Mitigation Measure HAZ-3(a), as well as comments related to the proportionality and feasibility associated with this mitigation measure, and determined that the Conditions of Approval and Reimbursement Agreement for the project are the appropriate vehicle for implementing requirements of the project related to a future shared-use pedestrian/bicycle pathway along the north side of Tank Farm Road. As a result, Final EIR Section 2, Project Description, Subsection 2.5.2, Transportation Improvements, was modified to describe the applicant’s obligation to provide preliminary planning and engineering support for a future shared-use pedestrian/bicycle path along Tank Farm Road through Conditions of Approval and a Reimbursement Agreement, and Draft EIR Mitigation Measure HAZ-3(a) was rejected. Therefore, the incorporation of the following mitigation measure is required to reduce the Project’s impacts associated with pedestrian safety hazards. — Mitigation Measure HAZ-3(a) Tank Farm Interim Pedestrian Safety Signage. The project applicant shall fund and install interim signage along Tank Farm Road west of Santa Fe Road to highlight potential safety hazards to pedestrians along this connection. The signage shall be designed and installed consistent with applicable City Engineering Standards to the satisfaction of the Public Works Director. The signage shall remain in place until the future shared-use pedestrian/bicycle path along the north side of Tank Farm Road between Santa Fe Road and Innovation Way is constructed and open to the public. b. Finding: The City finds that the installation of interim signage along Tank Farm Road west of Santa Fe Road would highlight potential safety hazards to pedestrians along this connection but would not eliminate the project’s contribution toward pedestrian operations and safety impacts along this segment of Tank Farm Road. Implementation of the planned, shared-use pedestrian/bicycle path along the north side of Tank Farm Road west of Santa Fe Road, as identified in the City’s Active Transportation Plan and AASP, would address the pedestrian operations and safety deficiency west of the project site. However, the City finds there are no feasible mitigation measures to implement the planned path due to potential right-of- way/jurisdiction authority constraint because most of the shared-use path is located outside of the San Luis Obispo City limit and would require right-of-way acquisition from private property owner(s), as well as approval by the County of San Luis Obispo. Furthermore, there are no other feasible mitigation measures available that would mitigate this impact. The City finds that this impact would be significant and unavoidable. Page 323 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 38 SECTION 7. FINDINGS FOR ALTERNATIVES TO THE PROPOSED PROJECT A. INTRODUCTION As identified in Section 6 of this document, the proposed Project will cause the following significant and unavoidable environmental impacts to occur: • Impact HAZ-3: Contribution to new pedestrian demand which would increase the existing identified pedestrian safety hazard along Tank Farm Road west of the project site. Because the proposed Project will cause significant and unavoidable environmental impacts to occur as identified above, the City must consider the feasibility of any environmentally superior alternatives to the Project, as proposed. The City must evaluate whether one or more of these alternatives could substantially lessen or avoid the unavoidable significant environmental effects. As such, the environmental superiority and feasibility of each alternative to the Project is considered in this section. Specifically, this section evaluates the effectiveness of these alternatives in reducing the significant and unavoidable impacts of the proposed Project. B. DESCRIPTION OF THE ALTERNATIVES The Final EIR evaluates the following three alternatives to the Project: a No Project (No Build) Alternative; a No Project (Existing Land Use Designation- Business Park) Alternative; and a 25% Reduced Project Alternative. 1. Alternative 1: No Project (No Build) Alternative. As required by CEQA, the EIR evaluates the environmental consequences of not proceeding with the Project, including the General Plan Map Amendment, rezone, Specific Plan Amendment to the AASP, Conceptual Site Plan, and Major Development Review. This alternative assumes the Project site is not developed with the proposed residential mixed-use project. Under this alternative, the Project site would continue to be used for vehicle parking and construction material storage. 2. Alternative 2: No Project (Existing Land Use Designation- Business Park) Alternative. Alternative 2 assumes the Project is not approved and envisions the potential buildout of the Project site based on the property’s existing land use designation. The Project site is located within the AASP and is currently designated Business Park (BP) with a small portion of the property within the Conservation Open Space (C/OS) zone delineating a portion of Acacia Creek which is primarily located on the adjacent property to the east. The BP land use designation provides for research and development and light manufacturing in a campus setting. As identified in the AASP Land Use Program and Development Capacities Table 4-1, the Specific Plan assumes that estimated buildout in the BP designation would be based on a 0.21 floor area ratio (FAR). The maximum FAR allowable for the BP designation under the General Plan Land Use Element is 1.0. City staff conducted an independent analysis of project located in the BP land use designation that were constructed and entitled within the last 20 years1 and concluded that the average FAR for the BP designation is 0.51. 1 Evaluated BP project include 301 Prado Road, 6541 Tank Farm Road, 4051 Broad Street, 689 Tank Farm Road, 892 Aerovista Place, 862 Aerovista Place, and 950 Aero Drive. Note that of these projects 301 Prado Road is the only one not located in the AASP. Page 324 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 39 Therefore, a more accurate estimate of the existing development potential of the property is approximately 246,600 square feet of business park development 3. Alternative 3: 25% Reduced Project Alternative. Alternative 3 envisions development of similar land uses to the proposed Project, but reduced in size and scale by 25%. Alternative 3 would include similar entitlements to the proposed Project, but the conceptual site plan would instead allow development of up to 180 high density residential units, 30 mixed-use units, 9,375 square feet of commercial-service/office space, and a 1,700-square foot clubhouse building on the 11.1-acre project site. C. EFFECTIVENESS OF ALTERNATIVES IN AVOIDING SIGNIFICANT PROJECT IMPACTS This section evaluates the effectiveness of the alternatives in reducing the significant and unavoidable impacts. 1. Significant and Unavoidable Pedestrian Hazard Impacts. The Project would result in significant and unavoidable project impacts related to pedestrian operations and safety impacts. Under the No Project (No Build) Alternative, no development would occur, and no additional pedestrian trips along a facility where no pedestrian facilities exist would be generated; therefore, pedestrian operations and safety impacts would be reduced. Under the No Build (Existing Land Use Designation – Business Park) Alternative, there would still be an increase in pedestrian demand in a location without dedicated pedestrian facilities or controlled intersection crossings, which would be a potentially significant pedestrian safety impact. Similar to the proposed Project, potential right-of-way constraints along Tank Farm Road would make the feasibility of mitigation at this location uncertain, resulting in a significant and unavoidable pedestrian safety impact under Alternative 2. Under the 25% Reduced Project Alternative, there would still be an increase in pedestrian demand in a location without dedicated pedestrian facilities or controlled intersection crossings, which would be a potentially significant pedestrian safety impact. Similar to the proposed Project, potential right-of- way constraints along Tank Farm Road would make the feasibility of mitigation at this location uncertain, resulting in a significant and unavoidable pedestrian safety impact under Alternative 3. D. ENVIRONMENTALLY SUPERIOR ALTERNATIVE AND FEASIBILITY OF PROJECT ALTERNATIVES 1. Finding: The No Project (No Build) Alternative, would result in the fewest adverse environmental effects. However, the No Project (No Build) Alternative fails to meet the Project objectives. As a result, the City finds that the No Project Alternative would be infeasible to implement. 2. Finding: The No Project (Existing Land Use Designation – Business Park) Alternative would result in increased environmental impacts in comparison to the proposed Project for several topics, including impacts to sensitive receptors from criteria pollutants, wildlife corridors, energy, and greenhouse gas emissions. Impacts to pedestrian hazards, traffic noise, vibration, and water and wastewater utilities would be similar but would be less compared to the proposed Project. The significant pedestrian safety impacts would remain significant and unavoidable. As a result, the City finds that Alternative 2 is feasible, but is not environmentally superior to the proposed project. Alternative 2 would not meet the Project objectives related to developing housing and would not help meet General Plan Land Use Policy 2.3.6, which requires the City to encourage mixed-use projects, Land Use Policy 3.8.5 and Housing Policy 5.1, which require the City to encourage mixed residential Page 325 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 40 and commercial uses in commercial districts and zones, or Conservation and Open Space Policy 4.4.3, which requires the City to promote higher-density, compact housing to achieve more efficient use of public facilities and services, land resources, and to improve the jobs/housing balance. As a result, the City finds that Alternative 2 would not satisfy all of the Project objectives or reduce significant environmental impacts compared to the Project, and would conflict with General Plan Goals and Policies related to mixed-uses and high-density housing. 3. Finding: Among the development scenarios, Alternative 3, the 25% Reduced Project Alternative, would be the environmentally superior alternative. Alternative 3 would result in a reduced magnitude of impacts related to air quality, biological resources, cultural and tribal cultural resources, hazards, noise, and utilities. However, Alternative 3 would result in potentially significant impacts to sensitive species and jurisdictional features, undiscovered cultural/tribal cultural resources, contaminated soils, and construction noise, similar to the proposed Project and would require similar mitigation measures as the proposed Project to reduce impacts to a less-than-significant level. In addition, the Project’s significant and unavoidable pedestrian safety impact would remain significant and unavoidable under Alternative 3. Alternative 3 would partially meet Project objectives, but to a lesser extent than the proposed Project because of the reduced scale of planned residential development in comparison to the proposed Project. Alternative 3 would not help meet Land Use Policy 3.8.5 and Housing Policy 5.1, which require the City to encourage mixed residential and commercial uses in commercial districts and zones, or Conservation and Open Space Policy 4.4.3, which requires the City to promote higher-density, compact housing to achieve more efficient use of public facilities and services, land resources, and to improve the jobs/housing balance. As a result, the City finds that Alternative 3 would partially satisfy the Project objectives, but while both the Project and Alternative 3 would require a General Plan Amendment, Alternative 3 would conflict with General Plan Goals and Policies related to mixed-uses and high-density housing and would not reduce the potentially significant impacts or the significant and unavoidable environmental impacts compared to the Project. Thus, the City finds Alternative 3 to be infeasible. Page 326 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 41 SECTION 8. STATEMENT OF OVERRIDING CONSIDERATIONS A. INTRODUCTION The Final EIR for the Project identifies the following significant and unavoidable impacts of the Project: 1. The Project would result in addition of project-generated pedestrian trips would exacerbate existing safety hazards along either side of Tank Farm Road between the project site and the recently constructed collector Street (Innovation Way). For a project that would result in significant and unavoidable environmental impacts after consideration of feasible mitigation measures, CEQA requires that the lead agency balance the benefits of the project against the unavoidable environmental risks in determining whether to approve the project. If the benefits of the project outweigh the unavoidable impacts, those impacts may be considered acceptable (CEQA Guidelines Section 15093[a]). CEQA requires that, before adopting such a project, the lead agency adopt a Statement of Overriding Considerations setting forth the reasons why the agency finds that the benefits of the project outweigh the significant environmental effects caused by the project. This statement is provided below for the Project. B. REQUIRED FINDINGS The City has incorporated all feasible mitigation measures into the Project. Although these measures will lessen the unavoidable impacts listed above, the measures will not fully avoid these impacts. The City has examined a reasonable range of alternatives to the Project and has determined that none of these alternatives are feasible, environmentally superior, or would satisfy all of the Project objectives to the same or greater extent as the Project. Alternative 1 would avoid all of the significant impacts of the project but would not achieve the Project objectives and is not considered feasible. Alternative 2 would result in increased environmental impacts to sensitive receptors from criteria pollutants, wildlife corridors, energy, and greenhouse gas emissions. In addition, Alternative 2 would fail to achieve the Project objectives, would conflict with General Plan Goals and Policies related to mixed-uses and high-density housing, and would still result in significant and unavoidable pedestrian safety impacts. Alternative 3 would be environmentally superior to the project for some environmental issue areas but would not reduce the significant and unavoidable impacts to pedestrian safety and would still require mitigation for significant environmental impacts. Alternative 3 would result in reduced mixed-use development and physical environmental effects, resulting in correspondingly reduced impacts. However, Alternative 3 would only partially satisfy the Project objectives, would conflict with General Plan Goals and Policies related to mixed-uses and high-density housing, and would not reduce the potentially significant impacts or the significant and unavoidable environmental impacts compared to the Project. In preparing this Statement of Overriding Considerations, the City has balanced the benefits of the proposed Project against its unavoidable environmental risks. For the reasons specified below, the City finds that the considerations below outweigh the Project’s unavoidable environmental risks. The City further finds that each of these findings is individually sufficient to support the approval of the Project. A determination that one of more of these findings is not supported by substantial evidence shall not affect the validity of the remaining findings. Page 327 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 42 1. Provision of Variety of Housing Types. The Project will develop new multi-family residences for a range of socioeconomic groups and affordability levels, providing average unit sizes that are below current City averages. The Project fulfills a portion of the City’s housing needs identified in the Housing Element and is consistent with Housing Element and Land Use Element goals that encourage more housing to achieve the City’s housing affordability goals. 2. Establish a Connected Mixed-Use Community. Bike and pedestrian trips would be connected to adjacent developments and uses by a proposed connection to the 650 Tank Farm Road property and extension of the onsite shared-use path to the shared-use path at the Damon-Garcia Sports Fields to the north. 3. Implementation of Transportation Improvements. The Project would implement planned transportation improvements in the City’s Circulation Element, which include sidewalks and bike lanes along Tank Farm Road, an on-site Class I bike path from the Santa Fe Road extension to the Damon-Garcia Sports Fields, and off-site transportation improvements, including the roundabout and frontage improvements along Tank Farm Road as well as the future alignment of Santa Fe Road. 4. Encourage Walkability. Land Use Element Policy 1.5, 10.1, and 10.4, Circulation Element Policy 5.5.1, and Conservation and Open Space Policy 2.2.4 and 4.4.1 all encourage the development of more housing in close proximity to services to promote walkability. The project would add high- density residential use in close proximity to commercial centers, employment centers, and parks, consistent with these policies. 5. Reduce Per-Capita Vehicle Trips: The Project would develop a new mixed-use residential neighborhood to meet the City’s housing needs near a major employment and commercial center which would encourage the use of bicycles and walking, reducing regional VMT. The addition of the project is projected to result in an overall decrease in overall regional VMT (all trip types) and regional residential VMT. 6. Provision of New Jobs: The Project would create new construction-related and permanent jobs in the Project area. In addition, 12,500 square feet of commercial-service/office space would provide jobs in close proximity to housing. 7. Sales Tax: Development of neighborhood commercial uses would contribute sales tax revenues that help fund needed City services (City of San Luis Obispo website, Local Revenue Measure G-20). 8. Sustainability: The Project includes energy efficiency measures including an all-electric design and the installation of solar panels. In addition, shared cars would be provided at a minimum rate of one car per 50 units to reduce the need for additional vehicles in each housing unit. The project includes a preference program for housing units for workers within a 1.5-mile radius of the project site to encourage commuting without the use of vehicles. 9. Economic Public Benefits: The project will provide significant economic benefits to the public from a variety of one time and continuing revenue sources. One-time revenue sources include activities such as construction jobs and purchase of construction materials and supplies. Continuing revenue sources include property taxes, sales taxes on locally procured materials and supplies and other revenues. Page 328 of 495 Findings of Fact and Statement of Overriding Considerations 600 Tank Farm Residential Mixed-Use Project City of San Luis Obispo October 2021 43 Accordingly, the City finds that the Project’s adverse, unavoidable environmental impacts are outweighed by these considerable benefits. Dated: ______________________, 2021 _____________________________________ Erica A. Stewart Mayor, City of San Luis Obispo 3887627.1 Page 329 of 495 Page 330 of 495 T A N K F A R M SANTA FEEXHIBIT - C GENP-0814-2019 Existing Land Use - Business Park (Left)Proposed Land Use - Services & Manufacturing (Right)¯ T A N K F A R M SANTA FELegend Open Space Community Commercial Recreation Low Density Residential Medium Density Residential Medium-high Density Residential Public Neighborhood Commercial Business Park Sevrices & Manufacturing Page 331 of 495 Page 332 of 495 O _____ ORDINANCE NO. _____ (2022 SERIES) AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING A REZONE FOR PROPERTY AT 600 TANK FARM ROAD. THE PROJECT INCLUDES AMENDING THE ZONING MAP TO CHANGE THE ZONING DESIGNATION OF THE ASSOCIATED PROPERTIES FROM BUSINESS PARK (BP-SP) TO COMMERCIAL SERVICES (C-S-SP), RESPECTIVELY, AND MAKING ASSOCIATED TEXT AMENDMENTS TO THE AIRPORT AREA SPECIFIC PLAN TO BE CONSISTENT WITH THE 600 TANK FARM MIXED-USE DEVELOPMENT PLAN INCLUDING ADOPTION OF A FINAL ENVIRONMENTAL IMPACT REPORT. AS REPRESENTED IN THE STAFF REPORT AND ATTACHMENTS DATED FEBRUARY 1, 2022 (600 TANK FARM: PR-0005-2021, GENP-0814-2019, SPEC-0407-2020, & EID-0608-2020) WHEREAS, the City Council of the City San Luis Obispo conducted a web based teleconference hearing on April 21, 2020, authorizing the initiation of the project and issuance of a request for proposals for preparation of an Environmental Impact Report for the project, pursuant to a proceeding instituted under GENP-0814-2019, Covelop Inc., applicant; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web based teleconference hearing on July 14, 2021, received public testimony and provided input on the Draft Environmental Impact Report, pursuan t to a proceeding instituted under ARCH-0406-2021, SBDV-0407-2021, GENP-0814-2019, SPEC-0407- 2020, and EID-0608-2020, Covelop Inc., applicant; and WHEREAS, the Airport Land Use Commission of the County of San Luis Obispo, upon receipt of a formal referral from the City of San Luis Obispo, conducted a web based teleconference hearing on August 18, 2021, and determined consistency with the San Luis Obispo County Regional Airport Land Use Plan subject to conditions, pursuant to a proceeding instituted under PR-0005-2020, Covelop Inc., applicant; and WHEREAS, the Planning Commission of the City of San Luis Obispo conducted a web based teleconference hearing on November 17, 2021, and recommended findings of consistency to the City Council regarding the proposed rezoning application; pursuant to a proceeding instituted under GENP-0814-2019, SPEC-0407-2020, and EID-0608- 2020, Covelop Inc., applicant; and WHEREAS, the City Council of the City of San Luis Obispo conducted web based teleconference hearing, on February 1, 2022, for the purposes of approving the rezoning application, pursuant to a proceeding instituted under GENP-0814-2019, SPEC-0407- 2020, and EID-0608-2020, Covelop Inc., applicant; and Page 333 of 495 Ordinance No. _____ (2022 Series) Page 2 O ______ WHEREAS, the City Council of the City of San Luis Obispo has duly considered all evidence, including the written and oral testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at said hearing. WHEREAS, notices of said public hearings were made at the time and in the manner required by law; and NOW, THEREFORE, the City Council of the City of San Luis Obispo does hereby ordain as follows: SECTION 1. Findings. Based upon all the evidence in the record, the Council makes the following findings: 1. The rezone and associated text amendments to the AASP allow the implementation of the 600 Tank Farm Mixed Use Project by rezoning the site to be consistent with the General Plan as amended. 2. The rezone and associated text amendments are consistent with General Plan Land Use Element policies and map as amended related to 600 Tank Farm Road Project, including the land uses and development envisioned for the area for following reasons: 1) The rezone and text amendments would f acilitate the General Plan Land Use map as amended and reflect General Plan development parameters for the area; and 2) the rezone and text amendments would facilitate appropriate infill development and construction of additional housing including affordable housing to meet City housing goals and better balance jobs and housing opportunities, because the project provides additional housing opportunities at a location close to major employers , commercial services and multimodal transportation facilities. 3. A Final Environmental Impact Report has been prepared for the project consistent with the rezone and AASP text amendments. 4. The rezone and text amendments will not create non-conforming uses at the site because any existing uses that remain on site would be allowed under the new zoning. SECTION 2. California Environmental Quality Act (CEQA) Findings, Mitigation Measures, and Mitigation Monitoring Program. Based upon all the evidence, the Planning Commission recommended that the City Council adopt the Final Environmental Impact Report (FEIR) (State Clearing House #2020110426), subject to the following CEQA findings in support of all entitlements related to the 600 Tank Farm Mixed -Use project: 1. The 600 Tank Farm Mixed Use Final Environmental Impact Report (Final EIR) was prepared in accordance with the California Environmental Quality Act (CEQA) and the State CEQA Guidelines, adequately addressing impacts associated with the project. Page 334 of 495 Ordinance No. _____ (2022 Series) Page 3 O ______ 2. The proposed rezone is consistent with the requirements of the 600 Tank Farm Mixed-Use FEIR as proposed based on the adopted CEQA Findings and Statement of Overriding Considerations, and prepared consistent with CEQA Guidelines Sections 15091 and 15093, and this approval incorporates those FEIR mitigation measures as described fully in the adopted CEQA Findings of Fact and Statement of Overriding Considerations (Resolution __________, Exhibit A) and Mitigation, Monitoring, and Reporting Program (Resolution ___________, Exhibit B). 3. All potentially significant effects were analyzed adequately in the referenced FEIR, and reduced to the extent feasible, provided identified mitigation measures are incorporated into the project and the mitigation monitoring program (Resolution _________, Exhibit B, Mitigation Monitoring and Reporting Program). SECTION 3. Action. The City Council of San Luis Obispo hereby approves the rezone as shown in attached “Exhibit A”, which is consistent with the land use designations included in the General Plan as amended, and 2) approves amendments of the text of the Airport Area Specif ic plan attached hereto marked “Exhibit B” and included herein by reference to be modified as follows: a) Change the site’s land use designation from Business Park (BP-SP) to Service Commercial (C-S-SP) within the Specific Plan Overlay, which is necessary to allow the proposed mixed-use development; b) Amendments to allow a mixed-use development specific to the property at 600 Tank Farm Road within the C-S-SP zone; c) Amend all AASP tables and text to reflect the zone change and addition of 280 residential units, and 12,500 square feet of commercial-service/office space for the project site; d) Modify the road section figures to reflect modifications to Tank Farm Road and Santa Fe Road consistent with traffic projections and full buildout of the circulation system; e) Describe necessary setback of improvements and buildings to delineated wetland areas in conformance with project Biological Assessments; and f) Updated applicable figures and graphics to reflect the changes in land use designations, and circulations systems. SECTION 4. Severability. If any subdivision, paragraph, sentence, clause, or phrase of this Ordinance is, for any reason, held to be invalid or unenforceable by a court of competent jurisdiction, such invalidity or unenforceability shall not affect the validity or enforcement of the remaining portions of this Ordinance, or any other provisions of the city' s rules and regulations. It is the city' s express intent that each remaining portion would have been adopted irrespective of the fact that any one or more subdivisions, paragraphs, sentences, clauses, or phrases be declared invalid or unenforceable. Page 335 of 495 Ordinance No. _____ (2022 Series) Page 4 O ______ SECTION 5. Publication. A summary of this ordinance, together with the names of Council members voting for and against, shall be published at least five (5) days prior to its final passage, in The New Times, a newspaper published and circulated in this City. This ordinance shall go into effect at the expiration of thirty (30) days after its final passage. INTRODUCED on the ___ day of ___, 202 2, AND FINALLY ADOPTED by the Council of the City of San Luis Obispo on the ___ day of ___, 202 2, on the following vote: AYES: NOES: ABSENT: __________________________ Mayor Erica A. Stewart ATTEST: ___________________________ Teresa Purrington City Clerk APPROVED AS TO FORM: __________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on _______________________. _____________________ Teresa Purrington City Clerk Page 336 of 495 BROADSANTA FETA N K F A R M HOOVERIN D U S TR IA LCLARION EXHIBIT - A GENP-0814-2019 Existing Zone - BP-SP (Left)Proposed Zone - C-S-SP (Right)¯BROADSANTA FETA N K F A R M HOOVERIN D U S TR IA LCLARION Legend Project Site Zoning General Zoning BP C-C C-R C-S C/OS M PF R-1 R-2 R-3 Page 337 of 495 Page 338 of 495 600 Tank Farm Road  AASP Policy, Text and Graphic  Amendments      Chapter 1—Introduction  I. None.  Chapter 2—Planning Area Description  II. None.  Chapter 3—Conservation and Resource Management  III. Add the following to the description of aircraft operations on Page 3‐12 under Aircraft Operations:  “The Airport Land Use Commission has completed a major amendment of the Airport Land Use  Plan which was adopted on May 26, 2021. The amended ALUP provides for noise contours that  are tied to aircraft and airport activity that is based on adopted federal Terminal Area Forecasts,  and on safety zones that are based on and consistent with those described in the Caltrans Airport  Land Use Planning Handbook.“  Chapter 4—Land Use  IV. Modify the paragraph on Page 4‐2 to read as follows:  “The land use plan was developed to ensure compatibility with airport operations. Uses that have  high concentrations of people or are sensitive to airport noise (e.g., low density residential,  schools, hospitals, etc.) are not included in the planning area. The designated AASP land uses  (Figure 4‐1) are consistent with the permitted and conditionally permitted land uses respond to  the in the flight patterns and land use criteria associated with the airport safety areas in the San  Luis Obispo County Regional Airport Land Use Plan (ALUP), as amended. Generally, the critical  areas in line with the runways will be maintained as open space. Lower intensity warehousing,  manufacturing, service, business park and residential uses are designated for the less sensitive  zones to the sides of the runways, and further out from the ends of the runways.”  Modify the last sentence on paragraph 7 on page 4‐2 to read as follows:  “In addition, by designating lands along the Broad Street and Tank Farm Road corridor as  Business Park, Services and Manufacturing, and Community Commercial,   the plan is encouraging  higher quality development that is in keeping with this important entry to the City from the Edna  Valley.”  V. Amend the first sentence of the Land Use Program description on page v to read as follows:  “The land use program for the Airport Area plans for the development of up to 1,255.1617.6 acres  with a mixture of Services and Manufacturing, Business Park, Government Facilities, and public  facilities that may be developed with recreation or public services. Residential development of a  total of up to 62 91 acres is planned, consisting of 48.568.2 acres within the Avila Ranch area,  and 22.8 acres along Tank Farm Road as identified in AASP Section 4.2.2  providing for mixed‐use  Page 339 of 495 developmentan existing mobile home park (6.7 acres) that will be retained. The balance of the  area is to be preserved as Open Space and Agriculture (371 acres). Table 4‐1 shows the amount  of land within each land‐use designation, as well as the estimated development potential at full  development of the AASP area.”    VI. Amend Table 4‐1 as follows:  Table 4-1 San Luis Obispo Airport Area Specific Plan Land Use Program and Development Capacities Residential Land Use Acres Units Per Acre Estimated Dwelling Units Undeveloped Land1 Low Density 17.512.8 7.9 1051 Medium Density 3520.5 10.9 306223 Medium-High Density 11.0415.2 21.2 184322 High Density 4.7 24 125 Mixed-Use (AASP 4.2.2) 22.8 24 547 Subtotal 48.59171.3 1,267720 Developed Land (Existing Mobile Homes 6.7 4.8 32 Total Residential Property 55.29171.3 6781,267 Non-Residential Land Use Designations Acres Floor Area Ratio Estimated Building Undeveloped Land Neighborhood Commercial 8.4 0.31 115,000 Community Commercial 9.66 0.44 185,147 Business Park 116.94107 0.21 1978,800 Service Commercial 155.0 0.24 1,620,432 Manufacturing 101.3 0.17 747,642 Subtotal 384.4381.4 3,647,021 Developed Land 145.2 0.28 1,786,745 Total Non-Residential Property 5269.6 5,433,7667,474 Other Land Use Designations Acres Agriculture 76.1 Conservation / Open Space/Parks 294.9 Government 292.5 Total Other Property 663.5 Total AASP Acreage2 1,281.155.1 1 The total potential square footage (and associated acreage) includes future development on properties  currently under pre‐annexation agreements and properties outside of the City’s jurisdiction with alternative fee  programs.  Since these properties may not be required to pay their fair share of infrastructure costs, the  difference will need to be funded by other funding sources (e.g., grants, additional City contributions, etc.).  2 Excludes acreage associated with roads, setbacks, creeks, and other features.  VII. Amend Figure 4‐1 to show the project site as C‐S.  VIII. Amend Figure 4‐4 to show the project site as C‐S.  IX. Amend the description of Service Commercial land use Page 4‐15 as follows:  “The redevelopment of the site of 650 Tank Farm Road (the Hidden Hills Mobilodge Mobile  Home Park and recreational vehicle storage) at 650 Tank Farm Road and the development of  600 Tank Farm (APNs 053‐421‐002 and 053‐421‐006) under the Service Commercial (C‐S) zoning  designation shall be limited to a commercial and residential mixed‐use development with a  predominantly residential component.”  Page 340 of 495 X. Amend Policy 4.3.7 as follows:  “According to updated traffic projections, traffic on Tank Farm Road can be adequately and  safely accommodated with a two‐lane, limited access configuration.  Prior to development of  the Chevron Tank Farm site, Chevron, or its successor in interest, must provide a tentative map  with preliminary design plans for improvements to Tank Farm Road adjacent to its property that  are consistent with traffic projections and full buildout of the circulation system. The design plans  will address roadway design standards provided in Chapter 6, including the roadway design,  median and parkway landscaping, re‐grading of the berms, re‐location and replacement of chain  link fencing with a more visually compatible solution, and alignment and design of on‐street and  off‐street pedestrian and bicycle connections as shown in the circulation section, chapter 6.”  XI. Modify the Parking Requirements text as follows:  4.4.5  Parking Requirements  “The parking requirements for development in the Specific Plan area are shown in Table 4‐8. The  table includes minimum and maximum parking rates. The design of parking areas is discussed in  detail in Chapter 5. The Avila Ranch Development Plan prescribes parking standards that shall  apply in the Avila Ranch Subarea. If the parking standards are not otherwise stated herein, the  zoning ordinance parking standards shall apply.”  XII. Delete the reference to and text associated with Medium Density Residential in Table 4‐4, as  follows:  Table 4-4 San Luis Obispo Airport Area Specific Plan PARCEL DIMENSIONS Land Use Designation Minimum Area Minimum Width Minimum Depth Maximum Depth: Width Ratio Minimum Frontage Open Space 40 ac 660 ft 660 ft None None (b) Business Park 0.5 ac (a) 100 ft 100 ft 3:1 50 ft Service Commercial 9,000 sf 60 ft 100 ft 3:1 40 ft Manufacturing 9,000 sf 60 ft 100 ft 3:1 40 ft Airport Facility Subdivision and lease parcels are subject to approval by the County. Medium density Residential Minimum dimensions are as provided in the Subdivision Regulations. The mobile-home park has been recognized as a long-established use. It may be converted to resident-ownership, but redevelopment of the site at an increased density is not permitted by the Airport Land Use Plan. Notes: (a) Guideline: The Business Park zone should include a range of parcel sizes above the minimum. (b) Each parcel must have access from a public road, or an access easement from a public road acceptable to the City. (c) Common Interest Subdivisions are permitted, subject to the requirements of the Subdivision Regulations. Chapter 5—Community Design  XIII. None.  Chapter 6—Circulation  XIV. Modify the introductory paragraph for Circulation and Transportation on Page 6‐2 as follows:  “The  transportation  and  circulation  system  for  the  Airport  Area  should  provide  safe  and  convenient mobility and access to all modes of transportation. The transportation system should  Page 341 of 495 be balanced with interconnected streets, transit routes, bicycle and pedestrian facilities, and  open space recreational areas with limited gaps or barriers. The transportation system should  encourage the use of, and provide facilities for, alternatives to the single‐occupant vehicle. The  2014 Circulation Element Update has established significant new modal split objectives for  buildout of the City and the AASP is consistent with those goals. The City has also re‐calibrated  its traffic model to reflect the scope and quantity of major community development projects  (e.g., Avila Ranch, San Luis Ranch, Froom Ranch, Orcutt Area Specific Plan), and trip generation  factors. These items, combined, have resulted in reconsideration of the extent of facilities to  accommodate vehicle traffic. At the same time, the Specific Plan must recognize the need to  serve regional and citywide traffic and freight on its street system.”  XV. Modify  all  reference  to  bike  facilities  and  bike  planning  to  be  consistent  with  the  Active  Transportation Plan.  “The Bicycle Transportation Plan, illustrated in Figure 6‐2, is comprised of the following three  types of bicycle facilities:  A. “Off‐street Class I multi‐use paths that parallel creeks and riparian corridors as well as major  streets consistent with the Active Transportation Plan;  B. On‐street Class II bicycle lanes on arterial (separated where feasible), and collector streets  consistent with the Active Transportation Plan;   C. Off‐street Class IV bicycle lanes on arterial and collector streets consistent with the Active  Transportation Plan; and  C.D. A combination of off‐street paths adjacent to streets and on‐street bicycle lanes.”  XVI. Modify Figure 6‐1 to show two different segments and design standards for Tank Farm Road. The  portion between Windmill/Chevron Collector and Santa Fe should be shown as a 2‐lane limited  access arterial.  East of Santa Fe is 4 lanes and west of Windmill/Chevron Collector is 4 lanes.  XVII. Modify Program 6.3.7 on Creek Setbacks on page 6‐17 to read as follows:  “Where possible, Class I bicycle paths adjacent to riparian corridors should be located outside of  setbacks required by the City’s Creek Setback Ordinance (SLO Municipal Code 17.16.025) to  protect creekbanks and riparian vegetation. A vegetative buffer shall be provided on the creek  side of paths and berms to ensure visual access to riparian corridors while controlling pedestrian  and bicycle access. Lesser setbacks may be provided if a finding is made that there will not be a  significant impact on riparian vegetation, wildlife migration or other biological resources.”  XVIII. Modify Figure 6‐4 to show Tank Farm with two separate road types‐‐a 4‐lane east of Santa Fe and  west of the “Chevron Collector”—and a 2‐lane limited access section between Santa Fe and the  Chevron Collector.  XIX. Modify Standard 6.4.2.2 to read as follows:  6.4.1.2 Tank Farm Road is designated a parkway arterial and will have a continuous, four‐lane,  urban cross‐section easterly of Santa Fe and westerly of Windmill/Chevron Collector. Between  Santa Fe and Windmill/Chevron Collector, it shall be a two‐lane, limited access arterial.  XX. Add Figure 6.4.3 to show the two‐lane configuration for Tank Farm.  Page 342 of 495 XXI. Add Standard 6.4.4.4 on Page 6‐24 as follows:  6.4.4.4 Santa Fe Road between Prado & Tank Farm shall be consistent with Figure 6‐4.5.  XXII. Modify referenced 6‐4.5 to be consistent with Figure 3 of the initiation package for 600 Tank Farm.  Total future cross section as follows:          Figure Interim cross section as follows:      Chapter 7—Utilities and Services  XXIII. None.  Chapter 8‐‐Finance  XXIV. None.  Chapter 9—Implementation  XXV. None.  Page 343 of 495 Page 344 of 495 R _____ RESOLUTION NO. _______ (2022 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, APPROVING A REIMBURSEMENT AGREEMENT WITH COVELOP, INC. FOR SPECIFIC INFRASTRUCTURE COSTS THAT ARE BEYOND THE 600 TANK FARM MIXED-USE DEVELOPMENT PROJECT’S FAIR SHARE REQUIREMENTS, AS REPRESENTED IN THE CITY COUNCIL AGENDA REPORT AND ATTACHMENTS DATED FEBRUARY 1, 2022 (600 TANK FARM ROAD, PR-0005-2021, ARCH-0406-2021; SBDV-0407-2021; GENP-0814-2019; SPEC-0407-2020; EID-0608-2020) WHEREAS, the City Council of the City of San Luis Obispo conducted a web based teleconference hearing on February 1, 2022, adopting the Final Environmental Impact Report and granting design approval of the 600 Tank Farm Mixed-Use project, pursuant to a proceeding instituted under ARCH-0406-2021, SBDV-0407-2021, GENP- 0814-2019, SPEC-0407-2020, and EID-0608-2020, Covelop Inc., applicant; and WHEREAS, Covelop, Inc., has applied for the approval of an “Infrastructure Reimbursement Agreement” (Exhibit A) concerning the development of the mix-use project; and WHEREAS, Covelop, Inc., has secured City approval to construct said mixed-use development subject to conditions of approval that require the orderly and timely completion of public infrastructure improvements to support the approved project; and WHEREAS, the City has an established a Citywide Transportation Impact Fee Program that allows new development projects to pay a fair share fee towards transportation infrastructure needs throughout the City; and WHEREAS, there are certain public improvements associated with the 600 Tank Farm Mixed-Use project that include public improvements that must be installed and are greater in size and capacity than required to serve only the project (“Excess Public Improvements”), qualifying said Excess Public Improvements for reimbursement as set forth in San Luis Obispo Municipal Code Section 16.20.110; and WHEREAS, Covelop, Inc., has presented estimates of the costs to design, permit and construct said Excess Public Improvements, and fair share proportionality of the properties that may benefit from the installation of the Excess Public Improvements; and WHEREAS, the approval of a Reimbursement Agreement will assist in the orderly and timely completion of public infrastructure; Page 345 of 495 Resolution No. ______ (2022 Series) Page 2 WHEREAS, the City Council of the City of San Luis Obispo has duly considered all evidence, including the testimony of the applicant, interested parties, and evaluation and recommendations by staff, presented at the hearing; and WHEREAS, notices of said public hearings were made a t the time and in the manner required by law; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of San Luis Obispo as follows: SECTION 1. The “Reimbursement Agreement,” attached to this Resolution as Exhibit A, is hereby approved, and the Mayor is authorized to approve minor revisions and execute this Agreement on behalf of the City. SECTION 2. The Finance Director is authorized to administer and implement the Reimbursement Agreement as provided therein. SECTION 3. The Mayor and City staff are authorized to take any actions necessary to carry out the intent of this Resolution. Page 346 of 495 Resolution No. ______ (2022 Series) Page 3 SECTION 4. The 600 Tank Farm Mixed-Use Development Plan and associated Final Environmental Impact Report (FEIR) were approved and certified by the City Council on February 1, 2022. Installation of the public improvements were identified as required mitigation measures to address significant transportation impacts resulting from the development proposal. The Reimbursement Agreement relates only to the financial mechanism by which the developer’s costs in excess of fair share will be reimbursed and does not implicate any physical change to the project or the environment . Therefore, no further environmental review is required for this action. On motion by______________, seconded by ______________, and on the following roll call vote: AYES: NOES: ABSENT: The foregoing resolution was passed and adopted this ____ day of __________ 2022. ___________________________ Mayor Erica A. Stewart ATTEST: _________________________ Teresa Purrington City Clerk APPROVED AS TO FORM: _________________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. ___________________________ Teresa Purrington City Clerk Page 347 of 495 Page 348 of 495 - 1 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) REIMBURSEMENT AGREEMENT FOR 600 TANK FARM ROAD This Agreement (the “Agreement”) is made on _____________________________, by and between the City of San Luis Obispo, a charter city and a municipal corporation (the “City”) and Covelop, Inc., a California corporation, or its successor(s)-in-interest, (the “Developer”), and collectively referred to as the “Parties.” RECITALS WHEREAS Developer is the owner of certain real property consisting of approximately 11.7 acres of land located at 600 Tank Farm Road in the City, which is more particularly described in attached Exhibit 1 incorporated herein by this reference (the “Property”); and WHEREAS the City Council of the City has approved a residential mixed-use project, including 280 residential units, as well as commercial, recreational park land, and open space uses on the Property, which is within the Airport Area Specific Plan (the “AASP”), through a series of actions and approved entitlements (collectively referred to as the “Project”) as follows: (1) The Final Environmental Impact Report and associated Mitigation Monitoring and Reporting Plan (including all mitigation measures therein) for the Project certified and adopted by Resolution No. _____, on ________ __, 2022; (2) An amendment to the General Plan (Resolution No. _____), adopted on ________ __, 2021, including amendments to the Land Use/Circulation Element (“LUCE Update”) adopted by Resolution No. _____ (2014 Series) on ________ __, 2022; (3) The AASP as amended by Ordinance No. ____, on ________ __, 2022; (4) The City’s Zoning Ordinance as amended by Ordinance No. ____, on ________ __, 2022; (5) The Vesting Tentative Map SBDV-0407-2021 approved on ________ __, 2022; and WHEREAS, Appendix A of the adopted Citywide Transportation Impact Fee (the “TIF”) Program, attached hereto as Exhibit 2 to this Agreement, identifies the portion of transportation improvements to be constructed by Developer, Citywide Transportation Impact Fees (TIF), General Funds, and/or private reimbursement agreements, and the Citywide TIF identifies other improvements that are reimbursable by virtue of their inclusion in the TIF programs; and WHEREAS, Exhibit 3 to this Agreement identifies certain Transportation Improvements Eligible for Reimbursement (the “Infrastructure Improvements”); and Page 349 of 495 - 2 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) WHEREAS, in order for Developer to incur the Developer Costs, the City agrees to appropriate any General Fund amounts and TIF amounts as part of the City’s Financial Plan. A schedule showing an Estimate of Developer Costs is provided in Exhibit 4; and WHEREAS, The City has found in connection with its review and consideration of this Agreement that no subsequent or supplemental Environmental Impact Report is necessary or required under CEQA because the terms and conditions of this Agreement are consistent with and within the scope of and contemplated by the FEIR adopted for the Project. THEREFORE, for good and valuable consideration, the Parties agree as follows: AGREEMENT 1. Terms. The foregoing recitals are deemed by both Parties to be a material part of this Agreement and are incorporated herein and binding on the Parties by this reference. 2. Capitalized Terms. Capitalized Terms used in this Agreement have the following meanings: (a) “Agreement” is this agreement as executed by the Developer and the City of San Luis Obispo. (b) “Approved Plans” are the plans for each Transportation Infrastructure Improvement set forth in Section 2(i) as approved by the City or County, including any modifications thereof including modifications directed during construction. (c) “Benefiting Properties” includes those properties shown in Exhibit 5, and including 250 Tank Farm Road, 660 Tank Farm Road, 3985 Broad Street, and 650 Tank Farm Road. (d) “City” is the City of San Luis Obispo, a municipal corporation and charter city. (e) “Conditions of Approval” are the Conditions of Approval for the ________ __, 2022 Project Approvals approved by Resolution, including the conditions of approval for Vesting Tentative Tract Map SBDV-0407-2021. (f) “County” is the County of San Luis Obispo. (g) “Developer” is Covelop, Inc., a California corporation, or its successor(s)- in-interest. (h) “Developer Costs” are the actual costs of designing, permitting, and constructing each of the Infrastructure Improvements listed on Exhibit 4. Developer Costs shall include eligible Developer hard and soft costs. Soft costs shall include all direct costs related to the project, including design, inspection, City plan check and inspection fees, supervision, and Page 350 of 495 - 3 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) survey. Developer Costs shall also include the cost of all right-of-way acquisitions secured by Developer, if any. (i) “Eligible Fees” are the following fees and sources used to reimburse Developer for Developer Costs: (i) Citywide Transportation Impact Fees (the “Citywide TIF”) as adopted by the respective City Council ordinance(s). Exhibit 4 identifies Citywide TIF funds from projects that directly benefit from the Transportation Infrastructure Improvements (“Benefitting Properties”). Fees from the Benefitting Properties are to be reserved for the exclusive purpose of providing reimbursement for the Transportation Infrastructure Improvements. Citywide TIF Fees collected from other development projects may also be prioritized for payment of Eligible Fees at the City’s discretion. (ii) Any Ad Hoc or Project Specific Mitigation Fees levied and collected by the City for the Infrastructure Improvements in Exhibit 3 to this Agreement, if any. (iii) General Fund amounts as identified in Attachment B to Exhibit 4 appropriated specifically for reimbursement for eligible Infrastructure Improvements and approved by the City Council. The City agrees to appropriate such funds in a timely way to ensure funding of necessary reimbursements. (iv) Citywide TIF fees from the Project. (v) Other Citywide TIF fees as deemed necessary by the City. (j) “Environmental Impact Report” (“EIR”) is an environmental report prepared to inform decision -makers and the public about the potential environmental impacts of the proposed Project and to reduce and mitigate those environmental impacts to the greatest extent feasible. (k) “Final Environmental Impact Report” (“FEIR”) is the approved environmental report. (l) “Infrastructure Improvements” is those improvements identified in Exhibit 3 to this Agreement. Infrastructure Improvements are referred to individually as “Infrastructure Improvement.” (m) “TIF Fees” is the Citywide transportation impact fees as defined under California Government Code Section 66000(b) as adopted by the City of San Luis Obispo on April 3, 20l8, as amended July 16, 2019. (n) “VTTM” is Vesting Tentative Tract Map SBDV-0407-2021 approved on ________ __, 2022. Page 351 of 495 - 4 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) (o) “Substantial Completion” is the time at which the engineer of record determines that work is substantially complete in accordance with the City engineering standards and specifications, with the concurrence of the City Engineer, which concurrence shall be provided within thirty (30) working days and shall not unreasonably be withheld. In addition, documentation of corresponding expenditures as provided in Section 3(c) has been submitted to the City. Substantial Completion shall be required only for the purposes of release of reimbursement for the final ten percent (10%) of Developer Costs pursuant to Section 5 of this Agreement. 3. City’s Obligations. In consideration of Developer’s agreement to design and construct the Infrastructure Improvements, the City agrees to the following: (a) To budget and appropriate the necessary Eligible Fees to provide reimbursements, including, but not limited to timely appropriation of General Fund amounts, and reservation of any Citywide TIF fees paid by Benefitting Properties. To this end, the City has appropriated $715,000 in the 2021-2023 Financial Plan that will cover design and the Tank Farm Bike Path Plans, Specifications and Estimates (PS&E), and the City Manager presently intends to recommend that the City, subject to the City Council’s plenary discretion in the exercise of its budgeting authority, appropriate at least an additional One Million Five Hundred Forty-Four Thousand Six Hundred ($1,544,600) during or prior to adoption of the 2022 Supplement to the Financial Plan to cover the costs of needed rights of way. (b) To reasonably cooperate with and respond to requests from Developer to review contractor bids in a timely manner to confirm that the work proposed conforms to Approved Plans. (c) To provide to Developer, no later than sixty (60) days prior to the date that Developer advises City that the work is to be commenced, a written description (the “City Description”) of the nature and extent of bills, invoices, contracts, and other documents necessary to evidence payment in order to be eligible for reimbursement pursuant to below Section 6 (the “Required Documentation of Expenditures”) or to request additional information to document costs. If Developer complies with a request by the City for additional documentation of costs, City may request additional information only insofar as it relates to the additional documentation provided. (d) Upon Developer’s completion of each Infrastructure Improvement as specified in the Approved Plans, and upon notification to the City, the City shall inspect the Infrastructure Improvement to determine compliance with Approved Plans and engineering standards. If the Infrastructure Improvement is determined by the City to be constructed in accordance with the Approved Plans and Specifications for the Infrastructure Improvement, the City shall approve each Infrastructure Improvement and accept it in accordance with below Section 8 of this Agreement. Regarding the roundabout, the City will assist the Developer in coordinating with the County on the design and construction. Page 352 of 495 - 5 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) (e) The City shall provide reimbursement for the cost of the Infrastructure Improvement, in accordance with this Agreement. (f) To reimburse Developer for all the costs to design the bike path along Tank Farm Road, as described in Exhibit 3. (g) To reserve 100% of the Citywide TIF fees from the Project and from the Benefitting Properties to fund the TIF portion of the reimbursements until the reimbursement is complete. 4. Developer’s Obligations. In consideration of the City’s entering into the Agreement, Developer agrees to the following: (a) In order to assure that the costs of construction of the Infrastructure Improvements are reasonable, prior to commencing construction of the Infrastructure Improvements, Developer shall obtain at least three (3) non-collusive bids for construction of the Infrastructure Improvements for all general or subcontracted work and provide copies to City. City shall review and comment on the completeness of the bids. Developer may select any bid that is within ten percent (10%) of the low bid, as long as those bids within ten percent (10%) of the low bid are also within the Engineer’s Estimate for the Improvement; provided, however, that Developer is not required to accept any particular bid, including the low bid. If Developer accepts a bid which is (i) more than ten percent (10%) higher than the lowest bidder, or (ii) above the Engineer’s Estimate for the Improvement, Developer must reasonably justify its selection to the City Public Works Director, which justification must be accepted or rejected by the City within fifteen (15) business days of submission. If the City rejects the justification, it must set forth in writing its reasoning for the rejection and meet and confer with Developer to discuss the rejection. City may not unreasonably reject Developer’s bid selection. If Developer wishes to proceed with a bid that is more than ten percent (10%) above the low bid, Developer shall not be eligible for any reimbursements which exceed one hundred ten percent (110%) of the low bid. (b) To provide the Required Documentation of Expenditures required in Section 3(c) of this Agreement. Developer shall organize the Documentation according to Infrastructure Improvement and shall reasonably correlate Documentation to the work required for each Infrastructure Improvement. (c) To respond to City’s reasonable requests for additional information to resolve discrepancies provided such additional information falls within the scope of the City’s Required Documentation of Expenditures. (d) To construct each Infrastructure Improvement according to the Approved Plans & Specifications and the City’s Standard Specification and Engineering Standards. (e) To construct each Infrastructure Improvement in the phases identified in the Conditions of Approval. Page 353 of 495 - 6 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) (f) To complete the preliminary planning and engineering tasks and related deliverables associated with the future bike path along Tank Farm Road, as described in Exhibit 3. 5. Reimbursement. Developer is entitled to reimbursement of one hundred percent (100%) of eligible Developer Costs pursuant to the terms of this Agreement. Reimbursement for eligible Developer Costs shall come from the combination sources described in Exhibit 4. Reimbursement from eligible fee programs shall not exceed the amount collected by those fee programs. (a) For the portion of the improvements funded by on site TIF credits then up to ninety percent (90%) of the Developer Costs eligible for reimbursement via impact fee credits shall be approved within thirty (30) days of Developer submitting to the City proof of obtaining a bond in a form acceptable to the City for completion of the improvement or shall ap ply when building permits are issued or fees are otherwise due. (b) For the portion of the improvements funded by TIF reimbursement from benefitting developments or General Fund reimbursement then up to ninety percent (90%) of the Developer Costs eligible for reimbursement via impact fees collected from other benefiting developments or from General Fund appropriations, as described in Exhibit 4, shall be reimbursed within thirty (30) days of City approval of Developer’s Documentation of Expenditures for actual costs incurred, but only to the extent the City has actually collected eligible TIF fees and appropriated eligible General Fund contributions. (c) The remaining ten percent (10%) of eligible Developer Costs shall be reimbursed within thirty (30) days of the City’s acceptance of substantial completion of each Improvement, again only to the extent the City has actually collected eligible TIF fees and appropriated eligible General Fund contributions. Upon completion of each improvement, Developer shall submit the Required Documentation of Expenditures requested by the City pursuant to above Section 3(c) to City for verification, and the City shall reconcile and issue final confirmation of the amount of eligible fee credits/reimbursements and General Fund reimbursements. If final actual Developer Costs increase or decrease pursuant to accepted bid amounts, approved change orders, or other modifications directed by the City Public Works Director, the creditable and reimbursable Developer Costs shall increase or decrease proportionately, and City staff shall seek corresponding adjustments to the respective fee programs and/or General Fund apportionments. If funds from the corresponding adjustments are not available and budgeted, then reimbursement shall be made consistent with Chapter 16.20 et seq of the City of San Luis Obispo Municipal Code. (d) As part of the City’s normal process for submitting budget requests, City staff shall request the City Council appropriate the amounts identified in Exhibit 4 and Section 3(a) above. (e) The Developer may submit request for progress payments for incremental completion of each Infrastructure Improvement, but no more frequently than once a calendar Page 354 of 495 - 7 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) quarter. Developer shall submit Required Documentation of Expenditures in the form identified pursuant to Section 3(c) of this Agreement to the City Public Works Director for verification. The City shall verify the validity and acceptability of the payment request, or shall submit a request in writing to the Developer for additional information deemed necessary by the City to verify Developer Costs within thirty (30) days after submittal. Such additional information shall be submitted by the Developer to the City within thirty (30) days from receipt of the written request by the City. If Developer complies with a request by the City for additional documentation of costs, City may request more additional information only insofar as it relates to the additional documentation provided. After the Required Documentation of Expenditures is deemed complete by the City, the City shall provide payment of eligible reimbursements within thirty (30) days. 6. Scope of Agreement. This Agreement shall not be construed to limit the right of the City to modify the Infrastructure Improvements, provided such changes are within the scope of the Conditions of Approval. It is understood that any changes to the Infrastructure Improvement, including changes directed in the field, may result in corresponding adjustments to the Developer Costs and the amount of eligible reimbursements as set forth in the Agreement. (a) Any increase or decrease in cost from the Developer Cost must be reflected in the Contractor bid or change orders submitted by Developer and approved by the City or vice versa. The only change orders excepted from City approval are (i) those in which Developer shifts cost savings from one-line item of an Infrastructure Improvement to another line item within the same Infrastructure Improvement excluding use of project contingency, or (ii) those for which Developer does not seek reimbursement from the City. (b) Developer and the City Engineer, together, may approve any individual change order, above and behind any contingency amounts, for any individual Infrastructure Improvement if the total Developer Cost increase is Forty-Five Thousand Dollars ($45,000) or less and the net total of the change orders theretofore approved does not exceed the contingency amount for the Infrastructure Improvement. Developer and the City Manager together may approve any individual change order for any individual Infrastructure Improvement if the cost increase is One Hundred Seventy-Five Thousand Dollars ($175,000) or less and the net total of the change orders theretofore approved does not exceed the contingency amount. Such change orders shall not require City Council approval. Any individual change order for any individual Infrastructure Improvement in excess of One Hundred Seventy-Five Thousand Dollars ($175,000) above the Development Costs, may require City Council approval as determined by the City Manager. Any change orders for additional work that is directed by the City Manager shall be conclusively deemed to have been reviewed and approved, and such work including an allowance for supervision, indirect expenses, overhead shall be outside of the amounts identified in this Section 6(b). (c) The City’s approval of a change order shall not be unreasonably withheld, delayed, or conditioned; provided it shall be reasonable for the City to deny any change order resulting from a cause other than unforeseen conditions, or for work that does not meet the Approved Plans, City Engineering Standards, or does not meet the workmanship that is customary for the region. The City shall accompany any rejection with a written statement of the basis Page 355 of 495 - 8 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) therefore. To the extent the change order requires City approval, Developer may proceed with the work covered by the change order pending City approval of the change order, or even after City rejection of the change order, but Developer shall do so at its own risk to the extent that the City raises valid objections to the change order proposal. Any change order that is submitted to the City for approval shall be deemed accepted if not accepted, or rejected, by the City within twenty (20) working days of such submittal. Any change order submitted that requires City Council approval shall schedule the hearing date for Council consideration within thirty (30) days after the change order request has been deemed complete by the City Engineer. 7. Indemnification. Developer shall indemnify, defend and hold City, its officials, officers, employees, and agents harmless from and against any and all liability, claims, suits, actions, damages, and causes of action arising out of any personal injury, bodily injury, loss of life, or damage to property, or any violation of any federal, state or municipal law or ordinance, including, but not limited to, the Developer’s failure to pay prevailing wages (which may apply) when required, or other cause in connection with the acts or omissions of Developer, its employees, subcontractors, or agents, or on account of the performance or character of construction and installation of the Infrastructure Improvements, except where such liability, claims, suits, actions, damages, and causes of action result from the negligence or willful misconduct of the City. Such indemnification by Developer shall cease for any claims made with respect to each Infrastructure Improvement upon which occurred after acceptance of that Infrastructure Improvements by the City. It is understood that the duty of Developer to indemnify and hold City harmless includes the duty to defend City as set forth in California Civil Code Section 2778. Within fifteen (15) days of City’s notice that it has been made a party to an action arising out of Developer’s acts or omissions under this Agreement, Developer shall provide a defense to the City in that action, with legal counsel acceptable to City. In the event Developer fails to provide such a defense to City, Developer shall be liable to the City for its attorneys’ fees and litigation costs incurred to defend itself beginning on the sixteenth (16th) day from the date of the City’s notice and request for a defense. Acceptance of insurance certificates and endorsements required under this Agreement does not relieve Developer from liability under this indemnification and hold harmless clause. This indemnification and hold harmless clause shall apply whether or not such insurance policies shall have been determined to be applicable to any of such damages or claims for damages. 8. Acceptance of the Infrastructure Improvements. Each Infrastructure Improvement to be constructed shall become the sole exclusive property of the City, or County, upon acceptance. Developer shall notify City in writing when each Infrastructure Improvement is complete. Each notice shall be submitted to the City by personal delivery and shall be deemed received by the City on the date of delivery. Such written notification shall include a request that the City accept each Infrastructure Improvement. As soon as practicable but no later than sixty (60) days of receipt of such notification of completion of an Infrastructure Improvement, the City shall determine whether the Infrastructure Improvement was constructed in accordance with the Approved Plans for that Infrastructure Improvement and engineering standards. Within sixty (60) days of when the City determines the Infrastructure Improvement was constructed in accordance with the Approved conditions, plans and engineering standards the City shall schedule the reasonably soonest Council Hearing Date for consideration of accepting the Infrastructure Improvements. If the City determines that an Infrastructure Improvement was not constructed in accordance with the Page 356 of 495 - 9 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) Approved Plans and engineering standards, then the City will provide written notice to Developer. Written notice shall include details of the identified deficiencies. The City shall meet and confer with Developer to discuss these deficiencies within ten (10) business days of Developer’s request to do so. 11. Force Majeure. The Term of this Agreement and the time within which Developer shall be required to perform any act under this Agreement shall be extended by a period of time equal to the number of days during which performance of such act is delayed unavoidably beyond the reasonable control of Developer by: strikes, lock- outs, acts of god, failure or inability to secure materials or labor by reason of priority or similar regulations or order of any governmental or regulatory body, initiative or referenda, moratoria, litigation filed attacking execution, or performance of this Agreement, enemy action, civil disturbances, fire, or unavoidable casualties. 12. Successors and Assigns. Each and every provision of this Agreement shall be binding and inure to the benefit of the successors-in-interest of the Parties hereto. 13. Term. This Agreement shall expire upon the earlier of fifteen (15) years from the date of execution of this Agreement, or when reimbursements for all improvements constructed by Developer identified in this Agreement are completed. 14. Integration. This is an integrated agreement containing all of the consideration, understandings, promises, and covenants exchanged between the Parties for purposes of identifying reimbursement and credits, other than those identified in the Private Reimbursement Agreement, and other administrative processes within the scope of Infrastructure Improvements as identified in Exhibit 2 of this Agreement, notwithstanding the Developer’s obligations as specified in the approved Conditions of Approvals, and the VTIM. 15. Construction and Interpretation. It is agreed and acknowledged by the Parties that the provisions of this Agreement have been arrived at through negotiation, and that the Parties have had a full and fair opportunity to revise the provisions of this Agreement and to have such provisions reviewed by legal counsel. Therefore, the normal rule of construction that any ambiguities are to be resolved against the drafting party shall not apply in construing or interpreting this Agreement. 16. Jurisdiction. Any action by any Party to this Agreement shall be brought in the appropriate court of competent jurisdiction within the County of San Luis Obispo, State of California, notwithstanding any other provision of law which may provide that such action may be brought in some other location. 17. Choice of Law. This Agreement is made under and in all respects will be interpreted, enforced and·governed by the laws of the State of California. 18. Amendment. This Agreement cannot be altered, amended, or modified in any way without the express written consent of each party hereto or their authorized successor-in-interest. 19. Time is of Essence. Time is of the essence for this Agreement. Page 357 of 495 - 10 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) 20. Notices. All notices required pursuant to this Agreement shall be in writing and may be given by personal delivery or by registered or certified mail, return receipt requested, to the Party to receive such notice at the addresses set forth below: TO THE CITY: City of San Luis Obispo Community Development Department 919 Palm Street San Luis Obispo, CA 93401-3249 Attn: Community Development Director WITH COPY TO: City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 Attn: City Attorney TO THE DEVELOPER: Covelop, Inc. 1135 Santa Rosa Street, #210 San Luis Obispo, California 93401 Any notice shall be deemed delivered on the first business day that delivery is attempted or upon receipt, whichever is sooner. As used herein, “business day” means any day other than a Saturday, Sunday, or any state or federal holiday on which financial institutions in San Luis Obispo County are authorized or required to close for observance thereof. Any Party may change the address to which notices are to be sent by notifying the other Parties of the new address, in the manner set forth above. 21. Counterparts. This Agreement may be executed in one or more counterparts, each of which shall be deemed an original, but all of which together shall constitute a single agreement. 22. Severability. If any one or more of the provisions contained in this Agreement shall be found to be invalid, illegal, or unenforceable in any respect, the validity, legality, and enforceability of the remaining provisions shall not, in any way, be affected or impaired. 23. Authority. The Parties hereby represent that the persons executing this Agreement are expressly authorized to do so for and on behalf of the Parties. 24. Captions. The captions of the Sections of this Agreement are for convenience and reference only and are not intended and shall not be construed to define or limit the provision to which they relate. Page 358 of 495 - 11 - Credit and Reimbursement Agreement 600 Tank Farm Road (01-14-2022) 25. Recitals and Exhibits. The Recitals first set forth herein and all Exhibits attached hereto are incorporated in this Agreement. IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be executed as of the day and year first above written. DEVELOPER: Covelop, Inc. By: ____________________________ ____________________________ Its: ____________________________ CITY: City of San Luis Obispo, a California charter city and municipal corporation By: ________________________ Michael Codron, Community Development Director APPROVED AS TO FORM AND LEGAL EFFECT: By: _______________________ J. Christine Dietrick, City Attorney Page 359 of 495 Exhibit 1 Property Page 360 of 495 Exhibit 2 Page 361 of 495 Appendix A of the adopted Citywide Transportation Impact Fee (the “TIF”) Program Page 362 of 495 Page 363 of 495 Exhibit 3 Transportation Improvements Eligible for Reimbursement This Agreement covers four major Transportation Improvement elements that are to be reimbursed: 1) Oversizing of an onsite 6’ sidewalk along Acacia Creek to a Class I “Acacia Creek” bike path connecting Tank Farm Road to the Damon-Garcia Sports Park; 2) the 14 -foot center turn lane portion of Santa Fe Road, as described in the alternative street section in the Airport Area Specific Plan and as illustrated in Attachment A to this Exhibit 3; 3) planning and design for the Tank Farm Road Class I bike path connecting Santa Fe Road to Windmill Road west to Santa Fe Road; and 4) the TIF-funded portions of Tank Farm Road to be installed by the project as shown as Area 4 in Attachment B to this Exhibit 3 (including the Tank Farm/Santa Fe Roundabout). The Project may also install portions of Tank Farm Road and Santa Fe Road that are the responsibility of other private developers and landowners, and the reimbursement for those improvements will be covered under a separate Private Reimbursement Agreement. Tank Farm Road and Santa Fe Improvements. The Construction Delineation Exhibit in Attachment B shows a delineation of the following segments and portions of Santa Fe and Tank Farm Road Transportation Improvement areas, as follows: Area 1: The portion of the Tank Farm Road public rights of way frontage that are the responsibility of Developer. This includes sidewalk, landscape parkway, bike lane/shoulder, curb and gutter, and the adjacent travel lane. These improvements include the extension of water and recycled water improvements, dry utilities, and a proportionate share of the street storm drainage improvements. These improvements are not eligible for reimbursement. Area 2: The portion of the Santa Fe Road public rights of way frontage that are the responsibility of Developer. This includes sidewalk, landscape parkway, bike lane/shoulder, curb and gutter, and the adjacent travel lane. These improvements include the extension of water and recycled water improvements, dry utilities, and a proportionate share of the street storm drainage improvements. These improvements are not eligible for reimbursement. Area 3: The portion of Santa Fe Road that is to be paid for from with General Fund contributions or TIF funds as described in TIF Project 16a as shown in Exhibit 2 of this Agreement. This includes the center 14 feet of the roadway as shown in Attachment A of this Exhibit 3. The allocated cost includes a proportionate share of the planning, environmental, and preliminary engineering work performed as part of the project’s entitlement, as well as a proportionate share of the street storm drainage improvements, and the improvements to the 14 -foot-wide center turn lane and median. Area 4: The portion of the Tank Farm Road that is the responsibility of the TIF fund (Project 14), General Fund, or other communitywide source, and includes the median, additional through lanes, the roundabout, drainage improvements, additional rights of way needed for the improvements. The improvements and allocated cost include a proportionate share of the planning, environmental, and preliminary engineering work, as well as a proportionate share of the street storm drainage improvements. Page 364 of 495 Area 5: This area is the portion of the Santa Fe Road frontage that would be the responsibility of the property owner west of Santa Fe Road. These improvements include additional sidewalk, land- scape parkway, bike lane/shoulder, curb and gutter, and the adjacent travel lane. These improvements include the extension of water and recycled water improvements, dry utilities, and a proportionate share of the street storm drainage improvements. Tank Farm Bike Path. The planning and design for the Tank Farm Bike Path are to be developed at a sufficient level of detail to provide for an accurate determination of construction quantities, necessary rights of way to be acquired, grading, and to a level sufficient to conduct a project-level environmental assessment. Such level of detail is described as a “65% level of detail” and is equivalent to Caltrans specifications and requirements for a Plans, Specifications and Estimates (“PS&E”) and as contained and described in Chapter 2, Section 2 -1 through Section 2-2, of Caltrans’ Plans Preparation Manual, and in accordance with the City’s Improvement Standards and Standard Specifications. The environmental documentation shall document relevant environmental analysis/concerns provided in previous environmental reviews conducted to date (including the Pr oject EIR and the Chevron EIR), describe level of CEQA review anticipated to be required, and provide applicable technical studies to support the City’s subsequent preparation of a formal CEQA document. The design shall provide horizontal and vertical alignments, utility conflicts, drainage strategy, grading needs, and the approach to creek/stream crossings. The rights of way analysis and scope of work shall define the right-of-way needed to construct the path, provide ROW exhibits and legal descriptions to help guide future negotiations between the City and property owner(s). This level of design requires a physical survey of the property, environmental studies such as biology, soils, wetlands, cultural resources, and other, and a detailed set of plans with accurate vertical and horizontal design elements, structural calcs, and accurate survey data. Notable deliverables include the following: 1. Three alternative alignments and approaches for consideration and review by the City. The City shall participate in the selection of these three alternatives. These alternatives will be at a “schematic” level of detail with general horizontal and vertical locations. After City comments (which may include City Advisory body involvement to be managed by the City), the three alternatives shall be refined and resubmitted to the City for selection of one alternative. The relevant technical studies shall be submitted to the City at this stage to inform City review, and for their comment and approval by the City. 2. A refined alignment shall be presented to the City which reflects the further development of the selected alternative. The level of detail shall be sufficient to estimate construction quantities, structural design elements, rights of way for the improvement, constructi on elements, earthwork calculations and balance, and utility locations. An OPIC shall be prepared. This plan set shall be submitted for City review and comment. City shall provide plan check comments in a consistent, non-contradictory format for all relevant departments and reviewers (Planning, Utilities, Engineering, Natural Resources, etc.). Page 365 of 495 3. An environmental assessment and initial study shall be prepared based on the selected alignment. The assessment shall include relevant technical studies, evaluation of each environmental subject area contained in the most current version of Appendix G of the CEQA Guidelines, analysis of the compliance with the City’s VMT regulations for transportation construction projects, and compliance with city development policies and regulations that have been adopted for the purpose of environmental impact regulation and mitigation. 4. A final set of plans shall be prepared with the form and content in Section 1.1 of Division 1010 of the Engineering Standards. A final OPIC shall be prepared. No plan check or final permit is anticipated. Acacia Creek Bike Path. The Acacia Creek Bike Path Transportation Improvement is a 12 - foot concrete path (Option 2 of Improvement Standard 7040) from the approximately mid -line of the project adjacent to Acacia Creek north approximately 750 lineal feet to the north property line, and extending 200 feet north of the north property line on the Damon-Garcia Sports Park to a tie-in point with the Damon-Garcia Sports Park Bike Path. This Class I bike path is considered and “oversizing” of the 6-foot sidewalk that would have normally been installed by the developer. The project’s “fair share” of the Class I bike path costs is the cost of the onsite 6 -foot bike path, currently estimated at $197,500 of the $573,500 total cost. Page 366 of 495 Attachment A to Exhibit 3 Santa Fe Road Airport Area Specific Plan Road Improvement Areas and Responsibilities Page 367 of 495 Attachment B to Exhibit 3 Construction Delineation Exhibit Page 368 of 495 Exhibit 4 Estimate of Developer Costs and Reimbursement Revenues Attachment A of this Exhibit 4 shows the estimate of Developer Costs for the Transportation Improvements. Attachment B of this Exhibit 4 shows how these improvements are intended to be funded from a combination funding from the General Fund, TIF Credits from the project, TIF fees from Benefitting Properties, Developer Contributions, and other sources. Actual costs may vary, and the cost estimate in Attachment A is provided for illustration of the scope and potential costs of the Transportation Improvements and not provided by way limitation of the specific cost elements, total costs, or quantities. Attachment B is provided for illustration of the potential magnitude and timing of General Fund obligations, and revenues from projects benefitting from the Transportation Improvements. Page 369 of 495 Attachment A to Exhibit 4 Developer Cost Estimate Total City Share, Reimburseable Total Total Area Street Area 10,464 9,805 10,882 90,105 3,306 Pcnt Street Area Description Units Quantity Estimated Cost Quantity Estimated Cost Quantity Cost w/Prevailing Wage Quantity Cost w/Prevailing Wage Quantity Estimated Cost Quantity Estimated Cost Quantity Estimated Cost Demolition and Earthwork LS 60,122.00$ 22,460.00$ 1 47,024.86$ 1 427,080.00$ 1 9,238.00$ 565,924.86$ 474,104.86$ Erosion Controls LS 5,000.00$ 5,000.00$ 1 8,650.00$ 1 15,000.00$ 1 5,000.00$ 7,500.00$ 38,650.00$ 31,150.00$ Water -$ -$ Fittings/Valves LS 1 4,500.00$ 1 4,500.00$ 9,000.00$ -$ Water Lines LF 600 24,000.00$ 375 15,000.00$ 39,000.00$ -$ Recycled Water Lines LF 600 24,000.00$ 375 15,000.00$ 39,000.00$ -$ Fire Hydrants Each 2 11,000.00$ 2 11,000.00$ 22,000.00$ -$ Sewer Lines -$ -$ Sewer Lines LF 375 25,500.00$ 25,500.00$ -$ Service Main Each 1 5,000.00$ 5,000.00$ -$ Manholes Each 1 5,500.00$ 5,500.00$ -$ Storm Drainage Allocation (See detail below)32,363$ 30,325.46$ 33,656.32$ 278,680.66$ 10,224.94$ 385,250.00$ 312,336.99$ Street Improvements -$ -$ Curb and Gutter LF 600 13,200.00$ 500 11,000.00$ 100 3,800.00$ 1,650 62,700.00$ 90,700.00$ 66,500.00$ Curbs (Mow)LF 600 9,600.00$ 680 10,880.00$ 1,671 41,775.00$ 62,255.00$ 41,775.00$ ADA Access Ramps Each 1 1,750.00$ 1 2,500.00$ 2 17,732.50$ 21,982.50$ 20,232.50$ Street Lights Each 2 11,000.00$ 2 11,000.00$ 3 28,500.00$ 50,500.00$ 28,500.00$ Joint Trench LF 360 6,300.00$ 8,500 148,750.00$ 6,300.00$ 148,750.00$ Sidewalks SF 2,160 25,920.00$ 4,960 59,520.00$ 85,440.00$ -$ Street Striping LS 1 2,500.00$ 1 2,500.00$ 1 4,325.00$ 1 4,325.00$ 1 5,000.00$ 18,650.00$ 8,650.00$ Asphalt Paving Tons 300 39,000.00$ 275 35,750.00$ 241 36,150.00$ 1,845 276,750.00$ 85 11,050.00$ 398,700.00$ 312,900.00$ Class II Road Base Tons 1,150 46,000.00$ 1,000 40,000.00$ 942 65,940.00$ 7,190 503,300.00$ 332 13,280.00$ 668,520.00$ 569,240.00$ Landscaping -$ -$ Trees Each 10 2,750.00$ 10 2,750.00$ 5,500.00$ -$ Planting and Irrigation SF 2,840 14,200.00$ 2,400 12,000.00$ 10,900 95,375.00$ 3,400 25,500.00$ 121,575.00$ 120,875.00$ Subtotal 326,904.62$ 330,985.46$ 202,046.18$ 1,751,218.16$ 53,792.94$ 181,750.00$ -$ 2,664,947.36$ 2,135,014.35$ -$ -$ Traffic Control LS 100,000.00$ -$ 100,000.00$ 100,000.00$ Right of Way Acquisition SF 2,990 37,375.00$ 41,960 525,500.00$ 1,010 12,625.00$ 575,500.00$ 562,875.00$ Cost Increase to Construction (2023)10.00%32,690.46$ 33,098.55$ 20,204.62$ 175,121.82$ 5,379.29$ 18,175.00$ 266,494.74$ 213,501.43$ Environmental Technical Studies 40,000.00$ -$ 40,000.00$ Design, Inspection and Construction Admin -$ -$ Engineering Design 12.50%40,863.08$ 41,373.18$ 25,255.77$ 218,902.27$ 6,724.12$ 22,718.75$ 100,000.00$ 333,118.42$ 366,876.79$ Construction Engineering/Survey 2.50%8,172.62$ 8,274.64$ 5,051.15$ 43,780.45$ 1,344.82$ 4,543.75$ 25,000.00$ 66,623.68$ 78,375.36$ Insurance 1.50%4,903.57$ 4,964.78$ 3,030.69$ 26,268.27$ 806.89$ 2,726.25$ 1,875.00$ 39,974.21$ 33,900.22$ City Plan Check (Per Fee Schedule)12,667.55$ 12,825.69$ 4,546.04$ 39,402.41$ 2,084.48$ 4,089.38$ -$ 71,526.16$ 48,037.82$ City Construction Inspection (Per Fee Schedule)26,675.42$ 27,008.41$ 13,133.00$ 113,829.18$ 4,389.50$ 11,813.75$ -$ 185,035.52$ 138,775.93$ Bonding 1.50%4,903.57$ 4,964.78$ 3,030.69$ 26,268.27$ 806.89$ 2,726.25$ 1,875.00$ 39,974.21$ 33,900.22$ Administration/Developer Ovhd 10.00%32,690.46$ 33,098.55$ 20,204.62$ 175,121.82$ 5,379.29$ 18,175.00$ 12,500.00$ 266,494.74$ 226,001.43$ Supervision 5.00%16,345.23$ 16,549.27$ 10,102.31$ 87,560.91$ 2,689.65$ 9,087.50$ 6,250.00$ 133,247.37$ 113,000.72$ Contingencies 20.00%65,380.92$ 66,197.09$ 40,409.24$ 350,243.63$ 10,758.59$ 36,350.00$ 25,000.00$ 532,989.47$ 452,002.87$ Subtotal 245,292.88$ 248,354.94$ 182,343.14$ 1,881,999.03$ 52,988.53$ 130,405.63$ 212,500.00$ 2,610,978.52$ 2,407,247.79$ Total 572,197.50$ 579,340.39$ 384,389.32$ 3,633,217.20$ 106,781.47$ 312,155.63$ 212,500.00$ 5,275,925.88$ 4,542,262.14$ Storm Drainage Note:All costs are estimates. Reimbursement to be based on actual costs. 18" SD Lines 660 108.00$ 71,280.00$ Eligible Developer Costs include all direct and indirect costs, including 10% Admin/Overhead Curb Inlet 4 6,750.00$ 27,000.00$ Earthwork 833 30.00$ 25,000.00$ Stormwater Treatment 3,500 43.25$ 151,375.00$ Flared End Sections 1 2,595.00$ 2,595.00$ Manholes 3 4,750.00$ 14,250.00$ Subtotal 291,500.00$ ROW 7,500 12.50$ 93,750.00$ Total 385,250.00$ Estimated Developer Costs City Responsibility; Public Reimbursement Agreement Acacia Creek Bike Path Class I Bike Path Connection Tank Farm Bike Path Planning "PAED" Level Planning, Engineering and Environmental Study 97,605 3,306 8.4%7.9%8.7%72.3%2.7% Area 5 Frontage Improvements (Private Reimbursements) Private Responsibility; No Reimbursement Agreement City Responsibility; Public Reimbursement Agreement Private Responsibility, Private Reimbursement Agreement Santa Fe (Covelop Frontage Improvements) Area 1 Tank Farm (Covelop Frontage Improvements) Area 3 Santa Fe (TIF Reimburseable) Area 4 Tank Farm (TIF Reimburseable Area 2 17,300 16,211 10,882 Page 370 of 495 Attachment B to Exhibit 4 Estimated Cost and Funding Sources If sufficient Off-Site TIF fees from Benefiting Properties have not yet been collected at time of reimbursement request, then Developer may either wait until those fees are collected for reimbursement or apply Onsite TIF Credits for reimbursement. Uses Santa Fe Road (Area 3)1 Tank Farm Road (Area 4)2 Acacia Creek Bike Path3 Tank Farm Bike Path PSE4 Total Design $ 30,306.93 $ 262,682.72 $ 36,024.83 $ 189,750.00 $ 518,764.49 Rights of Way $ 37,375.00 $ 525,500.00 $ - $ 562,875.00 Direct Expense $ 316,159.86 $ 2,837,596.79 $ 475,468.73 $ 3,691,275.04 Contingency $ 40,409.24 $ 350,243.63 $ 62,049.67 $ 37,950.00 $ 490,652.54 Total $ 424,251.02 $ 3,976,023.14 $ 573,543.23 $ 227,700.00 $ 5,201,517.39 Sources General Fund $ 254,550.61 $ 1,560,656.94 $ 376,005.65 $ 68,310.00 $ 2,259,523.21 Offsite Paid TIF5 $ 120,555.17 $ 1,715,876.15 $ 159,390.00 $ 1,995,821.32 $ 197,537.58 $ 197,537.58 Onsite TIF (Credits) $ 49,145.24 $ 699,490.05 $ 748,635.29 Total $ 424,251.02 $ 3,976,023.14 $ 573,543.23 $ 227,700.00 $ 5,201,517.39 4 30% of Costs from GF 1 60% of cost from GF; Balance from TIF 2 30% of Direct and Indirect Project Cost from GF; 100% of ROW from GF 3 100% of Non-Project Contributions from GF 5 Projected Fees from 660 Tank Farm and 3985 Broad Street Retail Pads Plusn 100% from 650 Tank Farm Road Direct Project Contribution Page 371 of 495 Exhibit 5 Benefitting Properties 3895 South Broad Street APN: 053-421-003 660 Tank Farm Road (AKA 666 Tank Farm Road ) APN: 053-421-004 650 Tank Farm Road APN: 053-421-005 250 Tank Farm Road APNs: 053-251-057 through 053-251-084, inclusive. Page 372 of 495 3985 South Broad Street, 666 Tank Farm Road, 650 Tank Farm Road 250 Tank Farm Road Page 373 of 495 Page 374 of 495 1  Project Location Theprojectsiteislocatedat600TankFarmRoad,130feetnortheastoftheintersectionofTank FarmRoadandSantaFeRoad,inthesouthernportionoftheCityofSanLuisObispo.Theproject siteiscomprisedoftwoparcels(AssessorParcelNumbers[APN]053Ͳ421Ͳ002and053Ͳ421Ͳ006) totalingapproximately11.7acres,aswellasproposedoffͲsitetransportationimprovementareas southandwestoftheparcelboundarytotalingapproximately1.0acre.Thetotalprojectsiteareais 12.7acres.Figure1showstheregionallocationoftheprojectsite,whileFigure2showstheproject sitewithinthelocalcontext.Theprojectsiteslopesfromthenorthwesttosoutheast,withsite elevationsat210feetmeansealevel(msl)inthenorthwestcornerofthepropertyand150feet mslatthesoutheastcorneroftheproperty.DamonGarciaͲSportsFieldstothenorth,undeveloped ChevronpropertyistothewestandsouthandAcaciaCreekistotheeast.TheSanLuisObispoCity Limitlinefollowsthesouthernandwesternboundaryofthesubjectparcelsandparallelsthe southernsideofTankFarmRoadsouthoftheprojectsite.TheSanLuisObispoCountyRegional Airportislocatedapproximately1,400feetsouthoftheprojectsite.  ExistingSiteCharacteristics  GeneralPlanDesignationandZoning TheprojectsiteislocatedwithintheAirportAreaSpecificPlan(AASP)andiscurrentlydesignated BusinessPark(BP)withasmallportionofthepropertywithintheConservationOpenSpace(C/OS) zone.Theexistingdevelopmentpotentialofthe11.7Ͳacresiteisapproximately250,000squarefeetof businessparkdevelopment.  SurroundingLandUses TheprojectsiteisborderedbyTankFarmRoadtothesouth,AcaciaCreektotheeast,DamonGarciaͲ SportsFieldstothenorth,andundevelopedChevronpropertytothewest.TheSanLuisObispoCity Limitlinefollowsthesouthernandwesternboundaryoftheprojectsiteandparallelsthesouthern sideofTankFarmRoadsouthoftheprojectsite(refertoFigure3).TheDamonGarciaͲSportsFields propertynorthoftheprojectsiteisdesignatedPublicFacilities(PF).AcaciaCreekeastoftheproject siteisdesignatedConservationOpenSpace(C/OS)andthemobilehomeparkeastofthecreekis designatedServiceCommercialwiththeSpecificPlanoverlay(CͲSͲSP).TheundevelopedChevron propertywestoftheprojectsiteboundaryisdesignatedCommercialServiceandIndustrialbySanLuis ObispoCounty.TheundevelopedpropertysouthofTankFarmRoadisdesignatedRecreationbySan LuisObispoCounty.Propertieswestoftheprojectsitelocatedat650TankFarmRoadand660Tank FarmRoadincludeapprovedentitlementsfordevelopmentofresidentialmixedͲuseandassistedliving facilities,depictedonFigure3.  ProjectCharacteristics  Otherentitlementsareunderway,includingaGeneralPlanMapAmendment,arezoneofthe property,aSpecificPlanAmendmenttotheAASP,aMinorUsePermitforamixedͲuseproject, ConceptualSitePlan,MajorDevelopmentReview,areimbursementagreement,andenvironmental clearanceandpermittingfornecessaryoffͲsiteimprovements.Approvaloftheseentitlementswould allowafinalDevelopmentPlan(consistentwiththerequirementsofthegrantedentitlements), includinggradingpermits,improvementplansandbuildingpermitstobehandledbytheCityas ministerialapprovals. Page 375 of 495 2  Figure 1 Regional Project Location Page 376 of 495 3  Figure 2 Project Site Boundary Page 377 of 495 5  Figure 3 Surrounding Land Uses Page 378 of 495 6  TheGeneralPlanMapAmendmentisnecessarytochangetheprojectsite’slandusedesignationin theCity’sLandUseElementinordertoreflectproposeddevelopment.TheSpecificPlan Amendmentwouldchangethesite’slandusedesignationaccordinglyandwouldalsomake associatedtextamendmentstotheAASP,asfollows: 1. AmendallAASPtablesandtexttoreflecttheadditionof240highdensityunits,40mixedͲ useunits,and12,500squarefeetofcommercialͲservice/officespacefortheprojectsite; 2. AmendvarioustextsectionsoftheAASPtoconformtotheproject; 3. ModifytheroadsectionfigurestoreflectmodificationstoTankFarmRoadandSantaFe Roadconsistentwithtrafficprojectionsandfullbuildoutofthecirculationsystem; 4. Describenecessarysetbackofimprovementsandbuildingstodelineatedwetlandareasin conformancewithprojectBiologicalAssessments;and, 5. UpdatereferencestotheSLOCountyRegionalAirportLandUsePlananddescribethe updatedAirportLandUsePlan.  Therequestedentitlementswouldallowfor280totalresidentialunits,whichistheequivalentof 256“DensityUnits”asdefinedbytheCityofSanLuisZoningOrdinance(DensityUnitsarethe numberofdwellingspernetacre,basedondwellingsizeandnumberofbedrooms,i.e.,studiounit under600squarefeetequals0.5DensityUnits,whileatwobedroomunitequals1.0DensityUnits). Inaddition,theprojectwouldprovidearoundaboutattheintersectionofTankFarmRoadand SantaFeRoadandinterimimprovementsforSantaFeRoadincludingtwotravellanesandClassIV bikepaths.  Conceptual Site Plan Residential and Mixed-Use Rezone TheprojectentitlementschangethelandusedesignationfromBusinessParktoService Commercial,whichwouldallowamixedͲuseprojectprovidingupto280residentialunitsand commercialͲservice/officeusesdefinedinAASPTable4.3.Figure4showstheproposedconceptual siteplanfortheproject. Theprojectsitewouldbedevelopedatadensityof23.7DensityUnitsperacre,withsharedpublic andprivateopenspaces,commonyards,andarecreationcenterwithacommunitybuilding.The proposedresidentialdevelopmentwouldincludeamixofstudios,oneͲbedroom,twoͲbedroom, andthreeͲbedroomunits.Theproposedzoningwouldallowforupto12,500squarefeetof commercialͲservice/officespace.Table1providestheproposedprojectcharacteristics,including themixofresidentialunittypesandbuildingareafortheprimarycomponentsoftheproject. Page 379 of 495 7  Figure 4 Conceptual Site Plan Page 380 of 495 9  Table 1 Project Characteristics ResidentialNonͲResidentialAcres UnitOccupancyTypeSize(sf)UnitsArea(sf)Area(sf)(net)Units/Acre R3Occupancy (1Ͳ,2Ͳand3Ͳbeds) 750Ͳ1,450140154,000n/a6.521.7 R4Occupancy (studio,1Ͳ,and2Ͳbed) 600Ͳ92510085,700n/a2.934.7 MixedUse (studioand1Ͳbed) 450Ͳ6254021,50012,5001.526.3 Total450Ͳ1,450280261,20012,50010.925.8 sf=squarefeet Other Project Components Theprojectincludesa2,250Ͳsquarefootclubhousebuildingwitha2,800Ͳsquarefootpatioarea. Theclubhousebuildingwouldprovidemeetingareas,anindoorgamearea,acommonlounge, administrativeofficearea,andacommunitykitchen.Thebuildingwouldalsoserveasatemporary salesofficeandanadministrativebuildingduringprojectsalesandconstruction. CitydevelopmentregulationsspecifyasetbackforAcaciaCreekof35feet,Figure6showsthe locationofthetopofbankforAcaciaCreekneartheprojectsite.TheZoningRegulationssection 17.70.030requirea35Ͳfootsetbackfromthetopofbankfornewstructures.Theproposedproject isrequestingaminimumsetbackofapproximately10feetfromtheaveragetopofbankfora bicycle/pedestrianpathtoconnecttoDamonGarciaSportsFields(andanaveragebikepathof20 feet)andaminorexceptionforamaximum15Ͳfootencroachmentintothesetbackforportionsof Buildings14and21fromtheaveragetopofbank.ZoningRegulationssection17.70.030stipulate thatanexceptiontothecreeksetbackrequirementsmaybeconsideredwheresubstantiated evidenceisavailablethatwillresultinbetterimplementationofotherZoningRegulationsor GeneralPlanpolicieswhileallowingreasonableuseofthesite.TheBiologicalResourcesAssessment (BRA)preparedfortheprojectbyKevinMerkAssociates,LLC(AppendixA)concludesthe encroachmentareawillnotthreatensensitivespeciesortheripariancorridor.Inordertofurther thepurposesofZoningRegulationssection17.70.030,theprojectproposesanincreaseinthe ripariansetbackelsewherealongthecorridor,witharipariansetbackthataveragesapproximately 40feet.ProposedbuildingsetbacksalongTankFarmRoadandSantaFeRoadis16feet Theproject’srequiredcreeksetbacks,commonareasandopenspaceinthenorthwestcornerofthe projectsitewouldresultin18percentofthesitebeingonsite“green”commonopenspace, includingplayareas,totlots,andlandscapeparkways.Theprojectwouldrequireremovalofsixteen (16)nonͲnativeornamental/invasivetreesontheprojectsite.Nonativetreesareproposedtobe removed. Bikeandpedestriantripswouldbesupportedbyaconnectiontothe650TankFarmRoadproperty andextensionoftheonsitebikepathtothebikepathattheDamonGarciaͲSportsFieldstothe north.Anewbridgeconnectingtheprojectsitetothe650TankFarmRoadpropertyisplannedto beinstalledbythedeveloperofthatproperty(refertoFigure4).Theplannedbridgeconnectingthe projectsitetothe650TankFarmRoadpropertywouldprovideasecondaryemergencyaccess route,pedestrianaccessandbicycleaccess.Theplannedbridgeconnecting600TankFarmand650 TankFarmwillnotbeforgeneralvehicletraffic.    Page 381 of 495 10  Regional Transportation Improvements Theprojectwouldimplementseveraltransportationfeaturesunderareimbursementagreement withtheCity,includingprovidingaroundaboutattheintersectionofTankFarmRoadandSantaFe RoadandinterimimprovementsforSantaFeRoadincludingtwotravellanesandClassIVbike paths.TheseimprovementsareincludedintheCity’slistofTransportationCapitalProjectsinthe GeneralPlanCirculationElement(SantaFeRoadExtension)andareshownintheAASP.Final improvementsforbikepaths,curbing,sidewalk,andparkwaystripwouldbeinstalledonthe project’sfrontages.PlannedregionaltransportationimprovementsareshowninFigure5,which providesaconceptualillustrationoftheSantaFeRoad/TankFarmRoadRoundabout.Theprojectis alsoproposingtodopreliminaryplanningandengineeringfortheTankFarmCreekClassIbike path. ATransportationImpactStudy(TIS)wascompletedbyCentralCoastTransportationConsultingin supportoftheCity’sGeneralPlanCirculationElementconsistencyevaluation.TheTISconcluded thattheprojectcomplieswiththeCity’sVMTguidelines,withoutmitigation,andalsocomplies withtheLevelofServicestandards.  Grading/Drainage Thesitewouldbesteppedinfour5Ͳfootsections/benches,withanupperbenchofapproximately 174Ͳ180feetmslinthenorthernportionoftheproperty,amiddlebenchofapproximately160Ͳ166 feetmslaroundthecentralportionoftheproperty,andtwolowerbenchesofapproximately152Ͳ 156feetmslinthesouthernportionoftheproperty.Figure6showstheconceptualsitesections. Theproposedgrading,totaling35,000Ͳ40,000cubicfeet,wouldbebalancedontheprojectsite(no soilimporttothesiteorexportfromthesiteisproposed).Thegradingwouldcontourtheproject sitetodrainfromwesttoeasttowardlocalizedsurfacebioswalesadjacenttoAcaciaCreek,which woulddraintowardanexistingretentionbasininthesoutheastcornerofthesite.Thisbasinwould dischargeintoAcaciaCreekatthepreͲdevelopmentrateasrequiredbytheCity’sDrainageMaster Plan,asrequiredbytheCity’sstormwaterregulations.Thereisalsoanexistingdrainagepipeunder TankFarmRoadthatpermitssitedrainagetothesouth.  Phasing Theprojectisplannedtobeconstructedintwophases.Phase1wouldinclude80townhomeand60 stackedflat(singleͲfamilycondominium)dwellingsunitsonthecentralportionoftheprojectsite, thecompletionofSantaFealongtheprojectfrontage,completionoftheClassIbikepathfromTank FarmtoDamonGarciaSportsPark,andthecompletionofthefrontageimprovementsalongTank FarmRoad.Phase2wouldinclude60townhomeunits,40stackedflatunits,the40mixedͲuseunits and12,500squarefeetofcommercialͲservice/officespace,andremainingprojectimprovements. Theintersectioncontrolimprovementswillbephasedasnecessaryaccordingtothetrafficanalysis fortheproject.TheconceptualphasingplanisshowninFigure7.          Page 382 of 495 11 Figure 5 Conceptual Illustration of the Santa Fe Road/Tank Farm Road Roundabout Page 383 of 495 12  Figure 6a Conceptual Site Grading – Sections/Benches Page 384 of 495 13  Figure 6b Conceptual Site Grading – Sections/Benches Page 385 of 495 15 Figure 7 Conceptual Phasing Plan Page 386 of 495 17  Project Objectives Theprimaryobjectivesfortheprojectareasfollows: 1. Developmentofaneconomicallyfeasiblespecificplanthatisconsistentwith,and implements,policieswithintheCity’sLUCEandAASP. 2. Establishmentofacompleteinternallyandexternally“linked”mixedusecommunitywith amenitiessuchasneighborhoodparksandcommercialgoodsandservicesthatcanserve theneighborhood. 3. Provisionofavarietyofhousingopportunitiesforawiderangeofsocioeconomicgroups andaffordabilitylevels,andataverageunitsizesthatarebelowcurrentCityaverages. 4. DevelopmentofaProjectwiththemaximumnumberofunitspermittedbytheunderlying zoning,approximately280residentialunits,withapproximately340,000squarefeetoftotal residentialfloorspaceand12,500squarefeetofcommercialfloorspace. 5. DevelopmentoftheAcaciaCreekfrontagethatprovidesthatareaasaProjectamenity withoutjeopardizingthecreeksbiologicalresourcesorriparianqualities. 6. InfrastructureobligationsthatdonotexceedthelevelofimpactfeesgeneratedonͲsiteover thebuildoutoftheproject;thatis,infrastructureobligationsshouldbesizedsuchthatoffͲ siteimpactfeesarenotnecessarytoreimbursethedeveloperinaccordancewitha ReimbursementAgreement. 7. ProvisionofawellͲconnectedinternalnetworkprivateparks,bicyclepaths,pedestrian sidewalks,openspacebuffers,andspacesforrecreationalactivities,includingdevelopment ofaClass1bikepathbetweenTankFarmRoadandDamonGarciaSportsParkwithinthe 35’creeksetback,andClassIVbikelanesconsistentwiththedraftActiveTransportation Plan. 8. Developmentoftheadjacentroadwaynetworkthatdoesnotoverbuildtheroadsabovethe longͲtermtrafficprojections,andwithpreferencefornonͲvehiculartrafficmodes. 9. Marketingandorientationoftheprojecttothesurroundingemployerstoreducevehicle milestravelledandtomaximizetheuseofnonͲvehiculartrafficmodes. 10. Developmentofaprojectthatcomplieswiththesafety,noiseandoverflightpoliciesofthe City’sAirportOverlayZoneandtheSanLuisObispoCountyAirportLandUsePlan.  Required Approvals TheCityofSanLuisObispoistheleadagencyfortheproject.Asdescribedabove,theproposed projectrequeststhefollowingCityentitlements:aGeneralPlanMapAmendment,arezoneofthe property,aSpecificPlanAmendmenttotheAASP,ConceptualSitePlan,MinorUsePermit,Major DevelopmentReview,aDevelopmentAgreementandenvironmentalclearancefornecessaryoffͲ siteimprovements.Approvaloftheseentitlementswouldallowafinaldevelopmentplan (consistentwiththerequirementsofthegrantedentitlements),includinggradingpermits, improvementplans,andbuildingpermitstobehandledbytheCityasministerialapprovals. TheprojectwillbereviewedbytheAirportLandUseCommission(ALUC)todetermineifitis consistentwiththeadoptedSanLuisObispoCountyAirportLandUsePlan(ALUP).Developmentof theprojectsiteundertheproposedprojectwouldberequiredtocomplywiththeRegionalWater   Page 387 of 495 18  QualityControlBoard(RWQCB)PostConstructionStormWaterRequirementsforredevelopedsites. Futuredevelopmentoftheprojectsite,includingwideningofTankFarmRoadalongtheproject’s frontageeastoftheprojectsitemayrequireworkwithinAcaciaCreek.Assuch,futuredevelopment undertheproposedprojectmayrequirepermittingperSection401/404oftheCleanWaterAct fromtheU.S.ArmyCorpsofEngineersandtheRWQCB,andunderSection1600etseq.ofthe CaliforniaFishandGameCodefromtheCaliforniaDepartmentofFishandWildlife.Aportionofthe offͲsiteimprovementsarelocatedonadjacentpropertythathasacertifiedEIR.TheFinalEIR preparedfortheChevronTankFarmRemediationandDevelopmentProject(StateClearinghouse No.2009031001)wouldbeusedtoidentifytheimpactsandrequiredmitigationmeasuresatthese offͲsiteimprovementlocations.Theresponsibilityfortheimplementationofthesemitigation measuresfromtheChevronTankFarmRemediationandDevelopmentProjectwillbedeterminedas partoftheEIR.                                          Page 388 of 495  Comment19: Pleaseupdatetheprojectdescriptiontoclearlyidentifyanyandallexceptionsorconcessionsthatarerequested fromtheZoningRegulationsPropertyDevelopmentStandards(Chapter17.70),pleaseincludeallstandardincentive requestsforaffordablehousingprojects.Exceptionsandconcessionsorincentivesshouldbeclearlydescribed(i.e., upperstorycreekstepbacksandtheparkingreductionrequest,andgroundfloorresidentialusesalongSantaFe Road).Pleaseprovideadescriptionwhichincludesasummaryjustifyingeachexceptionorconcessionasitrelatesto relevantpolicyobjectives.SeeAASPSection4.4.7,5.4.5,or5.4.6toverifywhetheranyrequestedexceptionscanbe satisfiedthroughtheAmenityIncentivesopportunityorsatisfiesspecificdesignstandards. Response CreekSetbacks/UpperStoryCreekSetbacks TheprojectincludesvariationinthesetbacksforAcaciaCreek.Thebuildingsetbacksrangefrom29feetto50feet alongtheeasternportionofthepropertyandaverageapproximately43feetovertheentiresite.TheClassIbike pathfromTankFarmRoadtoDamonGarciaSportsParkislocatedwithinthesetback,withanaveragesetbackof approximately20feet.Theprojectalsodoesnotincludetheadditionalsetbackforthethirdstorythatiscalledfor inZoningCode17.070.030E3. ABiologicalAssessmentwaspreparedtodeterminewhetherornotthecreeksetbacksproposedbytheproject wouldprovideimpactstothewildlifecorridororbiologicalresources.TheBiologicalAssessmentconcludedthatthe bikepathandtheproposedbuildingsetbackswouldnot.Theprojectalsoincludescompensatorysetbackssothat theaveragegroundfloorsetbackalongtheeasternboundaryoftheprojectis43feetasapposedto35feet.With theseproposedsetbacksalongthethreeͲstoryfrontage,theprojectisproviding12%Ͳ15%greateraveragesetbacks thatcalledforbytheAASPandZoningOrdinance.Theproposedsetbacksarenecessarytoprovidereasonable developmentoftheparcel,asprovidedinPolicy7.7.9oftheOpenSpaceandConservationElement,anddonot adverselyimpacttheripariancorridor.  ParkingReductionRequest Theprojectincludesprojectdesignfeaturesthatwillreduceparkingdemandandjustifyaparkingreduction exception.Theprojectincludesthefollowingfeatures:  1) Enhancedpedestrianandbicycleconnectivitythatisintegratedwiththeareawidesystem,includingped andbikeconnectivityto650TankFarmRoad,690TankFarmRoad,andDamonGarciaSportsPark.The projectwillimplementtheCity’snewraised“ClassIV”bikelanes.  2) Affordablehousingwillbeprovidedatadensityof23DensityUnitsperacre,andanaverageunitsizebelow 1,100squarefeetperdwellingunit(lessthan1,000squarefeetperunitacrosstheentireproject),the projectisaffordablebydesignandisrequiredtoprovidethree(3)deedrestrictedunits.  3) TheprojectislocatedonequarterofamilefromanexistingtransitstoponBroadStreetnearTankFarm Road.  4) Theprojectislocatedina“lowVMT”areaaccordingtotheCityandSLOCOGbecauseofthedensityof shoppingandjobsintheimmediatevicinity.Thereislessrelianceonvehicleformsoftransportation.  Page 389 of 495 5) TheprojectwillhaveanonͲvehicular(bike,ped,transit)modesplitof17.3percentandhighervehicle occupancythanistypicaloftheremainderofthecommunity.  6) Privateonsiterecreationalamenitiesthatwillreducethenecessitytotraveltooffsiterecreation destinations.  GroundFloorResidentialonSantaFe Section17.70.130oftheZoningOrdinancerequiresthatthedwellingunitsnotoccupythefirst50feetofground floorareawhichfacesapublicstreet,unlesstheCityfindsthattheprojectenhancesthepedestrianenvironmentin thesurroundingareaorwillperformafunctionorprovideaservicethatisessentialorbeneficialtothecommunity City.Theprojectincludesamixedusebuilding(Building21)onthecornerofTankFarmRoadandSantaFethat meetsthiscriterion,andaresidentialbuildingonthenorthernendofSantaFe(Building4)thatdoesnot.The reasonsfornotincludinggroundfloorcommercialspaceinBuilding4areasfollows: 1) SantaFeisnotanticipatedtobeconnectedtoPradoRoadfor10Ͳ15years,andSantaFewillfunctioninthe neartermasaresidentialculdesac.Groundfloorcommercialspaceinsuchalocationisnotdesirableto tenantsexceptindense,highlydevelopedareassuchasadowntown.  2) Theprojectisproviding12,500SFofcommercialgroundfloorspace.Thisamountofcommercialspaceis consideredthemaximumfeasiblefortheprojectsite,consideringotherproposalsinthearea,andthe goodsandservicesalreadyofferedinthearea(i.e..,MarigoldShoppingCenter).  3) Theprojectprovidesanessentialfunctionandservicethatisbeneficialtothecommunitybyproviding dwellingunitsthataresmallerinsizeandmoreaffordabletoworkersintheimmediatevicinity.Theproject maximizestheavailabilityoftheseunitsbydevelopingthegroundfloorofBuilding4asresidentialrather thancommercial.  AASPPolicy4.4.7AmenityIncentivesProvided B. Bicycleorpublictransportationfacilities,integratedwithareawidesystems,suchasimprovedtransit stopsorbikepaths.(TheprojectincludesClassIandClassIVbikepathsthatareintegratedtothe areawidesystem.)  F. Privaterecreationalfacilities(sportsandvolleyballcourts).(Aclubhousesandrecreationalfacilities areprovided.) AASPPolicy5.4.5 5.4.5 A10percentreductionintherequirednumberofparkingspacesmaybegrantedbytheDirectorfor developmentwithinoneͲquartermileofaregularlyscheduledtransitstop.(Atransitstopisprovidedon BroadStreetatTankFarm.)  5.4.6 A5percentreductionintherequirednumberofparkingspacesmaybegrantedbytheDirectorfor developmentthatprovidesshowersandchangingrooms,inadditiontothesecure,shelteredbicycle parkingfacilitiesalreadyrequiredbyCitycode.(Theclubhouseprovidesadditionalshowersandchanging areas.)  Page 390 of 495 5.4.7 A5percentreductionintherequirednumberofparkingspacesmaybegrantedbytheDirectorfor developmentofparkingareasthatincreasestormwaterinfiltration(seeDrainageguidelinesinsection 5.2.4).(Theparkinglotsincludeperviouspaversandconcretethatincreasefiltration.Theprojectalso includesaseriesofconnectedbioswalesandwaterqualitymanagementareasthatwillfacilitate drainage.)     Page 391 of 495 Page 392 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A1ENTITLEMENTS PACKAGEVICINITY MAPTITLE SHEETPROJECT DESCRIPTIONTHE PROJECT ENTITLEMENTS PROPOSE A CHANGE IN LAND USE DESIGNATION FROM BUSINESS PARK TO SERVICE COMMERCIAL, WHICH WOULD ALLOW A MIXED-USE PROJECT PROVIDING UP TO 280 RESIDENTIAL UNITS AND UP TO 12,500 SF OF COMMERCIAL-SERVICE/OFFICE USES. THE PROJECT SITE HAS A DENSITY OF 23.5 DU/ACRE WITH SHARED PUBLIC AND PRIVATE OPEN SPACES, COMMON YARDS, AND A RECREATION CENTER WITH A COMMUNITY BUILDING. THE PROPOSED RESIDENTIAL DEVELOPMENT WOULD INCLUDE A MIX OF STUDIOS, ONE-BEDROOM, TWO-BEDROOM, AND THREE- BEDROOM UNITS WITH PRIVATE BALCONIES. THE PROJECT ALSO INCLUDES A 2,250-SQUARE FOOT CLUBHOUSE BUILDING WITH A 2,800-SQUARE FOOT PATIO AREA. THE CLUBHOUSE BUILDING WOULD PROVIDE MEETING AREAS, AN INDOOR GAME AREA, A COMMON LOUNGE, ADMINISTRATIVE OFFICE AREA, AND A COMMUNITY KITCHEN.THE PROPOSED PROJECT IS REQUESTING A MINIMUM SETBACK OF APPROXIMATELY 10 FEET FROM ACACIA CREEK FOR A BICYCLE/PEDESTRIAN PATH TO CONNECT TO DAMON GARCIA SPORTS FIELDS (AND AN AVERAGE BIKE PATH OF 20 FEET) AND A MINOR EXCEPTION FOR A MAXIMUM 15-FOOT ENCROACHMENT INTO THE SETBACK FOR PORTIONS OF BUILDINGS 14, AND 21 FROM THE AVERAGE TOP OF BANK.THE PROJECT’S REQUIRED CREEK SETBACKS, COMMON AREAS AND OPEN SPACE IN THE NORTHWEST CORNER OF THE PROJECT SITE WOULD RESULT IN APPROXIMATELY 18 PERCENT OF THE SITE BEING ONSITE “GREEN” COMMON OPEN SPACE, INCLUDING PLAY AREAS, TOT LOTS, AND LANDSCAPE PARKWAYS. BIKE AND PEDESTRIAN TRIPS WOULD BE SUPPORTED BY A CONNECTION TO THE 650 TANK FARM ROAD PROPERTY AND EXTENSION OF THE ONSITE BIKE PATH TO THE BIKE PATH AT THE DAMON GARCIA-SPORTS FIELDS TO THE NORTH. A NEW BRIDGE CONNECTING THE PROJECT SITE TO THE 650 TANK FARM ROAD PROPERTY IS PLANNED TO BE INSTALLED BY THE DEVELOPER OF THAT PROPERTY.THE PROJECT IS REQUESTING THE FOLOWING EXCEPTIONS:• PARKING REDUCTION• GROUND FLOOR RESIDENTIAL ALONG SANTA FE ROAD• ENCROACHMENT OF BUILDING 14 & 21 INTO THE CREEK/RIPARIAN SETBACK• NO ADDITIONAL THIRD FLOOR CREEK SETBACKPROJECT TEAMCLIENT:COVELOP COLLABORATIVE DEVELOPMENTADDRESS: 1135 SANTA ROSA ST, SUITE 210SAN LUIS OBISPO, CA 93401CONTACT: DAMIEN MAVISEMAIL: DMAVIS@COVELOP.NETPHONE: 805.781.3133ARCHITECT:RRM DESIGN GROUPADDRESS: 3765 S. HIGUERA, SUITE 102SAN LUIS OBISPO, CA 93401CONTACT: DARIN CABRALEMAIL: DJCABRAL@RRMDESIGN.COMPHONE: 805.543.1794CIVIL ENGINEER:RRM DESIGN GROUPADDRESS: 3765 S. HIGUERA, SUITE 102SAN LUIS OBISPO, CA 93401CONTACT: NOAH WALTERSEMAIL: NGWALTERS@RRMDESIGN.COMPHONE: 805.543.1794LANDSCAPE ARCH:RRM DESIGN GROUPADDRESS: 3765 S. HIGUERA, SUITE 102SAN LUIS OBISPO, CA 93401CONTACT: JAKE MINNICKEMAIL: JRMINNICK@RRMDESIGN.COMPHONE: 805.543.1794PROJECT STATISTICSPROJECT ADDRESS:600 TANK FARM ROADSAN LUIS OBISPO, CA 93401APN:053-421-006 & 053-421-002CURRENT ZONING:BP-SPPROPOSED REZONING:CSOVERALL SITE AREA:11.7 ACRES (509,652 SF)NET SITE AREA:10.84 ACRES (472,190 SF)BUILDING AREASBUILDING TYPE BUILDING COUNT AREARESIDENTIAL:BUILDING A14 6,600 SFBUILDING B5 13,150 SFBUILDING C3 21,450 SFBUILDING D2 11,760 SFTOTAL RESIDENTIAL = 24 246,020 SFMIXED USE:BUILDING E 1 34,000 SFBUILDING F 1 2,574 SFTOTAL MIXED USE= 2 36,574 SFTOTAL BUILDINGS= 26 282,594 SFPROPOSED FAR 59.85%UNIT AREAS:UNIT TYPE UNIT COUNT AREAUNIT A1 (2-BR TH (SM)) 28 1050 SFUNIT A2 (2-BR TH (LG))14 1400 SFUNIT A3 (3-BR TH)28 1550 SFUNIT B1 (1-BR (WIDE))15 735 SFUNIT B2 (1-BR (LONG))15 765 SFUNIT B3 (2-BR (WIDE))10 1100 SFUNIT B4 (2-BR (LONG))30 1075 SFUNIT CD1 (STUDIO)8 565 SFUNIT CD2 (1-BR)18 725 SFUNIT CD3 (2-BR)74 950 SFUNIT E1 (STUDIO)20 450 SFUNIT E2 (1-BR)20 625 SFCOMMERCIALN/A 12,500 SFDENSITY & UNIT MIXALLOWED DENSITY:24 DU/ACREALLOWED DU’S260.16 DU’SPROPOSED:DU/UNIT UNIT COUNTTOTAL DU(DU/UNIT X UNIT COUNT)STUDIO0.5 DU/UNIT 28 141-BED0.66 DU/UNIT 68 44.882-BED1 DU/UNIT 156 1563-BED1.5 DU/UNIT 28 42TOTALS = 280 UNITS 256.88 DU’SPARKING CALCSVEHICLE PARKINGREQUIRED PARKING:RESIDENTIAL:STUDIO 0.75 SPACES/UNIT * (28 UNITS)= 21 SPACES1-BED 0.75 SPACES/UNIT * (68 UNITS)= 51 SPACES2-BED 1.5 SPACES/UNIT * (156 UNITS)= 234 SPACES3-BED 2.25 SPACES/UNIT * (28 UNITS)= 63 SPACESGUEST 1 SPACE/5 UNITS * (280 UNITS)= 56 SPACESTOTAL RESIDENTIAL= 425 SPACESCOMMERCIAL:1 SPACE/300 SF * (12,500 SF)= 41.7 SPACESTOTAL REQUIRED PARKING: 467 SPACESPROPOSED PARKING: (OVERALL 6.8% REDUCTION)435 SPACESEV PARKINGREQUIRED EV SPACES:RESIDENTIAL:READY 10% OF REQUIRED --> (425 * 0.10)= 43 SPACESCAPABLE 50% OF REQUIRED --> (425 * 0.25)= 106 SPACECOMMERCIAL:READY 10% OF REQUIRED --> (42 * 0.10)= 5 SPACESCAPABLE 25% OF REQUIRED --> (42 * 0.25)= 11 SPACESTOTAL EV READY REQUIRED= 48 SPACESTOTAL EV CAPABLE REQUIRED= 117 SPACESPROPOSED EV SPACES:EV READY 48 SPACESEV CAPABLE 117 SPACESBICYCLE PARKINGREQUIRED:RESIDENTIAL:LONG TERM 2 SPACES/UNIT * (280 UNITS)= 560 SPACESSHORT TERM (GUEST SPACES) 1 SPACE/5 UNITS * (280 UNITS)= 56 SPACESTOTAL RESIDENTIAL BIKE PARKING= 616 SPACESCOMMERCIAL:LONG TERM 25% OF REQUIRED --> 8.4 * 0.25= 2.1 --> 3 SPACESSHORT TERM 75% OF REQUIRED --> 8.4 * 0.75= 6.3 --> 7 SPACESTOTAL COMMERCIAL BIKE PARKING= 10 SPACESTOTAL LONG TERM BIKE PARKING= 563 SPACESTOTAL SHORT TERM BIKE PARKING= 63 SPACESPROPOSED BICYLE SPACES:LONG TERM 563 SPACESSHORT TERM 63 SPACESMOTORCYCLE PARKINGREQUIRED:1 MOTORCYCLE 20 PARKING SPACES 23.35 SPACESPROPOSED:23 SPACESBROAD ST TANK FARM RDINDUSTRIAL WAYPROJECT SITESANTA FE RDACACIA CREEK NET AREA EXHIBIT%%4 ;  ;  ;          ;  ; PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEROW BOUNDARYROW BOUNDARYTOP OF BANKTOP OF BANKOVERALL SITE AREA= 11.7 ACRESNET AREA= 10.8 ACRES(EXCLUDES STREET RIGHTS-OF-WAYANDAREA BETWEEN THE TOPS OF BANK OF ACACIA CREEK PER 6/20&)SETBACKS:PER SAN LUIS OBISPO AIRPORT AREA SPECIFIC PLAN, TABLE 4-7 REQUIRED (C-S)PROPOSEDDISTANCE FROM PL’S ALONG STREETS16 FT (BUILDINGS), 5 FT (PARKING) 16 FT (BUILDINGS), 5 FT (PARKING)DISTANCE FROM PL’S ALONG ADJACENT PARCELS0 FT (BUILDINGS), 0 FT (PARKING 0 FT (BUILDINGS), 0 FT (PARKINGBUILDING HEIGHT: PER SAN LUIS OBISPO AIRPORT AREA SPECIFIC PLAN, TABLE 4-9ALLOWED : OCCUPIED 36’-0”NON-OCCUPIED FEATURES 46’-0”3-STORIES MAXPROPOSED: VARIES, REFER TO BUILDING ELEVATIONSMAX. FAR:60% = (60% X 472,190 SF)= 283,314 SFMAX. BLDG & HARDSCAPE COVERAGE90% = (90% X 472,190 SF)= 424,971 SFMIN. LANDSCAPE COVERAGE10%=(10% X 472,190 SF)= 47,219 SFPROPOSED LOT COVERAGE:BUILDING/HARDSCAPE: 309,908 SF (309,908 SF/472,190 SF)= 65.6% LANDSCAPING: 162,282 SF (162,282 SF/472,190 SF)= 34.4% CLEAN ENERGY STATEMENTSHEET INDEXTITLE SHEET A1EXISTING SITE SURVEY A2SITE PLAN A3GRADING PLAN A4STORMWATER AND DRAINAGE PLAN A5ARCHITECTURAL SITE PLAN A6SITE SECTIONS A7BUILDING SECTIONS A8BUILDING SECTIONS A9SITE CIRCULATION EXHIBIT A10VIEW STUDIES PER AASP A11VIEW STUDIES PER AASP A12VIEW STUDIES PER AASP A13VIEW STUDIES PER AASP A14BUILDING A FLOOR PLANS A15BUILDING A ELEVATIONS A16BUILDING B FLOOR PLANS A17BUILDING B ELEVATIONS A18BUILDING C FLOOR PLANS A19BUILDING C ELEVATIONS A20BUILDING D FLOOR PLANS A21BUILDING D ELEVATIONS A22BUILDING E FLOOR PLANS A23BUILDING E FLOOR PLANS A24BUILDING E ELEVATIONS A25BUILDING E ELEVATIONS A26BUILDING F FLOOR PLANS A27BUILDING F ELEVATIONS A28COLORS AND MATERIALS SCHEME 1A A29COLORS AND MATERIALS SCHEME 1B A30COLORS AND MATERIALS SCHEME 2A A31COLORS AND MATERIALS SCHEME 2B A32COLORS AND MATERIALS SCHEME 3 A33COLORS AND MATERIALS SCHEME 4 A34PRELIMINARY SITE PLAN A35PEDESTRIAN LINKAGES & TRAFFIC CALMING EXHIBIT A36MULTI-MODAL TRANSPORTATION EXHIBIT - BIKE NODE A37LANDSCAPE AREAS AT MIXED USE BUILDING EXHIBIT A38OUTDOOR SPACES - ENLARGEMENTS EXHIBITS A39SITE PLAN ENLARGEMENT A40LANDSCAPE CHARACTER & AMENITIES A41SITE FURNISHINGS AND MATERIALS A42BICYCLE PARKING AND MONUMENT SIGNAGE A43SITE WALLS AND FENCING A44TRASH ENCLOSURES A45LANDSCAPE PLANT MATERIALS A46PRELIMINARY LANDSCAPE PLAN A47EXISTING TREE INVENTORY & REMOVALS A48LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’AVG. NATURAL GRADE CALCULATIONPage 393 of 495 1622-02-RS20December 21, 2021^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH OH OH OHPTN LOT 57 SLO SUBURBAN TRACT2/RS/551009/OR/474APN 053-421-002EXISTING FEMA FLOODZONE A, PER FIRMPANEL 06079C1332GEXISTING TOP OF BANKAND/OR EDGE OFRIPARIANEXISTING 35' ACACIACREEK SETBACKEXISTING 50' ACCESSEASEMENT TO BEABANDONEDEXISTING 20' PRIVATEUTILITY EASEMENT TO BEABANDONEDREMOVE EXISTING MATERIALSTORAGE AND ASSOCIATEDIMPROVEMENTSREMOVE EXISTINGBASE ACCESS ROADREMOVE EXISTING AC ANDCONCRETE DRIVEWAYIMPROVEMENTSREMOVE EXISTINGUNDERDRAIN AND STORMDRAINPROTECT EXISTING 18"CCFRPM SEWER(S = 0.0040)N1°20'06"E 1260.68'N87°55'14"W 449.10'N1°23'43"E 189.14'N14°00'29"W 200.10'N19°40'58"W 125.76'N8°53'28"E 445.94'N4°13'36"W 358.80'N88°36'26"W 375.24'REMOVE EXISTINGBASE ACCESS ROADUNDERGROUND EXISTINGOVERHEAD UTILITY LINESEX SSMH150.8± RIM131.3± INVREMOVE EXISTING GRAVELPARKING LOT IMPROVEMENTSREMOVE EXISTING FENCINGAND MISC STORAGEIMPROVEMENTS(TYP)REMOVE EXISTING FENCINGAND MISC STORAGEIMPROVEMENTSTANK FARM ROADPROTECT EXISTING FENCEACACIA CREEK(SECONDARY WATERWAY)SEE C9 FOR TREEINVENTORY ANDDISPOSITION(TYP)SEE C9 FOR TREEINVENTORY ANDDISPOSITION(TYP)SEE C9 FOR TREEINVENTORY ANDDISPOSITION(TYP)PTN LOT 57 SLO SUBURBAN TRACT2/RS/55APN 053-421-006N19°33'43"W 124.20'N36°15'34"W 150.03'N53°14'05"W 110.02'S79°41'29"W 12 8 . 8 2 'UNDERGROUND EXISTINGOVERHEAD UTILITY LINES ALONGPROPERTY FRONTAGELEGENDSSEXISTING 18" PUBLIC SEWER MAINWEXISTING 12" PUBLIC WATER MAINEXISTING EASEMENTEXISTING MAJOR CONTOUREXISTING MINOR CONTOUR600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A2ENTITLEMENTS PACKAGEEXISTING SITE SURVEYPage 394 of 495 1622-02-RS20December 21, 2021^^^^^^^^^^^^^^^^^^^^^^WWWWWWSDSDFWFWFWFWFWFWFWSDSDSDSSSSSSSSSSSSSD SDWWWWWWWWWWWFW FWFWFWFWFWFWFWFWFWFWFWFWFWFWSS SSSSSSSSSSSSSSSSSSSS WWWWWWRWRWRWRWRWRWSSSSSSSSW W W W W RW RW RW RW RW W FWFWWWSS SS^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH OH OH OH 7+00SSSDSSBUILDING #1BUILDING #2BUILDING #3BUILDING #4BUILDING #5BUILDING #6BUILDING #7BUILDING #8BUILDING #9BUILDING #11BUILDING #12BUILDING #13BUILDING #14BUILDING #15BUILDING #16BUILDING #17BUILDING #18BUILDING #19BUILDING #20BUILDING #21BUILDING #22BUILDING #23BUILDING #24BUILDING #25BUILDING #26BUILDING #27BUILDING #10TANK FARM ROADSANTA FE ROADEXISTING FEMA FLOOD ZONE APER FIRM PANEL 06079C1332GPROPOSED BIORETENTION AREA; SEESHEET C6 FOR STORMWATER DETAILS(TYP)ACACIA CREEK35' ACACIA CREEK SETBACKPROPOSED TRASH ENCLOSURE(TYP)SSMH169.42 RIM163.42 INVSSMH174.25 RIM168.25 INVSSMH179.08 RIM173.08 INVSSMH174.69 RIM168.69 INVSSMH170.08 RIM164.08 INVSSMH164.37 RIM158.37 INVSSMH159.18 RIM153.18 INVSSMH157.41 RIM151.41 INVSSMH153.51 RIM147.51 INVCONNECT TO EXISTING18" CCFRPM SEWER MAIN(INV = 132.4±)PROPOSED SEWER LATERAL(TYP)PROPOSED WATERSERVICE AND METER(TYP)PROPOSEDPERMEABLE PAVERSPROPOSEDPERMEABLE PAVERS(TYP)8.6' (TYP)61'TYP24'TYP61'9'8'PROPOSED RW IRRIGATIONPOC, SERVICE, & METER.16' BUILDING SETBACKPROPOSED BACK OFSIDEWALK AND RIGHT OF WAYPROPOSED FIRE AND DOMESTICWATER DOUBLE CHECK ASSEMBLYPROPOSED 8"PUBLIC WATER MAINPROPOSED PUBLICRECYCLED WATER MAINR50'R50'R83'R63'R120'R75'R35'R15' (TYP)R15' (TYP)R412'R35'R47'PROPOSED TRASH ENCLOSURE(TYP)24'TYP24'TYPR46'R50'PROPOSED EMERGENCY VEHICLE ACCESSONLY AND REMOVABLE BOLLARDSPROPOSED EMERGENCYVEHICLE ACCESS ONLY ANDREMOVABLE BOLLARDSOVERLAND RIVER ROCKSWALE TO BASIN; SEE C4FOR GRADINGOVERLAND RIVER ROCKSWALE TO BASIN; SEE C4FOR GRADINGPROPOSED TRASH ENCLOSURE(TYP)PROPOSED FIRE AND DOMESTICWATER DOUBLE CHECK ASSEMBLYMATCH EXISTINGPUBLIC IMPROVEMENTSPROPOSED PUBLICRECYCLED WATER MAINPROPOSED 8"PUBLIC WATER MAINPROPOSED POOL AND FLATWORKPROPOSED RETAINING WALL;SEE SHEET C4 FOR GRADINGPROPOSED RETAINING WALL;SEE SHEET C4 FOR GRADINGPROPOSED RETAINING WALL;SEE SHEET C4 FOR GRADINGPROPOSED 12'MULTI-USE PATHINTERIM TURNAROUND;FUTURE INTERSECTIONIMPROVEMENTS BY OTHERSEXISTING ACACIA CREEK FLOWLINESSMH158.2± RIM150.20 INVSSMH149.9± RIM131.9± INVPROPOSED 100-YR FLOODLIMITSB A4'8.6'10' x 36' COMMERCIALLOADING ZONEPROPOSEDBUILDINGSECTION BNTSSANTA FE ROAD (INTERIM)PLPROPOSED ROW12'LANE6.5'BIKE12'LANE9'PARKWAY7'CL IV BIKE5'SW15'SETBACK2'EXISTINGGRADECLPROPOSEDBUILDINGEXISTING ROWEXISTING ROW12'LANEVARIESMEDIAN12.62'EXISTING13'LANE13'LANE8'BIKE LANESECTION ANTSTANK FARM ROAD9'PARKWAY7'SW5'15'SECTION CNTSTYPICAL BIKE PATH SECTIONPLPROPOSEDBUILDINGVARIES14'BIKE LANEVARIES4'PROPOSEDRETAININGWALLACACIAFLOW LINEACACIA TOPOF BANKEXISTINGGRADE10' AC BIKE LANE WITH2' MIN CLASS II BASESHOULDERSPORCHESPER PLAN14'LANE13'LANEWESTERLYPROPERTY LINE13'LANE2'7'BIKE7'PARKWAY5'WALKSECTION BNTSSANTA FE ROAD (ULTIMATE)FUTURE IMPROVEMENTSBY OTHERS7'CL IV BIKE5'SW9'PARKWAYPLCLSWSSPROPOSED PRIVATE 8" PVC WATERLEGENDPROPOSED PRIVATE 8" PVC SEWERPROPOSED PRIVATE 12" HDPE STORM DRAINSSEXISTING 18" PUBLIC SEWER MAINWEXISTING 12" PUBLIC WATER MAINPROPOSED FIRE HYDRANTSDRWPROPOSED RECYCLED WATER MAINIHHW  PRELIMINARY SITE PLAN1. SEE SHEET C5 FOR STORM DRAIN IMPROVEMENTS2. INTERIM SANTA FE IMPROVEMENTS SHOWN; FUTUREIMPROVEMENTS/WIDENING BY OTHERS3. ON-SITE IMPROVEMENTS PRIVATE UNLESS NOTEDOTHERWISENOTE:DOMESTIC WATER SERVICE & METERFIRE SPRINKLER SERVICEFWC4600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A3ENTITLEMENTS PACKAGESITE PLANPage 395 of 495 1622-02-RS20December 21, 2021^^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH OH OH OH RW WWWWWWWSDSDFWFWFWFWFWFWFWSDSDSDSSSSSSSSSSSSSDSDWWWWWWWWWWWFWFWFWFWFWFWFWFWFWFWFWFWFWFWFWSSSSSSSSSSSSSSSSSSSSSSWWWWWWRWRWRWRWRWRWSSSSSSSSWWWWW RW RW RW RW RW W FWFWWSS^ ^^^^^^^^^BUILDING #1BUILDING #2BUILDING #3BUILDING #4BUILDING #5BUILDING #6BUILDING #7BUILDING #8BUILDING #9BUILDING #11BUILDING #12BUILDING #13BUILDING #14BUILDING #15BUILDING #16BUILDING #17BUILDING #18BUILDING #19BUILDING #20BUILDING #21BUILDING #22BUILDING #23BUILDING #24BUILDING #25BUILDING #26BUILDING #27BUILDING #102%3%TYP3%TYP3%TYP3%TYP3%TYP3%TYP1%TYP1%TYP0.5%TYP0.5%TYP0.5%TYP0.5%TYP0.5%TYP0.5%TYP3.5%2%TYP2%TYP2%TYP2%TYP2%TYP 2%TYP 2%TYP2%TYP2% TYP 2% TYP2%TYP2%TYP2%TYP2%TYP2%TYP2%TYP2%3%TYPFF=177.00FF=180.00FF=174.50FF=173.00FF=171.00FF=170.00FF=165.50FF=166.00FF=170.00FF=174.00FF=163.00FF=172.50FF=172.50FF=163.00FF=163.00FF=177.50FF=180.00FF=163.00FF=160.00FF=157.00FF=157.00FF=158.00FF=155.00FF=154.00FF=154.00FF=154.00165170175160160165170175155154.36 RIM151.37 INV151.82 RIM149.20 INVBASIN BOTFG=151.0BASIN BOTFG=149.0BASIN BOTFG=156.0BASIN BOTFG=158.0BASIN BOTFG=163.0159.19 RIM153.93 INV156.99 RIM153.03 INV154.89 RIM152.20 INV160.66 RIM154.33 INV163.80 RIM156.80 INV167.45FS170.98FS175.10FS171.68FS174.58FS179.78FS177.42FSFF=179.00169.65FS150150 155160165170175180185190195200205 210215150150155160 165170175175 155155160160165170155155160155155150150155155150150155155CONSTRUCT EXPOSED ROCKCUT PER GEOLOGY REPORTRECOMMENDATIONSPROPOSED RETAINING WALLHEIGHT VARIESPROPOSED RETAINING WALLHEIGHT VARIESSEE SITE PLAN FOR BIKE PATHTYPICAL SECTIONNO PROPOSED GRADINGWITHIN EXISTING ACACIA CREEKTOP OF BANKCONNECT TO EXISTING 650TANK FARM IMPROVEMENTSPROPOSED BIORETENTIONBASIN; SEE STORMWATERCONTROL PLAN FOR DETAILS(TYP)EXISTING FEMA FLOOD ZONE APER FIRM PANEL 06079C1332GPROPOSED RETAINING WALLHEIGHT VARIES(4' MAX)164.05FS159.34FS158.06FS155.95FS153.48FS153.56FS/HPPROPOSED BASINSLOPE 3:1 MAX(TYP)PROJECT OUTLETTHRU EXISTINGOUTLET AT ACACIAHEADWALL153.18FS159.01FS159.87FS158.31FS153.42FS149.96FS151.98FSCONSTRUCTOVERLAND SWALE TOBIORETENTION BASIN(S = 0.01 FT/FT MIN)35' CREEK SETBACK154.36FSNO PROPOSED GRADINGWITHIN EXISTING ACACIA CREEKTOP OF BANK152.0TOP155.0TOP160.0TOP165.8TOP154.81 TC154.31 FS155.39 TC154.89 FS154.12 TC153.62 FS154.90 TC154.40 FS156.12 TC155.62 FS157.52 TC157.02 FS158.97 TC158.47 FS159.93 TC159.43 FS159.45 TC158.95 FS161.16 TC160.66 FS163.47 TC162.97 FS164.56 TC164.06 FS165.49 TC164.99 FS170.31 TC169.81 FS174.10 TC173.60 FS173.59FS179.61 TC179.11 FS174.57 TC174.07 FS153.46 TC152.96 FS154.50 TC154.00 FS152.97 TC152.47 FS154.39 TC153.89 FS163.40 TC162.90 FS164.81 TC164.31 FS156.02FSSEE SHEET C6 FOR WATERQUALITY BASIN161.43 TC160.93 FS160.99 TC160.49 FS161.72 TC161.22 FSPROPOSED 100-yr FLOOD LIMITSCONSTRUCT OFF-SITE AC PATHTO DAMON-GARCIACONCRETE PATHCONSTRUCT RETAININGWALL (H = 6' MAX)EXISTING METAVOLCANICROCKROCK CUT PER SOILSREPORTCONCRETE PEDESTRIANSIDEWALKPORCH PER ARCH PLANSPROPOSEDGARAGE FLOOR(FF PER PLAN)FIRST FINISHEDFLOORPROPOSED STEM WALLCONCRETE DRIVEWAYAPRON (3.5' TYP)6" MOUNTABLE CURBAC DRIVE AISLE PER PLANTRACT BOUNDARYPROPOSEDGARAGE FLOOR(FF PER PLAN)PORCH PER ARCH PLANSCONCRETE PEDESTRIANSIDEWALKPROPOSED RETAININGWALL (4' MAX)FENCING PER LANDSCAPEPLANSPROPOSED LANDSCAPEBUFFERAC BIKE PATH PER PLANEXISTING TOP OF BANK/EDGEOF RIPARIAN HABITAT PERPROJECT BIOLOGISTVARIESLIMITS OF PROPOSEDGRADINGLEGENDPROPOSED PRIVATE 12" HDPE STORM DRAINSSSEWER MAIN (SEE SITE PLAN - C4)WWATER MAIN (SEE SITE PLAN - C4)RWRECYCLED (SEE SITE PLAN - C4)SDRAW CUT: 16,700 cu ydRAW FILL: 28,700 cu ydRAW NET: 12,000 cu yd <IMPORT>AREA OF DISTURBANCE: 14.3 acQUANTITY ESTIMATES ON THESE PLANS ARE TO BE USED FORBONDING AND PERMIT PURPOSES ONLY. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO VERIFY ACTUALQUANTITIES FOR THE PURPOSE OF CONSTRUCTIONAPPROXIMATE EARTHWORK QUANTITIES600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A4ENTITLEMENTS PACKAGEGRADING PLANPage 396 of 495 1622-02-RS20December 21, 2021^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH SDSDSDSD^^^^^^^^^^^^^^^^^^ADAADAEXISTING PROPERTY LINEPRELIMINARY PROPOSEDRIGHT OF WAY DEDICATIONEXISTING TOPOF BANK35' TOP OF BANK AND EDGE OFRIPARIAN SETBACKSCM 2: PRIVATETRIB AREA: 121,100 sfC i: 0.54 (75%)V: 11,415 cfV from SCM 5: 3,279 cf SCM AREA: 2,800 sfSCM 6: PRIVATETRIB AREA: 25082 sfC i: 0.54 (75%)V: 3,015 cfSCM AREA: 1,005 sfSCM 4: PIPsTRIB AREA: 23,062 sfC i: 0.54 (75%)V: 3,171 cfSCM AREA: 1,057 sfSCM 5: PRIVATETRIB AREA: 110,268 sfC i: 0.54 (75%)V: 6647 cfSCM AREA:1,187 sfV to SCM 2: 3279 cf650 TANK FARM IMPROVEMENTS BYOTHERSACACIA CREEKACACIA CREEKSANTA FE ROADTANK FARM ROADDMA 2DMA 1DMA 5RELOCATE EXISTINGOUTLET FOR PROJECTDISCHARGE TO ACACIAPROPOSED PRIVATESTORM DRAINSCM 1: PIPsTRIB AREA: 50,500 sfC i: 0.81 (95%)V: 6,625 cfSCM AREA: 5,300 sfDMA 7SCM 7: WATER QUALITY TREATMENT ONLY; SIZED4% OF DMA 7 PER PCR RECOMMENDATIONS(4,800 sf)DMA 4EXISTINGPROPERTY LINESDSDSDSDDMA 6DMA 8DMA 9DMA 3DMA 10SCM 3: PRIVATETRIB AREA: 111,640 sfC i: 0.54 (75%)V: 12,780 cf SCM AREA: 12,780 sfSCM 8: PRIVATETRIB AREA: 11,396 sfC i: 0.54 (75%)V: 2,600 cf SCM AREA: 2,600 sfSCM 3: PRIVATETRIB AREA: 11,250 sfC i: 0.54 (75%)V: 2,600 cf SCM AREA: 2,600 sfSCM 8: PRIVATETRIB AREA: 20000 sfC i: 0.54 (75%)V: 3,305 cf SCM AREA: 3,305 sfEXISTINGPROPERTY LINEEXISTING 35' TOPOF BANK SETBACKEXISTING CREEK^ ^^6+007+008+009+00SSSDWWRWRWR FWFW10' PROPOSED DRAINAGE AND MAINTENANCEEASEMENTIHHW  DRAINAGE MANAGEMENT AREA BOUNDARYPROPOS D IMPRO M NTSPAVING AREA/SIDEWALK: 50640 sfBUILDINGS: 133,320 sfHARDSCAPE: 38,970 sfTOTAL IMP R IOUS 3 4,460TOTAL AREA: 10.5 ACRESPROPOS D TR ATM NTBIORETENTION AREAPERVIOUS PAVERSTI R 1 RUNOFF R DUCTIONxROOF DRAIN DISCONNECTxMINIMIZE IMPERVIOUS AREASTI R AT R UALIT P RC NTIL 1 1 xON-SITE RETENTION-BASED TREATMENT AND INFILTRATIONTI R 3 R TAIN 9 T P RC NTIL STORM NT 1 9 xBASINS WILL RETAIN AND INFILTRATE THE REQUIRED95TH PERCENTILE RETENTION VOLUME WHERE:VOLUME (cf) = (1.95" / 12")* C i * AC i= 0.858i 3 - 0.78i 2 + 0.774i + 0.04A = TRIBUTARY AREA (sf)TI R 4 P AK MANA M NTxPEAK MANAGEMENT FOR THE ON-SITE DEVELOPMENT ISPROVIDED IN THE RETENTION BASINS AS SHOWN.xOFF-SITE RETENTION IS PROVIDED PREVIOUSLY BY THE AVOCETAND PADRE GRADING ACTIVITIES COMPLETED IN 2019 INRESERVOIR 4 AND THE NORTH MARSH RETENTION BASIN.24"VARIESCOBBLE OR SPLASHBLOCK WHERE STORMWATER ENTERSFLATBOTTOMNO SLOPES3:1MAX GRAVEL STORAGEBIORETENTION SOIL MIXDEPTH VARIESOVERFLOW /OUTLET STRUCTURETO POINT OF DISCHARGEOR ADJACENT STORMDRAINLEGENDTYPICAL BIORETENTION AREANTSHOA MAINTAINEDWATER QUALITYTREATMENT AREAREQUIRED STORMWATER CONTROL MEASURESCONCRETE PAVERS TYP.AGGREGATE INOPENINGS, TYP.GRAVELCONCRETE EDGESOIL SUBGRADECONCRETE PAVEMENTVARIESTYPICAL PERMEABLE PAVERS AREANTS600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A5ENTITLEMENTS PACKAGESTORMWATER AND DRAINAGE PLANPage 397 of 495 1622-02-RS20December 21, 2021%%4 ;  ;  ;         ;  ; $'$$'$<,(/'<,(/'<,(/'BLDG. 5BUILING TYPEDBLDG. 6BUILING TYPEDBLDG. 7BUILING TYPECBLDG. 4BUILING TYPECBLDG. 3BUILING TYPECBLDG. 9BUILING TYPEBBLDG. 1-2BUILING TYPEEBLDG. 11BUILING TYPEBBLDG. 12BUILING TYPEBBLDG. 13BUILING TYPEBBLDG. 8BUILING TYPEBBLDG. 10BUILING TYPEFBLDG. 14BUILING TYPEABLDG. 16BUILING TYPEABLDG. 19BUILING TYPEABLDG. 21BUILING TYPEABLDG. 26BUILING TYPEABLDG. 24BUILING TYPEABLDG. 27BUILING TYPEABLDG. 25BUILING TYPEABLDG. 15BUILING TYPEABLDG. 17BUILING TYPEABLDG. 18BUILING TYPEABLDG. 20BUILING TYPEABLDG. 22BUILING TYPEABLDG. 23BUILING TYPEAPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEROW BOUNDARYROW BOUNDARYROW BOUNDARYTOP OF BANKTOP OF BANKBLDG. SETBACK16' - 0"BLDG. SETBACK16' - 0"2' - 6"15' - 6"24' - 0"15' - 6"5' - 0"15' - 6"24' - 0"15' - 6"2' - 6"8' - 7 1/4"EVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEV EV EV EV EVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEV EV EVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVEVMOTORCYCLE PARKING, TYPMOTORCYCLE PARKING, TYPMOTORCYCLE PARKING, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYPSHORT TERM BIKE RACK, TYP10' THIRD FLOOR CREEK SETBACK, TYP10' THIRD FLOOR CREEK SETBACK, TYPON-SITE LOADING AREA1 0 ' - 0 " 1 0 ' - 0 "BIKE BARN, TYP. 600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A6ENTITLEMENTS PACKAGEARCHITECTURAL SITE PLANB-BB-BA-AA-AC-CC-CPage 398 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A7ENTITLEMENTS PACKAGESITE SECTIONSSITE SECTION A-ASITE SECTION B-BHEIGHT 29.9’HEIGHT 29.9’HEIGHT 29.9’HEIGHT 29.9’GROUND FLOORHEIGHT 29.9’BLDG 7BLDG 41 & 2BLDG 5BLDG 6BLDG 10BLDG 131718202223SITE SECTION C-CHEIGHT 29.9’HEIGHT 29.9’BLDG 18192627Page 399 of 495 1622-02-RS20December 21, 2021,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4- 1               ,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4- 1600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A8ENTITLEMENTS PACKAGEBUILDING SECTIONSBUILDING A SECTIONSCALE: 3/16" = 1'-0" BUILDING B SECTIONSCALE: 3/16" = 1'-0" BUILDING C SECTIONSCALE: 3/16" = 1'-0" BUILDING D SECTIONSCALE: 3/16" = 1'-0" Page 400 of 495 1622-02-RS20December 21, 2021  ,--./012)3/4- 1,--./012)3/4- 1,--./012)3/4- 1.5,--./012)3/4-1 .5,--./012)3/4- 1600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A9ENTITLEMENTS PACKAGEBUILDING SECTIONSBUILDING E SECTIONSCALE: 3/16" = 1'-0" Page 401 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A10ENTITLEMENTS PACKAGESITE CIRCULATION EXHIBITLEGENDSANTA FE RDTANK FARM RDACACIA CREEKACACIA CREEKCONNECTION TO 650 TANK FARM PROJECTCONNECTION TO DAMON GARCIA SPORTS FIELDPEDESTRIAN CIRCULATIONBICYCLE CIRCULATIONVEHICULAR CIRCULATIONPage 402 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A11ENTITLEMENTS PACKAGEVIEW STUDIES PER AASPKEY MAPVIEW OF PROJECT FROM TANK FARM ROADTANK FARM RD ACACIA CREEKSANTA FE RDPage 403 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A12ENTITLEMENTS PACKAGEVIEW STUDIES PER AASPVIEW OF PROJECT FROM INTERIOR PARKING LOTKEY MAPTANK FARM RD ACACIA CREEKSANTA FE RDPage 404 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A13ENTITLEMENTS PACKAGEVIEW STUDIES PER AASPVIEW FROM BUILDING ‘F’ PARKING ON SITEKEY MAPTANK FARM RD ACACIA CREEKSANTA FE RDPage 405 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A14ENTITLEMENTS PACKAGEVIEW STUDIES PER AASPVIEW OF PROJECT FROM SANTA FE ROADKEY MAPTANK FARM RD ACACIA CREEKSANTA FE RDPage 406 of 495 1622-02-RS20December 21, 20213/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 31' - 6"112' - 1"31' - 11 1/8"3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 111' - 11 1/4"'(&.'(&.'(&.'(&.'(&.31' - 6"2' - 0"3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 3/$17<3($ %('72:1+20( 112' - 1"6&$/(  %8,/',1*$ *5281')/2256&$/(  %8,/',1*$ 6(&21')/2256&$/(  %8,/',1*$ 7+,5')/225600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A15ENTITLEMENTS PACKAGEBUILDING A FLOOR PLANSPLAN TYPE - A11/8" = 1'-0" PLAN TYPE - A21/8" = 1'-0" PLAN TYPE - A31/8" = 1'-0" 2BED 2.5 BATH TOWNHOMEAPPROX. 1,050 SF2BED 2.5 BATH TOWNHOMEAPPROX. 1,400 SF3BED 2.5 BATH TOWNHOMEAPPROX. 1,550 SFLAUNDRYLAUNDRYLAUNDRYENTRYENTRYENTRYSTORAGE & BIKE PARKINGSTORAGE & BIKE PARKINGSTORAGE & BIKE PARKINGBALCONYBALCONYBALCONYBED 1BED 2BED 2BED 2BED 1BED 1BATH 1BATH 1BATH 2BATH 2BED 2BATH 2BATH 1POWDERPOWDERPOWDERGREATROOMGREATROOMGREATROOMKITCHENKITCHENKITCHENDININGDININGGARAGEGARAGEGARAGEPage 407 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A16ENTITLEMENTS PACKAGEBUILDING A ELEVATIONSLEFT ELEVATIONSCALE: 3/32" = 1'-0" FRONT ELEVATIONSCALE: 3/16" = 1'-0" RIGHT ELEVATIONSCALE: 3/32" = 1'-0" REAR ELEVATIONSCALE: 3/32" = 1'-0" MAX. HT (UNOCCUPIED SPACES)220.0’MAX. HT (OCCUPIED SPACES)210.0’HEIGHT CALC:LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’*FF = 180.0’ (BUILDING # 24 & 25)*FF = 163.0’ (BUILDING #14)BLDG MAX. PLATE HEIGHT**NOTE:PROVIDING HEIGHT INFORMATION FOR INSTANCE OF BUILDING TYPE AT HIGHEST AND LOWEST LOCATIONS ON SITE.AVG. NATURAL GRADE174.0’ 210.0’ (BUILDING # 24 & 25)193.0’ (BUILDING #14)BLDG MAX. HEIGHT*218.58’ (BUILDING # 24 & 25)201.58’ (BUILDING #14)Page 408 of 495 1622-02-RS20December 21, 20213/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 *$5$*( *$5$*( *$5$*( *$5$*( *$5$*( *$5$*( *$5$*( *$5$*( *$5$*('(&. '(&. '(&.3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 '(&. '(&. '(&.'(&. '(&.106' - 0 1/2"116' - 0 1/2"55' - 5 1/2"21' - 9 1/2"30' - 0"3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 3/$17<3(% %(')/$7 '(&. '(&. '(&.'(&.'(&. '(&.6&$/(  %8,/',1*% *5281')/2256&$/(  %8,/',1*% 6(&21')/2256&$/(  %8,/',1*% 7+,5')/225600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A17ENTITLEMENTS PACKAGEBUILDING B FLOOR PLANSPLAN TYPE - B11/8" = 1'-0" PLAN TYPE - B31/8" = 1'-0" PLAN TYPE - B21/8" = 1'-0" PLAN TYPE - B41/8" = 1'-0" 1 BEDROOM 1 BATH FLATAPPROX. 735 SF2 BEDROOM 2.5 BATH FLATAPPROX. 1,100 SF1 BEDROOM 1 BATH FLATAPPROX. 765 SF2 BEDROOM 2 BATH FLATAPPROX. 1,075 SFBED 1BED 1BED 1BED 1BED 2BED 2BALCONYBALCONYBALCONYBALCONYLAUNDRYLAUNDRYGREATROOMGREATROOMGREATROOMGREATROOMKITCHENKITCHENKITCHENKITCHENDININGSTORAGELAUNDRYLAUNDRYDININGSTORAGEBATH 1BATH 1BATH 2BATH 2BATH 1BATH 1SECOND BIKE PARKING @ GROUND UNITS ONLYSECOND BIKE PARKING @ GROUND UNITS ONLYSECOND BIKE PARKING @ GROUND UNITS ONLYBIKE PARKING SECOND BIKE PARKING @ GROUND UNITS ONLYBIKE PARKINGBIKE PARKINGBIKE PARKINGPage 409 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A18ENTITLEMENTS PACKAGEBUILDING B ELEVATIONSLEFT ELEVATIONSCALE: 3/32" = 1'-0" FRONT ELEVATIONSCALE: 3/16" = 1'-0" RIGHT ELEVATIONSCALE: 3/32" = 1'-0" REAR ELEVATIONSCALE: 3/32" = 1'-0" HEIGHT CALC:LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’MAX. HT (UNOCCUPIED SPACES)220.0’MAX. HT (OCCUPIED SPACES)210.0’*FF = 172.5’ (BUILDING # 12 & 13)*FF = 160.0’ (BUILDING #8)BLDG MAX. PLATE HEIGHT**NOTE:PROVIDING HEIGHT INFORMATION FOR INSTANCE OF BUILDING TYPE AT HIGHEST AND LOWEST LOCATIONS ON SITE.AVG. NATURAL GRADE174.0’ 202.5’ (BUILDING # 12 & 13)190.0’ (BUILDING #8)BLDG MAX. HEIGHT*216.04’ (BUILDING # 24 & 25)203.54’ (BUILDING #14)Page 410 of 495 1622-02-RS20December 21, 20213/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 '(&. '(&.'(&. '(&.'(&. '(&.'(&.'(&.3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 '(&. '(&.'(&.'(&.'(&.'(&.'(&.'(&.151' - 4"161' - 4"51' - 9 1/2"26' - 0"25' - 9 1/2"3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(" " 3/$17<3(&' %(')/$7 '(&. '(&. '(&. '(&.'(&.'(&.'(&.'(&.6&$/(  %8,/',1*& *5281')/2256&$/(  %8,/',1*& 6(&21')/2256&$/(  %8,/',1*& 7+,5')/225600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A19ENTITLEMENTS PACKAGEBUILDING C FLOOR PLANSPLAN TYPE - CD21/8" = 1'-0" PLAN TYPE - CD31/8" = 1'-0" 1 BEDROOM 1 BATH FLATAPPROX. 725 SF2 BEDROOM 2 BATH FLATAPPROX. 950 SFSECOND BIKE PARKING @ GROUND UNITS ONLYSECOND BIKE PARKING @ GROUND UNITS ONLYBIKE PARKINGBIKE PARKINGPage 411 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A20ENTITLEMENTS PACKAGEBUILDING C ELEVATIONSLEFT ELEVATIONSCALE: 3/32" = 1'-0" FRONT ELEVATIONSCALE: 3/16" = 1'-0" RIGHT ELEVATIONSCALE: 3/32" = 1'-0" REAR ELEVATIONSCALE: 3/32" = 1'-0" HEIGHT CALC:LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’MAX. HT (UNOCCUPIED SPACES)220.0’MAX. HT (OCCUPIED SPACES)210.0’*FF = 158.0’ (BUILDING #7)*FF = 154.0’ (BUILDING #3)BLDG MAX. PLATE HEIGHT**NOTE:PROVIDING HEIGHT INFORMATION FOR INSTANCE OF BUILDING TYPE AT HIGHEST AND LOWEST LOCATIONS ON SITE.AVG. NATURAL GRADE174.0’ 188.0’ (BUILDING # 24 & 25)184.0’ (BUILDING #14)BLDG MAX. HT*199.71’ (BUILDING # 24 & 25)195.71’ (BUILDING #14)Page 412 of 495 1622-02-RS20December 21, 20215' - 11"52' - 10"63' - 1"3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' 678',2 3/$17<3(&' 678',2 3/$17<3(&' 678',2 3/$17<3(&' 678',2 85' - 4"'(&. '(&.'(&.'(&.'(&.'(&.3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 '(&. '(&.'(&. '(&.75' - 9 1/2"3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 3/$17<3(&' %(')/$7 51' - 10"60' - 6"85' - 4"'(&. '(&.'(&.'(&.6&$/(  %8,/',1*' *5281')/2256&$/(  %8,/',1*' 6(&21')/2256&$/(  %8,/',1*' 7+,5')/225600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A21ENTITLEMENTS PACKAGEBUILDING D FLOOR PLANSPLAN TYPE - CD31/8" = 1'-0" PLAN TYPE - CD11/8" = 1'-0" 2 BEDROOM 2 BATH FLATAPPROX. 950 SFSTUDIOAPPROX. 565 SFSECOND BIKE PARKING @ GROUND UNITS ONLYSECOND BIKE PARKING @ GROUND UNITS ONLYBIKE PARKINGBIKE PARKINGPage 413 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A22ENTITLEMENTS PACKAGEBUILDING D ELEVATIONSLEFT ELEVATIONSCALE: 3/32" = 1'-0" FRONT ELEVATIONSCALE: 3/16" = 1'-0" RIGHT ELEVATIONSCALE: 3/32" = 1'-0" REAR ELEVATIONSCALE: 3/32" = 1'-0" HEIGHT CALC:LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’MAX. HT (UNOCCUPIED SPACES)220.0’MAX. HT (OCCUPIED SPACES)210.0’*FF = 157.0’ (BUILDING #6)*FF = 155.0’ (BUILDING #5)BLDG MAX. PLATE HEIGHT**NOTE:PROVIDING HEIGHT INFORMATION FOR INSTANCE OF BUILDING TYPE AT HIGHEST AND LOWEST LOCATIONS ON SITE.AVG. NATURAL GRADE174.0’ 187.0’ (BUILDING #6)185.0’ (BUILDING #5)BLDG MAX. PLATE HEIGHT198.71’ (BUILDING #6)196.71’ (BUILDING #5)Page 414 of 495 1622-02-RS20December 21, 2021&200(5&,$/63$&(&200(5&,$/63$&(81,76725$*((/(&75,&$/5(6,'(17 6(175</2%%<7494 SF572 SF459 SF641 SF5295 SF(/(95220200' - 4"212' - 3"51' - 4"57' - 0"155' - 3"149' - 1"6+2:(56 /2&.(563/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 452 SF453 SF613 SF612 SF'(&.'(&.'(&.'(&.'(&.'(&.'(&.'(&.'(&.3/$17<3(( 678',2 '(&.'(&.3/$17<3(( 678',2 528 SF'(&.452 SF'(&.'(&.'(&.456 SF456 SF'(&. '(&. '(&. '(&. '(&.6&$/(  %8,/',1*( *5281')/2256&$/(  %8,/',1*( 6(&21')/225600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A23ENTITLEMENTS PACKAGEBUILDING E FLOOR PLANSPage 415 of 495 1622-02-RS20December 21, 20213/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( %(')/$7 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 612 SF3/$17<3(( 678',2 3/$17<3(( 678',2 3/$17<3(( 678',2 '(&.'(&. '(&. '(&. '(&. '(&.'(&.'(&.'(&.'(&.'(&.'(&.'(&.'(&.'(&.'(&.3/$17<3(( 678',2 '(&. '(&.'(&.'(&.3/$17<3(( 678',2 6&$/(  %8,/',1*( 7+,5')/225600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A24ENTITLEMENTS PACKAGEBUILDING E FLOOR PLANSPLAN TYPE - E21/8" = 1'-0" PLAN TYPE - E11/8" = 1'-0" 1 BEDROOM 1 BATH FLATAPPROX. 615 SFSTUDIOAPPROX. 450 SFBIKE PARKING. (2) VERTICALBIKE PARKING. (2) VERTICALPage 416 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A25ENTITLEMENTS PACKAGEBUILDING E ELEVATIONSFRONT ELEVATIONSCALE: 3/16" = 1'-0" LEFT ELEVATIONSCALE: 3/32" = 1'-0" HEIGHT CALC:LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’MAX. HT (UNOCCUPIED SPACES)220.0’MAX. HT (OCCUPIED SPACES)210.0’FF = 154.0’ (BUILDING #1-2)BLDG MAX. PLATE HEIGHT*AVG. NATURAL GRADE174.0’ 190.0’ (BUILDING #1-2)BLDG MAX. HEIGHT200.0’ (BUILDING #1-2)Page 417 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A26ENTITLEMENTS PACKAGEBUILDING E ELEVATIONSREAR ELEVATIONSCALE: 3/16" = 1'-0" RIGHT ELEVATIONSCALE: 3/32" = 1'-0" Page 418 of 495 1622-02-RS20December 21, 2021/281*(63$&(287'225%%4$5($.,7&+(1(175<%86,1(66$5($555555322/(48,30(17(/(&7(;(5&,6(52206+2:(5 6+2:(56&$/(  *5281')/2253/$1600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A27ENTITLEMENTS PACKAGEBUILDING F FLOOR PLANSPage 419 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A28ENTITLEMENTS PACKAGEBUILDING F ELEVATIONSLEFT ELEVATIONSCALE: 3/32" = 1'-0" FRONT ELEVATIONSCALE: 3/16" = 1'-0" RIGHT ELEVATIONSCALE: 3/32" = 1'-0" REAR ELEVATIONSCALE: 3/32" = 1'-0" HEIGHT CALC:LOW POINT OF SITE: 148.5'HIGH POINT OF SITE: 199.5' AVG. NATURAL GRADE: (148.5' + 199.5') / 2 = 174'MAX HEIGHT ALLOWED (OCCUPIED)= 36'-0" ń174' + (36)' = 210'MAX HEIGHT ALLOWED (UNOCCUPIED)= 46’-0” ń174’ + (46)’ = 220’MAX. HT (UNOCCUPIED SPACES)220.0’MAX. HT (OCCUPIED SPACES)210.0’FF = 163.0’ (BUILDING #10)BLDG MAX. PLATE HEIGHTAVG. NATURAL GRADE174.0’ 173.0’ (BUILDING #10)BLDG MAX. HT183.25’ (BUILDING #10)MAILBOX LOCATIONPage 420 of 495 1622-02-RS20December 21, 2021COLOR AND MATERIALS PALETTE FOR BUILDING TYPES A & B2. BOARD & BATTEN FIBER CEMENT BOARD & BATT SIDING3. HORIZ. SIDING FIBER CEMENT 8” LAP SIDING4. PAINT COLOR SHERWIN WILLIAMS WHITE SNOW SW 9541 5. PAINT COLOR SHERWIN WILLIAMS GRAY SHINGLE SW 76705600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A29ENTITLEMENTS PACKAGECOLORS AND MATERIALS SCHEME 1ACHARACTER SKETCH11555552134761. ASPHALT SHINGLE ROOFING: OWENS CORNING OAKRIDGE TWILIGHT BLACK6. METAL ROOFING STANDING SEAM METAL ROOFING, - DARK GRAY88. LIGHT FIXTURE STYLE: MAXIM MODEL 86393BZ (NIGHT SKY COMPLIANT)336666667. STOREFRONT: MILGARD WINDOWS BLACK FRAME222233222266666666622233344222224445555552222244Page 421 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A30ENTITLEMENTS PACKAGECOLORS AND MATERIALS SCHEME 1BPage 422 of 495 1622-02-RS20December 21, 2021COLOR AND MATERIALS PALETTE FOR BUILDING TYPES C & D3. BOARD & BATTEN FIBER CEMENT BOARD & BATT SIDING COLOR:SHERWIN WILLIAMS WHITE SNOW SW 95414. HORIZ. SIDING FIBER CEMENT 8” LAP SIDING COLOR:SHERWIN WILLIAMS WHITE SNOW SW 95415. BOARD & BATTEN FIBER CEMENT BOARD & BATT SIDING COLOR:SHERWIN WILLIAMS LIVEABLE GREEN SW6176 6. CEMENT PLASTER: SHERWIN WILLIAMS GREEN EARTH SW 7748 444444444600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A31ENTITLEMENTS PACKAGECOLORS AND MATERIALS SCHEME 2ACHARACTER SKETCH1116666666666666666666666621347652. METAL ROOFING: MCARTHY WHOLSALE STANDING SEAM METAL SHAKE GRAY555533555559. LIGHT FIXTURE STYLE: MAXIM MODEL 86393BZ (NIGHT SKY COMPLIANT)1. ASPHALT SHINGLE ROOFING: OWENS CORNING OAKRIDGE TWILIGHT BLACK9222222222222222226666666666666555555544444333333344444442222227. STOREFRONT: MILGARD WINDOWS BLACK FRAME8888888888888888Page 423 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A32ENTITLEMENTS PACKAGECOLORS AND MATERIALS SCHEME 2BPage 424 of 495 1622-02-RS20December 21, 2021zzCOLOR AND MATERIALS PALETTE FOR BUILDING E (MIXED USE)5. BRICK VENEER TRAIN STATION THIN BRICK BRICK VENEER3. PAINT COLOR SHERWIN WILLIAMS WHITE SNOW SW 9541 3600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A33ENTITLEMENTS PACKAGECOLORS AND MATERIALS SCHEME 3CHARACTER SKETCH33214561. METAL ROOFING: MCARTHY WHOLSALE STANDING SEAM METAL SHAKE GRAY4. PAINT COLOR: LEVEL 4 SMOOTH TROWEL FINISH COLOR: SHERWIN WILLIAMS SAGE GREEN LIGHT111111166662. HORIZ. SIDING FIBER CEMENT 8” LAP SIDING777. STOREFRONT: STOREFRONT WINDOW SYSTEM - BLACK6. WAINSCOT: PRECAST CONCRETE 33555555555533333333111111555555555555555522222222788. LIGHT FIXTURE STYLE: MAXIM MODEL 86393BZ (NIGHT SKY COMPLIANT)44444446666Page 425 of 495 1622-02-RS20December 21, 2021COLOR AND MATERIALS PALETTE FOR BUILDING F (CLUBHOUSE)4. PAINT COLOR SHERWIN WILLIAMS WHITE SNOW 9541 4600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A34ENTITLEMENTS PACKAGECOLORS AND MATERIALS SCHEME 4CHARACTER SKETCH111122222135761. METAL ROOFING: MCARTHY WHOLSALE STANDING SEAM METAL SHAKE GRAY2. BOARD & BATTEN FIBER CEMENT BOARD & BATT SIDING3. HORIZ. SIDING FIBER CEMENT 8” LAP SIDING 55555. WOOD PLANK SIDING: HORIZ. CEDER PLANK 6. BRICK VENEER TRAIN STATION THIN BRICK BRICK VENEER8. LIGHT FIXTURE STYLE: MAXIM MODEL 86393BZ (NIGHT SKY COMPLIANT)C33366666666666687. STOREFRONT: STOREFRONT WINDOW SYSTEM - BLACK44444411Page 426 of 495 1622-02-RS20December 21, 2021ACACIA CREEK26262613B33DESIGN KEYCLUBHOUSE - SEE ENLARGEMENT SHEET 40PEDESTRIAN WALKWAY, TYP.SHORT-TERM BIKE PARKING, TYP. (63 MIN.)SEE SHEET A43COMMUNITY MAILBOXES - SEE ARCH SHEETS111555555557777777777777777MULTI-USE PATH 22222FLEXIBLE USE DECK AT BIORETENTION AREA333ENTRY NODE AT MULTI-USE PATH WITH SEATING4466NATURAL PLAY AREA - SEE ENLARGEMENTDECORATIVE PERMEABLE PAVERS, TYP.PEDESTRIAN CROSSING, TYP.LOADING ZONETRASH ENCLOSURE, TYP. - SEE SHEET A45EXISTING ROCK OUTCROP99988888121213131313131313B1313131414141414141414COMMUNITY PICNIC AREAS10101010BIORETENTION AREA, TYP. - SEE CIVIL SHEETS111111111111RIGHT-OF-WAY IMPROVEMENTS - NOT A PART15161515LONG TERM BIKE PARKING BARNS, TYP. (5)SEE SHEET A43 35’ ACACIA CREEK SETBACK16161616171717RETAINING WALL, TYP. - SEE CIVIL SHEETS & A4418181818181818FUTURE BIKE/ PEDESTRIAN BRIDGE - NOT A PART1919ACACIA CREEK BUFFER202020BICYCLE REPAIR STATION WITH SEATINGDROUGHT TOLERANT PLANTINGSEE SHEET A47 FOR LANDSCAPE PLANFENCING - 6’H POOL FENCING - 6’H PRIVACY ENTRY MONUMENT LOCATION - SEE SHEET A43FENCING - 42”H ON WALL - SEE SHEET A44 EARTH MOUNDSPUBLIC ART LOCATION22222221212323232323F1F1F2F3F32425FFF226F32524EXISTING EUCALYPTUS CANOPY TYP.SEE SHEET A48 FOR TREE INVENTORY & REMOVALSSANTA FE ROADTANK FARM ROAD0’ 80’40’20’ 75’0’160’80’40’ 320’SCALES: 1” = 80’- 0” (12”X18” SHEET) 1”=40’-0” (24”X36” SHEET)NORTH600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A35ENTITLEMENTS PACKAGEPRELIMINARY SITE PLANPage 427 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A36ENTITLEMENTS PACKAGEPEDESTRIAN LINKAGES & TRAFFIC CALMING EXHIBITPage 428 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A37ENTITLEMENTS PACKAGEMULTI-MODAL TRANSPORTATION EXHIBIT - BIKE NODEPage 429 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A38ENTITLEMENTS PACKAGELANDSCAPE AREAS AT MIXED USE BUILDING EXHIBITPage 430 of 495 1622-02-RS20December 21, 2021600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A39ENTITLEMENTS PACKAGEOUTDOOR SPACES - ENLARGEMENTS EXHIBITSPage 431 of 495 1622-02-RS20December 21, 2021COVERED OUTDOOR PATIOPOOL / SPAOVERHEAD STUCTURE - SEE A42OUTDOOR SEATING, TYP. - SEE A41-42, A44SYNTHETIC TURF EXERCISE AREA - SEE A42FIRE TABLES WITH SEATINGTIMBERSTACKS CLIMBING LOGS - SEE A41FLEXIBLE USE DECK OVER BIORETENTION AREAEXERCISE E UIPMENTWATER TROUGH ENTRY FEATURECENTRAL BOARDWALK6’ H PERIMETER POOL FENCE - SEE A44CLIMBER PLAY FEATURE - SEE A4130-42”H LANDSCAPE ACCENT WALLS, TYP. SEE A44CABANAS WITH RAISED PLANTERS112223334444445566778899101011111112121313141414151518-30”H SEATWALL, TYP. - SEE A441616161616ART / MURAL 171717BARBECUE AND COUNTER 1818DRAGONFLY PLAY ELEMENTOUTDOOR PING PONG TABLEFIREPLACE 192021212019CLUBHOUSE DESIGN KEY600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A40ENTITLEMENTS PACKAGESITE PLAN ENLARGEMENTPage 432 of 495 1622-02-RS20December 21, 2021OUTDOOR AMENITIES &NATURAL PLAY SEE SHEETS A35 & A40 FOR LOCATIONS OF ELEMENTS SHOWN ON THIS SHEET600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A41ENTITLEMENTS PACKAGELANDSCAPE CHARACTER & AMENITIES Page 433 of 495 1622-02-RS20December 21, 2021600 TANK FARM ROAD36SITE FURNISHINGS AND MATERIALSWALL LIGHTSLITHONIA WM1925850 LUMEN LED850 LUMEN LEDWASTE RECEPTACLESVICTOR STANLEYRB-36 AND SD 242RB-36 AND SD 242PEDESTRIAN LIGHTSLITHONIA W527 WITH PM30POST MOUNT - 12’ HIGH, LEDPOST MOUNT - 12’ HIGH, LEDBOLLARDLITHONIA RADEAN LEDSEE ARCH AND VSEE ARCH AND VSIGN LIGHTSLITHONIA M707 & E12 ARM850 LUMEN LED850 LUMEN LEDALL LIGHTS AND BOLLARDS IN COLOR BLACK OR BRONZESITEFURNISHINGS AND MATERIALSSEE SHEETS A35 & A40 FOR LOCATIONS OF ELEMENTS SHOWN ON THIS SHEET, EXCLUDING LIGHT FIXTURES600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A42ENTITLEMENTS PACKAGESITE FURNISHINGS AND MATERIALSPage 434 of 495 1622-02-RS20December 21, 20216$1/8,62%,632&$6&$/(,1&+(6'$7('5$:1%<&0+(0$,/LQIR#3HDN5DFNVFRP3+21(  0$7(5,$/6 ),1,6+0$7(5,$/6‘+2752//('5281'%$5‘+2752//('5281'%$5[[$1*/(),1,6+67$1'$5'+27',33('*$/9$1,=('237,21$/32:'(5&2$7 %$6,&&2/256 %,.(6,1*/(6,'(':+((/63$&,1*   127('5$:,1*1266&56$1/8,62%,632&$0$,/IR#3HDN5DFNVFRP3+21(  42-60 H ENTRY MONUMENT SIGNAGE - WOOD OPTIONSCEDAR WOOD SLAT MATERIAL WITH CONCRETE ACCENTSALUMINUM LETTERING, 24 S FT LETTERING MAX.DIMENSIONS SHALL BE CONSISTENT WITH CITY OF SLO STD.SEE SITE PLAN FOR LOCATIONS, SHEET A35 42-60 H ENTRY MONUMENT SIGNAGE - GABION OPTIONSSTONE GABION WITH STEEL ACCENTS ALUMINUM LETTERING, 24 S FT LETTERING MAX.DIMENSIONS SHALL BE CONSISTENT WITH CITY OF SLO STD.SEE SITE PLAN FOR LOCATIONS, SHEET A35 SHORT TERM BIKE PARKING PEAK CAMPUS’ RACKS, GALVANIZED POWDER COATED STEEL IN COLOR BRONZESURFACE MOUNT PER MANUFACTURER SPECIFICATIONSSEE SITE PLAN FOR LOCATIONS AND UANITITIES, SHEET A35 LONG-TERM BIKE PARKING SEE SITE PLAN FOR LOCATIONS AND UANITITIES, SHEET A35SEE TITLE SHEET FOR BIKE PARKING STATISTICS, SHEET A1MATERIAL AND FINISH TO MATCH ARCHITECTURE * PROJECT SIGNAGE DESIGN AND DETAILS TO BE PROVIDED IN FUTURE ‘SIGNAGE PROGRAM’ SUBMITTAL 600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A43ENTITLEMENTS PACKAGEBICYCLE PARKING AND MONUMENT SIGNAGEPage 435 of 495 1622-02-RS20December 21, 202118"1P.I.P. CONCRETE WALL2ADJACENT PAVING, SEE PLAN3COMPACTED AGGREGATE BASEPER GEOTECHNICAL REPORT4CONCRETE FOOTING5EXPANSION JOINT6#4 REBAR HORIZONTAL AS SHOWN7#4 REBAR @16" O.C. VERT9HOOK TAILS INTO FOOTING, TYP.67213595881/2" CHAMFER ALL EDGES, TYP.3'-6"1" MIN.6’ WOOD SLAT PRIVACY FENCE AND GATE42 METAL FENCE ON WALL4-6’ METAL PICKET GATE30-42 LANDSCAPE ACCENT WALLCONCRETE BOARDFORM FINISH, IN COLOR GREYSEE EXAMPLE IMAGERY AT RIGHT, THIS SHEET6’ METAL PICKET FENCESEE CIVIL SHEETS FOR RETAINING WALL HEIGHTS AND LOCATIONSSEE SITE PLAN SHEET A35 FOR FENCING LOCATIONSSEE SITE PLAN SHEET A35 & ENLARGEMENT SHEET A40 FOR LANDSCAPE WALL LOCATIONS CMU RETAINING WALLSHEIGHT VARIES, SEE CIVIL PLANSCOLOR, TYPE AND FINISH TO MATCH TRASH ENCLOSURES, SHEET A4530-42 LANDSCAPE ACCENT WALLSCONCRETE BOARDFORM FINISH, IN COLOR GREY18-30 SEATWALLSFINISH TO MATCH LANDSCAPE ACCENT WALLS WITHWOOD SLAT INSETS* FENCE HEIGHT EXCEPTION REQUEST SHALL BE INCLUDED IN FUTURE SUBMITTAL 600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A44ENTITLEMENTS PACKAGESITE WALLS AND FENCINGPage 436 of 495 1622-02-RS20D 21, 2021SIDE ELEVATION - TRASH ENCLOSURENOTES:1. FINISHES OF CMU WALL, WOOD, ROOF, AND HARDWARE TOMATCH CORRESPONDING ARCHITECTURAL FINISHES.2. ENTRANCE TO SIDE ACCESS ENCLOSURE WILL OCCUR ONEITHER SIDE DEPENDING ON SITE LOCATION.FRONT ELEVATION - TRASH ENCLOSURESLIDE BOLT AND SLEEVEDROP BOLT AND SLEEVE6'-0"8'-0"10'-0"PRECAST CONCRETE CAPWOOD POSTCORRUGATEDMETAL ROOFCMU BLOCK WALL4 CU YD BINWOOD POSTCORRUGATEDMETAL ROOFPRECAST CONCRETE CAPCMU BLOCK BSPLIT-FACE BLOCK8x8x16 HALF-SCORE9'-1"6" ALL SIDESSTEEL GATE FRAMEBARREL HINGEWOOD PANELSCMU BLOCK APRECISION BLOCK8x8x16 STANDARD4 CU YD BINORGANICSORGANICS18'-5"10'-7"(2) DOUBLE SWING GATESROOF POST3'-5"PLAN VIEW - TRASH ENCLOSURE (SIDE ACCESS OPTION)CMU WALLROOF OUTLINEGATE POST6'-7"10'-7"(2) DOUBLE SWING GATESROOF POSTCMU WALLROOF OUTLINEGATE POST5'-4"6'-7"4 CU YD BIN4 CU YD BINPLAN VIEW - TRASH ENCLOSURE (REAR ACCESS OPTION)8'-0"3. REFER TO CIVIL SITE PLAN FOR LOCATIONS OF TRASH ENCLOSURES.4. TRASH ENCLOSURES SHALL BE SCREENED WITH VEGETATION PER CITY OF SLO STD.600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A45ENTITLEMENTS PACKAGETRASH ENCLOSURESPage 437 of 495 1622-02-RS20D 21, 2021SENESENESENESENESENESENESENENESENESENESENESENESENESENESENESENESENESENESENESENESENESENENENESENESESENESENEENESENENESESENESENESESESCIO CIO CIO CIOCIO CIO CIO CCCIO CCIO CIO CIO CIOCIO CIO CCIO CIO CIOCIO IO CIO CIO CIO CIO CIOCICCICCIOCCIO IO CCIIO CCCSERPSERPSERPSERPSERPSERPSERPSERPSERPSERSERSERPSERPSERPSERSERPSERPRPSERPSERPRPSERSENSENENSENSENSENSENSENSENSENENSENSENSENSENSENENENNSENSENENSNSNSNSENSKNIPKNKNIPKNIPKNKNKNKNKNKNKNIPKNKNKNIPKNIPKNIPNIPNIPNIPNIPIPIPNIPKKNKNIPKNIPKNNIPNIPKNIPKNKNIPKNKNKNKNKNIPNIPKNIPKNKNKKHOFHOFHOHOHOHOFIHOFIHOHOFHOFIHOFHOFHOFHOFIOFHOHOHOHOFHOHOFHOOFIHHOFHOHHHA UVA UA UVA UA UVA UVA UVA UVA UVA UVA UV UV UVA UVA A UVA UV UVA UA UA UA UA UVUVUVVARIAARIAARARIAARIAARIAARIAARIAARIAARIAARIARIAARIAIAARIAARIAARIAARIAAARIAARARARARARARARARAARARLOMALOMLOMALOMALOMALOMALOLOMALOMALOMALOMALOMALOMALOMALOMALOMAOMALOMALOLOMALOLOOMALOOMALOMAOMAOMALOLOLOMAOMAALOMAOMAANDNDRANNDRANDRANDRANDNNDNNDNDNDNNNDND LON LON LON LO LO LON LON LON LON LON LON LON LON LON LONLON LON LON LON LON LO LOGIFOGIFOIFOGIFOGIFOFOIFOGIFOIFOFOFOGIGIFFOFOLIALILIALIALIALIALIALIALIALIALILIALIALIALIALIALIALIALIALIALIALIALIAIALIALIAARCTARCTARCTARCTARCTARCTRCTRCRCTARCTRCTARCRCTRCTAARCTARCCTARRCARRCTOSTAOSTAOSTAOSTOSTAOSTAOSTASTASTASTASTASTASTATATAOSTSTASTATAOSTSTAOSTASTASTATASTATASTASTATAOSTAOSTASTASTASTATATATATASTATASTASTASTATATATAOSTASTASTATATAOSSTAOSSTASTASTATATASTASTASTAPPHPHPHPHPHPHPHPHPHYLPHYLPHYPHYLPHYLPPPPHPHPHPHPHPHPPHPHPHPHPHPHPHPHPHYLPPPHPHPHPHPHPHPHPHYLPHPHPHPHPHPHPPPHPHPHPHPHYLPHPHPHPPHPHPHPHYPHPHPHPHPHPHYPHYPPHPHPHPHPHPHYPHPHHYOS SOS SOS SOS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SOS SS SS SS SS SS SS SS SS SS SOS SS SOS SS SS SS SOS SOS SOS SS SS SS SS SS SS SPPPPPPPPPPPPPPPPPPPPP.PP.PP.PP.PP.PPPPPPPPPPPPPP.PPPPPPPPPPPPPPPPPPPPPPPPPPPPPLEUCLEUCLELEUCLEUCLEUCLEUCLEUCLELELELELELELELEUCLEUCLELEULELEULEUCLEUCLELEULEUCLEUCLEUCLELELELEULEULELELELEULEULEUADENADENADENADEADADADADADENADADADEADEADENDENADENDENADENDENADENDENDENDENDENENENENENENENADADADADEADADEADEADENDENDENENENENADENDENDENADEENENADEADEDENENADEADENDENENADEENADDENADDENENADADDENENDRONDRONDRONDRONDRONDRONDRODRODRODRONDRONDRONDRONONONDRONDRONDRONDRONONDRODRONONONDRONDRONDRONONONONDRONDRONONDRDRONONDRONDRONDRONRONDRONRONRONDRONDRONONDRODDRODRONDRDRODRONNNDDDROONDDRODRONDRDRON SA S S SA SA SA SA SA SA SA SA SA SA SA S SASA SSA S S S S SSA S SSA SSASA SSASA SSA SA SA SA SA SAFARIFARIFARIFARIFARFARIFARIFARARIFARIARIARIARIFARIFARFARIRIFARFARFARFARFARFARFARFARFARFARFARFARFAFARFARRI GOL GO GOL GOL GO GOL GO GO GOL GOL GOL GOLOLOLOLOLOLOL GOLOLOLOLOLOLOLOL GOLOL GOLOLOLOL GOL GOLOLOLOL GO GOL GO GOGOOLOL GOD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD STD D DD SDD STD STD D STD SD SD SDD SD STD SD SDD STD ST ST ST STD ST STDD STD ST ST STD STD STD STRIKERIKERIKERIKERIKERIKERIKERIKERIKERIKEIKEIKEIKEIKERIKEIKERIKERIKERIKERIKEIKEIKERIKEIKERRIKEIKERRIKERIIKERIIKE’’’DECODECDECODECODECODECODECODECODECODECODECODECOECODECODECODECODECODECODECODECODECODEDECODECOECECOOECMPOSMPOSMPOSMPOSMPMPOSMPOSMPOSMPOSMPOSMPOMPOSMPOSMPOSMPOSMPOSMPOSMPOSMPOSMPOSMPOSMPOSMPOSMPMPOSMMMPOOSMMPOSOSED GED GED GED GED GED GED GED GED GED GED GED GED GED EDED GEDED EDED ED EDED GEDRANIRANIRANIRANIRANIRANIRANIRANIRANRANIRANIRANIANIANIRANIRANIRANIRANIRANIRANIRANIRANIRANIRANIRANINIANIRANIRANIANIANIRANIANIANANANIANININIANIRANTETE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TE TETE TE TTETETE TETETETETE TETE TETE TALALOEALOEALOALOEALOEALOEALOEALOEALOEALOEALOELOEALOELOEALOELOEALOEALOEAAALO POL POL PO POL POL POL POL POL POL POL POL POL POL POL POOLOLYPHYYPHYYPHYYPHYYPHYYPHYYPHYYPHYYPHYYPHYYPHYYPHYYPHYPHYPHYYPHYYPHYYPHYYPYLLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALLALALLAAGAVAGAAGAAGAGAGAGAAGAGAVAGAVAGAVAGAVGAVAGAVAGAVAGAVAGAAGAVAGAAVAGAAGAGAAGAGE E BE BE E E E E BE BE E E E BE E E LUE LULUE LUE LUE LUE LULUE LULUE UE LUE UE LUE LUGLOWGLOWGLOWGLOWGLOWGLOWGLOWGLOWGLOWOWGLOWGLOWOWGLGW’ & ’ & ’ & ’ & ’ & ’ & ’ &’ & ’ & AGAVAGAVAGAVAGAVAGAVAGAVAGAVGAAGAVAGAVAGAVAGAVAGAVAGAVGAVAGAVGAVAVAGAVAVAVAVVAVAVAVAVAVAVAVAVVAVAVVAGAAVVAGE ATE ATE ATE ATE ATE ATE AT ATE ATE ATE ATE ATE AT ATE ATE ATE ATE ATE ATE ATE ATE AE ATE E ATE ATEE E AE AE AE AEEE E AE ATE ATE AE E AE ATENUTENUTENUTENUTENUTENUTENUTENUTENUTENTENTENTENUTENUTENUTENUTENUTENUTENUTENUTENUTENUTENTENTENUTENUTENUTENUTENUTENTETENUTENTENUTENUTENTENNUTENTENUTENTENUTEENUTENTEATAATAATAATA ATA AATATATATATA ATA ATA ATATA ATATATAATAATA ATATATA ATAATA ATATATA TA FURCFURCFURCFURCRCRCFURFURFURFURCFURCFURCFURCRCURCFURFURFURFURFURFURFURCFURCFURURCFURFURFURCRCURCRCRCRCFURRCREREREREREREREREA REA REA REAREARERERRRREREREREA RRRRERERERERERERREREREA REREEA REARERERERRERRERRREARRREFOETFOETFOETFOETFOETFOEFOETFOEFOETFOEFOETFOETFOETFOETFOEFOETFOETFOETFOETFOETFOETOETFOETFOEFOFOEFOETFOETFOETFOEFOETFOEFOFOETFOEFOEFOETFOEFOEFOEOEFOEFOETFOEFOEFOFOEETFOEFOFOEETETIDIDIDA IDA IDAIDAIDA IDA IDA IDA IDIDAIDAIDADA IDIDAMEMEDMMEMEMEMMMEMEMEMEDMEMEMMEDMEMEMEMEDMEDMEDMEDMMEMEMEDMEMEMEMMEMMEMMMEMMMEMMMMEMMMEIOPIIOPIIOPIOPIIOPIIOPIIOPIOPCTA’CTA’CTA’CTA’CTA’CTATATA’TA’OLEA EUROPEAOPEAPEAPEA FR FR FR FR FR FRUTILUTILUTILTILUTILTILUTILUTILUTILTILUTILTILUTILESS’ESS’ESS’ESS’ESS’ESS’ESS’ESS’ESS’ESS’ESS’ECHEECECHEECHEECHEECECECECECHEECHEECHEECHECHECHECHECHECHEHEHEECECHECHECHEECECECECHEHEHEECECECECECECHEECHEHEECHEECECVVVEVERVERVERVERVERIVERIVERIVEVVERVEVERIVERVERIVERVERVERERIERIERIVA SPA SPA SPA SPA SP SPA SPA SP SPA SPA SP SPA SP SP SPA SPA SPA SP SPA S SPP.P.PP.P.P.P.P.P.P.P.DDDDWADWARARARARARARARARARDDDWARARARARARDARARDDDWARARARARDDWARDARDDARARDDARARARF CIF CIF F CIF CF F CFF CF CF F F CF F F CF F CF CF CF CF F CFF CF CTRUSTRUSTRUSTRUSTRUSRUSUSUSTRUSRUSUSUSUSTRUSUSRUSUSCOTCOTCOTCOCCOCOTICOTICOTICOTCOTICOTCOTICOTICOTICOCCOCOTCOTOTICOCOTOTIOTICOTCOTTIOTIOTIOTINUS NUSNUSNUNUNUNUS NUS NUS US US NUNUUS NUS US NUSNUS NUNUUS US US US NUSUSNUS NUS US US NUS NNUS US US NUUS COGGCOGGCOGGCOGGCOGGCOGGCOGGCOGGCOCOGGCOGGCOGGCOGGCOGGCOGCOGGCOGGCOGGCOGGCOGGOGCOGGGGCOGGCOGGCOGGGGCOGGCOGGCOGGCOGGOGCOGGCOGGCOGCOGGCOGOGCOGGOGOGCOGGCOGGCOGGCOGGCOGGCOGCOGGCOGGOGCOGGCOCOGGOGOGGGGCOGGCOGGCOGGCOGCOGGGGOGCOGGOGGCOGGCOGOGOGGCOGGCOGGGCOCOGGRRYIARRYIARYIARYIARYIARYIAYIAYIARYIARYIARYIARYIARYIAYIARYIAYIARYIAYIAYIARYIARYIAYIAYIAYIARYIAYIAYIAYIARYIARYIAYIAYIARYIRYRYRYIRYIYIAYIAYIAYIAYIAIAYIAAAAASASSTASSTASSTASSTAASSTAAASASSTAASASASASSSTAASSSTSSTSSTAASASSSTSST. CI. CI. C. CI. CI. CI. CI. CI. CI. CI. CI. . CI. . CI. C. CI. CI. CI. CI. CI. C. C. C. C. CI. C. C. C. TRUTRUSTRUSTRUSTRTRTRTRTRUTRUSTRUSTRUSTRUSTRUSRUSRUSRUSTRUSTRUSTRUTRUSTRUSTRUSTRUTRUTRUSTRTRUSTRUTRURUSTRTRUSRUSTRTRUSTRTRRUSTRTRTRTRUTRPLANT PALETTEASSTASSTASSTASSTASSTASSTASSTASSTSTSTSTST SUC SUCSUC SUC SUSUC SU SUC SU S SCULECULECULELECULENTSNNTSNTSNTSTSNTSNTSNTSNTSNTSNTSNTNTSNTSNTSNTNTNTSNTSNTSNTNTNTSNTNTSNTSNNNTNTNTSNNTSNTSNTSNNTSNDROUDROUDROUDROUDROUDROUDROUDROUDROUDROUDROUDRODRODROUDROUDROUDROUROUDROUDRODROUROUDRDROROUROUDROROUROUDROROROUROUDROUOUGHT GHT GHT GHTGHGHTGHGHT GHTGHGHGHGHTGHGTOLETOLETOLETOLETOLTOLETOLTOLETOTTOTOLTOLTOLTTOTRANTRANTRANTRANTANTANTANTANTANTANNTANTNTNTANTNTNTANTNTNTNTNTNTANTANTNTANTAN MAS MAS MAS MAS MAS MA MAS MAS MAS MA MAS MAS MASMAS MAS MAS MAS MA MAS MASMASMASMAS MAAS MA MA MA MAAS MA MA MA M MA MAAS MSINGSINGSISINGSINGSINGSINGSINSINGSINGSINGSINGSINGSINGSINGSINGSINGSINSINGSINGSINGSINGSINGSINGSINSINSINGSINSINSININGGGSINGINGLIDLIDLID LID LID LID LID LID LID LID LID LID LID LID LID LID LIDLIDLIDLIDLIDLIDLILIDLID LIDMEADMEADMEAMEAMMEMEAMEADMEADMEADMEADMEADMEADMEADMEADMEADMEMEAMEADMMEADMEMEMEEAMMMEAOWOW MOW MOW MOOOW MOW MOW MOW MW MOW MOW MOOW MW MOW MOW MOOWOWOWIXIXIXIXIXIXIXIXIXIXIXIXIX600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A46ENTITLEMENTS PACKAGELANDSCAPE PLANT MATERIALSPage 438 of 495 1622-02-RS20D 21, 2021ACACIA CREEKSANTA FE ROADTANK FARM ROAD600 TANK FARM ROAD41PRELIMINARY LANDSCAPE PLANPLANTING LEGENDT E ES TED SOIL THE PLANT PALETTE IS COMPRISED OF SPECIES KNOWN TO THRIVE IN THE LOCAL MEDITTERAENEAN CLIMATE ANDL RE UIRE L REUIRE CONDITIONS. THE PROPOSED PLANT MATERIAL OUTSIDE OF AREAS ALLOCATED FOR RECREATIONAL USE WILL RECONDITIONS. THE PROPOSED PLANT MATERIAL OUTSIDE OF AREAS ALLOCATED FOR RECREATIONAL USE WILL REESCRIBED LOW TO VERY LOW WATER ONCE ESTABLISHED. THIS PLANT PALETTE COUPLED WITH THE IRRIGATION SYSTEM DESCATION BELOW HAS BEEN DESIGNED TO MEET OR EXCEED THE STATE AND LOCAL STANDARDS FOR WATER CONSERVATIOBASED ON THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE PER SLOMC 17.70.220ER AND A WEATHER SENSING, SMART CONTROLLER’ WILL BE USED TO MONITOR THE PROVISION OF IRRIGATION WATER A, SHRUBS, MANAGE DAILY WATER CONSUMPTION TO THE MINIMUM RE UIREMENTS FOR EACH HYDROZONE. ALL TREES, SHATER CAN AND GROUNDCOVER AREAS WILL BE IRRIGATED ON SEPARATE HYDROZONES SO THAT ONCE ESTABLISHED, WATNTING BE REGULATED IN A MORE EFFICIENT MANNER. TREES WILL BE IRRIGATED BY BUBBLERS. ALL ORNAMENTAL PLANTIL BE WILL RECEIVE DRIP IRRIGATION OR OTHER HIGHLY EFFICIENT IRRIGATION. ALL ABOVE GROUND UTILITIES SHALL BESCREENED WITH VEGETATION.SUCH ASACER MACROPHYLLUM BIGLEAF MAPLEALNUS RHOMBIFOLIA WHITE ALDERGLEDITSIA TIACANTHOS INERMIS SHADE MASTER’ THORNLESS LOCUSTGINGKO BILOBA AUTUMN GOLD’ GINGKO KOELREUTERIA BIPINNATA CHINESE FLAME TREELOPHOSTEMON CONFERTUS BRISBANE BOXLIRIODENRON TULIPIFERA TULIP TREECERCIDIUM PARKINSONIA DESERT MUSEUM’ PALO VERDE TREEPISTACHIA CHINENSIS CHINESE PISTACHEPLATANUS X ACERIFLOIA (HISPANICA) LONDON PLANE TREEUERCUS AGRIFOLIA COAST LIVE OAK UERCUS TOMENTELLA ISLAND OAKSH E ST EET T EES (1 24” X) T 161SH S SSES E S (1 1 ) T 6 83 SSUCH ASARBUTUS X MARINA’ MARINA ARBUTUSARCHONTOPHOENIX CUNNINGHAMIANA KING PALMBAUHINIA BLAKEANA HONG KONG ORCHID TREEBRACHYCHITON SPP. PINK BOTTLE TREEBRAHEA EDULIS GUADALUPE PALMCASSIA LEPTOPHYLLA GOLDEN MEDALLION TREECERCIS X HEARTS OF GOLD’ GOLDEN REDBUDHYMENOSPORUM FLAVUM SWEETSHADELAGERSTROEMIA SPP. CRAPE MYRTLEMYRICA CALIFORNICA PACIFIC WAX MYRTLEOLEA EUROPEA SWAN HILL’ - STERILE FRUITLESS OLIVEPYRUS CALLERYANA FLOWERING PEARE T T EES (1 ) T 6 SUCH ASCHORISIA SPECIOSA (CIEBA) FLOSS SILK TREEACARANDA MIMOSIFOLIA ACARANDA MULTI-TRUNKPLATANUS RACEMOSA MULTI-TRUNK CALIFRONIA SYCAMOREUERCUS AGRIFOLIA MULTI-TRUNK COAST LIVE OAKS E E T EES (24 36” X) T 1TOTAL ON-SITE LANDSCAPE AREA 56, 835 SFESTIMATED TOTAL WATER USE: 1,543,411.3 GAL / YR.ESTIMATED TOTAL WATER USE: 1,543,411.3 GAL / YR.MAXIMUM APPLIED WATER ALLOWANCE: 1,543,411.3 GAL / 0 YR.MAXIMUM APPLIED WATER ALLOWANCE: 1,543,411.3 GAL / 0 YR.MAXIMUM APPLIED WATER ALLOWANCE: 1,543,411.3 GAL / 0 YR.AREAS WITHIN THE PRO ECT SITE THAT ARE TO BE USED FOR RECREATIONAL PURPOSES AND ALL AREAS THAT WILL BE IRRIGATED WITH RECLAIMED WATER ARE CLASSIFIED AS SPECIAL LANDSCAPE AREAS. SPECIAL LANDSCAPE AREAS HAVE BEEN INCORPORATED INTO THE FOLLOWING CALCULATIONS AND ARE REFLECTED IN THE MAXIMUM APPLIED WATER ALLOWANCE PER CALIFORNIA CODE OF REGULATIONS AND THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE. TOTAL TREES TO BE PLANTED ON THE PROJECT SITE = 236TOTAL TREES TO BE PLANTED ON THE PROJECT SITE = 236SEE EXISTING TREE DISPOSITION TABLE SHEET A48 FOR SPECIES, SIZE, QUANTITY AND LOCATION OF (E) TREES TO REMAIN, PROTECT, AND TREES PROPOSED FOR REMOVAL.ACACIA COGNATA COUSIN ITT RIVER WATTLEADENANTHOS SERICEUS COASTAL WOOLLYBUSHAEONIUM CANARIENSE AEONIUMAGAVE ATTENUATA NOVA BLUE CLONEAGAVE DESMETTIANA VARIEGATA VARIEGATED AGAVEAGAVE VILMORINIANA OCTOPUS AGAVEAGAVE X BLUE GLOW BLUE GLOW AGAVEALOE POLYPHYLLA SPIRAL ALOEALOE STRIATA CORAL ALOEALYOGYNE HUEGELII SANTA CRUZ BLUE HIBISCUSARCTOSTAPHYLOS SPP. MANZANITABACCHARIS PILULARIS PIGEON POINT COYOTE BRUSHBULBINE FRUTESCENS STALKED BULBINECAESALPINIA SPP. YELLOW/RED BIRD OF PARADISECAREX PRAEGRACILIS CALIFORNIA FIELD SEDGECAREX TUMULICOLA BERKELEY SEDGECEANOTHUS GRISEUS HORIZONTALIS YANKEE POINT CALIFORNIA LILACCERCIS CANADENSIS RISING SUN RISING SUN REDBUDCHONDROPETALUM TECTORUM CAPE RUSHCISTUS PULVERULENTUS SUNSET ROCKROSECLYTOSTOMA CALLISTEGIOIDES VIOLET TRUMPET VINECOTINUS COGGYGRIA ROYAL PURPLE ROYAL PURPLE SMOKE TREEDIANELLA CAERULEA CASSA BLUE CASSA BLUE FLAX LILYDIETES BICOLOR FORTNIGHT LILYECHEVERIA X AFTERGLOW AFTERGLOW ECHEVERIAFURCRAEA FOETIDA MEDIOPICTA MAURITIUS HEMPHARDENBERGIA VIOLACEA HAPPY WANDERER LILAC VINEHESPERALOE PARVIFLORA RED YUCCAHETEROMELES ARBUTIFOLIA TOYONHEUCHERA SANGUINEA CORAL BELLSJUNCUS EFFUSUS OCCIDENTAL BLUE OCCIDENTAL BLUE RUSHKNIPHOFIA UVARIA ECHO MANGO REBLOOMING TORCHLILYLAVANDULA X INTERMEDIA PROVENCE PROVENCE LAVENDRTLEUCADENDRON SPP. CONEBUSHLEUCOSPERMUM CORDIFOLIUM NODDING PINCUSHIONLEYMUS CONDENSATUS CANYON PRINCE NATIVE BLUE RYELOMANDRA SPP. MAT RUSHMIMULUS AURANTIACUS STICKY MONKEY FLOWERMUHLENBERGIA DUBIA PINE MUHLYMUHLENBERGIA RIGENS DEER GRASSNEPETA X FAASSENII WALKERS LOW WALKERS LOW CATMINTOLEA EUROPAEA LITTLE OLLIE TM LITTLE OLLIE OLIVEPENNISETUM SPATHIOLATUM RYE PUFFSPENSTEMON X FIREBIRD FIREBIRD BEARD TONGUEPHLOMIS FRUTICOSA JERUSALEM SAGEPHORMIUM X SEA JADE NEW ZEALAND FLAXPITTOSPORUM TENUIFOLIUM SILVER SHEEN SILVER SHEEN TAWHIWHIPODOCARPUS X ICEE BLUE ICEE BLUE PODOCARPUSRHUS INTEGRIFOLIA LEMONADE BERRYRIBES SANGUINEUM RED FLOWERING CURRANTRIBES SPECIOSUM FUCHSIA FLOWERING GOOSEBERRYSALVIA GREGGII RASBERRY DELIGHT AUTUMN SAGESALVIA SPATHACEA HUMMINGBIRD SAGESALVIA X POZO BLUE POZO BLUE SAGESENECIO MANDRALISCAE BLUE FINGERSESLERIA AUTUMNALIS AUTUMN MOOR GRASSSTRELITZIA NICOLAI GIANT BIRD OF PARADISEVERBENA BONARIENSIS PURPLETOP VERVAINVERBENA LILACINA DE LA MINA LILAC VERBENAVERBENA X BALENDAKLE TM ENDURASCAPE PURPLE VERBENAVITIS CALIFORNICA CALIFORNIA WILD GRAPEINDICATES SPECIES IS ALSO SUITABLE USE IN BIORETENTION AREASINDICATES SPECIES IS ALSO SUITABLE FOR USE IN ACACIA CREEK BUFFERPROPOSED STREET TREES PER CITY OF SLO STREET TREE MASTER PLANPLNORTH0’ 80’40’20’ 75’0’160’80’40’ 320’SCALES: 1” = 80’- 0” (12”X18” SHEET) 1”=40’-0” (24”X36” SHEET)600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A47ENTITLEMENTS PACKAGEPRELIMINARY LANDSCAPE PLAN Page 439 of 495 1622-02-RS20D 21, 20217677717470696872737567434241403938373635343332313029282725242322212019188517161514131211109875432184818283798078TANK FARM RDEXISTING TREEDRIPLINE, TYPICAL.TOP OF BANK PERBIOLOGICAL RESOURCESASSESSMENT BY KEVINMERK ASSOCIATES, LLC,DATED 8-14-20, TYPICAL600 TANK FARM ROADAPN: 053-421-001,053-421-006PROPERTYLINE, TYPICAL650 TANK FARM ROADAPN: 053-421-005ACACIA CR E E K ACACIA CREEK ACACI A C R E E KSCALE: 1" = 80'1.TREE INVENTORY, LOCATIONS, AND TAG NUMBERS PER ARBORIST REPORTPREPARED BY RRM DESIGN GROUP, DATED 08/06/2021.2. ALL TREES LOCATED WITHIN THE PROJECT BIOLOGIST DESIGNATEDRIPARIAN AREAS DEFINED IN THE BIOLOGICAL RESOURCE ASSESSMENT BYKEVIN MERK ASSOCIATES, DATED NOVEMBER 4, 2020, ARE TO REMAIN.3. NESTING RAPTORS ARE KNOWN TO INHABIT THE STAND OF BLUE GUMEUCALYPTUS LOCATED ALONG ACACIA CREEK. PLEASE CONSULT WITHTHE PROJECT BIOLOGIST PRIOR TO ANY TREE MAINTENANCE ORREMOVAL OPERATIONS.4. SEE SHEET A39 IN THE ENTITLEMENT DRAWING PACKAGE AND/OR C7 OFTHE VESTING TENTATIVE MAP DRAWING PACKAGE FOR SPECIES,LOCATION, AND SIZE OF PROPOSED TREE PLANTINGS.NOT S ISTIN SIT PLANTree TagBotanical Name Common NameDiameter at BreastHeight (in.)Approx. Dripline ØDisposition1(XFDO\SWXVJOREXOXV'Compacta'blue gum98.5 45'2blue gum72.5 50'3blue gum33.5 20' Remove4blue gum53.5 35'5(XFDO\SWXVJOREXOXVblue gum115.5 50'TREE TAG 6 NOT USED7(XFDO\SWXVJOREXOXVblue gum71.0 60' Protect8blue gum112.5 55' Protect9(XFDO\SWXVJOREXOXVblue gum65.5 40' Protect10(XFDO\SWXVJOREXOXVblue gum60.5 60'11(XFDO\SWXVJOREXOXVblue gum39.5 50' Protect12blue gum54.0 20' Protect13blue gum60.055' Protect14(XFDO\SWXVJOREXOXVblue gum33.0 40' Protect15(XFDO\SWXVJOREXOXVblue gum58.0 60' Protect16(XFDO\SWXVJOREXOXVblue gum55.0 60' Protect17blue gum64.0 50'18blue gum49.5 30' Protect19blue gum52.0 30'20blue gum52.0 30'21blue gum71.5 30'22blue gum38.5 20' Remove23blue gum38.5 20'24blue gum50.0 20' Remove25blue gum62.0 20'TREE TAG 26 NOT USED27blue gum50.0 20'28blue gum49.5 20' Remove29blue gum30.5 40'30blue gum48.5 20' Remove31blue gum53.0 20'32blue gum26.0 20' Remove33blue gum32.0 20'34blue gum22.5 20'Remove35blue gum16.0 20' Remove36blue gum17.5 20' Remove37(XFDO\SWXVJOREXOXVblue gum80.5 60'38(XFDO\SWXVJOREXOXVblue gum70.0 60'39(XFDO\SWXVJOREXOXVblue gum53.0 60'40(XFDO\SWXVJOREXOXVblue gum44.0 60'41(XFDO\SWXVJOREXOXVblue gum61.0 60'42(XFDO\SWXVJOREXOXVblue gum82.0 60'43(XFDO\SWXVJOREXOXVblue gum42.0 25'TREE TAGS 44-66 NOT USEDExisting Tree InventoryPrepared By: Jake Minnick, PLA, ISA Certified Arborist #WE-11830ADBH Measurement Height: 54"Date of Evaluation: 06/01/2021686FKLQXVPROOHCalifornia pepper49.5 30' Remove696FKLQXVPROOHCalifornia pepper27.0 20' Remove706FKLQXVPROOHCalifornia pepper21.5 30' Remove716FKLQXVPROOHCalifornia pepper54.0 20' Remove726FKLQXVPROOHCalifornia pepper69.0 30' Remove736FKLQXVPROOHCalifornia pepper67.035' Remove746FKLQXVPROOHCalifornia pepper48.5 25' Remove756FKLQXVPROOHCalifornia pepper3.0 3' Remove766FKLQXVPROOHCalifornia pepper48.5 25' Remove776FKLQXVPROOHCalifornia pepper53.5 25' Remove78(XFDO\SWXVJOREXOXVblue gum35.5 30'79(XFDO\SWXVJOREXOXVblue gum20.0 20' Remove80(XFDO\SWXVJOREXOXVblue gum7.5 10' Remove81(XFDO\SWXVJOREXOXVblue gum8.5 6' Remove82(XFDO\SWXVJOREXOXVblue gum5.0 5' Remove83(XFDO\SWXVJOREXOXVblue gum11.0 15' Remove84(XFDO\SWXVJOREXOXVblue gum54.0 25' Protect85blue gum47.5 30' ProtectExisting Tree Inventory ContinuedINDICATES AN EXISTING TREE TO REMAININDICATES AN EXISTING TREE TO BE REMOVEDTREE TAG NUMBERLEGENDQUANTITY60342691 MIN.3.5:1 MIN.TREE DISPOSITION TABLEEXISTINGPROTECTTOTAL REMOVALSPROPOSEDPROPOSED MITIGATION RATIO74TREES PROPOSED FOR REMOVAL ARE IN POOR HEALTH, ARE OVERCROWDED, EXHIBIT STRUCTURAL DEFECTS, ORCONFLICT WITH PROPOSED ONSITE IMPROVEMENTS, SUCH AS BUILDING LOCATIONS, A STORMWATER BASIN, A MULTI-USEPATH, AND ASSOCIATED GRADING. THESE PROPOSED IMPROVEMENTS ENCROACH INTO THE CRITICAL ROOT ZONE (CRZ)OF TREES PROPOSED FOR REMOVAL. ALL TREES PROPOSED FOR REMOVAL ARE RECOGNIZED AS INVASIVE SPECIES BYTHE CALIFORNIA INVASIVE PLANTS COUNCIL (CAL-IPC), AND EACH SPECIES HAS NATURALIZED ONSITE AND SPREAD TOOFFSITE LOCATIONS NEARBY.TREES PROPOSED FOR REMOVAL ONSITE SHOULD BE REMOVED, AND THEIR STUMPS GROUND DOWN TO A DEPTH OF 24".SEVERAL TREES PROPOSED FOR REMOVAL ARE LOCATED OFFSITE, ADJACENT TO THE WESTERN ACACIA CREEK TOP OFBANK BOUNDARY. THESE TREES SHOULD BE CUT FLUSH NEAR THE TOP OF THE ROOT COLLAR AND THE STUMPS AND ROOTSLEFT IN PLACE TO PROVIDE INTERIM STABILIZATION OF THE CREEK BANKS WHILE SUITABLE REPLACEMENT RIPARIAN SPECIESESTABLISH. THE PROJECT ARBORIST WILL FLAG TREES WITH STUMPS AND ROOTS THAT ARE TO REMAIN PRIOR TO THEINITIATION ANY TREE WORK.OFFSITE TREES PROPOSED TO REMAIN ALONG ACACIA CREEK SHOULD BE PRUNED UNDER THE DIRECTION OF THEPROJECT ARBORIST. IT HAS BEEN DETERMINED THAT ALL TREES TO REMAIN CAN BE PRUNED TO ACCOMMODATE THEPROPOSED PROJECT. IN GENERAL, TREES TO REMAIN HAVE NOT BEEN MAINTAINED IN MANY YEARS. MANY HAVE LARGEAMOUNTS OF DEAD WOOD THROUGHOUT THE CROWN, AND SEVERAL HAVE UNBALANCED CROWNS. MOST WILLREQUIRE A CROWN CLEANING TO REDUCE RISK ASSOCIATED WITH DEAD LIMB DROP AND SEVERAL WILL REQUIRE ACROWN REDUCTION TO ENSURE A BALANCED CROWN.A TREE REPLACEMENT PLAN IS PROPOSED FOR BOTH ONSITE AND OFFSITE TREE REMOVALS AT A MINIMUM 3.5:1REPLACEMENT RATIO. THIS EXCEEDS THE REQUIRED 1:1 REPLACEMENT RATIO SET FORTH IN CHAPTER 12.24 TREEREGULATIONS OF THE SAN LUIS OBISPO MUNICIPAL CODE BY 3.5X. ONSITE REPLACEMENT TREE SPECIES ARE PROPOSEDAS A MIXTURE OF NATIVE AND NON-NATIVE SELECTIONS BASED ON THEIR PROVEN SUCCESS UNDER LOCAL CLIMATICAND SOIL CONDITIONS.PRUNING, REMOVAL, AND REPLACEMENT PLANProtectProtectProtectProtectProtectProtectProtectProtectProtectProtectProtectRemoveProtectProtectProtectRemoveProtectProtectProtectProtectProtectProtectProtectTree TagBotanical Name Common NameDiameter at BreastHeight (in.)Approx. Dripline ØDisposition67(XFDO\SWXVJOREXOXVblue gum55.5 45' ProtectONSITE REMOVALSOFFSITE REMOVALS1610(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'A47600 TANK FARM600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401A48ENTITLEMENTS PACKAGEEXISTING TREE INVENTORY & REMOVALSPage 440 of 495 ^^^^^^^^^^^^^^^DENSE TRE E COVER DENSE TREE COVER COVERDENSE TREE DENSE TREE COVER 51454555101501150111111111601601611606666060606055555555 150110150001505011111111165616515165EECOOVERDDDDD N CCCCC SEOVSEVSEOVSEVSEVSO 45111111555155555555555551155511555111115555^^^^^^^^^^^^^^^^^^^^^^^^^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^ ^^^^^^^^^^^XXXXX//////XXXXXXXXXXXXXXXXXXXXX//////////////////XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXX XXX XXXXXX XXXXXXXXXXXXXXXXXXXXXXX XX XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXX XXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXX XXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXX XXXXXX XXXX XXXX XXXXXXXX XXXX XXXXX XXXX XXXXXXXXX XXXXXXXXXX XXXXXXX XXXXXXX XXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXX XXXXXXX XXXXXXXXXX XXXXXXXXXX XXXXXXXXXXXX XXXXX XXXXXX XXXX XXX XXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXX XXXXXXXXX XXXXXXX XXXX XXXXXX XXXXXX XXXXX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXX XXXXX XXX XXXXX XXX XXX XXX XXX XXXXXX XXX XXX XXX XXXX XXX XXXXX XXXX XXXX XXX XXX XXX XXX XXX XXXXX XXX XXX XXXXXXXX XXX XXX XXX XXX XXXX XXXXXXXXX XXXX XXX XXX XXX XXX XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXX XXXXXXXXX XXXXXXXXXXXXXXX XXXXXXX XXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXXXXXXXXXXXXXXXX XXXXXXXX XXXXXXXX XXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXX XXXXX XX XXX XXX XXX XXX XXX XXX XXX XXXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXX XXXXXXXX XXX XXXX XXXXXXX XXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXX XXXXXXXXXXXXX XXX XXXXXXXX XXXXXX XXXXXX XXXXX XXXXXXXXX XXXX XXXXXXXXXXXXX XXXXXXXXX XXXX XXXXX XXXXXXXXXXXXXXXXXXX XXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXXX XXXXXXXXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXXXX XXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXX XXXXXXX XXXXXXX XXXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXX XXXXXXXX XXXXXX XXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXX XXXXXXXXXXX XXXXX XXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXX XXXXX XXXXXXXXXXX XXXXX XXXXXXXXX XXXXX XXXXX XXXXXXX XXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXX XXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXX XXXXXXX XXXXXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXXX XX XXX XXX XXXXX XXXX X XXXX XXXXXX X XX X XXX XXX XXXXXXXX XXXXX XXXXX XXXXX XXXXX XXXXX XXXXXX XXXXXXX XXXXXX XXXXX XXXXXX XXXXXXX XXXXXXX XXXXXX XXXXXX XXXXXX XXXXXXX XXXXXX XXXXXXXXX XXXXXXXX XXXXXXXXXXXXXXXXXXXX XXX XXXXXXXXXXXXXXXX XXXXX XXXXXXXXXXXXX XXXXXX XXXX XXX XXX XXX XXX XX XXX XXXXX XXXXXXXXXX XXXXX XXXXXXX XXXXX XXXXXXXXXXXXX XXXXXXXXX XXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXXX XXX XX XXXX XXX XXXXXXXX XXX XXXXXXXX XXX XXX XX XXX XXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXX XXXXXXXXXXX XXXXXXXXXXXX XXXXXXXXXXXXX XXXXXXXXXXXXXXXX XXXXXXXXXXX XXXXXXXXXX XXXXXXX XXXX XXXXX XXXXXXXXX XXX XXX XXX XXX XX XXX XXXX XXX XXXXX XXXX XXXX XXXX XXXX XXX XX XXXXXXXX XXXXX XXX XXXXXXX XXXXX XXX XXXXXXX XXXXXXXXXX XXXX XXXXXXXX XXXXXX XXXX XXXXX XXX XXXXX XXX XXXXXXXX XXXXX XXXXXX XXXXX XXXXXXXXXXXXXXX XXX XXX XXXXXXXXXXXX X XXXXX XXXXX XXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXX XXXXXXX XXXXXXXXXXX XXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXX X XXXXXXXXXXXXXXXX XXXXXXXX X XX XXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX X XXXXXXXXXXXXXX XX XXXXXXXXXXXXXXX XXXXX XXXXXXX XX XXX XXX XXXXXXXXXXXX XXXXXXXXXXXXXXXXXX X XXXX X XX XXXXXXXXXX XXXXXX XXXX XXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX 1451114514514545141141141141144541145145114545141414511111111111111501151505015050550111111115151555555155555555515515511111555111155511111511515555155511151111111601160011606011666600111611555555555555555555555555 5050505055505050050165165165165165165165616511111111111111XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXX XXXXXXXXXXX XX X X X XXXX XXXXX XXXXX XX XX X X X XXX XXX XXXXXXXX XXXXXX XXXX XXXX XXXX X XX XXXX XX XX X X X XXXX XXXX XX X X X X X XX X XXXXX XX XX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXX5555555555555555555555555555555555555555555555555555555555555555555555555555555555555 RRRRRREROVOVEVEROVVECCEEEEEREERENSNSEDENSDDRRRRRREROOVVEVEOVVERCCEEEEEREEREREEENSNSNSEDENSDDEDROVVVECEEEENSNSDEDXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX17 ACR1 17 ACRESSR1159.0FS153.5FSAAAAAAAAAAA-A-A----AAAAAAAAAAAAAABBBBXBBBBBBBBBBBBB-BB-BBBXBBXBBXBBXBBXBBBBBB EXISTING PROPERTY LINEXXXPRELIMINARY PROPOSEDRIGHT OF WAY DEDICATIONFUTURE ADDITIONAL PAVE OUTFOR TRUCK TURNAROUNDPROPOSED SANTA FE INTERIMIMPROVEMENTSRIGHT OF WAY NEEDS FORTANK FARM ROADIMPROVEMENTSINTERIM BIKE LANEIMPROVEMENTS ONLY — NOSIDEWALK SOUTH SIDE ONLYPROPOSED BIKE AND PEDIMPROVEMENTSRIGHT TURN IN AND RIGHTTURN OUT MOVEMENTSONLY00000000000000000000000005050050050050500505000500500500050050050050500050005000500050005000500050500505005050050500500050500505005050050500505005050050500505005050050500505005050050500505005050050500505005050501115015050505050150150150150505050505015505015505015505015505015505011150150501115015005050505050501515555050505050151515155050155050151555505015155550501555015550155501555015550155501555015550155501555015550155501555015155015155115015550151550151550151515115015151551511501515155515511115015151511501515155151150151515515115011515551551111501151505551555111115011515050505505050555115511111150115155515511115011515055515511115011515055515511111501515555555511115015115555555511115151155555555151511501515555555511115151155555511151511555555115115555515151511555555151515151515151551155555151515151515151515115115115151151515111111 55555555555555555555555555555555555555555555551555555555555555555155515551555515551555155551555515555155551555515551555155515555155551555515555155551555515555155551555515555155551555155515515155515551555155515551551515515155151551515515155151551515515155151551155151551155115511551155115511551155115515511551551551551551515151515151515151515151515151511110000000006006000000006000000000006000660006000660006000600006600066000660066000660006600066006660066600666006666666006600660066006600666006660066666006660066666660066666006666666006666006666006666600666660066660066666006666066660066666006666600606006060060600606600606660060600606600606666600666660066666006666600666606066060666006066600606666666600606666666666666666666600606666006066660060666600606666006066660060666666660060666666660066666006061660060616600606166006061660060616666661110606166116006061611116111111111111111600606166111600606161111611160060616111161116006066616006066006066006061660060660060616661111111600606661661600606661600606166111160060666116000616611116000666666666161661616666616000666666166160006000600060006600060616616000616616000616616000666666166160006666661661600060616611600060006000600060006066066006166061606166616600600066616000606166100600666100600666166600061616166666666066166166666661666666666000660006600066000660606000660606006061660000006000000000166600066066166000060006066166000060006006061660060060616600606166006061660006066061660060616606061660606606066060616606061660606166666666660000000000000000060606160600000000000000000060006066006066006061600060060660060616660000000000060060616600600606166000000000060606160600000000060606160606006061666006061666006061666166616661666666006066616666006060060600606600606166006060060660060616666006061666006066616666006066616666006061666006061666006060606060616600606600606600606600606600606160606600606166006066006066006061666660000006060006600606166000000600606160006000000000600606160006000000000600606160006000000000600606160006160600000060060616000606061660606606166060660660660616661661666166666666600060606006060606661666606000606060600606060606060606060606600660061660606006600616666006166600616600000000060060616000660006060600606060666166660006060600606060666166660061666006166600616660061666006166600616660061666661666166616666666166600616666166661666616666166661616166666666616666166661661666166616111661611116111166616111161111611116111161616161616111161616161111111111116111111111111115555555555555555556566656666166616566661661666661661155666656666666656666111111111111111111111111111111111111111111100000000000070700707000707707707707707707017070701701701700170017001700170017017001700170017001700170017070170017001700170017070170701707017070170701707017070170701707017070170701707017070170701707017070170701707017070170701707017070170701707017071707170171707170717071707170171701717017170171701717017170171701717017017017701770177017017017170117011701170117011701170117011701701701701701701701701701701701717171717171717171711111155555555557555575757557557557575755755755757575757575757575751751757575757575757575171775757575757517171717171717171717171717117171717171717117117117117171711717117111111111111115555555555755755757575757557557557557557557557557557557557557557557557575755755755757575757575757575757557557551757575751757575757575757517575175751757517575175751757517575175751757517575175751757517575175717571757517575175717571757175717571757175717571757175717571757175717517175717571757175171751717517175171751717517175171751717517175171751717517175171751717517175117511751717511751175117511751175117511751175117511711711711711711711751171711717171717171111111111111111111111111 814888148148148148148148148148148148148148148148148814881488148481488148814881448141484814814148481448141481414811481481414811481148148148148148148148148148148148148148148148148148148148148148141411999999999999999999999999999494949494999494999994949494999999499949494949499949494949499994949494949999999499949994949494949994949494949949949994999499949499494994949994949499949499494994949949499999999494449494949494949494949494949999949494949494949499494994449449944494499494949494949494949494949494949494994949491494949494949494949494949494949144949144949144949144949144949144949144949144949144491444914494914449144491444914494914449144491444914449144491444914144914449144491444914144914144914144914144914144914144914144914141491144914144911449114149114149114149114149114149114149114141114111411141114111411141114111411141114141414141111 111111151551151155515151515551555115515551155515151511551555115515551555155151511111115115155151511115155151511111151551515111151551515111151155515151515515151515151511115115151515515151111511151551515151511115151515155151515151111515151515515151515111151515151551515151511115151515155151515151111515151515515151111511515515151111511515515151111115155511115151515515151515111151515151515151555511115151515511115151515511115151515515151515111151515115555111111515115555111111515115555111111515115555111111515115555111111515155551111515111555511111155155551111115151155551111115515555111111551555511111155155551111115151155555511111155555155555511111155515555111111551555551111115551555551111115551555511111155555155551111115555515555111111155555551555511111115551555511111115555551555511111115551555511111115551555511111155555155511111115555515551111111555551555111111155555515551111115515551555111111155555155511111155555155511111155555155511111155155515551111115515155151111515151551555111111551555151111551555151111551555155551515551555515155551515555151555515155551515555151515555555555151555555151555515155555151555551515551155511555115551155511555115551155511555115551155511555115551515551155511551155511551155115515515515515515511111111111225222222225222222222 152222152222152222152222152222522221522221522221522221522221522221522152215221522152215221522152215221522152152152152152222221521522215221522152215215215215215215215215215215211111522222222222222222222222222222222222222222225222222522222252222225222222522222252222221522222252222222215222222215222222215222222222222222222222222215222222152222222222152222222152222215222152222221522152221522222215222222222215222222215222222215222222215222222215222222252222222522222225222222225222222221522222221522222221522222212522222222125222222221112152111122222252122222252525215252222222222125212222225212222215151525222222222515525252222222222525222222215215222252222225252222225252222225252222225252222225252222222252222222515512522222222252222222515511111512522222211112522222225222222252222222222522222222222211525222222115252222221152522222211525222222115252222221152522222211525222222152222222215222222221111152222522222215222252222522222252222221522222222522222211522222211152222221222221522222212222252222222252222222222225222222222222152222221252222215222222152222222222222211521525222251525525152222512522222152222515222252222115215111111111111111111115251211111521152151111521511521511152512155555555555555155555555555555555555515555555555555515555555555555555555555555555155555555555555155555555555555555555515555555155555551111111111555555555555555555555555555555555511115555555555555555555555555555111555555555555555515555555555555555555511555555515555555555555155555515555551555555555555155555535315555555555555555535555555555553555555355555355555355555355555355555355555555535555515555531555555155555315555355555555115555513555555555515355555555555555151355555513555555355555513555555135555551355555535555551355555533135555553313555555331355555511133333135333331113333333333135555553333333313555555355555513555555135555553333313555555333331111555535555555533333135555553333311131355555533331355555533333133555555333333133555555335555551335555551335555553355555513355555513355555513355555531335555553333333135555553555555355555533335535555333555555355555533135555553333133555555333333313355555533333315355355555153553555551115355355551515555155555555551553355551555555335555135355553535553355553355553355553355553355553355553535553535553355551535535555553355551555553355551555515353555535331535355551535355515555555555155155553355533555335553355533555335551353535533335553153535555533555515555335555155513535355333111113535355335555335555313533533533531355335531111112252222552252255222255225225522522225225522552252255222255225225522225522522552222552252255222255225225522225522522552222552252255221353535533313533531225522522552213533531111225522522552222225111225522225222252222522225222252222522225221112255222252212255225225522111225522225221151522522225225115152252222522511111122552222522551515151515151225222252251515511111122522225222252222522112255222252222222255222252222552222522112255222252222552222522225222252211225522225222222112255222252222221122552222522222211225522225222222115152252222522512252222522515155122522225225151551112255222252222111552111225522225222212215152222522221221515222252222222222222222222222222222221112255222252222122151522225222211515222222222222122151522225222211151522222151522222222151522215152221215222221111151522222222222212152222211215222221154444154541114154511141545111114544454441545111415451114544415451111141545111114154511111415451111141545111114154511111415451111141541111141541111145454545411111114444154111114541111145411111454111114541111145411111454111114541111145411111454111114154111114154111415411145411111454111114154111415411141541114154111415411141541114154111415411141541114154111154111154154154111154115411515415115414154115115411541415411541154115414154115411541154115411541154154115415415415415415415415415415415415415415415415415415415456556665655666665655656556565656556565565655615656161565616156561615656165656156561615656161565616156561615656161565616156561615656161565616156561661565616156561661565616156561615656161565616615656166156561661565616615656166156561661561616666615656166615616666615661666156616661565616615615666615616666661561666615616666156166666151566661515666656615115616661515666666151566666615156666151566151566665661151566115115616615156661151156166156661515666151566115115616615616611561661561661561661615616615616615616615616615616615616615616615615661561661561661561661561566156156615615661561566156156615615661561566156156615615661561566156156615615661561566156566156566156566156566156566156156615615661561566156566666156515656615651565155155155151551515151515 7777777757777577757577577577577577577577577577577577577577577757777577757775775777577757775777577757771577571577715777715775715777157775777157757157757157757157757157757157757157757157757157757157757157757157757157757157757157751577515775715775157751577571577515775157751577515775157751577515775157751577151577515775157751577151577151577151577151577151577151577115771157711577115771157711577115771157711577115771157711577115771157711577115115115115115115115115115151515151515151515151515151515151515151111 888888885858585858585858585858858858858858858588588588588588588158585885885885881585815858158581585815858158581585815858158581585815858158581585815858158581585815858158581585815858158581585815858158581585815858158515851585815851585158515851585158515851585815851581515851585158515815158151581515815158151581515815158151581158115811581158115811581158115811581158115811581581158115811581581581515151515151515151515151511 999999995999595995959595915995995995959159959959959959959599599599915999159991599915999159991599915999159991599159959159599159599159959915959915959915995915959591595959159595915959591595959159595959595959151515151599999999995555559159999995591599999959591599559159955915995591599559159955915999999559159999995591595959595959591111199999999991511115959151599995559199559199559159955911991591199159119915911991595959595959595959591111199999999999999999999999999111111591199115919911591199159199111515151591591111119999111115555959119999159119915555959119999155559591199991159991159595959599911555595115999115555951155559511555595115151515915111111111591591111115555951159111111591111115915915155155159151515515515551551551555555111155555555515515551555155515555155555155555555511111555555555555555555555155515551555551555551555555511111111155555511151111111111555515511151115111111111111111111 1116161111616161616161616161616116161161161161161161161161116111611161116111611161116111611161161616161616116161161611616161616161161611611161616161616161616161611616161611161116111611161116161616161616111611161161161161161161161161161161161161161161611666616616116616616616616616616616616661666161616166616616161616161616161611111111111111 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX22226262XXXXX22226262XXXXX626262XXXXXX66262XXXXXXXXX66262XXXXXXX6262XXXXX6262XXXXX6262XXXXX662XXXXXXX662XXXXXXX66262XXXXXX662XXXXXXX662XXXXXXX662XXXXXXX66262XXXXXX66262XXXXX66262XXXXXX66262XXXXX66262XXXXX66262XXXXX666262XXX6262XX666262XX6262XXXX66262XXXXX666262XX6262X666262XX6262X662XX6262X6262XX6262X62XX626262XX626262XX6262662XX6262X62XX626262XX626262XX626262X6262X6262XX626262X6262X6262X6262X62162X6216262X621621621621626216262162621626216621662166216621626216621662166216262162621626262162616261626216261626162616261626162616261626162616261626162616261626162616261626162616261626162616261626162616216162161621616211621162116261621616216162116211621162116211611611611611611611611611611611611611611611611611611611611611611611611611616161116111133333333333363636361631663663611111111111111111111111111111111111111111111114444444444444444444444444444444444444446464646464646461646416446464664646111111111111111111111111111111111111111111111666666666661666166666666666661166666666611111111117777777777777777777777777777777777777777777777676676767676767667676767677767667676676766767667676676766767667676676766767667676676766767667676676766767667676676766767667676676766767667676676766767667676671676671671616676671676616766161616161616161161616161616161611616116161616161616161616161616161616161616161616161616161616161616161616161616161616161616161616161616161611111161111111111111888868868686886886886886886886868868868868868868868868868868868868868868868868868868868868868686886886886886886868686816868686868686868686868681686816868168681686816868168681686816868168681686816868168681686816868168681686816868168681686816861686168616861686168616861686168616861686168616816168616861686168161681616816168161681616816168161681616816168161681616816168161681616816168116811681168116811681168116811681161161168116116116116116116116116116116116161616161611111111 9999699696969696969696969696969696969696969696969169969969969969969169916991699169969916991699169691699169916991699169916969169691696916969169691696916969169691696916969169691696916969169691696916969169616969169616961696169691696169616961696169616961696169161696169616961696169616916169161691616916169161691169161691616916169116911691169116911691169116911691691169116911691691691691691691616161616161616161616161616161616161111 11111171171717171717171717171717117171711711711711711711711711111711711711111711111711111171111171111171111171111171111171111171111171111171117111111711111171111711117111171111711117111111711111171111171171171171171171171171171111711711711717117171171711717117171171711717117171171711717111711171171117171117171111711117111171111711117111717111717117171111171111171111711171111171111171117111711171117111711171117111711171117111711171117117171771711171171171717717171771717717717171771717717171777171717771717717171771717177171717717771717177717171777171717771717177717171771717717717177171717177717177717177177171771717171771717171771111111111111111111111111111111111111111111111111111111111111111111111111111111111111171111111111111111111111111111111172722272722222172272272727227227272172272217221722172272272217221722172217221722172217221722172217221722172217221722172217221722172217221722172217221722222222172222217222221722222172222217222221722172222217222221722222172222217222221722222172222217222221722222172222217222172172222722221722272172227217222221721717217172171721717217172171721717217721721721721721721721721721721172117211721172117217211721721721721721721721721721721721172172117211721172117211721172111711172117111711111111111111737733333333373737373737373731731773773773737737377377777773773737737777777373737377771731773773773737737373777771731773717317737173177371731773717317737173177371731737173177371731737173177371731317317371731317313173131731317313173131731317313117313173131731317313173131731311731311731311173131733111731311731311731311731311173311173131117331117331173311173131731317313173117313733173131731173131731173131117311133337331731113337333317311333733173113337331731373317313331731333173133317313331731333173133317333317333317313331733331733331731333173333173333173317333317331733173333173173173173173173173173173173173173173173171717 7333373737373173737317317317317317317317317317317317317317331731733331737317331733173317331733331773331773331773331773331773331773331717737331773737317733317733177331773731773177311773177311773177317731773117311731173117317311731731173117311731173173117317317317317317317317317317317317333333333333333333333373737373737317317317317317311731173117311731173117311117311731173117311731173111173131731317313173117311731173117311731173131731317311731317313173131731317313173131117173173171373173137317137317137317313117317117317117317117317117317117317173117173171117317173171731711173171731173117311731173117311731173117311731173117311731173117311731173111731173117311731173117311731173117311731173117311117311731173117311731173117311731173117311711731171171171717111111111113333333 7373173731731731731731731731731731731731731731731731731731731731731737317317731773171731173731731773117311737317731717317173117373171731173117317317317317317317317317317317317317317317317317317317317317317317317311114444444444444444444444444444444444444444747444444444444444444444447444444744447447447444744474447444744474447447474444474747474474474774744747444747447447474474474447444744747747474447474747444747474474774744747747474747747447477474474774747444747474777747777477747477747774777477747774777477747774777477747774747774747747474771717717774747777774747777477774747777774747777774777477174741711717747477171717747477171717747417117177474177171717177171177474171171774741711717747477171717174717117171711177171117717117177171117717111771711771711771711771717717177171177171771717717177171771717717177171771717717171717171117111171711111111111111111111111111111111111111111144447447474747474747474747474747474747474747474741741741741741747474174741747417474174741741747474174747417474747417474741747474174747417474741747474174747474174747474174747474174474741747474741744747417447474174747474174747474174747474174747441747474417474747417474744174747441747474741747417441747417441747417741747474417474744174741744174741744174747441747417741747417741741741717417417417417474177417417414174174141741741174174117417411741741174174117417411741741174174117171171711741741171711717117171717171717171717171717171717171717171717171717171717171717171717171717171711711717171171171171171171171171171171111111111111111111111111 EXISTING TOPOF BANK35' TOP OF BANK AND EDGEOF RIPARIAN SETBACKPROPOSED INTERIM BULB-OUTIMPROVEMENTSPHASE 2PHASE 2PHASE 1RESRE0.45 ACRRRLOT 4.17 ACRES11111.1111ES.1111R.1111111.17 ACR.17 ACR1.17 ACRESRESRR117ACR1 17 ACRESSR1LOTLLLLLOOT5LLL5OTLLLLL5OT TLOT 5OT 5OT T 0.44 ACRESCCCACCAAACRESC0OOOOOTOOT9OT9OT 9OT 9OT 9OT 9LOLOLOLOLOLOTTTOOOOOOOOOOOOOOOOOOOOL00140ACR01.40 ACREC0 ACRACACCACRESS1.1.40 AACRCCRECRERRECRCRCCCCCAA000400.411.RES1.4...OOLOTOLOOLOT 7OTT 7LOTOOOTTLOOTOOOOOOLOOLLLOLLLOTTTLOOOOOT 77770.93 AAAAAAAAAAAAAAAAAAAAAAAAAAAA0.93 AA030000000ARESRRRRRCCCCCCCCACCAAAAAAAAAAAAAAAAAAAAAAAAAAAARSAAAAAAAAAAAAAAAAAAAAAAAAALOT1TTTTTTTTTTOOOOOOOOOOOOOOOOOOOLOOLOT 1LOTOLOTTTTTTTTTTTOOOOOOOOOOOOOOOOOOOOOLOLOLOTO11T111111TCRESCSCCCCCCCCCCCCCCCCCCCCAAAAAAAAAAAAAAAAAA1111CCCCCCCCCCCCCCCCCCCCACACAAAAAAAAAAAAAAAAA2 A2 A5252.5555..11CCCCCCCCCCCCCCCCCCCCCCCCCCCCAAAAAAAAAAAAAAAAAAAAAAAAAAA1111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111111115555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555555522LOTT2TO2TTTTTTTTTTTTTTLLLL2222222222222LLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLLL353533535353535353535353535353535353535353535355535355353535355353553333333333333333535333335353553535535355353553333535355535355353553335355553535533555535355535355555555353553355353553333555353553350 ACRESA000001.991110 AAC90 AAA0000090000AOT33333OTTOOOOOOOOOOOOOOOOOLOOOLOLOLL33T33333TTOOOOOOOOTOOO330.92 ACRESSRESS0.0SLOT 1000000SSRESEEECRESCRRREACRESACREACRAR9 AC9.79 A070.7900.79 A79ESES0.70.79 0ACACREARECRESCRERESELOT 8OT8LLOLOLOTT 8888082ACRES00.82 ACRES0082ACRES0LOT 11LLOLLLLOT 11LOLLLLOT 11LOT11LLLOLLL0.46 ACRES46 ESLOT6LTFF = 177.0±FF = 180.0±FF = 174.5±FF = 173.0±FF = 171.0±FF = 170.0±FF = 165.5±FF = 166.0±FF = 170.0±FF = 174.0±FF = 163.0±FF =172.5±FF = 172.5±FF = 163.0±FF = 163.0±FF = 177.5±FF = 180.0±FF = 163.0±FF = 160.0±FF =157.0±FF = 157.0±FF = 158.0±FF = 155.0±FF = 154.0±FF = 154.0±FF = 154.0±FF = 179.0±XXXXXXXXXFFFXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXFFFFXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXX X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXX XXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXN:\1600\1622-01-LP19-600-Tank-Farm-Road-Due-Diligence-Assistance\Engineering\DesDev\Exhibits\SitePlan_021320.dwg, SHEET TITLE, Jun 08, 2021 11:43am, ngwalters0feet1001"=50'50150June 8, 2021PRELIMINARY CIVIL SITE PLAN600 TANK FARMC2PHASING TABLEPHASE 1 (LOTS 3-7)PHASE 2 (LOTS 1-2, 7-11)Page 441 of 495 W WWWWWWSDSDSDSDSDSSS S SSSS^^BUILDING #1BUILDING #2BUILDING #3BUILDING #4BUILDING #5BUILDING #6BUILDING #7BUILDING #8BUILDING #9BUILDING #11BUILDING #12BUILDING #13BUILDING #14BUILDING #15BUILDING #16BUILDING #17BUILDING #18BUILDING #19BUILDING #20BUILDING #21BUILDING #22BUILDING #23BUILDING #24BUILDING #25BUILDING #26BUILDING #27BUILDING #10SWSSPROPOSED PRIVATE 8" PVC WATERLEGENDPROPOSED PRIVATE 8" PVC SEWERPROPOSED PRIVATE 12" HDPE STORM DRAINSSEXISTING 18" PUBLIC SEWER MAINWEXISTING 12" PUBLIC WATER MAINPROPOSED FIRE HYDRANTSDRWPROPOSED RECYCLED WATER MAINN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C4_Site Plan.dwg, C4, Jun 01, 2021 8:36am, ngwaltersJune 1, 2021600 TANK FARM0feet801"=40'40120PRELIMINARY SITE PLANC41. SEE SHEET C5 FOR STORM DRAIN IMPROVEMENTSNOTE:DOMESTIC WATER SERVICE & METERFIRE SPRINKLER SERVICEFW(1) 2-bed unit, 2nd Floor(1) 1-bed unit, 3rd Floor(1) 2-bedunit(1) 1-bed unit, 3rd Floor(1) Studio unit, Ground Floor(1) Studio unit, 2nd Floor(1) Studio unit, Ground Floor(1) 1-bed unit, 2nd Floor(1) 1-bed unit, 3rd Floor(1) 1-bed unit, 2nd Floor(1) 1-bed unit, 2nd FloorPage 442 of 495 S P R R SOUTH STREETHIGHW A Y BROAD ST REET TANK FARM ROADHIGUERA STREETHIGHWAY PROJECTVesting Common Interest Tentative Parcel Map No. SLO 21-0015IN THE CITY OF SAN LUIS OBISPO, CALIFORNIAUTILITIESBEING A PORTION OF LOT 57 OF THE SAN LUIS OBISPOSUBURBAN TRACT AS SHOWN IN BOOK 1, PAGE 92 OFRECORDS OF SURVEYELECTRIC.............. PACIFIC GAS & ELECTRICTELEPHONE.......... AT&TCABLE.................. CHARTER COMMUNICATIONSGAS...................... SOCAL GAS COMPANYSEWER.................. CITY OF SAN LUIS OBISPOWATER.................. CITY OF SAN LUIS OBISPORECYCLED............ CITY OF SAN LUIS OBISPOHORIZONTAL & VERTICAL CONTROLTOPOGRAPHYTOPOGRAPHY AND MAPPING PROVIDED BY RRM DESIGNGROUP, MAY 2016VICINITY MAPSHEET INDEXNOT TO SCALEC1..............TITLE SHEETC2..............EXISTING CONDITIONS MAPC3..............VESTING PARCEL MAPC4..............SITE PLANC5..............GRADING PLANC6..............STORMWATER MANAGEMENT PLANC7..............PRELIMINARY LANDSCAPE PLANC8..............TREE INVENTORYA1..............BUILDING SECTIONSA2-A8........FLOOR PLANSTHE BASIS OF BEARING FOR THIS MAP THE BASIS OFBEARINGS IS THE NORTHERLY LINE OF TANK FARM, ROAD,BEARING BEING SOUTH 65°07'52" WEST PER 67/RS/93.THE BENCHMARK FOR THIS SURVEY IS BASED ON CITY OFSAN LUIS OBISPO BENCHMARK NO. 47, BEING USG&GSE-910 AT THE EASTERLY END OF THE NORTH SIDE OF THEBRIDGE ABUTMENT OF SAN LUIS OBISPO CREEK ON PRADOROAD WEST OF S. HIGUERA STREET, ELEVATION OF 138.88'.OWNERCOVELOP HOLDINGS, LLCP.O. BOX 12910SAN LUIS OBISPO, CA 93401REPRESENTATIVERRM DESIGN GROUP3765 S. HIGUERA STREETSAN LUIS OBISPO, CA 93401(805) 543-1794LAND USETHE PROPOSED LAND USE IS CONSISTENT WITH THEEXISTING C-S-SP ZONING AND APPLICABLE SPECIFICPLAN AND CIRCULATION ELEMENTS FOR (11)COMMERCIAL MIXED USE PARCELS AS A SUBDIVISIONOF (2) BP-SP PARCELS (UNDER REVIEW FOR ZONECHANGE TO C-S-SP).TITLE SHEETC1N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C1_Title.dwg, C1, Sep 02, 2021 3:56pm, ngwaltersSeptember 2, 2021600 TANK FARMPage 443 of 495 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH OH OH OHPTN LOT 57 SLO SUBURBAN TRACT2/RS/551009/OR/474APN 053-421-002EXISTING FEMA FLOODZONE A, PER FIRMPANEL 06079C1332GEXISTING TOP OF BANKAND/OR EDGE OFRIPARIANEXISTING 35' ACACIACREEK SETBACKEXISTING 50' ACCESSEASEMENT TO BEABANDONEDEXISTING 20' PRIVATEUTILITY EASEMENT TO BEABANDONEDREMOVE EXISTING MATERIALSTORAGE AND ASSOCIATEDIMPROVEMENTSREMOVE EXISTINGBASE ACCESS ROADREMOVE EXISTING AC ANDCONCRETE DRIVEWAYIMPROVEMENTSREMOVE EXISTINGUNDERDRAIN AND STORMDRAINPROTECT EXISTING 18"CCFRPM SEWER(S = 0.0040)N1°20'06"E 1260.68'N87°55'14"W 449.10'N1°23'43"E 189.14'N14°00'29"W 200.10'N19°40'58"W 125.76'N8°53'28"E 445.94'N4°13'36"W 358.80'N88°36'26"W 375.24'REMOVE EXISTINGBASE ACCESS ROADUNDERGROUND EXISTINGOVERHEAD UTILITY LINESEX SSMH150.8± RIM131.3± INVREMOVE EXISTING GRAVELPARKING LOT IMPROVEMENTSREMOVE EXISTING FENCINGAND MISC STORAGEIMPROVEMENTS(TYP)REMOVE EXISTING FENCINGAND MISC STORAGEIMPROVEMENTSTANK FARM ROADPROTECT EXISTING FENCEACACIA CREEK(SECONDARY WATERWAY)SEE C9 FOR TREEINVENTORY ANDDISPOSITION(TYP)SEE C9 FOR TREEINVENTORY ANDDISPOSITION(TYP)SEE C9 FOR TREEINVENTORY ANDDISPOSITION(TYP)PTN LOT 57 SLO SUBURBAN TRACT2/RS/55APN 053-421-006N19°33'43"W 124.20'N36°15'34"W 150.03'N53°14'05"W 110.02'S79°41'29"W 12 8 . 8 2 'UNDERGROUND EXISTINGOVERHEAD UTILITY LINES ALONGPROPERTY FRONTAGELEGENDSSEXISTING 18" PUBLIC SEWER MAINWEXISTING 12" PUBLIC WATER MAINEXISTING EASEMENTN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C2_Existing.dwg, C2, Sep 02, 2021 3:56pm, ngwaltersSeptember 2, 20210feet801"=40'40120600 TANK FARMEXISTING MAJOR CONTOUREXISTING MINOR CONTOUREXISTING CONDITIONSC2Page 444 of 495 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^0.92 ACRESLOT 100.79 ACRESLOT 80.82 ACRESLOT 110.45 ACRESLOT 61.41 ACRESLOT 70.93 ACRESLOT 11.56 ACRESLOT 21.83 ACRESLOT 3N1°20'06"E 99.61'N88°39'54"W 156.42'N1°20'06"E 147.27'N88°39'54"W 82.44'N1°20'06"E 153.56'N55°19'18"E 88.80'N88°39'54"W 188.67'N88°39'54"W 45.37'N88°39'54"W 130.61'N1°26'06"E 149.61'N1°20'06"E 149.61'N88°39'54"W 130.35'N88°39'54"W 102.00'N88°39'54"W 181.82'N1°26'06"E 29.17'N1°23'34"E 178.34'N88°39'54"W 153.36'N1°20'06"E 28.36'N88°39'54"W 93.26'N88°39'54"W 231.83'N1°23'34"E 159.61'N73°16'16"E 13.24'N88°39'54"W 45.25'0.50 ACRESLOT 4EXISTING ACCESS EASEMENT TO BE ABANDONEDPROPOSED RIGHT-OF-WAY DEDICATION(WIDTH VARIES)PROPOSED RIGHT-OF-WAYDEDICATIONN1°23'43"E 189.14'N14°00'29"W 200.10'N19°40'58"W 125.76'N8°53'28"E 445.94'N4°13'36"W 358.80'N88°36'26"W 375.24'N1°20'06"E 1260.68'Δ=6°56'58"R=767.00'L=93.03'Δ=1°28'20"R=433.00'L=11.13'Δ=15°30'41"R=433.00'L=117.22'Δ=9°42'42"R=50.00'L=8.47'N87°55'14"W 449.10'Δ=20°55'56"R=169.00'L=61.74'Δ=46°15'20"R=56.00'L=45.21'Δ=4°45'22" R=101.50' L=8.43'Δ=37°43'04"R=101.00'L=66.49'N5°21'40"W 18.32'Δ=11°43'40"R=469.00'L=96.00'Δ=5°01'54"R=50.00'L=4.39'N1°20'06"E 50.51'N1°20'06"E 174.33'Δ=13°05'14"R=50.00'L=11.42'Δ=59°39'17"R=27.00'L=28.11'Δ=64°37'52"R=69.00'L=77.83'Δ=82°22'25"R=69.00'L=99.20'EXISTING ACCESS EASEMENT TO REMAINEXISTING 12' PGE EASEMENT TO REMAINTANK FARM ROADSANTA FE ROADEXISTING 35' TOP OF BANK AND/OREDGE OF RIPARIAN SETBACK1.16 ACRESLOT 50.44 ACRESLOT 9N1°20'06"E 338.00'N88°39'54"W 56.75'PROPOSED PUBLIC ACCESSEASEMENT (WIDTH VARIES)PROPOSED PUBLIC ACCESSEASEMENT (WIDTH VARIES)PROPOSED 24' EMERGENCYACCESS EASEMENTABANDON EXISTING 20' UTILITY EASEMENT10'10'48.9'36'34.2'34'33'46'27'17.5'7.5'2.8'16'16'16'16'16'16'61'49.9'5.9'23.5'16'16'18.4'32'6.8'15.8'22.9'27.2'19.4'18'18'17.5'5.8'29.9'16'42.9'28.8'46'16'16.7'16.7'PROPOSED 100-YR FLOOD LIMITS;SEE SHEET C5 FOR PROPOSEDGRADINGEXISTING 100-YR FLOOD LIMITSN88°39'54"W 13.61'N88°39'54"W 9.95'S88°39'54"E 5.00'5.9'50.9'50.9' 7.78'10'6.8'28.8'28.7'16'24.1'16'20.1'20.1' 20.2'S1°20'06"W 34.02'S1°20'06"W 99.40'S88°39'54"E 5.00'17'23.1'8.9'10'10'10'N1°26'06"E 111.00'N88°39'54"W 63.00'N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C3_VPM.dwg, C3, Sep 02, 2021 3:56pm, ngwaltersSeptember 2, 20210feet801"=40'40120600 TANK FARMTRACT BOUNDARYLEGENDPROPOSED PROPERTY LINEPROPOSED EASEMENT/SETBACKPROPOSED RWPRIVATE VEHICULAR ACCESS, PEDESTRIAN ACCESS,PARKING, DRAINAGE, STORM DRAIN, SEWER,RECYCLED WATER, AND WATER EASEMENTS OVERLOTS 1 THROUGH 11 EXCLUDING BUILDINGLOCATIONS.PUBLIC UTILITY EASEMENT (PUE) OVER LOTS 1THROUGH 11 EXCLUDING BUILDING LOCATIONS.EASEMENTS NOTEVESTING TENTATIVE PARCEL MAPC3Page 445 of 495 ^^^^^^^^^^^^^^^^^^^^^^WWWWWWSDSDFWFWFWFWFWFWFWSDSDSDSSSSSSSSSSSSSD SDWWWWWWWWWWWFW FWFWFWFWFWFWFWFWFWFWFWFWFWFWSS SSSSSSSSSSSSSSSSSSSS WWWWWWRWRWRWRWRWRWSSSSSSSSW W W W W RW RW RW RW RW W FWFWWWSS SS^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH OH OH OH 7+00SSSDSSBUILDING #1BUILDING #2BUILDING #3BUILDING #4BUILDING #5BUILDING #6BUILDING #7BUILDING #8BUILDING #9BUILDING #11BUILDING #12BUILDING #13BUILDING #14BUILDING #15BUILDING #16BUILDING #17BUILDING #18BUILDING #19BUILDING #20BUILDING #21BUILDING #22BUILDING #23BUILDING #24BUILDING #25BUILDING #26BUILDING #27BUILDING #10TANK FARM ROADSANTA FE ROADEXISTING FEMA FLOOD ZONE APER FIRM PANEL 06079C1332GPROPOSED BIORETENTION AREA; SEESHEET C6 FOR STORMWATER DETAILS(TYP)ACACIA CREEK35' ACACIA CREEK SETBACKPROPOSED TRASH ENCLOSURE(TYP)SSMH169.42 RIM163.42 INVSSMH174.25 RIM168.25 INVSSMH179.08 RIM173.08 INVSSMH174.69 RIM168.69 INVSSMH170.08 RIM164.08 INVSSMH164.37 RIM158.37 INVSSMH159.18 RIM153.18 INVSSMH157.41 RIM151.41 INVSSMH153.51 RIM147.51 INVCONNECT TO EXISTING18" CCFRPM SEWER MAIN(INV = 132.4±)PROPOSED SEWER LATERAL(TYP)PROPOSED WATERSERVICE AND METER(TYP)PROPOSEDPERMEABLE PAVERSPROPOSEDPERMEABLE PAVERS(TYP)8.6' (TYP)61'TYP24'TYP61'9'8'PROPOSED RW IRRIGATIONPOC, SERVICE, & METER.16' BUILDING SETBACKPROPOSED BACK OFSIDEWALK AND RIGHT OF WAYPROPOSED FIRE AND DOMESTICWATER DOUBLE CHECK ASSEMBLYPROPOSED 8"PUBLIC WATER MAINPROPOSED PUBLICRECYCLED WATER MAINR50'R50'R83'R63'R120'R75'R35'R15' (TYP)R15' (TYP)R412'R35'R47'PROPOSED TRASH ENCLOSURE(TYP)24'TYP24'TYPR46'R50'PROPOSED EMERGENCY VEHICLE ACCESSONLY AND REMOVABLE BOLLARDSPROPOSED EMERGENCYVEHICLE ACCESS ONLY ANDREMOVABLE BOLLARDSOVERLAND RIVER ROCKSWALE TO BASIN; SEE C4FOR GRADINGOVERLAND RIVER ROCKSWALE TO BASIN; SEE C4FOR GRADINGPROPOSED TRASH ENCLOSURE(TYP)PROPOSED FIRE AND DOMESTICWATER DOUBLE CHECK ASSEMBLYMATCH EXISTINGPUBLIC IMPROVEMENTSPROPOSED PUBLICRECYCLED WATER MAINPROPOSED 8"PUBLIC WATER MAINPROPOSED POOL AND FLATWORKPROPOSED RETAINING WALL;SEE SHEET C4 FOR GRADINGPROPOSED RETAINING WALL;SEE SHEET C4 FOR GRADINGPROPOSED RETAINING WALL;SEE SHEET C4 FOR GRADINGPROPOSED 12'MULTI-USE PATHINTERIM TURNAROUND;FUTURE INTERSECTIONIMPROVEMENTS BY OTHERSEXISTING ACACIA CREEK FLOWLINESSMH158.2± RIM150.20 INVSSMH149.9± RIM131.9± INVPROPOSED 100-YR FLOODLIMITSB A4'8.6'10' x 36' COMMERCIALLOADING ZONEPROPOSEDBUILDINGSECTION BNTSSANTA FE ROAD (INTERIM)PLPROPOSED ROW12'LANE6.5'BIKE12'LANE9'PARKWAY7'CL IV BIKE5'SW15'SETBACK2'EXISTINGGRADECLPROPOSEDBUILDINGEXISTING ROWEXISTING ROW12'LANEVARIESMEDIAN12.62'EXISTING13'LANE13'LANE8'BIKE LANESECTION ANTSTANK FARM ROAD9'PARKWAY7'SW5'15'SECTION CNTSTYPICAL BIKE PATH SECTIONPLPROPOSEDBUILDINGVARIES14'BIKE LANEVARIES4'PROPOSEDRETAININGWALLACACIAFLOW LINEACACIA TOPOF BANKEXISTINGGRADE10' AC BIKE LANE WITH2' MIN CLASS II BASESHOULDERSPORCHESPER PLAN14'LANE13'LANEWESTERLYPROPERTY LINE13'LANE2'7'BIKE7'PARKWAY5'WALKSECTION BNTSSANTA FE ROAD (ULTIMATE)FUTURE IMPROVEMENTSBY OTHERS7'CL IV BIKE5'SW9'PARKWAYPLCLSWSSPROPOSED PRIVATE 8" PVC WATERLEGENDPROPOSED PRIVATE 8" PVC SEWERPROPOSED PRIVATE 12" HDPE STORM DRAINSSEXISTING 18" PUBLIC SEWER MAINWEXISTING 12" PUBLIC WATER MAINPROPOSED FIRE HYDRANTSDRWPROPOSED RECYCLED WATER MAINN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C4_Site Plan.dwg, C4, Sep 02, 2021 3:56pm, ngwaltersSeptember 2, 2021600 TANK FARM0feet801"=40'40120PRELIMINARY SITE PLAN1. SEE SHEET C5 FOR STORM DRAIN IMPROVEMENTS2. INTERIM SANTA FE IMPROVEMENTS SHOWN; FUTUREIMPROVEMENTS/WIDENING BY OTHERS3. ON-SITE IMPROVEMENTS PRIVATE UNLESS NOTEDOTHERWISENOTE:DOMESTIC WATER SERVICE & METERFIRE SPRINKLER SERVICEFWC4Page 446 of 495 ^^ ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH OH OH OH RW WWWWWWWSDSDFWFWFWFWFWFWFWSDSDSDSSSSSSSSSSSSSDSDWWWWWWWWWWWFWFWFWFWFWFWFWFWFWFWFWFWFWFWFWSSSSSSSSSSSSSSSSSSSSSSWWWWWWRWRWRWRWRWRWSSSSSSSSWWWWW RW RW RW RW RW W FWFWWSS^ ^^^^^^^^^BUILDING #1BUILDING #2BUILDING #3BUILDING #4BUILDING #5BUILDING #6BUILDING #7BUILDING #8BUILDING #9BUILDING #11BUILDING #12BUILDING #13BUILDING #14BUILDING #15BUILDING #16BUILDING #17BUILDING #18BUILDING #19BUILDING #20BUILDING #21BUILDING #22BUILDING #23BUILDING #24BUILDING #25BUILDING #26BUILDING #27BUILDING #102%3%TYP3%TYP3%TYP3%TYP3%TYP3%TYP1%TYP1%TYP0.5%TYP0.5%TYP0.5%TYP0.5%TYP0.5%TYP0.5%TYP3.5%2%TYP2%TYP2%TYP2%TYP2%TYP2%TYP2%TYP2%TYP2% TYP 2% TYP2%TYP2%TYP2%TYP2%TYP2%TYP2%TYP2%3%TYPFF=177.00FF=180.00FF=174.50FF=173.00FF=171.00FF=170.00FF=165.50FF=166.00FF=170.00FF=174.00FF=163.00FF=172.50FF=172.50FF=163.00FF=163.00FF=177.50FF=180.00FF=163.00FF=160.00FF=157.00FF=157.00FF=158.00FF=155.00FF=154.00FF=154.00FF=154.00165170175160160165170175155154.36 RIM151.37 INV151.82 RIM149.20 INVBASIN BOTFG=151.0BASIN BOTFG=149.0BASIN BOTFG=156.0BASIN BOTFG=158.0BASIN BOTFG=163.0159.19 RIM153.93 INV156.99 RIM153.03 INV154.89 RIM152.20 INV160.66 RIM154.33 INV163.80 RIM156.80 INV167.45FS170.98FS175.10FS171.68FS174.58FS179.78FS177.42FSFF=179.00169.65FS150150 155160165170175180185190195200205 210215150150155160 165170175175 155155160160165170155155160155155150150155155150150155155CONSTRUCT EXPOSED ROCKCUT PER GEOLOGY REPORTRECOMMENDATIONSPROPOSED RETAINING WALLHEIGHT VARIESPROPOSED RETAINING WALLHEIGHT VARIESSEE SITE PLAN FOR BIKE PATHTYPICAL SECTIONNO PROPOSED GRADINGWITHIN EXISTING ACACIA CREEKTOP OF BANKCONNECT TO EXISTING 650TANK FARM IMPROVEMENTSPROPOSED BIORETENTIONBASIN; SEE STORMWATERCONTROL PLAN FOR DETAILS(TYP)EXISTING FEMA FLOOD ZONE APER FIRM PANEL 06079C1332GPROPOSED RETAINING WALLHEIGHT VARIES(4' MAX)164.05FS159.34FS158.06FS155.95FS153.48FS153.56FS/HPPROPOSED BASINSLOPE 3:1 MAX(TYP)PROJECT OUTLETTHRU EXISTINGOUTLET AT ACACIAHEADWALL153.18FS159.01FS159.87FS158.31FS153.42FS149.96FS151.98FSCONSTRUCTOVERLAND SWALE TOBIORETENTION BASIN(S = 0.01 FT/FT MIN)35' CREEK SETBACK154.36FSNO PROPOSED GRADINGWITHIN EXISTING ACACIA CREEKTOP OF BANK152.0TOP155.0TOP160.0TOP165.8TOP154.81 TC154.31 FS155.39 TC154.89 FS154.12 TC153.62 FS154.90 TC154.40 FS156.12 TC155.62 FS157.52 TC157.02 FS158.97 TC158.47 FS159.93 TC159.43 FS159.45 TC158.95 FS161.16 TC160.66 FS163.47 TC162.97 FS164.56 TC164.06 FS165.49 TC164.99 FS170.31 TC169.81 FS174.10 TC173.60 FS173.59FS179.61 TC179.11 FS174.57 TC174.07 FS153.46 TC152.96 FS154.50 TC154.00 FS152.97 TC152.47 FS154.39 TC153.89 FS163.40 TC162.90 FS164.81 TC164.31 FS156.02FSSEE SHEET C6 FOR WATERQUALITY BASIN161.43 TC160.93 FS160.99 TC160.49 FS161.72 TC161.22 FSPROPOSED 100-yr FLOOD LIMITSCONSTRUCT OFF-SITE AC PATHTO DAMON-GARCIACONCRETE PATHCONSTRUCT RETAININGWALL (H = 6' MAX)SECTION A-ANTSEXISTING METAVOLCANICROCKROCK CUT PER SOILSREPORTCONCRETE PEDESTRIANSIDEWALKPORCH PER ARCH PLANSPROPOSEDGARAGE FLOOR(FF PER PLAN)FIRST FINISHEDFLOORPROPOSED STEM WALLCONCRETE DRIVEWAYAPRON (3.5' TYP)6" MOUNTABLE CURBAC DRIVE AISLE PER PLANTRACT BOUNDARYPROPOSEDGARAGE FLOOR(FF PER PLAN)PORCH PER ARCH PLANSCONCRETE PEDESTRIANSIDEWALKPROPOSED RETAININGWALL (4' MAX)FENCING PER LANDSCAPEPLANSPROPOSED LANDSCAPEBUFFERAC BIKE PATH PER PLANEXISTING TOP OF BANK/EDGEOF RIPARIAN HABITAT PERPROJECT BIOLOGISTVARIESLIMITS OF PROPOSEDGRADINGSECTION B-BNTSLEGENDPROPOSED PRIVATE 12" HDPE STORM DRAINSSSEWER MAIN (SEE SITE PLAN - C4)WWATER MAIN (SEE SITE PLAN - C4)RWRECYCLED (SEE SITE PLAN - C4)SDN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C5_Grading.dwg, C5, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMPRELIMINARY GRADING PLANRAW CUT: 16,700 cu ydRAW FILL: 28,700 cu ydRAW NET: 12,000 cu yd <IMPORT>AREA OF DISTURBANCE: 14.3 acQUANTITY ESTIMATES ON THESE PLANS ARE TO BE USED FORBONDING AND PERMIT PURPOSES ONLY. IT IS THERESPONSIBILITY OF THE CONTRACTOR TO VERIFY ACTUALQUANTITIES FOR THE PURPOSE OF CONSTRUCTIONAPPROXIMATE EARTHWORK QUANTITIES0feet801"=40'40120C5Page 447 of 495 ^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^^OH OH OH OH SDSDSDSD^^^^^^^^^^^^^^^^^^ADAADAEXISTING PROPERTY LINEPRELIMINARY PROPOSEDRIGHT OF WAY DEDICATIONEXISTING TOPOF BANK35' TOP OF BANK AND EDGE OFRIPARIAN SETBACKSCM 2: PRIVATETRIB AREA: 121,100 sfC i: 0.54 (75%)V: 11,415 cfV from SCM 5: 3,279 cf SCM AREA: 2,800 sfSCM 6: PRIVATETRIB AREA: 25082 sfC i: 0.54 (75%)V: 3,015 cfSCM AREA: 1,005 sfSCM 4: PIPsTRIB AREA: 23,062 sfC i: 0.54 (75%)V: 3,171 cfSCM AREA: 1,057 sfSCM 5: PRIVATETRIB AREA: 110,268 sfC i: 0.54 (75%)V: 6647 cfSCM AREA:1,187 sfV to SCM 2: 3279 cf650 TANK FARM IMPROVEMENTS BYOTHERSACACIA CREEKACACIA CREEKSANTA FE ROADTANK FARM ROADDMA 2DMA 1DMA 5RELOCATE EXISTINGOUTLET FOR PROJECTDISCHARGE TO ACACIAPROPOSED PRIVATESTORM DRAINSCM 1: PIPsTRIB AREA: 50,500 sfC i: 0.81 (95%)V: 6,625 cfSCM AREA: 5,300 sfDMA 7SCM 7: WATER QUALITY TREATMENT ONLY; SIZED4% OF DMA 7 PER PCR RECOMMENDATIONS(4,800 sf)DMA 4EXISTINGPROPERTY LINESDSDSDSDDMA 6DMA 8DMA 9DMA 3DMA 10SCM 3: PRIVATETRIB AREA: 111,640 sfC i: 0.54 (75%)V: 12,780 cf SCM AREA: 12,780 sfSCM 8: PRIVATETRIB AREA: 11,396 sfC i: 0.54 (75%)V: 2,600 cf SCM AREA: 2,600 sfSCM 3: PRIVATETRIB AREA: 11,250 sfC i: 0.54 (75%)V: 2,600 cf SCM AREA: 2,600 sfSCM 8: PRIVATETRIB AREA: 20000 sfC i: 0.54 (75%)V: 3,305 cf SCM AREA: 3,305 sfEXISTINGPROPERTY LINEEXISTING 35' TOPOF BANK SETBACKEXISTING CREEKFLOWLINE^ ^^^^4+005+006+007+008+009+00SSSDWWWRWRWRWRWRWRWRW FWFWFWSSJT10' PROPOSED DRAINAGE AND MAINTENANCEEASEMENTN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\C6_Stormwater.dwg, SW1, Sep 03, 2021 10:45am, ngwaltersSeptember 3, 2021600 TANK FARM0feet1201"=60' 60180DRAINAGE MANAGEMENT AREA BOUNDARYPROPOSED IMPROVEMENTSPAVING AREA/SIDEWALK: 50640 sfBUILDINGS: 133,320 sfHARDSCAPE: 38,970 sfTOTAL IMPERVIOUS = 384,460TOTAL AREA: 10.5 ACRESPROPOSED TREATMENTBIORETENTION AREAPERVIOUS PAVERSTIER 1- RUNOFF REDUCTIONxROOF DRAIN DISCONNECTxMINIMIZE IMPERVIOUS AREASTIER 2 - WATER QUALITY (85th PERCENTILE = 1.15")xON-SITE RETENTION-BASED TREATMENT AND INFILTRATIONTIER 3 - RETAIN 95TH PERCENTILE STORM EVENT (1.95")xBASINS WILL RETAIN AND INFILTRATE THE REQUIRED95TH PERCENTILE RETENTION VOLUME WHERE:VOLUME (cf) = (1.95" / 12")* C i * AC i= 0.858i 3 - 0.78i 2 + 0.774i + 0.04A = TRIBUTARY AREA (sf)TIER 4 - PEAK MANAGEMENTxPEAK MANAGEMENT FOR THE ON-SITE DEVELOPMENT ISPROVIDED IN THE RETENTION BASINS AS SHOWN.xOFF-SITE RETENTION IS PROVIDED PREVIOUSLY BY THE AVOCETAND PADRE GRADING ACTIVITIES COMPLETED IN 2019 INRESERVOIR 4 AND THE NORTH MARSH RETENTION BASIN.24"VARIESCOBBLE OR SPLASHBLOCK WHERE STORMWATER ENTERSFLATBOTTOMNO SLOPES3:1MAX GRAVEL STORAGEBIORETENTION SOIL MIXDEPTH VARIESOVERFLOW /OUTLET STRUCTURETO POINT OF DISCHARGEOR ADJACENT STORMDRAINLEGENDTYPICAL BIORETENTION AREANTSHOA MAINTAINEDWATER QUALITYTREATMENT AREAREQUIRED STORMWATER CONTROL MEASURESCONCRETE PAVERS TYP.AGGREGATE INOPENINGS, TYP.GRAVELCONCRETE EDGESOIL SUBGRADECONCRETE PAVEMENTVARIESTYPICAL PERMEABLE PAVERS AREANTSSTORMWATER CONTROL PLANC6Page 448 of 495 YIELDYIEL D BUILDING #6BUILDING #7BUILDING #9BPROPOSED ROUNDABOUTBACK OF SIDEWALKCOLINEAR WITH PROPOSEDVPM IMPROVEMENTSR69'PROPOSED PROJECT RIGHTOF WAY DEDICATION PERVPMR50'R30'R47'PROPOSED VPM INTERIMIMPROVEMENTS; DRIVEWAYACCESS TO REMAIN AS PARTOF FUTURE ROUNDABOUT'(TYP)18'PROPOSED VPM INTERIM EDGEOF PAVEMENT7' PARKWAY18'R18.25'R28.25'14'TRANSITION TO SANTA FETYPICAL SECTION NOTSHOWNEXISTING TRACT BOUNDARYLANDSCAPEDMEDIANFUTURE SANTA FECONTINUATION ANDALIGNMENT BY OTHERSR56' R61'WB-50 DESIGN VEHICLE(NB-LEFT TURN)WB-50 DESIGN VEHICLE(EB-RIGHT TURN)MOUNTABLE CURB ORSTRIPING MODIFICATIONSN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Exhibits\RB1_Santa Fe Roundabout Exhibit_072421.dwg, SHEET TITLE, Sep 02, 2021 3:28pm, ngwaltersSeptember 2, 2021600 TANK FARM0feet401"=20'2060SANTA FE ROUNDABOUT EXHIBITRB2Page 449 of 495 BUILDING #1BUILDING #2BUILDING #3BUILDING #4BUILDING #5BUILDING #6BUILDING #7BUILDING #8BUILDING #9BUILDING #11BUILDING #12BUILDING #13BUILDING #14BUILDING #15BUILDING #16BUILDING #17BUILDING #18BUILDING #19BUILDING #20BUILDING #21BUILDING #22BUILDING #23BUILDING #24BUILDING #25BUILDING #26BUILDING #27BUILDING #10^^^40822Pumper Fire TruckOverall Length 40.000ftOverall Width 8.167ftOverall Body Height 7.745ftMin Body Ground Clearance 0.656ftTrack Width 8.167ftLock-to-lock time 5.00sMax Wheel Angle 45.00°N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Exhibits\TR-1_Truck Turning_072721.dwg, ngw, Jul 28, 2021 9:23am, ngwaltersJuly 28, 20210feet801"=40'40120600 TANK FARM0feet401"=20'2060FIRE TRUCK TURNING EXHIBITTR1Page 450 of 495 1622-01-LP19MAY 2021600 TANK FARM ROAD600 TANK FARM ROAD, SAN LUIS OBISPO, CA 93401LENTITLEMENT PACKAGEPRELIMINARY LANDSCAPE PLANPLANTING LEGENDIRRIGATION COMPLIANCE & DESIGN CRITERIATHE PLANT PALETTE IS COMPRISED OF SPECIES KNOWN TO THRIVE IN THE LOCAL MEDITTERAENEAN CLIMATE AND SOIL CONDITIONS. THE PROPOSED PLANT MATERIAL OUTSIDE OF AREAS ALLOCATED FOR RECREATIONAL USE WILL REQUIRE LOW TO VERY LOW WATER ONCE ESTABLISHED. THIS PLANT PALETTE COUPLED WITH THE IRRIGATION SYSTEM DESCRIBED BELOW HAS BEEN DESIGNED TO MEET OR EXCEED THE STATE AND LOCAL STANDARDS FOR WATER CONSERVATION BASED ON THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE PER SLOMC 17.70.220A WEATHER SENSING, ‘SMART CONTROLLER’ WILL BE USED TO MONITOR THE PROVISION OF IRRIGATION WATER AND MANAGE DAILY WATER CONSUMPTION TO THE MINIMUM REQUIREMENTS FOR EACH HYDROZONE. ALL TREES, SHRUBS, AND GROUNDCOVER AREAS WILL BE IRRIGATED ON SEPARATE HYDROZONES SO THAT ONCE ESTABLISHED, WATER CAN BE REGULATED IN A MORE EFFICIENT MANNER. TREES WILL BE IRRIGATED BY BUBBLERS. ALL ORNAMENTAL PLANTING WILL RECEIVE DRIP IRRIGATION OR OTHER HIGHLY EFFICIENT IRRIGATION. ALL ABOVE GROUND UTILITIES SHALL BE SCREENED WITH VEGETATION.SUCH AS:ACER MACROPHYLLUM BIGLEAF MAPLEGLEDITSIA TIACANTHOS INERMIS ‘SHADE MASTER’ THORNLESS LOCUSTGINGKO BILOBA ‘AUTUMN GOLD’ GINGKO KOELREUTERIA BIPINNATA CHINESE FLAME TREELOPHOSTEMON CONFERTUS BRISBANE BOXLIRIODENRON TULIPIFERA TULIP TREECERCIDIUM PARKINSONIA ‘DESERT MUSEUM’ PALO VERDE TREEPISTACHIA CHINENSIS CHINESE PISTACHEPLATANUS X ACERIFLOIA (HISPANICA) LONDON PLANE TREEQUERCUS AGRIFOLIA COAST LIVE OAKSHADE & STREET TREES (15 GAL - 24” BOX) QTY 132SHRUBS, GRASSES, AND GROUNDCOVERS (1, 5, 15 GAL) QTY 56,835 SFSUCH AS:ARBUTUS X ‘MARINA’ MARINA ARBUTUSARCHONTOPHOENIX CUNNINGHAMIANA KING PALMBAUHINIA BLAKEANA HONG KONG ORCHID TREEBRACHYCHITON SPP. PINK BOTTLE TREEBRAHEA EDULIS GUADALUPE PALMCASSIA LEPTOPHYLLA GOLDEN MEDALLION TREECERCIS X ‘HEARTS OF GOLD’ GOLDEN REDBUDCITRUS SPP. CITRUSHYMENOSPORUM FLAVUM SWEETSHADELAGERSTROEMIA SPP. CRAPE MYRTLEOLEA EUROPEA ‘SWAN HILL’ - STERILE FRUITLESS OLIVEPYRUS CALLERYANA FLOWERING PEARACCENT TREES (15 GAL) QTY 45 SUCH AS:CHORISIA SPECIOSA (IEBA) FLOSS SILK TREEJACARANDA MIMOSIFOLIA JACARANDA MULTI-TRUNKPLATANUS RACEMOSA MULTI-TRUNK CALIFRONIA SYCAMOREQUERCUS AGRIFOLIA COAST LIVE OAKSPECIMEN TREES (24-36” BOX) QTY 10TOTAL ON-SITE LANDSCAPE AREA: 56, 835 SFESTIMATED TOTAL WATER USE: 1,543,411.3 GAL / YR.MAXIMUM APPLIED WATER ALLOWANCE: 1,543,411.3 GAL / 0 YR.AREAS WITHIN THE PROJECT SITE THAT ARE TO BE USED FOR RECREATIONAL PURPOSES AND ALL AREAS THAT WILL BE IRRIGATED WITH RECLAIMED WATER ARE CLASSIFIED AS SPECIAL LANDSCAPE AREAS. SPECIAL LANDSCAPE AREAS HAVE BEEN INCORPORATED INTO THE FOLLOWING CALCULATIONS AND ARE REFLECTED IN THE MAXIMUM APPLIED WATER ALLOWANCE PER CALIFORNIA CODE OF REGULATIONS AND THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE. SEE EXISTING TREE DISPOSITION TABLE SHEET A32 FOR SPECIES, SIZE, QUANTITY AND LOCATION OF (E) TREES TO REMAIN, PROTECT, AND TREES PROPOSED FOR REMOVAL.ACACIA COGNATA `COUSIN ITT` RIVER WATTLEADENANTHOS SERICEUS COASTAL WOOLLYBUSHAEONIUM CANARIENSE AEONIUMAGAVE ATTENUATA `NOVA` BLUE CLONEAGAVE DESMETTIANA `VARIEGATA` VARIEGATED AGAVEAGAVE VILMORINIANA OCTOPUS AGAVEAGAVE X `BLUE GLOW` BLUE GLOW AGAVEALOE POLYPHYLLA SPIRAL ALOEALOE STRIATA CORAL ALOEALYOGYNE HUEGELII `SANTA CRUZ` BLUE HIBISCUSARCTOSTAPHYLOS SPP. MANZANITABACCHARIS PILULARIS `PIGEON POINT` COYOTE BRUSHBULBINE FRUTESCENS STALKED BULBINECAESALPINIA SPP. YELLOW/RED BIRD OF PARADISECAREX PRAEGRACILIS CALIFORNIA FIELD SEDGECAREX TUMULICOLA BERKELEY SEDGECEANOTHUS GRISEUS HORIZONTALIS `YANKEE POINT` CALIFORNIA LILACCERCIS CANADENSIS `RISING SUN` RISING SUN REDBUDCHONDROPETALUM TECTORUM CAPE RUSHCISTUS PULVERULENTUS `SUNSET` ROCKROSECLYTOSTOMA CALLISTEGIOIDES VIOLET TRUMPET VINECOTINUS COGGYGRIA `ROYAL PURPLE` ROYAL PURPLE SMOKE TREEDIANELLA CAERULEA `CASSA BLUE` CASSA BLUE FLAX LILYDIETES BICOLOR FORTNIGHT LILYECHEVERIA X `AFTERGLOW` AFTERGLOW ECHEVERIAFURCRAEA FOETIDA `MEDIOPICTA` MAURITIUS HEMPHARDENBERGIA VIOLACEA `HAPPY WANDERER` LILAC VINEHESPERALOE PARVIFLORA RED YUCCAHETEROMELES ARBUTIFOLIA TOYONHEUCHERA SANGUINEA CORAL BELLSJUNCUS EFFUSUS `OCCIDENTAL BLUE` OCCIDENTAL BLUE RUSHKNIPHOFIA UVARIA `ECHO MANGO`REBLOOMING TORCHLILYLAVANDULA X INTERMEDIA `PROVENCE` PROVENCE LAVENDRTLEUCADENDRON SPP. CONEBUSHLEUCOSPERMUM CORDIFOLIUM NODDING PINCUSHIONLEYMUS CONDENSATUS `CANYON PRINCE` NATIVE BLUE RYELOMANDRA SPP. MAT RUSHMIMULUS AURANTIACUS STICKY MONKEY FLOWERMUHLENBERGIA DUBIA PINE MUHLYMUHLENBERGIA RIGENS DEER GRASSNEPETA X FAASSENII `WALKERS LOW` WALKERS LOW CATMINTOLEA EUROPAEA `LITTLE OLLIE` TM LITTLE OLLIE OLIVEPENNISETUM SPATHIOLATUM RYE PUFFSPENSTEMON X `FIREBIRD` FIREBIRD BEARD TONGUEPHLOMIS FRUTICOSA JERUSALEM SAGEPHORMIUM X `SEA JADE` NEW ZEALAND FLAXPITTOSPORUM TENUIFOLIUM `SILVER SHEEN` SILVER SHEEN TAWHIWHIPODOCARPUS X `ICEE BLUE` ICEE BLUE PODOCARPUSRHUS INTEGRIFOLIA LEMONADE BERRYRIBES SANGUINEUM RED FLOWERING CURRANTRIBES SPECIOSUM FUCHSIA FLOWERING GOOSEBERRYSALVIA GREGGII `RASBERRY DELIGHT` AUTUMN SAGESALVIA SPATHACEA HUMMINGBIRD SAGESALVIA X `POZO BLUE` POZO BLUE SAGESENECIO MANDRALISCAE BLUE FINGERSESLERIA AUTUMNALIS AUTUMN MOOR GRASSSTRELITZIA NICOLAI GIANT BIRD OF PARADISEVERBENA BONARIENSIS PURPLETOP VERVAINVERBENA LILACINA `DE LA MINA` LILAC VERBENAVERBENA X `BALENDAKLE` TM ENDURASCAPE PURPLE VERBENAVITIS CALIFORNICA CALIFORNIA WILD GRAPEINDICATES SPECIES IS SUITABLE USE IN BIORETENTION AREASPROPOSED STREET TREES PER CITY OF SLO STREET TREE MASTER PLAN(PLATANUS X ACERIFOLIA/HISPANICA) ************June 7, 2021600 TANK FARMSTORMWATER CONTROL PLANC6June 7, 2021600 TANK FARMSTORMWATER CONTROL PLANC6PRELIMINARY LANDSCAPE PLAN0’ 80’40’20’ 75’0’160’80’40’ 320’SCALES: 1” = 80’- 0” (12”X18” SHEET) 1”=40’-0” (24”X36” SHEET)NORTHC7SEPTEMBER 2021ACACIA CREEKSANTA FE ROADTANK FARM ROADPLANTING LEGENDIRRIGATION COMPLIANCE & DESIGN CRITERIATHE PLANT PALETTE IS COMPRISED OF SPECIES KNOWN TO THRIVE IN THE LOCAL MEDITTERAENEAN CLIMATE AND SOIL CONDITIONS. THE PROPOSED PLANT MATERIAL OUTSIDE OF AREAS ALLOCATED FOR RECREATIONAL USE WILL REQUIRE LOW TO VERY LOW WATER ONCE ESTABLISHED. THIS PLANT PALETTE COUPLED WITH THE IRRIGATION SYSTEM DESCRIBED BELOW HAS BEEN DESIGNED TO MEET OR EXCEED THE STATE AND LOCAL STANDARDS FOR WATER CONSERVATION BASED ON THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE PER SLOMC 17.70.220A WEATHER SENSING, ‘SMART CONTROLLER’ WILL BE USED TO MONITOR THE PROVISION OF IRRIGATION WATER AND MANAGE DAILY WATER CONSUMPTION TO THE MINIMUM REQUIREMENTS FOR EACH HYDROZONE. ALL TREES, SHRUBS, AND GROUNDCOVER AREAS WILL BE IRRIGATED ON SEPARATE HYDROZONES SO THAT ONCE ESTABLISHED, WATER CAN BE REGULATED IN A MORE EFFICIENT MANNER. TREES WILL BE IRRIGATED BY BUBBLERS. ALL ORNAMENTAL PLANTING WILL RECEIVE DRIP IRRIGATION OR OTHER HIGHLY EFFICIENT IRRIGATION. ALL ABOVE GROUND UTILITIES SHALL BE SCREENED WITH VEGETATION.SUCH AS:ACER MACROPHYLLUM BIGLEAF MAPLEALNUS RHOMBIFOLIA WHITE ALDERGLEDITSIA TIACANTHOS INERMIS ‘SHADE MASTER’ THORNLESS LOCUSTGINGKO BILOBA ‘AUTUMN GOLD’ GINGKO KOELREUTERIA BIPINNATA CHINESE FLAME TREELOPHOSTEMON CONFERTUS BRISBANE BOXLIRIODENRON TULIPIFERA TULIP TREECERCIDIUM PARKINSONIA ‘DESERT MUSEUM’ PALO VERDE TREEPISTACHIA CHINENSIS CHINESE PISTACHEPLATANUS X ACERIFLOIA (HISPANICA) LONDON PLANE TREEQUERCUS AGRIFOLIA COAST LIVE OAK QUERCUS TOMENTELLA ISLAND OAKSHADE & STREET TREES (15 GAL - 24” BOX) QTY 161SHRUBS, GRASSES, AND GROUNDCOVERS (1, 5, 15 GAL) QTY 56,835 SFSUCH AS:ARBUTUS X ‘MARINA’ MARINA ARBUTUSARCHONTOPHOENIX CUNNINGHAMIANA KING PALMBAUHINIA BLAKEANA HONG KONG ORCHID TREEBRACHYCHITON SPP. PINK BOTTLE TREEBRAHEA EDULIS GUADALUPE PALMCASSIA LEPTOPHYLLA GOLDEN MEDALLION TREECERCIS X ‘HEARTS OF GOLD’ GOLDEN REDBUDHYMENOSPORUM FLAVUM SWEETSHADELAGERSTROEMIA SPP. CRAPE MYRTLEMYRICA CALIFORNICA PACIFIC WAX MYRTLEOLEA EUROPEA ‘SWAN HILL’ - STERILE FRUITLESS OLIVEPYRUS CALLERYANA FLOWERING PEARACCENT TREES (15 GAL) QTY 65 SUCH AS:CHORISIA SPECIOSA (CIEBA) FLOSS SILK TREEJACARANDA MIMOSIFOLIA JACARANDA MULTI-TRUNKPLATANUS RACEMOSA MULTI-TRUNK CALIFRONIA SYCAMOREQUERCUS AGRIFOLIA MULTI-TRUNK COAST LIVE OAKSPECIMEN TREES (24-36” BOX) QTY 10TOTAL ON-SITE LANDSCAPE AREA: 56, 835 SFESTIMATED TOTAL WATER USE: 1,543,411.3 GAL / YR.MAXIMUM APPLIED WATER ALLOWANCE: 1,543,411.3 GAL / 0 YR.AREAS WITHIN THE PROJECT SITE THAT ARE TO BE USED FOR RECREATIONAL PURPOSES AND ALL AREAS THAT WILL BE IRRIGATED WITH RECLAIMED WATER ARE CLASSIFIED AS SPECIAL LANDSCAPE AREAS. SPECIAL LANDSCAPE AREAS HAVE BEEN INCORPORATED INTO THE FOLLOWING CALCULATIONS AND ARE REFLECTED IN THE MAXIMUM APPLIED WATER ALLOWANCE PER CALIFORNIA CODE OF REGULATIONS AND THE MODEL WATER EFFICIENT LANDSCAPE ORDINANCE. TOTAL TREES TO BE PLANTED ON THE PROJECT SITE = 236SEE EXISTING TREE DISPOSITION TABLE SHEET A40 FOR SPECIES, SIZE, QUANTITY AND LOCATION OF (E) TREES TO REMAIN, PROTECT, AND TREES PROPOSED FOR REMOVAL.ACACIA COGNATA `COUSIN ITT` RIVER WATTLEADENANTHOS SERICEUS COASTAL WOOLLYBUSHAEONIUM CANARIENSE AEONIUMAGAVE ATTENUATA `NOVA` BLUE CLONEAGAVE DESMETTIANA `VARIEGATA` VARIEGATED AGAVEAGAVE VILMORINIANA OCTOPUS AGAVEAGAVE X `BLUE GLOW` BLUE GLOW AGAVEALOE POLYPHYLLA SPIRAL ALOEALOE STRIATA CORAL ALOEALYOGYNE HUEGELII `SANTA CRUZ` BLUE HIBISCUSARCTOSTAPHYLOS SPP. MANZANITABACCHARIS PILULARIS `PIGEON POINT` COYOTE BRUSHBULBINE FRUTESCENS STALKED BULBINECAESALPINIA SPP. YELLOW/RED BIRD OF PARADISECAREX PRAEGRACILIS CALIFORNIA FIELD SEDGECAREX TUMULICOLA BERKELEY SEDGECEANOTHUS GRISEUS HORIZONTALIS `YANKEE POINT` CALIFORNIA LILACCERCIS CANADENSIS `RISING SUN` RISING SUN REDBUDCHONDROPETALUM TECTORUM CAPE RUSHCISTUS PULVERULENTUS `SUNSET` ROCKROSECLYTOSTOMA CALLISTEGIOIDES VIOLET TRUMPET VINECOTINUS COGGYGRIA `ROYAL PURPLE` ROYAL PURPLE SMOKE TREEDIANELLA CAERULEA `CASSA BLUE` CASSA BLUE FLAX LILYDIETES BICOLOR FORTNIGHT LILYECHEVERIA X `AFTERGLOW` AFTERGLOW ECHEVERIAFURCRAEA FOETIDA `MEDIOPICTA` MAURITIUS HEMPHARDENBERGIA VIOLACEA `HAPPY WANDERER` LILAC VINEHESPERALOE PARVIFLORA RED YUCCAHETEROMELES ARBUTIFOLIA TOYONHEUCHERA SANGUINEA CORAL BELLSJUNCUS EFFUSUS `OCCIDENTAL BLUE` OCCIDENTAL BLUE RUSHKNIPHOFIA UVARIA `ECHO MANGO`REBLOOMING TORCHLILYLAVANDULA X INTERMEDIA `PROVENCE` PROVENCE LAVENDRTLEUCADENDRON SPP. CONEBUSHLEUCOSPERMUM CORDIFOLIUM NODDING PINCUSHIONLEYMUS CONDENSATUS `CANYON PRINCE` NATIVE BLUE RYELOMANDRA SPP. MAT RUSHMIMULUS AURANTIACUS STICKY MONKEY FLOWERMUHLENBERGIA DUBIA PINE MUHLYMUHLENBERGIA RIGENS DEER GRASSNEPETA X FAASSENII `WALKERS LOW` WALKERS LOW CATMINTOLEA EUROPAEA `LITTLE OLLIE` TM LITTLE OLLIE OLIVEPENNISETUM SPATHIOLATUM RYE PUFFSPENSTEMON X `FIREBIRD` FIREBIRD BEARD TONGUEPHLOMIS FRUTICOSA JERUSALEM SAGEPHORMIUM X `SEA JADE` NEW ZEALAND FLAXPITTOSPORUM TENUIFOLIUM `SILVER SHEEN` SILVER SHEEN TAWHIWHIPODOCARPUS X `ICEE BLUE` ICEE BLUE PODOCARPUSRHUS INTEGRIFOLIA LEMONADE BERRYRIBES SANGUINEUM RED FLOWERING CURRANTRIBES SPECIOSUMFUCHSIA FLOWERING GOOSEBERRYSALVIA GREGGII `RASBERRY DELIGHT` AUTUMN SAGESALVIA SPATHACEA HUMMINGBIRD SAGESALVIA X `POZO BLUE` POZO BLUE SAGESENECIO MANDRALISCAE BLUE FINGERSESLERIA AUTUMNALIS AUTUMN MOOR GRASSSTRELITZIA NICOLAI GIANT BIRD OF PARADISEVERBENA BONARIENSIS PURPLETOP VERVAINVERBENA LILACINA `DE LA MINA` LILAC VERBENAVERBENA X `BALENDAKLE` TM ENDURASCAPE PURPLE VERBENAVITIS CALIFORNICA CALIFORNIA WILD GRAPEINDICATES SPECIES IS ALSO SUITABLE USE IN BIORETENTION AREASINDICATES SPECIES IS ALSO SUITABLE FOR USE IN ACACIA CREEK BUFFERPROPOSED STREET TREES PER CITY OF SLO STREET TREE MASTER PLAN*************PLNORTH0’ 80’40’20’ 75’0’160’80’40’ 320’SCALES: 1” = 80’- 0” (12”X18” SHEET) 1”=40’-0” (24”X36” SHEET)********************Page 451 of 495 7677717470696872737567434241403938373635343332313029282726 (DEAD)25242322212019188517161514131211109876 (DEAD)5432184818283798078TANK FARM RDEXISTING TREEDRIPLINE, TYPICAL.EXISTING TREE,TYPICALTOP OF BANK PERBIOLOGICAL RESOURCESASSESSMENT BY KEVINMERK ASSOCIATES, LLC,DATED 8-14-20, TYPICAL600 TANK FARM ROADAPN: 053-421-001,053-421-006PROPERTYLINE, TYPICAL650 TANK FARM ROADAPN: 053-421-005ACACIA CR E E K ACACIA CREEK ACACI A C R E E K TREE TAGNUMBER, TYPICALEXISTING TREEAPPROXIMATETRUNK LOCATION,TYPICAL OF 10SCALE: 1" = 80'1.ALL EXISTING TREE RELATED INFORMATION PER ARBORIST REPORT BY RRM DESIGNGROUP, DATED 06/09/2021.2. PROPOSED SITE PLAN INCLUDES REPLACEMENT TREE QUANTITIES EXCEEDING A 1:1MITIGATION RATIO TO THE TREES PROPOSED FOR REMOVAL.3. ALL TREES LOCATED WITHIN THE PROJECT BIOLOGIST DESIGNATED RIPARIANAREAS DEFINED IN THE BIOLOGICAL RESOURCE ASSESSMENT BY KEVIN MERKASSOCIATES, DATED NOVEMBER 4, 2020, ARE TO REMAIN.NOTESEXISTING SITE PLANTree TagBotanical Name Common NameDiameter at BreastHeight (in.)Approx. Dripline ØDisposition1Eucalyptus globulusblue gum98.5 45' Remove2Eucalyptus globulusblue gum72.5 50' Remove3Eucalyptus globulusblue gum33.5 20' Remove4Eucalyptus globulusblue gum53.5 35' Remove5Eucalyptus globulusblue gum115.5 50' RemoveTREE TAG 6 NOT USED7Eucalyptus globulusblue gum71.0 60' Protect8Eucalyptus globulusblue gum112.5 55' Protect9Eucalyptus globulusblue gum65.5 40' Protect10Eucalyptus globulusblue gum60.5 60' Remove11Eucalyptus globulusblue gum39.5 50' Protect12Eucalyptus globulusblue gum54.0 20' Protect13Eucalyptus globulusblue gum60.055' Protect14Eucalyptus globulusblue gum33.0 40' Protect15Eucalyptus globulusblue gum58.0 60' Protect16Eucalyptus globulusblue gum55.0 60' Protect17Eucalyptus globulusblue gum64.0 50' Remove18Eucalyptus globulusblue gum49.5 30' Protect19Eucalyptus globulusblue gum52.0 30' Remove20Eucalyptus globulusblue gum52.0 30' Remove21Eucalyptus globulusblue gum71.5 30' Remove22Eucalyptus globulusblue gum38.5 20' Remove23Eucalyptus globulusblue gum38.5 20' Remove24Eucalyptus globulusblue gum50.0 20' Remove25Eucalyptus globulusblue gum62.0 20' RemoveTREE TAG 26 NOT USED27Eucalyptus globulusblue gum50.0 20' Remove28Eucalyptus globulusblue gum49.5 20' Remove29Eucalyptus globulusblue gum30.5 40' Remove30Eucalyptus globulusblue gum48.5 20' Remove31Eucalyptus globulusblue gum53.0 20' Remove32Eucalyptus globulusblue gum26.0 20' Remove33Eucalyptus globulusblue gum32.0 20' Remove34Eucalyptus globulusblue gum22.5 20'Remove35Eucalyptus globulusblue gum16.0 20' Remove36Eucalyptus globulusblue gum17.5 20' Remove37Eucalyptus globulusblue gum80.5 60' Remove38Eucalyptus globulusblue gum70.0 60' Remove39Eucalyptus globulusblue gum53.0 60' Remove40Eucalyptus globulusblue gum44.0 60' Remove41Eucalyptus globulusblue gum61.0 60' Remove42Eucalyptus globulusblue gum82.0 60' Remove43Eucalyptus globulusblue gum42.0 25' RemoveTREE TAGS 44-66 NOT USEDExisting Tree InventoryPrepared By: Jake Minnick, ISA Certified Arborist #WE-11830ADBH Measurement Height: 54"Date of Evaluation: 06/01/202167Eucalyptus globulusblue gum55.5 45' Protect68Schinus molleCalifornia pepper49.5 30' Remove69Schinus molleCalifornia pepper27.0 20' Remove70Schinus molleCalifornia pepper21.5 30' Remove71Schinus molleCalifornia pepper54.0 20'Remove72Schinus molleCalifornia pepper69.0 30' Remove73Schinus molleCalifornia pepper67.0 35' Remove74Schinus molleCalifornia pepper48.5 25' Remove75Schinus molleCalifornia pepper3.0 3' Remove76Schinus molleCalifornia pepper48.5 25' Remove77Schinus molleCalifornia pepper53.5 25' Remove78Eucalyptus globulusblue gum35.5 30' Remove79Eucalyptus globulusblue gum20.0 20' Remove80Eucalyptus globulusblue gum7.5 10' Remove81Eucalyptus globulusblue gum0.0 6' Remove82Eucalyptus globulusblue gum5.0 5' Remove83Eucalyptus globulusblue gum11.0 15' Remove84Eucalyptus globulusblue gum54.0 25' Protect85Eucalyptus globulusblue gum47.530'ProtectExisting Tree Inventory ContinuedN:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Xrefs\XLT-1622-02-RS20.dwg, TREE MAP 24x36, Jun 09, 2021 3:32pm, jrminnickJune 9, 2021600 TANK FARMTREE PLANC87677717470696872737567434241403938373635343332313029282725242322212019188517161514131211109875432184818283798078TANK FARM RDEXISTING TREEDRIPLINE, TYPICAL.TOP OF BANK PERBIOLOGICAL RESOURCESASSESSMENT BY KEVINMERK ASSOCIATES, LLC,DATED 8-14-20, TYPICAL600 TANK FARM ROADAPN: 053-421-001,053-421-006PROPERTYLINE, TYPICAL650 TANK FARM ROADAPN: 053-421-005ACACIA CR E E K ACACIA CREEK ACACI A C R E E KSCALE: 1" = 80'1.TREE INVENTORY, LOCATIONS, AND TAG NUMBERS PER ARBORIST REPORTPREPARED BY RRM DESIGN GROUP, DATED 08/06/2021.2. ALL TREES LOCATED WITHIN THE PROJECT BIOLOGIST DESIGNATEDRIPARIAN AREAS DEFINED IN THE BIOLOGICAL RESOURCE ASSESSMENT BYKEVIN MERK ASSOCIATES, DATED NOVEMBER 4, 2020, ARE TO REMAIN.3. NESTING RAPTORS ARE KNOWN TO INHABIT THE STAND OF BLUE GUMEUCALYPTUS LOCATED ALONG ACACIA CREEK. PLEASE CONSULT WITHTHE PROJECT BIOLOGIST PRIOR TO ANY TREE MAINTENANCE ORREMOVAL OPERATIONS.4. SEE SHEET A39 IN THE ENTITLEMENT DRAWING PACKAGE AND/OR C7 OFTHE VESTING TENTATIVE MAP DRAWING PACKAGE FOR SPECIES,LOCATION, AND SIZE OF PROPOSED TREE PLANTINGS.NOTESEXISTING SITE PLANTree TagBotanical Name Common NameDiameter at BreastHeight (in.)Approx. Dripline ØDisposition1(XFDO\SWXVJOREXOXV'Compacta'blue gum98.5 45'2blue gum72.5 50'3blue gum33.5 20' Remove4blue gum53.5 35'5(XFDO\SWXVJOREXOXVblue gum115.5 50'TREE TAG 6 NOT USED7(XFDO\SWXVJOREXOXVblue gum71.0 60' Protect8blue gum112.5 55' Protect9(XFDO\SWXVJOREXOXVblue gum65.5 40' Protect10(XFDO\SWXVJOREXOXVblue gum60.5 60'11(XFDO\SWXVJOREXOXVblue gum39.5 50' Protect12blue gum54.0 20' Protect13blue gum60.055' Protect14(XFDO\SWXVJOREXOXVblue gum33.0 40' Protect15(XFDO\SWXVJOREXOXVblue gum58.0 60' Protect16(XFDO\SWXVJOREXOXVblue gum55.0 60' Protect17blue gum64.0 50'18blue gum49.5 30' Protect19blue gum52.0 30'20blue gum52.0 30'21blue gum71.5 30'22blue gum38.5 20' Remove23blue gum38.5 20'24blue gum50.0 20' Remove25blue gum62.0 20'TREE TAG 26 NOT USED27blue gum50.0 20'28blue gum49.5 20' Remove29blue gum30.5 40'30blue gum48.5 20' Remove31blue gum53.0 20'32blue gum26.0 20' Remove33blue gum32.0 20'34blue gum22.5 20'Remove35blue gum16.0 20' Remove36blue gum17.5 20' Remove37(XFDO\SWXVJOREXOXVblue gum80.5 60'38(XFDO\SWXVJOREXOXVblue gum70.0 60'39(XFDO\SWXVJOREXOXVblue gum53.0 60'40(XFDO\SWXVJOREXOXVblue gum44.0 60'41(XFDO\SWXVJOREXOXVblue gum61.0 60'42(XFDO\SWXVJOREXOXVblue gum82.0 60'43(XFDO\SWXVJOREXOXVblue gum42.0 25'TREE TAGS 44-66 NOT USEDExisting Tree InventoryPrepared By: Jake Minnick, PLA, ISA Certified Arborist #WE-11830ADBH Measurement Height: 54"Date of Evaluation: 06/01/2021686FKLQXVPROOHCalifornia pepper49.5 30' Remove696FKLQXVPROOHCalifornia pepper27.0 20' Remove706FKLQXVPROOHCalifornia pepper21.5 30' Remove716FKLQXVPROOHCalifornia pepper54.0 20' Remove726FKLQXVPROOHCalifornia pepper69.0 30' Remove736FKLQXVPROOHCalifornia pepper67.035' Remove746FKLQXVPROOHCalifornia pepper48.5 25' Remove756FKLQXVPROOHCalifornia pepper3.0 3' Remove766FKLQXVPROOHCalifornia pepper48.5 25' Remove776FKLQXVPROOHCalifornia pepper53.5 25' Remove78(XFDO\SWXVJOREXOXVblue gum35.5 30'79(XFDO\SWXVJOREXOXVblue gum20.0 20' Remove80(XFDO\SWXVJOREXOXVblue gum7.5 10' Remove81(XFDO\SWXVJOREXOXVblue gum8.5 6' Remove82(XFDO\SWXVJOREXOXVblue gum5.0 5' Remove83(XFDO\SWXVJOREXOXVblue gum11.0 15' Remove84(XFDO\SWXVJOREXOXVblue gum54.0 25' Protect85blue gum47.5 30' ProtectExisting Tree Inventory ContinuedINDICATES AN EXISTING TREE TO REMAININDICATES AN EXISTING TREE TO BE REMOVEDTREE TAG NUMBERLEGENDQUANTITY60342691 MIN.3.5:1 MIN.TREE DISPOSITION TABLEEXISTINGPROTECTTOTAL REMOVALSPROPOSEDPROPOSED MITIGATION RATIO74TREES PROPOSED FOR REMOVAL ARE IN POOR HEALTH, ARE OVERCROWDED, EXHIBIT STRUCTURAL DEFECTS, ORCONFLICT WITH PROPOSED ONSITE IMPROVEMENTS, SUCH AS BUILDING LOCATIONS, A STORMWATER BASIN, A MULTI-USEPATH, AND ASSOCIATED GRADING. THESE PROPOSED IMPROVEMENTS ENCROACH INTO THE CRITICAL ROOT ZONE (CRZ)OF TREES PROPOSED FOR REMOVAL. ALL TREES PROPOSED FOR REMOVAL ARE RECOGNIZED AS INVASIVE SPECIES BYTHE CALIFORNIA INVASIVE PLANTS COUNCIL (CAL-IPC), AND EACH SPECIES HAS NATURALIZED ONSITE AND SPREAD TOOFFSITE LOCATIONS NEARBY.TREES PROPOSED FOR REMOVAL ONSITE SHOULD BE REMOVED, AND THEIR STUMPS GROUND DOWN TO A DEPTH OF 24".SEVERAL TREES PROPOSED FOR REMOVAL ARE LOCATED OFFSITE, ADJACENT TO THE WESTERN ACACIA CREEK TOP OFBANK BOUNDARY. THESE TREES SHOULD BE CUT FLUSH NEAR THE TOP OF THE ROOT COLLAR AND THE STUMPS AND ROOTSLEFT IN PLACE TO PROVIDE INTERIM STABILIZATION OF THE CREEK BANKS WHILE SUITABLE REPLACEMENT RIPARIAN SPECIESESTABLISH. THE PROJECT ARBORIST WILL FLAG TREES WITH STUMPS AND ROOTS THAT ARE TO REMAIN PRIOR TO THEINITIATION ANY TREE WORK.OFFSITE TREES PROPOSED TO REMAIN ALONG ACACIA CREEK SHOULD BE PRUNED UNDER THE DIRECTION OF THEPROJECT ARBORIST. IT HAS BEEN DETERMINED THAT ALL TREES TO REMAIN CAN BE PRUNED TO ACCOMMODATE THEPROPOSED PROJECT. IN GENERAL, TREES TO REMAIN HAVE NOT BEEN MAINTAINED IN MANY YEARS. MANY HAVE LARGEAMOUNTS OF DEAD WOOD THROUGHOUT THE CROWN, AND SEVERAL HAVE UNBALANCED CROWNS. MOST WILLREQUIRE A CROWN CLEANING TO REDUCE RISK ASSOCIATED WITH DEAD LIMB DROP AND SEVERAL WILL REQUIRE ACROWN REDUCTION TO ENSURE A BALANCED CROWN.A TREE REPLACEMENT PLAN IS PROPOSED FOR BOTH ONSITE AND OFFSITE TREE REMOVALS AT A MINIMUM 3.5:1REPLACEMENT RATIO. THIS EXCEEDS THE REQUIRED 1:1 REPLACEMENT RATIO SET FORTH IN CHAPTER 12.24 TREEREGULATIONS OF THE SAN LUIS OBISPO MUNICIPAL CODE BY 3.5X. ONSITE REPLACEMENT TREE SPECIES ARE PROPOSEDAS A MIXTURE OF NATIVE AND NON-NATIVE SELECTIONS BASED ON THEIR PROVEN SUCCESS UNDER LOCAL CLIMATICAND SOIL CONDITIONS.PRUNING, REMOVAL, AND REPLACEMENT PLANProtectProtectProtectProtectProtectProtectProtectProtectProtectProtectProtectRemoveProtectProtectProtectRemoveProtectProtectProtectProtectProtectProtectProtectTree TagBotanical Name Common NameDiameter at BreastHeight (in.)Approx. Dripline ØDisposition67(XFDO\SWXVJOREXOXVblue gum55.5 45' ProtectONSITE REMOVALSOFFSITE REMOVALS1610(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'(XFDO\SWXVJOREXOXV'Compacta'SEPTEMBER 2021Page 452 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A1, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA1BUILDING SECTIONSPage 453 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A2, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA2FLOOR PLANSPage 454 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A3, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA3FLOOR PLANSPage 455 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A4, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA4FLOOR PLANSPage 456 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A5, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA5FLOOR PLANSPage 457 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A6, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA6FLOOR PLANSPage 458 of 495 N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A7, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMA7FLOOR PLANSPage 459 of 495 FLOOR PLANSA8N:\1600\1622-02-RS20-600-Tank-Farm-Entitlements\Engineering\TTM\Sheet-Files\CA_Floor Plans.dwg, A8, Sep 02, 2021 3:57pm, ngwaltersSeptember 2, 2021600 TANK FARMPage 460 of 495 MEMORANDUM DATE: January 10, 2022 TO: City Council BY: John Rickenbach, Contract Planner FROM: Michael Codron, Community Development Director SUBJECT: Item #1 ARCH-0406-2021; SBDV-0407-2021; GENP-0814-2019; SPEC- 0407-2020; EID-0608-2020 (600 Tank Farm Road) – A summary and evaluation of the comments from the Council initiation and conceptual review and previous advisory body reviews. DISCUSSION On April 21, 2020 the City Council provided the following direction to assist staff with the processing of the application for the project (Council Initiation and Minutes of 4.21.20):  Proceed the processing of the Project through the entitlement process;  Authorize the issuance of a Request for Proposals (RFP) for the preparation of an Environmental Impact Report (EIR) for the project and related entitlements;  Authorize the City Manager to enter into a consultant services agreement with the consultant that best responds to the RFP in terms of qualifications, cost, and approach, that is funded (consultant and staff costs) solely by the Applicant;  Include requested changes by the Applicant;  Staff to work toward a Development Agreement or other enforceable mechanism, with the applicant to accomplish the infrastructure scope, the local’s preference and other areas as determined by staff; and  Include early feedback from the Active Transportation Committee (ATC) and Planning Commission (PC) for the conceptual review and scoping. Based on that direction, City staff began processing the application, and initiated an RFP process to prepare an EIR for the project, ultimately selecting Ri ncon Consultants in a competitive bid process. Staff also began discussions with the applicant toward a possible Development Agreement, later determining a more effective mechanism to achieve City goals would be through project conditions that included various public Page 461 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 2 infrastructure to be built by the applicant where possible. The City is not proposing a development agreement because: 1) the developer currently intends to start construction soon and does not need a vested right that would last longer than the life of the tentative map (16.12.050.A); and 2) staff did not identify any specific needed consideration that was non-nexus based and therefore could use a combination of project design, conditions of approval, and mitigation measures to secure the City’s desired public benefits. As appropriate, the City would enter into a reimbursement agreement with the applicant for improvements that go beyond the applicant’s fair share in the context of possible project impacts. Conceptual Review The applicant’s plan was presented to the Active Transportation Committee (ATC), Architectural Review Commission (ARC) and PC for additional input, with the intent of incorporating their comments into the project for further processing as appropriate. The following discusses that input and how the application responded to each directional item. The applicant also provided responses to each of the recommendations, (see Exhibit 1 of this memo). ATC Conceptual Review Directional Items On July 16, 2020, the ATC reviewed the conceptual design of the project and by consensus provided 21 recommendations regarding the proposed bicycle and pedestrian connectivity and safety, as well as consistency with the latest updates to the City’s Active Transportation Plan for the applicant to incorporate into the project design and associated materials (Conceptual ATC Report and Minutes 7.16.20), which are summarized into the following directional items. ATC Directional Item #1: The project should consider bicycle and pedestrian connections along Tank Farm Road to improve east ‐west connections between Higuera and Broad Streets. Response: This issue was considered and addressed in the EIR, with mitigation provided to address possible impacts. Other project conditions require planning and design to facilitate offsite connections along Tank Farm Road as appropriate , and in coordination with the Public Works Department. ATC Directional Item #2: The project should study bicycle and pedestrian impacts to the Broad/Tank Farm Road intersection. Response: This issue was addressed in the traffic study for the project, an d the project incorporates the study’s recommendations. ATC Directional Item #3: Concerned about connecting the Acacia Creek Path to a wrong way Class IV bikeway. Page 462 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 3 Response: This issue is no longer applicable to the project. The connection was revised to provide direct bicycle access to Santa Fe Road. ATC Directional Item #4: Consider the potential of connecting Clarion Court to Fiero Lane as an alternative to Tank Farm Road for bikes and pedestrians. Response: This is outside the project area and therefore not part of the project . In addition, this improvement was not included as a mitigation measure to address potential impacts identified in the EIR, or from any multi-modal impacts identified in the traffic impact study. ATC Directional Item #5: If Hawthorne Elementary is the designated school for this site, consider how children will walk and bike there. Response: This is outside the project area and therefore not part of the project . In addition, this improvement was not included as a mitigation measure to address potential impacts identified in the EIR, or from any multi-modal impacts identified in the traffic impact study. ATC Directional Item #6: Consider what possible role a bridge across the Railroad Safety Trail at Industrial Way could do to provide access to the east side of the railroad tracks. Response: This is outside the project area and therefore not part of the project . In addition, this improvement was not included as a mitigation measure to address potential impacts identified in the EIR, or from any multi-modal impacts identified in the traffic impact study. ATC Directional Item #7: Consider the role that bike lanes on Industrial Road could play to improve access to the site and avoid busy arterial streets like Tank Farm. Response: This is outside the project area and therefore not part of the project . In addition, this improvement was not included as a mitigation measure to address potential impacts identified in the EIR, or from any multi-modal impacts identified in the traffic impact study. ATC Directional Item #8: Concerned about the impact widening Tank Farm Road to 5 lanes would have on bicycle and pedestrian comfort levels. Response: Potential improvements to Tank Farm Road have been directed by City staff, and the project is designed to address potential safety impacts through the EIR mitigation and conditions of approval. ATC Directional Item #9: Suggests the design of roundabout at Tank Farm / Santa Fe should separate bike and ped modes. Page 463 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 4 Response: This can be considered by City staff through the design p rocess for that facility. ATC Directional Item #10: Requests that the Acacia Creek Path have adequate connections to other bikeway and pedestrian facilities. Response: The Acacia Creek crossing has been coordinated with the adjacent project at 650 Tank Farm Road, Santa Fe Road, and Damon-Garcia Sports Fields. ATC Directional Item #11: Suggests considering other options before using bollards on the bike/ped bridge across creek to 650 Tank Farm. If bollards are the only option, make safe as possible. Response: The proposed bollards have been set back from the Class I path to limit vehicle access only and not impede pedestrian bicycle circulation. ATC Directional Item #12: Avoid bike facility designs that encourage wrong way riding. Response: The circulation design, which was developed in coordination with City staff, discourages wrong way riding. ATC Directional Item #13: Recommends avoiding multilane road on Tank Farm to minimize bike/ped impacts. Consider not widening Tank Farm Road for multilanes. Response: The circulation design was developed in coordination with City staff to minimize safety impacts and maximize functionality. The traffic impact study for the project did not recommend multilane improvements for Tank Farm Road. ATC Directional Item #14: Ensure adequate sidewalk connections throughout internal development. Response: Appropriate pedestrian connectivity was incorporated in the project, as coordinated with City staff . The project accommodates possible pedestrian links to offsite locations, including to Tank Farm Road, the bridge to neighboring development at 650 Tank Farm Road, and along Acacia Creek. ATC Directional Item #15: Suggests more separation than 2 feet between Class IV bikeway and motor traffic. Suggests adding a parkway between the bike and motor vehicle modes. Response: Circulation design was coordinated with City staff. A conceptual design for project circulation is included in Figure 2-6 of the Final EIR, but a final design has not yet been determined. As proposed, there is no parkway between the bike lane Page 464 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 5 and motor vehicles just east of the roundabout on Tank Farm Road. The comment may be considered by the PC and City Council in their review of the project. ATC Directional Item #16: Recommends that pathways for pedestrians throughout the development are direct. Response: Appropriate pedestrian connectivity was incorporated in the project, as coordinated with City staff. The project accommodates possible pedestrian links to offsite locations, including to Tank Farm Road, the bridge to neighboring development at 650 Tank Farm Road, and along Acacia Creek. ATC Directional Item #17: Please look for ways to incorporate design elements of the forthcoming Active Transportation Plan as much as possible into the project Response: Circulation design was coordinated with City staff, with an eye toward incorporating the elements of the Active Transportation Plan (ATP). Based on coordinated review with City Transportation staff, the project is consistent with the ATP. ATC Directional Item #18: Recommends to incorporate slower roadway speeds where possible. Response: The circulation design was developed in coordination with City staff to minimize safety impacts and maximize functionality. Internal privately maintained roadways will be limited to low speeds based on recommendations from City transportation staff to maintain safe pedestrian circulation and because of parking movements within the project. ATC Directional Item #19: Consider locating the bridge to 650 Tank Farm farther north. Response: The Acacia Creek crossing has been coordinated with the adjacent project at 650 Tank Farm Road, and is outside of the scope of this project; however, the bridge has been designed to minimize safety impacts and maximize functionality in accordance with the mitigation measures per the 650 Tank Farm Mixed -use Mitigated Negative Declaration. ATC Directional Item #20: Please provide more separation between ped/bike/motor vehicle modes on Tank Farm Road cross section Response: The circulation design, which was developed in coordination with City staff to minimize safety impacts and maximize functionality. A conceptual design for project circulation is included in Figure 2-6 of the Final EIR, but a final design has not yet been determined. As proposed, there is no parkway between the bike lane and motor vehicles just east of the roundabout on Tank Farm Road. Page 465 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 6 ATC Directional Item #21: Suggests that a lot of thought be put into how the project will provide good bike/ped connectivity to destinations outside of the project. Response: The circulation design, which was developed in coordination with City staff to minimize safety impacts and maximize functionality. The project accommodates possible pedestrian links to offsite locations, including to Tank Farm Road, the bridge to neighboring development at 650 Tank Farm Road, and along Acacia Creek. Refer to the Site Circulation exhibit included in the ARC application package. ARC Conceptual Review Directional Items On August 17, 2020, the ARC reviewed the conceptual design of the project and by consensus provided nine recommendations regarding building orientation in relation to site access and private/common open space areas, and provided comments on the architectural style of the project in terms of compatibility between the different uses for the applicant to incorporate into the project design and associated materials (Conceptual ARC Report and Minutes 8.17.20), which are summarized into the following directional items. ARC Directional Item #1: Incorporate more open space between the parking area and the commercial building creating a plaza for patrons of the commercial businesses. Response: The project design does not include additional open space because of tradeoffs in project design, balancing housing, parking, circulation, and infrastructure requirements. ARC Directional Item #2: Incorporate more recessed windows to add articulation. Response: The applicant did not include more recessed windows after considering the need for additional waterproofing and fiber cement siding; however, window trims have been incorporated into the design to provide greater shadow variation on the building facades in order to provide additional articulation. ARC Directional Item #3: Identify fencing along Acacia Creek, promote Acacia Creek to be accessible to residents as open space. Response: The project is not proposing fencing along Acacia Creek in order to provide residences better access to the open space associated with the creek. ARC Directional Item #4: Consider ways to engage the street along the commercial building to encourage exterior space along Tank Farm. Response: No additional exterior public space was provided along Tank Farm Road, in large part because of concerns about noise. At this time, the tenants of the commercial shell building are unknown, and future tenants may apply for Page 466 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 7 improvements to provide amenities along Tank Farm Road on an individual case by case basis. ARC Directional Item #5: Consider adding small patios that relate to the retail use. Response: This idea was considered by the applicant, but ultimately not included because of other design considerations due to noise exposure along Tank Farm Road, and other viable locations would further reduce the amount of required parking. ARC Directional Item #6: The residential and retail buildings would benefit from a common color palette or more compatible architectural styles. Response: Proposed color schemes 2 and 3 have been updated to respond to this concern by providing more compatible and complementary color palettes. ARC Directional Item #7: Incorporate a serpentine pattern to the drive aisles on the site plan. Response: The applicant has incorporated a serpentine design between Tank Farm Road and the woonerf street from Santa Fe Road, however, other drive aisles were unable to support a more serpentine design without reducing the number of residential units and required parking. ARC Directional Item #8: Create an interfacing element between the wood siding and the shed roof on the residential units. Response: The elevation design has been updated to reflect a more consistent relationship between the various building types. ARC Directional Item #9: Incorporate a pronounced rafter tail (similar to the SESLOC building) on the edges of the buildings to tie the commercial space with the residential. Response: The project has incorporated some shed roof and wood corbels into the Mixed Use building as well as the two building types (C & D) to better reflect the architecture of the SESLOC building and provide more visual cohesiveness. PC Conceptual Review Directional Items On September 23, 2020, the PC reviewed the conceptual design of the project and by consensus provided seven directional items regarding building orientation in relation to Tank Farm Road, mixed-use development compatibility, and on-site and off-site pedestrian and bicycle circulation for the applicant to incorporate into the project design and associated materials (Conceptual PC Report and Minutes 9.23.20), which are summarized into the following directional items. Page 467 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 8 PC Directional Item #1: Consider the circulation interrelationship of this and other nearby developments as a whole and their impact on bicycling and pedestrian connectivity in the immediate area as well as to further destinations in the City. Response: This concept was considered in the project design. The applicant worked closely with City staff on a variety of circulation and land use issues, the impacts of which were examined in the EIR for the project. The project accommodates possible pedestrian links to offsite locations, including to Tank Farm Road, the bridge to neighboring development at 650 Tank Farm Road, and along Acacia Creek. Please also refer to the responses to issues raised by the ATC, previously discussed in this memorandum. PC Directional Item #2: Consider increasing the number of units. Response: This concept was considered by the applicant who determined that various site constraints precluded additional housing units from being proposed. PC Directional Item #3: Ensure compatibility of the commercial services for this project and adjacent sites. Response: The mixed use development will likely attract businesses that are compatible with neighboring residential uses within the framework of the proposed square footage and other site constraints, such as parking. PC Directional Item #4: Design of building adjacent to Tank Farm should be oriented to Tank Farm if they serve the general public rather than just the development. Response: The applicant worked closely with staff to implement this direction. The commercial aspect of this project is conceived being oriented to the public rather than inward to serve only the residents of the site. PC Directional Item #5: Provide a more prominent direct pedestrian conn ection between the residential and commercial areas – minimize crossing of parking areas. Response: Various site constraints make achieving this goal somewhat difficult. However, various landscaping cues and paseos provide for some degree of physical and visual connectivity between residents on one side of the project and commercial uses on the other. PC Directional Item #6: Consider broadening the proposed 1.5‐mile local preference zone. Response: The applicant considered this concept, but is currently not proposing to expand the 1.5-mile local preference zone. Page 468 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 9 PC Directional Item #7: Consider opportunities to enhance connectivity across the emergency bridge. Response: As proposed, the bridge would be for pedestrian or bike access, as we ll as emergency vehicles. EIR Scoping and Draft EIR Review On December 9, 2020, the PC reviewed the scope of the EIR for the purpose of receiving public testimony, to provide input to City Staff and consultants on any additional scope items or environmental issues. No action was taken at this meeting (PC Scoping and Minutes 12.9.20). On July 14, 2021, the PC received an overview of the Draft EIR and received public testimony and provided input to City staff and EIR consultants regarding any additional analysis to adequately evaluate environmental issue areas within the Draft EIR. No action was taken at this meeting (PC DEIR Review and Minutes 7.14.21). FEIR Chapter 8 (Response to Comments) includes responses to public and Planning Commission comments received during the July 2021 meeting. Advisory Body Review Airport Land Use Commission (ALUC) Referral On August 18, 2021, the ALUC reviewed the referral by the City of San Luis Obispo and provided conditions and a determination of consistency with the Airport Land Use Plan (ALUP) for the proposed AASP amendments, General Plan Map Amendment, Rezoning, and the mixed-use development plan (ALUC Report and Minutes 8.18.21). See further discussion in the February 1, 2022, Council Agenda Report Consistency with the Airport Land Use Plan. Tree Committee (TC) Review On September 27, 2021, the TC reviewed the proposed 26 tree removals and replanting plan for 236 trees for consistency with the City’s Tree Removal Regulations. The TC recommended that the PC find the proposed tree removal plan and replanting plan consistent with the City’s Tree Removal Regulations § 12.24 (TC Report and Minutes 9.27.21). ARC Review On October 4, 2021, the ARC reviewed the proposed project design for consistency with the CDG and AASP Design Standards. During their review the ARC provided six recommendations to the applicant to address specific concerns related to building and site design, and recommended that the PC find the project consistent with the CDG and AASP (ARC Report and Minutes 10.4.21). The applicant’s response to ARC’s recommendations is included in Table 1 below. Page 469 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 10 Table 1. Response to ARC Direction ARC Direction Applicant/Staff Response ARC Directional Item #1: Provide one more color scheme for Building A types. Response: The applicant has revised the design to include an additional color scheme for Building types A and B, and an additional scheme for Building types C and D (Attachment H, Sheet X1 and Sheet X2). Staff Analysis: The applicant’s revised design substantially addresses ARC’s recommendation, and the Planning Commission concurred in its recommendation to City Council. ARC Directional Item #2: Incorporate balcony railings that provide more privacy; 66%-75% solid panels to screen views. Response: The applicant has revised the design of the balconies to provide approximately 75% screening of balcony railing to screen storage and improve privacy between structures (Attachment H, Sheet X2). Staff Analysis: The applicant’s revised design substantially addresses ARC’s recommendation, and the Planning Commission concurred in its recommendation to City Council. ARC Directional Item #3: On the Building B rear elevation provide white garage doors rather than gray to blend in more. Response: The applicant has modified the designs of Building B and the new color scheme for Building types C and D, to include white garage doors to correspond with the alternating colors on the rear elevations (Attachment H, Sheet X1). Staff Analysis: The applicant’s revised design substantially addresses ARC’s recommendation, and the Planning Commission concurred in its recommendation to City Council. ARC Directional Item #4: Provide more planting or other visual indicators for pedestrians and traffic calming (referencing the red arrow shown on sheet A10 descending from Santa Fe Road). Response: The applicant has revised the design of the project to provide additional traffic calming measures along the drive isle, by providing alternative pavement for pedestrian crossings and additional parking planters (Attachment H, Sheet X3). Staff Analysis: The applicant’s revised design substantially addresses ARC’s recommendation, and the Planning Commission concurred in its recommendation to City Council. ARC Directional Item #5: Use landscaping to reduce massing of Building E. Response: The applicant has revised the project plans to provide greater landscaping along Tank Farm Road and Santa Fe Road to reduce the mass of Building E as seen from the public right- of-way (Attachment H, Sheet X5). Page 470 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 11 Table 1. Response to ARC Direction ARC Direction Applicant/Staff Response Staff Analysis: The applicant’s revised design substantially addresses ARC’s recommendation, and the Planning Commission concurred in its recommendation to City Council. ARC Directional Item #6: Provide well thought out pedestrian-scale elements. Response: The applicant has provided enhanced exhibits of the pedestrian-scale elements throughout the site, to provide greater context of amenities and pedestrian linkages (Attachment H, Sheets X3-X6). Staff Analysis: The applicant’s revised design substantially addresses ARC’s recommendation, and the Planning Commission concurred in its recommendation to City Council. PC Review On November 17, 2021, the PC reviewed the modified project plans based on the ARC comments above. The PC reviewed the project and recommended approval to the City Council with minor including minor modification to Conditions 68 and 115 but not otherwise recommending changes to the project (PC Report and Minutes 11.17.21), the modifications are identified as follows:  Condition No. 68: Revisions shown in strikeout or underlined text: “Unless otherwise waived by the City, the use of pervious pavers or alternate paving materials as visual cues for pedestrians should be expanded to include some of the more extensive parking areas serving the commercial lease spaces, common area/Club House, the central pedestrian crossroads area, and the northerly shared parking area on Lots 9 and 11 and the central area.” Response: This condition will improve pedestrian safety by providing better visual cues indicating the presence of pedestrians.  Condition No. 115: Revisions shown in underlined text: “Tank Farm Road Frontage Improvements. Project applicant shall reconstruct the Tank Farm Road project frontage to current City Engineering Standards. Unless otherwise approved by the Public Works Director, plans submitted for Public Improvement Plans sha ll include widening the northern side of Tank Farm to a cross section that substantially conforms with the Airport Area Specific Plan and Active Transportation Plan, which includes the following typical cross section elements on the north half of the stree t: 5’ sidewalk / 7’ protected bike lane / 9’ parkway / curb and gutter / two westbound 12’-13’ auto lanes / raised median / one existing eastbound auto lane / existing eastbound bike lane. Designs shall be developed in coordination with the frontage improvements currently in development for the adjacent 650 Tank Farm Road development to ensure that appropriate geometric transitions. Improvements shall Page 471 of 495 600 Tank Farm - ARCH-0406-2021, SBDV-0407-2021; GENP-0814-2019, SPEC-0407-2020 & EID-0608-2020 Memorandum: Previous Council and Advisory Body Review and Comment Summary Page 12 be approved or substantially approved to the satisfaction of the Public Works and Community Development Departments prior to issuance of any building permits and improvements shall be completed prior to issuance of first occupancy permits.” Response: This condition will improve pedestrian safety by providing adequate widths to accommodate pedestrians and bicycles on Tank Farm Road adjacent to the project site. Page 472 of 495 # Directional Item Response 1 include requested changes by the Applicant, staff to work  toward a Development Agreement or other enforceable  mechanism, with the applicant to accomplish the infrastructure  scope, the locals preference and other areas as determined by  staff and to include early feedback from the Active  Transportation Committee and Planning Commission for the  conceptual review and scoping. No longer applicable 2 The project should consider bicycle and pedestrian connections  along Tank Farm Rd to improve east‐west connections between  Higuera and Broad Streets Considered. Refer to the mitigation in the DEIR 3 The project should study bicycle and pedestrian impacts to the  Broad/Tank Farm Rd intersection Refer to Traffic Study 4 Concerned about connecting the Acacia Creek Path to a wrong  way Class IV bikeway No longer applicable. The connection has been  revised to direct bicycle circulation to Santa Fe  Road 5 Consider the potential of connecting Clarion Court to Fiero Lane  as an alternative to Tank Farm Road for bikes and peds This request is outside the scope of this project 6 If Hawthorne Elementary is the designated school for this site,  consider how children will walk and bike there This request is outside the scope of this project 7 Consider what possible role a bridge across the Railroad Safety  Trail at Industrial Way could do to provide access to the east  side of the railroad tracks This request is outside the scope of this project 8 Consider the role that bike lanes on Industrial Road could play  to improve access to the site and avoid busy arterial streets like  Tank Farm This request is outside the scope of this project 9 Concerned about the impact widening Tank Farm Road to 5  lanes would have on bicycle and pedestrian comfort levels. Noted. The design of the Tank Farm Road  improvements have been directed by City  staff. 10 Suggests the design of roundabout at Tank Farm / Santa Fe  should separate bike and ped modes Noted City Council ‐ Rezone Initiation (April 21, 2020) ATC ‐ Conceptual Review (July 17, 2020) 600 Tank Farm - Conceptual City Comments Page 473 of 495 11 Requests that the Acacia Creek Path have adequate connections  to other bikeway and pedestrian facilities The Acacia Creek crossing has been  coordinated with thew adjacent project for  pedestrian and bicycle use.  12 Suggests considering other options before using bollards on the  bike/ped bridge across creek to 650 Tank Farm. If bollards are  the only option, make safe as possible. The proposed bollards have been set back  from the Class I path to limit vehicle access  only and not impede pedestrian bicycle  circuilation 13 Avoid bike facility designs that encourage wrong way riding. Agreed 14 Recommends avoiding multilane road on Tank Farm to minimize  bike/ped impacts. Consider not widening Tank Farm Road for  multilanes Noted. The design of the Tank Farm Road  improvements have been directed by City  staff. 15 Ensure adequate sidewalk connections throughout internal  development Provided in project design 16 Suggests more separation than 2 feet between Class IV bikeway  and motor traffic. Suggests adding a parkway between the bike  and motor vehicle modes. Understood. The design of the road  improvements have been directed by City  staff. 17 Recommends that pathways for pedestrians throughout the  development are direct Provided in project design 18 Please look for ways to incorporate design elements of the  forthcoming Active Transportation Plan as much as possible into  the project Provided in project design 19 Recommends to incorporate slower roadway speeds where  possible The road speed is dictated by the width of the  roadway improvements and City staff. 20 Consider locating the bridge to 650 Tank Farm farther north The proposed bridge crossing at Acaia Creek is  located per the previous crossing location and  the Environmental Analysis that was certified  for the adjacent project (650 Tank Farm) 21 Please provide more separation between ped/bike/motor  vehicle modes on Tank Farm Road cross section Understood. The design of the road  improvements have been directed by City  staff. 22 Suggests that a lot of thought be put into how the project will  provide good bike/ped connectivity to destinations outside of  the project Agreed. Please refer to the Site Circulation  exhibit included in the ARC package Page 474 of 495 23 Incorporate more open space between the parking area and the  commercial building creating a plaza for patrons of the  commercial businesses. The design of the project was not able to  accommodate this request. 24 Incorporate more recessed windows to add articulation. Concidered, but given the extensive amount of  fiber cement siding, recessed windows are not  recommended based on waterproofing  concerns. 25 Identify fencing along Acacia Creek, promote Acacia Creek to be  accessible to residents as open space. This project is not proposing fencing along  Acacia Creek, thus residences would have  access to the open space. 26 Consider ways to engage the street along the commercial  building to encourage exterior space along Tank Farm. Providing exterior use spaces along Tank Farm  Road is not desirable given the concerns  regarding noise. 27 Consider adding small patios that relate to the retail use.Considered but felt they would not be  approporiate 28 The residential and retail buildings would benefit from a  common color pallet or more compatible architectural styles.Agreed. Refer to scheme 2 & 3 29 Incorporate a serpentine pattern to the drive aisles on the site  plan. Refer to pavers in the main intersection off  Santa Fe Road 30 Create an interfacing element between the wood siding and the  shed roof on the residential units. The elevation design has been updated to  reflect a more consistant relationship between  the various building types. 31 Incorporate a pronounced rafter tail (similar to the SESLOC  building) on the edges of the buildings to tie the commercial  space with the residential. We have incorporated some shed roof and  wood corbels into the Mixed‐Use building as  well as the two buldings types (C & D) as a  knod to SESLOC without matches their design ARC ‐ Conceptual Review (August 17, 2020) Page 475 of 495 32 Consider the circulation interrelationship of this and other  nearby developments as a whole and their impact on bicycling  and pedestrian connectivity in the immediate area as well as to  further destinations in the City. Considered.  33 Consider increasing the number of units. Unable to acheieve this due to site constraints. 34 Ensure compatibility of the commercial services for this project  and adjacent sites.Understood.  35 Design of building adjacent to Tank Farm should be orientated  to Tank Farm if they serve the general public rather than just  the development. Agreed. The Mixed‐Use building addresses  Tank Farm and Santa Fe. 36 Provide a more prominent direct pedestrian connection  between the residential and commercial areas – minimize  crossing of parking areas. 37 Consider broadening the proposed 1.5‐mile local preference  zone. Considered and not currently planning on  broadening.  38 Consider opportunities to enhance connectivity across the  emergency bridge. Bridge to be used for ped and bike access, or  emergency vehicles only.  PC ‐ Conceptual Review (September 23, 2020) Page 476 of 495 1010 Marsh St., San Luis Obispo, CA 93401 (805) 546-8208 . FAX (805) 546-8641 PROOF OF PUBLICATION (2015.5 C.C.P.) STATE OF CALIFORNIA, County of San Luis Obispo, I am a citizen of the United States and a resident of the county aforesaid; I am over the age of eighteen years, and not a party interested in the above entitled matter. I am the principal clerk of the printer of the New Times, a newspaper of general circulation, printed and published weekly in the City of San Luis Obispo, County of San Luis Obispo, and which has been adjudged a newspaper of general circulation by the Superior Court of the County of San Luis Obispo, State of California, under the date of February 5, 1993, Case number CV72789: that notice of which the annexed is a printed copy (set in type not smaller than nonpareil), has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to -wit: in the year 2022 I certify (or declare) under the the penalty of perjury that the foregoing is true and correct. Dated at San Luis Obispo, California, this day Zi(%t//� of .�461�V�j(' 2022. Patricia Horton, Horton, New Times Legals Proof of Publication of rr� SAN LUIS OBISPO CITY COUNCIL NOTICE OF PUBLIC HEARING The San Luis Obispo City Council invites all iMuclited persons to attend a public hearing on Tuesday, February 1, 202Z m 6d10 p.m. held via telecomburar e. Pumuantto Executive Orders N-60-20 and N-08-21 executed by the Governor of California, and subsequently Assembly Bill 361, enacted in response to the state of emergency relaling m novel commavirus disease 2019 (COV(O-19) and enabling teleconferencing accommodations by suspending or waiving specified provisions in the Ralph M. Brown Act (Government Code § M950 at seq.l, Council Members and the Public may participate in this meeting by teleconference. Meetings can be viewed an Government Access Channel 20 or stmamad live from the City. YouTube channel at httpd/ yoombsalo.city. Public comment prior to the start of the meeting, may be submitted in writing via U.S. Mail delivered to the City Clerk's office at 990 Palm Street San Luis Obispo, CA 93401 or by email he emadcouncil®slocky.org. PUBLIC HEARING ITEM: A Public Hearing to introduce an Ordinance amending the Citys Zoning Map by changing the zoning designation of the properties associated with the 600 Tank Farm Mixed - Use Project from Business Park (BP-SP) to Commercial Services (C-S-SP) and making associated ten amendments to the Airport Area Specific Plan. The City Council will also review the Egg Tank Farm Mixed -Use Project which has 280 Residential Units and 12,500sf of Commercial space, associated exceptions, Specific Plan Amendment, Vesting Tentative Parcel Map, General Plan Amendment and Rezone, and associated Final Environmental Impact Report (600 Tank Farm Road, ARCH-0407-20211, for mare information, you are invited to contact Kyle Bell Of the City's Community Development Department at %5) 781-7524 or by email at kbet0slociryarg The City Council may also discuss other hearings or business items before or after the items listed above. If you challenge the proposed project in court you may be limped to raising only those issues you or someone else raised at the public hearing described in this notice, or in written correspondence delivered to the City Council at, or prior to, Me public hearing. January 20, 2022 M.. Y P—IJI.NTMG Admin/NTMG OFicHNU51NFSS/Public No,imiP,mforFLb