Loading...
HomeMy WebLinkAbout02-07-2022 ARC Agenda Packet Architectural Review Commission AGENDA Monday, February 7, 2022, 5:00 p.m. Teleconference - Broadcast via Webinar Pursuant to Executive Orders N-60-20 and N-08-21 executed by the Governor of California, and subsequently Assembly Bill 361, enacted in response to the state of emergency relating to novel coronavirus disease 2019 (COVID-19) and enabling teleconferencing accommodations by suspending or waiving specified provisions in the Ralph M. Brown Act (Government Code § 54950 et seq.), commissioners and members of the public may participate in this regular meeting by teleconference. Using the most rapid means of communication available at this time, members of the public are encouraged to participate in Architectural Review Commission meetings in the following ways: Remote Viewing - Members of the public who wish to watch the meeting can: View the Webinar: URL: https://slocity- org.zoom.us/j/89406699547?pwd=RDFsbzVXdlhwTTluZndubkJqTGZpdz09 Telephone Attendee: +1 (669) 900-6833 Webinar ID: 894 0669 9547; Passcode: 295991 Note: The City utilizes Zoom Webinar for public meetings. All attendees will enter the meeting muted. Prior to joining the meeting, consider reviewing the following tutorials: Joining a Zoom Meeting, Zoom Audio & Video Basics, Basic In-Meeting Navigation Public Comment - Public comment can be submitted in the following ways: Mail or Email Public Comment Received by 3:00 PM on the day of meeting - Can be submitted via email to advisorybodies@slocity.org or U.S. Mail to City Clerk at 990 Palm St. San Luis Obispo, CA 93401. All emails will be archived/distributed to Commissioners, however, submissions after 3:00 p.m. on the day of the meeting may not be archived/distributed until the following day. Emails will not be read aloud during the meeting. Verbal Public Comment In Advance of the Meeting – Call (805) 781-7164; state and spell your name, the agenda item number you are calling about and leave your comment. The verbal comments must be limited to 3 minutes. All voicemails will be forwarded to the Commissioners and saved as Agenda Correspondence. Voicemails will not be played during the meeting. During the meeting – Join the webinar (instructions above). Once public comment for the item you would like to speak on is called, please raise your virtual hand, your name will be called, and your microphone will be unmuted. If you have questions, contact the office of the City Clerk at cityclerk@slocity.org or (805) 781-7100. Pages 1.CALL TO ORDER Chair Withers will call the Regular Meeting of the Architectural Review Commission to order. 2.PUBLIC COMMENT FOR ITEMS NOT ON THE AGENDA The public is encouraged to submit comments on any subject within the jurisdiction of the Architectural Review Commission that does not appear on this agenda. Although the Commission will not take action on items presented during the Public Comment Period, the Chair may direct staff to place an item on a future agenda for discussion. 3.CONSENT Matters appearing on the Consent Calendar are expected to be non- controversial and will be acted upon at one time. A member of the public may request the Architectural Review Commission to pull an item for discussion. The public may comment on any and all items on the Consent Agenda within the three-minute time limit. Recommendation: To approve Consent Item 3a. 3.a.CONSIDERATION OF MINUTES - DECEMBER 6, 2021 ARCHITECTURAL REVIEW COMMISSION MINUTES 5 Consideration of the Architectural Review Commission Minutes of December 6, 2021. 4.PUBLIC HEARINGS Note: The action of the Architectural Review Commission is a recommendation to the Community Development Director, another advisory body, or to City Council and, therefore, is not final and cannot be appealed. 4.a.2406 & 2414 JOHNSON (ARCH-0383-2021) REVIEW OF TWO, NEW, PRE-MANUFACTURED SINGLE-UNIT RESIDENCES AND A PRE- MANUFACTURED ACCESSORY DWELLING UNIT ON TWO SEPARATE LOTS WITH SHARED DRIVEWAY ACCESS 9 Recommendation: Review the proposed project in terms of consistency with the City’s Community Design Guidelines (CDG) and provide a recommendation to the Community Development Director. 5.COMMENT AND DISCUSSION 5.a.STAFF UPDATES AND AGENDA FORECAST Receive a brief update from Senior Planner Shawna Scott. 6.ADJOURNMENT The next Regular Meeting of the Architectural Review Commission meeting is scheduled for March 7, 2022 at 5:00 p.m. via teleconference. The Regular Meeting of February 21, 2022 will be cancelled due to observance of the President's Day holiday. LISTENING ASSISTIVE DEVICES are available -- see the Clerk The City of San Luis Obispo wishes to make all of its public meetings accessible to the public. Upon request, this agenda will be made available in appropriate alternative formats to persons with disabilities. Any person with a disability who requires a modification or accommodation in order to participate in a meeting should direct such request to the City Clerk’s Office at (805) 781-7100 at least 48 hours before the meeting, if possible. Telecommunications Device for the Deaf (805) 781-7410. Agenda related writings or documents provided to the Architectural Review Commission are available for public inspection on the City’s website: http://www.slocity.org/government/advisory-bodies. Meeting video recordings can be found on the City’s website: http://opengov.slocity.org/weblink/Browse.aspx?startid=26289&row=1&dbid=1 1 Architectural Review Commission Minutes December 6, 2021, 5:00 p.m. Teleconference - Broadcast via Webinar Architectural Review Commissioners Present: Commissioner Michael DeMartini, Commissioner Brian Pineda, Commissioner Allen Root, Commissioner Micah Smith, Vice Chair Ashley Mayou, Chair Christie Withers (one vacant seat) City Staff Present: Senior Planner Shawna Scott, Deputy City Clerk Megan Wilbanks _____________________________________________________________________ 1. CALL TO ORDER A Regular Meeting of the San Luis Obispo Architectural Review Commission was called to order on December 6, 2021 at 5:03 p.m. by Chair Withers with Commissioners present via teleconference. 2. PUBLIC COMMENT FOR ITEMS NOT ON THE AGENDA Public Comment: None --End of Public Comment-- 3. CONSENT Motion By Chair Withers Second By Commissioner Smith To approve Consent Item 3a. Ayes (4): Commissioner Pineda, Commissioner Smith, Vice Chair Mayou, and Chair Withers (one vacant seat) Absent (3): Commissioner DeMartini, and Commissioner Root CARRIED (4 to 0) 3.a CONSIDERATION OF MINUTES - NOVEMBER 1, 2021 AND NOVEMBER 15, 2021 ARCHITECTURAL REVIEW COMMISSION MINUTES Approve the Architectural Review Commission Minutes of November 1, 2021 and November 15, 2021. Page 5 of 38 2 Commissioners DeMartini and Root joined the meeting at 5:06 p.m. 4. PUBLIC HEARINGS 4.a 55 BROAD ST. (ARCH-0386-2020) CONTINUED REVIEW OF A NEW 79,492 SF, THREE TO FOUR STORY PROJECT WITHIN THE PLANNED DEVELOPMENT OVERLAY FOR THE RESIDENTIAL CARE FACILITY KNOWN AS THE VILLAGES Associate Planner Kyle Bell presented the staff report and responded to Commission inquiries. Applicant representatives, Jay Blatter, Jan Hockhouser, Patrick Smith, and Jim Burrows provided a brief overview of the project and responded to questions raised. Chair Withers opened the public hearing. Public Comments: None --End of Public Comment-- Chair Withers closed the public hearing. Motion By Commissioner Smith Second By Commissioner Root Find the proposed project consistent with the Community Design Guidelines and Sign Regulations, and provide the following recommendations to the Planning Commission for approval:  Consider a material change to the material of the wainscoting on the base of Building A - veering and cap to add more authenticity.  Consider a plane change on Building A such as adding a smooth surface like faux stone, cast concrete, or incorporate matching tile Ayes (6): Commissioner DeMartini, Commissioner Pineda, Commissioner Root, Commissioner Smith, Vice Chair Mayou, and Chair Withers (one vacant seat) CARRIED (6 to 0) Page 6 of 38 3 5. COMMENT AND DISCUSSION 5.a STAFF UPDATES AND AGENDA FORECAST Senior Planner Shawna Scott provided an update of upcoming projects. 6. ADJOURNMENT The meeting was adjourned at 6:00 p.m. The Architectural Review Commission will hold a Special Meeting on January 24, 2022 at 5:00 p.m. The next Regular Meeting of the Architectural Review Commission meeting is scheduled for February 7, 2022 at 5:00 p.m. via teleconference. _________________________ APPROVED BY ARCHITECTURAL REVIEW COMMISSION: XX/XX/202X Page 7 of 38 Page 8 of 38 City of San Luis Obispo, Council Memorandum City of San Luis Obispo Architectural Review Commission Staff Agenda Correspondence DATE: February 3, 2022 TO: Chair and Commissioners FROM: Rachel Cohen, Associate Planner VIA: Shawna Scott, Senior Planner SUBJECT: ITEM 4.a - 2406 & 2414 JOHNSON (ARCH-0383-2021) REVIEW OF TWO, NEW, PRE-MANUFACTURED SINGLE-UNIT RESIDENCES AND A PRE- MANUFACTURED ACCESSORY DWELLING UNIT ON TWO SEPARATE LOTS WITH SHARED DRIVEWAY ACCESS Staff was made aware that the water calculation tables shown on Sheet L -2 (Attachment A, Project Plans) were not legible. The attached document provides a clear and legible version of the tables. Page 9 of 38 Page 10 of 38 Page 11 of 38 Page 12 of 38 ARCHITECTURAL REVIEW COMMISSION AGENDA REPORT SUBJECT: 2406 & 2414 JOHNSON (ARCH-0383-2021) REVIEW OF TWO, NEW , PRE- MANUFACTURED SINGLE-UNIT RESIDENCES AND A PRE-MANUFACTURED ACCESSORY DWELLING UNIT ON TWO SEPARATE LOTS WITH SHARED DRIVEWAY ACCESS BY: Rachel Cohen FROM: Shawna Scott Phone Number: 805-781-7574 Phone Number: 805-781-7176 Email: rcohen@slocity.org Email: sscott@slocity.org APPLICANT: Jeffrey Spevack REPRESENTATIVE: Tim Becher RECOMMENDATION Review the proposed project in terms of consistency with the City’s Community Design Guidelines (CDG) and provide a recommendation to the Community Development Director. 1.0 PROJECT DESCRIPTION AND SETTING The applicant is proposing two, new, pre-manufactured single-unit residences on two separate lots that share driveway access. Parcel 1 would contain a 3-bedroom unit with a separate 2-bedroom ADU structure (subject to state standards) (see Attachment A, Project Plans). Parcel 3 would also contain a 3-bedroom residential unit that matches the structure on Parcel 1. Both housing sites are proposing tree removals and replacements as shown in the associated landscape plans. Location: 2406 & 2414 Johnson Avenue. Parcel Sizes: Parcel 1 - 0.4 acre; Parcel 3 - 0.25 acre Access: Both parcels are accessed from Johnson Avenue by a common driveway Site Condition: Vacant Zoning: R-1 (Low density residential) General Plan: Low density residential Surrounding Uses: East: Single family residential development West: Johnson Ave. North: Single family residential development South: Single family residential development Meeting Date: 2/7/2022 Item Number: 4a Time Estimate: 30 minutes Figure 1: Subject Properties 2406 (Parcel 3) 2414 (Parcel 1) Page 13 of 38 Item 4a ARCH-0383-2021 Architectural Review Commission Report – February 7, 2022 2.0 PROPOSED DESIGN Architecture: Single story structures with craftsman elements. Design Details: Vertical and horizontal siding, gable roofs, porches, craftsman style door, column features, and window trim. Materials: Hardipanel siding, Harditrim, and Hardiplank lap siding (see Attachment B) Colors: Pale green, whites, and grays (see Attachment B) 3.0 BACKGROUND & PREVIOUS REVIEW September 18, 2009: the Hearing Officer approved a tentative parcel map creating three lots from one lot. October 28, 2009: the Planning Commission reviewed an appeal of the of the subdivision and denied the appeal and upheld the Hearing Officer’s decision. January 5, 2010: the City Council reviewed an appeal of the Planning Commission’s decision and denied the appeal and upheld the Hearing Officer ’s decision. The City Council included additional development standards in the conditions of approval as a part of upholding the approval (Resolution No. 10140 (2010 Series), PDF page 140). 4.0 FOCUS OF REVIEW The ARC’s role is to: 1. Review the project in terms of its consistency with the Community Design Guidelines (CDG), and 2. Provide comments and recommendations to the Community Development Director. Community Design Guidelines: https://www.slocity.org/home/showdocument?id=2104 5.0 COMMUNITY DESIGN GUIDELINES / DISCUSSION ITEMS The proposed development must be consistent with the requirements of the CDG. Staff has not identified any discussion items or concerns related to consistency with the CDG Chapter 2 (General Design Principles), Chapter 5 (Residential Project Design), and Chapter 6 (Site Planning and Other Design Details) (see Attachment A, Project Plans). Page 14 of 38 Item 4a ARCH-0383-2021 Architectural Review Commission Report – February 7, 2022 6.0 PROJECT STATISTICS Table 1: Site Details for Parcel 1 Site Details Proposed Allowed/Required* Setbacks Front Side Side Northwest side Rear > 20 feet (flag lot) 5 feet 5 feet 10 feet 10 feet 20 feet 5 feet 5 feet 10 feet** 5 feet Maximum Height of Structures 14.5 feet (does not exceed 406-foot elevation) Not to exceed 406- foot elevation** F.A.R. 0.11 0.4 Number of Vehicle Spaces 3 3** *2019 Zoning Regulations **Reso No. 10140 (2010 Series)) Table 2: Site Details for Parcel 3 Site Details Proposed Allowed/Required* Setbacks Front Side Side Rear 20 feet 8.5 inches 20 feet 27 feet 8 inches 16 feet 1 inch 20 feet 5 feet 5 feet 5 feet Maximum Height of Structures 15.5 feet 25 feet F.A.R. 0.18 0.4 Number of Vehicle Spaces 3 3** *2019 Zoning Regulations **Reso No. 10140 (2010 Series)) Figure 2: West Elevation Page 15 of 38 Item 4a ARCH-0383-2021 Architectural Review Commission Report – February 7, 2022 Environmental Status: The project is categorically exempt from environmental review under Class 32, 15332 (In-Fill Development Projects). 7.0 ACTION ALTERNATIVES 7.1 Recommend findings of consistency with the CDG. An action recommending approval of the application based on consistency with the CDG will be forwarded to the Community Development Director for final action. This action may include recommendations for conditions to address consistency with the CDG. 7.2 Continue the project to a hearing date certain, or uncertain. An action continuing the application should include direction to the applicant and staff on pertinent issues. 7.3 Recommend findings of inconsistency with the CDG. An action recommending findings of inconsistency should include findings that cite the basis for denial and should reference inconsistency with the General Plan, Community Design Guidelines, Zoning Regulations, or other policy documents. 8.0 ATTACHMENTS A - Project Plans (ARCH-0383-2021) B - Project Materials and Colors (ARCH-0383-2021) Page 16 of 38 T-1 PROJECT DESCRIPTION; PROJECT AREAS; CONDITIONS A-1 UNITS A, B: PLAN & ELEVATIONS A-2 A.D.U. PLAN & ELEVATIONS A-3 EXISTING S.F.R. ELEVATIONS L-1 PRELIMINARY LANDSCAPE PLAN L-2 C-1.1 ATLAS CIVIL DESIGN SHEETS: IRRIGATION PLAN T-2 PROPOSED SITE PLAN; SITE SECTIONS GRADING & IMPROVEMENT PLAN PARCEL 1-STORM DRAIN & CROSS SECTIONS C-2.1 PRECISE GRADING PLAN-ADUC-2.2 C-3.3 PRECISE GRADING PLAN-SFR UNIT A PARCEL 3-STORM DRAIN & CROSS SECTIONS C-4.1 C-4.2 PRECISE GRADING PLAN-SFR UNIT B RETAINING WALL PROFILEC-5.1 DETAILSC-6.1 C-7.1 COMPOSITE UTILITY PLAN C-8.1 EROSION CONTROL PLAN JIM HOMER LANDSCAPE DESIGN SHEETS: 1. NEW 3-BR. S.F.R. MANUFACTURED HOME AND 2-BR. A.D.U. MANUFACTURED HOME ON EXISTING VACANT PARCEL WITH DRIVEWAY, PARKING, PATIOS, WALKWAYS & LANDSCAPING AT PARCEL 1 2. NEW 3-BR. S.F.R. MANUFACTURED HOME ON EXISTING VACANT PARCEL, WITH PATIO, WALKWAY & LANDSCAPING AT PARCEL 3 3. TREE REMOVAL & REPLACEMENT; STREET TREES; GRADING AS REQUIRED; FENCING, LANDSCAPING & IRRIGATION SYSTEMS PARCEL 1: 2406 JOHNSON AVE. SAN LUIS OBISPO, CA APN 003-703-072 PARCEL 3: 2414 JOHNSON AVE. SAN LUIS OBISPO, CA APN 003-703-074 ZONING: R1 OCCUPANCY CLASS: R-3 BUILDING TYPE: V-B, SPRINKLERED UNITS A & B: MODEL #3845 CTB; A.D.U.: MODEL #K610CTB SKYLINE HOMES, 499 W. ESPLANADE AVE., SAN JACINTO, CA 92583 DESIGNATION PARCEL 1 UNIT A COVERED PORCH PORCH & STEPS (<30") A.D.U. COVERED PORCH (<30") PORCH & STEPS (<30") DECK LOT 1 EASEMENTS PARCEL 3 UNIT B COVERED PORCH PORCH & STEPS (<30") HARDSCAPE, PARCEL 1, UNIT A HARDSCAPE, PARCEL 1, A.D.U. HARDSCAPE, PARCEL 3, UNIT B DRIVEWAY, PARKING & ACCESS, PARCEL 1 DRIVEWAY, PARKING & ACCESS, PARCEL 3 STEPS & SECONDARY PORCHES, TOTAL LANDSCAPE, PARCEL 1 LANDSCAPE, PARCEL 3 FLOOR AREA RATIO, PARCEL 1 FLOOR AREA RATIO, PARCEL 3 AREA (SQ. FT.) (.4 Acre) 17382 1923 41 41 971 80 47 80 120 (5170) (.25 Acre) 10914 1923 41 41 755 305 1194 1933 624 87 2906 2390 0.11 0.18 JEFFREY SPEVACK 2410 JOHNSON AVE. SAN LUIS OBISPO, CA 93401 tel. 805.423.2335 PARCEL 1 (17% slope): 4 D.U. x .4 (Ac.) = 1.75; 2 D.U. ALLOWED FOR LOT 1 PARCEL 3 (13.5% slope): 7 D.U. x .25 (Ac.) = 1.6; 2 D.U. ALLOWED FOR LOT 3 PARCEL 1, UNIT A, UNCOVERED PARCEL 1, A.D.U., UNCOVERED PARCEL 3, UNIT B, UNCOVERED 2+1 0 2+1 SPACES 1) PROJECT STREET FRONTAGE, JOHNSON AVE. 2) WEST CORNER OF SMITH ST. & JOHNSON AVE. INTERSECTION CIVIL ENGINEER SHANNON DAVIS, PE, MS ATLAS CIVIL DESIGN 872 HIGUERA ST. SAN LUIS OBISPO, CA 93401 619.307.2749 SOILS ENGINEER CRAIG CROZIER C61361 GEOSOLUTIONS, INC. 220 HIGH ST. SAN LUIS OBISPO, CA 93401 tel. 805.543.8539 REPORT #SLO-6905-2 LANDSCAPE DESIGN JIM HOMER LANDSCAPE DESIGN P.O.B. 180 SAN LUIS OBISPO, CA 93406 tel. 805.431.9403 CHRIS STIER CERTIFIED ARBORIST #WE9262-A GREENVALE TREE COMPANY PO BOX 13234 SAN LUIS OBISPO, CA 93406 tel. 805.544.1124 REPORT DATED AUGUST 11, 2021 TREE REPORT (1) The Community Development Director has designated Parcels One, Two and Three as "sensitive sites". This status ensures that future infill development will respect existing site constraints, privacy for occupants and neighbors of the project, provide for adequate parking, and be compatible with the scale and character of the existing neighborhood. An application for architectural review will be required for all three parcels in accordance with Municipal Code Section 2.48.050. Development applications for Parcel One must be reviewed by the Architectural Review Commission. (2) Applications submitted for architectural review on Parcel One shall include housing designed not to exceed a 406-foot elevation at the highest point of the roof, to preserve pleasant views from and towards the property (LUE 2.2.12), and remain consistent in character with the neighborhood. (3) The building footprint shown on Parcel One shall be reduced in size so that eventual housing development of the parcel will be setback at least 10 feet from the northeast property line. The driveway shall not be allowed within this required 10 foot setback. (4) Future development of Parcels One & Three shall provide one (l) additional on-site guest parking space per lot, subject to the approval of the Community Development Director. (6) Grading associated with development of new structures shall be minimized to the smallest practical area of land for development on each parcel. (10) The subdivision improvement plans and map shall show and honor the existing sump and berm area located at the northeast corner of proposed Parcel 2 that serves the upslope lots of Tract 1272. The final map shall include an additional drainage easement if the existing containment area and safe overflow for the storm drain system are not located within the existing easement area. Otherwise, the applicant shall demonstrate that the existing grading improvements are not necessary and shall propose a revised solution for the safe overflow. (14) A CCTV inspection of the existing sewer lateral proposed to serve Parcel 3 shall be submitted to the Building Division during the building permit process. (1) Planting of five (5) street trees along the Johnson Avenue frontage (Covenant# 2017030230 dated June 22, 2017) as well as all associated and/or required work within the 10 ft. street tree easement T-1 Page 17 of 38 T-2 Page 18 of 38 A-1 Page 19 of 38 A-2 Page 20 of 38 A-3 Page 21 of 38 Page 22 of 38 Page 23 of 38 Page 24 of 38 Page 25 of 38 Page 26 of 38 ENGINEER OF RECORD: DATE APPROVAL BY THE CITY DOES NOT GUARANTEE ACCURACY NOR COMPLETENESS OF THESE PLANS. IT DOES AUTHORIZE THE OWNER TO BUILD THE PROJECT HEREON. IT SHALL BE THE RESPONSIBILITY OF THE OWNER AND ENGINEER OF RECORD TO CORRECT ANY DEFICIENCIES THAT APPEAR DURING OR AFTER CONSTRUCTION. CITY SPECIFICATIONS AND ENGINEERING STANDARDS SHALL BE FOLLOWED UNLESS THEY ARE SPECIFICALLY WAIVED OR MODIFIED BY NOTES ON THESE PLANS. THE ENGINEER OF RECORD SHALL PROVIDE SUBMITTALS AS REQUIRED IN THE ENGINEERING STANDARDS. NOTICE PUBLIC IMPROVEMENT PLANS FOR:REVISIONS DESCRIPTION CITY FILE NO. SHEET OF DRAWN BY: CHECKED BY: JOB NO. DATE APPROVAL ENGR CITY COMMUNITY DEVELOPMENT DIRECTOR CITY UTILITIES ENGINEER RECOMMENDED FOR APPROVAL BY OTHER ELECTRIC CO. GAS CO. TELEPHONE CO. TELEVISION CO. OTHER UTILITY DATE DATE DATE DATE DATE C1 10 DATE DATE DATE DATE DATE SAN LUIS OBISPO PUBLIC WORKS BY: 1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT OF NORTHERN CALIFORNIA" BY PHONE AT 8-1-1 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OF POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES. Reference Documents: City Standard Specifications: August 2020 Edition City Engineering Standards: August 2020 Edition OTHER DATE HORIZONTAL CONTROL FOR POINTS 8060 & 8059 AS PUBLISHED IN THE CITY OF SAN LUIS OBISPO 2007 HORIZONTAL CONTROL NETWORK. CITY NETWORK IS BASED ON THE NORTH AMERICAN DATUM OF 1983 (NAD83) EPOCH DATE 1991.35, ZONE 5 CALIFORNIA. VERTICAL CONTROL BENCHMARK NO. 108 WITH AN ELEVATION OF 311.94 AS PUBLISHED IN THE CITY OF SAN LUIS OBISPO 2020 BENCHMARK SYSTEM. CITY'S BENCHMARK SYSTEM IS BASED ON THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD88). index to plans general notes datum GRADING & IMPROVEMENT PLAN SPEVACK RESIDENCES 2406, 2410 & 2414 JOHNSON AVENUE Underground Service Alert Call 811 ABBREVIATIONS EARTHWORK QUANTITIES UNDERGROUND UTILITIES NOTE NOTE TO CONTRACTOR ENGINEER OF RECORD NOTE FLOOD DESIGNATION PROJECT CONSULTANTS PROPOSED LEGEND EXISTING LEGEND VICINITY MAP SCALE: NOT TO SCALE SITE Tel: 1-760-718-8010 www.AtlasCivilDesign.com Civil Engineering Site Optimization DesignCivilCivil Design San Diego Orange County Los Angeles San Luis Obispo Monterey 21-088 TITLE SHEET Page 27 of 38 EU C PIN E PIN E PIN E PIN E PIN E PIN E PIN E PIN E 3-4" AC A C I A C (E) 18"RCP SD (E) 8"PVC SS PA R C E L 1 - 2 4 0 6 17, 3 8 2 S F OA K OA K DE C K (E) RR TIE RET. WALL DI Buildin g E n v e l o p e (P ) U G P PT 'B' LOT 3, TRACT LOT 2, TRACT 1272 LOT 12, TRACT 1272 POINT 'A' BEGIN WALL 1 POINT 'B' POINT 'C' POINT 'D' POINT 'E' END WALL 1 W A L L 1 ( S E E P R O F I L E , S H E E T C 5 . 1 ) F.F. ELEV. 391.25' FIN. GRADE 389.75' PAD ELEV. 388.00' PROPOSED 2-BR A.D.U. 971 S.F. PROPOSED 3-BR. S.F.R. UNIT A, 1923 S.F. F.F.E. 391.75' FIN. GRADE 390.25' PAD ELEV. 387.50' PORCH P A T I O W A L L 1 ( S E E P R O F I L E , S H E E T C 5 . 1 ) A SECTION VIEW B SECTION VIEW F.F.E. 391.25' PROPOSED 2-BR A.D.U. 971 S.F. PER ARCHITECTURAL PLANS PAD ELEV. 388.00' D SECTION VIEW PROPOSED 3-BR. S.F.R. UNIT A, 1923 S.F. PER ARCHITECTURAL PLANS PAD ELEV. 387.50' F.F.E. 391.75' C SECTION VIEW PROPOSED 3-BR. S.F.R. UNIT A, 1923 S.F. PER ARCHITECTURAL PLANS PAD ELEV. 387.50' F.F.E. 391.75' DRAINAGE CONSTRUCTION NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N B C3.1 D C3.1 A C3.1 C C3.1 PA R C E L 1 - S T O R M D R A I N & C R O S S S E C T I O N S C2 Page 28 of 38 EU C PIN E PIN E PIN E PIN E PIN E PIN E (E) 18"RCP SD (E) 8"PVC S DI LOT 2, TRACT 1272 POINT 'A' BEGIN WALL 1 POINT 'B' POINT 'C' W A L L 1 ( S E E P R O F I L E , S H E E T C 5 . 1 ) F.F. ELEV. 391.25' FIN. GRADE 389.75' PAD ELEV. 388.00' PROPOSED 2-BR A.D.U. 971 S.F. PORCH P A T I O PIN E Buildin g E n v e l o p e DRAINAGE CONSTRUCTION NOTES CONSTRUCTION NOTESCONSTRUCTION NOTES HORIZONTAL CONTROL & PAVING NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N PA R C E L 1 - P R E C I S E G R A D I N G P L A N - A . D . U . C3 Page 29 of 38 PIN E PA R C E L 1 - 2 4 0 6 17, 3 8 2 S F OA K (E) RR TIE RET. WALL Buildin g E n v e l o p e B' LOT 3, TRACT 1272 POINT 'D' POINT 'E' END WALL 1 PROPOSED 3-BR. S.F.R. UNIT A, 1923 S.F. F.F.E. 391.75' FIN. GRADE 390.25' PAD ELEV. 387.50' W A L L 1 ( S E E P R O F I L E , S H E E T C 5 . 1 ) DRAINAGE CONSTRUCTION NOTES CONSTRUCTION NOTESCONSTRUCTION NOTES HORIZONTAL CONTROL & PAVING NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N PA R C E L 1 - P R E C I S E G R A D I N G P L A N - S . F . R . C4 Page 30 of 38 6" S S 6" C . I . W JO H N S O N A V E N U E CO N C AC AC PO R C H SHED PE P P E R PAL M 6"J U N I P . JU N I P . 18 " P V C S D PA R C E L 3 - 2 4 1 4 10, 9 1 4 S F Building Envelope EXI S T I N G H O U S E (P ) 4 " S S (P) WS (E) FH (E) G (E) SS (P) G (P) SDMH (P) 8"SD (P ) 6 " S D (P S S S 18" SW UNDERDRAIN DET. 3420 SHT 8 363.00 FL OUT, 363.18 FL IN CB 7 12X12 - 365.1 TG 18 LF CONCRETE SWALE @ BWL, DET SHT 9 PL NE W D W PERFORATED DRAIN TO C.B. PERFORATED DRAIN TO TRENCH DRAIN NEW STORM DRAIN WALL PERF. DRAIN NDS DURO-SLOPE TRENCH DRAIN W/ DUCTILE IRONH-20 GRATE & 4" OUTLET TO CB CB1 S PROPOSED 3-BR S.F.R. UNIT B, 1923 S.F. F.F.E. 375.92' FIN. GRADE 374.42' PAD ELEV. 373.59' A SECTION VIEW B SECTION VIEW PROPOSED 3-BR S.F.R. UNIT B, 1923 S.F. PER ARCHITECTURAL PLANS F.F.E. 375.92' PAD ELEV. 373.59' D SECTION VIEW PROPOSED 3-BR S.F.R. UNIT B, 1923 S.F. PER ARCHITECTURAL PLANS F.F.E. 375.92' PAD ELEV. 373.59' C SECTION VIEW PROPOSED 3-BR S.F.R. UNIT B, 1923 S.F. PER ARCHITECTURAL PLANS F.F.E. 375.92' PAD ELEV. 373.59' DRAINAGE CONSTRUCTION NOTES CONSTRUCTION NOTESCONSTRUCTION NOTES HORIZONTAL CONTROL & PAVING NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N D C4.1 C C4.1 B C4.1 A C4.1 PA R C E L 3 - S T O R M D R A I N & C R O S S S E C T I O N S C5 Page 31 of 38 AC AC SH PE P PE PA L M 6"J U N I P . JUN I P . 18 " P V C S D PA R C E L 3 - 2 4 1 4 10, 9 1 4 S F Building Envelope (P ) 4 " SS (P) 8SD (P ) 6 " S D PERFORATED DRAIN TO C.B. S PROPOSED 3-BR S.F.R. UNIT B, 1923 S.F. F.F.E. 375.92' FIN. GRADE 374.42' PAD ELEV. 373.59' DRAINAGE CONSTRUCTION NOTES CONSTRUCTION NOTESCONSTRUCTION NOTES HORIZONTAL CONTROL & PAVING NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N PA R C E L 3 - P R E C I S E G R A D I N G P L A N - S . F . R . C6 Page 32 of 38 HOR SCALE: 1''=20' VERT SCALE: 1''=10' PROFILE: WALL1 380 390 400 410 380 390 400 410 1+00 2+00 3+00 3+50 BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N RE T A I N I N G W A L L P R O F I L E C7 Page 33 of 38 BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g S i t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N 1 DRAIN WITH GRATE DETAIL 4 OUTFALL26" CURB 5 BROW DITCH 3 TRAFFIC RATED PAVER TYPICAL SECTION STANDARD 6" CURB FLUSH 6" CURB PAVED AREAS LANDSCAPE AREAS 6 TYPE "J" RETAINING WALL DE T A I L S C8 7 TYPICAL TRENCH SECTION Page 34 of 38 EU C PIN E PIN E PIN E PIN E PIN E PIN E PIN E PIN E 3-4" AC A C I A PA L M PE P P E R PAL M 6"J U N I P . JU N I P . PA R C E L 1 - 2 4 0 6 17, 3 8 2 S F PA R C E L 2 - 2 4 1 0 13, 6 6 5 S F PA R C E L 3 - 2 4 1 4 10, 9 1 4 S F JUN I P . JUN I P . OA K OA K OA KPT 'B' S SS S S PL NE W D W S JO H N S O N A V E N U E (P U B L I C R . O . W . ) UTILITY GENERAL NOTEWATER CONSTRUCTION NOTES SEWER CONSTRUCTION NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N CO M P O S I T E U T I L I T Y P L A N C9 Page 35 of 38 EU C PIN E PIN E PIN E PIN E PIN E PIN E PIN E PIN E 3-4" AC A C I A PA L M PE P P E R PAL M 6"J U N I P . JU N I P . GA Z E B O PA R C E L 1 - 2 4 0 6 17, 3 8 2 S F PA R C E L 2 - 2 4 1 0 13, 6 6 5 S F PA R C E L 3 - 2 4 1 4 10, 9 1 4 S F JUN I P . JUN I P . OA K OA K OA KPT 'B' S SS S S PL NE W D W S JO H N S O N A V E N U E (P U B L I C R . O . W . ) EROSION CONTROL NOTES BY RE V I S I O N S DA T E 24 0 6 , 2 4 1 0 & 2 4 1 4 J O H N S O N A V E N U E CI T Y O F S A N L U I S O B I S P O SHEET OF 10 IM P R O V E M E N T P L A N S F O R P . M . S L O 0 9 - 0 0 7 4 Te l : 1 - 7 6 0 - 7 1 8 - 8 0 1 0 ww w . A t l a s C i v i l D e s i g n . c o m Ci v i l E n g i n e e r i n g Si t e O p t i m i z a t i o n De s i g n Ci v i l Ci v i l D e s i g n Sa n D i e g o O r a n g e C o u n t y L o s A n g e l e s S a n L u i s O b i s p o M o n t e r e y NOT F O R C O N S T R U C T I O N LEGEND ER O S I O N C O N T R O L P L A N C10 Page 36 of 38 Page 37 of 38 Page 38 of 38