Department: Public Works
Cost Center: 5002
For Agenda of: 2/15/2022
Placement: Consent
Estimated Time: N/A
FROM: Matt Horn, Public Works Director
Prepared By: Emily Jackson, CIP Process Improvement Manager
SUBJECT: AUTHORIZATION TO ADVERTISE SANTA ROSA AT MONTEREY
INTERSECTION IMPROVEMENTS, SPECIFICATION NO. 1000559
RECOMMENDATION
1. Approve the project plans for Santa Rosa at Monterey Intersection Improvements,
Specification Number 1000559; and
2. Authorize staff to advertise for bids; and
3. Authorize the City Manager to award a Construction Contract pursuant to Section
3.24.190 of the Municipal Code for the bid total, if the lowest responsible bid is within
the project budget of $1,000,000; and
4. Authorize the City Manager to execute Contract Change Orders in excess of $100,000
if within the total available project budget.
DISCUSSION
Background
On March 3, 2020, the City Council approved a Reimbursement Agreement (RA) (see
Attachment B) with 1144 Higuera Street, LLC (“Developer”) to upgrade the sidewalk
infrastructure on the property located at 1144 Higuera Street. As a part of that
development, a new restaurant space was created at the southeast corner, adjacent to
the intersection of Santa Rosa and Monterey Streets. Initially, the Developer was
proposing to install City Standard Mission Style Sidewalk approximately eight -foot-wide,
or the minimum width for new downtown sidewalks per City Engineering Standards.
Subsequent to that, based on conversations between the Developer and staff, the
Developer proposed installing eight-foot-wide sidewalks along Santa Rosa Street and an
eighteen-foot-wide sidewalk along Monterey Street.
The enhanced sidewalk along Monterey Street was proposed to create a signature corner
that clearly conveys to the community that they are entering the Downtown Core. The
intent was to provide a focal point at the entrance to Downtown (from Scenic Highway 1
and Historic Monterey Street) that is prominent, activated (through sidewalk dining) and
welcoming.
Page 15 of 199
Item 5c
The improvements were expected to have numerous benefits, including encouraging
community members and visitors to visit the Downtown area, increasing opportunities for
outdoor dining, and encouraging future redevelopment along upper Monterey Street.
Further, these improvements provided an opportunity to implement additional traffic
safety improvements identified in the City’s Traffic Safety Program and supported by the
City Active Transportation Committee to address ongoing collision trends involving
pedestrians and turning motor vehicles at this intersection. These improvements are
discussed in further detail below.
To complete the improvements, more than half of Monterey Street would have to be
reconstructed in order to match vertical elevations, provide acceptable slopes and grades
for community members with limited mobility, address stormwater drainage issues, and
transition the existing roadway to the new sidewalk elevation. The necessary street
improvements were fiscally infeasible for the Developer. Fortunately, City staff already
had projects underway to improve the existing intersection and the pavement of Monterey
Street for future consideration by the Council. As a result, the City and Developer agreed
to partner on the improvements, with the City Council approving the RA to reimburse the
Developer for a portion of the improvements.
Due to the onset of the COVID-19 Pandemic, the Developer decided to forego the
enhancements and installed the minimum required sidewalk width and other amenities.
Related, the RA approved by the Council on March 3, 2020 was never signed by the
Developer.
Current Status
The Developer has now decided to upgrade the infrastructure envisioned in the approved
RA. The major cost is the removal of the already installed infrastructure at the project
site. The upgrades will be made by the Developer’s contractor and the Developer is fully
responsible for these additional costs. To support the enhancements, the City will
proceed with its own project to construct the previously planned public improvements to
the intersection and will be responsible for those costs. Given this, the RA is no longer
necessary. The City and Developer will work together closely to coordinate contractor
efforts on the two projects.
Public Improvements Planned and Approved
The Developer has prepared plans to implement public improvements associated with
this project and those plans have been reviewed and approved by the City. The
improvements will consist of the following:
1. High Visibility Crosswalks. Install high-visibility crosswalks at each leg of the
intersection to increase visibility of pedestrians crossing the intersection . This work
will be the responsibility of the City.
Page 16 of 199
Item 5c
2. Bicycle Enhancements. Provide enhanced bicycle markings, including green
bike lanes through the intersection on Santa Rosa Street and a bicycle left -turn
box for westbound Monterey Street to alert vehicles to the possible presence of
bicycles in the roadway and provide a delineated path for riders to follow. This work
will be the responsibility of the City.
3. Traffic Signal Modifications to Address Collision Trends. Install new traffic
signal equipment at the intersection, as recommended in the City’s Traffic Safety
Report, to reduce conflicts between turning vehicles and pedestrians. Traffic
signal modifications include addition of a lengthy pedestrian head -start (or “lead
pedestrian interval”) crossing phase, which provides 7-10 seconds for pedestrians
to begin crossing the intersection before vehicle movements are permitted,
installation of ADA-compliant pedestrian push buttons, increased visibility of traffic
signal indicators, and the addition of decorative dark green signal poles consistent
with current City Standards and Engineering Specifications. These signal
modifications also provide flexibility for the future implementation of a pedestrian
scramble phase, if future studies indicate a scramble is an appropriate measure.
This work will also bring the signal equipment into compliance with current City
Standards and accessibility requirements. Lastly, the new signal equipment will
allow for signal phasing changes that will allow for decreased exposure for
pedestrian/vehicle conflicts. This work will be the responsibility of the City.
4. Substantial Repaving. The project includes the repaving an area of Monterey
Street that is approximately 30 feet wide and 160 feet long. This work will be the
responsibility of the City.
5. Prominent and Widened Sidewalk. As previously discussed, new sidewalk in
the Mission Style with appropriate accessible ramps will also be installed. The
Monterey Street frontage will be eighteen-feet wide and allow for multiple uses
including outdoor dining and pedestrians. This work will be the responsibility of the
Developer.
Previous Council or Advisory Body Action
The previously referenced Reimbursement Agreement (RA) was approved by Council on
March 3, 2020. Though the RA was never fully executed, the scope of the project
generally remains the same.
The proposed intersection improvements were presented to the City Active
Transportation Committee in 2019, and the Committee endorsed the proposed pedestrian
and bicycle enhancements.
Page 17 of 199
Item 5c
Policy Context
Consistent with the October 2018 Purchasing Policy Update to the July 2015 Financial
Management Manual, Council approval must be obtained before proceeding with this
project, as approval is required for Public Projects that cost over $175,000.
The proposed intersection improvements are consistent with the design
recommendations of the City’s Downtown Concept Plan and Active Transportation Plan,
which call for wider sidewalks, activation of the downtown pedestrian realm, and bicycle
and pedestrian crossing enhancements at major intersections.
Public Engagement
This project has a notify level of engagement as identified in the City’s Public Engagement
and Notification level. Public hearings were held before the Architectural Review
Commission and Active Transportation Committee during the entitlement process for the
building.
CONCURRENCE
This project has been reviewed and has concurrence from the Public Works CIP
Engineering and Transportation Divisions.
ENVIRONMENTAL REVIEW
The project was determined to be Categorically Exempt from environmental review under
Class 32, In-Fill Development Projects (CEQA Guidelines Section 15332). The project is
surrounded by urban uses and is consistent with the general plan land use designation
for the property. The proposed public improvements and reimbursement agreement are
consistent with this determination and will not result in any reasonably foreseeable
significant impacts to the environment.
FISCAL IMPACT
Budgeted: No Budget Year: 2021-22
Funding Identified: Yes
Page 18 of 199
Item 5c
Fiscal Analysis:
As a part of the FY 2021-22 Mid-year budget update, staff is requesting $1,000,000 from
the CIP Reserve to fund this project.
Funding
Sources
Total Budget
Available
Current
Funding
Request
Remaining
Balance
Annual
Ongoing
Cost
Capital Outlay
Fund
$3,276,208 $1,000,000 $2,276,208 N/A
State
Federal
Fees
Other:
Total $3,276,208 $2,276,208 N/A
* The $1,000,000 budget is being requested as a part of the FY 2021-22 Mid-Year update. The ‘Total
Available Budget’ is contingent upon adoption of the Mid-Year request.
The estimated budget for the City’s project to improve the roadway and intersection
adjacent to the Developer’s project is as follows:
Project Funding Breakdown
Construction $700,000
Contingencies $100,000
Project Total $800,000
Funding Sources
General Fund $1,000,000
Funding Source Total $1,000,000
The most recent estimate for the Developer’s cost is $230,000 for the sidewalk
enhancements and a $20,000 contingency.
ALTERNATIVES
Deny the request. The City Council could deny staff’s requests related to this project.
This action is not recommended because it will delay these important safety
improvements to the intersection of Santa Rosa and Monterey Street and delay the
economic benefits of new commercial properties becoming available and used by local
businesses and will not provide the opportunity to enhance this location into a prominent
corner.
ATTACHMENTS
A - Plans for Santa Rosa at Monterey Intersection Improvements
Page 19 of 199
Page 20 of 199
$WWDFKPHQW$Page 21 of 199
Page 22 of 199
Page 23 of 199
Page 24 of 199
Page 25 of 199
Page 26 of 199
Page 27 of 199
Page 28 of 199
Page 29 of 199
Page 30 of 199