PUBLIC COMMENT: Commissioner Stevenson requested that several items be placed
on future agendas for commission discussion, including:
1. Note taker (steno clerk) is needed to record minutes to enable staff to better
follow the meeting and participate as needed. This is done at other
committee meetings and should also be provided at the ARC;
2. Timing of staff reports. Staff reports should be available at the time the public
notice is available for the public;
3. Page numbering of ARC agendas. As requested, we want pages numbered
sequentially in a location that won’t create confusion for other review bodies;
4. CEQA training for ARC Commissioners;
5. Review of procedures for mitigated negative declarations; and
6. Suggested policies for appropriate size and location of fiber optic switching
buildings in San Luis Obispo city limits.
ARC Minutes
July 17, 2000
Page 2
PROJECTS:
1. 2855 McMillan Avenue. ARC and ER 20-00; Review of a 6,400 sq. ft. industrial
building, including shop area, showrooms, storage, office and caretaker’s
apartment, and environmental review; M zone; Mike Leicester, applicant. Pam
Ricci
Whitney McIlvaine, Associate Planner, presented the staff report recommending the
Commission continue to a date uncertain to allow the applicant and his representative
the opportunity to meet with the adjacent property owner and work out the terms and
conditions regarding the use of the existing reciprocal ingress and egress easement on
the north side of the property.
The public hearing was opened.
The public hearing was closed.
COMMISSION COMMENTS
Commr. Lopes asked about the location and purpose of the project.
On motion by Commr. Lopes and seconded by Commr. Metz, the ARC continued this
item to a date uncertain to allow the applicant and the adjacent property owner to work
out a dispute regarding an access easement that affects project design and site
planning.
AYES: Commrs. Chandler, Metz, Howard, Lopes, Schultz and Stevenson
NOES:
ABSENT: Commr. Rawson
The motion passed.
ARC Minutes
July 17, 2000
Page 3
2. a. 3975 S. Higuera. ARC 83-00; Review of a new commercial building; C-S zone;
T.K. Development, applicant. Whitney McIlvaine
b. 102 Suburban Road. ARC 100-00; Review of a new commercial building; C-S
zone; T.K. Development, applicant. Whitney McIlvaine
Whitney McIlvaine, Associate Planner, presented the staff report recommending the
Commission grant final approval by separate motions to both projects, based on
findings, and with conditions, which she outlined.
The public hearing was opened.
Lauren Luker, on behalf of the applicant, explained that the object of the project is to
achieve continuity of the commercial center with colors and materials.
Randy Rea said that it is acceptable to lose the rear doors as recommended by staff
and that there are many options to create space for any required internal fire
suppression equipment or a delivery corridor. He said the applicant was in agreement
with the conditions as received.
The public hearing was closed.
COMMISSION COMMENTS
Commr. Lopes said that the Food 4 Less store is a bare bones, big box style
architecture and that he would prefer something different with these buildings. He noted
that each storefront could have a different treatment, and felt that the project doesn’t
present itself well to the street. Commr. Lopes said that the buildings could have more
windows at the rear and recommended a 5-foot wall around the patio for wind
protection. Both patios would be subject to traffic noise and he would prefer to see a
trellis support beneath the metal awnings. He also felt that the buildings should be
reoriented toward the street. He stated that he would like a continuance.
Commr. Metz suggested posts for the awnings with vines, including plantings at the
front of the buildings and landscaping in the patio areas. She also suggested
elimination of the windows at the lower storefronts.
Commr. Schultz said that he would eliminate the back doors and would like masonry
wainscoting to replace the lower windows at the storefront. He said that he liked the
trellis posts and was pleased with the continuity of the design.
Commr. Howard said that she does not want to see Marigold II, and that there is no
ARC Minutes
July 17, 2000
Page 4
point in bringing the back of the building closer to pedestrians. She said that she felt
that continuity is not necessarily good and the existing building is nothing to brag about.
She felt that the project did not require back doors, but the windows at the rear could be
retained.
Commr. Chandler said that the masonry needs to be softened with landscaping and
suggested adding more trellising at the rear on the blank wall. He liked the parapet
design and suggested using something to provide a wind break for patios other than just
a block wall.
Commr. Stevenson said that the design elements complement the building scale from
the parking lot side, but that the rear elevation needed more articulation. The
suggested that the patio may need some orientation toward the street, and a 5-foot
block wall to help screen the patio from the wind.
Commr. Metz said that the trash enclosure should be better screened.
On motion by Commr. Lopes and seconded by Commr. Metz, the ARC granted final
approval to project No. ARC 83-0, 3975 South Higuera Street, based on findings and
subject to conditions, as noted in the follow-up letter to the applicant.
Findings
1. The project is exempt from environmental review under CEQA Section 15322 (Infill
Development).
2. As conditioned, the project’s design is appropriate for the Service Commercial zone
and will be compatible with surrounding development.
Conditions
1. The applicant shall submit a final landscaping plan for review and approval by the
Community Development Director to include planting adjacent to the rear masonry
wall to include trellises or planters with shrubs, trees, or vines to achieve 50%
screening of the wall surface. It shall also include planting in the expanded parking
area in front of pad D, and new planting at the entrance to center and along the
South Higuera frontage of lot 4 where existing landscaping has deteriorated or not
filled in.
2. Where, in the opinion of the City Arborist, existing trees are seriously damaged or
removed as a result of the proposed construction, the applicant shall replace such
trees at a ratio of two to one with a species and size as recommended by the City
Arborist.
3. Exterior lighting shall be directed downward and not spill onto adjoining properties.
The maximum height of lighting equipment and supporting structures, including
ARC Minutes
July 17, 2000
Page 5
fixtures, standard and base, shall not be higher than 20 feet above the finished
grade approved as part of this permit. Lighting levels measured at the finished
grade directly beneath the fixture shall not exceed 10 foot-candles. Individual wall-
mounted fixtures that direct light downward only should be used beneath the open
gable trusses above storefront entries. Such fixtures shall be subject to review and
approval by the Community Development Director. There should be no lighting at all
at the rear of the buildings. Avoid fluorescent lighting and use a fixture with broader
spectrum lighting beneath the awnings.
4. Building height, including any roof mounted mechanical equipment, shall not exceed
20 feet from average finish grade beneath each building footprint.
5. On the rear building elevations, eliminate all doors; support the metal gable trusses
with trellis columns on which vines are trained to grow; and add windows at the rear
elevation of each tenant space which are proportionate and similar in design to the
windows on the front elevations for review and approval by the Director.
6. Add trellises under the awnings as well as under the canopies on the rear
elevations.
7. Use a course of masonry at the base of the front elevations instead of the lower
windows proposed in the plans submitted with the application.
8. Provide landscaping planters at the front of the building.
9. Screen the trash enclosure doors.
Code Requirements
1. Street trees shall be planted in accordance with City standards, to the satisfaction of
the City Arborist.
2. Traffic impact fees shall be paid prior to the issuance of building permits.
3. Water and wastewater impact fees shall be paid prior to the issuance of building
permits. Both the Water and the Wastewater Impact Fees are based on the size of
the water meter serving each parcel.
4. An accessible path of travel between all buildings on the site is required.
5. “Van accessible” parking stalls shall be provided.
6. A water allocation is required, due to the additional demand on the City’s water
supplies. Currently, a water allocation can only be obtained through the water
retrofit program. The City’s Water Conservation division can help in determining the
needed allocation and the necessary number of retrofits. Water Conservation can
ARC Minutes
July 17, 2000
Page 6
be reached by calling 781-7258. The cost of retrofitting is directly credited against
the project’s Water Impact Fees, at a rate of $150 per bathroom retrofitted.
7. Water and Wastewater Impact Fees shall be paid at the time building permits are
issued. Both the Water and Wastewater Impact Fees are based on the size of the
water meter(s) installed to serve the project.
8. Appropriate backflow prevention will be necessary on any connection to the City
water system if the property includes an active well, or otherwise utilizes well water.
If well water is proposed for use on this property, additional requirements may
apply. The location of backflow prevention devices is subject to approval by the
Community Development Director.
9. Depending on the proposed uses at the site, industrial waste/wastewater
pretreatment requirements may apply. The project shall be coordinated with the
City’s Industrial Waste Coordinator, Dale Karnes, who can be reached at 781-7425.
10. The required fire flow shall be determined using Appendix III-A of the California Fire
Code.
11. Existing fire hydrants are adequate for the proposed development.
12. Fire protection systems shall be in accordance with the California Fire Code and
California Building Code as amended by the City. The location of all fire protection
equipment shall be approved by the Fire Department prior to installation.
13. Buildings undergoing construction, alteration or demolition shall be in accordance
with Article 87 of the California Fire Code.
14. Front entry walkways that have vehicle overhang shall be capable of providing a
minimum of 4 feet clear width.
15. Parking lot design must be consistent with City Parking and Driveway standards.
16. The applicant must provide motorcycle parking and both short- and long-term
bicycle parking consistent with the Zoning Regulations. The location of bicycle racks
shall be consistent with criteria stipulated by the San Luis Obispo Bicycle
Transportation Plan (1993).
17. The project must comply with inclusionary housing requirements.
18. The project must comply with the California Fire Code to the satisfaction of the City
Fire Chief.
On motion by Commr. Lopes and seconded by Commr. Metz, the ARC granted final
approval to project No. ARC 100-0, 102 Suburban Road, based on findings and subject
ARC Minutes
July 17, 2000
Page 7
to conditions, as noted in the follow-up letter to the applicant.
Findings
1. The project is exempt from environmental review under CEQA Section 15322 (Infill
Development).
2. As conditioned, the project’s design is appropriate for the Service Commercial zone
and will be compatible with surrounding development.
Conditions
1. The applicant shall submit a final landscaping plan for review and approval by the
Community Development Director. It shall include new planting along the South
Higuera frontage and the Suburban Road frontage of lot 1 where existing
landscaping has deteriorated or not filled in. It shall also include planting adjacent to
the rear masonry wall to include trellises or planters with shrubs, trees, or vines to
achieve 50% screening of the wall surface.
2. Where, in the opinion of the City Arborist, existing trees are seriously damaged or
removed as a result of the proposed construction, the applicant shall replace such
trees at a ratio of two to one with a species and size as recommended by the City
Arborist.
3. Exterior lighting shall be directed downward and not spill onto adjoining properties.
The maximum height of lighting equipment and supporting structures, including
fixtures, standard and base, shall not be higher than 20 feet above the finished
grade approved as part of this permit. Lighting levels measured at the finished
grade directly beneath the fixture shall not exceed 10 foot-candles. Individual wall-
mounted fixtures that direct light downward only should be used beneath the open
gable trusses above storefront entries. Such fixtures shall be subject to review and
approval by the Community Development Director. There should be no lighting at all
at the rear of the buildings. Avoid fluorescent lighting and use a fixture with broader
spectrum lighting beneath the awnings.
4. Building height, including any roof mounted mechanical equipment, shall not exceed
20 feet from average finish grade beneath each building footprint.
5. On the rear building elevations, eliminate all doors; support the metal gable trusses
with trellis columns on which vines are trained to grow; and add windows at the rear
elevation of each tenant space which are proportionate and similar in design to the
windows on the front elevations for review and approval by the Director.
6. Add trellises under the awnings as well as under the canopies on the rear
elevations.
ARC Minutes
July 17, 2000
Page 8
7. Use a course of masonry at the base of the front elevations instead of the lower
windows proposed in the plans submitted with the application.
8. Provide landscaping planters at the front of the building and within the patio areas.
9. Provide a 5-foot tall windscreen for the patio area using any of the following:
masonry, fencing, landscaped trellises, or a transparent material.
Code Requirements
1. Street trees shall be planted in accordance with City standards, to the satisfaction of
the City Arborist.
2. Traffic impact fees shall be paid prior to the issuance of building permits.
3. Water and wastewater impact fees shall be paid prior to the issuance of building
permits. Both the Water and the Wastewater Impact Fees are based on the size of
the water meter serving each parcel.
4. An accessible path of travel between all buildings on the site is required.
5. “Van accessible” parking stalls shall be provided.
6. A water allocation is required, due to the additional demand on the City’s water
supplies. Currently, a water allocation can only be obtained through the water
retrofit program. The City’s Water Conservation division can help in determining the
needed allocation and the necessary number of retrofits. Water Conservation can
be reached by calling 781-7258. The cost of retrofitting is directly credited against
the project’s Water Impact Fees, at a rate of $150 per bathroom retrofitted.
7. Water and Wastewater Impact Fees shall be paid at the time building permits are
issued. Both the Water and Wastewater Impact Fees are based on the size of the
water meter(s) installed to serve the project.
8. Appropriate backflow prevention will be necessary on any connection to the City
water system if the property includes an active well, or otherwise utilizes well water.
If well water is proposed for use on this property, additional requirements may
apply. The location of backflow prevention devices is subject to approval by the
Community Development Director.
9. Depending on the proposed uses at the site, industrial waste/wastewater
pretreatment requirements may apply. The project shall be coordinated with the
City’s Industrial Waste Coordinator, Dale Karnes, who can be reached at 781-7425.
10. The required fire flow shall be determined using Appendix III-A of the California Fire
Code.
ARC Minutes
July 17, 2000
Page 9
11. Existing fire hydrants are adequate for the proposed development.
12. Fire protection systems shall be in accordance with the California Fire Code and
California Building Code as amended by the City. The location of all fire protection
equipment shall be approved by the Fire Department prior to installation.
13. Buildings undergoing construction, alteration or demolition shall be in accordance
with Article 87 of the California Fire Code.
14. Front entry walkways that have vehicle overhang shall be capable of providing a
minimum of 4 feet clear width.
15. Parking lot design must be consistent with City Parking and Driveway standards.
16. The applicant must provide motorcycle parking and both short- and long-term
bicycle parking consistent with the Zoning Regulations. The location of bicycle racks
shall be consistent with criteria stipulated by the San Luis Obispo Bicycle
Transportation Plan (1993).
17. The project must comply with inclusionary housing requirements.
The project must comply with the California Fire Code to the satisfaction of the City Fire
Chief.
AYES: Commrs. Lopes, Howard, Chandler, Schultz and Metz
NOES:
ABSENT: Commr. Rawson
The motion passed.
3. 4499 Spanish Oaks Drive. ARC 26-00; Review of home designs and site
development on 53 single family lots in Tract 1750-6; R-1-SP zone; R. W. Hertel,
applicant. John Shoals
Commr. Schultz noted that he would refrain from participation in the discussion of this
item because he owned property in the near vicinity of this site.
John Shoals, Associate Planner, presented the staff report recommending the
Commission grant final approval to: six home designs, reduced street yards for certain
lots, building colors and materials, landscaping, drainage, noise wall and fencing based
on findings and subject to conditions. He also recommended the ARC provide
ARC Minutes
July 17, 2000
Page 10
directions on one home design (plan 605), including exceptions to building height and
street yard for certain lots.
The public hearing was opened.
Bob Flower of R. W. Hertel discussed his July 11, 2000 letter in response to the ARC’s
concerns. He clarified the building total areas, including garages, and explained the
process in re-designing the 605 plan, and the proposed 5-foot high wrought-iron fencing
along Spanish Oaks Drive five feet back from the street line. He clarified that the
drainage was addressed with the subdivision and that the California Regional Water
Quality Board (CRWQB) and the Army Corp of Engineers and California Department of
Fish & Game have approved the drainage plans.
The public hearing was closed.
COMMISSION COMMENTS
Commr. Stevenson asked for clarification on building heights on the upslope lots and
how that would be verified.
John Shoals explained that building height will be verified based on the topography of
each individual lot.
Commr. Lopes asked for clarification on the location and design of the sound wall and
fencing along Spanish Oaks Drive.
Commr. Chandler indicated that he felt comfortable with some street yard exceptions,
but not the building height exceptions. He liked the changes made to the home designs
and the concept landscape plan.
Commr. Howard commended the architect on the design changes. She was
comfortable with the modifications and could support exceptions to street yards and
building height. She said that she felt the varied street yards enhance the street
appearance, and she did not want to see flat roofs to comply with the maximum building
height of 25 feet.
Commr. Metz was concerned with landscaping on the 2-to-1 slopes along Spanish
Oaks Drive. She was specifically concerned with the selection of plant materials and
wanted assurances that the plants would not be removed by the individual homeowners
and would be properly maintained. She said that she felt that the 5-foot fencing should
be installed at the top of the 2-to-1 slope.
Bob Fowler suggested adding language to the CCR’s to assure planting of the materials
and proper maintenance.
ARC Minutes
July 17, 2000
Page 11
Carol Florence of Oasis Landscaping answered Commr. Metz’s questions on plant
materials and locations.
Commr. Lopes suggested placing a landscape easement with fencing at the top of the
lots because he is concerned with individual lot ownership and an inconsistent level
maintenance. He was in agreement with building setbacks, but the building height
exception should not be granted.
Commr. Lopes asked the applicant how he felt about an easement and the
homeowners maintaining the landscaping along Spanish Oaks Drive.
Bob Fowler said that he prefers to have the homeowners maintain landscaping since it
is on individual lots.
Carol Florence suggested having landscaping on Spanish Oaks installed early at the
same time as the Orcutt Road landscaping so that it will be established and difficult for
homeowners to remove.
Commr. Stevenson commended the architect on the project changes, but said that he
still had concerns with the fencing and landscaping at the double-frontage lots on
Spanish Oaks Drive. He wanted to make sure that landscaping screens the rear of the
homes and future rear yard decks. He suggested incorporating shrubs and other plant
materials to screen the foundations and lower level of the homes. He felt the
subdivision would be adequately screened with the additional landscaping, i.e., trees
and shrubs, along Orcutt Road, the creek and various locations throughout the
development. Drainage was properly addressed, and he felt that the building height
exception with a 1-to-2-foot variation (up to 27 feet) was acceptable. He suggested that
the developer’s landscape architect, Oasis, prepare a conceptual plan for the rear
yards of the double-frontage lots backing up to Spanish Oaks Drive and that they come
up with a plant palette of acceptable plant materials for the rear yards of lots along the
creek, the permanent open space parcel (Islay Hill) and along Spanish Oaks Drive. He
also wanted to make sure that the noise barrier be screened and transition into the
natural landscape and hillside.
Commr. Lopes asked for clarification on window treatments and expressed concerns
with detailing and treatments on side elevations.
Randy Rhea of APS Architects indicated that the windows will have a build-up (2x6)
stucco trim.
Commr. Lopes wanted to see additional detailing and window treatments on side
elevations that are visible from Orcutt Road, especially the 604 plan.
Bob Fowler agreed to look into additional treatments on side elevations.
ARC Minutes
July 17, 2000
Page 12
Commrs. Lopes and Stevenson wanted to make sure that the noise barrier along Orcutt
Road was screened from view and transitioned into the natural topography and
vegetation.
Carol Florence and applicant agreed that the wall could be designed to “die out” into the
natural topography rather than being stepped up to 6 feet.
Commr. Chandler asked for clarification on the street yards for lots 39 to 45. He wanted
to know how many buildings were set back 10 feet.
Associate Planner Shoals stated that one or two were 10 feet back from property lines,
and most are between 12 to 18 feet, which is an average of about 14 feet.
Commr. Lopes made a motion to approve the project, with modifications, based on the
following findings and subject to following conditions:
General Findings
1. The proposed designs are appropriate at the proposed location and will be
compatible with the surrounding land uses because they are architecturally
compatible with existing homes in the Edna-Islay neighborhood.
2. The proposed building designs and locations, as amended by the ARC, comply with
the special areas of concerns and requirements established under the Edna-Islay
Specific Plan, adopted February of 1982.
3. The proposed use is exempt from environmental review because the City of San
Luis Obispo City Council adopted an environmental impact report in 1982, and the
California Environmental Quality Act (CEQA) does not require further study of the
residential development.
Building Height Exception Findings
4. The property that will be shaded by the excepted development will not be developed
or will not be deprived of reasonable solar exposure, considering the topography
and zoning.
5. The exception is of a minor nature, involving an insignificant portion of total
available solar exposure. The exception is for a small portion of the roof structure at
the center of the house.
6. No significant fire protection, emergency access, privacy or security impacts are
likely to result from the exception. The height exception is situated in a location that
will not create a significant adverse impact on public safety.
ARC Minutes
July 17, 2000
Page 13
Street Yard Exception Findings
7. The reduced street yards for Lots 2,3, 5-22 and 27-31 are for the front entry and a
small portion of the living area. Granting the street yard exceptions allows the
project to be developed with varied street setbacks and also accommodates the 604
plan which places an entry porch in close proximity to the sidewalk and de-
emphasizes the automobile by recessing the garage.
8. The street yard exceptions will not adversely affect the health, safety and welfare of
persons living or working at the site or in the vicinity. The exception applies to the
entry porch and a small portion of living area, which is not in a location that will
obstruct traffic visibility or negatively impact the street’s appearance.
9. In accordance with City Council Resolution No. 6873 (1990 series), all buildings on
Lots 39 through 46 are located within the designated building envelopes established
as part of the subdivision map for Tract 1750, Unit 6.
10. The street yard exceptions are consistent with the hillside development standards
contained in the Edna-Islay Specific Plan and the City’s General Plan. The reduced
street yards will minimize grading of visible driveways and encroachment on the
lower slopes of Islay Hill.
Conditions
1. The project shall be in substantial conformance with the ARC approved plans dated
June 21, 2000. Any substantial exterior changes to the site and building designs
will require additional architectural review.
2. All applicable conditions of approvals of the City Council approval of the tentative
map for Tract 1750 shall remain in effect, those conditions are incorporated herein,
reference.
3. Final project design shall comply with all requirements of the Edna-Islay Specific
Plan, including noise barriers with landscaping along Tank Farm and Orcutt Roads
and fencing with turtle barriers along the open space area, the creek and the turtle
movement corridors.
4. Excluding those lots granted exceptions for building height and street yard, the
house designs on all other lots shall comply with all R-1 development standards.
5. The building height exceptions are limited to Lots 39 through 46. If necessary, the
houses (plan 605) on these lots may exceed the maximum building height (25 feet)
by one to two feet, depending on the grade of the individual lot. Final building
height shall be based on site-specific information and detailed grading for individual
lots, and verified by the Community Development Director prior to issuance of
building permits.
ARC Minutes
July 17, 2000
Page 14
6. A final landscape plan consistent with the approved landscape concept plan shall
be submitted to the Community Development staff for approval prior to issuance of
building permits. The landscaping shall be installed and maintained in accordance
with the approved plan.
7. The developer shall submit a landscape concept plan for all lots adjoining the
permanent open space parcel (base of Islay Hill) and the creek area to the
Community Development staff for approval. The landscape concept plan shall
include a palette of plant materials to be used by the property owners with rear
yards adjacent to these sensitive areas. Plant materials shall be reflective of the
different settings in the area.
8. The developer shall submit a landscape concept plan showing fencing and
landscaping along the double frontage lots on Spanish Oaks Drive to the
Community Development staff for approval. The plan shall show wrought-iron
fencing at the top of the 2-to-1 slope and multi-layered landscaping (between the
fencing and street) to screen the rear of the houses, including foundations and
decks. The developer shall install the fencing and landscaping, and record a
landscape maintenance easement over this area with the requirement that the
homeowner’s association maintain landscaping in this highly visible area. The
developer shall also prepare a palette of plant materials to be used by the property
owners with rear yards adjacent to this sensitive area.
9. The landscape screening along Orcutt Road and on the sloped area of the double-
frontage lots on Spanish Oaks Drive shall be installed prior to the construction of
any houses on the Huckleberry Lane and Populus Avenue.
rd
10. The paving in front of the 3 parking stall shall be constructed of an alternative
pervious paving material. Alternative paving materials include, but are not limited to:
eco-block, interlocking pavers, cobblestone or other material determined to be of
equivalent performance, strength, quality and durability.
11. Water meters shall be manifolded in pairs, as much as possible. The applicant
should be aware of any retrofit and fee requirements. The Utilities Department will
have additional comments following the submittal of improvement plans.
12. Windows on side elevations of plans facing Orcutt Road shall include additional
treatments and detailing consistent with the front of the house.
AYES: Commrs. Howard, Stevenson, Chandler, Metz and Lopes
NOES:
ABSENT: Commr. Rawson
ABSTAINED: Commr. Schultz
The motion passed.
ARC Minutes
July 17, 2000
Page 15
The meeting adjourned at 8:10 p.m. to a regular meeting of the Architectural Review
Commission, scheduled for Monday, August 7, 2000 at 5:00 p.m. in the Council
Hearing Room at City Hall, 990 Palm Street.
Respectfully submitted,