HomeMy WebLinkAbout08-07-2000 ARC Minutes
ARCHITECTURAL REVIEW COMMISSION
August 7, 2000 - 5:00 p.m.
Council Hearing Room, 990 Palm Street
San Luis Obispo, CA
PRESENT: Commissioners Mark Chandler, Zeljka Howard, Mark Rawson,
Chairperson Charles Stevenson, Rob Schultz, Jennifer Metz and Jim
Lopes
ABSENT: None
STAFF: Associate Planners Pam Ricci and Whitney McIlvaine
PROJECTS:
1. 1014 Palm Street. ARC 49-00; Final review of a second floor addition to an
existing historic building, and height exception to allow a 29-foot high building
where a 25-foot high building is allowed; O-H zone: George O’Neill, applicant.
Pam Ricci.
Pam Ricci, Associate Planner, presented the staff report recommending the
Commission grant final approval to the project, including a building height exception,
based on findings, and subject to conditions, which she outlined.
The public hearing was opened.
Tom Martin, the architect, indicated that he was available to answer questions.
Commr. Rawson indicated concern with matching new windows with the old windows
and asked if it would look worse if not an exact match.
Mr. Martin noted that the windows would need to be specially milled with leaded inserts
to approximate the originals.
Commr. Lopes suggested the idea of using the existing lower floor windows on the new
lower floor.
The public hearing was closed.
COMMISSION COMMENTS
Commr. Howard said that she supported the staff recommendation with the lower
ARC Minutes
August 7, 2000
Page 2
windows maintained in place (second floor when building is raised).
Commr. Chandler said that he wanted to maintain the authenticity of the lower windows
and supported the height exception.
Commr. Lopes indicated that he supported the project with the existing windows on the
lower floor.
Commr. Metz said that she was conflicted about the windows.
Commr. Schultz supported the project and the staff recommendation with the existing
windows on the second floor. He said that he thought divided lights could be recreated
on the first floor.
Commr. Rawson said that moving the existing windows to the new first floor would be a
problem that might compromise other building elements.
On a motion by Commr. Lopes, and seconded by Commr. Schultz, the ARC granted
final approval to the project, based on findings, and subject to conditions, as follows:
Findings
1. The mass of the remodeled and enlarged structure with a maximum building height
of 29 feet is appropriate at the proposed location and will be compatible with
surrounding properties since:
Plans reviewed and supported by the Cultural Heritage Committee showed a
building of that same height;
The remodeled and enlarged structure would be of comparable scale to other
offices in the same block;
The roofline and architectural integrity of the building is maintained with the
building height proposed; and
The highest part of the roof structure is at the peak toward the center of the roof,
which creates fewer potential shading and view issues for adjacent properties.
ARC Minutes
August 7, 2000
Page 3
2. The project’s combination of office and residential uses conform to general plan
policies, which encourage retention of existing buildings, and mixed land uses.
3. The proposed mixed uses provide greater public benefits than single use
development of the site including:
The project retains a structure included on the City’s list of Contributing Historical
Structures, which is in keeping with the ARC guidelines that call for protecting and
enhancing buildings that have historical value by virtue of architectural character,
historic association or age.
The proposed offices and residential uses on the same site provide the
opportunity to have jobs and housing on the same site; and
The site is within walking distance of downtown and close to public
transportation, which supports mixed-use goals to limit automobile use.
4. The project is exempt from environmental review under Section 15303. of the CEQA
Guidelines, Class 3, New Construction or Conversion of Small Structures.
Conditions
1. The applicant shall file a new reciprocal parking and driveway agreement that
accurately reflects the reconfigured parking layout and allows joint use of the
common driveway area for access, as well as maneuvering.
2. The front elevations of the building shall include divided lights for lower windows, as
well as upper windows.
AYES: Commrs. Howard, Schultz, Rawson, Chandler, Metz and Lopes and
Stevenson
NOES: None
The motion passed.
ARC Minutes
August 7, 2000
Page 4
2. 321 Madonna Road. ARC 87-99; Review of public art for shopping center
redevelopment; C-R-PD zone; MBK Southern California, LTD, applicant. Pam
Ricci
Pam Ricci, Associate Planner, presented the staff report recommending that the ARC
find that the public art piece meets the City’s Public Art Guidelines and recommend its
construction to the City Council.
The Public Hearing was opened.
Jim Jacobsen, the sculptor, explained the Japanese-American history of the area and
motivations for the design. He described the different elements of the piece and how it
would be constructed to withstand the wind. He reviewed the project with a Buddhist
priest and members of the congregation and asked for input on the name “WA” which
means peace, harmony and unity.
Ann Ream said that this was the first private public art project and that the process went
very smoothly, with 11 submissions received.
The Public Hearing was closed.
COMMISSION COMMENTS
Commr. Chandler indicated that he liked the piece and he asked Jim Jacobson about
colors and the process for keeping them maintained. Mr. Jacobson said that the project
was finished using a powder coat which is baked on.
Commr. Lopes said that he liked the piece, but wanted to make sure that it will be
pedestrian-scale. Mr. Jacobson explained that it could perhaps be lowered 1 foot.
Commr. Metz supported the project; Mr. Jacobson answered a question from her
regarding efforts to obtain Japanese-American community support for the project.
Commr. Schultz said that he liked the height of the sculpture because it will keep
children from being tempted to try to jump on it.
Commr. Rawson said that the project is very nice.
Commr. Howard stated that the sculpture is delightful and educational, and that the
scale is just right because it needs to be visible to the right-of-way and easy to view.
Commr. Stevenson said that it is a nice piece and respects the Japanese-American
ARC Minutes
August 7, 2000
Page 5
heritage of the community.
On motion by Commr. Rawson, and seconded by Commr. Metz , the ARC found that
the public art for the shopping center meets the criteria for public art.
AYES: Commrs. Rawson, Metz, Howard, Schultz, Chandler, Lopes and
Stevenson
NOES: None
The motion passed.
3. 2034 Santa Barbara Avenue. ARC MI 182-99; Request for a 13-foot high
fence where an 8-foot high fence was previously approved by the ARC; C-S-H
zone; Pacific Home Do-It Center, applicant. Peggy Mandeville
Whitney McIlvaine, Associate Planner, presented the staff report, recommending that
the Commission deny the 13-foot high fence request based on findings, which she
outlined.
The public hearing was opened.
Rob Strong circulated photos and explained that only part of the rear property line fronts
on Emily Street. He said that the City is attempting to obtain a 5- to 7-foot dedication on
Santa Barbara so Pacific Home Do It Center needs all the room it can get. He further
explained the request for planting of vines outside of the security fence on the Emily
Street right-of-way.
The public hearing was closed.
COMMISSION COMMENTS
Commr. Rawson asked what will happen with Emily Street and whether this area could
be landscaped.
Commr. Lopes questioned whether with this request all previous conditions are open for
review.
Commr. Lopes said that he wants to see a 5-foot setback from Emily and along the rest
of the rear property line and he suggested modifications to Condition 4 to delete the
second sentence.
Commr. Metz said that she would support a continuance until Emily Street
ARC Minutes
August 7, 2000
Page 6
improvements are determined. She said that she likes the idea of vine pockets.
Commr. Schultz said that he supports the original decision.
Commr. Rawson said that he thinks the landscaping could happen on Emily Street, and
since the applicant is not filling the lot to create a retaining wall, he is not concerned with
the height of 13 feet and supports the applicant’s request.
Commr. Howard said that she would support the request.
Commr. Rawson commented that Condition 4 adequately addresses the 5 foot setback
by requiring interlocking pavers in lieu of permanent landscaping.
The public hearing was re-opened.
Rob Strong said that pavers meet the condition and he said that he didn’t see any
benefit to landscaping in the setback.
Commr. Chandler said that he supports applicant’s request.
Commr. Stevenson liked the idea of vines on the fence and was sympathetic to the
problem.
Rob Strong explained that the applicant would place box trees strategically in the
setback area.
Commr. Rawson said that the Commission has already granted an 8 foot fence at the
edge of the right-of-way.
Commr. Metz asked what the applicant is trying to achieve and what if the driveway is
turf block.
Commr. Stevenson said that a meeting has not been noticed for a setback variance.
David Diaz said that he is opposed to the idea of an offset retaining wall, and that the
shelf created by that offset will get used for pallets, not landscaping.
The public hearing was closed.
ARC Minutes
August 7, 2000
Page 7
COMMISSION COMMENTS:
Commr. Rawson said that the 5 foot setback is not an issue
Commr. Lopes asked a question regarding addition a condition to require landscaping in
the 5 foot setback.
Notes future of Emily Street as a plaza might enable a better solution.
Rob Strong asked if the 5 foot setback could be interlocking pavers with box trees and
said that he feels that the City is being uncooperative. He claimed that applicant can
insist that Emily Street be improved as a street and the City will then lose the plaza.
On a motion by Commr. Lopes, and seconded by Commr. Schultz, the ARC moved to
deny the 13-foot high fence request based on findings.
AYES: Commrs. Schultz and Lopes.
NOES: Commrs. Chandler, Howard, Rawson, Stevenson and Metz.
First motion failed 5-2.
On a second motion by Commr. Rawson and seconded by Commr. Howard, the ARC
approved an exception to fence height standards to allow a 13-foot high fence (an 8-foot
fence on top of a 5-foot retaining wall) along a portion of the rear property line of the
Pacific Home Do It Center, based on the following findings and subject to the following
conditions:
Findings
1. The project is exempt from environmental review under CEQA Section 15332 (Infill
Development).
2. As viewed from Emily Street, the maximum fence height will be 8 feet due to the
change in grade between the street and the project site.
3. This is consistent with the Railroad District Plan because the fence preserves views
of historic railroad features from adjacent areas and the 8-foot high vinyl-clad fence
has been designed to enhance, not obscure such views.
4. A maximum fence height exception of 13 feet (an 8-foot vinyl clad chain link fence
on top of a 5-foot retaining wall) along the Emily Street property line adequately
addresses potential security issues in this area near the railroad tracks that does not
get much vehicular or pedestrian traffic.
Conditions
ARC Minutes
August 7, 2000
Page 8
1. The maximum fence height shall be 13 feet (an 8-foot vinyl clad chain link fence on
top of a 5-foot retaining wall) along the rear (Emily Street) property line.
2. A minimum 5-foot wide area shall be provided along the Emily Street frontage for the
purpose of landscaping. Additionally, sufficient plantings shall be located along this
frontage to provide adequate screening. Finally, landscaping shall be provided
within the new parking area to provide screening.
AYES: Commrs. Chandler, Howard, Rawson, Stevenson and Lopes
NOES: Schultz and Metz
The motion passed.
4. 735 Tank Farm Road. ARC 79-00; Review of a 56,389 square foot research
and development building and site improvements; C-S-SP zone; APS Architects,
applicant. John Shoals
Whitney McIlvaine, Associate Planner, presented the staff report, recommending the
Commission grant schematic approval to the project based on findings and subject to
conditions which she outlined.
Robert Schiebelhut, the applicant, wants an added condition regarding the lot line
adjustment. He explained the intended use will be a software and internet “people”
building and that he has two potential tenants who want higher ceilings to enable 11 feet
clear and there is a need for room above the ceiling for wiring, etc. He said that he has
met with neighbors several times and worked with Willowbrook Homeowners
Association, the Housing Authority and the Santa Lucia Homeowners Association.
Mr. Schiebelhut discussed issues with Willowbrook::
1. Applicant would agree to landscape off-site in neighboring yards.
2. There will be lights on at night.
3. Applicant agrees to move the trash enclosure as required by staff.
4. The building will have a large setback from the eastern property line.
5. Access from Broad Street through State Farm will not be possible.
ARC Minutes
August 7, 2000
Page 9
Applicant is agreeable with the wall on the south property line as required by staff. He
circulated photos and indicated that there is a need for the building height as proposed.
Mike Peachy, the architect, said that he recognizes site constraints since this property is
adjacent to a residential neighborhood. He said that this is not just a regular office
building since there will be a huge mechanical demand and the roof is designed to
accommodate mechanical equipment and also relate to residential design. The building
could act as a noise wall and wind buffer. The appearance of mass is reduced by the
building setbacks, and lighting will be 15 feet standards on the lower grade and should
not be too intrusive.
Mr. Peachy explained the limitation of planting in a drainage easement and he also said
that showers and lockers will be provided. The current building base material can
remain and he questioned the need for recessing windows and recommends changing
the window frame color to the same as the sill. He agreed to trellises and a requirement
for a blended grey roofing.
Commr. Lopes asked where detention as required on this site will be. He also said that
he was concerned about the roof line.
Commr. Schultz asked why the ARC didn’t get at least a conclusion of the traffic study.
The public hearing was opened.
Steve Del Martini, on behalf of Santa Lucia Homeowners Association, said that the
Association supports the project and that the main issues are noise, lighting, and
especially traffic. Parking is also an important issue.
George Moylan said that the Edna Islay Housing Corp. owns units to the east and south
of the site and that the San Luis Obispo Housing Authority manages these units and
both agencies support the project.
The public hearing was closed.
COMMISSION COMMENTS
Commr. Schultz said that he was concerned with building height and would like a drive
aisle connection in the parking area.
Comm. Howard said that it was a beautiful building which seems to be more friendly
than the typical commercial use vis a vis residential use; however, she said that she
was uncomfortable with the building height and thought that lighting and noise could be
issues.
Comm. Chandler indicated that he liked what the building is trying to accommodate and
ARC Minutes
August 7, 2000
Page 10
is happy with the design. He said that access from Broad would be ideal, but he was
concerned that lighting would be an issue. He said that he wants parking bays
connected.
Commr. Stevenson said that for the parking area, he would prefer to see more of a
setback buffer from Tank Farm Road and would consider the elimination of 15 spaces
at the northwestern of the lot. He thanked the applicant for the effort made with the
neighbors. He said that the project needs an entry feature that addresses the street,
and expressed his concern that the night lights might spill over from people working
late.
Commr. Lopes said that he would like a wider landscaped area along Tank Farm Road,
that he supports an entry at the side of the building. He suggested that the roofline be
more defined, and wants height reduced in strategic locations to alleviate the long roof
line. He said that he supports the low pole height for light standards. Regarding the
landscaping, he said that grouping trees and allowing for a view through to the hills
might be considered.
Mike Peachy, the architect, responded regarding roof height and said that he would
prefer to articulate the roof by popping up the roof 10 feet higher.
Bob Shiebelhut responded to the Commissioners’ comments.
Commr. Stevenson stressed the need to provide a stronger entry feature along Tank
Farm Road, and was concerned regarding the trash enclosure location near the street
yard.
On motion by Commr. Lopes, and seconded by Commr. Howard, the ARC granted final
approval to the project, based on the following findings and subject to the following
conditions and code requirements:
Findings
1. With the building modifications and conditions or approval, the project can be
considered consistent with City’s General Plan policies on commercial siting,
separation and buffering of residential uses from non-residential uses, appropriate
uses and scenic roadways.
2. The proposed project, with the recommended conditions and modifications,
complies with property development standards for the C-S zone.
3. With the building modifications and conditions of approval, the proposed scale and
design of the building will be compatible with surrounding commercial and
industrial uses.
ARC Minutes
August 7, 2000
Page 11
Conditions
1. Final project design and construction drawing shall be in substantial compliance with
the project plans as amended and approved by the ARC.
2. The site plans shall be modified as follows:
Provide an accessible path of travel from the public right of way to the building.
Relocate the motorcycle spaces from the southeast corner of the site away from
the residences to closer to the building.
Connect the two parking bays to create a loop system.
Provide on-site amenities for workers, such as outdoor employee eating or
recreation areas.
Install a 6-foot high wall along the southerly property line to buffer the commercial
building from the residential uses.
Relocate the trash enclosure away from residences and screen it, i.e. with
berming and landscaping.
3. The building design shall be modified as follows:
Explore lowering the overall height of the building at strategic locations to break
up the roofline.
Provide a trellis, espalier or arbor with vines at the northeast and southeast
corners of the building.
Provide windowsills to create additional relief.
Consider varying roof color to break up the massive appearance of the roofline.
For example, the primary roof could slate gray with other forms a different gray.
Provide a pronounced entry on the Tank Farm Road elevation.
4. The landscape plan shall be modified as follows:
Increase the number of trees and shrubs on the east side of the building and
along the easterly property lines to screen the new buildings from the existing
residences.
Increase the landscaping along Tank Farm Road using earthen berms, additional
shrubs and more trees.
ARC Minutes
August 7, 2000
Page 12
Install a 6-foot high block wall with vines along the southerly property line.
5. Building details including: site lighting, mechanical equipment, and signage shall
return to Planning staff for review and approval at the time that working drawings
are submitted for a building permit. Light poles in the parking areas shall not
exceed 15 feet in height. Minimize wall lighting on the building other than at
building entries.
6. The applicant shall be responsible for providing a running total of the site’s parking
requirements with the submittal of any building permit for tenant improvements.
7. An accessible path of travel from the public right of way to the building is required.
8. A safe overflow for the site drainage detention system will be required; it is not clear
from the plans submitted where the safe overflow will be located.
9. The proposed detention basin is shown located over the existing storm drain line.
The depth of the detention basin shall not endanger the existing storm drain line.
10. A detailed hydrology report shall be prepared to demonstrate compliance with City
drainage standards to the satisfaction of the Public Works Director. The scope of
the study must include analysis of all existing public and private drainage facilities
and creek capacities between this property and an adequate point of disposal.
Detention facilities will be required. A connection to the existing Santa Lucia Hills
Home-owners Association (HOA) storm drain along the Southerly property line is
subject to approval by the HOA and capacity evaluation by a civil engineer, to the
satisfaction of the Public Works Department. A separate storm drain may be
required – connected to a public system in Broad St., if approval cannot be obtained
and/or capacity is not available. (Presumably this parcel does not belong to the
HOA.) All proposed detention basin and drainage improvements, except those
within a public street, shall be privately owned and maintained by the property
owner.
11. Eliminate the row of parking along Tank Farm Road and replace it with additional
landscaping.
12. A lot line adjustment shall be processed prior to issuance of building permits.
Code Requirements
1. Street trees are required to be planted per City Standards (the number of trees is
determined by one tree per 35 linear feet of street frontage).
2. Traffic impact fees shall be paid prior to the issuance of a building permit.
ARC Minutes
August 7, 2000
Page 13
3. EPA Requirement: General Construction Activity Storm Water Permits are required
for all storm water discharges associated with a construction activity where clearing,
grading and excavation results in land disturbance of five or more acres. Storm
water discharges of less than five acres, but which is part of a larger common plan
of development or sale, also require a permit. Permits are required until the
construction is complete. To be covered by a General Construction Activity Permit,
the owner(s) of land where construction activity occurs must submit a completed
"Notice of Intent" (NOI) form, with the appropriate fee, to the State Water Board.
4. A water allocation is required, due to the additional demand on the City’s water
supplies. Currently, a water allocation can only be obtained through the water
retrofit program. The City’s Water Conservation division can help in determining the
needed allocation and the necessary number of retrofits. Water Conservation can
be reached by calling 781-7258. The cost of retrofitting is directly credited against
the project’s Water Impact Fees, at a rate of $150 per bathroom retrofitted.
5. Water and Wastewater Impact Fees shall be paid at the time building permits are
issued. Both the Water and the Wastewater Impact Fees are based on the size of
the water meter(s) serving the project.
6. Fire Department Access: Access shall be in accordance with Article 9 of the
California Fire Code. Access roads shall have an unobstructed width of not less
than 20 feet. Access roads shall be designed and maintained to support the
imposed loads of a 60,000 pound fire apparatus and shall be provided with a
surface so as to provide all-weather driving capabilities. Project shall be designed
to allow fire apparatus to circulate through the rear parking area without having to
turn-around. The hammerhead design is not an acceptable alternative.
7. Water Supplies: Water supplies shall be in accordance with Sections 901 and 903
of the California Fire Code. An approved water supply connected to the City
distribution system and capable of providing the required fire flow for fire protection
is required. The fire flow shall be determining using Appendix III-A of the California
Fire Code. The project will have a required fire flow of 3,250 gpm.
8. Fire Hydrants: Fire hydrants shall be installed in accordance with Section 903.4 of
the California Fire Code. The location, number and type of hydrants connected to
the City system shall be determined using Appendix III-B of the California Fire Code
and the approved City Engineering Standards. Three hydrants shall be required
with spacing not exceeding 400 ft.
9. Fire Protection Systems and Equipment: Fire protection systems shall be in
accordance with the California Fire Code and California Building Code as amended
by the City. The location of all fire protection equipment, connections and valves
shall be approved by the Fire Department prior to installation.
ARC Minutes
August 7, 2000
Page 14
10. Fire Safety During Construction: Buildings undergoing construction, alteration or
demolition shall be in accordance with Article 87 of the California Fire Code.
AYES: Commrs. Chandler, Howard, Stevenson, Schultz and Lopes
NOES: None
ABSENT: Commrs. Rawson and Metz
The motion passed.
5. 100 Cross Street. ARC 61-00. Review of a proposed 42,000 square foot
commercial office building and site improvements; C-S zone; Weyrich
Development, applicant. Whitney McIlvaine
Whitney McIlvaine, Associate Planner, presented the staff report, recommending final
approval of the project, based on findings and with conditions which she outlined.
Commr. Rawson returned.
The public hearing was opened.
Steve Pults, the project architect, said that planter widths in the parking lot are an issue
and questioned the mechanical screening condition.
Steve Caminiti, the landscape architect, was also present.
Dan Lloyd was present, representing the applicant.
Steve Caminiti said that he likes the effect of sod at the back of the sidewalk, similar to
that in front of Idlers, and said that he can screen the parking in a 5 foot area behind the
sod. He said that trees in the parking lot are deciduous and that the applicant would
add some evergreen trees. In regard to Condition 8, he indicated that he was not sure
about this concern. He said that the applicant would replant where necessary in the
frontage and that the employee area is ringed with trees.
Commr. Lopes asked about the selection of trees.
Dan Lloyd asked whether public art will be required.
The public hearing was closed.
COMMISSION COMMENTS
ARC Minutes
August 7, 2000
Page 15
Commrs. Lopes and Howard said that they support the project.
Commr. Chandler said that he is concerned with parking and would like to see
additional landscaping at the corner of Tank Farm and South Higuera.
Commr. Lopes indicated that he wants more landscaping along Tank Farm Road and
suggested that the applicant consider relocating parking. He said that he wants to
relocate the building closer to Tank Farm Road and perhaps the pedestrian link should
be from South Higuera directly to the South Higuera building entrance. He also
suggested adding glass above the wall around the break area.
Commr. Schultz said that the employee break area could possibly be relocated and also
said that he would like to see more landscaping.
Commr. Stevenson commented on lots of paving, said that he likes the sod and
suggested eliminating driving and parking along Tank Farm Road, or possibly adding
more parking.
Steve Pults said that he would prefer circulation around the building and wants to
maintain the parking area.
Dan Lloyd said that he wants to maximize parking and doesn’t want to move the
building toward Tank Farm Road.
Commr. Stevenson said that the project could be moved forward toward Tank Farm
Road without losing parking.
Commr. Schultz said that he does not want an entry without convenient parking.
On motion by Commr. Lopes, and seconded by Commr. Howard, the ARC granted final
approval to the project, based on the following findings and subject to the following
conditions and code requirements:
Finding
1. As conditioned, the project’s design is appropriate for the Service Commercial
zone and will be compatible with surrounding development.
Conditions
1. Exterior lighting shall be directed downward and not spill onto adjoining properties.
The maximum height of any parking lot lighting, including fixtures, standard and
base, shall not be higher than 20 feet above the finished grade approved as part of
this permit. Lighting levels measured at the finished grade directly beneath the
fixture shall not exceed 10 foot-candles. Any individual wall-mounted fixtures shall
ARC Minutes
August 7, 2000
Page 16
not be located above the first floor of the building and shall direct light downward.
Light fixtures shall be subject to review and approval by the Community
Development Director. Ornamental lights on the building shall be directed
downward and not used for parking lot lighting.
2. Building height, including any roof-mounted mechanical equipment, shall not
exceed 35 feet. Roof-mounted mechanical equipment shall be recessed deeply
enough to be fully screened by the parapet walls as shown on the approved plans.
3. Any tenant signs to be located on the building shall not be located above the first
floor and shall be near the building entrances.
4. Plans submitted for a building permit shall comply with all parking and driveway
standards and zoning regulations for motorcycle and bicycle parking.
5. Landscaping along Tank Farm Road shall include trees and low and mid-size
shrubbery to screen the parking lot and soften the appearance of the building.
6. Peninsular planters in the parking lot shall have a minimum width of 5 feet.
7. Provide large, evergreen trees in the parking area.
8. Some of the existing landscaping along the frontages has died or not filled in well.
Prior to occupancy, these areas shall be replanted, fertilized, and mulched. The
existing irrigation system shall also be checked and repaired if it is not working
properly.
9. Building plans submitted for a permit shall include a detail of the employee break
area. Such area shall be partially shaded and shall provide wind protection. The
wall shall be topped with 2 feet of a clear material to increase wind protection.
10. Provide pedestrian access to South Higuera Street at the southwest corner of the
lot, using a contrasting surfacing material.
11. In compliance with mitigation established with the approval of Tract 2202, the
project shall incorporate short- and long-term bicycle parking and shower facilities
for employees use; designated carpool parking; skylights to maximize natural
daylighting; operable windows to maximize natural ventilation; energy-efficient
lighting systems for both interior and exterior use; facilities for ongoing interior and
exterior on-site recycling; and a plan for recycling construction materials to be
submitted with the building permit application.
12. The site and landscaping plan shall be revised to relocate parking along Tank
Farm Road to the south side of the building to create a double loaded parking bay.
Eliminate the drive aisle between the building and Tank Farm Road. Provide
additional landscaping in this area (approximately 20 feet wide) and move the
ARC Minutes
August 7, 2000
Page 17
building toward Tank Farm Road to the edge of the added landscaping. Provide
pedestrian access from the building to Tank Farm Road.
13. Provide an entry feature on the Tank Farm Road elevation similar to the one on the
South Higuera elevation.
Code Requirements
1. Street trees shall be planted in accordance with City standards, to the satisfaction
of the City Arborist.
2. Traffic impact fees shall be paid prior to the issuance of building permits. Fees will
reflect the intended use of the building.
3. Water and wastewater impact fees shall be paid prior to the issuance of building
permits. Both the Water and the Wastewater Impact Fees are based on the size of
the water meter serving each parcel.
4. A water allocation is required, due to the additional demand on the City’s water
supplies. Currently, a water allocation can only be obtained through the water
retrofit program. The City’s Water Conservation division can help in determining
the needed allocation and the necessary number of retrofits. Water Conservation
can be reached by calling 781-7258. The cost of retrofitting is directly credited
against the project’s Water Impact Fees, at a rate of $150 per bathroom retrofitted.
5. Appropriate backflow prevention will be necessary on any connection to the City
water system if the property includes an active well, or otherwise utilizes well
water. If well water is proposed for use on this property, additional requirements
may apply. The location of backflow prevention devices is subject to approval by
the Community Development Director.
6. The required fire flow shall be determined using Appendix III-A of the California
Fire Code.
7. Fire hydrants shall be installed in accordance with Section 0903.4 of the California
Fire Code.
8. Fire protection systems shall be in accordance with the California Fire Code and
California Building Code as amended by the City. The location of all fire protection
equipment shall be approved by the Fire Department prior to installation.
9. Buildings undergoing construction, alteration or demolition shall be in accordance
with Article 87 of the California Fire Code.
10. Parking lot design must be consistent with City Parking and Driveway standards.
11. The project must comply with inclusionary housing requirements.
AYES: Commrs. Chandler, Howard, Rawson, Stevenson, Schultz and Lopes
ARC Minutes
August 7, 2000
Page 18
NOES: None
ABSENT: Commr. Metz
The motion passed.
The meeting adjourned at 11:00 p.m. to a regular meeting of the Architectural Review
Commission, scheduled for Monday, August 21, 2000 at 5:00 p.m. in the Council
Hearing Room at City Hall, 990 Palm Street.
Respectfully Submitted,
Pam Ricci and Whitney McIlvaine
Recording Secretaries