Loading...
HomeMy WebLinkAboutItem 6 - 1010 E. Foothill Blvd. Tree Removal AppealTree Removal Inspection TO: Arbor First FROM: Anthony Whipple, Acting City Arborist/Urban Forest Supervisor SUBJECT: Removal Application SR #12056 On November 10th, 2021, I inspected one tree located at 1010 Foothill Blvd. In response to tree removal application SR#12056. The removal of the mentioned application was submitted based on: San Luis Obispo Municipal Code 12.24.090 (E) 1 Upon inspection of Comphor Tree (Cinimmomom camphora), located in the front yard. Under criteria set forth in 12.24.090 (E) 1 This Tree was under review in 2015 and 2018 and denied by Tree Committee. I could not find significant structural damage and or appropriate criteria for removal authorized by the City of San Luis Obispo Municipal Code, Title 12, Tree Regulations, and I denied the removal application. Appeals must be file with the City Clerk’s Office Municipal Code 12.24.180 Anthony Whipple, Acting City Arborist/Urban Forest Supervisor (805) 781-7023 awhipple@slocity.org Public Works - Urban Forestry 25 Prado Road, San Luis Obispo, CA 93401-3218 805.781.7220 slocity.org Item 6 Packet Page 40 Item 6 Packet Page 41 Item 6 Packet Page 42 Item 6 Packet Page 43 Item 6 Packet Page 44 Item 6Packet Page 45 Item 6Packet Page 46 Item 6Packet Page 47 Item 6Packet Page 48 Item 6Packet Page 49 Item 6Packet Page 50 Item 6Packet Page 51 Item 6Packet Page 52 (4) ARB MRN15 gal(1) PRU SA315 gal(5) GIN AUT15 galGeneral NotesScaleProject No.DateSheet010-0012022-02-07---Revision/IssueNo. DateBEK COLLECTIVEPO BOX 708CAYUCOS, CA 93430BIANCA@BEKCOLLECTIVE.COMBEKCOLLECTIVE.COMDesigned By:ZION LUTHERAN CHURCHTREE MITIGATION PLAN1010 FOOTHILL BLVD.SAN LUIS OBISPO, CA 93401Project/Client:1"=20'L-1PLAN - TREEMITIGATION10'20' 40'0'TREESCODEBOTANICAL / COMMON NAMESIZEQTYARB MRN Arbutus x 'Marina' / Marina Strawberry Tree Standard 15 gal 4GIN AUT Ginkgo biloba 'Autumn Gold' TM / Autumn Gold Maidenhair Tree 15 gal 5PRU SA3 Prunus salicina `Santa Rosa` / Santa Rosa Plum 15 gal 1PLANT SCHEDULEF:\Shared drives\BEK Collective\03-Deliver\STAMP-BEK-SIGNED-BIT.tifF:\Shared drives\BEK Collective\01-Attract\Identity\Logo\BEK-Logo-Black Thin-02 (1).jpg1. INSTALL PER CITY OF SAN LUISOBISPO STREET TREE PLANTINGINSTRUCTIONS ANDREQUIREMENTS (SIMILAR).(1) EXISTING CAMPHORTREE TO BE REMOVED6' CLR.FROMBACK OFSIDEWALK15' MIN.CLEAR FROMSTRUCTURE6' CLR.FROM BACKOF WALL6' CLR. FROMBACK OF WALL10' MIN.CLR. FROMSTRUCTURE10' MIN.CLR. FROMSTRUCTUREItem 6Packet Page 53