HomeMy WebLinkAboutItem 6 - 1010 E. Foothill Blvd. Tree Removal AppealTree Removal Inspection
TO: Arbor First
FROM: Anthony Whipple, Acting City Arborist/Urban Forest Supervisor
SUBJECT: Removal Application SR #12056
On November 10th, 2021, I inspected one tree located at 1010 Foothill Blvd. In response to tree
removal application SR#12056. The removal of the mentioned application was submitted based on:
San Luis Obispo Municipal Code 12.24.090 (E) 1
Upon inspection of Comphor Tree (Cinimmomom camphora), located in the front yard. Under
criteria set forth in 12.24.090 (E) 1
This Tree was under review in 2015 and 2018 and denied by Tree Committee.
I could not find significant structural damage and or appropriate criteria for removal authorized by
the City of San Luis Obispo Municipal Code, Title 12, Tree Regulations, and I denied the removal
application.
Appeals must be file with the City Clerkâs Office Municipal Code 12.24.180
Anthony Whipple, Acting City Arborist/Urban Forest Supervisor
(805) 781-7023
awhipple@slocity.org
Public Works - Urban Forestry
25 Prado Road, San Luis Obispo, CA 93401-3218
805.781.7220
slocity.org
Item 6
Packet Page 40
Item 6
Packet Page 41
Item 6
Packet Page 42
Item 6
Packet Page 43
Item 6
Packet Page 44
Item 6Packet Page 45
Item 6Packet Page 46
Item 6Packet Page 47
Item 6Packet Page 48
Item 6Packet Page 49
Item 6Packet Page 50
Item 6Packet Page 51
Item 6Packet Page 52
(4) ARB MRN15 gal(1) PRU SA315 gal(5) GIN AUT15 galGeneral NotesScaleProject No.DateSheet010-0012022-02-07---Revision/IssueNo. DateBEK COLLECTIVEPO BOX 708CAYUCOS, CA 93430BIANCA@BEKCOLLECTIVE.COMBEKCOLLECTIVE.COMDesigned By:ZION LUTHERAN CHURCHTREE MITIGATION PLAN1010 FOOTHILL BLVD.SAN LUIS OBISPO, CA 93401Project/Client:1"=20'L-1PLAN - TREEMITIGATION10'20' 40'0'TREESCODEBOTANICAL / COMMON NAMESIZEQTYARB MRN Arbutus x 'Marina' / Marina Strawberry Tree Standard 15 gal 4GIN AUT Ginkgo biloba 'Autumn Gold' TM / Autumn Gold Maidenhair Tree 15 gal 5PRU SA3 Prunus salicina `Santa Rosa` / Santa Rosa Plum 15 gal 1PLANT SCHEDULEF:\Shared drives\BEK Collective\03-Deliver\STAMP-BEK-SIGNED-BIT.tifF:\Shared drives\BEK Collective\01-Attract\Identity\Logo\BEK-Logo-Black Thin-02 (1).jpg1. INSTALL PER CITY OF SAN LUISOBISPO STREET TREE PLANTINGINSTRUCTIONS ANDREQUIREMENTS (SIMILAR).(1) EXISTING CAMPHORTREE TO BE REMOVED6' CLR.FROMBACK OFSIDEWALK15' MIN.CLEAR FROMSTRUCTURE6' CLR.FROM BACKOF WALL6' CLR. FROMBACK OF WALL10' MIN.CLR. FROMSTRUCTURE10' MIN.CLR. FROMSTRUCTUREItem 6Packet Page 53