Loading...
HomeMy WebLinkAboutItem 6 pt. 2From:Nate Buchman-SeaBay To:LaFreniere, Matt Subject:22 Chorro Siding Repairs Encroachment Date:Tuesday, January 12, 2021 1:07:31 PM Attachments:image.png image.png image.png Hi Matt, The facility manager at 22 Chorro Street has asked me to help manage a small maintenance repair project they are doing over there. I wanted to reach out to you to ask about any encroachment permits items you think we will need. The scope is as follows: 1. Chorro St Side. Remove and replace some damaged wood siding. Sand and refinish all remaining siding. The plan is to have a scaffold built on the ramp for 3-4 days. the scaffold will come to within 18" of the edge of the building on the left side by the fire extinguisher. I'd like to discuss how this will impact the pedestrian path of travel for that sidewalk and what we need to do for approval. We should not need to impact any roadway travel. 2. Foothill St Side. Sand and refinish wood siding. This work will be done with ladders and possibly a single man scissor lift. This is a wide walkway area so we should be able to create a safety barricade that allows enough room for us to work and also for pedestrian travel, but of course I am looking to you for review/input. No impact to roadway anticipated. Please let me know what you think and what steps I need to take to get approval. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Cohen, Rachel To:amartinez@seabay-group.com Cc:Craig R. Smith, AIA Subject:2640 / 2600 Broad Street Final Inspection Date:Tuesday, October 26, 2021 8:41:00 AM Attachments:image001.png image002.png image003.png image004.png Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re-installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From:SeaBay - Armando Martinez To:Sadowski, Mark Cc:Craig R. Smith AIA - CRSA Architecture; Jim Clancy Subject:2640 Broad - NHC - Gas Sign off by City Date:Tuesday, October 12, 2021 3:51:55 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, SoCal gas has informed me that they do not have the green tag or line release from the City for our gas line out here. Trevor confirmed yesterday he passed us last week during our inspection. Can you please help on getting this released to SoCal Gas? Is there a confirmation you can send and I can get that over to them? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Codron, Michael Cc:Sadowski, Mark; Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Jim Clancy Subject:2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 8:50:35 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Isela Santillanez-Seabay To:Recycle Right Cc:Armando Martinez - Seabay Subject:AM1923 2640 Broad Street Date:Monday, October 18, 2021 9:05:41 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CBCA #1005237 AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Ruiz, Mary To:Ames, Stephen; Fitzgerald, Tom; McCaffrey, Sean; Crnkovic, Daniel; Martinez, Jose; Nelson, Trevor Cc:Isela Santillanez-Seabay; SeaBay - Armando Martinez; Lane, Jordan Subject:BLDG-0434-2020 2640 Broad St Date:Wednesday, October 20, 2021 11:26:52 AM Attachments:image001.png image002.png image003.png image004.png Utilities Recycling – Approved. BLDG-0434-2020 2640 Broad St Please use this email as proof of completion. Mary Ruiz Administrative Assistant II UtilitiesEmruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From:SeaBay - Armando Martinez To:Bell, Kyle; Cohen, Rachel; Leveille, Brian; Scott, Shawna; Van Leeuwen, Kyle Cc:Nate Buchman-SeaBay; Jill LeMieux Subject:Current Development Projects in San Luis Obispo - General Contractor Date:Tuesday, September 3, 2019 10:42:30 AM Attachments:SeaBay Building Group Profile-2019 2.pdf Good morning, my name is Armando Martinez representing SeaBay Building Group, LLC. We opened an office in San Luis Obispo, CA (1011 Pacific St) last year and we are looking to expand our portfolio of projects there. We recently joined the SLO Camber of Commerce and Jill LeMieux from the CofC directed me to your attention regarding new construction coming up in SLO. I visited your website and if possible I would like to talk to you today about the following projects with hopes of getting on the bidders list. I have attached some more information about SeaBay Building Group for your reference. Marsh & Chorro Mixed Used 1121 Montalban Mixed Used 956 Monterey Mixed Used. 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thank you or your time and look forward to hearing from you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:SeaBay - Armando Martinez; Randy Johnson Jr; Nate Buchman-SeaBay; lucas lundin - SeaBay; Craig R. Smith AIA - CRSA Architecture Cc:Browning, Bobby Subject:Expired Encroachment Permit, Traffic Control Date:Tuesday, March 16, 2021 3:51:02 PM Attachments:image001.png image002.png image003.png image004.png Gentlemen, It’s been brought to our attention that the encroachment permit (#ENCR-0316-2021) has expired and there are outstanding traffic control concerns that are creating traffic, bicycle, and pedestrian hazards. Please contact Public Works Inspector Bobby Browning (cc’d) to discuss correcting these items as soon as possible. Thank you, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From:Maggio, Rodger To:Hermann, Greg Subject:FW: Issued Permit Date:Friday, July 10, 2020 3:46:57 PM Attachments:SLOUNIFLOW_919 Front Copier iRC5235 Color_4327_001.pdf image001.png Greg, Issue got resolved. Rodger From: Nichols, Vanessa <vnichols@slocity.org> Sent: Friday, July 10, 2020 3:00 PM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Isela Santillanez - SeaBay isantillanez@seabay-group.com> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Maggio, Rodger rmaggio@slocity.org> Subject: Issued Permit Attached you will find the issued permit for the tenant improvement of Natural Healing Center. Please sign and email back to me as soon as possible. Also, I can set an appointment time for Monday morning that you can come by and pick up the plans and permit documentation. Please let me know what time would work for you. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Friday, July 10, 2020 2:57 PM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:Sadowski, Mark To:Stanwyck, Shelly; Codron, Michael; Bailey, Georgina Subject:FW: NHC - 2640 Broad Follow-up Date:Thursday, September 24, 2020 10:45:20 PM Attachments:image001.png Please see below for correspondence sent to contractor at Natural Healing Center after our inspection today and let me know if there anything I can help clarify. Mark From: Sadowski, Mark Sent: Thursday, September 24, 2020 10:35 PM To: rjohnson@seabay-group.com; amartinez@seabay-group.com Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom tfitzger@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Dana Lee dana@craigrsmithaia.com>; elainad@craigrsmithaia.com Subject: NHC - 2640 Broad Follow-up Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Codron, Michael To:Hermann, Greg Subject:Fw: NHC - 2640 Broad Follow-up Date:Friday, September 25, 2020 7:15:58 AM Attachments:image001.png Fyi Michael Codron Director of Community Development City of San Luis Obispo Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org From: Sadowski, Mark <msadowsk@slocity.org> Sent: Thursday, September 24, 2020 10:45 PM To: Stanwyck, Shelly <sstanwyc@slocity.org>; Codron, Michael <mcodron@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: FW: NHC - 2640 Broad Follow-up Please see below for correspondence sent to contractor at Natural Healing Center after our inspection today and let me know if there anything I can help clarify. Mark From: Sadowski, Mark Sent: Thursday, September 24, 2020 10:35 PM To: rjohnson@seabay-group.com; amartinez@seabay-group.com Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom tfitzger@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Dana Lee dana@craigrsmithaia.com>; elainad@craigrsmithaia.com Subject: NHC - 2640 Broad Follow-up Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Bailey, Georgina To:Hermann, Greg Subject:FW: NHC Site Visit Summary of Meeting Date:Thursday, September 30, 2021 4:19:52 PM Attachments:image001.png image002.png image003.png image004.png From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Thursday, September 30, 2021 1:47 PM To: Bailey, Georgina <gbailey@slocity.org> Cc: Joe Armendariz <joe@nhcdispensaries.com>; Valnette Garcia <val@nhcdispensaries.com>; Jim Clancy <jim@nhcdispensaries.com>; Paul F Ready <PFReady@farmerandready.com>; Codron, Michael <mcodron@slocity.org>; Dietrick, Christine <cdietric@slocity.org> Subject: Re: NHC Site Visit Summary of Meeting This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Georgina and all, please see below: 1. I stated paving would be completed on 10/12 (not 10/10). 2. I stated that everything needed to call in for finals will be completed by 10/14, except for commissioning by 3rd parties. However, we cannot commission the building until PG&Eprovidesuspermanentpower. We have been ready for PG&E since 9/13, but theyareseverelybacklogged. 3. With PG&E scheduled for 10/17 thru 10/19 for permanent power, we do not haveenoughtimetoachieveCofObythe10/22 deadline due to the commissioning activities thatrequirePG&E permanent power. 4. We need an extension of the 10/22 deadline—preferably to 12/3. PG&E cannotimproveupontheirschedule; we have tried every avenue with them. This is out of our control. Can SLO please help and grant the extension? There is a lot on the line and Seabayiscaughtinthemiddlehere. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 28, 2021 at 4:58 PM Bailey, Georgina <gbailey@slocity.org> wrote: Hello NHC Team, We hope you found the site visit helpful and that we were able to answer your relevant questions. The following is a summary of the meeting. Please review and let us know if you have any suggested changes. If we don’t hear back, we’ll assume this accurately captures the conversation. Thank you, Georgina. Natural Healing Center SLO, LLC (NHC) Team Present Valnette Garcia, CEO of NHC SLO Joe Armendariz, Government Affairs Manager for NHC SLO Jim Clancy, CFO of NHC SLO Armando Martinez, SeaBay Building Group Randall Fox, Attorney for NHC SLO Paul Ready, Attorney for NHC SLO A female representative from Craig Smith’s office City of San Luis Obispo (City) Team Present Michael Codron, Community Development Director John Mezzapesa, Code Enforcement Officer Chad Pfarr, Police Sergeant Quenten Rouse, Police Detective Georgina Bailey, Cannabis Program Coordinator During the site visit at 2640 Broad St, on September 23, 2021 from 1:30 pm to 2:30 pm the NHC Team gave the City Team a tour of Natural Healing Center’s future business site. Armando Martinez invited the City Team to tour the site so the City could get an overview of the project status and have an understanding of the remaining items needing completion before final inspections. The site tour started with Armando giving a status update on the site and overview of the remaining items needing completion. Armando listed the parking lot paving and getting power to the building from PG&E as the critical items needing to be completed before final inspections. Armando stated that the tree wells had been installed, and that he was working with Public Works to complete all items for the site that needed coordination. Armando stated that the site does not currently have the power necessary to operate and is facing a scheduling issue with PG&E. The scheduling issue is that PG&E cannot come out to hook the site up to upgrade the power service to the property before NHC must activate their operator permit. Armando asked Michael if there was anything the City could do to assist with PG&E. Michael informed the NHC team to keep working directly with PG&E to get connected and that the City did not have any ability to expedite the process with PG&E and did not have any contacts with PG&E outside of the main channels already available to NHC. Then one of the lawyers present, Randall Fox, asked Michael if the City would be able to give the site an extension in the event PG&E could not get the site power before the activation date. Michael stated that the City team was only there for the purposes of the site visit and that question was outside the scope of the site visit. The City team toured both the outside area of the retail storefront building and inside of the retail storefront building. Armando stated that his crew was aiming to complete the parking lot paving by October 10th. Armando stated that he was shooting to have all remaining work for the site completed by October 14th so the City could do final inspections, and if anything needed to be corrected, NHC would have time to do so before the activation deadline. During the site visit Joe Armendariz asked Georgina Bailey how often the City reviewed the Community Benefit Commitments and how often NHC must make good on the commitments outlined in the Community Benefit Agreement. Georgina stated the Community Benefit Commitments are yearly commitments for the operator permit, and that the City reviews operators Community Benefit Commitments for compliance yearly on the fiscal year that runs from July 1st to June 30th of each calendar year, as a part of the yearly operator permit renewal process. Toward the end of the site tour, the NHC Team asked if the City had availability to do final inspections for the building site on a timeline that coincided with NHC’s activation deadline. Michael said that the City will have availability to do final inspections before NHC’s activation deadline and that it is the NHC team’s responsibility to coordinate final inspections with all of the right City departments necessary to sign off on the project. It was noted that this includes the Police Department signing off on NHC’s implemented Security Plan, which Chad Pfarr stated he would be available for and during the final inspection would look at the video cameras and vault requirements, amongst all other security requirements. Georgina Bailey pronouns she/her/hers Cannabis Program Coordinator/Management Fellow City Administration 990 Palm, San Luis Obispo, CA 93401-3249 E gbailey@slocity.org T 805.783.7875 slocity.org Stay connected with the City by signing up for e-notifications From:Johnson, Derek To:Stanwyck, Shelly Cc:Codron, Michael Subject:FW: Permit #BLDG043420 - Natural Healing Center Date:Tuesday, April 6, 2021 10:19:13 AM FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Cox, Rebecca To:Bromby, Holly Cc:Sadowski, Mark Subject:FW: Permit #BLDG043420 - Natural Healing Center Date:Wednesday, April 7, 2021 8:34:58 AM Attachments:image005.png image006.png image007.png image008.png image009.png image010.png image011.png Hi Holly! Mark left a test voicemail last night, did you by chance get one from “Rick” at 2640 Broad? Thanks! From: Sadowski, Mark <msadowsk@slocity.org> Sent: Wednesday, April 7, 2021 8:34 AM To: Cox, Rebecca <rcox@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center I left a message on the inspection line last night to test out and wondering if it might be an IT issue. Let me know if you get a message from “Rick” at 2640 Broad with my phone number Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Cox, Rebecca <rcox@slocity.org> Sent: Wednesday, April 7, 2021 8:00 AM To: Sadowski, Mark <msadowsk@slocity.org>; Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center Thanks, item is added to tomorrow’s agenda. As a status update on inspection count, we currently have 3 spots left for Friday and then we’ll be booking for next week. Rebecca From: Sadowski, Mark <msadowsk@slocity.org> Sent: Tuesday, April 6, 2021 10:10 PM To: Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center I have heard similar feedback on a couple other projects over the past week and not sure why this may be occurring. I’ll touch base with Tom in the morning and see if the contractor has expressed any of this to him, as it is the first time I’ve learned we are reportedly missing inspections for this project. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Codron, Michael <mcodron@slocity.org> Sent: Tuesday, April 6, 2021 6:18 PM To: Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark <msadowsk@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center Some helpful feedback about inspection scheduling, please review and let’s discuss this topic on Thursday at CDMG. Thank you, -Michael From: Johnson, Derek <djohnson@slocity.org> Sent: Tuesday, April 6, 2021 10:19 AM To: Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Codron, Michael <mcodron@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:Fitzgerald, Tom Subject:FW: Permit #BLDG043420 - Natural Healing Center Date:Friday, April 9, 2021 9:19:00 AM Attachments:image002.png image004.png image003.png image001.png FYI From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, April 9, 2021 8:48 AM To: Codron, Michael <mcodron@slocity.org> Cc: AM1922@seabay-group.com; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Johnson, Derek <djohnson@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Sadowski, Mark msadowsk@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: Re: Permit #BLDG043420 - Natural Healing Center Hello Michael, Thank you again for the call yesterday and your teams attention to our concerns. This sounds like a solid plan to start with. We appreciate the support. We will contact Tom today to discuss the scheduling for next week. Thank you again to all those involved. On Thu, Apr 8, 2021 at 4:34 PM Codron, Michael <mcodron@slocity.org> wrote: Hello Armando and Craig, It was good speaking with you both today. As discussed, we are going to make Tom Fitzgerald, your current inspector, available to perform inspections twice a day going forward so that you are able to make sustained progress on the project. If that proves to be insufficient, we are also in the process of lining up a contract inspector for one of the major subdivisions in town. That inspector will have additional capacity for the next few months and could be assigned additional duties. For now, please coordinate directly with Tom on your scheduling needs and let us know how things are going. If we need to adjust we can do so. Thanks for reaching out and letting us know your concerns. I’m glad we have a solution that seems like it will work for you. Best, -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From:Codron, Michael To:Maggio, Rodger; Sadowski, Mark Cc:Cox, Rebecca; Stanwyck, Shelly Subject:FW: Permit #BLDG043420 - Natural Healing Center Date:Tuesday, April 6, 2021 6:18:00 PM Some helpful feedback about inspection scheduling, please review and let’s discuss this topic on Thursday at CDMG. Thank you, -Michael From: Johnson, Derek <djohnson@slocity.org> Sent: Tuesday, April 6, 2021 10:19 AM To: Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Codron, Michael <mcodron@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Nichols, Vanessa To:Isela Santillanez - SeaBay Subject:FW: Permit Fees - NHC Date:Tuesday, July 7, 2020 10:20:46 AM Attachments:SLOUNIFLOW_919 Front Copier iRC5235 Color_4289_001.pdf image001.png Had email wrong on first email sent. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: Nichols, Vanessa Sent: Tuesday, July 7, 2020 10:13 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lsanlillanez@seabay-group.com Subject: Permit Fees - NHC Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:Nichols, Vanessa To:isanlillanex@seabay-group.com Subject:FW: Permit Fees - NHC Date:Tuesday, July 7, 2020 10:14:17 AM Attachments:SLOUNIFLOW_919 Front Copier iRC5235 Color_4289_001.pdf image001.png Had email wrong on first try. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: Nichols, Vanessa Sent: Tuesday, July 7, 2020 10:13 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lsanlillanez@seabay-group.com Subject: Permit Fees - NHC Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:SeaBay - Armando Martinez To:Flores, Allie Cc:Bob Bullen; lucas lundin - SeaBay; Isela Santillanez - SeaBay; Craig R. Smith AIA - CRSA Architecture Subject:Fwd: CPS Log File Date:Friday, October 22, 2021 2:49:37 PM Attachments:Test_&_Balance_Report.csv This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. The city inspector asked me to send over the test & balance report for permit #BLDG 0434- 2020 address 2640 Broad Street. See attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: California HERS Raters Group <cahersraters@gmail.com> Date: Fri, Oct 22, 2021 at 10:58 AM Subject: CPS Log File To: amartinez@seabay-group.com <amartinez@seabay-group.com> Please find your attached log file: Test_&_Balance_Report.csv Chris Austin California HERS Raters Group From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Craig R. Smith AIA - CRSA Architecture Subject:Fwd: FW: Business License Application Accepted - Payment Due Date:Thursday, July 2, 2020 9:00:13 AM Attachments:SLO Business License Receipt.pdf Good morning Vanessa, attached is our accepted payment for our SLO business licenses. They are telling me it will not be certified until Monday. Can we still have the permit issued to us this week to start work on site Monday? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: SeaBay - Deb Roddick <droddick@seabay-group.com> Date: Thu, Jul 2, 2020 at 8:53 AM Subject: FW: Business License Application Accepted - Payment Due To: Armando Martinez - SeaBay <amartinez@seabay-group.com> Here is the email and attached is the receipt that we paid. Deb Roddick | Controller SeaBay Building Group, LLC 205 S. Clark Drive, Suite 1 Tempe, AZ 85281 Cell: 602.478.5312 www.seabay-group.com Together. We Build. Licenses: AK #124048 AZ #301717 KB-1 Dual CA #1005237 NV#0083837 OR #211637 WA #SEABABG843CB From: bt@slocity.org <bt@slocity.org> Sent: Thursday, July 2, 2020 8:48 AM To: accounting@seabay-group.com Subject: Business License Application Accepted - Payment Due The City of San Luis Obispo has processed your On-Line Business License Application. The taxes and/or fees have been calculated and are awaiting payment. Please pay the total below within 7 days to complete the process. Upon our receipt of your payment, your Business License certificate will be mailed. Total Balance Due: 86.77 To pay for your business license, please go to: https://businessrenewal.slocity.org/PrimeWeb/Pay/Pay1/BusinessLicense You may pay on line using your credit card. You will be asked for your Business License Account number and your Pin number. Account No.: 116680 Pin No.: 149323 Thank you for doing business in the City of San Luis Obispo. Finance Department City of San Luis Obispo From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Nate Buchman-SeaBay; Isela Santillanez - SeaBay; Craig R. Smith AIA - CRSA Architecture Subject:Fwd: FW: Business License Certificate Date:Monday, July 6, 2020 9:03:18 AM Attachments:Seabay.pdf Back of License.doc Good morning Vanessa, attached please find a copy of our SLO business license. Any update on the permit issuance? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: SeaBay - Deb Roddick <droddick@seabay-group.com> Date: Mon, Jul 6, 2020 at 7:34 AM Subject: FW: Business License Certificate To: Armando Martinez - SeaBay <amartinez@seabay-group.com>, Nate Buchman - SeaBay nbuchman@seabay-group.com>, Isela Santillanez - SeaBay <isantillanez@seabay- group.com> I will also save in Egnyte. Deb Roddick | Controller SeaBay Building Group, LLC 205 S. Clark Drive, Suite 1 Tempe, AZ 85281 Cell: 602.478.5312 www.seabay-group.com Together. We Build. Licenses: AK #124048 AZ #301717 KB-1 Dual CA #1005237 NV#0083837 OR #211637 WA #SEABABG843CB From: bt@slocity.org <bt@slocity.org> Sent: Monday, July 6, 2020 7:20 AM To: accounting@seabay-group.com Subject: Business License Certificate 116680 SeaBay Building Group LLC A copy of your Business License Certificate is attached for your immediate use. Another copy will be mailed from the printer within 2 weeks. Thank you. Business License Finance Department City of San Luis Obispo 805) 781-7134 From:SeaBay - Armando Martinez To:Nelson, Trevor Subject:Fwd: NHC Scanned Doc Date:Friday, October 29, 2021 11:46:43 AM Attachments:Image102921084652.pdf Image102921084714.pdf Image102921085032.pdf Image102921085059.pdf Image102921085121.pdf Image102921085141.pdf Image102921085202.pdf Image102921085225.pdf Image102921085247.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Trevor attached please find the special inspection reports and observation reports for NHC permit #0434-2020. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: Dana Hunter <dana@craigrsmithaia.com> Date: Fri, Oct 29, 2021 at 9:46 AM Subject: NHC Scanned Doc To: Armando Martinez - Seabay <amartinez@seabay-group.com> Dana Hunter, AIA | NCARB Hunter Smith Architecture Principal Architect 860 Walnut Street, Suite B San Luis Obispo, CA 93401 Phone: 805-544-3380 ext. 206 Cell: 949-275-7355 www.huntersmitharchitecture.com From:SeaBay - Armando Martinez To:Flores, Allie Subject:Fwd: NHC SLO: Ceiling light fixture substitution and revised title 24 Date:Wednesday, September 8, 2021 1:27:00 PM See below Allie, thank you. Forwarded message --------- From: Sadowski, Mark <msadowsk@slocity.org> Date: Thu, Aug 12, 2021 at 12:02 PM Subject: RE: NHC SLO: Ceiling light fixture substitution and revised title 24 To: Craig R. Smith, AIA <craig@craigrsmithaia.com> CC: SeaBay - Armando Martinez <amartinez@seabay-group.com>, Dana Lee dana@craigrsmithaia.com> Hi Craig, Ivan completed and approved these yesterday. I will look to get them stamped and back to you by end of day today. Work may proceed in the interim. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Original Message----- From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Thursday, August 12, 2021 11:37 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com> Subject: NHC SLO: Ceiling light fixture substitution and revised title 24 This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hey Mark, Getting a lot of pressure from the clients regarding a “completion” date on the revised ceiling light fixture substitution for the Natural Healing project on Broad Street. If you could please provide us an expected date I would greatly appreciate it. Construction material availability is becoming a major “factor” in keeping to a given time frame and we are making every effort to stay on the current schedule. Thanks, Appreciate your efforts regarding this matter, Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Nelson, Trevor Cc:Craig R. Smith AIA - CRSA Architecture; lucas lundin - SeaBay Subject:Fwd: NHC title 24 Reports - HVAC Date:Monday, October 25, 2021 1:00:35 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Trevor, See link below for the title 24 document regarding the HVAC units I showed you last week. Thank you for your help through the process. Forwarded message --------- From: Dana Hunter <dana@craigrsmithaia.com> Date: Mon, Oct 25, 2021 at 10:10 AM Subject: NHC Reports To: Armando Martinez - Seabay <amartinez@seabay-group.com> CC: lucas lundin - SeaBay <llundin@seabay-group.com> Armando, Here is the link to the reports: https://HSArch.quickconnect.to/d/s/lzfpgHdAuftYUGPthrIRyagnLmz5tTzP/ZR6D6snXwTz7 R2GaPh9R55SxgCvoYo9r-WrWg0Uw7BAk Dana Hunter, AIA | NCARB Hunter Smith Architecture Principal Architect 860 Walnut Street, Suite B San Luis Obispo, CA 93401 Phone: 805-544-3380 ext. 206 Cell: 949-275-7355 www.huntersmitharchitecture.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Sadowski, Mark; Maggio, Rodger Cc:Craig R. Smith AIA - CRSA Architecture; Bob Bullen Subject:Fwd: Urgent - PG&E Contract for NHC - Time Extension Request Date:Monday, September 13, 2021 4:07:33 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good evening Mr. Sadowski & Mr. Maggio, I am reaching out of concern for my project due to information provided by PG&E today on our scheduled installation time window for PG&E work. The utility cannot get to my site until 11/1 to 11/3 at the earliest. PG&E's email schedule confirmation is below for your quick reference. My client's (NHC) license is predicated on a 10/22 TCO or CofO date. We cannot commission the building until PG&E provides us permanent power. I am seeking relief on the 10/22 date to be extended to 12/1. Right now we anticipated project completion by 10/14 but without permanent power commissioning cannot occur. Thank you for your time and consideration. Please give me a call if you have any questions or concerns. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: McDonald, Justin <JKMO@pge.com> Date: Mon, Sep 13, 2021 at 12:42 PM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, McDonald, Justin JKMO@pge.com> Hi Armando, Scheduling has scheduled this project for first available date of 11/1-11/3. I’ve let them know that you need/want to be in by 10/14 and to notate the file if anything comes available to work this quicker. I’ll keep you updated if any changes are made. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 10:02 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think before clickinglinksoropeningattachments.***** Thank you for that Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 9:36 AM McDonald, Justin <JKMO@pge.com> wrote: There is no route for expediting unless a hospital, school or entity of the such. Lets see what I get for a construction date and then I’ll ask the scheduler to work ahead if a spot comes available if it’s not good enough. I’ll keep you posted. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 9:33 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** If there is anything we can do to expedite our project, a fee to pay, anything please let me know. I need to have TCO by 10/14. Thank you for the consideration Justin. On Mon, Sep 13, 2021 at 9:26 AM McDonald, Justin <JKMO@pge.com> wrote: Armando, I’ve requested for this project to be scheduled. I’ll let you know once I have a construction date. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:32 AM To: McDonald, Justin <JKMO@pge.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** Hi Justin, Attached are the (2) signed contracts for PG&E#-3518093 project address 2640 Broad Street San Luis Obispo. I don't want to overstep my bounds here but since time is of the essence, I wanted to make sure you got confirmation that everything is signed and paid for on the owner side so when Deniel does green tag us we can discuss scheduling. I know it's not a PG&E concern but we are in dire need to be able to be open by 10/14 and obviously need permanent power to be able to commission the space. I am reaching out to start the dialogue on the possibility of exporting our project. It is not a big project but if there is anything we can do to get on the books next week or the following it will be a life saver. Thank you for your time and consideration Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: Jim Clancy <jim@nhcdispensaries.com> Date: Fri, Sep 10, 2021 at 11:16 AM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, Helios Dayspring <helios@nhcdispensaries.com>, Nick Reed <nreed@r3bcorp.com> Armando, See attached from Garrett Otto, looks like they are signed to me. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:13 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com>; Helios Dayspring <helios@nhcdispensaries.com>; Nick Reed <nreed@r3bcorp.com> Subject: Re: Urgent - PG&E Contract for NHC Can you please confirm they have the signed contacts? One for the building and one for the street light? If you can get some sort of confirmation that would be great. I can send that to the scheduling contact over at their office. Thanks for jumping on this Jim. On Fri, Sep 10, 2021 at 11:10 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, See attached confirmation of payment to PG&E. Are there any next steps NHC needs to take at this time? Please advise. Thank you, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:40 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Re: Urgent - PG&E Contract for NHC Check to PG&E or CRSA? I'm worried about PG&E, the contract with NHC and PG&E needs to be signed and paid before they will schedule us. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:38 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, I spoke with Craig yesterday that we are cutting the check today. We agreed to mail it but if someone wants to stop by to pick it up let me know. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:24 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay- group.com> Subject: Re: Urgent - PG&E Contract for NHC Jim, This payment needs to happen before they will put us on their schedule. Can you please take care of this today? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:22 AM Garrett Otto <gotto@ottoelectrical.com> wrote: I just forwarded you an email chain from April where Jim and I discussed the contact and payment. It appeared that the contract was already signed and just needed to be paid. Did that payment ever happen? Garrett Otto, PE Principal Electrical Engineer 805.459.4329 gotto@ottoelectrical.com www.ottoelectrical.com On Fri, Sep 10, 2021 at 9:07 AM SeaBay - Armando Martinez amartinez@seabay-group.com> wrote: Garett, I just got off the phone with PG&E to check on the scheduling for our project. Justin McDonald mentioned that the owner had not signed or paid their contract. I asked who at NHC was the contact sent to last year and he mentioned the name of Nick Andre who quit last year at NHC. I tried to get Justin to change the email to Jim Clancy @ NHC but he said only you (Garrett) can change the contract info on PG&E side. Can you please get in touch with Justin today to let him know the contract can go to Jim Clancy? Justin McDonald - 805-290-9555 Jim Clancy - 724-544-0191 email: jim@nhcdispensaries.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Nichols, Vanessa To:SeaBay - Armando Martinez; Isela Santillanez - SeaBay Cc:Craig R. Smith AIA - CRSA Architecture; Maggio, Rodger Subject:Issued Permit Date:Friday, July 10, 2020 2:59:43 PM Attachments:SLOUNIFLOW_919 Front Copier iRC5235 Color_4327_001.pdf image001.png Attached you will find the issued permit for the tenant improvement of Natural Healing Center. Please sign and email back to me as soon as possible. Also, I can set an appointment time for Monday morning that you can come by and pick up the plans and permit documentation. Please let me know what time would work for you. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Friday, July 10, 2020 2:57 PM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:Sadowski, Mark To:rjohnson@seabay-group.com; amartinez@seabay-group.com Cc:Craig R. Smith AIA - CRSA Architecture; Fitzgerald, Tom; Maggio, Rodger; Dana Lee; elainad@craigrsmithaia.com Subject:NHC - 2640 Broad Follow-up Date:Thursday, September 24, 2020 10:34:00 PM Attachments:image001.png Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Craig R. Smith, AIA To:Cohen, Rachel Cc:SeaBay - Armando Martinez Subject:NHC Project : 2640 Broad Street Date:Friday, October 22, 2021 4:40:24 PM Attachments:Screen Shot 2021-10-22 at 4.35.35 PM.png Screen Shot 2021-10-22 at 4.35.47 PM.png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Rachel, As a follow-up to the City’s inspection processing, please find attached pictures of the installed roof mounted mechanical screen per the approved plans. Your review and approval are required. Thanks, Craig R. Smith, AIA Consulting Architect Hunter Smith Architecture 860 Walnut Street, Suite B San Luis Obispo, CA 93401 PH: 805-544-3380 ext. 202 Cell: 805-215-2313 From:Bailey, Georgina To:Joe Armendariz; Valnette Garcia; Jim Clancy; Paul F Ready; SeaBay - Armando Martinez Cc:Codron, Michael; Dietrick, Christine Subject:NHC Site Visit Summary of Meeting Date:Tuesday, September 28, 2021 4:58:52 PM Attachments:image001.png image002.png image003.png image004.png Hello NHC Team, We hope you found the site visit helpful and that we were able to answer your relevant questions. The following is a summary of the meeting. Please review and let us know if you have any suggested changes. If we don’t hear back, we’ll assume this accurately captures the conversation. Thank you, Georgina. Natural Healing Center SLO, LLC (NHC) Team Present Valnette Garcia, CEO of NHCSLOJoeArmendariz, Government Affairs Manager for NHCSLOJimClancy, CFO of NHCSLOArmandoMartinez, SeaBay BuildingGroupRandallFox, Attorney for NHCSLOPaulReady, Attorney for NHCSLOAfemalerepresentativefromCraig Smith’s office City of San Luis Obispo (City) Team Present Michael Codron, Community Development Director John Mezzapesa, Code Enforcement Officer Chad Pfarr, Police Sergeant Quenten Rouse, Police Detective Georgina Bailey, Cannabis Program Coordinator During the site visit at 2640 Broad St, on September 23, 2021 from 1:30 pm to 2:30 pm the NHC Team gave the City Team a tour of Natural Healing Center’s future business site. Armando Martinez invited the City Team to tour the site so the City could get an overview of the project status and have an understanding of the remaining items needing completion before final inspections. The site tour started with Armando giving a status update on the site and overview of the remaining items needing completion. Armando listed the parking lot paving and getting power to the building from PG&E as the critical items needing to be completed before final inspections. Armando stated that the tree wells had been installed, and that he was working with Public Works to complete all items for the site that needed coordination. Armando stated that the site does not currently have the power necessary to operate and is facing a scheduling issue with PG&E. The scheduling issue is that PG&E cannot come out to hook the site up to upgrade the power service to the property before NHC must activate their operator permit. Armando asked Michael if there was anything the City could do to assist with PG&E. Michael informed the NHC team to keep working directly with PG&E to get connected and that the City did not have any ability to expedite the process with PG&E and did not have any contacts with PG&E outside of the main channels already available to NHC. Then one of the lawyers present, Randall Fox, asked Michael if the City would be able to give the site an extension in the event PG&E could not get the site power before the activation date. Michael stated that the City team was only there for the purposes of the site visit and that question was outside the scope of the site visit. The City team toured both the outside area of the retail storefront building and inside of the retail storefront building. Armando stated that his crew was aiming to complete the parking lot paving by October 10th. Armando stated that he was shooting to have all remaining work for the site completed by October 14th so the City could do final inspections, and if anything needed to be corrected, NHC would have time to do so before the activation deadline. During the site visit Joe Armendariz asked Georgina Bailey how often the City reviewed the Community Benefit Commitments and how often NHC must make good on the commitments outlined in the Community Benefit Agreement. Georgina stated the Community Benefit Commitments are yearly commitments for the operator permit, and that the City reviews operators Community Benefit Commitments for compliance yearly on the fiscal year that runs from July 1st to June 30th of each calendar year, as a part of the yearly operator permit renewal process. Toward the end of the site tour, the NHC Team asked if the City had availability to do final inspections for the building site on a timeline that coincided with NHC’s activation deadline. Michael said that the City will have availability to do final inspections before NHC’s activation deadline and that it is the NHC team’s responsibility to coordinate final inspections with all of the right City departments necessary to sign off on the project. It was noted that this includes the Police Department signing off on NHC’s implemented Security Plan, which Chad Pfarr stated he would be available for and during the final inspection would look at the video cameras and vault requirements, amongst all other security requirements. Georgina Bailey pronouns she/her/hers Cannabis Program Coordinator/Management Fellow City Administration 990 Palm, San Luis Obispo, CA 93401-3249 E gbailey@slocity.org T 805.783.7875 slocity.org Stay connected with the City by signing up for e-notifications From:Nate Buchman-SeaBay To:Maggio, Rodger Cc:AM1922@seabay-group.com Subject:NHC SLO Interior Occupancy Signage Date:Thursday, June 17, 2021 2:07:14 PM Attachments:image001(7).png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Roger, We have a little question on our occupancy sign notes that's causing some confusion. We have a few signs and the architect has asked us to include some wording that our sign guy has never seen before. Here is the language from the architect: We are required to provide a legible note at the bottom of the sign that states: “MAXIMUM BUILDING OCCUPANTS LOAD SIGN SHALL BE MAINTAINED BY THE BUILDING OWNER OR AUTHORIZED AGENT.” Refer to delta and cloud on sheet A- 2.0. Our sign guy (Devan at Signs of Success) says this language does appear in the code book, but just as a note and does not need to be included on the actual signs. But, the architect is saying that your office requested it be printed on each one under the max occupancy info (please see attachment). We think this may just be a misunderstanding, but we wanted to check with you first before omitting the additional phrasing under the max occupancy info. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 ID #RCE-5611-7 UT#12269176-5501 From:Craig R. Smith, AIA To:Sadowski, Mark; Maggio, Rodger Cc:SeaBay - Armando Martinez Subject:NHC SLO: 2640 Broad Street Project Date:Thursday, April 29, 2021 4:51:34 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mark and Rodger, I think it best that we schedule and conduct a meeting between the general contractor and the assigned building inspector (Tom) to review the inspection processing and how the general contractor has responded and managed the inspection requirements. I feel this necessary based on the recent inspection processing and how it has been responded to, handled and managed. Please let us know a date and a time to meet. I’m assuming it will be a Zoom meeting, or if possible, conducted at the building department with safe distancing in place. Please let me know how this can work into your scheduling. Thank you for taking the time and effort to deal with this. I feel it will be the best way to deal with the issues at hand rather than by email or phone. Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com From:Craig R. Smith AIA - CRSA Architecture To:Corey, Tyler Cc:Helios Dayspring; SeaBay - Armando Martinez; Jim Clancy; Dana Lee Subject:NHC SLO: 2640 Broad Street Date:Wednesday, January 6, 2021 1:46:41 PM Tyler, Thanks for getting back to me regarding the extended time for the occupancy/in-business date of April 22, 2021. If you could just confirm this in writing (or respond to this email) so as not to have any confusion come the day we call for a final inspection I would really appreciate it. Again, I appreciate you taking the time and effort regarding this matter. Take care, Craig R. Smith, AIAPrincipalArchitect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com From:Craig R. Smith AIA - CRSA Architecture To:Sadowski, Mark; Maggio, Rodger Cc:SeaBay - Armando Martinez; Randy Johnson Jr; Nate Buchman-SeaBay; lucas lundin - SeaBay Subject:NHC: 2640 Broad Street Date:Wednesday, February 17, 2021 2:51:00 PM This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Dear Mark and Rodger, As you are aware, we are under construction on the cannabis dispensary project at 2640 Broad Street (Natural Healing Center). We have a given date to acquire occupancy of April 22, in order to maintain the City’s retail cannabis license, per the standing conditions of approval. Due to several related issues regarding the difficulties of dealing with the COVID 19 pandemic, we (as others have) are continuing to meet challenges on a daily basis. This email is to formally make a request to allow the hiring of a qualified and acceptable certified deputy inspector so as to keep up with our very tight and demanding construction schedule. As you have allowed this in past, we would seek out only those that have your approval to perform the inspection tasks at hand. This request is due to the need to provide daily (sometimes twice a day) inspections in order to continue and complete all construction by the required occupancy date. Please consider this request and let me know if it would be acceptable. I will then forward the names of the deputy inspectors, with qualifications, for your approval. Really appreciate your consideration regarding this request. Thank you.. Craig R. Smith, AIAPrincipalArchitect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com From:SeaBay - Armando Martinez To:mcodrom@slocity.org; Johnson, Derek Cc:Randy Johnson; Craig R. Smith AIA - CRSA Architecture; AM1922@seabay-group.com Subject:Permit #BLDG043420 - Natural Healing Center Date:Tuesday, April 6, 2021 9:52:24 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a-dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Nichols, Vanessa To:SeaBay - Armando Martinez; lsanlillanez@seabay-group.com Subject:Permit Fees - NHC Date:Tuesday, July 7, 2020 10:12:40 AM Attachments:SLOUNIFLOW_919 Front Copier iRC5235 Color_4289_001.pdf image001.png Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:Browning, Bobby To:Randy Johnson Jr Cc:Whipple, Anthony; Guzman, Manuel; SeaBay - Armando Martinez; Nate Buchman-SeaBay Subject:Protect Existing Street Trees 2640 Broad St Date:Monday, June 28, 2021 11:07:12 AM Attachments:image001.png image002.png image003.png image004.png 2640 Broad Tree.jpg Randy, We spoke several weeks ago about the street trees that need further protection at 2640 Broad St. Much of the bark has been removed and there are exposed roots along your trench line. See attached photo. Per your construction and landscaping drawings, these two remaining trees are to be protected. Please take a look through our standards on tree protection section 77-1.03A(2), and take steps to prevent any more damage done. Bobby Browning Engineering Inspector III Public Works 919 Palm Street, San Luis Obispo, CA 93401-7314 E bbrowning@slocity.org slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From:LaFreniere, Matt To:Nate Buchman-SeaBay Subject:RE: 22 Chorro Siding Repairs Encroachment Date:Tuesday, January 12, 2021 1:47:58 PM Attachments:image002.png image004.png image006.png image010.png image011.png image012.png image013.png Hi Nate, This might be fairly straightforward if you’re able to maintain a minimum 4’0” wide sidewalk clearance for the entire project. Please reference the Encroachment Permit Checklist at: https://www.slocity.org/home/showpublisheddocument?id=5395. One of the most important items to start with is the insurance requirement. Please have your insurance company email me a COI and a CG 2012 endorsement listing the City of San Luis Obispo as additionally insured. Please also submit the following from www.slocity.org/encroachment: Temporary Traffic Control Application This is required to be filled out completely and submitted with a traffic control plan. See City Appendix G for traffic control figures. Water Pollution Control Plan Documents: Water Pollution Control Plan Water Pollution Control Plan - Tracking Information I’ll reply with an invoice and instructions on how to pay online, once I receive the encroachment permit items. Thank you, Matt LaFreniere pronouns he/him/his Permit Technician Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E mlafreni@slocity.org T 805.781.7015 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From:Nate Buchman-SeaBay nbuchman@seabay-group.com> Sent:Tuesday,January 12,2021 1:07 PM To:LaFreniere,Matt mlafreni@slocity.org> Subject:22 Chorro Siding Repairs Encroachment Hi Matt, The facility manager at 22 Chorro Street has asked me to help manage a small maintenance repair project they are doing over there.I wanted to reach out to you to ask about any encroachment permits items you think we will need. The scope is as follows: 1.Chorro St Side.Remove and replace some damaged wood siding.Sand and refinish all remaining siding.The plan is to have a scaffold built on the ramp for 3-4 days.the scaffold will come to within 18"of the edge of the building on the left side by the fire extinguisher.I'd like to discuss how this will impact the pedestrian path of travel for that sidewalk and what we need to do for approval.We should not need to impact any roadway travel. 2.Foothill St Side.Sand and refinish wood siding.This work will be done with ladders and possibly a single man scissor lift.This is a wide walkway area so we should be able to create a safety barricade that allows enough room for us to work and also for pedestrian travel,but of course I am looking to you for review/input.No impact to roadway anticipated. Please let me know what you think and what steps I need to take to get approval. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Nate Buchman-SeaBay To:LaFreniere, Matt Subject:Re: 22 Chorro Siding Repairs Encroachment Date:Friday, January 29, 2021 11:33:01 AM Attachments:image001.png image002.png image003.png image004.png image005.png image006.png image007.png Thanks Matt. The client has not yet accepted our proposal for the work. But, I will let them know this will be the expected encroachment fee. Thanks again. On Fri, Jan 29, 2021 at 11:06 AM LaFreniere, Matt <mlafreni@slocity.org> wrote: Hi Nate, Thank you for the submittal. The attached invoice can be paid at: https://infoslo.slocity.org/EnerGov_Prod/selfservice#/payinvoice. You will need to enter the invoice number, which is: 00023606. Please let me know once the invoice has been paid so I can issue the permit. Thank you, Matt LaFreniere pronouns he/him/his Permit Technician Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E mlafreni@slocity.org T 805.781.7015 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Thursday, January 21, 2021 4:25 PM To: LaFreniere, Matt <mlafreni@slocity.org> Subject: Re: 22 Chorro Siding Repairs Encroachment Hi Matt. Thanks for speaking to me about this today. Please see the attached pdf showing the encroachment request and pedestrian traffic control plan. I am not sure if this work requires a permit/inspection as it is just a repair of existing materials, so I wasn't sure what to note under the inspector. Please let me know what you think and if any more information is needed. Thanks, On Tue, Jan 12, 2021 at 1:48 PM LaFreniere, Matt <mlafreni@slocity.org> wrote: Hi Nate, This might be fairly straightforward if you’re able to maintain a minimum 4’0” wide sidewalk clearance for the entire project. Please reference the Encroachment Permit Checklist at: https://www.slocity.org/home/showpublisheddocument? id=5395. One of the most important items to start with is the insurance requirement. Please have your insurance company email me a COI and a CG 2012 endorsement listing the City of San Luis Obispo as additionally insured. Please also submit the following from www.slocity.org/encroachment: Temporary Traffic Control Application This is required to be filled out completely and submitted with a traffic control plan. See City Appendix G for traffic control figures. Water Pollution Control Plan Documents: Water Pollution Control Plan Water Pollution Control Plan - Tracking Information I’ll reply with an invoice and instructions on how to pay online, once I receive the encroachment permit items. Thank you, Matt LaFreniere pronouns he/him/his Permit Technician Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E mlafreni@slocity.org T 805.781.7015 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Tuesday, January 12, 2021 1:07 PM To: LaFreniere, Matt <mlafreni@slocity.org> Subject: 22 Chorro Siding Repairs Encroachment Hi Matt, The facility manager at 22 Chorro Street has asked me to help manage a small maintenance repair project they are doing over there. I wanted to reach out to you to ask about any encroachment permits items you think we will need. The scope is as follows: 1. Chorro St Side. Remove and replace some damaged wood siding. Sand and refinish all remaining siding. The plan is to have a scaffold built on the ramp for 3-4 days. the scaffold will come to within 18" of the edge of the building on the left side by the fire extinguisher. I'd like to discuss how this will impact the pedestrian path of travel for that sidewalk and what we need to do for approval. We should not need to impact any roadway travel. 2. Foothill St Side. Sand and refinish wood siding. This work will be done with ladders and possibly a single man scissor lift. This is a wide walkway area so we should be able to create a safety barricade that allows enough room for us to work and also for pedestrian travel, but of course I am looking to you for review/input. No impact to roadway anticipated. Please let me know what you think and what steps I need to take to get approval. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:LaFreniere, Matt To:Nate Buchman-SeaBay Subject:RE: 22 Chorro Siding Repairs Encroachment Date:Friday, January 29, 2021 11:06:01 AM Attachments:Invoice - 22 Chorro - staging for siding repairs.pdf image001.png image002.png image003.png image004.png image005.png image006.png image007.png Hi Nate, Thank you for the submittal. The attached invoice can be paid at: https://infoslo.slocity.org/EnerGov_Prod/selfservice#/payinvoice. You will need to enter the invoice number, which is: 00023606. Please let me know once the invoice has been paid so I can issue the permit. Thank you, Matt LaFreniere pronouns he/him/his Permit Technician Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E mlafreni@slocity.org T 805.781.7015 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Thursday, January 21, 2021 4:25 PM To: LaFreniere, Matt <mlafreni@slocity.org> Subject: Re: 22 Chorro Siding Repairs Encroachment Hi Matt. Thanks for speaking to me about this today. Please see the attached pdf showing the encroachment request and pedestrian traffic control plan. I am not sure if this work requires a permit/inspection as it is just a repair of existing materials, so I wasn't sure what to note under the inspector. Please let me know what you think and if any more information is needed. Thanks, On Tue, Jan 12, 2021 at 1:48 PM LaFreniere, Matt <mlafreni@slocity.org> wrote: Hi Nate, This might be fairly straightforward if you’re able to maintain a minimum 4’0” wide sidewalk clearance for the entire project. Please reference the Encroachment Permit Checklist at: https://www.slocity.org/home/showpublisheddocument?id=5395. One of the most important items to start with is the insurance requirement. Please have your insurance company email me a COI and a CG 2012 endorsement listing the City of San Luis Obispo as additionally insured. Please also submit the following from www.slocity.org/encroachment: Temporary Traffic Control Application This is required to be filled out completely and submitted with a traffic control plan. See City Appendix G for traffic control figures. Water Pollution Control Plan Documents: Water Pollution Control Plan Water Pollution Control Plan - Tracking Information I’ll reply with an invoice and instructions on how to pay online, once I receive the encroachment permit items. Thank you, Matt LaFreniere pronouns he/him/his Permit Technician Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E mlafreni@slocity.org T 805.781.7015 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Tuesday, January 12, 2021 1:07 PM To: LaFreniere, Matt <mlafreni@slocity.org> Subject: 22 Chorro Siding Repairs Encroachment Hi Matt, The facility manager at 22 Chorro Street has asked me to help manage a small maintenance repair project they are doing over there. I wanted to reach out to you to ask about any encroachment permits items you think we will need. The scope is as follows: 1. Chorro St Side. Remove and replace some damaged wood siding. Sand and refinish all remaining siding. The plan is to have a scaffold built on the ramp for 3-4 days. the scaffold will come to within 18" of the edge of the building on the left side by the fire extinguisher. I'd like to discuss how this will impact the pedestrian path of travel for that sidewalk and what we need to do for approval. We should not need to impact any roadway travel. 2. Foothill St Side. Sand and refinish wood siding. This work will be done with ladders and possibly a single man scissor lift. This is a wide walkway area so we should be able to create a safety barricade that allows enough room for us to work and also for pedestrian travel, but of course I am looking to you for review/input. No impact to roadway anticipated. Please let me know what you think and what steps I need to take to get approval. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Nate Buchman-SeaBay To:LaFreniere, Matt Subject:Re: 22 Chorro Siding Repairs Encroachment Date:Thursday, January 21, 2021 4:25:54 PM Attachments:image002.png image004.png image006.png image010.png image011.png image012.png image013.png 22 Chorro - SLO Encroachment App - SeaBay Building Group - 01-21-21.pdf Hi Matt. Thanks for speaking to me about this today. Please see the attached pdf showing the encroachment request and pedestrian traffic control plan. I am not sure if this work requires a permit/inspection as it is just a repair of existing materials, so I wasn't sure what to note under the inspector. Please let me know what you think and if any more information is needed. Thanks, On Tue, Jan 12, 2021 at 1:48 PM LaFreniere, Matt <mlafreni@slocity.org> wrote: Hi Nate, This might be fairly straightforward if you’re able to maintain a minimum 4’0” wide sidewalk clearance for the entire project. Please reference the Encroachment Permit Checklist at: https://www.slocity.org/home/showpublisheddocument? id=5395. One of the most important items to start with is the insurance requirement. Please have your insurance company email me a COI and a CG 2012 endorsement listing the City of San Luis Obispo as additionally insured. Please also submit the following from www.slocity.org/encroachment: Temporary Traffic Control Application This is required to be filled out completely and submitted with a traffic control plan. See City Appendix G for traffic control figures. Water Pollution Control Plan Documents: Water Pollution Control Plan Water Pollution Control Plan - Tracking Information I’ll reply with an invoice and instructions on how to pay online, once I receive the encroachment permit items. Thank you, Matt LaFreniere pronouns he/him/his Permit Technician Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E mlafreni@slocity.org T 805.781.7015 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Tuesday, January 12, 2021 1:07 PM To: LaFreniere, Matt <mlafreni@slocity.org> Subject: 22 Chorro Siding Repairs Encroachment Hi Matt, The facility manager at 22 Chorro Street has asked me to help manage a small maintenance repair project they are doing over there. I wanted to reach out to you to ask about any encroachment permits items you think we will need. The scope is as follows: 1. Chorro St Side. Remove and replace some damaged wood siding. Sand and refinish all remaining siding. The plan is to have a scaffold built on the ramp for 3-4 days. the scaffold will come to within 18" of the edge of the building on the left side by the fire extinguisher. I'd like to discuss how this will impact the pedestrian path of travel for that sidewalk and what we need to do for approval. We should not need to impact any roadway travel. 2. Foothill St Side. Sand and refinish wood siding. This work will be done with ladders and possibly a single man scissor lift. This is a wide walkway area so we should be able to create a safety barricade that allows enough room for us to work and also for pedestrian travel, but of course I am looking to you for review/input. No impact to roadway anticipated. Please let me know what you think and what steps I need to take to get approval. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Cohen, Rachel To:SeaBay - Armando Martinez; Craig R. Smith, AIA Subject:RE: 2640 / 2600 Broad Street Final Inspection Date:Wednesday, October 27, 2021 11:41:00 AM Attachments:image001.png image002.png image003.png image004.png Is it possible to shift the bike racks so that the bike slots are staggered in such a wasy that they do not interfere with the bollards? It is not possible to leave the racks as they are because several of the slots are unusable, unless you provide additional spaces elsewhere that compensate for the unusable spaces. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 8:23 AM To: Cohen, Rachel <rcohen@slocity.org>; Craig R. Smith, AIA <craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Rachel, I discussed the bike racks with Craig Smith and we both came to the same conclusion. There are no other locations to place bike racks on the site other than their current location. The pipe bollards in front of the racks are required to be in their current locations and cannot move. Even if we move the bikes in front of the glass storefront to meet some of the dimensions in your previous email, the pipe bollards will be in the way to achieve the 9' of egress/ingress. Can the bike racks remain as currently installed? Craig can you please confirm? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars (the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re-installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From:SeaBay - Armando Martinez To:Cohen, Rachel; Craig R. Smith, AIA Subject:Re: 2640 / 2600 Broad Street Final Inspection Date:Wednesday, October 27, 2021 8:24:14 AM Attachments:image001.png image002.png image003.png image004.png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Rachel, I discussed the bike racks with Craig Smith and we both came to the same conclusion. There are no other locations to place bike racks on the site other than their current location. The pipe bollards in front of the racks are required to be in their current locations and cannot move. Even if we move the bikes in front of the glass storefront to meet some of the dimensions in your previous email, the pipe bollards will be in the way to achieve the 9' of egress/ingress. Can the bike racks remain as currently installed? Craig can you please confirm? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan (flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars (the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re- installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From:SeaBay - Armando Martinez To:Cohen, Rachel Cc:Craig R. Smith, AIA Subject:Re: 2640 / 2600 Broad Street Final Inspection Date:Tuesday, October 26, 2021 9:45:20 AM Attachments:image004.png image003.png image002.png image001.png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Thanks Rachel, I will get with the project architect to see if we can accommodate the racks at their current location or come up with a new location for them. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan (flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars (the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re- installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Cohen, Rachel Cc:Craig R. Smith, AIA Subject:Re: 2640 / 2600 Broad Street Final Inspection Date:Friday, October 29, 2021 7:18:13 AM Attachments:image001.png image002.png image004.png image003.png Good morning Rachel, Attached please find pictures of the completed trash enclosure. Did you get a chance to review the bike rack layout pictures I sent over on Wednesday? Also, if I may ask, is there any update on the mural approval? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Oct 27, 2021 at 1:38 PM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Hi Rachel, See attached pictures of rearranged bike racks. Would this work for the City? On Wed, Oct 27, 2021 at 11:48 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando- Unfortunately the Zoning Regulations has specific requirements for each kind of bicycle parking and we cannot exchange one for another. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 11:45 AM To: Cohen, Rachel <rcohen@slocity.org> Cc: Craig R. Smith, AIA <craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection Hi Rachel, What if we added more long term bike storage inside the loading dock to make up for the unusable spots? Just a thought. On Wed, Oct 27, 2021 at 11:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Is it possible to shift the bike racks so that the bike slots are staggered in such a wasy that they do not interfere with the bollards? It is not possible to leave the racks as they are because several of the slots are unusable, unless you provide additional spaces elsewhere that compensate for the unusable spaces. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 8:23 AM To: Cohen, Rachel <rcohen@slocity.org>; Craig R. Smith, AIA craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Rachel, I discussed the bike racks with Craig Smith and we both came to the same conclusion. There are no other locations to place bike racks on the site other than their current location. The pipe bollards in front of the racks are required to be in their current locations and cannot move. Even if we move the bikes in front of the glass storefront to meet some of the dimensions in your previous email, the pipe bollards will be in the way to achieve the 9' of egress/ingress. Can the bike racks remain as currently installed? Craig can you please confirm? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan (flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re-installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Cohen, Rachel Cc:Craig R. Smith, AIA Subject:Re: 2640 / 2600 Broad Street Final Inspection Date:Wednesday, October 27, 2021 1:38:45 PM Attachments:image001.png image002.png image004.png image003.png Hi Rachel, See attached pictures of rearranged bike racks. Would this work for the City? On Wed, Oct 27, 2021 at 11:48 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando- Unfortunately the Zoning Regulations has specific requirements for each kind of bicycle parking and we cannot exchange one for another. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 11:45 AM To: Cohen, Rachel <rcohen@slocity.org> Cc: Craig R. Smith, AIA <craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection Hi Rachel, What if we added more long term bike storage inside the loading dock to make up for the unusable spots? Just a thought. On Wed, Oct 27, 2021 at 11:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Is it possible to shift the bike racks so that the bike slots are staggered in such a wasy that they do not interfere with the bollards? It is not possible to leave the racks as they are because several of the slots are unusable, unless you provide additional spaces elsewhere that compensate for the unusable spaces. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 8:23 AM To: Cohen, Rachel <rcohen@slocity.org>; Craig R. Smith, AIA craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Rachel, I discussed the bike racks with Craig Smith and we both came to the same conclusion. There are no other locations to place bike racks on the site other than their current location. The pipe bollards in front of the racks are required to be in their current locations and cannot move. Even if we move the bikes in front of the glass storefront to meet some of the dimensions in your previous email, the pipe bollards will be in the way to achieve the 9' of egress/ingress. Can the bike racks remain as currently installed? Craig can you please confirm? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan (flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars (the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re-installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Cohen, Rachel Cc:Craig R. Smith, AIA Subject:Re: 2640 / 2600 Broad Street Final Inspection Date:Wednesday, October 27, 2021 11:44:49 AM Attachments:image004.png image003.png image001.png image002.png Hi Rachel, What if we added more long term bike storage inside the loading dock to make up for the unusable spots? Just a thought. On Wed, Oct 27, 2021 at 11:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Is it possible to shift the bike racks so that the bike slots are staggered in such a wasy that they do not interfere with the bollards? It is not possible to leave the racks as they are because several of the slots are unusable, unless you provide additional spaces elsewhere that compensate for the unusable spaces. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 8:23 AM To: Cohen, Rachel <rcohen@slocity.org>; Craig R. Smith, AIA craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Rachel, I discussed the bike racks with Craig Smith and we both came to the same conclusion. There are no other locations to place bike racks on the site other than their current location. The pipe bollards in front of the racks are required to be in their current locations and cannot move. Even if we move the bikes in front of the glass storefront to meet some of the dimensions in your previous email, the pipe bollards will be in the way to achieve the 9' of egress/ingress. Can the bike racks remain as currently installed? Craig can you please confirm? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan (flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars (the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re- installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Cohen, Rachel To:SeaBay - Armando Martinez Cc:Craig R. Smith, AIA Subject:RE: 2640 / 2600 Broad Street Final Inspection Date:Wednesday, October 27, 2021 11:48:00 AM Attachments:image001.png image002.png image003.png image004.png Hi Armando- Unfortunately the Zoning Regulations has specific requirements for each kind of bicycle parking and we cannot exchange one for another. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 11:45 AM To: Cohen, Rachel <rcohen@slocity.org> Cc: Craig R. Smith, AIA <craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection Hi Rachel, What if we added more long term bike storage inside the loading dock to make up for the unusable spots? Just a thought. On Wed, Oct 27, 2021 at 11:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Is it possible to shift the bike racks so that the bike slots are staggered in such a wasy that they do not interfere with the bollards? It is not possible to leave the racks as they are because several of the slots are unusable, unless you provide additional spaces elsewhere that compensate for the unusable spaces. Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, October 27, 2021 8:23 AM To: Cohen, Rachel <rcohen@slocity.org>; Craig R. Smith, AIA <craig@craigrsmithaia.com> Subject: Re: 2640 / 2600 Broad Street Final Inspection This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Rachel, I discussed the bike racks with Craig Smith and we both came to the same conclusion. There are no other locations to place bike racks on the site other than their current location. The pipe bollards in front of the racks are required to be in their current locations and cannot move. Even if we move the bikes in front of the glass storefront to meet some of the dimensions in your previous email, the pipe bollards will be in the way to achieve the 9' of egress/ingress. Can the bike racks remain as currently installed? Craig can you please confirm? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Oct 26, 2021 at 8:41 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hi Armando – Thank you for taking me around the site on Friday, October 22, 2021. As I mentioned to you on the site, there are a few outstanding items left to correct / finish before Planning will sign off on the Final. 1. As we discussed, the bicycle racks are not installed per the architectural site plan flush against the building) which has made the space between the bollard lights and the rack too small and difficult to park bicycles. In addition, the two racks are too close together and only one of the slots can be parked in, leaving the adjacent slot un-parkable (these are the two spaces where the two racks meet). Lastly, the bike slot on the far left is too close to the wall and leaves insufficient space for handle bars (the bike we tested on site had narrow handle bars, wider bars would not fit. I spoke with staff in the Transportation Division and they confirmed that the racks need to be re-installed per the manufacturer’s instructions of the correct spacing of the rack from walls, from each other and from other items such as bollard lighting. The manufacturer provided the following information on specs: a. Leave at least 4" behind single sided racks. b. Leave at least 12" on the RH and LH side of racks for handlebar overhang. c. Leave at least 9' from back base of rack for ingress/egress. If it is not possible to keep all the racks in the current location, we could discuss another location on the site for bicycle parking or the removal of the bollard lighting. The project site has a bicycle parking requirement and all bicycle parking spaces have to be available, visible and usable on the site. 2. The trash enclosure needs to be complete per plans. When complete, you may sent photos to me to review that this part of the project is complete. 3. Mural - The director’s application has been received and in process. Approval of the mural will need to be complete for Planning sign-off. 4. Lastly after returning to the office, I learned that Planning fees are still due for the project. These fees will need to be paid prior to Planning sign-off on the final as well. The fees are as follows: a. USE-0371-2019 - $4,091.00 b. ARCH-0372-2019 - $2,592.72 Please let me know if you have any questions. Sincerely, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:SeaBay - Armando Martinez Cc:Craig R. Smith AIA - CRSA Architecture; Jim Clancy Subject:RE: 2640 Broad - NHC - Gas Sign off by City Date:Tuesday, October 12, 2021 7:46:00 PM Attachments:FW EXTERNAL Gas Meter Release - 2640 Broad St Conf# 00044aGMMPR2PC6P.msg image001.png image002.png image003.png image004.png Hi Armando, Please see the attached authorization sent and reply of receipt for this gas meter. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, October 12, 2021 3:51 PM To: Sadowski, Mark <msadowsk@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad - NHC - Gas Sign off by City This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, SoCal gas has informed me that they do not have the green tag or line release from the City for our gas line out here. Trevor confirmed yesterday he passed us last week during our inspection. Can you please help on getting this released to SoCal Gas? Is there a confirmation # you can send and I can get that over to them? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Sadowski, Mark Cc:Craig R. Smith AIA - CRSA Architecture; Jim Clancy Subject:Re: 2640 Broad - NHC - Gas Sign off by City Date:Tuesday, October 12, 2021 7:51:35 PM Attachments:image001.png image001.png image002.png image002.png image004.png image003.png image004.png Great! Thank you Mark. Have a good night. On Tue, Oct 12, 2021 at 7:46 PM Sadowski, Mark <msadowsk@slocity.org> wrote: Hi Armando, Please see the attached authorization sent and reply of receipt for this gas meter. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, October 12, 2021 3:51 PM To: Sadowski, Mark <msadowsk@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad - NHC - Gas Sign off by City This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, SoCal gas has informed me that they do not have the green tag or line release from the City for our gas line out here. Trevor confirmed yesterday he passed us last week during our inspection. Can you please help on getting this released to SoCal Gas? Is there a confirmation # you can send and I can get that over to them? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message ---------- From: "Nelson, Trevor" <tnelson@slocity.org> To: "Sadowski, Mark" <msadowsk@slocity.org> Cc: Bcc: Date: Tue, 12 Oct 2021 23:26:49 +0000 Subject: FW: [EXTERNAL] Gas Meter Release - 2640 Broad St Conf# 00044aGMMPR2PC6P From: setdesk@socalgas.com <setdesk@socalgas.com> Sent: Tuesday, October 12, 2021 3:02 PM To: Nelson, Trevor <tnelson@slocity.org> Subject: Re: [EXTERNAL] Gas Meter Release - 2640 Broad St Conf# 00044aGMMPR2PC6P This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Your email has been received and will be processed in order received. Please be advised that any addresses listed in the email will be considered as agasrelease, unless otherwise specified by the sender. We do not accept temporary gas releases. Thank you, Centralized Meter Set Desk 1-800-228-7377 setdesk@socalgas.com Southern California Gas Company values your privacy. For more information, viewourPrivacyPolicy (http://www.socalgas.com/privacy-policy.shtml) andPrivacyNotice(http://www.socalgas.com/privacy-notice.shtml). On 10/11/2021 3:35 PM, Trevor Nelson wrote: EXTERNAL EMAIL - Be cautious of attachments, web links, and requests for information *** EXTERNAL EMAIL - Be cautious of attachments, web links, and requests for information *** Good afternoon, Ok to release gas meter for address: 2640 Broad St, San Luis Obispo, CA 93401 Thank you, Trevor Nelson Building Inspector slocity.org] Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E tnelson@slocity.org T 805.781.7153 slocity.org [slocity.org] facebook.com] [instagram.com] [twitter.com] Stay connected with the City by signing up for e-notifications [slocity.org] This email originated outside of Sempra. Be cautious of attachments, web links, or requests for information. This email originated outside of Sempra. Be cautious of attachments, web links, or requests for information. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Craig R. Smith, AIA To:Codron, Michael Cc:SeaBay -Builders Armando Martinez Subject:Re: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 12:04:48 PM Hey Michael, I’m out of town and will not be able to attend the meeting. If during the tour should you or anyone else have any questions I’m available via phone. Thanks! Craig R Smith, AIA On Sep 15, 2021, at 12:36 PM, Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:SeaBay - Armando Martinez Cc:Bailey, Georgina; Craig R. Smith AIA - CRSA Architecture; Hermann, Greg; Jim Clancy; Maggio, Rodger; Sadowski, Mark Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Monday, September 20, 2021 10:54:00 AM Waiting for confirmation; shooting for 1:30 PM. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 20, 2021 10:53 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Good morning Michael, following up to see if you had a time pinned down for Thursday? I might have one of my business partners come down from my main office and I wanted to coordinate their arrival. On Wed, Sep 15, 2021 at 11:36 AM Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, - Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:SeaBay - Armando Martinez Cc:Sadowski, Mark; Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Jim Clancy; Hermann, Greg; Bailey, Georgina Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 11:36:00 AM Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Codron, Michael Cc:Bailey, Georgina; Craig R. Smith AIA - CRSA Architecture; Hermann, Greg; Jim Clancy; Maggio, Rodger; Sadowski, Mark Subject:Re: 2640 Broad Street - NHC - Site Tour Date:Monday, September 20, 2021 10:53:41 AM Good morning Michael, following up to see if you had a time pinned down for Thursday? I might have one of my business partners come down from my main office and I wanted to coordinate their arrival. On Wed, Sep 15, 2021 at 11:36 AM Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Codron, Michael Cc:Bailey, Georgina; Craig R. Smith AIA - CRSA Architecture; Hermann, Greg; Jim Clancy; Maggio, Rodger; Sadowski, Mark Subject:Re: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 22, 2021 9:30:35 AM Good morning Michael, looking forward to meeting everyone. See you tomorrow at 1:30pm. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 22, 2021 at 9:26 AM Codron, Michael <mcodron@slocity.org> wrote: Hi All, We will be on site for a tour at 1:30 on Thursday 9/23. City staff will be me, Georgina, Chad Pfarr (PD), and John Mezzapesa (Code). It will be great to hear from your team the project status and remaining items you have to complete for final. Thank you! -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 20, 2021 10:53 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Good morning Michael, following up to see if you had a time pinned down for Thursday? I might have one of my business partners come down from my main office and I wanted to coordinate their arrival. On Wed, Sep 15, 2021 at 11:36 AM Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:Maggio, Rodger Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Tuesday, September 21, 2021 8:34:00 AM That’s fine. I will be going with Georgina, Chad and John M. Will report back any info we gather. thx From: Maggio, Rodger <rmaggio@slocity.org> Sent: Monday, September 20, 2021 11:12 AM To: Codron, Michael <mcodron@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Mark and I have scheduled time at 1:30 on Thursday for the breezeway cleanup. From: Codron, Michael <mcodron@slocity.org> Sent: Monday, September 20, 2021 10:55 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Waiting for confirmation; shooting for 1:30 PM. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 20, 2021 10:53 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Good morning Michael, following up to see if you had a time pinned down for Thursday? I might have one of my business partners come down from my main office and I wanted to coordinate their arrival. On Wed, Sep 15, 2021 at 11:36 AM Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, - Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:SeaBay - Armando Martinez Cc:Sadowski, Mark; Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Jim Clancy; Hermann, Greg; Bailey, Georgina Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 11:13:00 AM Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:SeaBay - Armando Martinez Cc:Bailey, Georgina; Craig R. Smith AIA - CRSA Architecture; Hermann, Greg; Jim Clancy; Maggio, Rodger; Sadowski, Mark Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 22, 2021 9:26:00 AM Hi All, We will be on site for a tour at 1:30 on Thursday 9/23. City staff will be me, Georgina, Chad Pfarr (PD), and John Mezzapesa (Code). It will be great to hear from your team the project status and remaining items you have to complete for final. Thank you! -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 20, 2021 10:53 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Good morning Michael, following up to see if you had a time pinned down for Thursday? I might have one of my business partners come down from my main office and I wanted to coordinate their arrival. On Wed, Sep 15, 2021 at 11:36 AM Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, - Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Hermann, Greg To:Codron, Michael Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 2:02:44 PM Georgina will attend and I’m happy to as well if you’d like. Greg From: Codron, Michael <mcodron@slocity.org> Sent: Wednesday, September 15, 2021 11:36 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Hermann, Greg To:Codron, Michael Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 2:37:34 PM Copy. Thanks. Greg From: Codron, Michael <mcodron@slocity.org> Sent: Wednesday, September 15, 2021 2:37 PM To: Hermann, Greg <GHermann@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Great, I don’t think you need to worry about it and we will report back. -mc From: Hermann, Greg <GHermann@slocity.org> Sent: Wednesday, September 15, 2021 2:03 PM To: Codron, Michael <mcodron@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Georgina will attend and I’m happy to as well if you’d like. Greg From: Codron, Michael <mcodron@slocity.org> Sent: Wednesday, September 15, 2021 11:36 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Maggio, Rodger To:Codron, Michael Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Monday, September 20, 2021 11:11:37 AM Mark and I have scheduled time at 1:30 on Thursday for the breezeway cleanup. From: Codron, Michael <mcodron@slocity.org> Sent: Monday, September 20, 2021 10:55 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Waiting for confirmation; shooting for 1:30 PM. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 20, 2021 10:53 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Hermann, Greg <GHermann@slocity.org>; Jim Clancy jim@nhcdispensaries.com>; Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark msadowsk@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Good morning Michael, following up to see if you had a time pinned down for Thursday? I might have one of my business partners come down from my main office and I wanted to coordinate their arrival. On Wed, Sep 15, 2021 at 11:36 AM Codron, Michael <mcodron@slocity.org> wrote: Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, - Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Codron, Michael Cc:Sadowski, Mark; Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Jim Clancy; Hermann, Greg; Bailey, Georgina Subject:Re: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 11:33:26 AM Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, - Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:Hermann, Greg Subject:RE: 2640 Broad Street - NHC - Site Tour Date:Wednesday, September 15, 2021 2:37:00 PM Great, I don’t think you need to worry about it and we will report back. -mc From: Hermann, Greg <GHermann@slocity.org> Sent: Wednesday, September 15, 2021 2:03 PM To: Codron, Michael <mcodron@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Georgina will attend and I’m happy to as well if you’d like. Greg From: Codron, Michael <mcodron@slocity.org> Sent: Wednesday, September 15, 2021 11:36 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: RE: 2640 Broad Street - NHC - Site Tour Okay, I’ll follow up to confirm the specific time and members of the City team that will participate. -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 11:33 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Hermann, Greg <GHermann@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: 2640 Broad Street - NHC - Site Tour Mr. Codron, Early Thursday afternoon works great for us. Looking forward to see everyone then. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 15, 2021 at 11:13 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Mr. Martinez. I think Thursday early afternoon would be a good time for me and the team to meet you out on site. Let me know if that works for you. Best, -Michael From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Wednesday, September 15, 2021 8:50 AM To: Codron, Michael <mcodron@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: 2640 Broad Street - NHC - Site Tour This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mr. Cordon, Good morning and I hope the day finds you well. I am reaching out to invite you, Mr. Sadowski and Mr. Maggio to tour our site next week to verify the progress made the last couple of weeks at NHC. Our Broad Street sidewalk work should be complete by Wednesday 9/22 and ready for landscaping. We have been closely coordinating with PW to ensure we are meeting their expectations. The interior of the building is very close to having SeaBay start to call in finals for MEP+FS. The only hurdle left to tackle is PG&E and its scheduling department. While we are on PG&E schedule, the date they can provide permanent power does not work with our schedule. I am hoping you will accept our invitations and come pay us a visit. Thank you for your time and consideration. If you have any questions or concerns please feel free to contact me. Have a great rest of your day. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Ruiz, Mary To:Isela Santillanez-Seabay Cc:SeaBay - Armando Martinez Subject:RE: AM1923 2640 Broad Street Date:Wednesday, October 20, 2021 11:24:00 AM Attachments:image001.png image002.png image003.png image004.png Hello, Upon review of your receipts, you are in compliance with the recycling requirementsforBLDG-0434-2020. The Building Inspection Team will be notified. Best regards, Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Wednesday, October 20, 2021 10:15 AM To: Ruiz, Mary <mruiz@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com> Subject: Re: AM1923 2640 Broad Street Hello Mary, Please see the attached recycle reports for review, let me know if you have any questions. On Mon, Oct 18, 2021 at 12:05 PM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Armando, Thank you, looks like we just need your recycling report from Coastal Roll Off for this project. From here we will determine if at least 65% of materials were recycled and get back to you for final recycling approval. Please send all reports and any receipts via email to recycleright@slocity.org. We can complete this today. Thank you, Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 18, 2021 12:01 PM To: Ruiz, Mary <mruiz@slocity.org> Cc: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Subject: Re: AM1923 2640 Broad Street Hi Mary, Permit #BLDG-0434-2020. Thank you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 18, 2021 at 11:55 AM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Isela, Can you please provide me your permit number? Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Monday, October 18, 2021 9:03 AM To: Recycle Right <recycleright@slocity.org> Cc: Armando Martinez - Seabay <amartinez@seabay-group.com> Subject: AM1923 2640 Broad Street This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237AZ #301717 KB-1 Dual OR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keepthecontentsconfidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Ruiz, Mary Cc:Isela Santillanez-Seabay Subject:Re: AM1923 2640 Broad Street Date:Monday, October 18, 2021 12:01:44 PM Attachments:image001.png image002.png image003.png image004.png Hi Mary, Permit #BLDG-0434-2020. Thank you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 18, 2021 at 11:55 AM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Isela, Can you please provide me your permit number? Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Monday, October 18, 2021 9:03 AM To: Recycle Right <recycleright@slocity.org> Cc: Armando Martinez - Seabay <amartinez@seabay-group.com> Subject: AM1923 2640 Broad Street This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237AZ #301717 KB-1 Dual OR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keepthecontentsconfidential, and immediately delete the message and any attachments from your system. From:Isela Santillanez-Seabay To:Ruiz, Mary Cc:SeaBay - Armando Martinez Subject:Re: AM1923 2640 Broad Street Date:Wednesday, October 20, 2021 10:15:17 AM Attachments:image001.png image002.png image003.png image004.png Am1922 Recycle Tag 2.18.21C.pdf AM1922 Recycle Tag 2.17.21C.pdf Am1922 Coastal Roll Off Recycle Tag.pdf Hello Mary, Please see the attached recycle reports for review, let me know if you have any questions. On Mon, Oct 18, 2021 at 12:05 PM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Armando, Thank you, looks like we just need your recycling report from Coastal Roll Off for this project. From here we will determine if at least 65% of materials were recycled and get back to you for final recycling approval. Please send all reports and any receipts via email to recycleright@slocity.org. We can complete this today. Thank you, Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 18, 2021 12:01 PM To: Ruiz, Mary <mruiz@slocity.org> Cc: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Subject: Re: AM1923 2640 Broad Street Hi Mary, Permit #BLDG-0434-2020. Thank you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 18, 2021 at 11:55 AM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Isela, Can you please provide me your permit number? Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Monday, October 18, 2021 9:03 AM To: Recycle Right <recycleright@slocity.org> Cc: Armando Martinez - Seabay <amartinez@seabay-group.com> Subject: AM1923 2640 Broad Street This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keepthecontentsconfidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Isela Santillanez-Seabay Cc:Recycle Right Subject:Re: AM1923 2640 Broad Street Date:Monday, October 18, 2021 9:05:25 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Construction complete is 10/22. Sorry for the confusion. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 18, 2021 at 9:03 AM Isela Santillanez-Seabay <isantillanez@seabay- group.com> wrote: Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CBCA #1005237 AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Ruiz, Mary To:SeaBay - Armando Martinez Cc:Isela Santillanez-Seabay Subject:RE: AM1923 2640 Broad Street Date:Monday, October 18, 2021 12:05:00 PM Attachments:image001.png image002.png image003.png image004.png Hi Armando, Thank you, looks like we just need your recycling report from Coastal Roll Off for this project. From here we will determine if at least 65% of materials were recycled and get back to you for final recycling approval. Please send all reports and any receipts via email to recycleright@slocity.org. We can complete this today. Thank you, Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 18, 2021 12:01 PM To: Ruiz, Mary <mruiz@slocity.org> Cc: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Subject: Re: AM1923 2640 Broad Street Hi Mary, Permit #BLDG-0434-2020. Thank you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 18, 2021 at 11:55 AM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Isela, Can you please provide me your permit number? Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Monday, October 18, 2021 9:03 AM To: Recycle Right <recycleright@slocity.org> Cc: Armando Martinez - Seabay <amartinez@seabay-group.com> Subject: AM1923 2640 Broad Street This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CBCA #1005237 AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Ruiz, Mary Cc:Isela Santillanez-Seabay Subject:Re: AM1923 2640 Broad Street Date:Wednesday, October 20, 2021 11:27:54 AM Attachments:image001.png image002.png image003.png image004.png Thank you Mary. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Oct 20, 2021 at 11:24 AM Ruiz, Mary <mruiz@slocity.org> wrote: Hello, Upon review of your receipts, you are in compliance with the recyclingrequirementsforBLDG-0434-2020. The Building Inspection Team will be notified. Best regards, Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Wednesday, October 20, 2021 10:15 AM To: Ruiz, Mary <mruiz@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com> Subject: Re: AM1923 2640 Broad Street Hello Mary, Please see the attached recycle reports for review, let me know if you have any questions. On Mon, Oct 18, 2021 at 12:05 PM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Armando, Thank you, looks like we just need your recycling report from Coastal Roll Off for this project. From here we will determine if at least 65% of materials were recycled and get back to you for final recycling approval. Please send all reports and any receipts via email to recycleright@slocity.org. We can complete this today. Thank you, Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 18, 2021 12:01 PM To: Ruiz, Mary <mruiz@slocity.org> Cc: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Subject: Re: AM1923 2640 Broad Street Hi Mary, Permit #BLDG-0434-2020. Thank you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 18, 2021 at 11:55 AM Ruiz, Mary <mruiz@slocity.org> wrote: Hi Isela, Can you please provide me your permit number? Mary Ruiz Administrative Assistant II Utilities E mruiz@slocity.org T 805.781.7238 slocity.org Stay connected with the City by signing up for e-notifications From: Isela Santillanez-Seabay <isantillanez@seabay-group.com> Sent: Monday, October 18, 2021 9:03 AM To: Recycle Right <recycleright@slocity.org> Cc: Armando Martinez - Seabay <amartinez@seabay-group.com> Subject: AM1923 2640 Broad Street This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good Morning, I am looking for some help on getting our construction recycle plan approved. I have the recycle tags from the Coastal Roll off but I am not sure where to submit them. Our construction will be complete by 11/1 and will need this approved for the final permit. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237AZ #301717 KB-1DualOR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Isela Santillanez | Project Coordinator SeaBay Building Group, LLC 23575 Cabot Blvd. Suite 201 Hayward, CA 94545 Office: 510.962.8004 Cell: 510.571.7859 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CBCA #1005237AZ #301717 KB-1 Dual OR #211637 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Flores, Allie To:SeaBay - Armando Martinez Subject:RE: CPS Log File Date:Monday, October 25, 2021 9:12:00 AM Attachments:image001.png image002.png image003.png image004.png Please reach out to him directly. His email address is tnelson@slocity.org. Thank you, Allie Flores Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E aflores@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 25, 2021 9:07 AM To: Flores, Allie <aflores@slocity.org> Subject: Re: CPS Log File Trevor (building inspector) asked me to email him this document to this email address. On Mon, Oct 25, 2021 at 7:41 AM Flores, Allie <aflores@slocity.org> wrote: Hello, I need clarification on what to do with this. Thank you, Allie Flores Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E aflores@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, October 22, 2021 2:49 PM To: Flores, Allie <aflores@slocity.org> Cc: Bob Bullen <bbullen@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay- group.com>; Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Subject: Fwd: CPS Log File This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. The city inspector asked me to send over the test & balance report for permit #BLDG 0434-2020 address 2640 Broad Street. See attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: California HERS Raters Group <cahersraters@gmail.com> Date: Fri, Oct 22, 2021 at 10:58 AM Subject: CPS Log File To: amartinez@seabay-group.com <amartinez@seabay-group.com> Please find your attached log file: Test_&_Balance_Report.csv Chris Austin California HERS Raters Group 806.806.0088 Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Flores, Allie Subject:Re: CPS Log File Date:Monday, October 25, 2021 9:13:05 AM Attachments:image002.png image003.png image004.png image001.png Will do, thanks. On Mon, Oct 25, 2021 at 9:12 AM Flores, Allie <aflores@slocity.org> wrote: Please reach out to him directly. His email address is tnelson@slocity.org. Thank you, Allie Flores Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E aflores@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 25, 2021 9:07 AM To: Flores, Allie <aflores@slocity.org> Subject: Re: CPS Log File Trevor (building inspector) asked me to email him this document to this email address. On Mon, Oct 25, 2021 at 7:41 AM Flores, Allie <aflores@slocity.org> wrote: Hello, I need clarification on what to do with this. Thank you, Allie Flores Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E aflores@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, October 22, 2021 2:49 PM To: Flores, Allie <aflores@slocity.org> Cc: Bob Bullen <bbullen@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay- group.com>; Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Subject: Fwd: CPS Log File This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. The city inspector asked me to send over the test & balance report for permit #BLDG 0434-2020 address 2640 Broad Street. See attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: California HERS Raters Group <cahersraters@gmail.com> Date: Fri, Oct 22, 2021 at 10:58 AM Subject: CPS Log File To: amartinez@seabay-group.com <amartinez@seabay-group.com> Please find your attached log file: Test_&_Balance_Report.csv Chris Austin California HERS Raters Group 806.806.0088 Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Flores, Allie Subject:Re: CPS Log File Date:Monday, October 25, 2021 9:07:37 AM Attachments:image004.png image003.png image001.png image002.png Trevor (building inspector) asked me to email him this document to this email address. On Mon, Oct 25, 2021 at 7:41 AM Flores, Allie <aflores@slocity.org> wrote: Hello, I need clarification on what to do with this. Thank you, Allie Flores Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E aflores@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, October 22, 2021 2:49 PM To: Flores, Allie <aflores@slocity.org> Cc: Bob Bullen <bbullen@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay- group.com>; Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Subject: Fwd: CPS Log File This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. The city inspector asked me to send over the test & balance report for permit #BLDG 0434- 2020 address 2640 Broad Street. See attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: California HERS Raters Group <cahersraters@gmail.com> Date: Fri, Oct 22, 2021 at 10:58 AM Subject: CPS Log File To: amartinez@seabay-group.com <amartinez@seabay-group.com> Please find your attached log file: Test_&_Balance_Report.csv Chris Austin California HERS Raters Group 806.806.0088 Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Flores, Allie To:SeaBay - Armando Martinez Subject:RE: CPS Log File Date:Monday, October 25, 2021 7:41:00 AM Attachments:image001.png image002.png image003.png image004.png Hello, I need clarification on what to do with this. Thank you, Allie Flores Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E aflores@slocity.org T 805.781.7101 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, October 22, 2021 2:49 PM To: Flores, Allie <aflores@slocity.org> Cc: Bob Bullen <bbullen@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com> Subject: Fwd: CPS Log File This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. The city inspector asked me to send over the test & balance report for permit #BLDG 0434-2020 address 2640 Broad Street. See attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: California HERS Raters Group <cahersraters@gmail.com> Date: Fri, Oct 22, 2021 at 10:58 AM Subject: CPS Log File To: amartinez@seabay-group.com <amartinez@seabay-group.com> Please find your attached log file: Test_&_Balance_Report.csv Chris Austin California HERS Raters Group 806.806.0088 From:SeaBay - Armando Martinez To:Nelson, Trevor Cc:Bob Bullen; Craig R. Smith AIA - CRSA Architecture; Isela Santillanez - SeaBay; lucas lundin - SeaBay Subject:Re: CPS Log File Date:Monday, October 25, 2021 9:13:54 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Trevor attached is the T&B report. The rest of the HVAC title 24 docs coming today. On Fri, Oct 22, 2021 at 2:48 PM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: The city inspector asked me to send over the test & balance report for permit #BLDG 0434- 2020 address 2640 Broad Street. See attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: California HERS Raters Group <cahersraters@gmail.com> Date: Fri, Oct 22, 2021 at 10:58 AM Subject: CPS Log File To: amartinez@seabay-group.com <amartinez@seabay-group.com> Please find your attached log file: Test_&_Balance_Report.csv Chris Austin California HERS Raters Group 806.806.0088 Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Bell, Kyle To:SeaBay - Armando Martinez Cc:Nate Buchman-SeaBay; Jill LeMieux Subject:RE: Current Development Projects in San Luis Obispo - General Contractor Date:Tuesday, September 3, 2019 1:05:51 PM Good afternoon, Please see the links to the Developer websites for the specific projects I have been assigned. Let me know if you have any specific questions. Kyle Bell CDD Associate Planner T 805.781.7524 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, September 3, 2019 10:39 AM To: Bell, Kyle <KBell@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Leveille, Brian bleveill@slocity.org>; Scott, Shawna <sscott@slocity.org>; Van Leeuwen, Kyle KVanLeeu@slocity.org> Cc: Nate Buchman-SeaBay <nbuchman@seabay-group.com>; Jill LeMieux <jill@slochamber.org> Subject: Current Development Projects in San Luis Obispo - General Contractor Good morning, my name is Armando Martinez representing SeaBay Building Group, LLC. We opened an office in San Luis Obispo, CA (1011 Pacific St) last year and we are looking to expand our portfolio of projects there. We recently joined the SLO Camber of Commerce and Jill LeMieux from the CofC directed me to your attention regarding new construction coming up in SLO. I visited your website and if possible I would like to talk to you today about the following projects with hopes of getting on the bidders list. I have attached some more information about SeaBay Building Group for your reference. Marsh & Chorro Mixed Used : Jamestown - https://www.jamestownlp.com/portfolio/california/ 1121 Montalban Mixed Used: Covelop - http://covelop.net/ 956 Monterey Mixed Used. Jamestown - https://www.jamestownlp.com/portfolio/california/ 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thank you or your time and look forward to hearing from you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Cohen, Rachel Subject:Re: Current Development Projects in San Luis Obispo - General Contractor Date:Thursday, September 19, 2019 10:07:51 AM Good morning Rachel, what is Richard Burde's email address? Thank you for the information and your time. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Wed, Sep 18, 2019 at 10:26 AM Cohen, Rachel <rcohen@slocity.org> wrote: Hello Armando- I have provided the information that I have below. I am only the project planner on a couple of the projects listed. Cheers, Rachel Cohen Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 6, 2019 1:10 PM To: Cohen, Rachel <rcohen@slocity.org>; Leveille, Brian <bleveill@slocity.org>; Scott, Shawna <sscott@slocity.org>; Van Leeuwen, Kyle <KVanLeeu@slocity.org> Cc: Nate Buchman-SeaBay <nbuchman@seabay-group.com>; Jill LeMieux jill@slochamber.org> Subject: Re: Current Development Projects in San Luis Obispo - General Contractor Good afternoon City of San Luis Obispo, I am following up on my earlier request for project information on the project list below. Any help would be greatly appreciated. If possible, looking for developer contact names, email addresses, phone numbers or websites. 650 Tank Farm: Agera Grove Investments, LLC Palm Nipomo Parking Garage: City of SLO NWC Board Street Mixed Used: 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility: Regional Transportation Authority of San Luis Obispo Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 3, 2019 at 10:38 AM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Good morning, my name is Armando Martinez representing SeaBay Building Group, LLC. We opened an office in San Luis Obispo, CA (1011 Pacific St) last year and we are looking to expand our portfolio of projects there. We recently joined the SLO Camber of Commerce and Jill LeMieux from the CofC directed me to your attention regarding new construction coming up in SLO. I visited your website and if possible I would like to talk to you today about the following projects with hopes of getting on the bidders list. I have attached some more information about SeaBay Building Group for your reference. 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thank you or your time and look forward to hearing from you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Bell, Kyle Cc:Nate Buchman-SeaBay; Jill LeMieux Subject:Re: Current Development Projects in San Luis Obispo - General Contractor Date:Tuesday, September 3, 2019 3:50:00 PM Kyle, Thank you very much for the information. If I come up with any specific questions I'll be sure to reach out. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 3, 2019 at 1:05 PM Bell, Kyle <KBell@slocity.org> wrote: Good afternoon, Please see the links to the Developer websites for the specific projects I have been assigned. Let me know if you have any specific questions. Kyle Bell CDD Associate Planner T 805.781.7524 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, September 3, 2019 10:39 AM To: Bell, Kyle <KBell@slocity.org>; Cohen, Rachel <rcohen@slocity.org>; Leveille, Brian bleveill@slocity.org>; Scott, Shawna <sscott@slocity.org>; Van Leeuwen, Kyle KVanLeeu@slocity.org> Cc: Nate Buchman-SeaBay <nbuchman@seabay-group.com>; Jill LeMieux jill@slochamber.org> Subject: Current Development Projects in San Luis Obispo - General Contractor Good morning, my name is Armando Martinez representing SeaBay Building Group, LLC. We opened an office in San Luis Obispo, CA (1011 Pacific St) last year and we are looking to expand our portfolio of projects there. We recently joined the SLO Camber of Commerce and Jill LeMieux from the CofC directed me to your attention regarding new construction coming up in SLO. I visited your website and if possible I would like to talk to you today about the following projects with hopes of getting on the bidders list. I have attached some more information about SeaBay Building Group for your reference. Marsh & Chorro Mixed Used : Jamestown - https://www.jamestownlp.com/portfolio/california/ 1121 Montalban Mixed Used: Covelop - http://covelop.net/ 956 Monterey Mixed Used. Jamestown - https://www.jamestownlp.com/portfolio/california/ 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thank you or your time and look forward to hearing from you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Cohen, Rachel To:SeaBay - Armando Martinez Subject:RE: Current Development Projects in San Luis Obispo - General Contractor Date:Wednesday, September 18, 2019 10:26:18 AM Hello Armando- I have provided the information that I have below. I am only the project planner on a couple of the projects listed. Cheers, Rachel Cohen Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 6, 2019 1:10 PM To: Cohen, Rachel <rcohen@slocity.org>; Leveille, Brian <bleveill@slocity.org>; Scott, Shawna sscott@slocity.org>; Van Leeuwen, Kyle <KVanLeeu@slocity.org> Cc: Nate Buchman-SeaBay <nbuchman@seabay-group.com>; Jill LeMieux <jill@slochamber.org> Subject: Re: Current Development Projects in San Luis Obispo - General Contractor Good afternoon City of San Luis Obispo, I am following up on my earlier request for project information on the project list below. Any help would be greatly appreciated. If possible, looking for developer contact names, email addresses, phone numbers or websites. 650 Tank Farm: Agera Grove Investments, LLC Palm Nipomo Parking Garage: City of SLO NWC Board Street Mixed Used: 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility: Regional Transportation Authority of San Luis Obispo Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 3, 2019 at 10:38 AM SeaBay - Armando Martinez <amartinez@seabay-group.com> wrote: Good morning, my name is Armando Martinez representing SeaBay Building Group, LLC. We opened an office in San Luis Obispo, CA (1011 Pacific St) last year and we are looking to expand our portfolio of projects there. We recently joined the SLO Camber of Commerce and Jill LeMieux from the CofC directed me to your attention regarding new construction coming up in SLO. I visited your website and if possible I would like to talk to you today about the following projects with hopes of getting on the bidders list. I have attached some more information about SeaBay Building Group for your reference. 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thank you or your time and look forward to hearing from you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Cohen, Rachel; Leveille, Brian; Scott, Shawna; Van Leeuwen, Kyle Cc:Nate Buchman-SeaBay; Jill LeMieux Subject:Re: Current Development Projects in San Luis Obispo - General Contractor Date:Friday, September 6, 2019 1:10:31 PM Good afternoon City of San Luis Obispo, I am following up on my earlier request for project information on the project list below. Any help would be greatly appreciated. If possible, looking for developer contact names, email addresses, phone numbers or websites. 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 3, 2019 at 10:38 AM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Good morning, my name is Armando Martinez representing SeaBay Building Group, LLC. We opened an office in San Luis Obispo, CA (1011 Pacific St) last year and we are looking to expand our portfolio of projects there. We recently joined the SLO Camber of Commerce and Jill LeMieux from the CofC directed me to your attention regarding new construction coming up in SLO. I visited your website and if possible I would like to talk to you today about the following projects with hopes of getting on the bidders list. I have attached some more information about SeaBay Building Group for your reference. 650 Tank Farm Palm Nipomo Parking Garage NWC Board Street Mixed Used 545 Higuera Mixed Used Mail Pouch South Bridge Street. Project South Tower 36 French Hospital Expansion RTA Maintenance Facility Thank you or your time and look forward to hearing from you. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Browning, Bobby To:SeaBay - Armando Martinez; Randy Johnson Jr; Nate Buchman-SeaBay; lucas lundin - SeaBay; Craig R. Smith AIA - CRSA Architecture Cc:Guzman, Manuel; Crisp, Matthew Subject:RE: Expired Encroachment Permit, Traffic Control Date:Tuesday, March 23, 2021 12:48:13 PM Attachments:image001.png image002.png image003.png image004.png MOT for Pedestrians and Bicycles.jpg Randy, Since we don’t have a schedule set for the sidewalk restoration at 2640 Broad St, there needs to be a more permanent traffic control configuration to protect pedestrian. See attached photo of similar set up we’ve done in the past. Please priorities this to be done early as possible. Bobby Browning Engineering Inspector III Public Works 919 Palm Street, San Luis Obispo, CA 93401-7314 E bbrowning@slocity.org slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Sadowski, Mark <msadowsk@slocity.org> Sent: Tuesday, March 16, 2021 3:51 PM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Randy Johnson Jr rjohnson@seabay-group.com>; Nate Buchman-SeaBay <nbuchman@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com> Cc: Browning, Bobby <bbrowning@slocity.org> Subject: Expired Encroachment Permit, Traffic Control Gentlemen, It’s been brought to our attention that the encroachment permit (#ENCR-0316-2021) has expired and there are outstanding traffic control concerns that are creating traffic, bicycle, and pedestrian hazards. Please contact Public Works Inspector Bobby Browning (cc’d) to discuss correcting these items as soon as possible. Thank you, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From:Nichols, Vanessa To:SeaBay - Armando Martinez Subject:RE: Issued Permit Date:Monday, July 13, 2020 7:37:15 AM Attachments:image001.png Hi, Just need to let you know that a face mask is required. See you at 9:00am. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Sunday, July 12, 2020 12:26 PM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Isela Santillanez - SeaBay isantillanez@seabay-group.com>; Maggio, Rodger <rmaggio@slocity.org>; Nate Buchman-SeaBay nbuchman@seabay-group.com>; Randy Johnson <rjohnson@seabay-group.com> Subject: Re: Issued Permit Thank you Vanessa. On Sun, Jul 12, 2020 at 12:23 PM Nichols, Vanessa <vnichols@slocity.org> wrote: I will put the pick up time I my calendar at 9:00am. If I am not at the door when you arrive please give me a call 805-781-7588. See you tomorrow morning. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Sunday, July 12, 2020 12:16 PM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Isela Santillanez - SeaBay isantillanez@seabay-group.com>; Maggio, Rodger <rmaggio@slocity.org>; Nate Buchman- SeaBay <nbuchman@seabay-group.com>; Randy Johnson <rjohnson@seabay-group.com> Subject: Re: Issued Permit Thank you Vanessa, can we pick up the permit Monday at 9am? The address is 919 Palm Street correct? On Sun, Jul 12, 2020 at 12:02 PM Nichols, Vanessa <vnichols@slocity.org> wrote: Please provide and address of where you would like for us to send the approved plans and permit documentation. Or I can sent an appointment time for tomorrow, Monday, for you come by and pick all of it up. Please let me know how you would like to handle getting all of the documents. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, July 10, 2020 3:09 PM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Maggio, Rodger <rmaggio@slocity.org> Subject: Re: Issued Permit Thank you for your help Vanessa, please see attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 3:00 PM Nichols, Vanessa <vnichols@slocity.org> wrote: Attached you will find the issued permit for the tenant improvement of Natural Healing Center. Please sign and email back to me as soon as possible. Also, I can set an appointment time for Monday morning that you can come by and pick up the plans and permit documentation. Please let me know what time would work for you. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Friday, July 10, 2020 2:57 PM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Isela Santillanez - SeaBay; Craig R. Smith AIA - CRSA Architecture; Maggio, Rodger Subject:Re: Issued Permit Date:Friday, July 10, 2020 3:09:26 PM Attachments:image001.png SLOUNIFLOW_919 Front Copier iRC5235 Color_4327_001.pdf Thank you for your help Vanessa, please see attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 3:00 PM Nichols, Vanessa <vnichols@slocity.org> wrote: Attached you will find the issued permit for the tenant improvement of Natural Healing Center. Please sign and email back to me as soon as possible. Also, I can set an appointment time for Monday morning that you can come by and pick up the plans and permit documentation. Please let me know what time would work for you. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Friday, July 10, 2020 2:57 PM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Craig R. Smith AIA - CRSA Architecture; Isela Santillanez - SeaBay; Maggio, Rodger; Nate Buchman-SeaBay; Randy Johnson Subject:Re: Issued Permit Date:Sunday, July 12, 2020 12:26:25 PM Attachments:image001.png Thank you Vanessa. On Sun, Jul 12, 2020 at 12:23 PM Nichols, Vanessa <vnichols@slocity.org> wrote: I will put the pick up time I my calendar at 9:00am. If I am not at the door when you arrive please give me a call 805-781-7588. See you tomorrow morning. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Sunday, July 12, 2020 12:16 PM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Maggio, Rodger rmaggio@slocity.org>; Nate Buchman-SeaBay <nbuchman@seabay-group.com>; Randy Johnson <rjohnson@seabay-group.com> Subject: Re: Issued Permit Thank you Vanessa, can we pick up the permit Monday at 9am? The address is 919 Palm Street correct? On Sun, Jul 12, 2020 at 12:02 PM Nichols, Vanessa <vnichols@slocity.org> wrote: Please provide and address of where you would like for us to send the approved plans and permit documentation. Or I can sent an appointment time for tomorrow, Monday, for you come by and pick all of it up. Please let me know how you would like to handle getting all of the documents. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, July 10, 2020 3:09 PM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Maggio, Rodger rmaggio@slocity.org> Subject: Re: Issued Permit Thank you for your help Vanessa, please see attached. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 3:00 PM Nichols, Vanessa <vnichols@slocity.org> wrote: Attached you will find the issued permit for the tenant improvement of Natural Healing Center. Please sign and email back to me as soon as possible. Also, I can set an appointment time for Monday morning that you can come by and pick up the plans and permit documentation. Please let me know what time would work for you. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Friday, July 10, 2020 2:57 PM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:Craig R. Smith AIA - CRSA Architecture Cc:SeaBay - Armando Martinez; rjohnson@seabay-group.com; Nate Buchman-SeaBay; lucas lundin - SeaBay; Dana Lee; Jim Clancy Subject:RE: Natural Healing Center - 2640 Broad St. - Permit # PLREV-0536-2020 Date:Monday, December 7, 2020 12:37:04 PM Attachments:image001.png image002.png image003.png image004.png Hi Craig, Would be able to have Steve Perkins take a quick look and confirm he is ok with these plan sheets? An email response is fine and we can schedule the inspection from there. I can even digitally stamp for this while we’re waiting on the rest of the drawings to wrap up. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Monday, December 7, 2020 11:27 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; rjohnson@seabay-group.com; Nate Buchman-SeaBay <nbuchman@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay- group.com>; Dana Lee <dana@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com> Subject: Re: Natural Healing Center - 2640 Broad St. - Permit # PLREV-0536-2020 Mark, As a follow-up to an earlier request regarding the ability to commence with some work while the resubmitted plans are going through the recheck process, attached are the relevant and applicable plan sheets with the recent updated revisions per the plan check that was conducted by Steve Perkins. The recheck didn’t have any foundation corrections and I have attached the resubmitted and updated plan sheets that address this specific scope of work. As earlier mentioned, we are just trying to keep the construction going forward and would like your consideration for us to continue with the foundation work per the attached, approved plan sheets. If OK with you, we could meet with Tom (inspector) to verify/inspect the work so as to have all the foundation work completed by the time the recheck was approved. Please let me know and call or email me with any questions. Appreciate you considering this request. Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com On Nov 30, 2020, at 10:08 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hi Craig, Thanks for checking in on the resubmittal. Can you clarify what the scope of work is relating to the foundation repair that they are looking to proceed with? Possibly a plan sheet or detail I could review to help in determining next steps? Thanks Craig, Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org image002.png><image003.png><image004.png> Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Monday, November 30, 2020 11:59 AM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lucas lundin - SeaBay llundin@seabay-group.com>; Nate Buchman-SeaBay <nbuchman@seabay- group.com>; rjohnson@seabay-group.com; Dana Lee <dana@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com> Subject: Natural Healing Center - 2640 Broad St. - Permit # PLREV-0536-2020 Dear Mark and Roger, Thanks again for expediting the project revision recheck. We are preparing to resubmit for the recheck follow-up and are just waiting on some details from one of the suppliers regarding the connection detail for the proposed ceiling fixture over the retail area. This may not happen until next week and the prepared recheck review did not have any corrections for the related foundation repair work, therefore, in the interest of time and scheduling, we would like to proceed with this portion of work, if possible, prior to finalizing the recheck. The work would complete all the remaining repair and replacement work per sheet S-1.0 (foundation plan). Our office would conduct the “structural observation” and our soils engineer would complete their inspection for a city inspection follow-up in order to then proceed and complete this scope of work. Let me know if this is by your approval so as to maintain our current time and project completion schedule. Appreciate your review of this request. Best Regares, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com From:Sadowski, Mark To:Craig R. Smith AIA - CRSA Architecture Cc:SeaBay - Armando Martinez; lucas lundin - SeaBay; Nate Buchman-SeaBay; rjohnson@seabay-group.com; Dana Lee; Jim Clancy Subject:RE: Natural Healing Center - 2640 Broad St. - Permit # PLREV-0536-2020 Date:Monday, November 30, 2020 10:08:00 PM Attachments:image001.png image002.png image003.png image004.png Hi Craig, Thanks for checking in on the resubmittal. Can you clarify what the scope of work is relating to the foundation repair that they are looking to proceed with? Possibly a plan sheet or detail I could review to help in determining next steps? Thanks Craig, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Monday, November 30, 2020 11:59 AM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lucas lundin - SeaBay llundin@seabay-group.com>; Nate Buchman-SeaBay <nbuchman@seabay-group.com>; rjohnson@seabay-group.com; Dana Lee <dana@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com> Subject: Natural Healing Center - 2640 Broad St. - Permit # PLREV-0536-2020 Dear Mark and Roger, Thanks again for expediting the project revision recheck. We are preparing to resubmit for the recheck follow-up and are just waiting on some details from one of the suppliers regarding the connection detail for the proposed ceiling fixture over the retail area. This may not happen until next week and the prepared recheck review did not have any corrections for the related foundation repair work, therefore, in the interest of time and scheduling, we would like to proceed with this portion of work, if possible, prior to finalizing the recheck. The work would complete all the remaining repair and replacement work per sheet S-1.0 (foundation plan). Our office would conduct the “structural observation” and our soils engineer would complete their inspection for a city inspection follow-up in order to then proceed and complete this scope of work. Let me know if this is by your approval so as to maintain our current time and project completion schedule. Appreciate your review of this request. Best Regares, Craig R. Smith, AIAPrincipalArchitect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com From:Codron, Michael To:Craig R. Smith AIA - CRSA Architecture Cc:SeaBay - Armando Martinez; Dana Lee; Jim Clancy; Helios Dayspring; Nichols, Vanessa Subject:RE: Natural Healing Center - 2640 Broad Street Date:Friday, November 20, 2020 1:20:00 PM Attachments:image001.png image002.png image003.png image004.png Just a quick status report: Building and Fire have completed their comments. I can have those sent to you now if you want to review. I spoke with Rachel and she is reviewing the revision now - she expects to be complete by the end of the day today. Vanessa will be back on Monday. I’ve copied her so that she knows we’ve been in touch. - Michael Michael Codron Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Friday, November 20, 2020 11:48 AM To: Codron, Michael <mcodron@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Helios Dayspring helios@nhcdispensaries.com> Subject: Natural Healing Center - 2640 Broad Street Michael, I’m reaching out for some assistance in getting our recent “revision” plan recheck completed so as to continue with the construction work for the Natural Healing Center on Broad Street. I sent an email, regarding this, to Rodger on Tuesday (see below) and haven’t received any response regarding the overall status or progress of the recheck. He only provided me with his review. Additionally, we have contacted Vanessa, at the building department, and haven’t received any updates. Our client is concerned, as well as we are concerned, regarding the need to complete this process in as timely a manner as possible. Given the need to meet a “completion” date for occupancy, could you please let us know the status and what may be an expected date to receive the plan recheck? Appreciate this… Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com Rodger Our client wanted us to contact you directly, regarding the Natural Healing Center project on Broad Street. As you know we are currently under construction but have had a recent delay due to some minor revisions and elements that have been determined (or discovered) to be in need of additional work, repair or modification as a result of the completion of the demolition work. We prepared the plan check submittal with the revised plan sets, calculations and information, and couriered it to the Building Department on October 27 (three weeks ago). At that time the Building Department Vanessa) indicated that it would be completed by November 16 (yesterday). Additionally, we requested that we be “routed” any revision or plan checked items as they were submitted back to the Building Department so as to get a “leg” up on the response time for the completion of the plan check process. To date, we haven’t received any update, been informed of the status of the plan check or routed any progress plan check items. While we all are busy, this project has a completion date requirement for its license, per the conditions of approval, and we really need to continue with all portions of work as soon as possible. Could you please look into the status and let me know where we stand? Appreciate the effort. Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com From:Codron, Michael To:Craig R. Smith AIA - CRSA Architecture Cc:SeaBay - Armando Martinez; Dana Lee; Jim Clancy; Helios Dayspring Subject:RE: Natural Healing Center - 2640 Broad Street Date:Friday, November 20, 2020 12:09:00 PM Attachments:image001.png image002.png image003.png image004.png Thanks for reaching out, Craig. I’ll look right into this. Best to all and will update no later than end of day on Monday. -Michael Michael Codron Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Friday, November 20, 2020 11:48 AM To: Codron, Michael <mcodron@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com>; Jim Clancy <jim@nhcdispensaries.com>; Helios Dayspring helios@nhcdispensaries.com> Subject: Natural Healing Center - 2640 Broad Street Michael, I’m reaching out for some assistance in getting our recent “revision” plan recheck completed so as to continue with the construction work for the Natural Healing Center on Broad Street. I sent an email, regarding this, to Rodger on Tuesday (see below) and haven’t received any response regarding the overall status or progress of the recheck. He only provided me with his review. Additionally, we have contacted Vanessa, at the building department, and haven’t received any updates. Our client is concerned, as well as we are concerned, regarding the need to complete this process in as timely a manner as possible. Given the need to meet a “completion” date for occupancy, could you please let us know the status and what may be an expected date to receive the plan recheck? Appreciate this… Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com Rodger Our client wanted us to contact you directly, regarding the Natural Healing Center project on Broad Street. As you know we are currently under construction but have had a recent delay due to some minor revisions and elements that have been determined (or discovered) to be in need of additional work, repair or modification as a result of the completion of the demolition work. We prepared the plan check submittal with the revised plan sets, calculations and information, and couriered it to the Building Department on October 27 (three weeks ago). At that time the Building Department Vanessa) indicated that it would be completed by November 16 (yesterday). Additionally, we requested that we be “routed” any revision or plan checked items as they were submitted back to the Building Department so as to get a “leg” up on the response time for the completion of the plan check process. To date, we haven’t received any update, been informed of the status of the plan check or routed any progress plan check items. While we all are busy, this project has a completion date requirement for its license, per the conditions of approval, and we really need to continue with all portions of work as soon as possible. Could you please look into the status and let me know where we stand? Appreciate the effort. Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com From:Codron, Michael To:Craig R. Smith, AIA Cc:SeaBay - Armando Martinez Subject:Re: Natural Healing Center : 2640 Broad Street Date:Wednesday, April 28, 2021 5:44:05 PM Thanks, Craig. We'll carefully review and follow up with options. -Michael Michael Codron pronouns he/him/his Director of Community Development City of San Luis Obispo Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Wednesday, April 28, 2021 4:51 PM To: Codron, Michael <mcodron@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com> Subject: Natural Healing Center : 2640 Broad Street Michael, Attached is a picture of the area that is currently under remediation for hazardous material removal at the NHC site. Specifically, the area directly adjacent to the old oil tank that was found during site excavation. The tank has since and finally) been removed, however, during the testing an adjacent “dump” area over an old brick kiln was found. This all goes back to when SLO Brick Company owned and used the site. The picture shows the base of the kiln with portions of the side walls that supported the old kiln structure. The current issue is the potential that there may be additional contaminated soil under this concrete slab. The other picture is the filled hazardous waste dumpsters that have to sit on the property for three weeks before they can be removed. At that time, we can continue with the remediation of the kiln slab area. What is very concerning is the possibility that contaminated soil may extend deeper and out on to, and under, Broad Street. This cannot be determined until the testing resumes. With this happening we have had to reassess our construction work scheduling and it’s been challenging. We have 84 days until we are required to have occupancy to conduct sales and conform to the cannabis licensing start date. We feel we will definitely have the building completed, but we aren’t sure the site will be ready due to the current issues and related unknowns as stated above. Therefore, I’m reaching out to see if we could consider a temporary certificate of occupancy alternative without the full use of the parking lot? In other words, getting the building completed by the required date is not an issue. It’s the ability to have the complete and final scope of work completed for final occupancy to include the entire parking lot. We would be completely compliant with regard to fire and life safety. We would have full ADA/accessibility and we would be able to conduct a full and conforming security program as approved by SLO PD. We just need to coordinate this with the planning and building departments with regard providing an updated site plan addressing the expected and allowable work for the parking lot during the T C of O. We need your input on all this and can sit down with you, staff, Mark, Rodger and Derek, as necessary, to discuss and take further. Really appreciate all that you have done with regard to the past issues. Just need to deal with this to keep it going and get it done… Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com On Apr 8, 2021, at 4:34 PM, Codron, Michael <mcodron@slocity.org> wrote: Hello Armando and Craig, It was good speaking with you both today. As discussed, we are going to make Tom Fitzgerald, your current inspector, available to perform inspections twice a day going forward so that you are able to make sustained progress on the project. If that proves to be insufficient, we are also in the process of lining up a contract inspector for one of the major subdivisions in town. That inspector will have additional capacity for the next few months and could be assigned additional duties. For now, please coordinate directly with Tom on your scheduling needs and let us know how things are going. If we need to adjust we can do so. Thanks for reaching out and letting us know your concerns. I’m glad we have a solution that seems like it will work for you. Best, -Michael Michael Codron pronouns he/him/his Director of Community Development image001.png> Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org image002.png><image003.png><image004.png> Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Thursday, April 8, 2021 8:55 AM To: Codron, Michael <mcodron@slocity.org> Cc: AM1922@seabay-group.com; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Johnson, Derek djohnson@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: Re: Permit #BLDG043420 - Natural Healing Center Thank you both for your time and consideration to my request. On Thu, Apr 8, 2021 at 8:48 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Derek and hello Armando. We are having an internal conversation about your request later today and I will be able to reach out again this afternoon to further discuss what options exist. -Michael Michael Codron pronouns he/him/his Director of Community Development image001.png> Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org image002.png><image003.png><image004.png> Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Johnson, Derek <djohnson@slocity.org> Sent: Thursday, April 8, 2021 8:29 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Codron, Michael <mcodron@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: RE: Permit #BLDG043420 - Natural Healing Center Good Morning Armando, I have looped in Mr. Codron as it appears that he did not receive your email. Thank you and look forward to supporting your project. Derek From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>;AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a-dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CBCA #1005237AZ #301717 KB-1DualOR #211637AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CBCA #1005237AZ #301717 KB-1DualOR #211637AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:Craig R. Smith, AIA Cc:SeaBay - Armando Martinez; Dana Lee; Bailey, Georgina Subject:RE: Natural Healing Center: TCO and Final CO dates Date:Wednesday, July 7, 2021 8:51:00 AM Hi All, Council approved an additional 3-month extension last night. Georgina can confirm the new activation deadline for the operator permit. We do encourage you to continue to move forward as quickly as possible and will support the needs of the project in terms of reasonable strategies for temporary occupancy. Hope this is welcome news and look forward to seeing continued progress on the project! -Michael From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Tuesday, July 6, 2021 2:02 PM To: Codron, Michael <mcodron@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com>; Bailey, Georgina <gbailey@slocity.org> Subject: Natural Healing Center: TCO and Final CO dates Michael, As a matter of update, and as of today, we are struggling with all efforts to make the 7/22 TCO date. The remediation of the contaminated soil took much longer than expected and, as a result, we need to make a request for a minimum time extension in order to even complete the TCO requirements. The weak link in the TCO requirements is the ability to find temporary, off site parking. We have reached out to Matt Quaglino, who owns the Mattress Factory building across the street, but due to conditions imposed by his tenant and the fact that they are planning to start construction on 9/21, for the proposed improvements to the existing structure, the ability to obtain any temporary parking is not looking positive. No other adjacent properties can offer any temporary parking, as well. Please advise me as to what can be done to follow-up, or process anything that can be implemented in order to gain a time extension. If necessary, I can make any application, speak to council, or management, as necessary. If we could just get 30 more days, we could make the TCO work and as of today, with all other outstanding issues pending, the date of 9/27/21 would be a date of certainty for final occupancy and the completion of all required work. Michael, we would greatly appreciate anything you can offer or provide regarding this matter and this project. Call or email me with any questions or need for any additional information as necessary. Thanks for all your help... Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com On Jun 21, 2021, at 10:04 AM, Codron, Michael <mcodron@slocity.org> wrote: Hello Joe, the Building Division has reviewed and supports the plan prepared by Craig Smith to get the project to a TCO by 7/22. In addition, we are processing an extension just in case something else comes up that throws that date off (of course, getting open ASAP is everyone’s goal). We understand how Covid and the unique circumstances impacting the project site have created these unforeseen challenges. I appreciate the invite out, but today is my only day in the office this week and I have a full calendar. I will be back next Monday and will check in with Georgina on the progress made. Thanks for reaching out and best of luck on occupancy of the project. -Michael From: Joe Armendariz <joe@nhcdispensaries.com> Sent: Monday, June 21, 2021 8:31 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Joe Armendariz joe@armendarizpartners.com> Subject: site visit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Mike, I wanted to throw out the idea that instead of a Zoom call, if you have a few minutes this week to meet us at the site to assess where we are that would be fine as well. We are working overtime to open on July 22 and we want to hit that mark. Your input on a couple issues could be helpful in making sure we can do that. Thanks, Joe Armendariz Government Relations Natural Healing Manager, LLC 8o5.990.2494 From:Bailey, Georgina To:Codron, Michael; Craig R. Smith, AIA Cc:SeaBay - Armando Martinez; Dana Lee Subject:RE: Natural Healing Center: TCO and Final CO dates Date:Wednesday, July 7, 2021 9:04:06 AM Hi Craig, Just to follow up, the new activation deadline for the operator permit is October 22, 2021. I will make sure Joe and Val know this information as well. Let me know if you have any other questions. Best, Georgina From: Codron, Michael <mcodron@slocity.org> Sent: Wednesday, July 7, 2021 8:51 AM To: Craig R. Smith, AIA <craig@craigrsmithaia.com> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com>; Bailey, Georgina <gbailey@slocity.org> Subject: RE: Natural Healing Center: TCO and Final CO dates Importance: High Hi All, Council approved an additional 3-month extension last night. Georgina can confirm the new activation deadline for the operator permit. We do encourage you to continue to move forward as quickly as possible and will support the needs of the project in terms of reasonable strategies for temporary occupancy. Hope this is welcome news and look forward to seeing continued progress on the project! -Michael From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Tuesday, July 6, 2021 2:02 PM To: Codron, Michael <mcodron@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com>; Bailey, Georgina <gbailey@slocity.org> Subject: Natural Healing Center: TCO and Final CO dates Michael, As a matter of update, and as of today, we are struggling with all efforts to make the 7/22 TCO date. The remediation of the contaminated soil took much longer than expected and, as a result, we need to make a request for a minimum time extension in order to even complete the TCO requirements. The weak link in the TCO requirements is the ability to find temporary, off site parking. We have reached out to Matt Quaglino, who owns the Mattress Factory building across the street, but due to conditions imposed by his tenant and the fact that they are planning to start construction on 9/21, for the proposed improvements to the existing structure, the ability to obtain any temporary parking is not looking positive. No other adjacent properties can offer any temporary parking, as well. Please advise me as to what can be done to follow-up, or process anything that can be implemented in order to gain a time extension. If necessary, I can make any application, speak to council, or management, as necessary. If we could just get 30 more days, we could make the TCO work and as of today, with all other outstanding issues pending, the date of 9/27/21 would be a date of certainty for final occupancy and the completion of all required work. Michael, we would greatly appreciate anything you can offer or provide regarding this matter and this project. Call or email me with any questions or need for any additional information as necessary. Thanks for all your help... Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com On Jun 21, 2021, at 10:04 AM, Codron, Michael <mcodron@slocity.org> wrote: Hello Joe, the Building Division has reviewed and supports the plan prepared by Craig Smith to get the project to a TCO by 7/22. In addition, we are processing an extension just in case something else comes up that throws that date off (of course, getting open ASAP is everyone’s goal). We understand how Covid and the unique circumstances impacting the project site have created these unforeseen challenges. I appreciate the invite out, but today is my only day in the office this week and I have a full calendar. I will be back next Monday and will check in with Georgina on the progress made. Thanks for reaching out and best of luck on occupancy of the project. -Michael From: Joe Armendariz <joe@nhcdispensaries.com> Sent: Monday, June 21, 2021 8:31 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Joe Armendariz joe@armendarizpartners.com> Subject: site visit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Mike, I wanted to throw out the idea that instead of a Zoom call, if you have a few minutes this week to meet us at the site to assess where we are that would be fine as well. We are working overtime to open on July 22 and we want to hit that mark. Your input on a couple issues could be helpful in making sure we can do that. Thanks, Joe Armendariz Government Relations Natural Healing Manager, LLC 8o5.990.2494 From:Codron, Michael To:Craig R. Smith, AIA Cc:SeaBay - Armando Martinez; Dana Lee; Bailey, Georgina Subject:RE: Natural Healing Center: TCO and Final CO dates Date:Tuesday, July 6, 2021 4:25:00 PM The extension is on the City Council’s agenda tonight for consideration. I’ll follow up with you tomorrow regarding the results. -Michael From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Tuesday, July 6, 2021 2:02 PM To: Codron, Michael <mcodron@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee dana@craigrsmithaia.com>; Bailey, Georgina <gbailey@slocity.org> Subject: Natural Healing Center: TCO and Final CO dates Michael, As a matter of update, and as of today, we are struggling with all efforts to make the 7/22 TCO date. The remediation of the contaminated soil took much longer than expected and, as a result, we need to make a request for a minimum time extension in order to even complete the TCO requirements. The weak link in the TCO requirements is the ability to find temporary, off site parking. We have reached out to Matt Quaglino, who owns the Mattress Factory building across the street, but due to conditions imposed by his tenant and the fact that they are planning to start construction on 9/21, for the proposed improvements to the existing structure, the ability to obtain any temporary parking is not looking positive. No other adjacent properties can offer any temporary parking, as well. Please advise me as to what can be done to follow-up, or process anything that can be implemented in order to gain a time extension. If necessary, I can make any application, speak to council, or management, as necessary. If we could just get 30 more days, we could make the TCO work and as of today, with all other outstanding issues pending, the date of 9/27/21 would be a date of certainty for final occupancy and the completion of all required work. Michael, we would greatly appreciate anything you can offer or provide regarding this matter and this project. Call or email me with any questions or need for any additional information as necessary. Thanks for all your help... Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com On Jun 21, 2021, at 10:04 AM, Codron, Michael <mcodron@slocity.org> wrote: Hello Joe, the Building Division has reviewed and supports the plan prepared by Craig Smith to get the project to a TCO by 7/22. In addition, we are processing an extension just in case something else comes up that throws that date off (of course, getting open ASAP is everyone’s goal). We understand how Covid and the unique circumstances impacting the project site have created these unforeseen challenges. I appreciate the invite out, but today is my only day in the office this week and I have a full calendar. I will be back next Monday and will check in with Georgina on the progress made. Thanks for reaching out and best of luck on occupancy of the project. -Michael From: Joe Armendariz <joe@nhcdispensaries.com> Sent: Monday, June 21, 2021 8:31 AM To: Codron, Michael <mcodron@slocity.org> Cc: Bailey, Georgina <gbailey@slocity.org>; Joe Armendariz joe@armendarizpartners.com> Subject: site visit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good morning Mike, I wanted to throw out the idea that instead of a Zoom call, if you have a few minutes this week to meet us at the site to assess where we are that would be fine as well. We are working overtime to open on July 22 and we want to hit that mark. Your input on a couple issues could be helpful in making sure we can do that. Thanks, Joe Armendariz Government Relations Natural Healing Manager, LLC 8o5.990.2494 From:Dana Hunter To:Sadowski, Mark Cc:rjohnson@seabay-group.com; amartinez@seabay-group.com; Craig R. Smith AIA - CRSA Architecture; Fitzgerald, Tom; Maggio, Rodger; elainad@craigrsmithaia.com Subject:Re: NHC - 2640 Broad Follow-up Date:Friday, September 25, 2020 11:55:51 AM Attachments:image0.png Hi Mark, CRS dropped off the plans. Here is their confirmation . Sent from my iPhone On Sep 24, 2020, at 10:35 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Codron, Michael To:Hermann, Greg Subject:RE: NHC - 2640 Broad Follow-up Date:Friday, September 25, 2020 9:19:00 AM Attachments:image001.png Right, right :-> all standard, just want to make sure everyone is in the loop. Happy Friday From: Hermann, Greg <GHermann@slocity.org> Sent: Friday, September 25, 2020 9:18 AM To: Codron, Michael <mcodron@slocity.org> Subject: RE: NHC - 2640 Broad Follow-up Thank you. Sounds like some issues, but there is the opportunity to correct, right? Also, this is the standard process we would follow with any business, right? Trying to think of another sentence I can end with ”right?” Greg From: Codron, Michael <mcodron@slocity.org> Sent: Friday, September 25, 2020 7:16 AM To: Hermann, Greg <GHermann@slocity.org> Subject: Fw: NHC - 2640 Broad Follow-up Fyi Michael Codron Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org From: Sadowski, Mark <msadowsk@slocity.org> Sent: Thursday, September 24, 2020 10:45 PM To: Stanwyck, Shelly <sstanwyc@slocity.org>; Codron, Michael <mcodron@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: FW: NHC - 2640 Broad Follow-up Please see below for correspondence sent to contractor at Natural Healing Center after our inspection today and let me know if there anything I can help clarify. Mark From: Sadowski, Mark Sent: Thursday, September 24, 2020 10:35 PM To: rjohnson@seabay-group.com; amartinez@seabay-group.com Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom tfitzger@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Dana Lee dana@craigrsmithaia.com>; elainad@craigrsmithaia.com Subject: NHC - 2640 Broad Follow-up Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Hermann, Greg To:Codron, Michael Subject:RE: NHC - 2640 Broad Follow-up Date:Friday, September 25, 2020 9:21:15 AM Attachments:image001.png Thank you sir and likewise! From: Codron, Michael <mcodron@slocity.org> Sent: Friday, September 25, 2020 9:19 AM To: Hermann, Greg <GHermann@slocity.org> Subject: RE: NHC - 2640 Broad Follow-up Right, right :-> all standard, just want to make sure everyone is in the loop. Happy Friday From: Hermann, Greg <GHermann@slocity.org> Sent: Friday, September 25, 2020 9:18 AM To: Codron, Michael <mcodron@slocity.org> Subject: RE: NHC - 2640 Broad Follow-up Thank you. Sounds like some issues, but there is the opportunity to correct, right? Also, this is the standard process we would follow with any business, right? Trying to think of another sentence I can end with ”right?” Greg From: Codron, Michael <mcodron@slocity.org> Sent: Friday, September 25, 2020 7:16 AM To: Hermann, Greg <GHermann@slocity.org> Subject: Fw: NHC - 2640 Broad Follow-up Fyi Michael Codron Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org From: Sadowski, Mark <msadowsk@slocity.org> Sent: Thursday, September 24, 2020 10:45 PM To: Stanwyck, Shelly <sstanwyc@slocity.org>; Codron, Michael <mcodron@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: FW: NHC - 2640 Broad Follow-up Please see below for correspondence sent to contractor at Natural Healing Center after our inspection today and let me know if there anything I can help clarify. Mark From: Sadowski, Mark Sent: Thursday, September 24, 2020 10:35 PM To: rjohnson@seabay-group.com; amartinez@seabay-group.com Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom tfitzger@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Dana Lee dana@craigrsmithaia.com>; elainad@craigrsmithaia.com Subject: NHC - 2640 Broad Follow-up Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Sadowski, Mark To:Dana Hunter Cc:rjohnson@seabay-group.com; amartinez@seabay-group.com; Craig R. Smith AIA - CRSA Architecture; Fitzgerald, Tom; Maggio, Rodger; elainad@craigrsmithaia.com Subject:RE: NHC - 2640 Broad Follow-up Date:Monday, September 28, 2020 9:08:40 AM Attachments:image001.png image002.png Good morning All, The plans are stamped approved and I was wondering if you want me to bring them to the inspection this morning, or if you want someone to pick them up from our office. Please let me know which you’d prefer. Thanks, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From: Dana Hunter <dana@craigrsmithaia.com> Sent: Friday, September 25, 2020 11:56 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: rjohnson@seabay-group.com; amartinez@seabay-group.com; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom <tfitzger@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; elainad@craigrsmithaia.com Subject: Re: NHC - 2640 Broad Follow-up Hi Mark, CRS dropped off the plans. Here is their confirmation . Sent from my iPhone On Sep 24, 2020, at 10:35 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Sadowski, Mark To:Dana Hunter Cc:rjohnson@seabay-group.com; amartinez@seabay-group.com; Craig R. Smith AIA - CRSA Architecture; Fitzgerald, Tom; Maggio, Rodger; elainad@craigrsmithaia.com Subject:RE: NHC - 2640 Broad Follow-up Date:Friday, September 25, 2020 12:07:00 PM Attachments:image001.png image002.png Thanks so much, Dana. We’ll work on getting these stamped and let the superintendent know when they’re ready to pick up. Have a great weekend Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From: Dana Hunter <dana@craigrsmithaia.com> Sent: Friday, September 25, 2020 11:56 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: rjohnson@seabay-group.com; amartinez@seabay-group.com; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom <tfitzger@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; elainad@craigrsmithaia.com Subject: Re: NHC - 2640 Broad Follow-up Hi Mark, CRS dropped off the plans. Here is their confirmation . Sent from my iPhone On Sep 24, 2020, at 10:35 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:SeaBay - Armando Martinez To:Sadowski, Mark Cc:Dana Hunter; rjohnson@seabay-group.com; Craig R. Smith AIA - CRSA Architecture; Fitzgerald, Tom; Maggio, Rodger; elainad@craigrsmithaia.com; Nate Buchman-SeaBay Subject:Re: NHC - 2640 Broad Follow-up Date:Monday, September 28, 2020 9:57:53 AM Attachments:image001.png image002.png Mark, If you could bring them with you that would be greatly appreciated. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 28, 2020 at 9:08 AM Sadowski, Mark <msadowsk@slocity.org> wrote: Good morning All, The plans are stamped approved and I was wondering if you want me to bring them to the inspection this morning, or if you want someone to pick them up from our office. Please let me know which you’d prefer. Thanks, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From: Dana Hunter <dana@craigrsmithaia.com> Sent: Friday, September 25, 2020 11:56 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: rjohnson@seabay-group.com; amartinez@seabay-group.com; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom <tfitzger@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; elainad@craigrsmithaia.com Subject: Re: NHC - 2640 Broad Follow-up Hi Mark, CRS dropped off the plans. Here is their confirmation . Sent from my iPhone On Sep 24, 2020, at 10:35 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:Sadowski, Mark To:Stanwyck, Shelly; Codron, Michael; Bailey, Georgina Cc:Maggio, Rodger Subject:RE: NHC - 2640 Broad Follow-up Date:Tuesday, September 29, 2020 5:05:48 PM Attachments:image001.png Good afternoon, I wanted to provide you all with an update on the firewall assembly issue. We met with the superintendent and plaster contractor today to expose portions of the wall that were covered without inspection. As mentioned below, we asked for 25% to be opened and after only 3 small sections were removed, it was evident that there were too many deficiencies to establish confidence in the remaining work. The lathing contractor will be removing the lath and paper on the remainder of the building and the drywall contractor will be returning to address the deficiencies noted. I anticipate there will be approximately a 1-2 week delay as a result of this effort, however there is still plenty of other work on the site to proceed with. Please let me know if there’s anything I can clarify. Thank you, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From: Sadowski, Mark Sent: Thursday, September 24, 2020 10:45 PM To: Stanwyck, Shelly <sstanwyc@slocity.org>; Codron, Michael <mcodron@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: FW: NHC - 2640 Broad Follow-up Please see below for correspondence sent to contractor at Natural Healing Center after our inspection today and let me know if there anything I can help clarify. Mark From: Sadowski, Mark Sent: Thursday, September 24, 2020 10:35 PM To: rjohnson@seabay-group.com; amartinez@seabay-group.com Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Fitzgerald, Tom tfitzger@slocity.org>; Maggio, Rodger <rmaggio@slocity.org>; Dana Lee dana@craigrsmithaia.com>; elainad@craigrsmithaia.com Subject: NHC - 2640 Broad Follow-up Hello Gentlemen, Thank you again for taking the time to meet with us today. It was a great opportunity to connect with everyone and help get things moving forward. I confirmed with Craig that the plans we have in our office do not match those in the field based on the date and plan version number. Craig will coordinate having some additional updated sets printed and delivered to our office. Once received, we’ll get them stamped and let you know when they’re ready to pick up. Tom verified the second portion of the under-slab plumbing today during the inspection today, and you are clear to finish backfilling and installing reinforcing steel. We pointed out a few areas to the concrete foreman that will need to have some footings cleaned out and proper clearances maintained. The concrete foreman was unaware that the compressive strength specified would required special inspection, so please be sure to coordinate having your special inspection firm present to verify footing cleanliness and concrete placement. It is our understanding that a footing and slab reinforcement inspection is planned for early next week with Tom so please call when you’re ready to schedule. With regards to the dens-glass installation, Tom and I observed that approximately 75% of the exterior fire assembly installed had been covered without inspection from the City. In the areas that remained visible, a number of deficiencies were noted with fasteners placed too close to the edges of the material, compromising the attachment and securing of the assembly. To assist in determining if there may be any other deficiencies in the areas covered without inspection, we are asking to have 25% of the covered portions exposed for verification. Should the exposed portions demonstrate acceptable installation, we will allow the remainder to stay covered. Should there be any be any further deficiencies discovered in the areas opened up, we will require that the entire lath and paper be removed for proper inspection of the fire assembly. Please coordinate with your plaster contractor to have them present and arrange for an inspection next week if possible. We will be asking the plaster contractor, in our presence, to remove lath and paper and expose areas at random for confirmation of dens-glass installation. We look forward to our continued partnership with you and the opportunity to make this an incredible addition to our community. Please don’t hesitate to reach out to Tom or I directly if there is anything else we can assist with. Regards, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Craig R. Smith AIA - CRSA Architecture Subject:Re: NHC Permit Contact Date:Tuesday, June 30, 2020 11:03:25 AM Attachments:image001.png Hello Vanessa, I just left you a voicemail but wanted to follow up with you via email. I have some questions on how to take possession of the permit with the current restrictions in place. Can the permit be emailed to me? If not, can we provide an address to have it mailed to or is it possible for me to pick it up? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Jun 30, 2020 at 10:54 AM Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com> wrote: Armando, Please see below with regard to the SLO BD contact person for the permit issuance. For the record, and as previously discussed, I started an “owner builder” application, but now that you're contracted to proceed, the combination permit can be issued in your name. Please contact Vanessa to get the required follow-up. Also, I have the stamped, approved plan sets and will bring those to our 3:00pm meeting today. Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com Begin forwarded message: From: "Nichols, Vanessa" <vnichols@slocity.org> Subject: NHC Date: June 26, 2020 at 4:44:43 PM PDT To: "Craig R. Smith AIA - CRSA Architecture" craig@craigrsmithaia.com>, Dana Lee <dana@craigrsmithaia.com> Hi Craig, The permit for the complete tenant improvement for NHC is approved. Please let me know if they would like to just pull this permit and withdraw the one we have here for getting work started. I need to adjust fees and provide fee refunds if this is how they are going to proceed. We can get started on issuing this permit first thing on Monday. Let me know. Have a great weekend. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Craig R. Smith AIA - CRSA Architecture Subject:Re: NHC Permit Contact Date:Wednesday, July 1, 2020 12:43:43 PM Attachments:image001.png Hi Vanessa, Thanks for the call back, we did apply for a business license in SLO. Waiting for the application to be accepted in order to pay the fee. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Jun 30, 2020 at 11:00 AM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Hello Vanessa, I just left you a voicemail but wanted to follow up with you via email. I have some questions on how to take possession of the permit with the current restrictions in place. Can the permit be emailed to me? If not, can we provide an address to have it mailed to or is it possible for me to pick it up? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Jun 30, 2020 at 10:54 AM Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com> wrote: Armando, Please see below with regard to the SLO BD contact person for the permit issuance. For the record, and as previously discussed, I started an “owner builder” application, but now that you're contracted to proceed, the combination permit can be issued in your name. Please contact Vanessa to get the required follow-up. Also, I have the stamped, approved plan sets and will bring those to our 3:00pm meeting today. Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com Begin forwarded message: From: "Nichols, Vanessa" <vnichols@slocity.org> Subject: NHC Date: June 26, 2020 at 4:44:43 PM PDT To: "Craig R. Smith AIA - CRSA Architecture" craig@craigrsmithaia.com>, Dana Lee <dana@craigrsmithaia.com> Hi Craig, The permit for the complete tenant improvement for NHC is approved. Please let me know if they would like to just pull this permit and withdraw the one we have here for getting work started. I need to adjust fees and provide fee refunds if this is how they are going to proceed. We can get started on issuing this permit first thing on Monday. Let me know. Have a great weekend. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From:Cohen, Rachel To:Craig R. Smith, AIA Cc:SeaBay - Armando Martinez Subject:RE: NHC Project : 2640 Broad Street Date:Monday, October 25, 2021 11:10:00 AM Attachments:image001.png image002.png image003.png image004.png image005.png image006.png Thank you Craig for your email. I appreciate the follow up. Cheers, Rachel Cohen pronouns she/her/hers Associate Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E rcohen@slocity.org T 805.781.7574 slocity.org Stay connected with the City by signing up for e-notifications From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Friday, October 22, 2021 4:40 PM To: Cohen, Rachel <rcohen@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com> Subject: NHC Project : 2640 Broad Street This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Rachel, As a follow-up to the City’s inspection processing, please find attached pictures of the installed roof mounted mechanical screen per the approved plans. Your review and approval are required. Thanks, Craig R. Smith, AIA Consulting Architect Hunter Smith Architecture 860 Walnut Street, Suite B San Luis Obispo, CA 93401 PH: 805-544-3380 ext. 202 Cell: 805-215-2313 From:SeaBay - Armando Martinez To:Bailey, Georgina Cc:Joe Armendariz; Valnette Garcia; Jim Clancy; Paul F Ready; Codron, Michael; Dietrick, Christine Subject:Re: NHC Site Visit Summary of Meeting Date:Thursday, September 30, 2021 1:47:57 PM Attachments:image001.png image002.png image003.png image004.png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Georgina and all, please see below: 1. I stated paving would be completed on 10/12 (not 10/10). 2. I stated that everything needed to call in for finals will be completed by 10/14, except for commissioning by 3rd parties. However, we cannot commissionthebuildinguntilPG&E provides us permanent power. We have been ready for PG&Esince9/13, but they are severely backlogged. 3. With PG&E scheduled for 10/17 thru 10/19 for permanent power, we do nothaveenoughtimetoachieveCofObythe10/22 deadline due to thecommissioningactivitiesthatrequirePG&E permanent power. 4. We need an extension of the 10/22 deadline—preferably to 12/3. PG&Ecannotimproveupontheirschedule; we have tried every avenue with them. This is out ofourcontrol. Can SLO please help and grant the extension? There is a lot on the line andSeabayiscaughtinthemiddlehere. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 28, 2021 at 4:58 PM Bailey, Georgina <gbailey@slocity.org> wrote: Hello NHC Team, We hope you found the site visit helpful and that we were able to answer your relevant questions. The following is a summary of the meeting. Please review and let us know if you have any suggested changes. If we don’t hear back, we’ll assume this accurately captures the conversation. Thank you, Georgina. Natural Healing Center SLO, LLC (NHC) Team Present Valnette Garcia, CEO of NHC SLO Joe Armendariz, Government Affairs Manager for NHC SLO Jim Clancy, CFO of NHC SLO Armando Martinez, SeaBay Building Group Randall Fox, Attorney for NHC SLO Paul Ready, Attorney for NHC SLO A female representative from Craig Smith’s office City of San Luis Obispo (City) Team Present Michael Codron, Community Development Director John Mezzapesa, Code Enforcement Officer Chad Pfarr, Police Sergeant Quenten Rouse, Police Detective Georgina Bailey, Cannabis Program Coordinator During the site visit at 2640 Broad St, on September 23, 2021 from 1:30 pm to 2:30 pm the NHC Team gave the City Team a tour of Natural Healing Center’s future business site. Armando Martinez invited the City Team to tour the site so the City could get an overview of the project status and have an understanding of the remaining items needing completion before final inspections. The site tour started with Armando giving a status update on the site and overview of the remaining items needing completion. Armando listed the parking lot paving and getting power to the building from PG&E as the critical items needing to be completed before final inspections. Armando stated that the tree wells had been installed, and that he was working with Public Works to complete all items for the site that needed coordination. Armando stated that the site does not currently have the power necessary to operate and is facing a scheduling issue with PG&E. The scheduling issue is that PG&E cannot come out to hook the site up to upgrade the power service to the property before NHC must activate their operator permit. Armando asked Michael if there was anything the City could do to assist with PG&E. Michael informed the NHC team to keep working directly with PG&E to get connected and that the City did not have any ability to expedite the process with PG&E and did not have any contacts with PG&E outside of the main channels already available to NHC. Then one of the lawyers present, Randall Fox, asked Michael if the City would be able to give the site an extension in the event PG&E could not get the site power before the activation date. Michael stated that the City team was only there for the purposes of the site visit and that question was outside the scope of the site visit. The City team toured both the outside area of the retail storefront building and inside of the retail storefront building. Armando stated that his crew was aiming to complete the parking lot paving by October 10th. Armando stated that he was shooting to have all remaining work for the site completed by October 14th so the City could do final inspections, and if anything needed to be corrected, NHC would have time to do so before the activation deadline. During the site visit Joe Armendariz asked Georgina Bailey how often the City reviewed the Community Benefit Commitments and how often NHC must make good on the commitments outlined in the Community Benefit Agreement. Georgina stated the Community Benefit Commitments are yearly commitments for the operator permit, and that the City reviews operators Community Benefit Commitments for compliance yearly on the fiscal year that runs from July 1st to June 30th of each calendar year, as a part of the yearly operator permit renewal process. Toward the end of the site tour, the NHC Team asked if the City had availability to do final inspections for the building site on a timeline that coincided with NHC’s activation deadline. Michael said that the City will have availability to do final inspections before NHC’s activation deadline and that it is the NHC team’s responsibility to coordinate final inspections with all of the right City departments necessary to sign off on the project. It was noted that this includes the Police Department signing off on NHC’s implemented Security Plan, which Chad Pfarr stated he would be available for and during the final inspection would look at the video cameras and vault requirements, amongst all other security requirements. Georgina Bailey pronouns she/her/hers Cannabis Program Coordinator/Management Fellow City Administration 990 Palm, San Luis Obispo, CA 93401-3249 E gbailey@slocity.org T 805.783.7875 slocity.org Stay connected with the City by signing up for e-notifications From:SeaBay - Armando Martinez To:Bailey, Georgina Cc:Codron, Michael; Dietrick, Christine; Craig R. Smith AIA - CRSA Architecture Subject:Re: NHC Site Visit Summary of Meeting Date:Friday, October 8, 2021 4:41:13 PM Attachments:image001.png image002.png image003.png image004.png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Georgina, Following up on my request for a time extension. We have and are continuing to do everything in our power to get the project completed but the hurdle of PG&E is still in our path. The 3rd parties commissiong items cannot be completed by 10/22. I kindly ask again, can SLO please help and grant the extension? There is a lot on the line and Seabay is caught in the middle here. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Thu, Sep 30, 2021 at 1:47 PM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Hi Georgina and all, please see below: 1. I stated paving would be completed on 10/12 (not 10/10). 2. I stated that everything needed to call in for finals will be completed by 10/14, except for commissioning by 3rd parties. However, we cannot commissionthebuildinguntilPG&E provides us permanent power. We have been ready for PG&Esince9/13, but they are severely backlogged. 3. With PG&E scheduled for 10/17 thru 10/19 for permanent power, we do nothaveenoughtimetoachieveCofObythe10/22 deadline due to thecommissioningactivitiesthatrequirePG&E permanent power. 4. We need an extension of the 10/22 deadline—preferably to 12/3. PG&Ecannotimproveupontheirschedule; we have tried every avenue with them. This is outofourcontrol. Can SLO please help and grant the extension? There is a lot on the lineandSeabayiscaughtinthemiddlehere. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Tue, Sep 28, 2021 at 4:58 PM Bailey, Georgina <gbailey@slocity.org> wrote: Hello NHC Team, We hope you found the site visit helpful and that we were able to answer your relevant questions. The following is a summary of the meeting. Please review and let us know if you have any suggested changes. If we don’t hear back, we’ll assume this accurately captures the conversation. Thank you, Georgina. Natural Healing Center SLO, LLC (NHC) Team Present Valnette Garcia, CEO of NHC SLO Joe Armendariz, Government Affairs Manager for NHC SLO Jim Clancy, CFO of NHC SLO Armando Martinez, SeaBay Building Group Randall Fox, Attorney for NHC SLO Paul Ready, Attorney for NHC SLO A female representative from Craig Smith’s office City of San Luis Obispo (City) Team Present Michael Codron, Community Development Director John Mezzapesa, Code Enforcement Officer Chad Pfarr, Police Sergeant Quenten Rouse, Police Detective Georgina Bailey, Cannabis Program Coordinator During the site visit at 2640 Broad St, on September 23, 2021 from 1:30 pm to 2:30 pm the NHC Team gave the City Team a tour of Natural Healing Center’s future business site. Armando Martinez invited the City Team to tour the site so the City could get an overview of the project status and have an understanding of the remaining items needing completion before final inspections. The site tour started with Armando giving a status update on the site and overview of the remaining items needing completion. Armando listed the parking lot paving and getting power to the building from PG&E as the critical items needing to be completed before final inspections. Armando stated that the tree wells had been installed, and that he was working with Public Works to complete all items for the site that needed coordination. Armando stated that the site does not currently have the power necessary to operate and is facing a scheduling issue with PG&E. The scheduling issue is that PG&E cannot come out to hook the site up to upgrade the power service to the property before NHC must activate their operator permit. Armando asked Michael if there was anything the City could do to assist with PG&E. Michael informed the NHC team to keep working directly with PG&E to get connected and that the City did not have any ability to expedite the process with PG&E and did not have any contacts with PG&E outside of the main channels already available to NHC. Then one of the lawyers present, Randall Fox, asked Michael if the City would be able to give the site an extension in the event PG&E could not get the site power before the activation date. Michael stated that the City team was only there for the purposes of the site visit and that question was outside the scope of the site visit. The City team toured both the outside area of the retail storefront building and inside of the retail storefront building. Armando stated that his crew was aiming to complete the parking lot paving by October 10th. Armando stated that he was shooting to have all remaining work for the site completed by October 14th so the City could do final inspections, and if anything needed to be corrected, NHC would have time to do so before the activation deadline. During the site visit Joe Armendariz asked Georgina Bailey how often the City reviewed the Community Benefit Commitments and how often NHC must make good on the commitments outlined in the Community Benefit Agreement. Georgina stated the Community Benefit Commitments are yearly commitments for the operator permit, and that the City reviews operators Community Benefit Commitments for compliance yearly on the fiscal year that runs from July 1st to June 30th of each calendar year, as a part of the yearly operator permit renewal process. Toward the end of the site tour, the NHC Team asked if the City had availability to do final inspections for the building site on a timeline that coincided with NHC’s activation deadline. Michael said that the City will have availability to do final inspections before NHC’s activation deadline and that it is the NHC team’s responsibility to coordinate final inspections with all of the right City departments necessary to sign off on the project. It was noted that this includes the Police Department signing off on NHC’s implemented Security Plan, which Chad Pfarr stated he would be available for and during the final inspection would look at the video cameras and vault requirements, amongst all other security requirements. Georgina Bailey pronouns she/her/hers Cannabis Program Coordinator/Management Fellow City Administration 990 Palm, San Luis Obispo, CA 93401-3249 E gbailey@slocity.org T 805.783.7875 slocity.org Stay connected with the City by signing up for e-notifications From:Sadowski, Mark To:Dana Hunter; Maggio, Rodger Cc:Craig R. Smith AIA - CRSA Architecture; SeaBay - Armando Martinez; lucas lundin - SeaBay; Randy Johnson; Jeremy Subject:RE: NHC SLO : 2640 Broad Date:Tuesday, August 3, 2021 3:55:00 PM Attachments:image001.png image002.png image003.png image004.png Hi Dana, No concern for Building. Rodger, Please advise of you’re ok with the proposed relocations and I can get this digitally stamped. Thanks, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: Dana Hunter <dana@craigrsmithaia.com> Sent: Monday, August 2, 2021 11:58 AM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; SeaBay - Armando Martinez amartinez@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Randy Johnson <rjohnson@seabay-group.com>; Jeremy < Subject: NHC SLO : 2640 Broad This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Mark and Rodger, Providing an exterior fire riser room shifted the location of the security bollards at the front of the building. Can you please review and make sure that the revised location are in compliance? Thank you , Dana Hunter, AIA | NCARB CRSA Architecture Associate Architect 860 Walnut Street, Suite B San Luis Obispo, CA 93401 PH: 805-544-3380 ext. 206 dana@craigrsmithaia.com www.crsaarchitecture.com Office Hours: Monday-Thursday* From:Nate Buchman-SeaBay To:Maggio, Rodger Cc:AM1922@seabay-group.com Subject:Re: NHC SLO Interior Occupancy Signage Date:Monday, June 21, 2021 2:39:49 PM Attachments:image.png Thank you for the clarification. We will word it as such, and I will remove the language in the section that is I've put the red X over. On Mon, Jun 21, 2021 at 2:18 PM Maggio, Rodger <rmaggio@slocity.org> wrote: Good Afternoon Nate, NHC is a Group M (mercantile) occupancy. Occupant load signage is only required by code for Group A public assembly occupancies. However, if public gathjerings are anticipated, the language would be: Maximum Occupant Load Shall Not Exceed XX Persons, by order of the Fire Marshal. From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Monday, June 21, 2021 12:37 PM To: Maggio, Rodger <rmaggio@slocity.org> Cc: AM1922@seabay-group.com Subject: Re: NHC SLO Interior Occupancy Signage This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hello Roger. I was just following up on this clarification before we begin to produce the signage. Please let me know if we are good to make the signs without the large text note under each one. Thanks, On Thu, Jun 17, 2021 at 2:06 PM Nate Buchman-SeaBay <nbuchman@seabay-group.com> wrote: Hi Roger, We have a little question on our occupancy sign notes that's causing some confusion. We have a few signs and the architect has asked us to include some wording that our sign guy has never seen before. Here is the language from the architect: We are required to provide a legible note at the bottom of the sign that states: “MAXIMUM BUILDING OCCUPANTS LOAD SIGN SHALL BE MAINTAINED BY THE BUILDING OWNER OR AUTHORIZED AGENT.” Refer to delta and cloud on sheet A-2.0. Our sign guy (Devan at Signs of Success) says this language does appear in the code book, but just as a note and does not need to be included on the actual signs. But, the architect is saying that your office requested it be printed on each one under the max occupancy info (please see attachment). We think this may just be a misunderstanding, but we wanted to check with you first before omitting the additional phrasing under the max occupancy info. Thanks, Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 ID #RCE-5611-7 UT#12269176-5501 Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 ID #RCE-5611-7 UT#12269176-5501 Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 ID #RCE-5611-7 UT#12269176-5501 From:Sadowski, Mark To:Craig R. Smith, AIA; Maggio, Rodger Cc:Helios Dayspring; Nick Reed; SeaBay - Armando Martinez; lucas lundin - SeaBay; Dana Lee; Jim Clancy; Fitzgerald, Tom Subject:RE: NHC SLO: 2640 Broad St., SLO, Ca. Date:Wednesday, August 4, 2021 10:25:00 PM Attachments:NHC SLO SITE REV. BOLLARDS.pdf image001.png image002.png image003.png image004.png Stamped bollard changes attached. We’ll be in touch with the lighting updates as soon as we finish later this week. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Wednesday, August 4, 2021 3:16 PM To: Maggio, Rodger <rmaggio@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Helios Dayspring <helios@nhcdispensaries.com>; Nick Reed <SeaBay - Armando Martinez <amartinez@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Dana Lee <dana@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Fitzgerald, Tom <tfitzgerald@slocity.org> Subject: Fwd: NHC SLO: 2640 Broad St., SLO, Ca. This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Rodger, Please see the email with attached indoor lighting modifications and revised bollard location plan for the Natural Healing Center on Broad Street. We are making every effort to get all parties to approve this as soon as possible in an effort to place the order on the specified items and light fixtures. Please review and, if OK, please confirm with Mr. Mark Sadowski. Thanks for taking the time on this. Best Regards, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com Begin forwarded message: From: "Craig R. Smith, AIA" <craig@craigrsmithaia.com> Subject: NHC SLO: 2640 Broad St., SLO, Ca. Date: August 2, 2021 at 9:31:00 AM PDT To: "Sadowski, Mark" <msadowsk@slocity.org> Cc: tfitzgerald@slocity.org, SeaBay - Armando Martinez <amartinez@seabay- group.com>, lucas lundin - SeaBay <llundin@seabay-group.com>, Randy Johnson rjohnson@seabay-group.com>, Dana Lee <dana@craigrsmithaia.com> Mark, Please find attached the revised electrical lighting and power plan for the Natural Healing Center project on Broad Street. As a result of fixture availability due to the post pandemic processing of getting construction projects going (or keep going…) and finding/ordering fixtures in a timely manner, we are submitting the attached revised plan set with conforming/alternative fixtures. The revised title 24 energy analysis is also included. We are looking for the review and approval by the building department to continue with this revision. In the interest of time, please advise us as to the quickest process. We can submit hard copies, as well, or the attached electronic version can be reviewed. Appreciate your attention and assistance regarding this issue and this project. Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com From:Sadowski, Mark To:Craig R. Smith, AIA; Maggio, Rodger Cc:Helios Dayspring; Nick Reed; SeaBay - Armando Martinez; lucas lundin - SeaBay; Dana Lee; Jim Clancy; Fitzgerald, Tom Subject:RE: NHC SLO: 2640 Broad St., SLO, Ca. Date:Wednesday, August 4, 2021 4:13:00 PM Attachments:image001.png image002.png image003.png image004.png Hi Craig, I will get the bollard detail stamped and back to you this evening. Ivan in our office is reviewing the lighting changes and will have them done by the end of the week. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Wednesday, August 4, 2021 3:16 PM To: Maggio, Rodger <rmaggio@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org>; Helios Dayspring <helios@nhcdispensaries.com>; Nick Reed <SeaBay - Armando Martinez <amartinez@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Dana Lee <dana@craigrsmithaia.com>; Jim Clancy jim@nhcdispensaries.com>; Fitzgerald, Tom <tfitzgerald@slocity.org> Subject: Fwd: NHC SLO: 2640 Broad St., SLO, Ca. This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Rodger, Please see the email with attached indoor lighting modifications and revised bollard location plan for the Natural Healing Center on Broad Street. We are making every effort to get all parties to approve this as soon as possible in an effort to place the order on the specified items and light fixtures. Please review and, if OK, please confirm with Mr. Mark Sadowski. Thanks for taking the time on this. Best Regards, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com Begin forwarded message: From: "Craig R. Smith, AIA" <craig@craigrsmithaia.com> Subject: NHC SLO: 2640 Broad St., SLO, Ca. Date: August 2, 2021 at 9:31:00 AM PDT To: "Sadowski, Mark" <msadowsk@slocity.org> Cc: tfitzgerald@slocity.org, SeaBay - Armando Martinez <amartinez@seabay- group.com>, lucas lundin - SeaBay <llundin@seabay-group.com>, Randy Johnson rjohnson@seabay-group.com>, Dana Lee <dana@craigrsmithaia.com> Mark, Please find attached the revised electrical lighting and power plan for the Natural Healing Center project on Broad Street. As a result of fixture availability due to the post pandemic processing of getting construction projects going (or keep going…) and finding/ordering fixtures in a timely manner, we are submitting the attached revised plan set with conforming/alternative fixtures. The revised title 24 energy analysis is also included. We are looking for the review and approval by the building department to continue with this revision. In the interest of time, please advise us as to the quickest process. We can submit hard copies, as well, or the attached electronic version can be reviewed. Appreciate your attention and assistance regarding this issue and this project. Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com From:SeaBay - Armando Martinez To:Craig R. Smith, AIA Cc:Maggio, Rodger; Sadowski, Mark Subject:Re: NHC SLO: 2640 Broad Street Project Date:Thursday, April 29, 2021 7:25:03 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Thank you Craig. We are available anytime at the City convenience. Thank you Mark and Rodger for the consideration and your time. On Thu, Apr 29, 2021 at 4:51 PM Craig R. Smith, AIA <craig@craigrsmithaia.com> wrote: Dear Mark and Rodger, I think it best that we schedule and conduct a meeting between the general contractor and the assigned building inspector (Tom) to review the inspection processing and how the general contractor has responded and managed the inspection requirements. I feel this necessary based on the recent inspection processing and how it has been responded to, handled and managed. Please let us know a date and a time to meet. I’m assuming it will be a Zoom meeting, or if possible, conducted at the building department with safe distancing in place. Please let me know how this can work into your scheduling. Thank you for taking the time and effort to deal with this. I feel it will be the best way to deal with the issues at hand rather than by email or phone. Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:Craig R. Smith, AIA Cc:SeaBay - Armando Martinez; Maggio, Rodger; Randy Johnson Jr; Dana Lee Subject:RE: NHC SLO: 2640 Broad Street Project Date:Monday, May 3, 2021 3:23:00 PM Attachments:image001.png image002.png image003.png image004.png Hello Craig, Thank you for taking the time to meet with us today. To summarize the items needed to follow up on from our meeting: 1. For section of concrete foundation poured without City inspection @ Line D between Line 3 & 4: a. Pot hole footings at two locations on Line E: @ Line 3 and at Line 4 to verify depth b. Scan footings at abovementioned locations to verify reinforcing steel and epoxy embed of rebar. c. Submit scan report to engineer of record and City Building Department. 2. Provide updated structural calculation information specifying all foundation designs were done to 2500 psi to eliminate requirement for special inspection of concrete. Thank you again and please let us know if there’s anything else we can help with. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Friday, April 30, 2021 2:44 PM To: Sadowski, Mark <msadowsk@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Maggio, Rodger rmaggio@slocity.org>; Randy Johnson Jr <rjohnson@seabay-group.com>; Dana Lee dana@craigrsmithaia.com> Subject: Re: NHC SLO: 2640 Broad Street Project This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, Per your request, the attached agenda is requested for our meeting on Monday, May 3. Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com NHC SLO : May 3, 2021Inspection Processing Meeting Agenda 1. Non-required inspections policy (inspections not on inspection card). 2. Correction notice vs. inspector’s notes. 3. Supplementary information and data for performed work to support design and or installation. 4. Concrete pour and placement requirements. On Apr 30, 2021, at 12:55 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Agenda to follow from architect 2640 Broad Inspections.ics> From:Craig R. Smith, AIA To:Sadowski, Mark Cc:SeaBay - Armando Martinez; Randy Johnson Jr; Nate Buchman-SeaBay; lucas lundin - SeaBay; Dana Lee Subject:Re: NHC SLO: 2640 Broad Street Project Date:Friday, May 14, 2021 9:53:21 AM Attachments:SL11302-3 SI R-Meter 3-13-2021 Signed PDF.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, Attached is the R-meter scan report, as conducted by GeoSolutions, regarding the footing along wall line D, between wall lines 3 and 4. All required reinforcement steel size/spacing and footing depth conform to the approved structural requirements and detail. Please note that the approved and structurally developed detail specifically noted the requirement for the foundation footing design to be 2500 psi, therefore, no special inspection is required. Call or email me with any further need to address this issue for this project. Thank you, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com On May 3, 2021, at 3:23 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hello Craig, Thank you for taking the time to meet with us today. To summarize the items needed to follow up on from our meeting: 1.For section of concrete foundation poured without City inspection @ Line D between Line 3 & 4: a.Pot hole footings at two locations on Line E: @ Line 3 and at Line 4 to verify depth b.Scan footings at abovementioned locations to verify reinforcing steel and epoxy embed of rebar. c.Submit scan report to engineer of record and City Building Department. 2.Provide updated structural calculation information specifying all foundation designs were done to 2500 psi to eliminate requirement for special inspection of concrete. Thank you again and please let us know if there’s anything else we can help with. Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org image002.png><image003.png><image004.png> Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From:Craig R.Smith,AIA craig@craigrsmithaia.com> Sent:Friday,April 30,2021 2:44 PM To:Sadowski,Mark msadowsk@slocity.org> Cc:SeaBay Armando Martinez amartinez@seabay-group.com>;Maggio,Rodger rmaggio@slocity.org>;Randy Johnson Jr rjohnson@seabay-group.com>;Dana Lee dana@craigrsmithaia.com> Subject:Re:NHC SLO:2640 Broad Street Project This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, Per your request,the attached agenda is requested for our meeting on Monday,May 3. Thanks, Craig R.Smith,AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com NHC SLO : May 3, 2021Inspection Processing Meeting Agenda 1.Non-required inspections policy inspections not on inspection card). 2.Correction notice vs.inspector’s notes. 3.Supplementary information and data for performed work to support design and or installation. 4.Concrete pour and placement requirements. On Apr 30,2021,at 12:55 PM,Sadowski,Mark msadowsk@slocity.org>wrote: Agenda to follow from architect 2640 Broad Inspections.ics> From:Craig R. Smith, AIA To:Sadowski, Mark Cc:SeaBay - Armando Martinez; Maggio, Rodger; Randy Johnson Jr; Dana Lee Subject:Re: NHC SLO: 2640 Broad Street Project Date:Friday, April 30, 2021 2:44:24 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Mark, Per your request, the attached agenda is requested for our meeting on Monday, May 3. Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com NHC SLO : May 3, 2021Inspection Processing Meeting Agenda 1. Non-required inspections policy (inspections not on inspection card). 2. Correction notice vs. inspector’s notes. 3. Supplementary information and data for performed work to support design and or installation. 4. Concrete pour and placement requirements. On Apr 30, 2021, at 12:55 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Agenda to follow from architect 2640 Broad Inspections.ics> From:Sadowski, Mark To:SeaBay - Armando Martinez; Craig R. Smith, AIA Cc:Maggio, Rodger Subject:RE: NHC SLO: 2640 Broad Street Project Date:Thursday, April 29, 2021 9:20:00 PM Attachments:image001.png image002.png image003.png image004.png Hi Craig, It looks like Monday between 9-10, 11-2, and 1-2 is available for Rodger and I. Please let us know if one of these time slots works for your schedule and we can coordinate from there. To help in preparation, do you have an agenda of items you would like to cover to ensure we can be as productive as possible? Thank you, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Thursday, April 29, 2021 7:25 PM To: Craig R. Smith, AIA <craig@craigrsmithaia.com> Cc: Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark <msadowsk@slocity.org> Subject: Re: NHC SLO: 2640 Broad Street Project This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Thank you Craig. We are available anytime at the City convenience. Thank you Mark and Rodger for the consideration and your time. On Thu, Apr 29, 2021 at 4:51 PM Craig R. Smith, AIA <craig@craigrsmithaia.com> wrote: Dear Mark and Rodger, I think it best that we schedule and conduct a meeting between the general contractor and the assigned building inspector (Tom) to review the inspection processing and how the general contractor has responded and managed the inspection requirements. I feel this necessary based on the recent inspection processing and how it has been responded to, handled and managed. Please let us know a date and a time to meet. I’m assuming it will be a Zoom meeting, or if possible, conducted at the building department with safe distancing in place. Please let me know how this can work into your scheduling. Thank you for taking the time and effort to deal with this. I feel it will be the best way to deal with the issues at hand rather than by email or phone. Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:Dana Hunter Cc:Craig R. Smith AIA - CRSA Architecture; SeaBay - Armando Martinez; Randy Johnson Jr; lucas lundin - SeaBay; Nate Buchman-SeaBay Subject:RE: NHC SLO: 2640 Broad Street Revision Plan Recheck Date:Tuesday, January 19, 2021 7:34:00 PM Attachments:image001.png image002.png image003.png image004.png Hi Dana, I have reached out to get an update from our reviewer and I’ll let you know as soon as I hear back from them. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Dana Hunter <dana@craigrsmithaia.com> Sent: Tuesday, January 19, 2021 10:18 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; SeaBay - Armando Martinez amartinez@seabay-group.com>; Randy Johnson Jr <rjohnson@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Nate Buchman-SeaBay <nbuchman@seabay-group.com> Subject: Re: NHC SLO: 2640 Broad Street Revision Plan Recheck Good Morning Mark, Can we please get an update on the status of the plans? Thank you, On Jan 7, 2021, at 9:41 PM, Sadowski, Mark <msadowsk@slocity.org> wrote: Hi Craig, The resubmittal was only received and routed on Monday 1/4 and has a due date of 1/18. We will let you know when we receive an update on the status of the review. Thanks Craig, Mark Sadowski Building & Safety Supervisor image001.png> Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 C 805.431.7162 slocity.org image002.png><image003.png><image004.png> Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Thursday, January 7, 2021 4:46 PM To: Sadowski, Mark <msadowsk@slocity.org> Cc: Dana Lee <dana@craigrsmithaia.com>; SeaBay - Armando Martinez amartinez@seabay-group.com>; Randy Johnson Jr <rjohnson@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com>; Nate Buchman-SeaBay nbuchman@seabay-group.com> Subject: NHC SLO: 2640 Broad Street Revision Plan Recheck Hey Mark, Just checking in on the progress of the recheck for our project at 2640 Broad Street. There were only a couple of corrections for Steve to look at and we are “dead” in water until the recheck is completed and approved. We are at a point where we need to call for inspections and Tom has indicated that he needs the “approved” recheck plans on site in order to make good on the request. Please let me know what the schedule might look like. Appreciate your help on this. Thanks, Craig R. Smith, AIA Principal Architect CRSA Architecture 805 215-2313 craig@craigrsmithaia.com Dana Hunter, NCARB CRSA Architecture Associate Architect 860 Walnut Street, Suite B San Luis Obispo, CA 93401 PH: 805-544-3380 ext. 206 dana@craigrsmithaia.com Office Hours: Monday-Thursday* From:Corey, Tyler To:Craig R. Smith AIA - CRSA Architecture Cc:Helios Dayspring; SeaBay - Armando Martinez; Jim Clancy; Dana Lee Subject:RE: NHC SLO: 2640 Broad Street Date:Wednesday, January 6, 2021 1:53:26 PM Attachments:image001.png You are correct Craig. The operator permit is good until April 22, 2021. Tyler Corey Principal Planner Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E tcorey@slocity.org T 805.781.7169 slocity.org From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Wednesday, January 6, 2021 1:47 PM To: Corey, Tyler <tcorey@slocity.org> Cc: Helios Dayspring <helios@nhcdispensaries.com>; SeaBay - Armando Martinez amartinez@seabay-group.com>; Jim Clancy <jim@nhcdispensaries.com>; Dana Lee dana@craigrsmithaia.com> Subject: NHC SLO: 2640 Broad Street Tyler, Thanks for getting back to me regarding the extended time for the occupancy/in-business date of April 22, 2021. If you could just confirm this in writing (or respond to this email) so as not to have any confusion come the day we call for a final inspection I would really appreciate it. Again, I appreciate you taking the time and effort regarding this matter. Take care, Craig R. Smith, AIA PrincipalArchitectCRSAArchitecture 805 215-2313 craig@craigrsmithaia.com From:Sadowski, Mark To:Craig R. Smith, AIA Cc:SeaBay - Armando Martinez; Dana Lee Subject:RE: NHC SLO: Ceiling light fixture substitution and revised title 24 Date:Thursday, August 12, 2021 12:02:00 PM Hi Craig, Ivan completed and approved these yesterday. I will look to get them stamped and back to you by end of day today. Work may proceed in the interim. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Original Message----- From: Craig R. Smith, AIA <craig@craigrsmithaia.com> Sent: Thursday, August 12, 2021 11:37 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Dana Lee <dana@craigrsmithaia.com> Subject: NHC SLO: Ceiling light fixture substitution and revised title 24 This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hey Mark, Getting a lot of pressure from the clients regarding a “completion” date on the revised ceiling light fixture substitution for the Natural Healing project on Broad Street. If you could please provide us an expected date I would greatly appreciate it. Construction material availability is becoming a major “factor” in keeping to a given time frame and we are making every effort to stay on the current schedule. Thanks, Appreciate your efforts regarding this matter, Best, Craig R. Smith, AIA Principal Architect CRSA Architecture 805.215.2313 craig@craigrsmithaia.com From:Maggio, Rodger To:"Craig R. Smith AIA - CRSA Architecture"; Sadowski, Mark Cc:SeaBay - Armando Martinez; Randy Johnson Jr; Nate Buchman-SeaBay; lucas lundin - SeaBay Subject:RE: NHC: 2640 Broad Street Date:Wednesday, February 17, 2021 3:15:07 PM Craig, I will discuss with Michael and Mark. It has been difficult locating extra help as of late. I will keep you posted. Rodger From: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com> Sent: Wednesday, February 17, 2021 2:51 PM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Randy Johnson Jr rjohnson@seabay-group.com>; Nate Buchman-SeaBay <nbuchman@seabay-group.com>; lucas lundin - SeaBay <llundin@seabay-group.com> Subject: NHC: 2640 Broad Street This message has originated from an External Source. Please use proper judgment and caution when opening attachments, clicking links, or responding to this email. Dear Mark and Rodger, As you are aware, we are under construction on the cannabis dispensary project at 2640 Broad Street (Natural Healing Center). We have a given date to acquire occupancy of April 22, in order to maintain the City’s retail cannabis license, per the standing conditions of approval. Due to several related issues regarding the difficulties of dealing with the COVID 19 pandemic, we (as others have) are continuing to meet challenges on a daily basis. This email is to formally make a request to allow the hiring of a qualified and acceptable certified deputy inspector so as to keep up with our very tight and demanding construction schedule. As you have allowed this in past, we would seek out only those that have your approval to perform the inspection tasks at hand. This request is due to the need to provide daily (sometimes twice a day) inspections in order to continue and complete all construction by the required occupancy date. Please consider this request and let me know if it would be acceptable. I will then forward the names of the deputy inspectors, with qualifications, for your approval. Really appreciate your consideration regarding this request. Thank you.. Craig R. Smith, AIA Principal Architect CRSAArchitecture805215-2313 craig@craigrsmithaia.com From:Codron, Michael To:Johnson, Derek; SeaBay - Armando Martinez Cc:Stanwyck, Shelly; Maggio, Rodger; Randy Johnson; Craig R. Smith AIA - CRSA Architecture; AM1922@seabay- group.com Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Thursday, April 8, 2021 8:48:00 AM Attachments:image001.png image002.png image003.png image004.png Thank you, Derek and hello Armando. We are having an internal conversation about your request later today and I will be able to reach out again this afternoon to further discuss what options exist. -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Johnson, Derek <djohnson@slocity.org> Sent: Thursday, April 8, 2021 8:29 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Codron, Michael mcodron@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: RE: Permit #BLDG043420 - Natural Healing Center Good Morning Armando, I have looped in Mr. Codron as it appears that he did not receive your email. Thank you and look forward to supporting your project. Derek From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Codron, Michael Cc:AM1922@seabay-group.com; Craig R. Smith AIA - CRSA Architecture; Johnson, Derek; Maggio, Rodger; Randy Johnson; Sadowski, Mark; Stanwyck, Shelly Subject:Re: Permit #BLDG043420 - Natural Healing Center Date:Friday, April 9, 2021 8:48:15 AM Attachments:image002.png image004.png image003.png image001.png Hello Michael, Thank you again for the call yesterday and your teams attention to our concerns. This sounds like a solid plan to start with. We appreciate the support. We will contact Tom today to discuss the scheduling for next week. Thank you again to all those involved. On Thu, Apr 8, 2021 at 4:34 PM Codron, Michael <mcodron@slocity.org> wrote: Hello Armando and Craig, It was good speaking with you both today. As discussed, we are going to make Tom Fitzgerald, your current inspector, available to perform inspections twice a day going forward so that you are able to make sustained progress on the project. If that proves to be insufficient, we are also in the process of lining up a contract inspector for one of the major subdivisions in town. That inspector will have additional capacity for the next few months and could be assigned additional duties. For now, please coordinate directly with Tom on your scheduling needs and let us know how things are going. If we need to adjust we can do so. Thanks for reaching out and letting us know your concerns. I’m glad we have a solution that seems like it will work for you. Best, -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Thursday, April 8, 2021 8:55 AM To: Codron, Michael <mcodron@slocity.org> Cc: AM1922@seabay-group.com; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Johnson, Derek <djohnson@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Stanwyck, Shelly sstanwyc@slocity.org> Subject: Re: Permit #BLDG043420 - Natural Healing Center Thank you both for your time and consideration to my request. On Thu, Apr 8, 2021 at 8:48 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Derek and hello Armando. We are having an internal conversation about your request later today and I will be able to reach out again this afternoon to further discuss what options exist. -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Johnson, Derek <djohnson@slocity.org> Sent: Thursday, April 8, 2021 8:29 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Codron, Michael mcodron@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org>; Randy Johnson <rjohnson@seabay- group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: RE: Permit #BLDG043420 - Natural Healing Center Good Morning Armando, I have looped in Mr. Codron as it appears that he did not receive your email. Thank you and look forward to supporting your project. Derek From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a-dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:Codron, Michael; Maggio, Rodger Cc:Cox, Rebecca; Stanwyck, Shelly Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Tuesday, April 6, 2021 10:10:22 PM Attachments:image001.png image002.png image003.png image004.png I have heard similar feedback on a couple other projects over the past week and not sure why this may be occurring. I’ll touch base with Tom in the morning and see if the contractor has expressed any of this to him, as it is the first time I’ve learned we are reportedly missing inspections for this project. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Codron, Michael <mcodron@slocity.org> Sent: Tuesday, April 6, 2021 6:18 PM To: Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark <msadowsk@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center Some helpful feedback about inspection scheduling, please review and let’s discuss this topic on Thursday at CDMG. Thank you, -Michael From: Johnson, Derek <djohnson@slocity.org> Sent: Tuesday, April 6, 2021 10:19 AM To: Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Codron, Michael <mcodron@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Johnson, Derek To:SeaBay - Armando Martinez; Codron, Michael Cc:Stanwyck, Shelly; Randy Johnson; Craig R. Smith AIA - CRSA Architecture; AM1922@seabay-group.com Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Thursday, April 8, 2021 8:29:23 AM Good Morning Armando, I have looped in Mr. Codron as it appears that he did not receive your email. Thank you and look forward to supporting your project. Derek From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Cox, Rebecca To:Sadowski, Mark; Codron, Michael; Maggio, Rodger Cc:Stanwyck, Shelly Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Wednesday, April 7, 2021 8:00:21 AM Attachments:image001.png image002.png image003.png image004.png Thanks, item is added to tomorrow’s agenda. As a status update on inspection count, we currently have 3 spots left for Friday and then we’ll be booking for next week. Rebecca From: Sadowski, Mark <msadowsk@slocity.org> Sent: Tuesday, April 6, 2021 10:10 PM To: Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center I have heard similar feedback on a couple other projects over the past week and not sure why this may be occurring. I’ll touch base with Tom in the morning and see if the contractor has expressed any of this to him, as it is the first time I’ve learned we are reportedly missing inspections for this project. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Codron, Michael <mcodron@slocity.org> Sent: Tuesday, April 6, 2021 6:18 PM To: Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark <msadowsk@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center Some helpful feedback about inspection scheduling, please review and let’s discuss this topic on Thursday at CDMG. Thank you, -Michael From: Johnson, Derek <djohnson@slocity.org> Sent: Tuesday, April 6, 2021 10:19 AM To: Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Codron, Michael <mcodron@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Bromby, Holly To:Cox, Rebecca; Sadowski, Mark Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Wednesday, April 7, 2021 9:26:50 AM Attachments:image001.png image002.png image003.png image004.png image005.png image006.png image007.png Hi Rebecca and Mark, The voicemails from (after) 3:00 pm Tuesday to 8:00 am this morning included the following: Rick 2640 Broad, Demo Final VM: 04/06 @ 10:30 PM There was also a blank message/hang up call, but the number that called was VM: 04/07 @ 7:52 AM So, with that, I’m guessing I wont be calling “Rick” back this morning to schedule this inspection? Thank you, Holly From: Cox, Rebecca <rcox@slocity.org> Sent: Wednesday, April 7, 2021 8:35 AM To: Bromby, Holly <hbromby@slocity.org> Cc: Sadowski, Mark <msadowsk@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center Hi Holly! Mark left a test voicemail last night, did you by chance get one from “Rick” at 2640 Broad? Thanks! From: Sadowski, Mark <msadowsk@slocity.org> Sent: Wednesday, April 7, 2021 8:34 AM To: Cox, Rebecca <rcox@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center I left a message on the inspection line last night to test out and wondering if it might be an IT issue. Let me know if you get a message from “Rick” at 2640 Broad with my phone number Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Cox, Rebecca <rcox@slocity.org> Sent: Wednesday, April 7, 2021 8:00 AM To: Sadowski, Mark <msadowsk@slocity.org>; Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center Thanks, item is added to tomorrow’s agenda. As a status update on inspection count, we currently have 3 spots left for Friday and then we’ll be booking for next week. Rebecca From: Sadowski, Mark <msadowsk@slocity.org> Sent: Tuesday, April 6, 2021 10:10 PM To: Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center I have heard similar feedback on a couple other projects over the past week and not sure why this may be occurring. I’ll touch base with Tom in the morning and see if the contractor has expressed any of this to him, as it is the first time I’ve learned we are reportedly missing inspections for this project. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Codron, Michael <mcodron@slocity.org> Sent: Tuesday, April 6, 2021 6:18 PM To: Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark <msadowsk@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center Some helpful feedback about inspection scheduling, please review and let’s discuss this topic on Thursday at CDMG. Thank you, -Michael From: Johnson, Derek <djohnson@slocity.org> Sent: Tuesday, April 6, 2021 10:19 AM To: Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Codron, Michael <mcodron@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Sadowski, Mark To:Cox, Rebecca Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Wednesday, April 7, 2021 8:33:00 AM Attachments:image005.png image006.png image007.png image008.png image009.png image010.png image011.png I left a message on the inspection line last night to test out and wondering if it might be an IT issue. Let me know if you get a message from “Rick” at 2640 Broad with my phone number Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Cox, Rebecca <rcox@slocity.org> Sent: Wednesday, April 7, 2021 8:00 AM To: Sadowski, Mark <msadowsk@slocity.org>; Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center Thanks, item is added to tomorrow’s agenda. As a status update on inspection count, we currently have 3 spots left for Friday and then we’ll be booking for next week. Rebecca From: Sadowski, Mark <msadowsk@slocity.org> Sent: Tuesday, April 6, 2021 10:10 PM To: Codron, Michael <mcodron@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: RE: Permit #BLDG043420 - Natural Healing Center I have heard similar feedback on a couple other projects over the past week and not sure why this may be occurring. I’ll touch base with Tom in the morning and see if the contractor has expressed any of this to him, as it is the first time I’ve learned we are reportedly missing inspections for this project. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Codron, Michael <mcodron@slocity.org> Sent: Tuesday, April 6, 2021 6:18 PM To: Maggio, Rodger <rmaggio@slocity.org>; Sadowski, Mark <msadowsk@slocity.org> Cc: Cox, Rebecca <rcox@slocity.org>; Stanwyck, Shelly <sstanwyc@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center Some helpful feedback about inspection scheduling, please review and let’s discuss this topic on Thursday at CDMG. Thank you, -Michael From: Johnson, Derek <djohnson@slocity.org> Sent: Tuesday, April 6, 2021 10:19 AM To: Stanwyck, Shelly <sstanwyc@slocity.org> Cc: Codron, Michael <mcodron@slocity.org> Subject: FW: Permit #BLDG043420 - Natural Healing Center FYI. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a- dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Codron, Michael To:SeaBay - Armando Martinez; Craig R. Smith AIA - CRSA Architecture Cc:AM1922@seabay-group.com; Johnson, Derek; Maggio, Rodger; Randy Johnson; Stanwyck, Shelly; Sadowski, Mark Subject:RE: Permit #BLDG043420 - Natural Healing Center Date:Thursday, April 8, 2021 4:34:00 PM Attachments:image001.png image002.png image003.png image004.png Hello Armando and Craig, It was good speaking with you both today. As discussed, we are going to make Tom Fitzgerald, your current inspector, available to perform inspections twice a day going forward so that you are able to make sustained progress on the project. If that proves to be insufficient, we are also in the process of lining up a contract inspector for one of the major subdivisions in town. That inspector will have additional capacity for the next few months and could be assigned additional duties. For now, please coordinate directly with Tom on your scheduling needs and let us know how things are going. If we need to adjust we can do so. Thanks for reaching out and letting us know your concerns. I’m glad we have a solution that seems like it will work for you. Best, -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Thursday, April 8, 2021 8:55 AM To: Codron, Michael <mcodron@slocity.org> Cc: AM1922@seabay-group.com; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Johnson, Derek <djohnson@slocity.org>; Maggio, Rodger rmaggio@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Stanwyck, Shelly sstanwyc@slocity.org> Subject: Re: Permit #BLDG043420 - Natural Healing Center Thank you both for your time and consideration to my request. On Thu, Apr 8, 2021 at 8:48 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Derek and hello Armando. We are having an internal conversation about your request later today and I will be able to reach out again this afternoon to further discuss what options exist. -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Johnson, Derek <djohnson@slocity.org> Sent: Thursday, April 8, 2021 8:29 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Codron, Michael mcodron@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org>; Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: RE: Permit #BLDG043420 - Natural Healing Center Good Morning Armando, I have looped in Mr. Codron as it appears that he did not receive your email. Thank you and look forward to supporting your project. Derek From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half- a-dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Codron, Michael Cc:AM1922@seabay-group.com; Craig R. Smith AIA - CRSA Architecture; Johnson, Derek; Maggio, Rodger; Randy Johnson; Stanwyck, Shelly Subject:Re: Permit #BLDG043420 - Natural Healing Center Date:Thursday, April 8, 2021 8:55:44 AM Attachments:image002.png image004.png image003.png image001.png Thank you both for your time and consideration to my request. On Thu, Apr 8, 2021 at 8:48 AM Codron, Michael <mcodron@slocity.org> wrote: Thank you, Derek and hello Armando. We are having an internal conversation about your request later today and I will be able to reach out again this afternoon to further discuss what options exist. -Michael Michael Codron pronouns he/him/his Director of Community Development Community Development 919 Palm Street, San Luis Obispo, CA 93401-3249 E mcodron@slocity.org T 805.781.7187 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Johnson, Derek <djohnson@slocity.org> Sent: Thursday, April 8, 2021 8:29 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; Codron, Michael mcodron@slocity.org> Cc: Stanwyck, Shelly <sstanwyc@slocity.org>; Randy Johnson <rjohnson@seabay- group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: RE: Permit #BLDG043420 - Natural Healing Center Good Morning Armando, I have looped in Mr. Codron as it appears that he did not receive your email. Thank you and look forward to supporting your project. Derek From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Tuesday, April 6, 2021 9:52 AM To: mcodrom@slocity.org; Johnson, Derek <djohnson@slocity.org> Cc: Randy Johnson <rjohnson@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; AM1922@seabay-group.com Subject: Permit #BLDG043420 - Natural Healing Center This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Mr Codron & Mr. Johnson, As the project manager for SeaBay Building Group on the Natural Healing Center project located at 2640 Broad Street in San Luis Obispo, I am writing to you with cautious optimism regarding the scheduling and inspection progress of the project. The project has experienced more than a half-a-dozen “no-calls” or “no-shows” when we schedule the required construction inspections. We have no way to verify that the inspection has been booked, on the City's end, due to the fact that no notification or documented appointment request is recorded. Therefore, we are at the mercy of the inspector to let us know “when” and “if” they will actually make the inspection. This causes disruptions to our work-flow and makes it impossible to properly update and forecast a completion date to our stakeholders. We appreciate the City's understanding of the situation regarding the pandemic and the extensions the City has provided for the completion of this project and the client's cannabis business license operational date extension for opening. Without the ability to properly, or adequately, schedule inspections and therefore provide a realistic and applicable time schedule, I have no recourse but to strongly voice my concern and re- request the presence and use of an ICC and city approved, certified, deputy inspector for this project. I kindly ask you to consider my request again. While we can hold a strong level of control over our subcontractors and the clients expectations, we hold no power to insure the date and time of any inspection, nor the ability to predict the current inspection scheduling the City of San Luis Obispo utilizes. We are in need of your assistance and help regarding this matter. Thank you for your consideration. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:Planning To:Nate Buchman-SeaBay Subject:RE: Permit Apllication and Drawings for SLO NHC Sign Permit Date:Monday, March 8, 2021 5:10:10 PM Attachments:image001.png image002.png image003.png image004.png no worries, I figured as much, but wanted to be sure we weren’t missing anything. Walter Oetzell Assistant Planner 805) 781-7593 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Monday, March 8, 2021 3:07 PM To: Planning <planning@slocity.org> Subject: Re: Permit Apllication and Drawings for SLO NHC Sign Permit Thank you Walter, My apologies, I meant to only reply to Evan and the internal team letting him know we recieved the document as well, and that we would route to the project owner for signature. Thanks again for checking, On Mon, Mar 8, 2021 at 2:24 PM Planning <planning@slocity.org> wrote: Hello Mr. Buchman, The below message was found in our Planning Department email Inbox today. If you intended to provide any information or materials to the Planning Division please note that they were not received with this message. I wanted to let you know before I deleted the message… Walter Oetzell Assistant Planner Community Development Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E woetzell@slocity.org T 805.781.7593 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Monday, March 8, 2021 10:02 AM To: Evan Royer <evan@thiessendesign.com> Cc: Planning <planning@slocity.org>; jeff <jeff@thiessendesign.com>; Randy Johnson rjohnson@seabay-group.com> Subject: Re: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Received, thank you. On Mon, Mar 8, 2021 at 9:16 AM Evan Royer <evan@thiessendesign.com> wrote: Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Nate Buchman-SeaBay To:Planning Subject:Re: Permit Apllication and Drawings for SLO NHC Sign Permit Date:Monday, March 8, 2021 3:07:42 PM Attachments:image001.png image002.png image003.png image004.png Thank you Walter, My apologies, I meant to only reply to Evan and the internal team letting him know we recieved the document as well, and that we would route to the project owner for signature. Thanks again for checking, On Mon, Mar 8, 2021 at 2:24 PM Planning <planning@slocity.org> wrote: Hello Mr. Buchman, The below message was found in our Planning Department email Inbox today. If you intended to provide any information or materials to the Planning Division please note that they were not received with this message. I wanted to let you know before I deleted the message… Walter Oetzell Assistant Planner Community Development Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E woetzell@slocity.org T 805.781.7593 slocity.org Stay connected with the City by signing up for e-notifications For updates on COVID-19 and how to access City services during COVID, visit slocity.org/covid19 From: Nate Buchman-SeaBay <nbuchman@seabay-group.com> Sent: Monday, March 8, 2021 10:02 AM To: Evan Royer <evan@thiessendesign.com> Cc: Planning <planning@slocity.org>; jeff <jeff@thiessendesign.com>; Randy Johnson rjohnson@seabay-group.com> Subject: Re: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Received, thank you. On Mon, Mar 8, 2021 at 9:16 AM Evan Royer <evan@thiessendesign.com> wrote: Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Nate Buchman-SeaBay To:Evan Royer Cc:Planning; jeff; Randy Johnson Subject:Re: Permit Apllication and Drawings for SLO NHC Sign Permit Date:Monday, March 8, 2021 10:04:35 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Evam, Please copy Lucas on any future correspondence as well. llundin@seabay-group.com On Mon, Mar 8, 2021 at 10:02 AM Nate Buchman-SeaBay <nbuchman@seabay-group.com> wrote: Received, thank you. On Mon, Mar 8, 2021 at 9:16 AM Evan Royer <evan@thiessendesign.com> wrote: Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:Nate Buchman-SeaBay To:Evan Royer Cc:Planning; jeff; Randy Johnson Subject:Re: Permit Apllication and Drawings for SLO NHC Sign Permit Date:Monday, March 8, 2021 10:03:07 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Received, thank you. On Mon, Mar 8, 2021 at 9:16 AM Evan Royer <evan@thiessendesign.com> wrote: Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Nate Buchman | Project Manager SeaBay Building Group, LLC 1011 Pacific St. San Luis Obispo, CA, 93401 Cell: 206-775-5004 www.seabay-group.com Together. We Build. Licenses: WA, CA, AZ, OR, AK, HI, NV, TX, Chicago From:building To:Evan Royer Cc:jeff; rjohnson@seabay-group.com; nbuchman@seabay-group.com; llundin@seabay-group.com Subject:RE: Permit Application and Drawings for SLO NHC Sign Permit Date:Wednesday, March 31, 2021 9:37:00 AM Hello, Your application has been routed. Please follow up with us on Monday if you don't hear back from us. Your permit number is SIGGN-0721-2021 for reference. Thank you, Andy Torres CDD Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E atorres@slocity.org T 805.781.7572 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Tuesday, March 30, 2021 3:41 PM To: building <building@slocity.org> Cc: jeff <jeff@thiessendesign.com>; rjohnson@seabay-group.com; nbuchman@seabay-group.com; llundin@seabay-group.com Subject: Re: Permit Application and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hello, Please see the attached SIGNED_Signage Submittal for the NHC SLO exterior Signs Permit. Please get back to us with your approval. Thank you. Quoting building <building@slocity.org>: Hi Evan, You need to fill out the attached application in order for us to process your submittal. Please fill out sections 1, 2, 3, and 4. Then submit all documents to building@slocity.org for review. Thank you, Andy Torres CDD Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E atorres@slocity.org T 805.781.7572 slocity.org -----Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Friday, March 26, 2021 2:01 PM To: building <building@slocity.org> Subject: Re: Permit Application and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Austin, Can you specify what is meant by "filled out minimum"? Please call me when you have a moment to discuss. Thanks. Quoting building <building@slocity.org>: Hi Evan, Would you please provide us with a filled out minimum building permit application, see attached, and resubmit your entire application package back to building@slocity.org ? Austin Bertucci Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E ABertucci@slocity.org T 805.781.7573 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Thursday, March 25, 2021 3:19 PM To: building <building@slocity.org> Cc: rjohnson@seabay-group.com; nbuchman@seabay-group.com; jeff jeff@thiessenmetalworks.com>; llundin@seabay-group.com; Oetzell, Walter <woetzell@slocity.org> Subject: Fwd: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see the attached "SIGNED" Sign permit application. Let me know if you need any additional information from me. Thank you. Forwarded message from "Oetzell, Walter" <woetzell@slocity.org> ----- Date: Wed, 24 Mar 2021 19:40:46 +0000 From: "Oetzell, Walter" <woetzell@slocity.org> Subject: RE: Permit Apllication and Drawings for SLO NHC Sign Permit To: Evan Royer <evan@thiessendesign.com> Hello Mr. Royer, I was asked to follow up with you about the signage for the NHC business at 2640 Broad. I retrieved your message from the Planning Division's email inbox, and found the signage plan and Supplemental Information Worksheet. As the plans depicted more than one wall sign, and a wall sign on a building face lacking a public entry, I needed to confer with my supervisor as to whether the wall signs could all be permitted. Because of the limited visibility for the north-facing wall sign oriented toward south-bound traffic and pedestrians on broad) and the presence of the entry to an accessible ramp leading to a building entry, we found that it was permissible to allow both wall signs, in the proposed locations. Attached to this message please find a "signed" Supplemental Information Worksheet to accompany the Sign Permit application you make to our Building & Safety Division. Feel free to contact me if I can be of further assistance. Walter Oetzell Assistant Planner 805) 781-7593 Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Monday, March 8, 2021 9:16 AM To: Planning <planning@slocity.org> Cc: jeff <jeff@thiessendesign.com>; rjohnson@seabay-group.com; nbuchman@seabay-group.com Subject: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com End forwarded message ----- Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com From:Evan Royer To:building Cc:jeff; rjohnson@seabay-group.com; nbuchman@seabay-group.com; llundin@seabay-group.com Subject:Re: Permit Application and Drawings for SLO NHC Sign Permit Date:Tuesday, March 30, 2021 3:41:47 PM Attachments:SIGNED_Signage Submittal-NHC SLO Exterior Signs-03-30-21.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hello, Please see the attached SIGNED_Signage Submittal for the NHC SLO exterior Signs Permit. Please get back to us with your approval. Thank you. Quoting building <building@slocity.org>: Hi Evan, You need to fill out the attached application in order for us to process your submittal. Please fill out sections 1, 2, 3, and 4. Then submit all documents to building@slocity.org for review. Thank you, Andy Torres CDD Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E atorres@slocity.org T 805.781.7572 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Friday, March 26, 2021 2:01 PM To: building <building@slocity.org> Subject: Re: Permit Application and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Austin, Can you specify what is meant by "filled out minimum"? Please call me when you have a moment to discuss. Thanks. Quoting building <building@slocity.org>: Hi Evan, Would you please provide us with a filled out minimum building permit application, see attached, and resubmit your entire application package back to building@slocity.org ? Austin Bertucci Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E ABertucci@slocity.org T 805.781.7573 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Thursday, March 25, 2021 3:19 PM To: building <building@slocity.org> Cc: rjohnson@seabay-group.com; nbuchman@seabay-group.com; jeff jeff@thiessenmetalworks.com>; llundin@seabay-group.com; Oetzell, Walter <woetzell@slocity.org> Subject: Fwd: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see the attached "SIGNED" Sign permit application. Let me know if you need any additional information from me. Thank you. Forwarded message from "Oetzell, Walter" <woetzell@slocity.org> ----- Date: Wed, 24 Mar 2021 19:40:46 +0000 From: "Oetzell, Walter" <woetzell@slocity.org> Subject: RE: Permit Apllication and Drawings for SLO NHC Sign Permit To: Evan Royer <evan@thiessendesign.com> Hello Mr. Royer, I was asked to follow up with you about the signage for the NHC business at 2640 Broad. I retrieved your message from the Planning Division's email inbox, and found the signage plan and Supplemental Information Worksheet. As the plans depicted more than one wall sign, and a wall sign on a building face lacking a public entry, I needed to confer with my supervisor as to whether the wall signs could all be permitted. Because of the limited visibility for the north-facing wall sign oriented toward south-bound traffic and pedestrians on broad) and the presence of the entry to an accessible ramp leading to a building entry, we found that it was permissible to allow both wall signs, in the proposed locations. Attached to this message please find a "signed" Supplemental Information Worksheet to accompany the Sign Permit application you make to our Building & Safety Division. Feel free to contact me if I can be of further assistance. Walter Oetzell Assistant Planner 805) 781-7593 Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Monday, March 8, 2021 9:16 AM To: Planning <planning@slocity.org> Cc: jeff <jeff@thiessendesign.com>; rjohnson@seabay-group.com; nbuchman@seabay-group.com Subject: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com End forwarded message ----- Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com From:building To:Evan Royer Subject:RE: Permit Application and Drawings for SLO NHC Sign Permit Date:Monday, March 29, 2021 1:14:00 PM Attachments:Permit Application.pdf Hi Evan, You need to fill out the attached application in order for us to process your submittal. Please fill out sections 1, 2, 3, and 4. Then submit all documents to building@slocity.org for review. Thank you, Andy Torres CDD Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E atorres@slocity.org T 805.781.7572 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Friday, March 26, 2021 2:01 PM To: building <building@slocity.org> Subject: Re: Permit Application and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Austin, Can you specify what is meant by "filled out minimum"? Please call me when you have a moment to discuss. Thanks. Quoting building <building@slocity.org>: Hi Evan, Would you please provide us with a filled out minimum building permit application, see attached, and resubmit your entire application package back to building@slocity.org ? Austin Bertucci Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E ABertucci@slocity.org T 805.781.7573 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Thursday, March 25, 2021 3:19 PM To: building <building@slocity.org> Cc: rjohnson@seabay-group.com; nbuchman@seabay-group.com; jeff jeff@thiessenmetalworks.com>; llundin@seabay-group.com; Oetzell, Walter <woetzell@slocity.org> Subject: Fwd: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see the attached "SIGNED" Sign permit application. Let me know if you need any additional information from me. Thank you. Forwarded message from "Oetzell, Walter" <woetzell@slocity.org> ----- Date: Wed, 24 Mar 2021 19:40:46 +0000 From: "Oetzell, Walter" <woetzell@slocity.org> Subject: RE: Permit Apllication and Drawings for SLO NHC Sign Permit To: Evan Royer <evan@thiessendesign.com> Hello Mr. Royer, I was asked to follow up with you about the signage for the NHC business at 2640 Broad. I retrieved your message from the Planning Division's email inbox, and found the signage plan and Supplemental Information Worksheet. As the plans depicted more than one wall sign, and a wall sign on a building face lacking a public entry, I needed to confer with my supervisor as to whether the wall signs could all be permitted. Because of the limited visibility for the north-facing wall sign oriented toward south-bound traffic and pedestrians on broad) and the presence of the entry to an accessible ramp leading to a building entry, we found that it was permissible to allow both wall signs, in the proposed locations. Attached to this message please find a "signed" Supplemental Information Worksheet to accompany the Sign Permit application you make to our Building & Safety Division. Feel free to contact me if I can be of further assistance. Walter Oetzell Assistant Planner 805) 781-7593 Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Monday, March 8, 2021 9:16 AM To: Planning <planning@slocity.org> Cc: jeff <jeff@thiessendesign.com>; rjohnson@seabay-group.com; nbuchman@seabay-group.com Subject: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com End forwarded message ----- Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com From:building To:Evan Royer Cc:rjohnson@seabay-group.com; nbuchman@seabay-group.com; jeff; llundin@seabay-group.com Subject:RE: Permit Application and Drawings for SLO NHC Sign Permit Date:Friday, March 26, 2021 11:44:45 AM Attachments:Permit Application.pdf Hi Evan, Would you please provide us with a filled out minimum building permit application, see attached, and resubmit your entire application package back to building@slocity.org ? Austin Bertucci Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E ABertucci@slocity.org T 805.781.7573 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Thursday, March 25, 2021 3:19 PM To: building <building@slocity.org> Cc: rjohnson@seabay-group.com; nbuchman@seabay-group.com; jeff <jeff@thiessenmetalworks.com>; llundin@seabay-group.com; Oetzell, Walter <woetzell@slocity.org> Subject: Fwd: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see the attached "SIGNED" Sign permit application. Let me know if you need any additional information from me. Thank you. Forwarded message from "Oetzell, Walter" <woetzell@slocity.org> ----- Date: Wed, 24 Mar 2021 19:40:46 +0000 From: "Oetzell, Walter" <woetzell@slocity.org> Subject: RE: Permit Apllication and Drawings for SLO NHC Sign Permit To: Evan Royer <evan@thiessendesign.com> Hello Mr. Royer, I was asked to follow up with you about the signage for the NHC business at 2640 Broad. I retrieved your message from the Planning Division's email inbox, and found the signage plan and Supplemental Information Worksheet. As the plans depicted more than one wall sign, and a wall sign on a building face lacking a public entry, I needed to confer with my supervisor as to whether the wall signs could all be permitted. Because of the limited visibility for the north-facing wall sign (oriented toward south-bound traffic and pedestrians on broad) and the presence of the entry to an accessible ramp leading to a building entry, we found that it was permissible to allow both wall signs, in the proposed locations. Attached to this message please find a "signed" Supplemental Information Worksheet to accompany the Sign Permit application you make to our Building & Safety Division. Feel free to contact me if I can be of further assistance. Walter Oetzell Assistant Planner 805) 781-7593 Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Monday, March 8, 2021 9:16 AM To: Planning <planning@slocity.org> Cc: jeff <jeff@thiessendesign.com>; rjohnson@seabay-group.com; nbuchman@seabay-group.com Subject: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com End forwarded message ----- Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com From:Evan Royer To:building Subject:Re: Permit Application and Drawings for SLO NHC Sign Permit Date:Friday, March 26, 2021 2:00:42 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Hi Austin, Can you specify what is meant by "filled out minimum"? Please call me when you have a moment to discuss. Thanks. Quoting building <building@slocity.org>: Hi Evan, Would you please provide us with a filled out minimum building permit application, see attached, and resubmit your entire application package back to building@slocity.org ? Austin Bertucci Permit Technician Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E ABertucci@slocity.org T 805.781.7573 slocity.org Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Thursday, March 25, 2021 3:19 PM To: building <building@slocity.org> Cc: rjohnson@seabay-group.com; nbuchman@seabay-group.com; jeff jeff@thiessenmetalworks.com>; llundin@seabay-group.com; Oetzell, Walter <woetzell@slocity.org> Subject: Fwd: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see the attached "SIGNED" Sign permit application. Let me know if you need any additional information from me. Thank you. Forwarded message from "Oetzell, Walter" <woetzell@slocity.org> ----- Date: Wed, 24 Mar 2021 19:40:46 +0000 From: "Oetzell, Walter" <woetzell@slocity.org> Subject: RE: Permit Apllication and Drawings for SLO NHC Sign Permit To: Evan Royer <evan@thiessendesign.com> Hello Mr. Royer, I was asked to follow up with you about the signage for the NHC business at 2640 Broad. I retrieved your message from the Planning Division's email inbox, and found the signage plan and Supplemental Information Worksheet. As the plans depicted more than one wall sign, and a wall sign on a building face lacking a public entry, I needed to confer with my supervisor as to whether the wall signs could all be permitted. Because of the limited visibility for the north-facing wall sign oriented toward south-bound traffic and pedestrians on broad) and the presence of the entry to an accessible ramp leading to a building entry, we found that it was permissible to allow both wall signs, in the proposed locations. Attached to this message please find a "signed" Supplemental Information Worksheet to accompany the Sign Permit application you make to our Building & Safety Division. Feel free to contact me if I can be of further assistance. Walter Oetzell Assistant Planner 805) 781-7593 Original Message----- From: Evan Royer <evan@thiessendesign.com> Sent: Monday, March 8, 2021 9:16 AM To: Planning <planning@slocity.org> Cc: jeff <jeff@thiessendesign.com>; rjohnson@seabay-group.com; nbuchman@seabay-group.com Subject: Permit Apllication and Drawings for SLO NHC Sign Permit This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Please see attached Sign Permit Supplemental Information Worksheet with associated plans a specifications for the exterior signage at SLO Natural Healing Center 2640 Broad St. Let me know if you need any additional information from me. Thank you. Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com End forwarded message ----- Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com Best Regards, Evan Royer Thiessen Design USAPh/fx: 805/547-1947 www.thiessendesign.com From:Nichols, Vanessa To:SeaBay - Armando Martinez; Isela Santillanez - SeaBay Cc:Craig R. Smith AIA - CRSA Architecture; Dana Lee Subject:RE: Permit Fees - NHC Date:Friday, July 10, 2020 8:36:48 AM Attachments:image001.png Good Morning Armando, I am following up on the tenant improvement permit issuance for the Natural Healing Center. I need to inform you that there is an issued interior demo permit for this project that will need to be finaled before we will be able to issue the permit for the tenant improvement. This is due to this interior demo permit being connect to a code enforcement case. We are ready to issue the tenant improvement permit, but to do so will need for the interior demo permit to be finaled and permit fees for the tenant improvement paid. Let me know if you have any questions or if I can be of any further assistance. Have a good Friday. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: Nichols, Vanessa Sent: Tuesday, July 7, 2020 10:13 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lsanlillanez@seabay-group.com Subject: Permit Fees - NHC Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Isela Santillanez - SeaBay; Craig R. Smith AIA - CRSA Architecture; Dana Lee Subject:Re: Permit Fees - NHC Date:Friday, July 10, 2020 10:18:28 AM Attachments:image001.png Thank you Vanessa, we'll get that taken care of. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 8:36 AM Nichols, Vanessa <vnichols@slocity.org> wrote: Good Morning Armando, I am following up on the tenant improvement permit issuance for the Natural Healing Center. I need to inform you that there is an issued interior demo permit for this project that will need to be finaled before we will be able to issue the permit for the tenant improvement. This is due to this interior demo permit being connect to a code enforcement case. We are ready to issue the tenant improvement permit, but to do so will need for the interior demo permit to be finaled and permit fees for the tenant improvement paid. Let me know if you have any questions or if I can be of any further assistance. Have a good Friday. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: Nichols, Vanessa Sent: Tuesday, July 7, 2020 10:13 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lsanlillanez@seabay- group.com Subject: Permit Fees - NHC Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:Nichols, Vanessa To:SeaBay - Armando Martinez Cc:Isela Santillanez - SeaBay; Craig R. Smith AIA - CRSA Architecture; Dana Lee; Maggio, Rodger Subject:RE: Permit Fees - NHC Date:Friday, July 10, 2020 2:23:34 PM Attachments:image001.png Permit Fees - 2640 Broad St.pdf Hi, I just spoke with Rodger Maggio. He is not going to require the demo permit be finaled before we issue the tenant improvement. However, we need to get this tenant improvement permit issued as soon as possible. I have attached the permit fee that were previously sent to this email. This can be paid by calling into the office to make a credit card payment over the phone or by mailing in a check. Permit cannot be issued until fees are paid. Let me know how you would like to take care of the fees. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, July 10, 2020 10:18 AM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Dana Lee <dana@craigrsmithaia.com> Subject: Re: Permit Fees - NHC Thank you Vanessa, we'll get that taken care of. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 8:36 AM Nichols, Vanessa <vnichols@slocity.org> wrote: Good Morning Armando, I am following up on the tenant improvement permit issuance for the Natural Healing Center. I need to inform you that there is an issued interior demo permit for this project that will need to be finaled before we will be able to issue the permit for the tenant improvement. This is due to this interior demo permit being connect to a code enforcement case. We are ready to issue the tenant improvement permit, but to do so will need for the interior demo permit to be finaled and permit fees for the tenant improvement paid. Let me know if you have any questions or if I can be of any further assistance. Have a good Friday. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: Nichols, Vanessa Sent: Tuesday, July 7, 2020 10:13 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lsanlillanez@seabay-group.com Subject: Permit Fees - NHC Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:SeaBay - Armando Martinez To:Nichols, Vanessa Cc:Isela Santillanez - SeaBay; Craig R. Smith AIA - CRSA Architecture; Dana Lee; Maggio, Rodger Subject:Re: Permit Fees - NHC Date:Friday, July 10, 2020 2:49:40 PM Attachments:image001.png Vanessa, I just got off the phone with NHC's controller and he confirmed they just paid the fee over the phone. Can you confirm and if so email us the permit or how can we pick it up if its ready to be issued? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 2:23 PM Nichols, Vanessa <vnichols@slocity.org> wrote: Hi, I just spoke with Rodger Maggio. He is not going to require the demo permit be finaled before we issue the tenant improvement. However, we need to get this tenant improvement permit issued as soon as possible. I have attached the permit fee that were previously sent to this email. This can be paid by calling into the office to make a credit card payment over the phone or by mailing in a check. Permit cannot be issued until fees are paid. Let me know how you would like to take care of the fees. Thank you Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, July 10, 2020 10:18 AM To: Nichols, Vanessa <vnichols@slocity.org> Cc: Isela Santillanez - SeaBay <isantillanez@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Dana Lee <dana@craigrsmithaia.com> Subject: Re: Permit Fees - NHC Thank you Vanessa, we'll get that taken care of. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Jul 10, 2020 at 8:36 AM Nichols, Vanessa <vnichols@slocity.org> wrote: Good Morning Armando, I am following up on the tenant improvement permit issuance for the Natural Healing Center. I need to inform you that there is an issued interior demo permit for this project that will need to be finaled before we will be able to issue the permit for the tenant improvement. This is due to this interior demo permit being connect to a code enforcement case. We are ready to issue the tenant improvement permit, but to do so will need for the interior demo permit to be finaled and permit fees for the tenant improvement paid. Let me know if you have any questions or if I can be of any further assistance. Have a good Friday. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: Nichols, Vanessa Sent: Tuesday, July 7, 2020 10:13 AM To: SeaBay - Armando Martinez <amartinez@seabay-group.com>; lsanlillanez@seabay- group.com Subject: Permit Fees - NHC Good Morning, Attached you will find the remaining permit fees owed for the tenant improvement for Natural Healing Center. These can be paid by mailing in a check to the address below yo my attention or by calling in and us processing a credit card payment over the phone. Let me know how you would like to handle the payment. Let me know if you have any questions. Thank you. Vanessa Nichols Permit Services Coordinator Community Development 919 Palm Street, San Luis Obispo, CA 93401-3218 E vnichols@slocity.org T 805.781.7588 slocity.org From: "Nichols, Vanessa" <vnichols@slocity.org> Sent: Tuesday, July 7, 2020 10:08 AM To: Nichols, Vanessa <vnichols@slocity.org> Subject: Attached Image From:Schwartz, Luke To:J.D. Boitano Cc:Nate Buchman-SeaBay; lucas lundin - SeaBay Subject:RE: Street Light - 2640 Broad Street Date:Tuesday, November 3, 2020 10:37:00 AM Yes, that cut-sheet is actually the latest spec we’ve been giving contractors since they recently discontinued our previous standard. Good to go. Luke Schwartz Transportation Manager Public Works Transportation Planning/Engineering 919 Palm Street, San Luis Obispo, CA 93401-3218 E LSchwartz@slocity.org T 805.781.7190 slocity.org From: J.D. Boitano <jd@primeelectric.us> Sent: Tuesday, November 3, 2020 10:22 AM To: Schwartz, Luke <LSchwart@slocity.org> Cc: Nate Buchman-SeaBay <nbuchman@seabay-group.com>; lucas lundin - SeaBay llundin@seabay-group.com> Subject: Street Light - 2640 Broad Street Luke, Good morning. I reached out to my supplier to get a quote on the City specified street light and the manufacture has said the fixture is discontinued. They responded with the attached cut sheet. Please advise how we would proceed with approval. Thank you. J.D. Boitano Prime Electrical Service jd@primeelectric.us Office 925) 240-9233 Fax 866) 780-3589 Cell 925) 408-7701 From:Sadowski, Mark To:SeaBay - Armando Martinez Cc:Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Bob Bullen; Codron, Michael; Bailey, Georgina Subject:RE: Urgent - PG&E Contract for NHC - Time Extension Request Date:Monday, October 4, 2021 1:22:09 PM Attachments:image001.png image002.png image003.png image004.png Good afternoon Armando, I don’t see any concern with utilizing the generator to test things out. We obviously won’t be able to grant final approval with the use of a generator though. Let me know if there’s anything else we can do to help with strategies. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 4, 2021 10:06 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com>; Codron, Michael mcodron@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: Urgent - PG&E Contract for NHC - Time Extension Request Good morning Mrak, I left you a VM seeking a moment of your time to discuss the potential use of a generator on site to get us through commissioning and final inspections until PG&E completes their work on 10/19. I wanted to discuss with you the plan of attack and to see if that will work for you and the city inspector. My mobile is on me at all times. I will reach back out later this afternoon in hopes of catching you for a conversation. Thank you for your time and consideration Mark. As stated before the PG&E date, while improved, does not give us enough time to commission the building and call in for finals to be completed by 10/22. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 4:26 PM Sadowski, Mark <msadowsk@slocity.org> wrote: Good afternoon Armando, Thank you for reaching out and keeping us in the loop. To help in coming up with a game plan, will the existing service adequately power the new tenant space? Trying to see if we could suggest a temp c of o while the permanent power issue is resolved. If the new service is needed to operate the facility, I will reach out to our management team to see what other alternatives may be available in terms of accommodating the requested schedule adjustment. Please let me know how I can help. Thank you Armando, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 4:07 PM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC - Time Extension Request This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good evening Mr. Sadowski & Mr. Maggio, I am reaching out of concern for my project due to information provided by PG&E today on our scheduled installation time window for PG&E work. The utility cannot get to my site until 11/1 to 11/3 at the earliest. PG&E's email schedule confirmation is below for your quick reference. My client's (NHC) license is predicated on a 10/22 TCO or CofO date. We cannot commission the building until PG&E provides us permanent power. I am seeking relief on the 10/22 date to be extended to 12/1. Right now we anticipated project completion by 10/14 but without permanent power commissioning cannot occur. Thank you for your time and consideration. Please give me a call if you have any questions or concerns. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: McDonald, Justin <JKMO@pge.com> Date: Mon, Sep 13, 2021 at 12:42 PM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, McDonald, Justin JKMO@pge.com> Hi Armando, Scheduling has scheduled this project for first available date of 11/1-11/3. I’ve let them know that you need/want to be in by 10/14 and to notate the file if anything comes available to work this quicker. I’ll keep you updated if any changes are made. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 10:02 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** Thank you for that Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 9:36 AM McDonald, Justin <JKMO@pge.com> wrote: There is no route for expediting unless a hospital, school or entity of the such. Lets see what I get for a construction date and then I’ll ask the scheduler to work ahead if a spot comes available if it’s not good enough. I’ll keep you posted. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 9:33 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** If there is anything we can do to expedite our project, a fee to pay, anything please let me know. I need to have TCO by 10/14. Thank you for the consideration Justin. On Mon, Sep 13, 2021 at 9:26 AM McDonald, Justin <JKMO@pge.com> wrote: Armando, I’ve requested for this project to be scheduled. I’ll let you know once I have a construction date. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:32 AM To: McDonald, Justin <JKMO@pge.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** Hi Justin, Attached are the (2) signed contracts for PG&E#-3518093 project address 2640 Broad Street San Luis Obispo. I don't want to overstep my bounds here but since time is of the essence, I wanted to make sure you got confirmation that everything is signed and paid for on the owner side so when Deniel does green tag us we can discuss scheduling. I know it's not a PG&E concern but we are in dire need to be able to be open by 10/14 and obviously need permanent power to be able to commission the space. I am reaching out to start the dialogue on the possibility of exporting our project. It is not a big project but if there is anything we can do to get on the books next week or the following it will be a life saver. Thank you for your time and consideration Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: Jim Clancy <jim@nhcdispensaries.com> Date: Fri, Sep 10, 2021 at 11:16 AM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, Helios Dayspring helios@nhcdispensaries.com>, Nick Reed <nreed@r3bcorp.com> Armando, See attached from Garrett Otto, looks like they are signed to me. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:13 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com>; Helios Dayspring helios@nhcdispensaries.com>; Nick Reed <nreed@r3bcorp.com> Subject: Re: Urgent - PG&E Contract for NHC Can you please confirm they have the signed contacts? One for the building and one for the street light? If you can get some sort of confirmation that would be great. I can send that to the scheduling contact over at their office. Thanks for jumping on this Jim. On Fri, Sep 10, 2021 at 11:10 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, See attached confirmation of payment to PG&E. Are there any next steps NHC needs to take at this time? Please advise. Thank you, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:40 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Re: Urgent - PG&E Contract for NHC Check to PG&E or CRSA? I'm worried about PG&E, the contract with NHC and PG&E needs to be signed and paid before they will schedule us. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:38 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, I spoke with Craig yesterday that we are cutting the check today. We agreed to mail it but if someone wants to stop by to pick it up let me know. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:24 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Re: Urgent - PG&E Contract for NHC Jim, This payment needs to happen before they will put us on their schedule. Can you please take care of this today? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:22 AM Garrett Otto <gotto@ottoelectrical.com> wrote: I just forwarded you an email chain from April where Jim and I discussed the contact and payment. It appeared that the contract was already signed and just needed to be paid. Did that payment ever happen? Garrett Otto, PE Principal Electrical Engineer 805.459.4329 gotto@ottoelectrical.com www.ottoelectrical.com On Fri, Sep 10, 2021 at 9:07 AM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Garett, I just got off the phone with PG&E to check on the scheduling for our project. Justin McDonald mentioned that the owner had not signed or paid their contract. I asked who at NHC was the contact sent to last year and he mentioned the name of Nick Andre who quit last year at NHC. I tried to get Justin to change the email to Jim Clancy @ NHC but he said only you (Garrett) can change the contract info on PG&E side. Can you please get in touch with Justin today to let him know the contract can go to Jim Clancy? Justin McDonald - 805-290-9555 Jim Clancy - 724-544-0191 email: jim@nhcdispensaries.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Sadowski, Mark Cc:Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Bob Bullen; Codron, Michael; Bailey, Georgina Subject:Re: Urgent - PG&E Contract for NHC - Time Extension Request Date:Monday, October 4, 2021 10:07:01 AM Attachments:image001.png image002.png image003.png image004.png Good morning Mrak, I left you a VM seeking a moment of your time to discuss the potential use of a generator on site to get us through commissioning and final inspections until PG&E completes their work on 10/19. I wanted to discuss with you the plan of attack and to see if that will work for you and the city inspector. My mobile is on me at all times. I will reach back out later this afternoon in hopes of catching you for a conversation. Thank you for your time and consideration Mark. As stated before the PG&E date, while improved, does not give us enough time to commission the building and call in for finals to be completed by 10/22. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 4:26 PM Sadowski, Mark <msadowsk@slocity.org> wrote: Good afternoon Armando, Thank you for reaching out and keeping us in the loop. To help in coming up with a game plan, will the existing service adequately power the new tenant space? Trying to see if we could suggest a temp c of o while the permanent power issue is resolved. If the new service is needed to operate the facility, I will reach out to our management team to see what other alternatives may be available in terms of accommodating the requested schedule adjustment. Please let me know how I can help. Thank you Armando, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 4:07 PM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC - Time Extension Request This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good evening Mr. Sadowski & Mr. Maggio, I am reaching out of concern for my project due to information provided by PG&E today on our scheduled installation time window for PG&E work. The utility cannot get to my site until 11/1 to 11/3 at the earliest. PG&E's email schedule confirmation is below for your quick reference. My client's (NHC) license is predicated on a 10/22 TCO or CofO date. We cannot commission the building until PG&E provides us permanent power. I am seeking relief on the 10/22 date to be extended to 12/1. Right now we anticipated project completion by 10/14 but without permanent power commissioning cannot occur. Thank you for your time and consideration. Please give me a call if you have any questions or concerns. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: McDonald, Justin <JKMO@pge.com> Date: Mon, Sep 13, 2021 at 12:42 PM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, McDonald, Justin JKMO@pge.com> Hi Armando, Scheduling has scheduled this project for first available date of 11/1-11/3. I’ve let them know that you need/want to be in by 10/14 and to notate the file if anything comes available to work this quicker. I’ll keep you updated if any changes are made. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 10:02 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think before clickinglinksoropeningattachments.***** Thank you for that Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 9:36 AM McDonald, Justin <JKMO@pge.com> wrote: There is no route for expediting unless a hospital, school or entity of the such. Lets see what I get for a construction date and then I’ll ask the scheduler to work ahead if a spot comes available if it’s not good enough. I’ll keep you posted. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 9:33 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** If there is anything we can do to expedite our project, a fee to pay, anything please let me know. I need to have TCO by 10/14. Thank you for the consideration Justin. On Mon, Sep 13, 2021 at 9:26 AM McDonald, Justin <JKMO@pge.com> wrote: Armando, I’ve requested for this project to be scheduled. I’ll let you know once I have a construction date. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:32 AM To: McDonald, Justin <JKMO@pge.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** Hi Justin, Attached are the (2) signed contracts for PG&E#-3518093 project address 2640 Broad Street San Luis Obispo. I don't want to overstep my bounds here but since time is of the essence, I wanted to make sure you got confirmation that everything is signed and paid for on the owner side so when Deniel does green tag us we can discuss scheduling. I know it's not a PG&E concern but we are in dire need to be able to be open by 10/14 and obviously need permanent power to be able to commission the space. I am reaching out to start the dialogue on the possibility of exporting our project. It is not a big project but if there is anything we can do to get on the books next week or the following it will be a life saver. Thank you for your time and consideration Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: Jim Clancy <jim@nhcdispensaries.com> Date: Fri, Sep 10, 2021 at 11:16 AM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, Helios Dayspring <helios@nhcdispensaries.com>, Nick Reed <nreed@r3bcorp.com> Armando, See attached from Garrett Otto, looks like they are signed to me. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:13 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com>; Helios Dayspring <helios@nhcdispensaries.com>; Nick Reed <nreed@r3bcorp.com> Subject: Re: Urgent - PG&E Contract for NHC Can you please confirm they have the signed contacts? One for the building and one for the street light? If you can get some sort of confirmation that would be great. I can send that to the scheduling contact over at their office. Thanks for jumping on this Jim. On Fri, Sep 10, 2021 at 11:10 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, See attached confirmation of payment to PG&E. Are there any next steps NHC needs to take at this time? Please advise. Thank you, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:40 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay- group.com> Subject: Re: Urgent - PG&E Contract for NHC Check to PG&E or CRSA? I'm worried about PG&E, the contract with NHC and PG&E needs to be signed and paid before they will schedule us. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:38 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, I spoke with Craig yesterday that we are cutting the check today. We agreed to mail it but if someone wants to stop by to pick it up let me know. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:24 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay- group.com> Subject: Re: Urgent - PG&E Contract for NHC Jim, This payment needs to happen before they will put us on their schedule. Can you please take care of this today? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:22 AM Garrett Otto <gotto@ottoelectrical.com> wrote: I just forwarded you an email chain from April where Jim and I discussed the contact and payment. It appeared that the contract was already signed and just needed to be paid. Did that payment ever happen? Garrett Otto, PE Principal Electrical Engineer 805.459.4329 gotto@ottoelectrical.com www.ottoelectrical.com On Fri, Sep 10, 2021 at 9:07 AM SeaBay - Armando Martinez amartinez@seabay-group.com> wrote: Garett, I just got off the phone with PG&E to check on the scheduling for our project. Justin McDonald mentioned that the owner had not signed or paid their contract. I asked who at NHC was the contact sent to last year and he mentioned the name of Nick Andre who quit last year at NHC. I tried to get Justin to change the email to Jim Clancy @ NHC but he said only you Garrett) can change the contract info on PG&E side. Can you please get in touch with Justin today to let him know the contract can go to Jim Clancy? Justin McDonald - 805-290-9555 Jim Clancy - 724-544-0191 email: jim@nhcdispensaries.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:SeaBay - Armando Martinez To:Sadowski, Mark Cc:Maggio, Rodger; Craig R. Smith AIA - CRSA Architecture; Bob Bullen; Codron, Michael; Bailey, Georgina Subject:Re: Urgent - PG&E Contract for NHC - Time Extension Request Date:Wednesday, October 6, 2021 10:05:03 AM Attachments:image001.png image002.png image003.png image004.png Good morning Mark, I understand we cannot get the final sign off on temp power but can we get preliminary sign offs by using the generator so when we do call in for our final we have less items to check off. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Oct 4, 2021 at 1:22 PM Sadowski, Mark <msadowsk@slocity.org> wrote: Good afternoon Armando, I don’t see any concern with utilizing the generator to test things out. We obviously won’t be able to grant final approval with the use of a generator though. Let me know if there’s anything else we can do to help with strategies. Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, October 4, 2021 10:06 AM To: Sadowski, Mark <msadowsk@slocity.org> Cc: Maggio, Rodger <rmaggio@slocity.org>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com>; Codron, Michael mcodron@slocity.org>; Bailey, Georgina <gbailey@slocity.org> Subject: Re: Urgent - PG&E Contract for NHC - Time Extension Request Good morning Mrak, I left you a VM seeking a moment of your time to discuss the potential use of a generator on site to get us through commissioning and final inspections until PG&E completes their work on 10/19. I wanted to discuss with you the plan of attack and to see if that will work for you and the city inspector. My mobile is on me at all times. I will reach back out later this afternoon in hopes of catching you for a conversation. Thank you for your time and consideration Mark. As stated before the PG&E date, while improved, does not give us enough time to commission the building and call in for finals to be completed by 10/22. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 4:26 PM Sadowski, Mark <msadowsk@slocity.org> wrote: Good afternoon Armando, Thank you for reaching out and keeping us in the loop. To help in coming up with a game plan, will the existing service adequately power the new tenant space? Trying to see if we could suggest a temp c of o while the permanent power issue is resolved. If the new service is needed to operate the facility, I will reach out to our management team to see what other alternatives may be available in terms of accommodating the requested schedule adjustment. Please let me know how I can help. Thank you Armando, Mark Sadowski Building & Safety Supervisor Community Development Building and Safety 919 Palm Street, San Luis Obispo, CA 93401-3218 E msadowski@slocity.org T 805.781.7184 slocity.org Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 4:07 PM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC - Time Extension Request This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good evening Mr. Sadowski & Mr. Maggio, I am reaching out of concern for my project due to information provided by PG&E today on our scheduled installation time window for PG&E work. The utility cannot get to my site until 11/1 to 11/3 at the earliest. PG&E's email schedule confirmation is below for your quick reference. My client's (NHC) license is predicated on a 10/22 TCO or CofO date. We cannot commission the building until PG&E provides us permanent power. I am seeking relief on the 10/22 date to be extended to 12/1. Right now we anticipated project completion by 10/14 but without permanent power commissioning cannot occur. Thank you for your time and consideration. Please give me a call if you have any questions or concerns. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: McDonald, Justin <JKMO@pge.com> Date: Mon, Sep 13, 2021 at 12:42 PM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, McDonald, Justin <JKMO@pge.com> Hi Armando, Scheduling has scheduled this project for first available date of 11/1-11/3. I’ve let them know that you need/want to be in by 10/14 and to notate the file if anything comes available to work this quicker. I’ll keep you updated if any changes are made. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 10:02 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** Thank you for that Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 9:36 AM McDonald, Justin <JKMO@pge.com> wrote: There is no route for expediting unless a hospital, school or entity of the such. Lets see what I get for a construction date and then I’ll ask the scheduler to work ahead if a spot comes available if it’s not good enough. I’ll keep you posted. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 9:33 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** If there is anything we can do to expedite our project, a fee to pay, anything please let me know. I need to have TCO by 10/14. Thank you for the consideration Justin. On Mon, Sep 13, 2021 at 9:26 AM McDonald, Justin <JKMO@pge.com> wrote: Armando, I’ve requested for this project to be scheduled. I’ll let you know once I have a construction date. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:32 AM To: McDonald, Justin <JKMO@pge.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay- group.com> Subject: Fwd: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Thinkbeforeclickinglinksoropeningattachments.***** Hi Justin, Attached are the (2) signed contracts for PG&E#-3518093 project address 2640 Broad Street San Luis Obispo. I don't want to overstep my bounds here but since time is of the essence, I wanted to make sure you got confirmation that everything is signed and paid for on the owner side so when Deniel does green tag us we can discuss scheduling. I know it's not a PG&E concern but we are in dire need to be able to be open by 10/14 and obviously need permanent power to be able to commission the space. I am reaching out to start the dialogue on the possibility of exporting our project. It is not a big project but if there is anything we can do to get on the books next week or the following it will be a life saver. Thank you for your time and consideration Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: Jim Clancy <jim@nhcdispensaries.com> Date: Fri, Sep 10, 2021 at 11:16 AM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, Helios Dayspring <helios@nhcdispensaries.com>, Nick Reed <nreed@r3bcorp.com> Armando, See attached from Garrett Otto, looks like they are signed to me. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:13 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com>; Helios Dayspring <helios@nhcdispensaries.com>; Nick Reed nreed@r3bcorp.com> Subject: Re: Urgent - PG&E Contract for NHC Can you please confirm they have the signed contacts? One for the building and one for the street light? If you can get some sort of confirmation that would be great. I can send that to the scheduling contact over at their office. Thanks for jumping on this Jim. On Fri, Sep 10, 2021 at 11:10 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, See attached confirmation of payment to PG&E. Are there any next steps NHC needs to take at this time? Please advise. Thank you, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:40 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay- group.com> Subject: Re: Urgent - PG&E Contract for NHC Check to PG&E or CRSA? I'm worried about PG&E, the contract with NHC and PG&E needs to be signed and paid before they will schedule us. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:38 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, I spoke with Craig yesterday that we are cutting the check today. We agreed to mail it but if someone wants to stop by to pick it up let me know. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:24 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay- group.com> Subject: Re: Urgent - PG&E Contract for NHC Jim, This payment needs to happen before they will put us on their schedule. Can you please take care of this today? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:22 AM Garrett Otto <gotto@ottoelectrical.com> wrote: I just forwarded you an email chain from April where Jim and I discussed the contact and payment. It appeared that the contract was already signed and just needed to be paid. Did that payment ever happen? Garrett Otto, PE Principal Electrical Engineer 805.459.4329 gotto@ottoelectrical.com www.ottoelectrical.com On Fri, Sep 10, 2021 at 9:07 AM SeaBay - Armando Martinez amartinez@seabay-group.com> wrote: Garett, I just got off the phone with PG&E to check on the scheduling for our project. Justin McDonald mentioned that the owner had not signed or paid their contract. I asked who at NHC was the contact sent to last year and he mentioned the name of Nick Andre who quit last year at NHC. I tried to get Justin to change the email to Jim Clancy @ NHC but he said only you Garrett) can change the contract info on PG&E side. Can you please get in touch with Justin today to let him know the contract can go to Jim Clancy? Justin McDonald - 805-290-9555 Jim Clancy - 724-544-0191 email: jim@nhcdispensaries.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Stay connected with the City by signing up for e-notifications From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 4:07 PM To: Sadowski, Mark <msadowsk@slocity.org>; Maggio, Rodger <rmaggio@slocity.org> Cc: Craig R. Smith AIA - CRSA Architecture <craig@craigrsmithaia.com>; Bob Bullen bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC - Time Extension Request This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Good evening Mr. Sadowski & Mr. Maggio, I am reaching out of concern for my project due to information provided by PG&E today on our scheduled installation time window for PG&E work. The utility cannot get to my site until 11/1 to 11/3 at the earliest. PG&E's email schedule confirmation is below for your quick reference. My client's (NHC) license is predicated on a 10/22 TCO or CofO date. We cannot commission the building until PG&E provides us permanent power. I am seeking relief on the 10/22 date to be extended to 12/1. Right now we anticipated project completion by 10/14 but without permanent power commissioning cannot occur. Thank you for your time and consideration. Please give me a call if you have any questions or concerns. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: McDonald, Justin <JKMO@pge.com> Date: Mon, Sep 13, 2021 at 12:42 PM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, McDonald, Justin JKMO@pge.com> Hi Armando, Scheduling has scheduled this project for first available date of 11/1-11/3. I’ve let them know that you need/want to be in by 10/14 and to notate the file if anything comes available to work this quicker. I’ll keep you updated if any changes are made. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 10:02 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think before clickinglinksoropeningattachments.***** Thank you for that Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Mon, Sep 13, 2021 at 9:36 AM McDonald, Justin <JKMO@pge.com> wrote: There is no route for expediting unless a hospital, school or entity of the such. Lets see what I get for a construction date and then I’ll ask the scheduler to work ahead if a spot comes available if it’s not good enough. I’ll keep you posted. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Monday, September 13, 2021 9:33 AM To: McDonald, Justin <JKMO@pge.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com> Subject: Re: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** If there is anything we can do to expedite our project, a fee to pay, anything please let me know. I need to have TCO by 10/14. Thank you for the consideration Justin. On Mon, Sep 13, 2021 at 9:26 AM McDonald, Justin <JKMO@pge.com> wrote: Armando, I’ve requested for this project to be scheduled. I’ll let you know once I have a construction date. Justin McDonald | Senior New Business Rep. | Service Planning – Los Padres Division Pacific Gas and Electric Company ® Office: 805-546-1271 | Email: Justin.McDonald@pge.com Crtl Click to access the Greenbook Manual Online Crtl Click to Submit an Application Crtl Click to access Customer Connections Online Crtl Click to access the Tariffs and Rules Our most important responsibility is the health and safety of our communities. PG&E is committed to continue addressing customer service needs and does not expect any disruption in gas or electric service during the COVID-19 pandemic. Please visit pge.com to find out more information about what PG&E is doing to help keep our customers and employees safe. From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:32 AM To: McDonald, Justin <JKMO@pge.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Fwd: Urgent - PG&E Contract for NHC CAUTION: This email was sent from an EXTERNAL source. Think beforeclickinglinksoropeningattachments.***** Hi Justin, Attached are the (2) signed contracts for PG&E#-3518093 project address 2640 Broad Street San Luis Obispo. I don't want to overstep my bounds here but since time is of the essence, I wanted to make sure you got confirmation that everything is signed and paid for on the owner side so when Deniel does green tag us we can discuss scheduling. I know it's not a PG&E concern but we are in dire need to be able to be open by 10/14 and obviously need permanent power to be able to commission the space. I am reaching out to start the dialogue on the possibility of exporting our project. It is not a big project but if there is anything we can do to get on the books next week or the following it will be a life saver. Thank you for your time and consideration Justin. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Forwarded message --------- From: Jim Clancy <jim@nhcdispensaries.com> Date: Fri, Sep 10, 2021 at 11:16 AM Subject: RE: Urgent - PG&E Contract for NHC To: SeaBay - Armando Martinez <amartinez@seabay-group.com> Cc: Bob Bullen <bbullen@seabay-group.com>, Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>, Garrett Otto <gotto@ottoelectrical.com>, Helios Dayspring helios@nhcdispensaries.com>, Nick Reed <nreed@r3bcorp.com> Armando, See attached from Garrett Otto, looks like they are signed to me. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 11:13 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Bob Bullen <bbullen@seabay-group.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Garrett Otto <gotto@ottoelectrical.com>; Helios Dayspring helios@nhcdispensaries.com>; Nick Reed <nreed@r3bcorp.com> Subject: Re: Urgent - PG&E Contract for NHC Can you please confirm they have the signed contacts? One for the building and one for the street light? If you can get some sort of confirmation that would be great. I can send that to the scheduling contact over at their office. Thanks for jumping on this Jim. On Fri, Sep 10, 2021 at 11:10 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, See attached confirmation of payment to PG&E. Are there any next steps NHC needs to take at this time? Please advise. Thank you, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:40 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Re: Urgent - PG&E Contract for NHC Check to PG&E or CRSA? I'm worried about PG&E, the contract with NHC and PG&E needs to be signed and paid before they will schedule us. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:38 AM Jim Clancy <jim@nhcdispensaries.com> wrote: Team, I spoke with Craig yesterday that we are cutting the check today. We agreed to mail it but if someone wants to stop by to pick it up let me know. Regards, Jim Clancy Chief Financial Officer Natural Healing Center, LLC 998 Huston Street Grover Beach, CA 93433 Cell: 724-544-0191 From: SeaBay - Armando Martinez <amartinez@seabay-group.com> Sent: Friday, September 10, 2021 9:24 AM To: Jim Clancy <jim@nhcdispensaries.com> Cc: Garrett Otto <gotto@ottoelectrical.com>; Craig R. Smith AIA - CRSA Architecture craig@craigrsmithaia.com>; Bob Bullen <bbullen@seabay-group.com> Subject: Re: Urgent - PG&E Contract for NHC Jim, This payment needs to happen before they will put us on their schedule. Can you please take care of this today? Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. On Fri, Sep 10, 2021 at 9:22 AM Garrett Otto <gotto@ottoelectrical.com> wrote: I just forwarded you an email chain from April where Jim and I discussed the contact and payment. It appeared that the contract was already signed and just needed to be paid. Did that payment ever happen? Garrett Otto, PE Principal Electrical Engineer 805.459.4329 gotto@ottoelectrical.com www.ottoelectrical.com On Fri, Sep 10, 2021 at 9:07 AM SeaBay - Armando Martinez <amartinez@seabay- group.com> wrote: Garett, I just got off the phone with PG&E to check on the scheduling for our project. Justin McDonald mentioned that the owner had not signed or paid their contract. I asked who at NHC was the contact sent to last year and he mentioned the name of Nick Andre who quit last year at NHC. I tried to get Justin to change the email to Jim Clancy @ NHC but he said only you (Garrett) can change the contract info on PG&E side. Can you please get in touch with Justin today to let him know the contract can go to Jim Clancy? Justin McDonald - 805-290-9555 Jim Clancy - 724-544-0191 email: jim@nhcdispensaries.com Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e- mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. Thanks, Armando Martinez | COO SeaBay Building Group, LLC 23575 Cabot Boulevard, Suite 201 Hayward CA 94545 Cell: 415-515-1375 www.seabay-group.com Together. We Build. Licenses: WA #SEABABG843CB CA #1005237 AZ #301717 KB-1 Dual OR #211637 AK #124048 NV #0083837 TX #0802994707 This e-mail may contain information that is privileged, confidential, or otherwise exempt from disclosure under applicable law. If you are not the addressee or it appears from the context or otherwise that you have received this e-mail in error, please advise me immediately by reply e-mail, keep the contents confidential, and immediately delete the message and any attachments from your system. From:J.D. Boitano To:Schwartz, Luke Cc:Nate Buchman-SeaBay; lucas lundin - SeaBay Subject:Street Light - 2640 Broad Street Date:Tuesday, November 3, 2020 10:22:03 AM Attachments:XSP Street_Area Spec Sheet - Medium (1).pdf Luke, Good morning. I reached out to my supplier to get a quote on the City specified street light and the manufacture has said the fixture is discontinued. They responded with the attached cut sheet. Please advise how we would proceed with approval. Thank you. J.D. Boitano Prime Electrical Service jd@primeelectric.us Office (925) 240-9233 Fax (866) 780-3589 Cell (925) 408-7701