Loading...
HomeMy WebLinkAboutItem 5g. Authorization to Advertise Verde, Luneta, Ramona, Broad Sewer Pipe Replacement Item 5g Department: Public Works Cost Center: 6102 For Agenda of: 3/15/2022 Placement: Consent Estimated Time: N/A FROM: Matt Horn, Public Works Director Prepared By: Hai Nguyen, Engineer III SUBJECT: AUTHORIZATION TO ADVERTISE VERDE/LUNETA/RAMONA/BROAD SEWER PIPE REPLACEMENT, SPECIFICATION NO. 1000091 RECOMMENDATION 1. Approve the project plans and specifications for Verde/Luneta/Ramona/Broad Sewer Pipe Replacement, Specification Number 1000091; and 2. Authorize staff to advertise for bids; and 3. Authorize the City Manager, or their designee to award the Construction Contract pursuant to Section 3.24.190 of the Municipal Code for the bid total, if the lowest responsible bid is within the publicly disclosed funding amount of $1,156,000; and 4. Authorize the City Engineer to approve Contract Change Orders up to the available project budget. DISCUSSION Background Replacement and rehabilitation of wastewater collection (sewer) pipes is part of an ongoing program to maintain aging and deteriorating infrastructure. This program has several objectives: 1) ensure reliable removal of wastewater; 2) reduce the need for emergency repairs; 3) reduce the need for preventive maintenance; and 4) ensure uninterrupted wastewater flow without health or environmental hazard from wastewater leakage. This project will accomplish these objectives for part of the City’s wastewater collection system. The Project The Verde/Luneta/Ramona/Broad Sewer Pipe Replacement Project (Project) proposes replacement of approximately 2,347 lineal feet of sewer main on Verde, Luneta, Ramona and Broad (Attachment C). The existing sewer pipes planned for replacement work have been video inspected and confirmed to have reached the end of their useful life. Page 269 of 984 Item 5g This Project also includes an additive alternate bid item. This Project’s additive alternate bid items include four lateral connections and abandonment of 500 lineal feet of sewer main. With the additive alternate bid items, the contractors bidding the project provide the cost of the additive items of work and staff will make the determination whether to award this portion of the work if the cost is within available budget. If it is not within the available budget to award the additive alternative, the work to abandon 500 lineal feet o f sewer main will have to be deferred and the existing sewer main will have to remain active. Previous Council or Advisory Body Action This Project was identified in the 2019-21 and 2021-23 Financial Plans that were approved by Council. Policy Context The City Council approved the Wastewater Collection System Infrastructure Renewal Strategy in January 2016. The plan identified a strategy for prioritizing pipeline replacement in the wastewater collection system to serve existing customers and future development in the City. Additionally, consistent with the October 2018 Purchasing Policy Update to the July 2015 Financial Management Manual, Council approval must be obtained before proceeding with this project, as approval is required for Public Projects th at cost over $175,000. Public Engagement Public engagement was conducted during the initial identification of this Project to be included in the 2019-21 and 2021-23 Financial Plans. CONCURRENCE This project has the concurrence of the Utilities Department. ENVIRONMENTAL REVIEW A portion of the Project is located within a potentially archeologically sensitive zone of influence (within 200 feet of Old Garden Creek). Mitigation measures approved through Mitigated Negative Declaration ER10-07 are included in the Project’s specifications and will be followed by the City’s contractor, as applicable, consistent with the requirements of the California Environmental Quality Act (CEQA). Page 270 of 984 Item 5g FISCAL IMPACT Budgeted: Yes Budget Year: 2019-21 & 2021-23 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund $ $ $ $ State Federal Fees Sewer Fund: $1,372,434 $1,371,500 $934 N/A Total $1,372,434 $1,371,500 $934 N/A 602 Sewer Fund Base Bid Estimate $1,040,000 Add Alt A Estimate $116,000 Contingencies $200,000 Total for Construction $1,356,000 Materials Testing $5,000 Archaeological Monintoring $10,000 Printing $500 Total Project Cost $1,371,500 Current Project Balance:$1,372,434 Remaining Balance:$934 Verde/Luneta/Ramona/Broad Sewer Replacement Specification No. 1000091 Project Account (1000091) The project is structured with a Base Bid and one Additive Alternative to maximize the scope of work within available funding. The strategy is to award the contract with the Base Bid and Additive Alternative A as funding will allow, up to the Publicly Disc losed Funding amount of $1,156,000 in compliance with Public Contract Code Section 20103.8(c). Sewerline improvements identified in this project are described in the 2019-21 and 2021- 23 Financial Plan, Capital Improvement Program (page 388). Funding for this project is available in the Project Account (1000091) which has a current balance $1,372,434. Page 271 of 984 Item 5g ALTERNATIVES Deny or defer approval to advertise. The City Council may choose to deny or defer the approval to advertise this project. Staff does not recommend this option, as the sewer mains included in this project continue to deteriorate and pose a high risk of catastrophic failure, requiring expensive repairs. ATTACHMENTS A - Project Plans (1000091) B - Project Specifications (1000091) C - Project Vicinity Map (1000091) Page 272 of 984 Project Locationsindex to planssheet no. descriptionsan luis obispo county, californiaSPECIFICATION NO.DATE SHEET1000091FILE NO./LOCATION1234567COVER SHEETLUNETA DRIVEVERDE DRIVEVERDE DRIVE & RAMONA DRIVERAMONA DRIVERAMONA DRIVEBROAD STREET7of1VERDE/LUNETA/RAMONA/BROADSEWER REPLACEMENTFEBRUARY 2022SEWER MANHOLE FLOW DIAGRAM SCHEMATIC.TROUGH VARIES WITH PIPE LAYOUT. ARROWSINDICATE FLOW DIRECTION.DEAD OR UNUSED SEWER LATERAL, VERIFYCONDITION. ABANDON IN PLACE IF DEAD,UNUSED, OR CAPPED.CONNECT SEWER LATERALS AND MARK TOP OFCURB WITH THE LETTER "S" PER ENG. STD. 6810.CONNECT SEWER LATERALS AND MARK TOP OFCURB WITH THE LETTER "S" PER ENG. STD. 6810.(BID ALTERNATIVE A)(E) STORM DRAIN(E) SEWER(E) WATER(E) GAS(E) OIL(E) TELEPHONE(E) FIBER OPTICABANDONED SEWERABANDONED WATER(E) SURVEY MONUMENT - PROTECT IN PLACE(E) SURVEY MONUMENT - REPLACE IF DAMAGEDOR DESTROYED. SEE GENERAL NOTE 4.DSDSSSSSSDSDSSSSWWGGOOTTFOFOASASAWAW1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT"UNDERGROUND SERVICE ALERT U.S.A." TOLL FREE AT 1-800-227-2600 FORTY-EIGHT (48)HOURS PRIOR TO START OF CONSTRUCTION, FOR LOCATION OF POWER, TELEPHONE, OILAND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITEE SHALL ALSOCONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER,DRAINAGE OR UNDERGROUND FACILITIES.2. THE CONTRACTOR SHALL POSSESS A CLASS "A" OR "C-34" LICENSE AT THE TIME OF BIDOPENING.3. CONTRACTOR SHALL VERIFY DEPTH AND LOCATION OF ALL CROSSINGS PRIOR TO LAYINGPIPE SO THAT PIPE ALIGNMENT AND GRADE CAN BE ADJUSTED AS NEEDED.4. TIE OUT CENTERLINE MONUMENTS BEFORE WORK AND REPLACE IF DISTURBED INACCORDANCE WITH THE LAND SURVEYORS ACT, AND SECTION 5-1.36E, REPLACEMONUMENT AND WELL PER ENG. STD. 9020.5. THE CONTRACTOR MUST REPLACE ALL PAVEMENT STRIPES, MARKINGS, AND MARKERSDISTURBED DURING CONSTRUCTION. ALL PAVEMENT STRIPES AND MARKINGS WITHIN 5FEET OF THE DISTURBED AREA MUST BE REPLACED. ALL STRIPING IS PER STATESTANDARD PLANS AND PER PER ENGINEERING STANDARD SPECIFICATION 84-1.01A.6. SEWER MAIN WITH LESS THAN 1% SLOPE MUST BE INSTALLED WITH FLOAT ROCK ASBEDDING AND INITIAL BACKFILL. SEE ENG. STD. 6020, NOTE 10 FOR ADDITIONALREQUIREMENTS.7. CONNECT EXISTING VCP SEWER MAIN TO NEW MANHOLE WITH 3 FOOT PVC STUB ANDSTRONG BACK RC COUPLINGS8. CONNECT EXISTING HDPE SEWER MAIN TO NEW MANHOLE WITH 3 FOOT HDPE STUB ANDFUSED COUPLINGS OR BUTT FUSION.9. CONNECT EXISTING PVC SEWER MAIN TO NEW MANHOLE WITH 3 FOOT PVC STUB AND PVCCOUPLINGS.10. ALL PIPE LENGTHS ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYINGALL PIPE LENGTHS.11. APPROXIMATE LOCATION OF LATERALS ARE SHOWN ON PLANS. LOCATING LATERALS ISTHE RESPONSIBILITY OF THE CONTRACTOR AND ANY DAMAGE TO A LATERAL MUST BEREPAIRED IMMEDIATELY AND AT NO COST TO THE CITY.12. ALL NEW MANHOLE MUST BE COATED PER SECTION 77-3.03D OF THE PROJECT SPECIALPROVISIONS. DO NOT COAT EXISTING SSMH I06-48 AT RAMONA AND PALOMAR.13. ALL WORK ON BROAD AND RAMONA (SHEET 6 & 7) MUST BE COMPLETED AS THE FIRSTPRIORITY OF WORK. ROCK EXCAVATION IS EXPECTED ON THESE STREETS (REFER TOSECTION 19-1.03E AND GEOTECHNICAL REPORTS FOR MORE INFORMATION).14. NOT ALL IMPROVEMENTS WITHIN PRIVATE PROPERTIES ARE SHOWN. UPON COMPLETIONOF WORK WITHIN PRIVATE PROPERTIES, THE CONTRACTOR MUST RESTORE PRIVATEPROPERTY IMPROVEMENTS TO THE SAME CONDITION BEFORE THE START OFCONSTRUCTION.Reference Documents:City Standard Specifications - 2020 EditionCity Engineering Standards - 2020 EditionAPPROVED BYBrian A. Nelson, City Engineer R.C.E. C79870 Approved DateNo. C 79870BRIAN A. NELSO N CIVILSIZE & INVSIZEELEV OUTSSSSPage 273 of 984 28529029530030531031532032533028529029530030531031532032533066+50 66+75 67+00 67+25 67+50 67+75 68+00 68+25 68+50 68+75 69+00 69+25 69+50 69+75 70+00 70+25STA. 66+57.05(N) SSCO I07-8RIM = 319.06'8" OUT 315.00' (E)(N) 347' - 8" HDPE SEWER, S = 7.83%BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWERSTA. 70+06.04(N) SSMH I07-7RIM = 293.58'8" IN 287.80' (W)6" IN 287.80' (S)8" OUT 287.70' (N)(E) GRADEREMOVE (E) SSMH I07-9(E) 2" GAS(E) 6" AC WATERWWWWWWWWWWGGGGGGGGGGWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SSSSSSSSSSG G G GGGG G G G G G G G G G GGWWWW WW W (E) 6" AC WATER(E) 6" AC WATER(E) 8" CI WATER(E) 8" AC WATER(E) 8" CI WATER(E) 2" GAS(E) 2" GAS(E) 2" GAS+6700+6800+6900+7000STA 66+57.05(N) SSCO I07-8RIM = 319.06'STA 70+06.04(N) SSMH I07-7RIM = 293.58'(N) 174' - 6" HDPE SEWER(N) 113' - 8" HDPE SEWERLUNETA DR.8.6'15.4'38'8'6'REMOVE AND REPLACESSCO I07-8PER ENG. STD. 67106" OUT 315.00REMOVE AND REPLACESSMH I07-7PER ENG. STD. 66108" IN 287.808" OUT 287.706" IN 287.80VERDE DR(N) 195' - 8" HDPE SEWERREMOVE (E) SSMH I07-9(N) 50' - 8" HDPE SEWERR1000.0'(N) 102' - 8" HDPE SEWER14' PUBLIC UTILITYEASEMENTREMOVE SSMH I07-9(E) 6" IN 299.50(E) 6" OUT 299.200SCALE IN FEET20 40LUNETA DRIVE2HORIZ 1" = 20'VERT 1" = 5'SEE SHEET 3CITY SPECIFICATION NO.DATE:PROJECT TITLE:SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONHNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHNMGBNFEBRUARY 202210000197APPROVED: [Mo Day, Yr]SEE SHEET 3Page 274 of 984 STA. 81+24.32(N) SSMH I07-2RIM = 285.34'8" IN 281.70' (S)8" OUT 281.60' (N)STA. 80+09.71(N) SSMH I07-7RIM = 293.58'8" IN 287.80' (W)6" IN 287.80' (S)8" OUT 287.70' (N)STA. 78+34.11(N) CO I07-15RIM = 302.70'6" OUT 295.00' (N)(N) 174' - 6" HDPE SEWER, S = 4.10%BY PIPE BURSTING THROUGH EXISTING 6" VCP SEWER(N) 113' - 8" HDPE SEWER, S = 5.23%BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER(N) 337' - 8" HDPE SEWER, S = 10.23%BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER(E) GRADESD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGW W W W W W W W W W W W W W W W W W WW SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSG G G G G G G G G G G G G G G G GSSSS SSSS SS SS SSSSSS SS SS SS SS SS SSSS SSSS SSSS SS SS SS SS GGGG G G G G G G G G G G WWWW WW (E) 6" AC WATER(E) 6" AC WATER (E) 8" CI WATER (E) 8" CI WATER (E) 2" GAS (E) 2" GAS(E) 6" AC WATER(E) 2" GAS+70 00 +71 STA 78+34.11(N) CO I07-15RIM = 302.70'(N) 174' - 6" HDPE SEWERSTA 81+24.32(N) SSMH I07-2RIM = 285.34'(N) 113' - 8" HDPE SEWER+00+7900+8000+8100+8200+8300VERDE DRLUNETA DR.STA 80+09.71(N) SSMH I07-7RIM = 293.58'12'5'5'34'12'REMOVE AND REPLACESSCO I07-15PER ENG. STD. 67106" OUT 295.00REMOVE AND REPLACESSMH I07-7PER ENG. STD. 66106" IN 287.808" OUT 287.706" IN 287.80REMOVE AND REPLACESSMH I07-2PER ENG. STD. 66108" IN 281.708" OUT 281.60(N) 102' - 8" HDPE SEWER 14' PUBLIC UTILITYEASEMENT12' PUBLIC UTILITYEASEMENT(E) 24" R C P (N) 337' - 8" HDPE SEWER78+25 78+50 78+75 79+00 79+25 79+50 79+75 80+00 80+25 80+50 80+75 81+00 81+25 81+50 81+75 82+00 82+25 82+50 82+75 83+00 83+25 83+502602652702752802852902953003052602652702752802852902953003050SCALE IN FEET20 40VERDE DRIVE3HORIZ 1" = 20'VERT 1" = 5'MATCHLINE - STA. 83+50.00: SEE SHEET 4MATCHLINE - STA. 83+50.00: SEE SHEET 4SHEET 2CITY SPECIFICATION NO.DATE:PROJECT TITLE:SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONHNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHNMGBNFEBRUARY 202210000197APPROVED: [Mo Day, Yr]Page 275 of 984 STA. 85+73.87(N) SSMH I06-46RIM = 249.92'8" IN 244.80' (S)6" IN 243.00' (N)8" IN 243.00' (W)10" OUT 242.90' (E)STA. 84+59.70(N) SSMH I06-49RIM = 252.64'8" IN 247.30' (S)8" OUT 247.20' (N)(N) 114' - 8" HDPE SEWER, S = 2.10%BY OPEN TRENCHING & REMOVE EXISTING 6" VCP SEWER(E) 6" PVC SEWER(N) 337' - 8" HDPE SEWER, S = 10.23%BY OPEN TRENCHING & REMOVE EXISTING 10" VCP SEWER(E) GRADE(E) 18" RCP(E) 2" GAS(E) 6" AC WATER(E) AT&TDUCT BANKSDSDSDSDWWWWWWWWW WWWWWWWWWWWWWWWWWWWSDSDSDSDSDGGGGGGGGGGGGGGGGGGGGGGGGW W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T G G G G G G G G G G G G G G G G G G SSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS WWG G G G (E) 8" VCP SEWER (E) 4" AC WATER(E) 6" AC WATER(E) 6" AC WATER (E) 2" GAS(E) 2" GAS(E) 18" RCP(E ) 1 8 " R C P(E) 18" RCP(E) 6" PVC SEWER(E) 2" GAS (E) AT&T (E) 6" AC WATER (E) 2" GAS (E) AT&T STA 84+59.70(N) SSMH I06-49RIM = 252.64'STA 85+73.87(N) SSMH I06-46RIM = 249.92'(N) 114' - 8" HDPE SEWER(N) 451' - 10" HDPE SEWER 00 +90 00 +8400+8500+86RAMONA DR34'12'13'4'5'VERDE DRREMOVE AND REPLACESSMH I06-49PER ENG. STD. 66108" IN 247.308" OUT 247.20REMOVE AND REPLACESSMH I06-46PER ENG. STD. 66108" IN 244.806" IN 243.008" IN 243.0010" OUT 242.90(E) 8" TELEPHONE (E) TELEPHONE (N) 337' - 8" HDPE SEWER(E) CHARTERSDSDSDSDWWWWWWWWWSSSSSSSSSSSSW W W W W W W W W W W WWWWWWSD SD SD SD SD SD SD SD SD SD SD GGGGGGGGGGGGGGGGGGWWWWWWWWWWWWWWWWWWWWWWWWWWWWTTTTTTTTTTTTTTTTTTTTTTTTTTTTTGGGGGGGGTTTTTTTTTTTTTTTTTTTTTTTTTTTTGGGGGGGGGGGGGGGGGGGGGWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSG TTTTTTTTTTTTTTTTTTT(E) 4" AC WATER(E) 6" AC WATER(E) 2" GAS(E) 2" GAS(E) 18" RCP(E) 18" RCP(E) 18" RCP(E) 6" PVC SEWER(E) 6" AC WATER(E) 2" GAS(E) AT&T(N) 114' - 8" HDPE SEWER(N) 451' - 10" HDPE SEWER+9000+9100+920014.5'40'STA 90+04.39(N) SSMH I06-46RIM = 249.92'15.5'10'RAMONA DRVERDE DRREMOVE AND REPLACESSMH I06-46PER ENG. STD. 66108" IN 243.0010" OUT 242.906" IN 243.008" IN 244.80REPLACE WATER WELL ANDCOVER PER ENG. STD. 6340(E) TELEPHONESTA. 90+04.39(N) SSMH I06-46RIM = 249.92'8" IN 244.80' (S)6" IN 243.00' (N)8" IN 243.00' (W)10" OUT 242.90' (E)(E) 8" VCP SEWER(N) 451' - 10" HDPE SEWER, S = 1.94%BY OPEN TRENCHING & REMOVE EXISTING 10" VCP SEWER(E) 2" GAS(E) CHARTERCONDUIT90+00 90+25 90+50 90+75 91+00 91+25 91+50 91+75 92+00 92+25 92+50 92+7523023524024525025526026527023023524024525025526026527023023524024525025526026527083+50 83+75 84+00 84+25 84+50 84+75 85+00 85+25 85+50 85+75VERDE DRIVE & RAMONA DRIVE4HORIZ 1" = 20'VERT 1" = 5'SEE RIGHTMATCHLINE - STA. 83+50.00: SEE SHEET 3MATCHLINE - STA. 83+50.00: SEE SHEET 3SEE LEFTMATCHLINE - STA. 92+75.00: SEE SHEET 5MATCHLINE - STA. 92+75.00: SEE SHEET 50SCALE IN FEET20 400SCALE IN FEET20 40CITY SPECIFICATION NO.DATE:PROJECT TITLE:SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONHNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHNMGBNFEBRUARY 202210000197APPROVED: [Mo Day, Yr]Page 276 of 984 SDSDSDSDSDSDSD SD WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW WWWWWWTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT T T T GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTGGGGGGGGGWWSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS GTTTTTTTTTTTTTTTTTTTTTTTTTTT T T TTTTTTT (E) 10" CI WATER(E) 2" GAS(E) AT&T(E) 10" CI WATER(E) 2" GAS(E) AT&T(E) 10" CI WATER(E) 6" VCP SEWER(E) 2" GAS(E) 18" CMPSTA 94+56.87(N) SSMH I06-47RIM = 244.49'STA 96+41.48(E) SSMH I06-48RIM = 240.73'(N) 183' - 10" HDPE SEWER+9300+9400+9500+96005'10'40'5'22.6'9.4'3'40'RAMONA DRPALOMAR AVEREMOVE (E) SSMH I06-47PER ENG. STD. 6610(E) 10" IN 238.70(E) 10" OUT 238.60INSTALL (N) SSMH I06-47PER ENG. STD. 661010" IN 234.1010" OUT 234.00(E) SSMH I06-48 TO REMAIN10" IN 228.006" IN 228.0010" OUT 227.90(E) 10" CIPP SEWER15.5'9.5'REMOVE(E) SSMH(N) 451' - 10" HDPE SEWER(N) 451' - 10" HDPE SEWER, S = 1.94%BY OPEN TRENCHING & REMOVE EXISTING 10" VCP SEWERSTA. 94+56.87(N) SSMH I06-47RIM = 244.49'10" IN 234.10' (W)10" OUT 234.00' (E)(N) 183' - 10" HDPE SEWER, S = 3.22%BY PIPE BURSTING THROUGH EXISTINGSTA. 96+41.48(E) SSMH I06-48RIM = 240.73'10" IN 228.00' (W)6" IN 228.00' (S)10" OUT 227.90' (SE)(E) GRADE(E) 10" CIPP SEWERCONNECT TO (E) SSMHPER ENG. STD. 6610(E) AT&TDUCT BANK(E) 2" GASREMOVE (E)SSMH22022523023524024525025526092+75 93+00 93+25 93+50 93+75 94+00 94+25 94+50 94+75 95+00 95+25 95+50 95+75 96+00 96+25 96+50 96+75220225230235240245250255260RAMONA DRIVE5HORIZ 1" = 20'VERT 1" = 5'MATCHLINE - STA. 92+75.00: SEE SHEET 4MATCHLINE - STA. 92+75.00: SEE SHEET 40SCALE IN FEET20 40CITY SPECIFICATION NO.DATE:PROJECT TITLE:SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONHNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHNMGBNFEBRUARY 202210000197APPROVED: [Mo Day, Yr]Page 277 of 984 SDSDSDSDSDW W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT T T T T T GGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGGG G G G G G G TTTTTTTTTTTTTTTTTTTTTTTTTTTTT T T T T T TTTTTTTSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTT T T T T TTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTWWW W W W W W W W W W WW WWTELTTTSSSSSSSSSSSSSSTTTTTTTG G G GG T T T T DSDSDSDS+10424+10100+10200+10300+10400STA 101+15.08(N) SSMH 01RIM = 237.50'STA 104+21.35(N) SSMH 02RIM = 246.12'ABANDON (E) 10" VCP SEWER(E) 10" VCP SEWER(E) 10" CI WATER (E) 20" DI WATER (E) 10" CI WATER*ABANDON (E) 10" VCP SEWER(E) TELEPHONE(E) GAS(N) 302' - 10" HDPE SEWERRAMONA DRBROAD ST (E) TELEPHONE(E) 10" CI WATER(E) TELPHONE(E) 2" GAS(E)TELEPHONE(N) 326' - 10" HDPE SEWER (E) 20" DI WATER (E) 8" CI WATER (E) TELEPHONE 40'11.2'14.3'14.5'(N) SSMH 01PER ENG. STD. 661010" IN 226.2010" OUT 226.15*ABANDON (E) 10" VCP SEWER *ABANDON SSMH J06-50RIM 234.51INV 226.74*ABANDON SSMH J06-58RIM 235.15INV 225.3510" IN 227.00(N) SSMH 02PER ENG. STD. 661010" IN 225.0510" OUT 225.00(E) GAS *ABANDON (E) 10" VCP SEWER*ABANDON (E) SEWERLINEPER ENG. STD. 6050*LATERAL TIE OVER BY HDD OROTHER APPROVED METHOD (TYP.)(N) 3' STUB - 10" HDPE SEWER*LATERAL TIE OVER BY HDD OROTHER APPROVED METHOD (TYP.)(E) SS LAT(E) SS LAT(E) 10' SEWEREASEMENT(E) TELEPHONE (E) TELPHONE(E) TELEPHONE(E) TELEPHONE PROTECT(E) WALLPROTECT(E) WALLSTA. 101+15.08(N) SSMH 01RIM = 237.50'10" IN 226.20' (W)10" IN 227.00' (N)10" OUT 226.15' (E)STA. 104+21.35(N) SSMH 02RIM = 246.12'10" IN 225.05' (W)10" OUT 225.00' (S)(N) 302' - 10" HDPE SEWER, S = 0.36%BY OPEN TRENCHING(N) 3' STUB10" HDPE SEWER, S = 0.36%BY OPEN TRENCHING(E) TELEDUCT BANK220225230235240245250255260220225230235240245250255260100+50 100+75 101+00 101+25 101+50 101+75 102+00 102+25 102+50 102+75 103+00 103+25 103+50 103+75 104+00 104+25 104+50 104+75RAMONA DRIVE6HORIZ 1" = 20'VERT 1" = 5'0SCALE IN FEET20 40CITY SPECIFICATION NO.DATE:PROJECT TITLE:SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONHNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHNMGBNFEBRUARY 202210000197APPROVED: [Mo Day, Yr]SEE SHEET 7*BID ALTERNATIVE "A" IS INDICATED BY ASTERISK*Page 278 of 984 220225230235240245250255260220225230235240245250255260109+50 109+75 110+00 110+25 110+50 110+75 111+00 111+25 111+50 111+75 112+00 112+25 112+50 112+75 113+00 113+25 113+50 113+75 114+00STA. 110+08.76(N) SSMH 02RIM = 246.12'10" IN 225.05' (W)10" OUT 225.00' (S)(E) 10" VCP SEWER(N) 326' - 10" HDPE SEWER, S = 0.39%BY OPEN TRENCHINGSTA. 113+38.65(N) SSMH J07-1RIM = 230.24'10" IN 223.70' (N)8" IN 224.24' (N)10" OUT 223.70' (S)(E) FIBERDUCT BANK2" GAS(E) 20 DI WATER(E) TELESDSDSDSDSDWWWWWWWWWWWWWWWWWWWWWWWWSSSSSSSSGGGGGGGGGGWWWWWWWWWWGGGGGGGGGGGGGGGGGWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWTTTTTTTTTTTTTTTTTT GGGGGGGGGGGGTTTTTTTTTTTTTTTTTTTTTT T T T SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSTT T TTTTTTTTTTTTTTTTTTTTTTTGGW WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W WWTELWSSSSSSSSSSSS SSSSSSSSSSSSTGGGGGGGGGGGGGGTTT T T T TGWWWWWWWWWTTTTTTTTTT SSSSSSSSSSSSSSSSSSSSSSTTTTTTTTTTTTTTTTTT(N) 326' - 10" HDPE SEWER+11000+11100+11200+11300+114STA 110+08.76(N) SSMH 02RIM = 246.12'RAMONA DRBROAD STMEINECKE AVESTA 113+38.65(N) SSMH J07-1RIM = 230.24'(E) 10" CI WATER(E) 20" DI WATER(E) 20" DI WATER(E) 8" CI WATER(E) 6" CI WATER(E) 6" VCP SEWER(E) TELEPHONE(E) 6" VCP SEWER(E) 8" PVC SEWER*ABANDON (E) 10" VCP SEWER(E) 10" VCP SEWER(E) 18" CMP(E) 20" DI WATER(E) 10" CI WATER*ABANDON (E) 10" VCP SEWER(E) TELEPHONE(E) GAS(E) 2" GAS(E) 2" GAS(E) FIBER DUCT BANK(N) 302' - 10" HDPE SEWER(E) GAS(E) TELEPHONE(N) 326' - 10" HDPE SEWER(E) 20" DI WATER(E) 8" CI WATER(E) TELEPHONE34'6'6'9'*ABANDON (E) 10" VCP SEWER(N) SSMH 02PER ENG. STD. 661010" IN 225.0510" OUT 225.00REMOVE AND REPLACESSMH J07-1PER ENG. STD. 661010" OUT 223.7010" IN 223.708" IN 224.24*REMOVE (E) SSMH I06-59AND INSTALL (N) CO PERDETAIL B, THIS SHEETRIM 232.26INV 223.8113'(E) GAS*ABANDON (E) SEWERLINEPER ENG. STD. 6050*ABANDON SSMH J06-58RIM 235.15INV 225.35MAINTAIN ACCESS TO THEVILLAGES AT ALL TIMES(E) 6" PVC SEWER LATERAL*LATERAL TIE OVER BY HDD OROTHER APPROVED METHOD (TYP.)INV 223.95(E) SS LAT(E) SS LAT(E) 10' SEWEREASEMENT(E) TELEPHONE(E) TELEPHONE(E) TELEPHONEPROTECT(E) WALL(N) 68 LF - 6" HPDE SEWER BYSLIPLINING PER DETAIL A, THIS SHEET(E) 10" VCP SEWERBROAD STREET7HORIZ 1" = 20'VERT 1" = 5'SEE SHEET 60SCALE IN FEET20 40CITY SPECIFICATION NO.DATE:PROJECT TITLE:SHEET TITLE:ofSHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONHNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHNMGBNFEBRUARY 202210000197APPROVED: [Mo Day, Yr]SEWER SLIPLININGANOTES:1. BEFORE INSTALLATION OF THE PIPE LINER, THE HOST PIPE MUST BE CLEANED AND ALL ROCKS ANDDEBRIS REMOVED.2. SLIP LINER PIPE GRADE MUST BE MAINTAINED PARALLEL TO THE GRADE OF THE HOST PIPE. THELINER PIPE MUST BE HELD AT THE INVERT OF THE HOST PIPE AND BE BRACED TO PREVENTFLOTATION OR MOTION DURING GROUTING.3. A CONCRETE BULKHEAD MUST BE INSTALLED AT EACH OPEN END BETWEEN THE HOST PIPE ANDNEW PIPE TO PREVENT GROUT FROM FLOWING FROM THE ENDS WHILE FILLING THE ANNULARSPACE BETWEEN THE TWO PIPE.3. GROUT MIX FOR ANNULAR SPACE MUST CONSIST OF LOW DENSITY FOAM, CONCRETE COMPOSEDOF WATER, CEMENTITIOUS MATERIAL AND OPTIONAL CHEMICAL ADMIXTURES. GROUT MUST HAVE ADENSITY OF 40-80 POUNDS PER CUBIC FOOT AND STRENGTH OF 300 PSI.4. THE ANNULAR VOID MUST BE GROUTED SOLID BY INJECTING GROUT FROM ONE END OF THE PIPERUN AND ALLOWING IT TO FLOW TOWARD THE OTHER END. VENTING OF THE ANNULAR VOID MUSTBE PERFORMED TO ASSURE UNIFORM FILLING OF THE VOID SPACE DURING THE GROUTINGPROCESS. PRESSURE ON THE ANNULAR VOID MUST NOT EXCEED 2 PSI TO AVOID DAMAGE TO THELINER PIPE.(E) 10" VCP SEWER(N) 6" HPDE SEWERGROUT ANNULARSPACE*BID ALTERNATIVE "A" IS INDICATED BY ASTERISK*(E) 6" PVC LATERALREMOVE (E) SSMH(N) 6" HPDE SEWER BYSLIPLINING PER DETAIL A,THIS SHEET(E) 10" VCPSEWER(N) CLEANOUT PERENG.STD. 6710(N) CLEANOUTBNOTES:1. ALL PVC FITTINGS MUST BE GLUED2. PVC AND HDPE CONNECTION MUST BE MADE WITH STRONG BACK RC COUPLINGS.(N) 6" PVC (SDR 35)PIPE AND FITTINGSPage 279 of 984 Page 280 of 984    63(&,$/3529,6,216  )25  &,7<2)6$1/8,62%,632  9HUGH/XQHWD5DPRQD%URDG6HZHU5HSODFHPHQW  6SHFLILFDWLRQ1R  0DUFK         38%/,&:25.6'(3$570(17 (1*,1((5,1*',9,6,21   3DOP6WUHHW 6DQ/XLV2ELVSR&$      Page 281 of 984     9HUGH/XQHWD5DPRQD%URDG6HZHU5HSODFHPHQW  6SHFLILFDWLRQ1R  $SSURYDO'DWH0DUFK         March XX, 2022       March XX, 2022   Page 282 of 984   7$%/(2)&217(176  127,&(72%,''(56, %,'68%0,66,21, %,''2&80(176,, 352-(&7,1)250$7,21,, 48$/,),&$7,216,,, $:$5'9 $&&2002'$7,219 %,')2506$ %,',7(0/,67)259(5'(/81(7$5$021$%52$'6(:(55(3/$&(0(1763(&,),&$7,21 12$ /,672)68%&2175$&7256' 38%/,&&2175$&7&2'(6(&7,2167$7(0(17( 38%/,&&2175$&7&2'(6(&7,2148(67,211$,5(( 38%/,&&2175$&7&2'(6(&7,2167$7(0(17( /$%25&2'(6(&7,2167$7(0(176( 121&2//86,21'(&/$5$7,21* %,''(5$&.12:/('*(0(176+ 48$/,),&$7,216, $77$&+%,''(5 6%21'72$&&203$1<%,'- 63(&,$/3529,6,216 ',9,6,21,*(1(5$/3529,6,216 *(1(5$/ %,'',1* 6&23(2):25. /(*$/5(/$7,216$1'5(63216,%,/,7<727+(38%/,& 3526(&87,21$1'352*5(66 ',9,6,21,,*(1(5$/&216758&7,21 (19,5210(17$/67(:$5'6+,3 ',9,6,219,,,0,6&(//$1(286&216758&7,21 /2&$/,1)5$6758&785( ',9,6,21,;75$)),&&21752/'(9,&(6 0$5.,1*6 ',9,6,21;,,,$33(1',&(6 $33(1',;$)2502)$*5((0(17 $33(1',;%±352-(&70,7,*$7,210($685(6 $33(1',;&±*(27(&+1,&$/5(32576  Page 283 of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age 284 of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¶VZHEVLWHDW  ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVSXEOLFZRUNVELGV SURSRVDOV  1RSULQWHGFRSLHVDUHDYDLODEOHIRUSXUFKDVHDWWKH&LW\RIILFH  6WDQGDUG6SHFLILFDWLRQVDQG(QJLQHHULQJ6WDQGDUGVUHIHUHQFHGLQWKH6SHFLDO3URYLVLRQV PD\EHGRZQORDGHGIUHHRIFKDUJHIURPWKH&LW\¶VZHEVLWHDW  ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVGRFXPHQWV RQOLQHFRQVWUXFWLRQGRFXPHQWV  <RXDUHUHVSRQVLEOHWRREWDLQDOOLVVXHGDGGHQGDSULRUWRELGRSHQLQJ$GGHQGDZLOOEH DYDLODEOH WR GRZQORDG DW WKH &LW\¶V ZHEVLWH OLVWHG DERYH RU DWWKH RIILFH RI WKH &LW\ (QJLQHHU  4XHVWLRQVPXVWEHVXEPLWWHGWKURXJK%LG6\QFVRWKDWLWLVDYDLODEOHWRWKHSXEOLF&RQWDFW WKHSURMHFWPDQDJHU+DL1JX\HQDWRUWKH3XEOLF:RUNV'HSDUWPHQWDW  SULRUWRELGRSHQLQJWRYHULI\WKHQXPEHURIDGGHQGDLVVXHG  <RXDUHUHVSRQVLEOHWRYHULI\\RXUFRQWDFWLQIRUPDWLRQLVFRUUHFWRQWKHSODQKROGHUVOLVW ORFDWHGRQWKH&LW\¶VZHEVLWHDW  ZZZVORFLW\RUJJRYHUQPHQWGHSDUWPHQWGLUHFWRU\SXEOLFZRUNVSXEOLFZRUNVELGV SURSRVDOV  352-(&7,1)250$7,21 ,Q JHQHUDO WKH SURMHFW FRQVLVWV RI WKH UHSODFHPHQW RI H[LVWLQJ VHZHUOLQHV E\ RSHQ WUHQFKLQJDQGSLSHEXUVWLQJ  Page 285 of 984 127,&(72%,''(56 127,&(72%,''(56 LLL 7KHSURMHFWHVWLPDWHGFRQVWUXFWLRQFRVWDQGFRQWUDFWWLPHHVWDEOLVKHGIRUWKHSURMHFWLVD IROORZV  %$6(%,'ZRUNLQJGD\V $'',7,9($/7(51$7,9(³$´     ZRUNLQJGD\V  727$/352-(&7%,' %$6(%,'$''$/7³$´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¶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age 286 of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¶VLQWHQWWRDZDUGWKHFRQWUDFWWRWKHORZHVWUHVSRQVLYH ELGVXEPLWWHGE\DUHVSRQVLEOHELGGHU,ILQWKHELGGHU¶VRSLQLRQWKHFRQWUDFWKDVEHHQRU PD\EHLPSURSHUO\DZDUGHGWKHELGGHUPD\SURWHVWWKHFRQWUDFWDZDUG  3URWHVWVPXVWEHILOHGQRODWHUWKDQILYHZRUNLQJGD\VDIWHUHLWKHU  ELGRSHQLQJGDWH  QRWLILFDWLRQRIUHMHFWHGELG  3URWHVWPXVWEHLQZULWLQJDQGUHFHLYHGE\WKHSURMHFWPDQDJHUORFDWHGDW 3DOP6WUHHW 6DQ/XLV2ELVSR&$  9DOLGSURWHVWVPXVWFRQWDLQWKHIROORZLQJLQIRUPDWLRQ  WKHUHDVRQVIRUWKHSURWHVW  DQ\VXSSRUWLQJGRFXPHQWDWLRQ  WKHUXOLQJH[SHFWHGE\WKH&LW\WRUHPHG\WKHSURWHVW $Q\SURWHVWQRWFRQWDLQLQJDOOUHTXLUHGLQIRUPDWLRQZLOOEHGHHPHGLQYDOLGDQGUHMHFWHG  7KH&LW\ZLOOFRQVLGHUDGGLWLRQDOGRFXPHQWDWLRQRURWKHUVXSSRUWLQJLQIRUPDWLRQUHJDUGLQJ WKHSURWHVWLIVXEPLWWHGLQFRPSOLDQFHWRWKHVSHFLILHGWLPHOLPLWV$Q\WKLQJVXEPLWWHGDIWHU WKHVSHFLILHGWLPHOLPLWZLOOEHUHMHFWHGDQGQRWEHFRQVLGHUHG  7KH 'LUHFWRU RI 3XEOLF :RUNV RU 'HVLJQHH PD\ UHTXHVW DGGLWLRQDO LQIRUPDWLRQ WR EH VXEPLWWHGZLWKLQWKUHHGD\VRIWKHUHTXHVWXQOHVVRWKHUZLVHVSHFLILHGDQGZLOOQRWLI\WKH SURWHVWHURIUXOLQJZLWKLQWHQGD\VRIGHWHUPLQDWLRQ  ,IWKHSURWHVWHULVQRWVDWLVILHGZLWKUXOLQJWKHSURWHVWHUPD\DSSHDOWKHUXOLQJWRWKH&LW\ &RXQFLOLQFRPSOLDQFHZLWK&KDSWHURIWKH&LW\RI6DQ/XLV2ELVSR0XQLFLSDO&RGH  3XUVXDQWWRWKH3XEOLF5HFRUGV$FW *RYHUQPHQW&RGH†HWVHT WKH&LW\ZLOO PDNHSXEOLFUHFRUGVDYDLODEOHXSRQUHTXHVW  Page 287 of 984 127,&(72%,''(56 127,&(72%,''(56 Y $:$5' 7KHORZHVWELGGHUZLOOEHGHWHUPLQHGLQFRPSOLDQFHZLWK3XEOLF&RQWUDFW&RGH6HFWLRQ  F ZLWKWKH3XEOLFO\'LVFORVHG)XQGLQJ$PRXQWRIXVLQJHLWKHU  x 727$/352-(&7%,'LIELGIRU%DVH%LG$GG$OW³$´LVOHVVWKDQ RU  x %$6(%,'LI%DVH%LGLVOHVVWKDQDQG%DVH%LG$GG$OW³$´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age 288 of 984 %,')2506 $ %,')2506  $OOELGIRUPVPXVWEHFRPSOHWHGDQGVXEPLWWHGZLWK\RXUELG)DLOXUHWRVXEPLWWKHVH IRUPVDQGUHTXLUHGELGERQGLVFDXVHWRUHMHFWWKHELGDVQRQUHVSRQVLYH6WDSOHDOOELG IRUPVWRJHWKHU  7+(81'(56,*1('DJUHHVWKDWWKH\KDYHFDUHIXOO\H[DPLQHG  WKHORFDWLRQRIWKHSURSRVHGZRUN  WKHSODQVDQGVSHFLILFDWLRQV  UHDGWKHDFFRPSDQ\LQJLQVWUXFWLRQVWRELGGHUV DQGSURSRVHWRIXUQLVKDOO  PDWHULDOV  ODERU WRFRPSOHWHDOOWKHUHTXLUHGZRUNVDWLVIDFWRULO\LQFRPSOLDQFHZLWK  SODQV  VSHFLILFDWLRQV  VSHFLDOSURYLVLRQV IRUWKHSULFHVVHWIRUWKLQWKHELGLWHPOLVW  %,',7(0/,67)259(5'(/81(7$5$021$%52$'6(:(55(3/$&(0(17 63(&,),&$7,2112  ,WHP,WHP8QLWRI(VWLPDWHG,WHP3ULFH7RWDO 1R66  'HVFULSWLRQ0HDVXUH4XDQWLW\ LQILJXUHV  LQILJXUHV  ϭϳdZ&&/KEdZK>W>EE /DW>DEdd/KE>^ϭ  ϮϳϳWKd,K>/E'>^ϭ  ϯϴϰZW>dZ&&/^dZ/W/E'Θ DZ<Z^>^ϭ  ϰϳKDW>zt/d,K^,>^ϭ  ϱϭϰ KDW>zt/d,D/d/'d/KE D^hZ^E Z,K>K'/> DKE/dKZ/E'W>E >^ϭ  ϲϳϳEKE^tZ>/E͕ DE,K>^E&/>/d/^>^ϭ  ϳϳϳzW^^WhDW/E'>^ϭ  ϴϳϳZ^dKZd/KEK&WZ/sd WZKWZdz>^ϭ  ϵΎϭϵZK<ysd/KEzϭϬϬϬ ϭϬϳϳZW>tdZt>>E KsZϭ ϭϭϲ͕ϭϱDKEhDEdZ^dKZd/KEϯ Page 289 of 984 %,')2506 %,')2506 % ,WHP,WHP8QLWRI(VWLPDWHG,WHP3ULFH7RWDO 1R66  'HVFULSWLRQ0HDVXUH4XDQWLW\ LQILJXUHV  LQILJXUHV  ϭϮϳϳ /E^d>>EtϲΗ,W ^tZ>/EzW/WhZ^d/E' d,ZKh',y/^d/E'^tZ>/E >&ϭϳϰ ϭϯϳϳ ZDKsy/^d/E'^tZ>/E E/E^d>>EtϴΗ,W ^tZ>/EzKWE dZE,/E' >&ϵϭϭ ϭϰϳϳ ZDKsy/^d/E'^tZ>/E E/E^d>>EtϭϬΗ,W ^tZ>/EzKWE d^ddZE,/E' >&ϲϯϰ ϭϱϳϳ /E^d>>EtϭϬΗ,W ^tZ>/EzKWE dZE,/E';^dd/KEϭϬϭнϬϬͲ ^dd/KEϭϭϯнϰϬͿ >&ϲϮϴ ϭϲϳϳ/E^d>>EtDE,K>ϴ ϭϳϳϳ/E^d>>DE,K>Kd/E'ϴ ϭϴϳϳZDKsy/^d/E'DE,K>ϲ ϭϵϳϳZDKsy/^d/E'E/E^d>> Et>EKhdϭ ϮϬϳϳKEEdy/^d/E'^tZ >dZ>dK^tZD/EϯϬ Ϯϭϳϳ/E^d>>ϲΗ,W^tZz ^>/W>/E/E'>&ϲϴ ϮϮΎϳϳZͲ'Z^tZ>dZ> zKEϱ&d>&ϭϬ %DVH%LG Ϯϯ ϳ dZ&&/KEdZK>W>EE /DW>DEdd/KE>^ ϭ  Ϯϰ ϳϳ WKd,K>/E' >^ ϭ  Ϯϱ ϴϰ ZW>dZ&&/^dZ/W/E'Θ DZ<Z^>^ ϭ  Ϯϲ ϳ KDW>zt/d,K^, >^ ϭ  Ϯϳ ϭϰ KDW>zt/d,D/d/'d/KE D^hZ^E Z,K>K'/> DKE/dKZ/E'W>E >^ ϭ  Ϯϴ ϳϳ EKE^tZ>/E͕ DE,K>^E&/>/d/^>^ ϭ  Ϯϵ ϳϳ zW^^WhDW/E' >^ ϭ  ϯϬ ϳϳ Z^dKZd/KEK&WZ/sd WZKWZdz>^ ϭ  Page 290 of 984 %,')2506 %,')2506 & ,WHP,WHP8QLWRI(VWLPDWHG,WHP3ULFH7RWDO 1R66  'HVFULSWLRQ0HDVXUH4XDQWLW\ LQILJXUHV  LQILJXUHV  ϯϭ ϳϳ >dZ>d/KsZz,  ϰ ϯϭ ϳϳ ZDKs;Ϳ^^D,E/E^d>> ;EͿ>EKhd ϭ $GGLWLYH$OWHUQDWLYH$  7RWDO3URMHFW%LG  %DVH%LG$GGLWLYH$OWHUQDWLYH$   &RPSDQ\1DPH    UHIHUVWRVHFWLRQLQWKH6WDQGDUG6SHFLILFDWLRQVZLWKPRGLILFDWLRQVLQWKH6SHFLDO3URYLVLRQVWKDWGHVFULEHUHTXLUHG ZRUN  %LGLWHPH[HPSWIURP6HFWLRQRIWKH6WDQGDUG6SHFLILFDWLRQV7KHXQLWSULFHZLOOQRWEHDGMXVWHGUHJDUGOHVVRI WKHILQDOELGLWHPTXDQWLW\  Page 291 of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³121(´DQGVXEPLWZLWKELG 1DPH8QGHU:KLFK 6XEFRQWUDFWRULV/LFHQVHG/LFHQVH1XPEHU  ',53XEOLF :RUNV 5HJLVWUDWLRQ 1XPEHU  $GGUHVVDQG3KRQH 1XPEHURI2IILFH0LOORU 6KRS 6SHFLILF 'HVFULSWLRQRI 6XEFRQWUDFW RI 7RWDO %DVH %LG                   $WWDFKDGGLWLRQDOVKHHWVDVQHHGHG Page 292 of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age 293 of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age 294 of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age 295 of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´E\WKH&LW\  6LJQDWXUHRI%LGGHU      3ULQW1DPHDQG7LWOHRI%LGGHU  ',5±3XEOLF:RUNV 5HJLVWUDWLRQ1R  %XVLQHVV1DPH '%$    2ZQHU/HJDO1DPH   ,QGLFDWH2QH…6ROHSURSULHWRU…3DUWQHUVKLS…&RUSRUDWLRQ  /LVW3DUWQHUV&RUSRUDWH2IILFHUV   1DPH7LWOH     1DPH7LWOH     1DPH7LWOH  %XVLQHVV$GGUHVV   6WUHHW$GGUHVV   0DLOLQJ$GGUHVV   &LW\6WDWH=LS&RGH   3KRQH1XPEHU   )D[1XPEHU   (PDLO$GGUHVV   'DWH  Page 296 of 984 %,')2506 %,')2506 , 48$/,),&$7,216 )DLOXUHWRIXUQLVKFRPSOHWHUHIHUHQFHLQIRUPDWLRQ217+,6)250DVVSHFLILHGLQWKLV SURMHFW¶V 1RWLFH WR %LGGHUV DQG LQGLFDWHG EHORZ LV FDXVH WR UH MHFW WKH ELG $GGLWLRQDO LQIRUPDWLRQPD\EHDWWDFKHGEXWLVQRWDVXEVWLWXWHIRUWKLVIRUP 5HIHUHQFH1XPEHU &XVWRPHU1DPH &RQWDFW,QGLYLGXDO  7HOHSKRQH (PDLO  3URMHFW1DPH 6LWH$GGUHVV  'LGWKLVSURMHFWLQVWDOODPLQLPXPRI /)RIVHZHUOLQHE\RSHQ WUHQFKLQJ" <HVƑ1RƑ 'HVFULEHWKHVHUYLFHVSURYLGHGDQGKRZWKLVSURMHFWLVVLPLODUWR WKDWZKLFKLVEHLQJELG     'DWHSURMHFWFRPSOHWHG :DVWKLVFRQWUDFWIRUDSXEOLFDJHQF\" <HVƑ1RƑ  5HIHUHQFH1XPEHU &XVWRPHU1DPH &RQWDFW,QGLYLGXDO  7HOHSKRQH (PDLO  3URMHFW1DPH 6LWH$GGUHVV  'LGWKLVSURMHFWLQVWDOODPLQLPXPRI /)RIVHZHUOLQHE\RSHQ WUHQFKLQJ" <HVƑ1RƑ 'HVFULEHWKHVHUYLFHVSURYLGHGDQGKRZWKLVSURMHFWLVVLPLODUWR WKDWZKLFKLVEHLQJELG     'DWHSURMHFWFRPSOHWHG :DVWKLVFRQWUDFWIRUDSXEOLFDJHQF\" <HVƑ1RƑ  5HIHUHQFH1XPEHU &XVWRPHU1DPH &RQWDFW,QGLYLGXDO  7HOHSKRQH (PDLO  3URMHFW1DPH 6LWH$GGUHVV  'LGWKLVSURMHFWLQVWDOODPLQLPXPRI /)RIVHZHUOLQHE\RSHQ WUHQFKLQJ" <HVƑ1RƑ 'HVFULEHWKHVHUYLFHVSURYLGHGDQGKRZWKLVSURMHFWLVVLPLODUWR WKDWZKLFKLVEHLQJELG     'DWHSURMHFWFRPSOHWHG :DVWKLVFRQWUDFWIRUDSXEOLFDJHQF\" <HVƑ1RƑ   Page 297 of 984 %,')2506 %,')2506 - $77$&+%,''(5 6%21'72$&&203$1<%,' .QRZDOOPHQE\WKHVHSUHVHQWV   7KDWZHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB$635,1&,3$/DQG  BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB $6 685(7< DUH KHOG DQG ILUPO\ ERXQGXQWRWKH&LW\RI6DQ/XLV2ELVSRLQWKHVXPRI  BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB 'ROODUV BBBBBBBBBBBBB  WR EH SDLG WR VDLG&LW\RULWVFHUWDLQDWWRUQH\LWVVXFFHVVRUVDQGDVVLJQVIRUZKLFKSD\PHQWZHOODQGWUXO\WREHPDGHZH ELQGRXUVHOYHVRXUKHLUVH[HFXWRUVDQGDGPLQLVWUDWRUVVXFFHVVRUVRUDVVLJQVMRLQWO\DQGVHYHUDOO\ILUPO\E\ WKHVHSUHVHQWV   7+(&21',7,212)7+,62%/,*$7,21,668&+WKDWLIWKHFHUWDLQELGRIWKHDERYH  ERXQGHQBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB  WRFRQVWUXFWBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB    LQVHUWQDPHRIVWUHHWDQGOLPLWVWREHLPSURYHGRUSURMHFW   GDWHGBBBBBBBBBBBBBBBBBBBBBLVDFFHSWHGE\WKH&LW\RI6DQ/XLV2ELVSRDQGLIWKHDERYH  ERXQGHQ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB KLV KHLUV H[HFXWRUV DGPLQLVWUDWRUVVXFFHVVRUVDQGDVVLJQVVKDOOGXO\HQWHULQWRDQGH[HFXWHDFRQWUDFWIRUVXFKFRQVWUXFWLRQDQG VKDOOH[HFXWHDQGGHOLYHUWKHWZRERQGVGHVFULEHGZLWKLQWHQ  GD\V QRWLQFOXGLQJ6DWXUGD\V6XQGD\VRU OHJDOKROLGD\V DIWHUWKHDERYHERXQGHQ  BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBKDVUHFHLYHGQRWLFHE\DQGIURPWKH VDLG&LW\RI6DQ/XLV2ELVSRWKDWVDLGFRQWUDFWLVUHDG\IRUH[HFXWLRQWKHQWKLVREOLJDWLRQVKDOOEHFRPHQXOO DQGYRLGRWKHUZLVHLWVKDOOEHDQGUHPDLQLQIXOOIRUFHDQGYLUWXH   ,1:,71(66:+(5(2)ZHKHUHXQWRVHWRXUKDQGVDQGVHDOVWKLVBBBGD\RIBBBBBBBBBB  %LGGHU3ULQFLSDO     6LJQDWXUH 'DWH 7LWOH    6XUHW\           %LGGHU VVLJQDWXUHLVQRWUHTXLUHGWREHQRWDUL]HG6XUHW\ VVLJQDWXUHPXVWEHQRWDUL]HG (TXLYDOHQWIRUPPD\EHVXEVWLWXWHG (Rev. 6-30-14)  Page 298 of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± HGLWLRQ  6WDWH RI &DOLIRUQLD 'HSDUWPHQW RI7UDQVSRUWDWLRQ 6WDQGDUG 6SHFLILFDWLRQV DQG 6WDQGDUG3ODQV±HGLWLRQ  ,QFDVHRIFRQIOLFWEHWZHHQGRFXPHQWVJRYHUQLQJUDQNLQJPXVWFRPSO\ZLWKVHFWLRQ RIWKH&LW\RI6DQ/XLV2ELVSR¶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age 299 of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¶WUDYHOODQHV  7ZRZD\FLUFXODWLRQZLWKIODJJHUVDQGPLQLPXP¶WUDYHOODQH  3URYLGHWUDIILFFRQWUROSODQDQGWUDIILFFRQWURODSSOLFDWLRQDWRUEHIRUHWKHSUHFRQVWUXFWLRQ PHHWLQJ7UDIILFFRQWUROSODQPXVWEHGUDZQWRVFDOH7UDIILFFRQWURODSSOLFDWLRQPD\EH REWDLQHGRQWKH&LW\¶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age 300 of 984 63(&,$/3529,6,216 63(&,$/3529,6,216  FRPSHQVDWLRQIRUFRQIRUPLQJWRWKHUHTXLUHPHQWVRIWKLVVHFWLRQVKDOOEHLQFOXGHGLQWKH OXPSVXPSULFHDQGQRDGGLWLRQDOFRPSHQVDWLRQZLOOEHDOORZHGWKHUHIRUH  ',9,6,219,,,0,6&(//$1(286&216758&7,21  /2&$/,1)5$6758&785(  $GGWR6HFWLRQ$  *URXQGZDWHU *URXQGZDWHUKDVEHHQHQFRXQWHUHGRQVLWH 6HH*HRWHFKQLFDOUHSRUWV±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±´$&WKURXJK´$&  9HUGH'ULYH±´$&WKURXJK´$&  5DPRQD±´$&WKURXJK´$&  %URDG±´$&WKURXJK´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age 301 of 984 63(&,$/3529,6,216 63(&,$/3529,6,216  $GGWR6HFWLRQ&%\SDVV3XPSLQJ 7KH&RQWUDFWRUPXVWSURYLGHIRUWKHIORZRIVHZDJHDURXQGWKHVHFWLRQRUVHFWLRQVRISLSH GHVLJQDWHGIRUUHSDLU7KHSXPS V DQGE\SDVVOLQH V PXVWEHRIDGHTXDWHFDSDFLW\WR DFFRPPRGDWHDVHZDJHIORZRIJDOORQVSHUGD\  $GG6HFWLRQ'0DQKROH&RDWLQJ &RDWLQJPDQKROHVVKDOOLQFOXGHWKHIROORZLQJDFWLYLWLHV  ‡ &OHDQLQJWKHPDQKROHDQGSUHSDUHWKHPDQKROHIRURQHRIWKHDSSURYHGFRDWLQJ V\VWHPV ‡ $SSO\LQJRQHRIWKHDSSURYHGFRDWLQJV\VWHPVDVVSHFLILHGKHUHLQ ‡ 7HVWLQJWKHILQLVKHGVXUIDFHFRDWLQJDVUHTXLUHGKHUHLQ ‡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age 302 of 984 63(&,$/3529,6,216 63(&,$/3529,6,216  x &RPSOHWLRQRIWKHFOHDQLQJDQGVXUIDFHSUHSDUDWLRQDFWLYLWLHVUHTXLUHGE\WKHVH VSHFLILFDWLRQV x &RPSOHWLRQ RI DOO YRLGILOOLQJ DFWLYLWLHV DQG XQGHUOD\PHQW DSSOLFDWLRQSULRUWR VXUIDFHFRDWLQJDSSOLFDWLRQ x &RPSOHWLRQRIWKHVXUIDFHFRDWLQJLQVWDOODWLRQSULRUWRWHVWLQJ x 6SDUNWHVWLQJRIWKHILQDOVXUIDFHFRDWLQJDVUHTXLUHGE\WKHVHVSHFLILFDWLRQV x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³&RQQHFW Page 303 of 984 63(&,$/3529,6,216 63(&,$/3529,6,216  ([LVWLQJ6HZHU/DWHUDOWR6HZHU0DLQ´7KHZRUNQHFHVVDU\WRUHJUDGHH[LVWLQJVHZHU ODWHUDOVWRDOLJQZLWKWKHQHZZ\HLQH[FHVVRIKRUL]RQWDOIHHWIURPWKHSRLQWRIFRQQHFWLRQ WRWKH 1 VHZHUOLQHVKDOOEHSDLGE\WKHOLQHDOIRRWFRQWUDFWSULFHIRUELGLWHP³5HJUDGH 6HZHU/DWHUDO%H\RQG)HHW´ ',9,6,21,;75$)),&&21752/'(9,&(6 0$5.,1*6 $GGWR6HFWLRQ&$SSOLFDWLRQRI6WULSHVDQG0DUNLQJV 3UHIRUPHGWKHUPRSODVWLFLVRQO\DOORZHGZLWKWKHDSSURYDORIWKH(QJLQHHU  ',9,6,21;,,,$33(1',&(6  $SSHQGL[$)RUPRI$JUHHPHQW  $SSHQGL[%±3URMHFW0LWLJDWLRQ0HDVXUHV  $SSHQGL[&*HRWHFKQLFDO5HSRUWV Page 304 of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age 305 of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¶VQHJOLJHQFH UHFNOHVVQHVVRUZLOOIXOPLVFRQGXFWLQWKHSHUIRUPDQFHRIZRUNKHUHXQGHURULWVIDLOXUHWR FRPSO\ZLWKDQ\RILWVREOLJDWLRQVFRQWDLQHGLQWKLV$JUHHPHQWH[FHSWVXFKORVVRUGDPDJH ZKLFKLVFDXVHGE\WKHVROHRUDFWLYHQHJOLJHQFHRUZLOOIXOPLVFRQGXFWRIWKH&LW\6KRXOG FRQIOLFWRILQWHUHVWSULQFLSOHVSUHFOXGHDVLQJOHOHJDOFRXQVHOIURPUHSUHVHQWLQJERWKWKH&LW\ DQG WKH &RQWUDFWRU RU VKRXOG WKH &LW\ RWKHUZLVH ILQG WKH &RQWUDFWRU¶V OHJDO FRXQVHO XQDFFHSWDEOHWKHQWKH&RQWUDFWRUVKDOOUHLPEXUVHWKH&LW\LWVFRVWVRIGHIHQVHLQFOXGLQJ ZLWKRXWOLPLWDWLRQUHDVRQDEOHOHJDOFRXQVHOIHHVH[SHUWIHHVDQGDOORWKHUFRVWVDQGIHHVRI OLWLJDWLRQ7KH&RQWUDFWRUVKDOOSURPSWO\SD\DQ\ILQDOMXGJPHQWUHQGHUHGDJDLQVWWKH&LW\ DQGLWVRIILFHUVRIILFLDOVHPSOR\HHVDQGYROXQWHHUV ZLWKUHVSHFWWRFODLPVGHWHUPLQHGE\ DWULHURIIDFWWRKDYHEHHQWKHUHVXOWRIWKH&RQWUDFWRU¶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age 306 of 984 $33(1',; $33(1',;  LQVWDQFHVZKHUHWKH&LW\LVVKRZQWRKDYHEHHQDFWLYHO\QHJOLJHQWDQGZKHUHWKH&LW\¶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age 307 of 984 $33(1',; $33(1',;  $33(1',;%±352-(&70,7,*$7,210($685(6   Page 308 of 984 August 2021 REVISED ARCHAEOLOGICAL MONITORING PLAN VERDE/LUNETA/RAMONA SEWER REPLACEMENT PROJECT SAN LUIS OBISPO, CALIFORNIA SPECIFICATION NO. 1000091 Submitted to: City of San Luis Obispo Department of Public Works Engineering Division 919 Palm Street San Luis Obispo, CA 93401 Prepared by: Kerrie Collison, RPA LSA 285 South Street, Suite P San Luis Obispo, CA 93401 (805)782-0745 LSA Project No. CBZ1801.04A Page 309 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) i TABLE OF CONTENTS TABLE OF CONTENTS ............................................................................................................................... i LIST OF ABBREVIATIONS AND ACRONYMS ............................................................................................. ii INTRODUCTION .......................................................................................................... 1 Project Description ........................................................................................................................ 2 Background Research .................................................................................................................... 2 Project Areas to be Monitored ...................................................................................................... 3 CULTURAL SETTING ..................................................................................................... 4 Precontact ..................................................................................................................................... 4 Ethnohistory .................................................................................................................................. 5 History ........................................................................................................................................... 6 CONSTRUCTION MONITORING PLAN .......................................................................... 8 Monitoring Personnel ................................................................................................................... 8 Monitoring Procedures ................................................................................................................. 8 Unanticipated Discoveries ............................................................................................................. 9 Human Remains ............................................................................................................................ 9 Native American Monitoring ......................................................................................................... 9 Report of Findings ....................................................................................................................... 10 ARCHAEOLOGICAL SITE TESTING ............................................................................... 11 Fieldwork ..................................................................................................................................... 11 Laboratory Analysis ..................................................................................................................... 12 Sites Not Eligible for the California Register ............................................................................... 12 Sites Eligible for the California Register ...................................................................................... 12 REFERENCES ............................................................................................................. 14 TABLE Table A: Chronological Sequence of the California Central Coast .......................................................... 4 APPENDICES A: PROJECT FIGURES B: 75 PERCENT PROJECT PLANS C: RECORD SEARCH RESULTS Page 310 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) ii LIST OF ABBREVIATIONS AND ACRONYMS cal B.P. calibrated years before present California Register California Register of Historical Resources Cal Poly formerly the California Polytechnic Institute; now California Polytechnic University, San Luis Obispo CCIC Central Coast Information Center CHC Cultural Heritage Committee City City of San Luis Obispo cm centimeter(s) Director Community Development Director DPR California Department of Parks and Recreation ft foot, feet GPS global positioning system Guidelines Archaeological Resource Preservation Program Guidelines MLD Most Likely Descendant NAHC Native American Heritage Commission National Register National Register of Historic Places OHP California Office of Historic Preservation Plan project archaeological monitoring plan PRC Public Resources Code project Verde/Luneta/Ramona Sewer Replacement Project RPA Registered Professional Archaeologist SLOCAS San Luis Obispo County Archaeological Society STP shovel test pit USGS United States Geological Survey Page 311 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 1 INTRODUCTION LSA has prepared this revised archaeological monitoring plan (Plan) for the City of San Luis Obispo (City) for the Verde/Luneta/Ramona Sewer Replacement Project (project). Per 2020 project plans, the replacement of existing sewer associated with the project begins in the street in front of 410 Luneta Drive and extends east into the intersection with Verde Drive, then extends south to the edge of the property at 515 Luneta Drive and north along Verde Drive to the intersection with Ramona Drive, and further extends east along Ramona Drive to the intersection with Palomar Avenue in San Luis Obispo, California (Figures 1–3, provided in Appendix A). As of 2021, project plans have been updated. The remainder of the existing sewer line (extending southeast) starting at the intersection of Palomar Avenue and Ramona Drive will now be abandoned and a new alignment of sewer will be excavated and installed in Ramona Drive heading east to the intersection with Broad Street, then extending south to terminate in the street in front of 60 Broad Street and rejoin the existing sewer alignment. The City’s Archaeological Resource Preservation Program Guidelines (Guidelines), developed by the Cultural Heritage Committee (CHC), Section 1.30 defines archaeologically sensitive areas and sites as: A. Areas inside or within 200 feet (ft) (61 meters) of the boundaries of an archaeological site shown on USGS topographic maps on file in the Community Development Department and/or recorded with the Central Coast Information Center (CCIC); B. Areas within 200 ft of top of banks of San Luis Obispo, Stenner, Brizzolara, Acacia, Old Garden, Prefumo, and Froom Creeks; C. Areas inside a Historical District or within an area designated as being archaeologically sensitive, or within a burial sensitivity area as shown on maps on file at the Community Development Department; D. Sites designated on the Master List of Historic Resources, or determined to be eligible for listing on the National Register of Historic Places (National Register) or California Register of Historical Resources (California Register) (PRC Section 5024.1 (a)); E. Sites within a historically or archaeological sensitive designated by the CHC, City Council, or other governmental agency; or F. Sites identified as being sacred places or Traditional Cultural Properties as defined in National Register Bulletin 38, Guidelines for Evaluating and Documenting Traditional Cultural Properties by Northern Chumash community members who have been identified by the California Native American Heritage Commission (NAHC) as having ancestral ties to San Luis Obispo County, or by other local tribal representatives similarly recognized by the NAHC (City of San Luis Obispo 2009: 8-9). The Guidelines are a model for the identification, evaluation, and preservation of archaeological and other cultural resources in the city. They are based upon and implement policies in the City’s Page 312 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 2 General Plan Land Use Element and Conservation and Open Space Element, and are part of the City’s environmental review process. Per Section 4.50 of the Guidelines, construction monitoring may be required if there is a possibility that significant or potentially significant archaeological resources are present in the impact zone of a construction project and that it is not reasonable to conduct additional physical investigations prior to construction (City of San Luis Obispo 2009: 18). This Plan implements Section 4.50 and presents the project’s background setting, construction monitoring procedures, criteria for evaluating cultural resources identified during construction, and methods for archaeological data recovery and mitigation (if required). Per Section 4.50 of the Guidelines, the City must review and approve this plan prior to commencement of construction for the project. PROJECT DESCRIPTION The original project involved only the replacement of existing sewer line on Luneta Drive, Verde Drive, and Ramona Drive. As of August 2021, the revised project involves the replacement of existing sewer line on Luneta Drive, Verde Drive, and Ramona Drive, and the installation of new sewer line on Ramona Drive and Broad Street. Construction activities will include excavation via trenching to remove existing sewer lines (or to install brand new lines), installation of new pipelines, backfilling/closing the trench, and replacing asphalt. Archaeological monitoring at certain locations will be required during excavation activities. According to the revised project plans provided by the City (Appendix B), excavation activities are anticipated to range to depths between approximately 6 ft and 20 ft. BACKGROUND RESEARCH Section 4.50 of the Guidelines requires construction monitoring if it is not reasonable to conduct additional physical investigations prior to construction. Due to the paved nature of the project, physical investigation of the project site was not reasonable. To determine which portions of the project site are sensitive for cultural resources, per Section 1.30 of the Guidelines, a record search for the original project site and a 0.25-mile radius was conducted at the CCIC of the California Historical Resources Information System at the University of California, Santa Barbara. The CCIC, an affiliate of the California Office of Historic Preservation (OHP), is the official repository of cultural resources records and reports for San Luis Obispo County. The record search also included a review of the following State and federal inventories: x Directory of Properties in the Historic Property Data File (OHP 2012). The directory includes the listings of the National Register of Historic Places, National Historic Landmarks, the California Register of Historical Resources, California Historical Landmarks, and California Points of Historical Interest. x California Historical Landmarks (OHP 1996). x California Points of Historical Interest (OHP 1992). x Five Views: An Ethnic Historic Site Survey for California (OHP 1988). x California Inventory of Historic Resources (OHP 1976). Page 313 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 3 The record search results indicate that one previous cultural resources study has included a portion of the original project site, and six cultural resources studies have included the 0.25-mile radius around the original project site (CCIC Record Search 20-108; Appendix C). The one study that has included a portion of the original project site was an archaeological survey along Ramona Drive. The additional six studies included an archaeological excavation (1), cultural resource investigations (2), and surveys (3). No cultural resources have been recorded within the project site as a result of previous cultural resources studies. One historic-period cultural resource has been recorded within 0.25-mile of the original project site: P-40-40176 (the historic-period Delta Tau Fraternity building). An updated record search was not conducted for the revised project because the revised project site was included within the original record search study area. PROJECT AREAS TO BE MONITORED Based on the results of the record search at the CCIC as well as an examination of maps, site records, and archaeological reports, archaeological monitoring is not required for the entire project site. Historic topographic maps (NETR 2020) depict an intermittent stream intersecting Ramona Drive near Palomar Avenue, and a separate intermittent stream coursing north/south between Ramona Drive and Luneta Drive. No previously recorded archaeological cultural resources exist within 0.25-mile of the project site. However, there is a documented presence of intermittent streams within 200 ft of portions of the project site. As such, one of two types of archaeological monitoring (full time and spot check) is required for specific portions of the project site. Full time archaeological monitoring is required during project excavation activities from Station 70+06.04 (at the intersection of Ramona Drive and Palomar Avenue) to the termination of project excavation at Station 13+38.65 on Broad Street. The nature of sewer line replacement means that the removal of existing sewer occurs within a previously disturbed trench and that sewage materials from existing sewer pipes spills into the bottom of the trench and obscures visuals of most native soils. For this reason, archaeological spot check monitoring (no more than six hours on-site per week divided between two to three days, as determined by the Project Archaeologist) is required on all of Verde Drive, on Ramona Drive between Station 71+41.10 and Station 96+41.48 (at the intersection with Palomar Avenue), and on Luneta Drive between Station 69+00 and Station 70+06.04 (at the intersection with Verde Drive). These portions of the revised project site are in an area with archaeological sensitivity but have extremely limited visibility for identifying cultural deposits. Monitoring is not required on Luneta Drive between Station 66+57.05 (in front of 410 Luneta Drive) and Station 69+00 (Appendix A, Figure 3). Page 314 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 4 CULTURAL SETTING PRECONTACT Early California archaeologists largely passed over the Central Coast of California until cultural resources management took off in the 1970s (Jones et al. 2007: 130). Jones et al. (2007) employ a chronological system for Central Coast Prehistory that incorporates periods, locally defined phases, and regional cultures. For San Luis Obispo and the Central Coast, the six periods of cultural chronology are Late, Middle/Late Transition, Middle, Early, Milling Stone/Early Archaic, and Paleo- Indian (Table A) (Jones et al. 2007). Table A: Chronological Sequence of the California Central Coast Period Temporal Span (A.D./B.C.) Temporal Span (B.P.) Late A.D. 1250 to 1769 700 B.P. to historic Middle/Late Transition A.D. 1000 to 1250 1000 to 700 cal B.P. 1 Middle 600 B.C. to A.D. 1000 3000 to 1000 cal B.P. Early 3500 to 600 B.C 5500 to 3000 cal B.P. Milling Stone/Early Archaic 8000 to 3500 B.C. 10,000 to 5500 cal B.P. Paleo-Indian Pre-8000 B.C. Pre-10,000 cal B.P. Source: Jones et al. (2007) 1 cal B.P. is calibrated years before present. Paleo-Indian Period (Pre-10,000 cal B.P.) Early human presence in San Luis Obispo is suggested only by fluted project points from two locations in San Luis Obispo County: Nipomo and near Santa Margarita. However, no other evidence has been found to suggest habitation during this period (Jones et al. 2007: 135). Milling Stone Culture (10,000 to 5500 cal B.P.) The Milling Stone Culture is marked by “large numbers of well-made handstone and/or milling slabs, crude core and cobble-core tools, and less abundant flake tools and large side-notched projectile points” (Jones et al. 2007: 135). Pitted stones, contracting stemmed points, lanceolate points, and crescents have also been found in the context of some Milling Stone sites. Occupation dating to the Milling Stone has been identified at no fewer than 42 sites in various settings—rocky coasts, estuaries, and nearshore interior valleys. As very few sites with Milling Stone components have been found farther than 15 miles from the shore and most interior Milling Stone sites produce marine shells, it is believed that many groups from the Milling Stone period maintained some form of a connection with the coast (Jones et al. 2007: 135-137). Early Period (5500 to 3000 cal B.P.) The Early Period is marked by the co-occurrence of contracting-stemmed and Rossi square-stemmed points, as well as large-notched type points leftover from the Milling Stone Culture. Ground stone assemblages from the Early Period contain handstones and milling slabs, along with pitted stones. Page 315 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 5 During this period, portable mortars and pestles appeared and the frequency of cobble-core tools decreased (Jones et al. 2007: 138). Middle Period (3000 to 1000 cal B.P.) Middle Period sites contain assemblages of contracting-stemmed points. These sites are also marked by the disappearance of the square-stemmed and large side-notched points. Ground stone assemblages reveal continued use of both slabs/handstones and portable mortars/pestles. Pitted stones and groove stone net sinkers are also commonly found at Middle Period sites. Bone flutes are occasionally found in association with burials dating to the Middle Period, and other burial accompaniments include bone tubes and Olivella beads. Toward the end of the Middle Period, smaller leaf-shaped projectile points appeared, marking the arrival of bow-and-arrow technology (Jones et al. 2007: 138-139). Middle/Late Transition (1000 to 700 cal B.P.) The transition between the end of the Middle Period and the beginning of the Late Period was marked by dramatic changes in assemblages and settlement patterns. This change was evidenced by the appearance of large numbers of arrow points, the disappearance of most stemmed points, and changes in bead types. The transition time dates slightly differently for various Chumash tribes, but in San Luis Obispo County the transition occurred sometime between A.D. 900 and A.D. 1280. Archaeological site CA-SLO-9 contained an assemblage dating to this time that was dominated by contracting-stemmed projectile points, small leaf-shaped arrow points, notched line sinkers, circular shell fishhooks, and Olivella saucer beads (Jones et al. 2007: 139). Late Period (700 B.P. to historic) Late Period sites contain assemblages consisting of large numbers of Desert side-notched and Cottonwood arrow points, small bifacial bead drills, bedrock mortars, hopper mortars, lipped and cupped Olivella beads, and steatite disk beads. The period is marked by single-component sites concentrated in the interior of the region, as opposed to concentrated in the coastal part of the region. Many sites dating to the Late Period are marked by small middens with associated (or nearby) bedrock mortars. ETHNOHISTORY The project site is within an area prehistorically occupied by the Northern (Obispeño) Chumash. The Obispeño Chumash are a subdivision within the larger Chumash cultural family and are named after their historical attachment to Mission San Luis Obispo de Tolosa, which was founded in 1772 (Greenwood 1978: 520). Early accounts of the Obispeño Chumash imply a hunter-gatherer lifestyle, but other aspects of accounts indicate that there was also a high level sociopolitical complexity (Jones et al. 2007: 129). Additionally, a house floor measuring 30 ft in diameter at Morro Bay was discovered during excavations (Greenwood 1978: 520), suggesting the existence of sedentary villages. There are fewer historical accounts and ethnographic studies of the Obispeño Chumash than for the Chumash of the Santa Barbara Channel. No villages were recorded by European visitors to the area; Pedro de Unamuno (1587), Sebastian Cermeño (1595), Gaspar de Portolá (1769), and Lieutenant Page 316 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 6 Pedro Fages (1772) all kept diaries, but none of them described large or heavily populated villages like those seen along the Santa Barbara Channel (Greenwood 1978: 520). While none of these expeditions reported large villages and, at the same time, the 30-ft house floor was found in Morro Bay in what is reportedly within sight of the Portolá camp, it is possible that villages flourished and declined before the years of European exploration. By the time historical contact occurred, the majority of Chumash houses were small, round, and domed. Other individuals apparently lived out in the open, and some dwellings near Morro Bay were constructed as a round hole with branches for a roof (Greenwood 1978: 521). While the archaeological record demonstrates that the Chumash exploited marine food resources, conditions did not favor the canoe and most marine food was harvested by hand, trap, pole, net, and hook-and-line from tidal pools and shallow waters (Greenwood 1978: 522). Obispeño chiefs had many wives and retained the right to divorce them. Social rank was derived from material wealth, and the chief received offerings of food, goods, and beads from those in the village (Greenwood 1978: 523). In 1914 and 1915, the last Obispeño speaker (Rosario Cooper) provided some details of Chumash life to American linguist and ethnologist J.P. Harrington, including cures for witchcraft, beliefs in nature, dances associated with the swordfish and coyote, and offerings thrown to the swordfish in Avila. Cooper also told Harrington of a game played with wild walnuts filled with brea, and of material culture items like brooms of juncus stalks, sleeping mats, foxskin quivers, and the use of white clay for shampoo (Greenwood 1978: 523). Following the establishment of the mission in San Luis Obispo and the conversion of the Chumash people, already-declining coastal villages suffered high mortality rates and the villages became barely inhabited. Obispeño culture also rapidly disappeared as a result of missionization (Greenwood 1978: 523). In 1803, Chumash population at the Mission was recorded to be 919; by 1838, the population was down to 170. By the time the Bureau of Indian Affairs compiled the Roll of 1928, only four Native Americans claimed to be survivors of San Luis Obispo neophytes (Greenwood 1978: 521). HISTORY Following its founding in 1772, Mission San Luis Obispo de Tolosa quickly became self-sufficient, and it was used as a stopover for those traveling between missions to the north and south of San Luis Obispo (HRG 2013: 13–14). Spanish and Mexican ranchos extended across what is now San Luis Obispo County but were subdivided after California’s admission to the Union in 1850 and the California Land Act of 1851. The California Land Act caused many rural landowners in the county to migrate into the City of San Luis Obispo, which was designated as the county seat in 1868. The Southern Pacific Railroad arrived in town in the late 1890s, and the California Polytechnic Institute (now California Polytechnic University, San Luis Obispo) (Cal Poly) was established in 1901 (HRG 2013: 14). The Mission and Cal Poly influenced the community’s growth, as did William Randolph Hearst’s San Simeon Ranch, which is more commonly known today as Hearst Castle. Development in San Luis Obispo began to expand in the 1900s due to the advent of the automobile, and tourism—particularly automobile tourism—played a role in the area’s continued development. While it affected most of the country, the Great Depression’s economic impacts in San Luis Obispo were mitigated by the establishment of a military training camp, Camp San Luis Obispo. The Page 317 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 7 establishment of the camp led to a dramatic increase in population, and the camp continued to draw in military families as training activity increased in preparation for World War II (HRG 2013: 15). Many soldiers permanently settled in San Luis Obispo after returning from the war, which spurred a need for single-family housing in the 1950s and 1960s (HRG2013: 15). The United States Census Bureau estimates that, as of July 1, 2017, the population of the city of San Luis Obispo was 47,541. Page 318 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 8 CONSTRUCTION MONITORING PLAN MONITORING PERSONNEL A qualified archaeological monitor will observe all project-related excavation activities on Cuesta Drive and Loomis Street. Native American monitors will not initially be on site during construction. The archaeological monitor for the project will be a Registered Professional Archaeologist (RPA) or will be under the direction supervision of the RPA. Monitors will be thoroughly briefed in monitoring methodology, responsibilities, procedures, safety requirements, and rules. The archaeological monitor will also retain a copy of this Monitoring Plan while on duty. For this project, the LSA Project Manager and Project Archaeologist (Kerrie Collison, M.A., RPA No. 28731436) will oversee monitoring operations. The archaeological monitoring schedule will be coordinated with the City Inspector or other City staff (or their designated representative) as appropriate. MONITORING PROCEDURES Prior to the commencement of excavation activities on the first day of monitoring, an LSA archaeologist will provide cultural resources awareness training to construction personnel. This training should be in the form of a presentation and handout describing the types of possible archaeological deposits that may be encountered during construction activities and the procedures that should be used in the event of inadvertent discoveries of cultural resources during construction. All ground-disturbing activities within the designated monitoring areas, including clearing, grubbing, tree removal, grading, boring, digging, trenching, and other related activities will be monitored by the archaeological monitor. The archaeological monitor will record archaeological deposits identified during monitoring, unless field observations indicate that the deposits are not in situ. The monitor will complete a daily form that identifies the date and location of the monitoring as well as any cultural resources that are identified. Photographs will be taken of monitoring activities and as part of resource documentation, as necessary. If archaeological cultural resources are identified during monitoring, the monitor will be empowered to temporarily halt construction and flag the resource to protect it from project activities that may disrupt it. The monitor will make an initial assessment of the potential for the find to qualify as a historical or unique archaeological resource under the California Environmental Quality Act (Public Resources Code Sections 21084.1 and 23082.3), and, as warranted, make recommendations for additional analysis necessary (including excavation) to formally evaluate the eligibility of the find for the California Register. Eligibility of the resource for the California Register would depend on a combination of factors, including the horizontal and vertical extent of the archaeological deposits, the type and relative abundance of archaeological material found, and the extent of prior disturbance of the deposits, if any. Archaeological materials can include artifacts, ecofacts, and discrete features. LSA will immediately notify the Community Development Director (Director) of any archaeological finds during project work, per Section 4.60.1 of the Guidelines. Page 319 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 9 UNANTICIPATED DISCOVERIES If archaeological cultural resources are found during the project, the following procedures would be implemented. If the find is not human remains, the area of the archaeological find would be flagged for avoidance at a distance determined by the monitor to avoid impacts to the resource by construction activities. The monitor would determine whether the find is an isolate (one or two cultural items located within 50 meters [164 ft]) of a site (three or more cultural items within 50 meters). If the find is determined to be an isolate, its location would be recorded using a handheld global positioning system (GPS) unit, the material collected, the resource characteristics recorded, and construction activities allowed to resume. If the find is determined to be an archaeological site, earth-moving activities would be diverted until the site type and boundary can be determined by following appropriate testing-evaluation procedures (discussed in further detail in Section 0 of this Plan). Regardless of whether the find is an isolate or site, all resources would be photographed and mapped using GPS, and descriptive notes would be taken before construction work would be allowed to resume. HUMAN REMAINS If human remains are found, the requirements of State Health and Safety Code Section 7050.5 must be met. State Health and Safety Code Section 7050.5 states that no further disturbance shall occur until the County Coroner has made a determination of origin and disposition pursuant to State Public Resources Code Section 5097.98. The County Coroner must be notified of the find immediately. If the remains are determined to be Native American, the County Coroner would notify the Native American Heritage Commission, which would determine and notify a Most Likely Descendant (MLD). With the permission of the landowner or his/her authorized representative, the MLD may inspect the site of the discovery. The MLD shall complete the inspection and make recommendations or preferences for treatment within 48 hours of being granted access to the site. The MLD recommendations may include scientific removal and nondestructive analysis of human remains and items associated with Native American burials, preservation of Native American human remains and associated items in place, relinquishment of Native American human remains and associated items to the descendants for treatment, or any other culturally appropriate treatment. In brief, the area of the find of human remains would be flagged off so that construction activity within at least 25 ft of the discovery would be redirected elsewhere, and the County Coroner (as well as the Director) would be notified immediately. Project activities would avoid any impacts to the human remains. NATIVE AMERICAN MONITORING A Native American tribal representative would be contacted in the event that Native American artifacts are encountered during ground-disturbing activities. If this occurs, the Native American tribal representative would be invited to observe remaining project ground-disturbing activities for additional Native American artifacts. Page 320 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 10 REPORT OF FINDINGS Upon completion of the construction monitoring (and any necessary laboratory operations, as discussed below), LSA will prepare a monitoring report documenting the monitoring results and the status of cultural resource(s), if applicable. If no archaeological cultural resources are found during construction, the monitoring report would be a brief letter report submitted to the Director. If monitoring is positive and results in the identification of cultural resources, the report would be consistent with the Guidelines of the State Office of Historic Preservation’s Archaeological Resource Management Reports (ARMR): Recommended Contents and Format (OHP 1990) and would be submitted to the Director. A positive findings report will include the following information: 1. The location and dates of monitoring. 2. The methodology and procedures for field and laboratory work. 3. The location, description, and eligibility determination of the cultural resource(s) found during monitoring. 4. All forms (archaeological monitoring, photographic record, and artifact record) completed as a part of monitoring will be provided as appendices to the report. State of California Department of Parks and Recreation (DPR) Series 523 forms will be prepared in accordance with the guidelines established by the OHP for cultural resources found during the project. 5. The status of curation of the material found. Copies of any report prepared for this project will be submitted to the City and to the CCIC. Page 321 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 11 ARCHAEOLOGICAL SITE TESTING If potentially significant, intact archaeological deposits or human remains are identified during construction monitoring, construction would be temporarily halted and the area of the find would be flagged for avoidance at a distance determined by the monitor to avoid impacts to the resource by construction activities (at least 25 ft in the case of human remains). The LSA Project archaeologist will contact the City and determine whether archaeological site testing is necessary. If determined necessary, archaeological site testing would be conducted to evaluate site importance/significance and, therefore, site eligibility for listing in the California Register. The archaeological site testing procedures will be conducted in a manner consistent with standard accepted professional archaeological methodology. Testing procedures can include surficial artifact collection, and excavation using shovel test pits (STPs), 1x1 meter excavation units, mechanized trenching, or a combination of these methods. Fieldwork Test excavation will consist of the excavation of STPs and 1x1 meter units. These excavations will be used to determine the character, integrity, and vertical (depth) and horizontal (size) extent of the site. Placement of STPs will be on a north-south axis or along the axis of greatest site length, whichever is more appropriate for a particular site. STPs will be excavated to determine the extent of midden deposits and to generally identify site areas where cultural material exists in quantity. STPs will measure approximately 40 centimeters (cm; 16 inches) in diameter and will be hand- excavated in 20 cm (8-inch) levels to a culturally sterile level or to a depth no greater than 100 cm (39 inches). Sediment from each STP level will be passed through 1/8-inch mesh screen and all cultural material will be saved in labeled Ziploc bags. Notes recorded at the time of excavation will identify sediment color, depth, and cultural material from each STP. Bagged material will be transported to the LSA laboratory for cleaning, sorting, identification, analysis, and curation. Based on the results of the STPs, units will be excavated to more accurately identify material density and depth. Units will be placed in areas of the site shown to contain the greatest potential for finding the deepest midden deposits, as well as the greatest quantity and diversity of cultural material. Excavation units will be hand-excavated in 10 cm (4-inch) levels following the natural surface contour. Excavated sediment will be screened through 1/8-inch mesh and cultural material from each level will be saved in labeled Ziploc bags. Bagged material will be transported to the LSA laboratory for cleaning, sorting, identification, analysis, and curation. Unit excavation will cease when sterile sediment or bedrock is encountered. During the course of unit excavation, if a distinct sediment type is identified, excavation may change to follow this new contour in 10 cm (4-inch) levels until it disappears or until another change occurs, whereupon excavation following the natural surface contour will resume. Once excavation ends, an STP may be placed in the unit floor to confirm that additional cultural material does not exist below what is thought to be the bottom of the unit. Page 322 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 12 During unit excavation, a line-level placed at the ground surface will be used to record the basal depth of in situ artifacts and features. Fire-affected rock will be counted and weighed. Notes, measurements, and drawings will be recorded on unit level forms during excavation. Items and samples given exact provenance will be sketched on the floor plan of the appropriate level form. After excavation, one wall of each unit will be profiled and photographed. The wall selected will be the wall displaying the most representative stratigraphic development, including residual features. Distinctive subsurface horizons will be described by sediment type and color using the Munsell Color Chart. LABORATORY ANALYSIS All collected material remains the property of the landowner (for this project, the City). All artifacts and ecofacts collected during monitoring will be taken to the LSA laboratory where they will be cleaned and prepared for analysis. Cataloging and processing will take place based on methods for each material class; material will be cataloged as individual artifacts or as groups of ecofacts, as appropriate. Items may be analyzed by specialists, as warranted. Ecofactual material such as (nonhuman) bone, charcoal, and/or shell may be submitted for radiocarbon testing that can reveal the age of the material analyzed. Similarly, artifacts made of obsidian (volcanic glass) may be submitted for sourcing and hydration analyses that will reveal the geochemical source and time of manufacture. Other specialized studies may be conducted, but will be dependent upon the presence of material. Items such as beads and fish ear bones (otoliths) can provide information on chronological site occupation and seasonality, although these items must be found before specialized studies can occur. Items will be prepared for curation in accordance with standardized curation guidelines, and will be temporarily curated at LSA until they are deposited with an approved curation facility. LSA anticipates that curation of any items recovered during this project will take place at the San Luis Obispo County Archaeological Society (SLOCAS) Curation Facility on the Cuesta College campus. Final cataloging and artifact preparation will be consistent with SLOCAS requirements. SITES NOT ELIGIBLE FOR THE CALIFORNIA REGISTER Should site testing indicate the site is not eligible for listing in the California Register, then the resource shall be fully recorded on DPR Series 523 Forms and construction activities allowed to resume. SITES ELIGIBLE FOR THE CALIFORNIA REGISTER Series 523 DPR forms will be completed to record site location and to provide material descriptions. Completed forms will be appended to the monitoring report. Should site testing indicate that the site may be eligible for listing on the California Register, then adverse effects to the resource shall be avoided, or effects mitigated. Avoidance of impacts to resources is always the preferred alternative, although where avoidance is not feasible mitigation of impacts to a resource can consist of, but is not limited to, excavation in accordance with a data recovery plan. Page 323 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 13 Data Recovery Excavation and Reporting Mitigation of impacts to an important (significant) resource can include excavation of the deposit in accordance with a data recovery plan (California Code of Regulations Title 14(3) Section 15126.4(b)(3)(C)), which states: When data recovery through excavation is the only feasible mitigation, a data recovery plan, which makes provision for adequately recovering the scientifically consequential information form and about the historical resource, shall be prepared and adopted prior to any excavation being undertaken. Such studies shall be deposited with the California Historical Resources Regional Information Center. Archaeological sites known to contain human remains shall be treated in accordance with the provisions of Section 7050.5 Health and Safety Code. As such, if a resource determined to be important and eligible for listing in the California Register is found during the project, then an attempt to avoid the resource through project redesign or other means would be made. If it is determined that the only feasible alternative is excavation and removal of the resource, a data recovery plan shall be written describing the scientific methodology to be employed during excavation. The data recovery plan will employ a research design to guide the excavation. Any studies developed as part of this effort will be reported upon in a manner that adheres to current professional standards, and reports will be filed with the City and the CCIC. If additional material is exposed at the same site after impacts have been mitigated, additional mitigation (excavation) will not be required unless the new material represents a new type of data (artifact classes and/or features) not recovered during previous mitigation. Page 324 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) 14 REFERENCES California Office of Historic Preservation (OHP) 1976 California Inventory of Historic Resources. California Department of Parks and Recreation, Sacramento. 1988 Five Views: An Ethnic Historic Site Survey for California. California Department of Parks and Recreation, Sacramento. 1990 Archaeological Resource Management Reports (ARMR): Recommended Contents and Format. February. 1992 California Points of Historical Interest. California Department of Parks and Recreation, Sacramento. 1996 California Historical Landmarks. California Department of Parks and Recreation, Sacramento. 2012 Directory of Properties in the Historic Property Data File. California Department of Parks and Recreation, Sacramento. April 5. City of San Luis Obispo 2009 Archaeological Resource Preservation Program Guidelines. Adopted October 20, 2009, by the San Luis Obispo City Council, Resolution No. 10120 (2009 Series). On file, LSA Associates, Inc. Available online: http://www.slocity.org/home/showdocument?id=4140. Greenwood, Roberta S. 1978 Obispeño and Purisimeño Chumash. In R. Heizer ed., Handbook of North American Indians, Vol. 8, California, pp. 520-523. Smithsonian Institution, Washington D.C. Historic Resources Group (HRG) 2013 City of San Luis Obispo Citywide Historic Context Statement. September 30. On file, LSA, San Luis Obispo, California. Jones, Terry L., Nathan E. Stevens, Deborah A. Jones, Richard T. Fitzgerald, and Mark G. Hylkema 2007 The Central Coast: A Midlatitude Milieu. In California Prehistory: Colonization, Culture, and Complexity. Terry L. Jones and Kathryn A. Klar, eds. pp. 125-146. AltaMira Press, Lanham, Maryland. National Environmental Title Research (NETR) 2020 Historic Aerials. Website: http://www.historicaerials.com (accessed June 15, 2020). Page 325 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) APPENDIX A PROJECT FIGURES Figure 1: Project Vicinity Figure 2: Project Location Figure 3: Project Site and Monitoring Area Page 326 of 984 £¤101 ÃÃ1 ÃÃ135 ÃÃ166 ÃÃ229 ÃÃ227 ÃÃ1 ÃÃ46 ÃÃ58 ÃÃ41 San Luis Obispo County Santa Barbara County Project Location SOURCE: Esri (2019) I:\CBZ1801.04\GIS\MXD\Figure 1_VerdeProjVicnity.mxd (8/12/2021) FIGURE 1 verde/Luneta/Ramona Sewer Replacement Project Vicinity LEGEND Project Location 036 MILES Page 327 of 984 Project Location SOURCE: USGS 7.5' Quad. San Luis Obispo, CA (1994) I:\CBZ1801.04\GIS\MXD\Figure 2_VerdeProjLocation.mxd (8/12/2021) FIGURE 2 Verde/Luneta/Ramona Sewer Replacement Project Location LEGEND Project Location 0 1000 2000 FEET Page 328 of 984 LEGEND Project Location Project Site (Archaeological Spot Check Monitoring Required) Project Site (Archaeological Monitoring Required-Full Time) No Archaeological Monitoring SOURCE: Bing Maps, 2020 I:\CBZ1801.04\GIS\MXD\Figure 3_VerdeProjLocationAerial.mxd (8/13/2021) FIGURE 3 Verde/Luneta/Ramona Sewer Replacement Project Site and Monitoring Area 0100200 FEET Page 329 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) APPENDIX B 75 PERCENT PROJECT PLANS Page 330 of 984 Project Locations index to plans sheet no. description san luis obispo county, california SPECIFICATION NO.DATE SHEET 1000091 FILE NO./LOCATION 1 2 3 4 5 6 7 COVER SHEET LUNETA DRIVE VERDE DRIVE VERDE DRIVE & RAMONA DRIVE RAMONA DRIVE RAMONA DRIVE BROAD STREET 7of1 VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT FEBRUARY 2022 SEWER MANHOLE FLOW DIAGRAM SCHEMATIC. TROUGH VARIES WITH PIPE LAYOUT. ARROWS INDICATE FLOW DIRECTION. DEAD OR UNUSED SEWER LATERAL, VERIFY CONDITION. ABANDON IN PLACE IF DEAD, UNUSED, OR CAPPED. CONNECT SEWER LATERALS AND MARK TOP OF CURB WITH THE LETTER "S" PER ENG. STD. 6810. CONNECT SEWER LATERALS AND MARK TOP OF CURB WITH THE LETTER "S" PER ENG. STD. 6810. (BID ALTERNATIVE A) (E) STORM DRAIN (E) SEWER (E) WATER (E) GAS (E) OIL (E) TELEPHONE (E) FIBER OPTIC ABANDONED SEWER ABANDONED WATER (E) SURVEY MONUMENT - PROTECT IN PLACE (E) SURVEY MONUMENT - REPLACE IF DAMAGED OR DESTROYED. SEE GENERAL NOTE 4. DSDS SS SS SDSD SSSS WW GG OO TT FOFO ASAS AWAW 1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT "UNDERGROUND SERVICE ALERT U.S.A." TOLL FREE AT 1-800-227-2600 FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION, FOR LOCATION OF POWER, TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR OR PERMITEE SHALL ALSO CONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER, DRAINAGE OR UNDERGROUND FACILITIES. 2. THE CONTRACTOR SHALL POSSESS A CLASS "A" OR "C-34" LICENSE AT THE TIME OF BID OPENING. 3. CONTRACTOR SHALL VERIFY DEPTH AND LOCATION OF ALL CROSSINGS PRIOR TO LAYING PIPE SO THAT PIPE ALIGNMENT AND GRADE CAN BE ADJUSTED AS NEEDED. 4. TIE OUT CENTERLINE MONUMENTS BEFORE WORK AND REPLACE IF DISTURBED IN ACCORDANCE WITH THE LAND SURVEYORS ACT, AND SECTION 5-1.36E, REPLACE MONUMENT AND WELL PER ENG. STD. 9020. 5. THE CONTRACTOR MUST REPLACE ALL PAVEMENT STRIPES, MARKINGS, AND MARKERS DISTURBED DURING CONSTRUCTION. ALL PAVEMENT STRIPES AND MARKINGS WITHIN 5 FEET OF THE DISTURBED AREA MUST BE REPLACED. ALL STRIPING IS PER STATE STANDARD PLANS AND PER PER ENGINEERING STANDARD SPECIFICATION 84-1.01A. 6. SEWER MAIN WITH LESS THAN 1% SLOPE MUST BE INSTALLED WITH FLOAT ROCK AS BEDDING AND INITIAL BACKFILL. SEE ENG. STD. 6020, NOTE 10 FOR ADDITIONAL REQUIREMENTS. 7. CONNECT EXISTING VCP SEWER MAIN TO NEW MANHOLE WITH 3 FOOT PVC STUB AND RC STRONG BACK COUPLINGS 8. CONNECT EXISTING HDPE SEWER MAIN TO NEW MANHOLE WITH 3 FOOT HDPE STUB AND FUSED COUPLINGS OR BUTT FUSION. 9. CONNECT EXISTING PVC SEWER MAIN TO NEW MANHOLE WITH 3 FOOT PVC STUB AND PVC COUPLINGS. 10. ALL PIPE LENGTHS ARE APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL PIPE LENGTHS. 11. APPROXIMATE LOCATION OF LATERALS ARE SHOWN ON PLANS. LOCATING LATERALS IS THE RESPONSIBILITY OF THE CONTRACTOR AND ANY DAMAGE TO A LATERAL MUST BE REPAIRED IMMEDIATELY AND AT NO COST TO THE CITY. 12. ALL NEW MANHOLE MUST BE COATED PER SECTION 77-3.03D(E) OF THE PROJECT SPECIAL PROVISIONS. DO NOT COAT EXISTING SSMH I06-48 AT RAMONA AND PALOMAR. 13. ALL WORK ON BROAD AND RAMONA (SHEET 6 & 7) MUST BE COMPLETED AS THE FIRST PRIORITY OF WORK. HEAVY ROCK EXCAVATION IS EXPECTED ON THESE STREETS (REFER TO SECTION 19-1.03E AND GEOTECHNICAL REPORTS FOR MORE INFORMATION). 14. NOT ALL IMPROVEMENTS WITHIN PRIVATE PROPERTIES ARE SHOWN. UPON COMPLETION OF WORK WITHIN PRIVATE PROPERTIES, THE CONTRACTOR MUST RESTORE PRIVATE PROPERTY IMPROVEMENTS TO THE SAME CONDITION BEFORE THE START OF CONSTRUCTION. Reference Documents: City Standard Specifications - 2020 Edition City Engineering Standards - 2020 Edition APPROVED BY Brian A. Nelson, City Engineer R.C.E. C79870 Approved Date No. C 79870BRIAN A . NELS O NCIV I L SIZE & INV SIZE ELEV OUT SS SS Page 331 of 984 285 290 295 300 305 310 315 320 325 330 285 290 295 300 305 310 315 320 325 330 66+50 66+75 67+00 67+25 67+50 67+75 68+00 68+25 68+50 68+75 69+00 69+25 69+50 69+75 70+00 70+25 STA. 66+57.05 (N) SSCO I07-8 RIM = 319.06' 8" OUT 315.00' (E) (N) 347 ' - 8 " H D P E S E W E R , S = 7 . 8 3 % BY OP E N T R E N C H I N G & R E M O V E E X I S T I N G 6 " V C P S E W E R STA. 70+06.04 (N) SSMH I07-7 RIM = 293.58' 8" IN 287.80' (W) 6" IN 287.80' (S) 8" OUT 287.70' (N) (E) GRADE REMOVE (E) SSMH I07-9 (E) 2" GAS (E) 6" AC WATER W WWWWWWWWWGGGGGGGGGGW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS G G G G G G G G G G G G G G G G G GGGGGGGGGGGGGGGGGGGGGGGGGSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS GGGGGGGGGGGGGGGGGGWWWWWWW(E) 6" AC WATER(E) 6" AC WATER (E) 8" CI WATER (E) 8" AC WATER (E) 8" CI WATER (E) 2" GAS (E) 2" GAS (E) 2" GAS+67 00 +68 00 +69 00 +70 00 STA 66+57.05 (N) SSCO I07-8 RIM = 319.06' STA 70+06.04 (N) SSMH I07-7 RIM = 293.58'(N) 174' - 6" HDPE SEWER(N) 113' - 8" HDPE SEWERLUNETA DR.8.6'15.4'38'8'6'REMOVE AND REPLACE SSCO I07-8 PER ENG. STD. 6710 6" OUT 315.00 REMOVE AND REPLACE SSMH I07-7 PER ENG. STD. 6610 6" IN 287.70 8" OUT 287.60 6" IN 287.70 VERDE DR(N) 195' - 8" HDPE SEWER REMOVE (E) SSMH I07-9 (N) 50' - 8" HDPE SEWER R1000.0' (N) 102' - 8" HDPE SEWER 14' PUBLIC UTILITY EASEMENT 0 SCALE IN FEET 20 40 LUNETA DRIVE2 HORIZ 1" = 20' VERT 1" = 5' SEE SHEET 3 CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION HNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHN MG BN FEBRUARY 2022 1000019 7 APPROVED: [Mo Day, Yr] SEE SHEET 3 Page 332 of 984 STA. 70+22.87 (N) SSMH I07-2 RIM = 285.34' 8" IN 281.70' (S) 8" OUT 281.60' (N) STA. 70+06.04 (N) SSMH I07-7 RIM = 293.58' 8" IN 287.80' (W) 6" IN 287.80' (S) 8" OUT 287.70' (N) STA. 69+88.54 (N) CO I07-15 RIM = 302.70' 6" OUT 295.00' (N) (N) 174' - 6" H D P E S E W E R , S = 4 . 1 0 % BY PIPE BUR S T I N G T H R O U G H E X I S T I N G 6 " V C P S E W E R (N) 113' - 8" H D P E S E W E R , S = 5 . 2 3 % BY OPEN T R E N C H I N G & R E M O V E E X I S T I N G 6 " V C P S E W E R (N) 3 3 7 ' - 8 " H D P E S E W E R , S = 1 0 . 2 3 % BY O P E N T R E N C H I N G & R E M O V E E X I S T I N G 6 " V C P S E W E R (E) GRADE SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G GWWWWWWW WWWWWWWWWWWWWSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS S GGGGGGGGGGGGGGGGGSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSGG GGGGGGGGGGGGWWWWWW(E) 6" AC WATER(E) 6" AC WATER(E) 8" CI WATER(E) 8" CI WATER(E) 2" GAS(E) 2" GAS (E) 6" AC WATER (E) 2" GAS +7000+71STA 69+88.54 (N) CO I07-15 RIM = 302.70' (N) 174' - 6" HDPE SEWER STA 70+22.87 (N) SSMH I07-2 RIM = 285.34' (N) 113' - 8" HDPE SEWER +00 +79 00 +80 00 +81 00 +82 00 +83 00 VERDE DRLUNETA DR.STA 80+09.71 (N) SSMH I07-7 RIM = 293.58'12'5'5'34'12'REMOVE AND REPLACE SSCO I07-15 PER ENG. STD. 6710 6" OUT 295.00 REMOVE AND REPLACE SSMH I07-7 PER ENG. STD. 6610 6" IN 287.70 8" OUT 287.60 6" IN 287.70 REMOVE AND REPLACE SSMH I07-2 PER ENG. STD. 6610 8" IN 281.70 8" OUT 281.60(N) 102' - 8" HDPE SEWER14' PUBLIC UTILITY EASEMENT 12' PUBLIC UTILITY EASEMENT (E ) 24 " RCP (N) 337' - 8" HDPE SEWER 78+25 78+50 78+75 79+00 79+25 79+50 79+75 80+00 80+25 80+50 80+75 81+00 81+25 81+50 81+75 82+00 82+25 82+50 82+75 83+00 83+25 83+50 260 265 270 275 280 285 290 295 300 305 260 265 270 275 280 285 290 295 300 305 0 SCALE IN FEET 20 40 VERDE DRIVE3 HORIZ 1" = 20' VERT 1" = 5'MATCHLINE - STA. 83+50.00: SEE SHEET 4MATCHLINE - STA. 83+50.00: SEE SHEET 4SHEET 2 CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION HNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHN MG BN FEBRUARY 2022 1000019 7 APPROVED: [Mo Day, Yr] Page 333 of 984 STA. 71+41.10 (N) SSMH I06-46 RIM = 249.92' 8" IN 244.80' (S) 6" IN 243.00' (N) 8" IN 243.00' (W) 10" OUT 242.90' (E) STA. 71+07.68 (N) SSMH I06-49 RIM = 252.64' 8" IN 247.30' (S) 8" OUT 247.20' (N) (N) 114' - 8" HDPE SEWER, S = 2 . 1 0 %BY OPEN TRENCHING & R E M O V E E X I S T I N G 6 " V C P S E W E R (E) 6" PVC SEWER (N) 33 7 ' - 8 " H D P E S E W E R , S = 1 0 . 2 3 % BY O P E N T R E N C H I N G & R E M O V E E X I S T I N G 1 0 " V C P S E W E R (E) GRADE (E) 18" RCP (E) 2" GAS (E) 6" AC WATER (E) AT&T DUCT BANK SD SD SDSDWWWWWWWWWW W W W W W W W W W W W W W W W W W W SDSDSDSDSDG G G G G G G G G G G G G G G G G G G G G G G GWWWWWWWW WWWWWWWWWWTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTTGGGGGGGGGGGGGGGGGGSS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSWWGGGG(E) 8" VCP SEWER(E) 4" AC WATER(E) 6" AC WATER (E) 6" AC WATER(E) 2" GAS (E) 2" GAS(E) 1 8 " R C P (E) 18" RCP(E) 18" RCP (E) 6" PVC SEWER(E) 2" GAS(E) AT&T(E) 6" AC WATER(E) 2" GAS(E) AT&TSTA 71+07.68 (N) SSMH I06-49 RIM = 252.64' STA 71+41.10 (N) SSMH I06-46 RIM = 249.92' (N) 114' - 8" HDPE SEWER (N) 451' - 10" HDPE SEWER00+9000+84 00 +85 00 +86RAMONA DR34'12'13'4'5'VERDE DR REMOVE AND REPLACE SSMH I06-49 PER ENG. STD. 6610 8" IN 247.30 8" OUT 247.20 REMOVE AND REPLACE SSMH I06-46 PER ENG. STD. 6610 8" IN 244.80 6" IN 243.00 8" IN 243.00 10" OUT 242.90 (E) 8" TELEPHONE(E) TELEPHONE(N) 337' - 8" HDPE SEWER (E) CHARTERSDSDSDSDWWWW WWWWW SSSSSSSS SS SSWWW WWWWWWWWWWWWWWSDSDSDSDSDSDSDSDSDSDSDGGGGGGGGGGGGGGGGGGW W W W W W W W W W W W W W W W W W W W W W W W W W W W T T T T T T T T T T T T T T T T T T T T T T T T T T T T T G G G G G G G G T T T T T T T T T T T T T T T T T T T T T T T T T T T T G G G G G G G G G G G G G G G G G G GGGWSSSSSSSSSSSSSSSSSS SS SSSSSSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS GT T T T T T T T T T T T T TTTTTT(E) 4" AC WATER(E) 6" AC WATER(E) 2" GAS(E) 2" GAS(E) 18" RCP(E ) 1 8 " R C P(E) 18" RCP(E) 6" PVC SEWER(E) 6" AC WATER (E) 2" GAS (E) AT&T (N) 114' - 8" HDPE SEWER(N) 451' - 10" HDPE SEWER +90 00 +91 00 +92 0014.5'40'STA 71+41.10 (N) SSMH I06-46 RIM = 249.92'15.5'10'RAMONA DR VERDE DRREMOVE AND REPLACE SSMH I06-46 PER ENG. STD. 6610 8" IN 243.00 10" OUT 242.90 6" IN 243.00 8" IN 244.80 REPLACE WATER WELL AND COVER PER ENG. STD. 6340 (E) TELEPHONE STA. 71+41.10 (N) SSMH I06-46 RIM = 249.92' 8" IN 244.80' (S) 6" IN 243.00' (N) 8" IN 243.00' (W) 10" OUT 242.90' (E) (E) 8" VCP SEWER (N) 451' - 10" HDPE SEWER, S = 1 . 9 4 %BY OPEN TRENCHING & RE M O V E E X I S T I N G 1 0 " V C P S E W E R (E) 2" GAS (E) CHARTER CONDUIT 90+00 90+25 90+50 90+75 91+00 91+25 91+50 91+75 92+00 92+25 92+50 92+75 230 235 240 245 250 255 260 265 270 230 235 240 245 250 255 260 265 270 230 235 240 245 250 255 260 265 270 83+50 83+75 84+00 84+25 84+50 84+75 85+00 85+25 85+50 85+75 VERDE DRIVE & RAMONA DRIVE4 HORIZ 1" = 20' VERT 1" = 5' SEE RIGHTMATCHLINE - STA. 83+50.00: SEE SHEET 3MATCHLINE - STA. 83+50.00: SEE SHEET 3SEE LEFT MATCHLINE - STA. 92+75.00: SEE SHEET 5MATCHLINE - STA. 92+75.00: SEE SHEET 50 SCALE IN FEET 20 400 SCALE IN FEET 20 40 CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION HNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHN MG BN FEBRUARY 2022 1000019 7 APPROVED: [Mo Day, Yr] Page 334 of 984 SD SD SD SD SD SDSDSD WWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWW W T T T T T T T T T T T T T T T T TTTTTTTT T T T T TTTTTTTG G G G G G G G G G G G G G G G G G G G G GGGG G G G G G G G G G G G T T T T T T T T T T T T T T T T T T T T T TTTT T T T T T T T T T T T GGGGGGGGGWWSS SS SS SS SS SS SS SS SSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SSSS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSS SS SSSSSSSSGT T T T T T T T T T T T T T T T T T T T T T T T T T TTTTT T T T T T (E) 10" CI WATER (E) 2" GAS (E) AT&T (E) 10" C I W A T E R (E) 2" G A S (E) AT & T (E) 10" CI WATER(E) 6" VCP SEWER(E) 2" GAS(E) 18" C M P STA 94+56.87 (N) SSMH I06-47 RIM = 244.49' STA 96+41.48 (E) SSMH I06-48 RIM = 240.73' (N) 183' - 1 0 " H D P E S E W E R +93 00 +94 00 +95 00 +96 005'10'40'5'22.6'9.4'3'40'RAMONA D R PALOMAR AVEREMOVE AND REPLACE SSMH I06-47 PER ENG. STD. 6610 10" IN 238.70 10" OUT 238.60 INSTALL (N) SSMH I06-47 PER ENG. STD. 6610 10" IN 234.10 10" OUT 234.00 (E) SSMH I06-48 TO REMAIN 10" IN 228.00 6" IN 228.00 10" OUT 227.90 (E) 1 0 " C I P P S E W E R15.5'9.5'REMOVE (E) SSMH (N) 451' - 10" HDPE SEWER (N) 451' - 10" HDPE SEWER, S = 1 . 9 4 %BY OPEN TRENCHING & RE M O V E E X I S T I N G 1 0 " V C P S E W E R STA. 94+56.87 (N) SSMH I06-47 RIM = 244.49' 10" IN 234.10' (W) 10" OUT 234.00' (E) (N) 183' - 10" HD P E S E W E R , S = 3 . 2 2 % BY PIPE BURSTI N G T H R O U G H E X I S T I N G STA. 96+41.48 (E) SSMH I06-48 RIM = 240.73' 10" IN 228.00' (W) 6" IN 228.00' (S) 10" OUT 227.98' (SE) (E) GRADE (E) 10" CIPP S E W E R CONNECT TO (E) SSMH PER ENG. STD. 6610 (E) AT&T DUCT BANK (E) 2" GAS REMOVE (E) SSMH 220 225 230 235 240 245 250 255 260 92+75 93+00 93+25 93+50 93+75 94+00 94+25 94+50 94+75 95+00 95+25 95+50 95+75 96+00 96+25 96+50 96+75 220 225 230 235 240 245 250 255 260 RAMONA DRIVE5 HORIZ 1" = 20' VERT 1" = 5'MATCHLINE - STA. 92+75.00: SEE SHEET 4MATCHLINE - STA. 92+75.00: SEE SHEET 40 SCALE IN FEET 20 40 CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION HNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHN MG BN FEBRUARY 2022 1000019 7 APPROVED: [Mo Day, Yr] Page 335 of 984 SD SD SD SD SD WWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWT T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T TTTTTTTG G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G G GGGGGGGT T T T T T T T T T T T T T T T T T T T T T T T T T T T TTTTTTTTTTTTTSS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSTTTT T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T T TTTTTT T T T T T T T T T T T T T T T T T T T T T T T T T T T T T TW W WWWWWWWWWWWWWWTEL T T T SSSSSSSSSS SS SS TTTTTTTGGGGGTTTTDS DS DS DS +104 24+101 00 +102 00 +103 00 +104 00 STA 101+15.08 (N) SSMH 01 RIM = 237.50' STA 104+21.35 (N) SSMH 02 RIM = 246.12'ABANDON (E) 10" VCP SEWER(E) 10" VCP SEWER(E) 10" CI WATER(E) 20" DI WATER(E) 10" CI WATER *ABANDON (E) 10" VCP SEWER (E) TELEPHONE (E) GAS (N) 302' - 10" HDPE SEWER RAMONA DR BROAD ST(E) TELEPHONE (E) 10" CI WATER (E) TELPHONE (E) 2" GAS (E)TELEPHONE (N) 326' - 10" HDPE SEWER(E) 20" DI WATER(E) 8" CI WATER(E) TELEPHONE40'11.2'14.3'14.5'(N) SSMH 01 PER ENG. STD. 6610 10" IN 226.20 10" OUT 226.15 *ABANDON (E) 10" VCP SEWER*ABANDON SSMH J06-50 RIM 234.51 INV 226.74 *ABANDON SSMH J06-58 RIM 235.15 INV 225.35 10" IN 227.00 (N) SSMH 02 PER ENG. STD. 6610 10" IN 225.05 10" OUT 225.00 (E) GAS*ABANDON (E) 10" VCP SEWER *ABANDON (E) SEWERLINE PER ENG. STD. 6050 *LATERAL TIE OVER BY HDD OR OTHER APPROVED METHOD (TYP.) (N) 3' STUB - 10" HDPE SEWER *LATERAL TIE OVER BY HDD OR OTHER APPROVED METHOD (TYP.)(E) SS LAT(E) SS LAT(E) 10' SEWER EASEMENT (E) TELEPHONE(E) TELPHONE (E) TELEPHONE (E) TELEPHONEPROTECT (E) WALL PROTECT (E) WALL STA. 101+15.08 (N) SSMH 01 RIM = 237.50' 10" IN 226.20' (W) 10" IN 227.00' (N) 10" OUT 226.15' (E) STA. 104+21.35 (N) SSMH 02 RIM = 246.12' 10" IN 225.05' (W) 10" OUT 225.00' (S) (N) 302' - 10" HDPE SEWER, S = 0.36% BY OPEN TRENCHING(N) 3' STUB 10" HDPE SEWER, S = 0.36% BY OPEN TRENCHING (E) TELE DUCT BANK 220 225 230 235 240 245 250 255 260 220 225 230 235 240 245 250 255 260 100+50 100+75 101+00 101+25 101+50 101+75 102+00 102+25 102+50 102+75 103+00 103+25 103+50 103+75 104+00 104+25 104+50 104+75 RAMONA DRIVE6 HORIZ 1" = 20' VERT 1" = 5' 0 SCALE IN FEET 20 40 CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION HNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHN MG BN FEBRUARY 2022 1000019 7 APPROVED: [Mo Day, Yr] SEE SHEET 7 *BID ALTERNATIVE "A" IS INDICATED BY ASTERISK* Page 336 of 984 220 225 230 235 240 245 250 255 260 220 225 230 235 240 245 250 255 260 109+50 109+75 110+00 110+25 110+50 110+75 111+00 111+25 111+50 111+75 112+00 112+25 112+50 112+75 113+00 113+25 113+50 113+75 114+00 STA. 110+08.76 (N) SSMH 02 RIM = 246.12' 10" IN 225.05' (W) 10" OUT 225.00' (S) (E) 10" VCP SEWER (N) 326' - 10" HDPE SEWER, S = 0.39% BY OPEN TRENCHING STA. 113+38.65 (N) SSMH J07-1 RIM = 230.24' 10" IN 223.70' (N) 8" IN 224.24' (N) 10" OUT 223.70' (S)(E) FIBER DUCT BANK 2" GAS (E) 20 DI WATER (E) TELE SD SD SD SD SD W W W W W W W W W W W W W W W W W W W W WWWWSSSSSSSSGGGGGGGGGGW W W W W W W W W W G G G G G G G G G G G G G G G G G WWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W TTTTTTTT T T T T T T T T T T GGGGGGGGGG G G TT T T T T T T T T T T T T T T T T TTTTTTTSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SS SS SS SSTTT TTTTTTTT TTTTTTTTTTTTTTTG G WWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W WWTEL WSSSSSSSSSSSSSSSSSSSSSSSST G G G G G GGGGGGGGGTTTTTTTGWWWWWWWWWT T T T T T T T T T SS SS SS SS SS SS SSSSSSSSSST T T T T T T T T T T T T T T T T T (N) 326' - 10" HDPE SEWER +110 00 +111 00 +112 00 +113 00 +114 STA 110+08.76 (N) SSMH 02 RIM = 246.12'RAMONA DRBROAD STMEINECKE AVESTA 113+38.65 (N) SSMH J07-1 RIM = 230.24' (E) 10" CI WATER (E) 20" DI WATER (E) 20" DI WATER (E) 8" CI WATER(E) 6" CI WATER(E) 6" VCP SEWER(E) TELEPHONE (E) 6" VCP SEWER (E) 8" P V C S E W E R *ABANDON (E) 1 0 " V C P S E W E R (E) 10" VCP SEWER (E) 18" CMP (E) 20" DI WATER (E) 10" CI WATER*ABANDON (E) 10" VCP SEWER(E) TELEPHONE(E) GAS(E) 2" GAS(E) 2" GAS(E) FIBER DUCT BANK(N) 302' - 10" HDPE SEWER(E) GAS (E) TELEPHONE(N) 326' - 10" HDPE SEWER (E) 20" DI WATER (E) 8" CI WATER (E) TELEPHONE 34'6'6'9'*ABANDON (E) 10" VCP SEWER (N) SSMH 02 PER ENG. STD. 6610 10" IN 225.05 10" OUT 225.00 (N) SSMH 02 PER ENG. STD. 6610 10" OUT 223.7010" IN 223.70 8" IN 224.24 (E) SSMH I06-59 TO REMAIN RIM 232.26 INV 223.8113'(E) GAS *ABANDON (E) SEWERLINE PER ENG. STD. 6050 *ABANDON SSMH J06-58 RIM 235.15 INV 225.35 MAINTAIN ACCESS TO THE VILLAGES AT ALL TIMES (E) 6" PVC SEWER LATERAL*LATERAL TIE OVER BY HDD OR OTHER APPROVED METHOD (TYP.) INV 223.95 (E) SS LAT(E) SS LAT(E) 10' SEWER EASEMENT (E) TELEPHONE (E) TELEPHONE(E) TELEPHONE PROTECT (E) WALL (N) 68 LF - 6" HPDE SEWER BY SLIPLINING PER DETAIL A, THIS SHEET (E) 10" V C P S E W E R BROAD STREET7 HORIZ 1" = 20' VERT 1" = 5' SEE SHEET 6 0 SCALE IN FEET 20 40 CITY SPECIFICATION NO. DATE:PROJECT TITLE:SHEET TITLE:of SHEET NO. DESIGNED BY: DRAWN BY: CHECKED BY: APPROVED BY: SCALE: PLAN FILE NO. / LOCATION HNVERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENTHN MG BN FEBRUARY 2022 1000019 7 APPROVED: [Mo Day, Yr] SEWER SLIPLININGA NOTES: 1. BEFORE INSTALLATION OF THE PIPE LINER, THE HOST PIPE MUST BE CLEANED AND ALL ROCKS AND DEBRIS REMOVED. 2. SLIP LINER PIPE GRADE MUST BE MAINTAINED PARALLEL TO THE GRADE OF THE HOST PIPE. THE LINER PIPE MUST BE HELD AT THE INVERT OF THE HOST PIPE AND BE BRACED TO PREVENT FLOTATION OR MOTION DURING GROUTING. 3. A CONCRETE BULKHEAD MUST BE INSTALLED AT EACH OPEN END BETWEEN THE HOST PIPE AND NEW PIPE TO PREVENT GROUT FROM FLOWING FROM THE ENDS WHILE FILLING THE ANNULAR SPACE BETWEEN THE TWO PIPE. 3. GROUT MIX FOR ANNULAR SPACE MUST CONSIST OF LOW DENSITY FOAM, CONCRETE COMPOSED OF WATER, CEMENTITIOUS MATERIAL AND OPTIONAL CHEMICAL ADMIXTURES. GROUT MUST HAVE A DENSITY OF 40-80 POUNDS PER CUBIC FOOT AND STRENGTH OF 300 PSI. 4. THE ANNULAR VOID MUST BE GROUTED SOLID BY INJECTING GROUT FROM ONE END OF THE PIPE RUN AND ALLOWING IT TO FLOW TOWARD THE OTHER END. VENTING OF THE ANNULAR VOID MUST BE PERFORMED TO ASSURE UNIFORM FILLING OF THE VOID SPACE DURING THE GROUTING PROCESS. PRESSURE ON THE ANNULAR VOID MUST NOT EXCEED 2 PSI TO AVOID DAMAGE TO THE LINER PIPE. (E) 10" VCP SEWER (N) 6" HPDE SEWER GROUT ANNULAR SPACE *BID ALTERNATIVE "A" IS INDICATED BY ASTERISK* Page 337 of 984 R EVISED A RCHAEOLOGICAL M ONITORING P LAN A UGUST 2021 V ERDE/LUNETA/RAMONA S EWER R EPLACEMENT P ROJECT S AN L UIS O BISPO, C ALIFORNIA P:\CBZ1801.04A Revised VLR Monitoring Plan\Revised Monitoring Plan_Verde Luneta Ramona.docx (08/27/21) APPENDIX C RECORD SEARCH RESULTS Page 338 of 984 5/7/2020 Kerrie Collison LSA 285 South Street, Suite P San Luis Obispo, CA 93401 Re: Verde Luneta Ramona Sewer Replacement (CBZ1801.04) The Central Coast Information Center received your record search request for the project area referenced above, located on the San Luis Obispo USGS 7.5’ quad(s). The following reflects the results of the records search for the project area and a one-quarter mile radius: As indicated on the data request form, the locations of reports and resources are provided in the following format: „custom GIS maps տ shapefiles տ hand-drawn maps տ none Resources within project area: 0 Resources within ¼ mi. radius: 1: P-40-040176 Reports within project area: 1: SL-04059 Reports within ¼ mi. radius: 6: see reports list Resource Database Printout (list):„enclosed տ not requested տ nothing listed Resource Database Printout (details):„enclosed տ not requested տ nothing listed Resource Digital Database Records:տ enclosed „not requested տ nothing listed Report Database Printout (list):„enclosed տ not requested տ nothing listed Report Database Printout (details):„enclosed տ not requested տ nothing listed Report Digital Database Records: տ enclosed „not requested տ nothing listed Resource Record Copies:„enclosed տ not requested տ nothing listed Report Copies:տ enclosed „not requested տ nothing listed OHP Historic Properties Directory:տ enclosed „not requested տ nothing listed Archaeological Determinations of Eligibility:տ enclosed տ not requested „nothing listed The following sources of information are available at http://ohp.parks.ca.gov/?page_id=28065. Some of these resources used to be available through the CHRIS but because they are now online, they can be accessed directly. The Office of Historic Preservation makes no guarantees about the availability, completeness, or accuracy of the information provided through the sources listed below. Page 339 of 984 California State Lands Commission Shipwreck Database Caltrans Historic Bridge Inventory U.S. Geological Survey Historic Topographic Maps Rancho Plat Maps National Park Service National Register of Historic Places Nominations Natural Resource Conservation Service Soil Survey Maps US Bureau of Land Management General Land Office Records California Historical Landmarks Listing (by county) Five Views: An Ethnic Historic Site Survey for California (1988) Historical Soil Survey Maps Please forward a copy of any resulting reports from this project to the office as soon as possible. Due to the sensitive nature of archaeological site location data, we ask that you do not include resource location maps and resource location descriptions in your report if the report is for public distribution. If you have any questions regarding the results presented herein, please contact the office at the phone number listed above. The provision of California Historical Resources Information System (CHRIS) data via this records search response does not in any way constitute public disclosure of records otherwise exempt from disclosure under the California Public Records Act or any other law, including, but not limited to, records related to archeological site information maintained by or on behalf of, or in the possession of, the State of California, Department of Parks and Recreation, State Historic Preservation Officer, Office of Historic Preservation, or the State Historical Resources Commission. Due to processing delays and other factors, not all of the historical resource reports and resource records that have been submitted to the Office of Historic Preservation are available via this records search. Additional information may be available through the federal, state, and local agencies that produced or paid for historical resource management work in the search area. Additionally, Native American tribes have historical resource information not in the CHRIS Inventory, and you should contact the California Native American Heritage Commission for information on local/regional tribal contacts. Should you require any additional information for the above referenced project, reference the record search number listed above when making inquiries. Requests made after initial invoicing will result in the preparation of a separate invoice. Thank you for using the CHRIS. Sincerely, Brian Barbier Coordinator Sincerely, Page 340 of 984 Report List Report No.Year Title AffiliationAuthor(s)ResourcesOther IDs SL-03193 1997 Phase 1 & Phase 2 Archaeological Evaluations of Property at 61 Broad Street, San Luis Obispo, California Heritage Discoveries, Inc.Conway, Thor SL-03221 1997 Cultural Resource Investigation of 651 Foothill Boulevard Bertrando and Bertrando Research Consultants Bertrando, Ethan SL-03922 1999 Cultural Resource Inventory Report for Williams Communications, Inc. fiber Optic Cable System Installation Project, San Luis Obispo to Los Osos Loop Jones & Stokes Associates, Inc. McGowan, Dana 40-000004, 40-001795, 40-001807, 40-002007 SL-04051 2000 Phase I Archaeological Survey Along Onshore Portions of the Global West Fiber Optic Cable Project SAIC (Science Applications International Corporation) none given 40-001528 SL-04051A 2000 Appendix A: Project Route Maps and Photographs Associated with Project Route as of July 1999; Appendix B: Project Route Maps and Photographs Associated with Project Route as of December 1999; Appendix C: Project Route Maps and Photographs Associated with Project Route as of March 2000 SAICn/a SL-04051B 2000 Appendix D: Confidential Archaeological Site Reocrd Search Maps of Recorded Sites and Previous Investigations Associated with Project Route as of July 1999 (removed); Appendix E: Confidential Site Record Search Maps of Recorded Sites and Previous Investigations Associated with Project Route as of December 1999 (removed); Appendix F: Confidential Archaeological Site Record Search Maps of Recorded Sites and Previous Investigations Associated with Project Route as of March 2000 (removed); Appendix G: Confidential Updated Site Record Forms (removed) SAICn/a SL-04059 2000 Cultural Resources Records Search and Survey Report for the WS06 Los Osos Re- route Fiber Optic Connection Corridor, City of San Luis Obispo, San Luis Obispo County, CA Chambers Gorup, Inc.Shepard, Richard Page 1 of 2 CCoIC 5/7/2020 4:05:29 PM Page 341 of 984 Report List Report No.Year Title AffiliationAuthor(s)ResourcesOther IDs SL-04303 1999 Cultural Resources Survey Report for the Level 3 Fiber Optic Project: WS06 Connection to San Luis Obispo 3R Facility and Los Osos Loop Connection Corridor, San Luis Obispo County, CA Chambers GroupShepard, Richard S. and Mason, Roger D. SL-06054 2007 Cultural Resource Investigation of APN 001- 014-014 148 Broad Street, San Luis Obispo Parker & AssociatesParker, John 40-040099 Page 2 of 2 CCoIC 5/7/2020 4:05:29 PM Page 342 of 984 SL-03193 [approx loc]SL-03922SL-03922 Verde Luneta Ramona Sewer Replacement (CBZ1801.04) Customer Name: Kerrie Collison, LSA Project Location: San Luis Obispo Reports Map 1 of 4 Central Coast Information Center Department of Anthropology University of California Santa Barbara, CA 93106-3210 (805) 893-2474 (805) 893-8707 FAX¤ 0 140 280 420 56070 Meters Legend Project Location One-Quarter Mile Radius Page 343 of 984 SL-04051SL-04051 Verde Luneta Ramona Sewer Replacement (CBZ1801.04) Customer Name: Kerrie Collison, LSA Project Location: San Luis Obispo Reports Map 2 of 4 Central Coast Information Center Department of Anthropology University of California Santa Barbara, CA 93106-3210 (805) 893-2474 (805) 893-8707 FAX¤ 0 140 280 420 56070 Meters Legend Project Location One-Quarter Mile Radius Page 344 of 984 SL-04059 Verde Luneta Ramona Sewer Replacement (CBZ1801.04) Customer Name: Kerrie Collison, LSA Project Location: San Luis Obispo Reports Map 3 of 4 Central Coast Information Center Department of Anthropology University of California Santa Barbara, CA 93106-3210 (805) 893-2474 (805) 893-8707 FAX¤ 0 140 280 420 56070 Meters Legend Project Location One-Quarter Mile Radius Page 345 of 984 SL-03221 SL-04303 SL-06054 Verde Luneta Ramona Sewer Replacement (CBZ1801.04) Customer Name: Kerrie Collison, LSA Project Location: San Luis Obispo Reports Map 4 of 4 Central Coast Information Center Department of Anthropology University of California Santa Barbara, CA 93106-3210 (805) 893-2474 (805) 893-8707 FAX¤ 0 140 280 420 56070 Meters Legend Project Location One-Quarter Mile Radius Page 346 of 984 Primary No.Trinomial Resource List Other IDs ReportsTypeAgeAttribute codes Recorded by P-40-040176 OHP PRN - 3401-0085-0000; OHP Property Number - 18626; Other - Delta Tau Fraternity SL-02651BuildingHistoricHP021983 (Historic Res. Survey Staff, City of San Luis Obispo) Page 1 of 1 CCoIC 5/7/2020 4:06:13 PM Page 347 of 984 P-40-040176 Verde Luneta Ramona Sewer Replacement (CBZ1801.04) Customer Name: Kerrie Collison, LSA Project Location: San Luis Obispo Sites Map 1 of 1 Central Coast Information Center Department of Anthropology University of California Santa Barbara, CA 93106-3210 (805) 893-2474 (805) 893-8707 FAX¤ 0 140 280 420 56070 Meters Legend Project Location One-Quarter Mile Radius Page 348 of 984 $33(1',; $33(1',;  $33(1',;&±*(27(&+1,&$/5(32576 Page 349 of 984 November10,2021 Mr.HaiNguyen CityofSanLuisObispo 919PalmStreet SanLuisObispoCA93401 PROJECT:CITYOFSANLUISOBISPO VERDE/LUNETA/RAMONASEWERREPLACEMENTPROJECT SUBJECT:SubsurfaceConditionsReport–SewerLineReplacementProject DearMr.Nguyen: Thepurposeofthisreportandtheattacheddataistosummarizethesubsurfaceconditions representedbythethreeboringsdrilledonSeptember16,2021onRamonaDriveandBroadStreet intheCityofSanLuisObispo,California. 1.0 SCOPEOFSERVICES Thescopeofservicesasrequestedbytheclientincludesthreeborings:twodrilledtoadepthof approximately15feetandonetoapproximately20feet.BoringsweredrilledusingasixͲinchhollow stemauger.BoringswereperformedonRamonaDriveandBroadStreet;seetheattachedsitevicinity mapforportionsofthestreetsincluded. Itisourintentthatthisreportbeusedexclusivelybytheclientinthepreparationofplansand specifications.Applicationbeyondthisintentisstrictlyattheuser’srisk. 2.0 FIELDINVESTIGATIONANDLABORATORYANALYSIS OnSeptember16,2021,threeexploratoryboringsweredrilledonRamonaDriveandBroadStreet withaMobileBͲ53drillrigequippedwitha6Ͳinchdiameterhollowstemauger,withanautomatic hammerforsampling.Theboringsweredrilledatthesitetodepthsrangingfromapproximately12.5 to21.5feetbelowtheexistinggroundsurface(bgs).Theapproximatelocationsoftheboringsare shownontheattachedExplorationLocationMap. SoilsampleswereobtainedfromthetruckͲmountedboringsusinga2ͲinchoutsidediameterringͲ linedbarrelsampler(ASTMD3550Ͳ01/07withshoesimilartoD2937Ͳ10);bulksoilsampleswerealso obtainedfromtheaugercuttings.Aftersamplingwascomplete,theboringswerebackfilledwith bentoniteandtheaugercuttings. SoilsencounteredintheboringswerecategorizedandloggedingeneralaccordancewiththeUnified ClassificationSystemandASTMD2488Ͳ17.Wherebedrockwasencountered,itspropertieswere describedbaseduponobservationofringand/orStandardPenetrationTestsamples,observationof theaugercuttings,theeffortrequiredtodrillintothebedrock,andtheeffortrequiredtodrive samplersintothebedrock.Logsoftheboringsareattached,alongwiththeboringloglegend.In reviewingtheboringlogsandlegend,thereadershouldrecognizethatthelegendisintendedasa Page 350 of 984 CityofSanLuisObispoSewerReplacementNovember10,2021 Verde/Luneta/Ramona2 guidelineonly,andthereareseveralconditionsthatmayinfluencethecharacteristicobservedduring drilling.Theseinclude,butarenotlimitedto,thepresenceofcobblesorboulders,cementation, variationsinsoilmoisture,presenceofgroundwaterandotherfactors.Italsobenotedthatthe descriptionsofbedrockmustspanamuchwiderrangeofdensityandstrengthcharacteristicsthan soilandarerelativetootherbedrockstrata.Forexample,weatheredbedrockmaybedescribedas “soft,”yetitwillbeconsiderablyharderthanalmostanytypeofsoil.Conversely,aclaysoilmaybe describedas“hard,”however,itwillnotbenearlyashardaseven“soft,”bedrocksuchasthe sandstoneencounteredatthesite.Consequently,theloggermustexercisejudgementininterpreting soilcharacteristics,possiblyresultinginsoildescriptionsthatvaryfromthelegend. Selectedsamplesfromtheboringsweretestedforbulkdensity(ASTMD2937Ͳ17,modifiedforring liners)andmoisturecontent(ASTMD2216Ͳ10),RͲvalue(ASTMD2844/D2844M),andmaximum densityandoptimummoisturecontent(ASTMD1557Ͳ12Modified).Thetestresultsareattached. SoilsamplesfromBoring2werealsosenttoOECforenvironmentaltestingduetothepast environmentalmitigationinthearea.ThesetestsallreturnednonͲdetectresults.TheOECtest reportisalsoattached. 3.0 GENERALSUBSURFACEPROFILE Boring1wasdrilledneartheintersectionofRamonaDriveandPalomarAvenueandyieldedclayey materialwithvaryingamountsofsandtothemaximumdepthexploredof16.5feet.Groundwater wasencounteredinBoring1atadepthof13.5feet.Boring2wasdrilledneartheintersectionof RamonaDriveandBroadStreetandshowedclayeymaterialsimilartoBoring1todepthsof approximately7feetovermoderatelyhardtohardsandstoneoftheFranciscanFormationtothe maximumexploreddepthof21.5feet.Boring3showedleanclaytoadepthof4feetbelowground surface,andmoderatelyhardtohardsandstonetothemaximumexploreddepthof12.5feet.No subsurfacegroundwaterwasencounteredinBorings2or3. Ifyouhaveanyquestionsorrequireadditionalinformation,pleasecontactmeatyourconvenience. Sincerely, EarthSystemsPacific RobertDown,PEAileenFlynn,EIT PrincipalEngineerStaffEngineer Attachments:SiteVicinityandExplorationLocationMaps(2Pages) BoringLogsandLegend(4pages) GeotechnicalLaboratoryTestReports(4pages) EnvironmentalLaboratoryTestReports(20pages) Doc.No.:2111Ͳ052.LTR/pm Page 351 of 984 NOT TO SCALE 4378 Old Santa Fe Road, San Luis Obispo, CA 93401 www.earthsystems.com (805) 544-3276 Fax (805) 544-1786 Date November 2021 Project No. 304831-001 Figure 1 SITE VICINITY MAP Verde/Luneta/Ramona Sewer Replacement Project Various Streets San Luis Obispo, CA 93401 NOT TO SCALEBASE MAP PROVIDED BY: Google Earth (2021) SITE Page 352 of 984 NOT TO SCALE 4378 Old Santa Fe Road, San Luis Obispo, CA 93401 www.earthsystems.com (805) 544-3276 Fax (805) 544-1786 Date November 2021 Project No. 304831-001 Figure 2 EXPLORATION LOCATION MAP Verde/Luneta/Ramona Sewer Replacement Project Various Streets San Luis Obispo, CA 93401 BASE MAP PROVIDED BY: Google Earth (2021) LEGEND Boring Location (Approx.)B1 B3 B2B1 Page 353 of 984 drafting/masters/Boring Log Legend 062719.dwgUNIFIED SOIL CLASSIFICATION SYSTEM (ASTM D 2487) OBSERVED MOISTURE CONDITION DRY SLIGHTLY MOIST MOIST VERY MOIST WET (SATURATED) TYPICAL BEDROCK HARDNESS TYPICAL BEDROCK WEATHERING GRAIN SIZES CONSISTENCY Page 354 of 984 DEPTH(feet)USCS CLASSSYMBOLINTERVAL(feet)SAMPLETYPEDRY DENSITY(pcf)MOISTURE(%)BLOWSPER 6 IN.SAMPLE DATA SOIL DESCRIPTION LEGEND: Ring Sample Grab Sample Shelby Tube Sample SPT NOTE: This log of subsurface conditions is a simplification of actual conditions encountered. It applies at the location and time of drilling.Subsurface conditions may differ at other locations and times. AUGER TYPE: 6" Hollow Stem DRILL RIG: Mobile B-53 with Automatic Hammer LOGGED BY: A. Flynn 4.0" AC/ 6.0" AB 5.0 - 6.5 10.0 - 11.5 15.0 - 16.5 5 5 9 4 3 9 5 5 7 CL 95.8 13.7 90.9 29.9 88.8 14.4 End of Boring @ 16.5' Subsurface water encountered @ 13.5' PAGE 1 OF 1 Boring No. 1 JOB NO.: 304831-001 DATE: 9/16/2021 SANDY LEAN CLAY: dark brown, stiff, moist (Alluvium) CLAYEY SAND: yellowish brown, dense, moist 0.5 - 3.0 Verde/Luneta/Ramona Sewer Replacement Project Various Streets San Luis Obispo, CA 93401 SC SANDY LEAN CLAY: grayish brown, medium stiff, moist CL FAT CLAY W/ SAND: grayish brown, medium stiff, moist CH gravel dark grayish brown wet 5.0 - 8.0 Page 355 of 984 DEPTH(feet)USCS CLASSSYMBOLINTERVAL(feet)SAMPLETYPEDRY DENSITY(pcf)MOISTURE(%)BLOWSPER 6 IN.SAMPLE DATA SOIL DESCRIPTION LEGEND: Ring Sample Grab Sample Shelby Tube Sample SPT NOTE: This log of subsurface conditions is a simplification of actual conditions encountered. It applies at the location and time of drilling.Subsurface conditions may differ at other locations and times. AUGER TYPE: 6" Hollow Stem DRILL RIG: Mobile B-53 with Automatic Hammer LOGGED BY: A. Flynn 5.0" AC/ 7.0" AB 5.0 - 6.5 10.0 - 11.5 50/6" 16 50/3" 15 6 18 20.0 - 21.5 50/5" CL 112.5 13.7 PAGE 1 OF 1 Boring No. 2 JOB NO.: 304831-001 DATE: 9/16/2021 SANDY LEAN CLAY: dark yellowish brown, stiff, slightly moist (VOC-PID: 0.30 PPM) (Alluvium) dark brown 2.5 - 4.0 0.5 - 3.0 Verde/Luneta/Ramona Sewer Replacement Project Various Streets San Luis Obispo, CA 93401 CLAYEY SAND: yellowish brown, medium dense, slightly moist (Residual Soil) SC SANDSTONE: dark yellowish brown, soft, slightly moist (VOC-PID: Non-Detect) (Franciscan Mélange) hard 17 9 21 7.5 - 9.0 24 12 31 12.5 - 13.0 50/3" 15.0 - 16.5 End of Boring @ 21.5' due to refusal No subsurface water encountered oxidation staining, organics medium hard (VOC-PID: Non-Detect) 96.5 27.9 Page 356 of 984 DEPTH(feet)USCS CLASSSYMBOLINTERVAL(feet)SAMPLETYPEDRY DENSITY(pcf)MOISTURE(%)BLOWSPER 6 IN.SAMPLE DATA SOIL DESCRIPTION LEGEND: Ring Sample Grab Sample Shelby Tube Sample SPT NOTE: This log of subsurface conditions is a simplification of actual conditions encountered. It applies at the location and time of drilling.Subsurface conditions may differ at other locations and times. AUGER TYPE: 6" Hollow Stem DRILL RIG: Mobile B-53 with Automatic Hammer LOGGED BY: A. Flynn 5.0" AC/ 7.0" AB 5.0 - 6.5 10.0 - 11.5 50/3" 50/3" CL PAGE 1 OF 1 Boring No. 3 JOB NO.: 304831-001 DATE: 9/16/2021 SANDY LEAN CLAY: dark brown, stiff, slightly moist (Alluvium) yellowish brown 1.0 - 4.0 Verde/Luneta/Ramona Sewer Replacement Project Various Streets San Luis Obispo, CA 93401 SANDSTONE: yellowish brown, moderately hard, very moist (Franciscan Mélange) SC light yellowish brown, hard 11.0 - 12.5 36 30 50/2" End of Boring @ 12.5' due to refusal No subsurface water encountered Page 357 of 984 CityofSanLuisObispo 304831Ͳ001 Verde,LunetaandRamonaSewer BULKDENSITYTESTRESULTS ASTMD2937Ͳ17(modifiedforringliners) October19,2021 BORING DEPTH MOISTURE WET DRY NO. feet CONTENT,%DENSITY,pcf DENSITY,pcf 16.0Ͳ6.5 14.4 101.7 88.8 1 11.0Ͳ11.5 29.9 118.0 90.9 1 16.0Ͳ16.5 29.7 124.3 95.8 23.5Ͳ4.0 27.9 123.4 96.5 26.0Ͳ6.5 13.7 127.8 112.5 Page 358 of 984 CityofSanLuisObispo 304831Ͳ001 Verde,LunetaandRamonaSewer MOISTUREͲDENSITYCOMPACTIONTEST ASTMD1557Ͳ12(Modified) PROCEDUREUSED:B October19,2021 PREPARATIONMETHOD:Dry Boring#1@0.5Ͳ3.5' RAMMERTYPE:Mechanical BrownSandyLeanClay(CL) SPECIFICGRAVITY:2.70(assumed) SIEVEDATA:MAXIMUMDRYDENSITY:124.7pcf SieveSize %Retained(Cumulative)OPTIMUMMOISTURE:11.8% 3/4" 0 3/8" 3 ENTEROVERSIZECORRECTIONDATA #4 33 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 012345678910111213141516171819202122232425DRY DENSITY, pcfMOISTURE CONTENT, percent Compaction Curve Zero Air Voids Curve Page 359 of 984 CityofSanLuisObispo 304831Ͳ001 Verde,LunetaandRamonaSewer MOISTUREͲDENSITYCOMPACTIONTEST ASTMD1557Ͳ12(Modified) PROCEDUREUSED:A October19,2021 PREPARATIONMETHOD:Dry Boring#3@1.0Ͳ4.0' RAMMERTYPE:Mechanical BrownSandyLeanClay(CL) SPECIFICGRAVITY:2.70(assumed) SIEVEDATA:MAXIMUMDRYDENSITY:120.8pcf SieveSize %Retained(Cumulative)OPTIMUMMOISTURE:11.1% 3/4" 0 3/8" 0 ENTEROVERSIZECORRECTIONDATA #4 0 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 012345678910111213141516171819202122232425DRY DENSITY, pcfMOISTURE CONTENT, percent Compaction Curve Zero Air Voids Curve Page 360 of 984 CityofSanLuisObispo 304831Ͳ001 Verde,LunetaandRamonaSewer RESISTANCE'R 'VALUEANDEXPANSIONPRESSURE ASTMD2844/D2844MͲ18 October19,2021 Boring#3@1.0Ͳ4.0' DryDensity@300psiExudationPressure:104.3Ͳpcf BrownSandyLeanClay(CL) %Moisture@300psiExudationPressure:20.2% SpecifiedTrafficIndex:5.0 RͲValueͲExudationPressure:9 RͲValueͲExpansionPressure:6 RͲValue@Equilibrium:6 0 10 20 30 40 50 60 70 80 90 0100200300400500600700800R-VALUEEXUDATION PRESSURE, psi EXUDATION PRESSURE CHART 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 0.0 0.2 0.4 0.6 0.8 1.0 1.2 1.4 1.6 1.8 2.0 2.2 2.4COVER THICKNESS BY EXUDATION PRESSURE, ftCOVER THICKNESS BY EXPANSION PRESSURE, ft EXPANSION PRESSURE CHART Page 361 of 984 Page 362 of 984 Page 363 of 984 Page 364 of 984 Page 365 of 984 Page 366 of 984 Page 367 of 984 Page 368 of 984 Page 369 of 984 Page 370 of 984 Page 371 of 984 Page 372 of 984 Page 373 of 984 Page 374 of 984 Page 375 of 984 Page 376 of 984 Page 377 of 984 Page 378 of 984 Page 379 of 984 Page 380 of 984 Page 381 of 984 Page 382 of 984 Page 383 of 984 1 2 3 4 5 6 7 8 Page 384 of 984 Page 385 of 984 Page 386 of 984 Page 387 of 984 Page 388 of 984 Page 389 of 984 Page 390 of 984 Page 391 of 984 Page 392 of 984 Page 393 of 984 Page 394 of 984 VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT 1 OF 1 0 SCALE IN FEET 800 PROJECT LOCATION N Page 395 of 984 Page 396 of 984