Storm Water Control Plan
For
Entry Drive Improvements
April 27, 2020
Stormwater Control Plan for Post Construction Requirements Exhibit 4
Application Submittal
Where directions state “Done” that means no additional information or forms below that point needs to be
filled out or furnished.
See Exhibits for Watershed Management Zones, Basins, & Urban Sustainability Areas
Use “n/a” where information requested is not applicable. If you are unsure regarding how to fill out any of
the information, please come in and request assistance from a staff person.
Project Information
Step 1
Applicant Name:
Application No:
Project Name:
Location Address:
Location APN:
Site Zoning:
Project Type: Commercial Detached Single Family Residential
Industrial Multi-unit Residential
Mixed Use Public
Project Phase:
Project Description:
Total Project Site Area =
(a) Total New Impervious Surface Area =
(b) Total Replaced Impervious Surface Area =
(c) Total Existing Impervious Area =
(d) Total Impervious Area of Completed Project =
(e) Net Impervious Area: (a+b) – (c-d) =
OR where (c-d) is a negative number: (a+b) =
Your project is NOT subject to Post Construction Requirements if…
Step 2
Area (a+b) of project is < 2,500 square feet –
Done OR
Area (a+b) of project is > 2,500 square feet, and is a project type listed below ( type) –
Done Road & parking surface repair – slurry & fog & crack seal, pothole & spot patching, overlay &
resurfacing & other damage repair with no expansion
Road & parking shoulder grading
Road & parking cleaning, repairing, maintaining, reshaping, regarding drainage systems
Sidewalk & bike path / lane project – no other impervious surface created and runoff is directed to
vegetated area
Curb & gutter improvement or replacement – no other impervious created
Underground utility project – surface replaced in kind
Utility vaults – Ex: lift stations, backflows
Fuel storage – above ground with spill containment
Photovoltaic systems – on existing impervious surface, over pervious surface with vegetated cover,
buffer strip at the most down gradient row of panels
Second story – no increase in building footprint
Decks & stairs & walkways – raised with space below for drainage
Temporary structures – in place less than 6 months
Trails and pathways, where no other impervious surfaces are replaced or created, and built to direct
stormwater runoff to adjacent vegetated areas.
Stormwater Control Plan for Post Construction Requirements
Otherwise, your project is subject to the Post Construction Requirements
Project Site Details
Step 3
Watershed Management Zone:
Urban Sustainability Area Name: Meet USA Conditions
See Area calculations in Step 1 to compare to thresholds in each Step below
Where directions state “Go To”, fill out and attach the referenced Form and any supporting documents
Step 4
Project is > 2,500 square feet
Yes ‐ Go To Requirement 1 – Site Design & Runoff Reduction ‐ Form 1 AND THEN
Go To Step 5
Step 5
Detached single family residential project where Area (e) is > 15,000 square feet OR
Project where Area (e) > 5,000 square feet
Yes ‐ Go To Requirement 2 – Water Quality Treatment ‐ Form 2 AND THEN
Go To Step 6
No ‐ Done
Step 6
Detached single family residential project where Area (e) > 15,000 square feet OR
Project where Area (a+b) > 15,000 square feet
AND is in Watershed Management Zone 4,7,10 over a ground water basin OR in Zone 1,2,5,6,8,9
Yes ‐ Go To Requirement 3 – Runoff Retention ‐ Form 3 AND THEN
Go To Step 7
No ‐ Done
Step 7
Project where Area (a+b) > 22,000 square feet AND is in Watershed Management Zone 1,2,3,6,9
Yes ‐ Go To Requirement 4 – Peak Management ‐ Form 4
No ‐ Done
Exhibits
1. Watershed Management Zones
2. Groundwater Basin Location
3. Watershed Management Zone Revision Request
4. Urban Sustainability Conditions and Maps of Approved Areas
Stormwater Control Plan for Post Construction Requirements Form 1
Requirement 1 – Site Design and Runoff Reduction:
Identify the strategies used to reduce runoff through site design. Strategies 1-5 required.
Describe or attach simple plan details for 1. – 5.
1.Limit disturbance of creeks and natural drainage features and setback development from these features.
2.Minimize compaction of highly permeable soils
3.Minimize clearing of native vegetation and grading, conserving natural areas and maximizing undisturbed
areas, and developing along natural landforms.
4.Minimize impervious surfaces including roadways and parking lots
5.Do one of the following:
Direct roof run off into cistern, rain barrel, or vegetated area
Direct driveway, walkways, patios, and/or parking area into vegetated area
Construct surfaces (bike lanes, walks, driveways, parking areas,patios) with permeable surfaces
6.Other (Optional): Identify strategy(s) and describe or show how it will be done in the project.