Loading...
HomeMy WebLinkAboutARCH-0161-2019 Traffic Study 042820PO Box 2934 . Prescott, AZ . 86302 . 805-680-1586 . steveoeg57@gmail.com OEG 18‐1102  April 28, 2020      Mr. Brian Starr  Studio Design Group Architects  762 Higuera Street, Suite 212  San Luis Obispo, CA  93401    Subject: French Hospital Update – Trip Generation and Parking   2020 Land Use, Parking Garage Location and Off‐Site Staff Parking    Dear Mr. Starr:    Orosz Engineering Group, Inc. (OEG) is pleased to provide you with this letter report to assist in the  evaluation of the potential traffic impacts that could be associated with the planned 2020 land use  modifications to the French Hospital Campus.  Based on our experience with previous campus planning  efforts, we have the background to complete the most recent request for an update to the 1993 Master  Plan.    In 2019, the location of the future parking garage was moved from near the Ella Street access to the  western side of the French Hospital Campus.  In 2020, French Hospital negotiated an off‐site employee  parking area at the Renovate Church located 2075 Johnson Avenue, approximately 600 feet from  entrance to the hospital.  Parking for at least 85 vehicles (could be as high as 105 spaces) is available at  this off‐site location.  Based on the proposed location of the Parking Garage and off‐site employee  parking area, the potential traffic impacts to Ella Street and the Ella Street intersection at Johnson Drive  will be reduced.    2020 UPDATE TO THE FRENCH HOSPITAL 1993 MASTER PLAN  Over time, the needs of the hospital have changed.  In 2018, the need for increased Hospital functions  are greater than the medical office building functions previously considered in the 1993 Master Plan.  A  summary and contrast between the functional uses assumed in the 1993 Master Plan with the current  2020 Update is presented in Table 1.    To determine the potential traffic related impacts that could be associated with the implementation of  the 2020 Master Plan Update functions, the trip generation of both masterplan functional uses was  prepared.  As seen in Table 2 for the 1993 Master Plan, a total of 2,184 Daily (ADT) trips were estimated.   During the peak hours, the 1993 Master Plan could have generated a total of 210 AM Peak Hour Trips  and 230 PM Peak Hour Trips.    Similarly, for the 2020 Master Plan Update functions, the trip generation was estimated.  For the trip  generation estimates, the latest ITE Trip Generation rates were used, 10th Edition.  The summary of the  2020 Master Plan Update trip generation is found in Table 3.  A total of 2,273 Daily (ADT) trips were  estimated.  During the peak hours, the 2020 Master Plan Update is estimated to generate a total of 204  AM Peak Hour Trips and 219 PM Peak Hour Trips.    Mr. Brian Starr  April 28, 2020  Page 2      PO Box 2934 . Prescott, AZ . 86302 . 805-680-1586 . steveoeg57@gmail.com Table 1  Land Use Comparison 1993 and 2020 French Hospital Master Plans         Use Size 1993 Plan 2019 Plan    Hospital SF 83,000 87,850    Hospital OR Expansion SF 9,500 ‐   General Single Tenant Offices SF 35,000 17,742    Hospital Office SF 7,800 1,800    Medical Arts Building SF 30,000 ‐    Hospital ER Expansion SF ‐ 8,669    Hospital Expansion SF 6,000 89,775    Hospital Chapel SF ‐ 1,000    Hospital Lab/Pharmacy SF ‐ 4,300              Total  171,300 213,136       Total Hospital Uses SF 106,300 193,394  Single Tenant Offices SF 35,000 17,742    Medical Arts Building SF 30,000 ‐        Total SF 171,300 213,136    TRIP GENERATION SUMMARY  Based on this trip generation comparison, the 2019 Master Plan Update functions would generate 89  more Daily (ADT) trips than the 1993 Master Plan.  During the peak hours, the current update to the  master plan would generate 6 fewer AM Peak Hour Trips and 11 fewer PM Peak Hour Trips.    This analysis has shown that the potential traffic impacts associated with the 2020 Master Plan Update  would result in fewer trips being generated than the 1993 Master Plan during the key PM peak hour and  would not significantly impact the existing roadway conditions over than that previously analyzed.    WESTERN PARKING GARAGE LOCATION IMPACTS  As shown in the 2020 site plan, the parking garage is proposed to be located in the southwestern corner  of the French Hospital Campus and there are at least 85 off‐site parking spaces on Johnson Drive east of  the Campus.  For traffic oriented to Johnson Drive, traffic oriented to French Hospital would have  approximately 75% fewer trips oriented to Ella Street to get access to Johnson Drive than previously  analyzed, as the proposed parking garage has a direct drive aisle connection to Johnson Drive  immediately to the north.  Table 2Existing 1993 Master PlanTrip Generation CharacteristicsTrip RatesLand Use ADTFunction Code Unit Rate Total In Out Total In OutHospital 610 KSF 10.72 0.89 0.61 0.28 0.97 0.31 0.66Offices 715 KSF 11.25 1.78 1.58 0.20 1.71 0.26 1.45Medical Arts Building (MOB) 720 KSF 32.6 2.73 2.13 0.6 3.46 0.97 2.49Medical Arts Building (Hospital) 610 KSF 10.72 0.89 0.61 0.28 0.97 0.31 0.66Trips GeneratedADTFunction Size Unit Total In Out Total In OutHospital 106.3 KSF 1140 94 64 30 103 33 70Offices 35 KSF 394 62 55 7 60 9 51Medical Arts Building (MOB) 15 KSF 489 41 32 9 52 15 37Medical Arts Building (Hospital) 15 KSF 161 13 9 4 15 5 101993 Master Plan Traffic Trip Generation Budget 2184 210 160 50 230 62 168AM Peak Hour PM Peak HourAM Peak Hour PM Peak Hour1993 Hospital Master Plan Table 32020 Master Plan UpdateTrip Generation CharacteristicsTrip RatesLand Use ADTFunction Code Unit Rate Total In Out Total In OutHospital 610 KSF 10.72 0.89 0.61 0.28 0.97 0.31 0.66Offices 715 KSF 11.25 1.78 1.58 0.20 1.71 0.26 1.45Trips GeneratedADTFunction Size Unit Total In Out Total In OutHospital 193.394 KSF 2073 172 117 55 188 60 128Offices 17.742 KSF 200 32 28 4 31 5 262020 Master Plan Update Trip Generation Totals 2273 204 145 59 219 65 1542020 Hospital Master Plan UpdateAM Peak Hour PM Peak HourAM Peak Hour PM Peak Hour