HomeMy WebLinkAboutItem 5f - Award Verde-Luneta-Ramona-Broad Sewer Replacement, Spec. No. 1000091 Item 5f Department: Public Works Cost Center: 6102 For Agenda of: 6/7/2022 Placement: Consent Estimated Time: N/A FROM: Matt Horn, Public Works Director Prepared By: Hai Nguyen, Engineer III SUBJECT: AWARD VERDE / LUNETA / RAMONA / BROAD SEWER REPLACEMENT, SPECIFICATION NO. 1000091 RECOMMENDATION 1. Award the construction contract for Verde / Luneta / Ramona / Broad Sewer Replacement, Specification Number 1000091 to Souza Engineering Contracting in the amount of $1,467,822; and 2. Approve the following budget transfers: a) $360,000 from the Sewer Fund Undesignated Capital account to the project account; and b) $150,000 from the Water Fund Undesignated Capital account to the project account; and 3. Authorize the City Engineer to execute Contract Change Orders within available project budget. DISCUSSION Background On March 15, 2022, the City Council authorized staff to advertise for construction bids for the Verde/Luneta/Ramona/Broad Sewer Replacement (Council Agenda Report) and to authorize the City Manager to award the contract if the lowest responsible bid was below the publicly disclosed funding amount of $1,156,000. The project bid documents included a Base Bid and an Additive Alternative. On April 28, 2022, four bids were received and opened (Attachment A). Souza Engineering Contracting Inc. provided the lowest responsive bid for the Base Bid and Additive Alternative A in the amount of $1,467,822. Since the lowest bid amount exceeds the delegated authority provided to the City Manager by $311,822, staff is returning to Council to request authorization to award the contract. The increase in construction costs may be attributed to the high demand for this type of contract work in the region, and the scope of work added to replace a segment of water main along Broad Street. Prior to the project bid opening deadline, staff identified 268 linear feet of existing cast iron waterline that is too close to the new sewer main being proposed. As part of the sequence of construction, the interfering portions of water main on Broad Street must be reconstructed after the new sewer mains are installed. Page 333 of 652 Item 5f The Contractor’s references, license, and registration with the Department of Industrial Relations have been verified. Staff has evaluated the bid and recommends contract award of the Base Bid and Additive Alternative A to Souza Engineering Contracting (Attachment B) and budget transfers be completed to fund the project. Bid Summary Base Bid Additive Alternative A Total Bid 1 Engineer’s Estimate $1,040,000 $116,000 $1,156,000 2 Souza Engineering Contracting $1,360,489 $107,333 $1,467,822 3 John Madonna Construction $2,048,030 $187,590 $2,235,620 4 Specialty Construction $2,471,517 $201,406 $2,672,923 5 Raminha Construction $2,413,420 $328,700 $2,742,120 Previous Council or Advisory Body Action On March 15, 2022, the City Council authorized staff to advertise for bids for Verde/Luneta/Ramona/Broad Sewer Replacement. Policy Context Per the March 15, 2022, Council Agenda Report, the project must be awarded by Council if the construction contract is higher than the publicly disclosed funding amount. Public Engagement Public engagement was conducted during the initial identification of this Project to be included in the 2019-21 and 2021-23 Financial Plans. CONCURRENCE This project has the concurrence of the Utilities Department. ENVIRONMENTAL REVIEW The project consists of the replacement of existing water and sewer mains, and a portion of the project site is located within a potentially archaeologically sensitive zone (within 200 feet of Old Garden Creek). Based on the scope and location of the Project, it is consistent with previously adopted Initial Study/Mitigated Negative Declaration (IS/MND) ER10-07. Mitigation measures approved through IS/MND ER10 -07 are included in the Project’s specifications and will be followed by the City’s contractor, consistent with the requirements of the California Environmental Quality Act (CEQA). Page 334 of 652 Item 5f FISCAL IMPACT Budgeted: Yes Budget Year: 2019-21 & 2021-23 Funding Identified: Yes Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund State Federal Fees Sewer Fund $2,323,815 $1,732,000 $591,815 Water Fund $1,768,902 $150,000 $1,618,902 Total $4,092,717 $1,882,000 $2,210,717 602 Sewer Fund 602 Sewer Fund 601 Water Fund Total Project Bid $1,085,000 $275,489 $107,333 $1,467,822 Contingencies (25%)$271,250 $68,872 $27,000 $367,122 Total for Construction $1,356,250 $344,361 $134,333 $1,834,944 Materials Testing $5,250 $5,639 $5,667 $16,556 Archaeological Monintoring $10,000 $10,000 $10,000 $30,000 Printing $500 $0 $0 $500 Total Project Cost $1,372,000 $360,000 $150,000 $1,882,000 Current Project Balance:$1,372,218 $951,597 $1,768,902 $4,092,717 Remaining Balance:$218 $591,597 $1,618,902 $2,210,717 Verde/Luneta/Ramona/Broad Sewer Replacement Specification No. 1000091 Project Total Costs Project Account (1000091) Sewer Fund Undesignated Capital (602-9501-71501) Water Fund Undesignated Capital (601-9501-71501) Underground utility projects are considered high-risk for increased funding needs due to many unknown subsurface conditions. Historically, waterline replacement projects require more contingencies funds (20%-25%) to cover the additional cost of modifying the project work due to previously unknown utility conflicts and hazardous conditions or materials encountered during construction. Staff is requesting 25% contingencies for this project. Funding for this project is available in the Project Account (1000091) which ha s a current balance of $1,372,218. Staff is recommending a transfer of $360,000 from the Sewer Page 335 of 652 Item 5f Fund Undesignated Capital and $150,000 from Water Fund Undesignated Capital to fund this project. ALTERNATIVES The City Council could deny the request to award the project. Staff does not recommend this option, as the sewer and water mains included in this project continue to deteriorate and pose a high risk of catastrophic failure, requiring expensive repairs. ATTACHMENTS A – Bid Results (1000091) B – Draft Agreement with Souza Engineering Contracting Inc. (1000091) Page 336 of 652 VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT, SPECIFICATION NO. 1000091Bid Opening: 4/28/2022UNITTOTAL UNITTOTAL UNITTOTAL UNITTOTALNo. ITEM UNITQUAN PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE1TRAFFIC CONTROL PLAN AND IMPLEMENTATIONLS 1 $31,000.00 $31,000.00 $120,000.00 $120,000.00 $330,000.00 $330,000.00 $100,000.00 $100,000.002POTHOLINGLS 1 $13,000.00 $13,000.00 $14,000.00 $14,000.00 $47,500.00 $47,500.00$45,000.00 $45,000.003REPLACE TRAFFIC STRIPING & MARKERSLS 1 $10,330.00 $10,330.00 $12,600.00 $12,600.00 $21,000.00 $21,000.00$6,500.00 $6,500.004COMPLY WITH OSHALS 1 $65,000.00 $65,000.00 $403,700.00 $403,700.00 $30,000.00 $30,000.00 $75,000.00 $75,000.005COMPLY WITH MITIGATION MEASURES AND ARCHAEOLOGICAL MONITORING PLANLS 1 $2,000.00 $2,000.00 $5,000.00 $5,000.00 $5,600.00 $5,600.00 $10,000.00 $10,000.006ABANDON SEWERLINE, MANHOLES AND FACILITIESLS 1 $5,300.00 $5,300.00 $3,000.00 $3,000.00 $9,500.00 $9,500.00 $20,000.00 $20,000.007BYPASS PUMPINGLS 1 $21,000.00 $21,000.00 $96,000.00 $96,000.00 $132,000.00 $132,000.00 $75,000.00 $75,000.008RESTORATION OF PRIVATE PROPERTYLS 1 $41,460.00 $41,460.00 $15,000.00 $15,000.00 $11,600.00 $11,600.00$40,000.00 $40,000.009COMPLY WITH NIGHT WORK PERMITLS 1 $7,000.00 $7,000.00 $5,000.00 $5,000.00 $16,000.00 $16,000.00 $5,000.00 $5,000.0010REPAIR DOUBLE BOX CULVERT IF DAMAGE BY HDD OPERATIONSLS 1 $7,500.00 $7,500.00 $10,000.00 $10,000.00 $580.00 $580.00 $10,000.00 $10,000.0011ROCK EXCAVATIONCY 1000 $42.00 $42,000.00 $100.00 $100,000.00 $235.00 $235,000.00 $50.00 $50,000.0012REPLACE WATER WELL AND COVEREA 1 $500.00 $500.00 $1,500.00 $1,500.00 $916.00 $916.00 $2,500.00 $2,500.0013REPLACE MONUMENT AND WELLEA 4 $1,200.00 $4,800.00 $3,000.00 $12,000.00 $3,200.00 $12,800.00 $2,500.00 $10,000.0014INSTALL NEW 6" HDPE SEWERLINE BY PIPE BURSTING THROUGH EXISTING SEWERLINELF 174 $220.00 $38,280.00 $205.00 $35,670.00 $185.00 $32,190.00 $300.00$52,200.0015INSTALL NEW 8" HDPE SEWERLINE BY PIPE BURSTING THROUGH EXISTING SEWERLINELF 68 $300.00 $20,400.00 $305.00 $20,740.00 $480.00 $32,640.00 $310.00 $21,080.0016REMOVE EXISTING SEWERLINE AND INSTALL NEW 8" HDPE SEWERLINE BY OPEN TRENCHINGLF 911 $166.00 $151,226.00 $150.00 $136,650.00 $340.00 $309,740.00 $400.00 $364,400.0017REMOVE EXISTING SEWERLINE AND INSTALL NEW 10" HDPE SEWERLINE BY OPEN TRENCHINGLF 634 $257.00 $162,938.00 $280.00 $177,520.00 $510.00 $323,340.00 $550.00 $348,700.0018INSTALL NEW 10" HPDE SEWERLINE BY OPEN TRENCHINGLF 441 $324.00 $142,884.00 $350.00 $154,350.00 $531.00 $234,171.00 $680.00 $299,880.0019INSTALL NEW 10" HPDE SEWERLINE BY HDDLF 30 $482.00 $14,460.00 $1,100.00 $33,000.00 $1,250.00 $37,500.00 $2,000.00 $60,000.0020INSTALL NEW 12" HPDE SEWERLINE BY OPEN TRENCHINGLF 628 $487.00 $305,836.00 $600.00 $376,800.00 $630.00 $395,640.00 $720.00 $452,160.0021INSTALL NEW MANHOLEEA 9 $19,000.00 $171,000.00 $20,000.00 $180,000.00 $13,500.00 $121,500.00 $15,000.00 $135,000.0022INSTALL COATING ON NEW MANHOLEEA 9 $2,650.00 $23,850.00 $5,600.00 $50,400.00 $2,700.00 $24,300.00 $6,000.00 $54,000.0023REMOVE EXISTING MANHOLEEA 7 $1,200.00 $8,400.00 $2,200.00 $15,400.00 $6,800.00 $47,600.00 $2,500.00 $17,500.0024REMOVE EXISTING AND INSTALL NEW CLEANOUTEA 2 $2,200.00 $4,400.00 $3,000.00 $6,000.00 $4,200.00 $8,400.00 $4,000.00 $8,000.0025CONNECT EXISTING SEWER LATERAL TO SEWER MAINEA 33 $1,925.00 $63,525.00 $1,900.00 $62,700.00 $1,500.00 $49,500.00 $4,500.00 $148,500.0026RE‐GRADE SEWER LATERAL BEYOND 5 FEETLF 10 $240.00 $2,400.00 $100.00 $1,000.00 $250.00 $2,500.00 $300.00 $3,000.00$1,360,489.00 $2,048,030.00 $2,471,517.00 $2,413,420.0027TRAFFIC CONTROL PLAN AND IMPLEMENTATIONLS 1 $4,900.00 $4,900.00 $10,900.00 $10,900.00 $22,000.00 $22,000.00 $30,000.00 $30,000.0028POTHOLINGLS 1 $1,800.00 $1,800.00 $6,400.00 $6,400.00 $4,000.00 $4,000.00 $15,000.00 $15,000.0029REPLACE TRAFFIC STRIPING & MARKERSLS 1 $1,035.00 $1,035.00 $1,100.00 $1,100.00 $1,000.00 $1,000.00 $6,000.00 $6,000.0030COMPLY WITH OSHALS 1 $1,000.00 $1,000.00 $2,900.00 $2,900.00 $4,000.00 $4,000.00 $12,500.00 $12,500.0031COMPLY WITH MITIGATION MEASURES AND ARCHAEOLOGICAL MONITORING PLANLS 1 $300.00 $300.00 $7,000.00 $7,000.00 $5,600.00 $5,600.00 $6,000.00 $6,000.0032ABANDON WATERLINE, WATER VALVES AND FACILITIESLS 1 $6,000.00 $6,000.00 $1,500.00 $1,500.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00338 INCH PVC WATERLINELF 268 $161.00 $43,148.00 $280.00 $75,040.00 $307.00 $82,276.00 $450.00$120,600.0034WATERLINE TIE IN AND APPURTENANCES AT RAMONA & BROADLS 1 $14,333.00 $14,333.00 $25,400.00 $25,400.00 $19,000.00 $19,000.00$30,000.00 $30,000.0035WATERLINE TIE IN AND APPURTENANCES AT RAMONA & MEINECKELS 1 $9,700.00 $9,700.00 $16,750.00 $16,750.00 $14,000.00 $14,000.00 $28,000.00 $28,000.0036WATERLINE TIE IN AND APPURTENANCES AT 55 BROADLS 1 $8,500.00 $8,500.00 $16,000.00 $16,000.00 $14,000.00 $14,000.00 $25,000.00 $25,000.0037TYPE 2 WATER SERVICE TIE INEA 1 $2,600.00 $2,600.00 $5,100.00 $5,100.00 $8,500.00 $8,500.00 $14,000.00 $14,000.0038REPLACE EXISTING WATER METER BOXEA 1 $845.00 $845.00 $2,400.00 $2,400.00 $3,700.00 $3,700.00 $3,000.00 $3,000.0039FIRE HYDRANTEA 1 $13,000.00 $13,000.00 $16,900.00 $16,900.00 $18,000.00 $18,000.00$18,500.00 $18,500.0040BLUE FIRE HYDRANT MARKEREA 1 $172.00 $172.00 $200.00 $200.00 $330.00 $330.00 $100.00 $100.00$107,333.00 $187,590.00 $201,406.00 $328,700.00$1,467,822.00 $2,235,620.00 $2,672,923.00 $2,742,120.00Specialty Construction Raminha ConstructionBASE BID TOTALJohn Madonna ConstructionTOTAL PROJECT BIDBASE BIDSouza Engineering ContractingADDITIVE ALTERNATE "A" BID TOTALPage 337 of 652 Page 338 of 652 AGREEMENT THIS AGREEMENT, made on _________________________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and SOUZA ENGINEERING CONTRACTING, INC. (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of VERDE/LUNETA/RAMONA/BROAD SEWER REPLACEMENT, SPEC NO. 1000091 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item No. SS(1) Item Description Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) 1 7 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $31,000.00 $31,000.00 2 77 POTHOLING LS 1 $13,000.00 $13,000.00 3 84 REPLACE TRAFFIC STRIPING & MARKERS LS 1 $10,330.00 $10,330.00 4 7 COMPLY WITH OSHA LS 1 $65,000.00 $65,000.00 5 14 COMPLY WITH MITIGATION MEASURES AND ARCHAEOLOGICAL MONITORING PLAN LS 1 $2,000.00 $2,000.00 6 77 ABANDON SEWERLINE, MANHOLES AND FACILITIES LS 1 $5,300.00 $5,300.00 DocuSign Envelope ID: 801298A5-3C4C-4D87-A4D5-C5560DB759E0 Page 339 of 652 Item No. SS(1) Item Description Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) 7 77 BYPASS PUMPING LS 1 $21,000.00 $21,000.00 8 77 RESTORATION OF PRIVATE PROPERTY LS 1 $41,460.00 $41,460.00 9 7 COMPLY WITH NIGHT WORK PERMIT LS 1 $7,000.00 $7,000.00 10 77 REPAIR DOUBLE BOX CULVERT IF DAMAGE BY HDD OPERATIONS LS 1 $7,500.00 $7,500.00 11* 19 ROCK EXCAVATION CY 1000 $42.00 $42,000.00 12 77 REPLACE WATER WELL AND COVER EA 1 $500.00 $500.00 13 5,15 REPLACE MONUMENT AND WELL EA 4 $1,200.00 $4,800.00 14 77 INSTALL NEW 6" HDPE SEWERLINE BY PIPE BURSTING THROUGH EXISTING SEWERLINE LF 174 $220.00 $38,280.00 15 77 INSTALL NEW 8" HDPE SEWERLINE BY PIPE BURSTING THROUGH EXISTING SEWERLINE LF 68 $300.00 $20,400.00 16 77 REMOVE EXISTING SEWERLINE AND INSTALL NEW 8" HDPE SEWERLINE BY OPEN TRENCHING LF 911 $166.00 $151,226.00 17 77 REMOVE EXISTING SEWERLINE AND INSTALL NEW 10" HDPE SEWERLINE BY OPEN TRENCHING LF 634 $257.00 $162,938.00 18 77 INSTALL NEW 10" HPDE SEWERLINE BY OPEN TRENCHING LF 441 $324.00 $142,884.00 19 (F) 77 INSTALL NEW 10" HPDE SEWERLINE BY HDD LF 30 $482.00 $14,460.00 20 77 INSTALL NEW 12" HPDE SEWERLINE BY OPEN TRENCHING LF 628 $487.00 $305,836.00 21 77 INSTALL NEW MANHOLE EA 9 $19,000.00 $171,000.00 22 77 INSTALL COATING ON NEW MANHOLE EA 9 $2,650.00 $23,850.00 23 77 REMOVE EXISTING MANHOLE EA 7 $1,200.00 $8,400.00 DocuSign Envelope ID: 801298A5-3C4C-4D87-A4D5-C5560DB759E0 Page 340 of 652 Item No. SS(1) Item Description Unit of Measure Estimated Quantity Item Price (in figures) Total (in figures) 24 77 REMOVE EXISTING AND INSTALL NEW CLEANOUT EA 2 $2,200.00 $4,400.00 25 77 CONNECT EXISTING SEWER LATERAL TO SEWER MAIN EA 33 $1,925.00 $63,525.00 26* 77 RE-GRADE SEWER LATERAL BEYOND 5 FEET LF 10 $240.00 $2,400.00 Base Bid $1,360,489.00 27 7 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $4,900.00 $4,900.00 28 77 POTHOLING LS 1 $1,800.00 $1,800.00 29 84 REPLACE TRAFFIC STRIPING & MARKERS LS 1 $1,035.00 $1,035.00 30 7 COMPLY WITH OSHA LS 1 $1,000.00 $1,000.00 31 14 COMPLY WITH MITIGATION MEASURES AND ARCHAEOLOGICAL MONITORING PLAN LS 1 $300.00 $300.00 32 77 ABANDON WATERLINE, WATER VALVES AND FACILITIES LS 1 $6,000.00 $6,000.00 33 77 8 INCH PVC WATERLINE LF 268 $161.00 $43,148.00 34 77 WATERLINE TIE IN AND APPURTENANCES AT RAMONA & BROAD LS 1 $14,333.00 $14,333.00 35 77 WATERLINE TIE IN AND APPURTENANCES AT RAMONA & MEINECKE LS 1 $9,700.00 $9,700.00 36 77 WATERLINE TIE IN AND APPURTENANCES AT 55 BROAD LS 1 $8,500.00 $8,500.00 37 77 TYPE 2 WATER SERVICE TIE IN EA 1 $2,600.00 $2,600.00 38 77 REPLACE EXISTING WATER METER BOX EA 1 $845.00 $845.00 39 77 FIRE HYDRANT EA 1 $13,000.00 $13,000.00 40 85 BLUE FIRE HYDRANT MARKER EA 1 $172.00 $172.00 Additive Alternative A $107,333.00 BID TOTAL: $ 1,467,822.00 DocuSign Envelope ID: 801298A5-3C4C-4D87-A4D5-C5560DB759E0 Page 341 of 652 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2015 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Public Contract Code Sections 10285.1 Statement 8. Public Contract Code Section 10162 Questionnaire 9. Public Contract Code Section 10232 Statement 10. Labor Code Section 1725.5 Statements 11. Bidder Acknowledgements 12. Qualifications 13. Non-collusion Declaration 14. Agreement and Bonds 15. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the Contractor’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. DocuSign Envelope ID: 801298A5-3C4C-4D87-A4D5-C5560DB759E0 Page 342 of 652 The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. ATTEST: CITY OF SAN LUIS OBISPO A Municipal Corporation ___________________________________ Teresa Purrington, City Clerk ___________________________________ Erica A. Stewart, Mayor APPROVED AS TO FORM ________________________________ J. Christine Dietrick City Attorney CONTRACTOR: Souza Engineering Contracting, Inc dba Souza Construction ________________________________ Steve A. Souza President ___________________________________ Lisa Elliott Secretary, Chief Financial Officer DocuSign Envelope ID: 801298A5-3C4C-4D87-A4D5-C5560DB759E0 Page 343 of 652 Page 344 of 652