HomeMy WebLinkAboutR-11329 authorizing use of Water Fund Unassigned Working Capital for construction of the Water Treatment Plant Generator Improvement ProjectR 11329 RESOLUTION NO. 11329 (2022 SERIES) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF SAN LUIS OBISPO, CALIFORNIA, AUTHORIZING USE OF WATER FUND UNASSIGNED WORKING CAPITAL FOR CONSTRUCTION OF THE WATER TREATMENT PLANT GENERATOR IMPROVEMENT PROJECT, SPECIFICATION NO. 1000126 WHEREAS, to ensure that water is safe to drink, the U.S. Environmental Protection Agency and the State Water Resources Control Board pr escribe regulations for safe and reliable services provided by public water systems; and WHEREAS, the City’s 2015 Potable Water Distribution System Operations Master Plan was approved by the City Council in 2016. The Master Plan discussed the need for emergency power provided by a generator to water pumping facilities associated with the water distribution network and water storage tanks including the Water Treatment Plant Transfer Pump Station; and WHEREAS, the City’s 2020 Urban Water Management Plan (Ch apter 6: Water Supply Reliability & Drought Risk Assessment) identifies the need to maintain water service during Pacific Gas & Electric (PG&E) Public Safety Power Shutoff (PSPS) events and a potential catastrophic fire event, and describes installation of a temporary generator at the Water Treatment Plant, to be replaced by a permanent generator at a later date; and WHEREAS, the provision of additional temporary or permanent emergency generators, requiring engineering design and inspection services, and c onstruction at the Water Treatment Plant is identified as a 2021-2023 Financial Plan Capital Improvement Project (CIP); and WHEREAS, on August 21, 2018, the San Luis Obispo City Council authorized an application to the California Department of Emergency Services (Cal OES) Hazard Mitigation Grant Program (HMGP) for Federal Emergency Management Agency (FEMA) funding in support of a standby generator and support ing infrastructure to power the Water Treatment Plant in the event of a power outage (Resolution No. 10931), which was approved with a federal share of $765,000 of the Project cost, with a local 25 percent match of $255,000; and WHEREAS, on August 20, 2019, the City Council approved a budget of $2,000,000 including design, equipment acquisition, construction costs, and contingencies, from the Water Fund, unassigned Working Capital to fund the Water Fund portion of the Water and Wastewater Emergency Power Supply Acquisition needs, and authorized “off cycle” fleet additions for new portable generator rental, lease, and/or purchases; and DocuSign Envelope ID: 9C309069-F28A-4F7B-8DD6-CFBA45A77EF5 Resolution No. 11329 (2022 Series) Page 2 R 11329 WHEREAS, an updated HMGP application packet with the revised scope and associated increase in cost was submitted March 22, 2020 to Cal OES and approved by FEMA on June 9, 2021, including an amended scope of work and an additional $630,000 in federal HMGP funds for the Project, resulting in a total of $1,395,000 in federal funds; and WHEREAS, an additional $465,000 for the Project was approved in the 2021-2023 Financial Plan and the total available budget for the Project is $2,638,082 including $1,395,000 in federal funds, and the total Project cost is estimated at $3,590,000 requiring an additional $951,918 to fund Project construction; and WHEREAS, a balance of over $10 million is available from Water Fund, unassigned Working Capital to fund the Project. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of San Luis Obispo as follows: SECTION 1. Budget. The budget of $951,918 will be moved to the Water Treatment Plant Generator Improvement Project, Specification No. 1000126, as it is a high priority and critical City project. DocuSign Envelope ID: 9C309069-F28A-4F7B-8DD6-CFBA45A77EF5 Resolution No. 11329 (2022 Series) Page 3 R 11329 SECTION 2. Environmental Review. Construction of this project is exempt from the California Environmental Quality Act (CEQA) per categorical exemption 15301, Existing Facilities. The proposed Water Treatment Plant Generator Improvement Project is located within the existing Water Treatment Plant and the generator would operate at times when power is not available. Therefore, the project would not result in an expansion of the existing use. Upon motion of Vice Mayor Christianson, seconded by Council Member Shoresman, and on the following roll call vote: AYES: Council Member Marx, Pease, Shoresman, Vice Mayor Christianson, and Mayor Stewart NOES: None ABSENT: None The foregoing resolution was adopted this 7th day of June 2022. ___________________________ Mayor Erica A. Stewart ATTEST: ______________________ Teresa Purrington City Clerk APPROVED AS TO FORM: ______________________ J. Christine Dietrick City Attorney IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal of the City of San Luis Obispo, California, on ______________________. ___________________________ Teresa Purrington City Clerk DocuSign Envelope ID: 9C309069-F28A-4F7B-8DD6-CFBA45A77EF5 6/10/2022 | 11:14 AM PDT