HomeMy WebLinkAboutItem 5h. Award a Contract to R. Burke Corporation for the Roadway Sealing 2022 Project Item 5h Department: Public Works Cost Center: 5006 For Agenda of: 6/21/2022 Placement: Consent Estimated Time: N/A FROM: Matt Horn, Public Works Director Prepared By: Hai Nguyen, Senior Civil Engineer SUBJECT: AWARD ROADWAY SEALING 2022, SPECIFICATION NO. 1000560 RECOMMENDATION 1. Award a contract to R. Burke Corporation, in the amount of $4,457,873, for Roadway Sealing 2022, Specification Number 1000560; and 2. Approve the following budget transfers to the project account1: a) $4,590,475 from the Street Reconstruction and Resurfacing - Annual Asset Maintenance Account (90346); and b) $100,000 from Jack House Roof and Windows Walk Railing (1000075-24); and c) $214,525 from South Street Median Landscaping (1000037); and d) $200,000 from Active Transportation Plan Implementation (100502); and e) $35,000 from Parking Lot Maintenance (1000031); and f) $150,000 from Pedestrian and Bicycle Pathway Maintenance (1000032); and g) $120,000 from the Storm Drains Annual Asset Maintenance Account (90742); and h) $120,000 from the Sidewalk Annual Asset Maintenance Account (90849); and i) $10,000 from Water Valve Cover Adjustments (91149); and j) $10,000 from the Sewer Maintenance Hole Cover Adjustments (1000084); and 3. Authorize the City Engineer to approve Contract Change Orders up to the available project budget. DISCUSSION Background On March 15, 2022, the City Council authorized staff to advertise for construction bids for the Roadway Sealing 2022 and to authorize the City Manager to award the contract if the lowest responsible bid was below the publicly disclosed funding amount of $2,600,000. The project bid documents included a Base Bid and an Additive Alternative. On May 12, 2022, two bids were received and opened (Attachment A). R. Burke Corporation provided the lowest responsive bid for the Base Bid and Additive Alternative A in the amount of $4,457,873. Since the lowest bid amount exceeds the delegated authority provided to the City Manager by $1,857,873, staff is returning to Council to request authorization to award the contract. 1 Contributing budget transfers described in Fiscal Impact Section Page 155 of 814 Item 5h The large increase in construction costs can be attributed to the rising cost of construction materials and labor, which have seen cost increases of approximately 25% over the last calendar year (April 2021-April 20222). The cost for slurry sealing doubled as compared to bids received in May 2020 for the previous sealing project. Since asphalt emulsion is a key component of a slurry seal mixture, a large share of this price increase can be attributed to recent significant increases in oil prices. Recommended funding, which required project deferrals, for these cost increases was presented with the 2022-23 Financial Plan Supplement on June 7, 2022. The detailed discussion occurred on page 85 and 101 of the budget document. With the adoption of the Financial Plan Supplement Council indicated its support for the budgetary changes in this reports’ recommendations. The Contractor’s references, license, and registration with the Department of Industrial Relations have been verified. Staff has evaluated the bid and recommends contract award of the Base Bid and Additive Alternative A to R. Burke Corporation (Attachment B) and budget transfers be completed to fund the project. Bid Summary Base Bid Additive Alternative A Total Bid 1 Engineer’s Estimate $2,350,000 $250,000 $2,600,000 2 R. Burke Corporation $4,148,953 $308,920 $4,457,873 3 Intermountain Slurry Seal $5,328,246 $359,164 $5,687,410 Previous Council or Advisory Body Action On March 15, 2022, the City Council authorized staff to advertise for bids for Roadway Sealing 2022. On June 7, 2022 Council approved project deferrals to provide additional funding for this project. Policy Context Per the March 15, 2022 Council Agenda Report, the project must be awarded by Council if the construction contract is higher than the publicly disclosed funding amount. Public Engagement Public engagement for the overall project was conducted during the following: x Budget and goal setting process, identifying this Project to be included in the 2021- 23 Financial Plan. x Community meeting in October 2021 2 DGS California Construction Cost Index CCCI. https://www.dgs.ca.gov/RESD/Resources/Page- Content/Real-Estate-Services-Division-Resources-List-Folder/DGS-California-Construction-Cost-Index- CCCI Page 156 of 814 Item 5h Additional public engagement efforts specific to the downtown core was conducted as follows: x Presentation to the Downtown SLO Response and Recovery Board Meeting, January 2021 x Presentation at Downtown SLO Parklet & Street Improvement Project Community Forum, May 2022 Finally, safety and complete street elements of the project are included in various planning documents including the Active Transportation Plan, the Bishop Peak and Pacheco Safe Routes to School Plan and the Downton Concept Plan, all of which had associated community engagement efforts. Staff will continue to be in coordination with Downtown SLO, San Luis Obispo Regional Transit Authority, San Luis Garbage Company and other partners. Additionally, JPW Communications has been hired to keep the public informed by providing constant updates about the upcoming work through social media, news articles and postcards. CONCURRENCE This project has been reviewed and has concurrence from Public Works including the Transportation Manager, Parking Manager, SLO Transit Manager and City Engineer. Additionally, the project has been reviewed and has concurrence from the SLO City Fire Department. The City’s Communications Manager has also reviewed the project and is working with the project team to implement the communications plan. ENVIRONMENTAL REVIEW This project is categorically exempt from environmental review pursuant to section 15301 of the CEQA Guidelines (Existing Facilities) since it is a maintenance and replacement project. A Notice of Exemption has been filed through the Community Development Department. FISCAL IMPACT Budgeted: Yes Budget Year: 2022-23 Funding Identified: Yes Page 157 of 814 Item 5h Fiscal Analysis: Funding Sources Total Budget Available Current Funding Request Remaining Balance Annual Ongoing Cost General Fund $5,881,591 $4,039,541 $1,842,050 $ State Federal Fees SB1 Fund: $1,490,459 $1,490,459 $0 Sewer Fund $26,301 $10,000 $16,301 Water Fund $30,000 $10,000 $20,000 Total $7,428,351 $5,550,000 $1,878,351 $ The estimated project costs by funding sources are reported in Attachment C. The Streets Reconstruction and Resurfacing account (90346) has a balance of $200,482 and will receive an additional $440,582 of SB1 Funding approved by Council on 4/19/2022. With the 2021-23 Financial Plan, the project account will receive $1,425,000 in General Fund and $1,049,877 in SB1 funding on July 1st. The total amount of SB1 Funding to support this project is from Council’s April 19, 2022 action that approved funding in the amount of $440,582 and planned budget appropriation from the 2021-23 Financial Plan in the amount of $1,049,877 for a total of $1,490,459. Based on the unexpectedly high bid prices, staff identified additional funding sources as part of the 2022-23 Budget Supplement that will provide $1,585,000 to support the total project costs by using funds programed to other CIP projects that are not ready to construct3 in Fiscal Year 2022-23. In total, $4,745,905 will be available in the Streets Reconstruction and Resurfacing Account for the project ($3,225,446 in General Funds and $1,490,459 in SB1 Funds). Additionally, as identified in the 2022-23 Budget Supplement4, staff is seeking approval to reallocate $100,000 from the Jack House Roof and Windows Walk Railing account (1000075-24) and $214,525 from the South Street Median Landscaping account (1000037) to the project account (1000560) because these CIP projects are not ready to construct. As discussed in the FY22-23 Budget Supplement, deferral of these projects is recommended in order to address more urgent needs and provide funding for projects that have exceeded budget estimates (i.e. construction of Roadway Sealing 2022). Deferral does not constitute cancellation, and funding will be requested to continue these projects when they are ready to construct and sufficient staffing resources are available to oversee them. Requested project deferrals are recommended as these projects currently have construction funding, and construction documents and design are not ready due to staffing levels. 3 FY22-23 CIP Supplement, Table C3, on Page 85. 4 FY22-23 CIP Supplement, Table C20, ID#15 on Page 101. Page 158 of 814 Item 5h Due to the number of multi-modal transportation improvements proposed in this project, the Active Transportation Plan Implementation Account (100502) will contribute $200,000 in Fiscal Year 2022-23 towards this project to support the installation of protected bike lanes and priority pedestrian/bicycle crossings along Marsh and Higuera Streets identified as Tier 1 (highest-priority) project in the Active Transportation Plan. Funding for curb ramp/bulbout improvements at the intersection of Higuera and Nipomo is proposed to come from the Sidewalk Annual Asset Maintenance Account (90849). This work will replace damaged sidewalk and incorporate design elements intended to improve pedestrian safety. Funding for storm drain replacement work at the intersection of Higuera and Nipomo is proposed to come from the Storm Drains Annual Asset Maintenance Account (90742). The account has a current balance of $300,225 and will be sufficient to support the total estimated cost of $120,000 for storm drain replacement work. The Parking lot Maintenance account (1000031) has a current balance of $180,578 and will receive an additional $35,000 in Fiscal Year 2022-23. These funds will be sufficient to support the Islay Park Parking Lot maintenance work identified in this project. The Pedestrian and Bicycle pathway Maintenance account (1000032) has a current balance of $5,775 and will receive an additional $150,000 in Fiscal Year 2022-23. These funds will be sufficient to support the Madonna Inn pathway maintenance work identified in this project. Where asphalt pavement is replaced, the project will incorporate upgrades to water valve and sewer maintenance hole covers, which requires budget transfers to the project account as follows: Water Valve Cover Adjustments (91149) Fund totaling $10,000 and Sewer Maintenance Hole Cover Adjustments (1000084) totaling $10,000. This project does not have significant asphalt reconstruction and therefore impacts to existing water and sewer facilities is minimal. ALTERNATIVES Deny award of the contract. The City Council may choose to not award the contract and reject all bids. Staff does not recommend this option, further delay in maintenance activities would result in more expensive rehabilitation treatments being required in the future as well as further cost increases from market factors. ATTACHMENTS A – Bid Results (1000560) B – Draft Agreement with R. Burke Corporation (1000560) C – Estimated Project Cost by Funding Sources Page 159 of 814 Page 160 of 814 ZKtz^>/E'ϮϬϮϮ͕^W/&/d/KEEK͘ϭϬϬϬϱϲϬ ŝĚKƉĞŶŝŶŐ͗ϱͬϭϮͬϮϬϮϮ hE/d dKd> hE/d dKd> EŽ͘ /dD hE/d YhE WZ/ WZ/ WZ/ WZ/ ϭ dzW//^>hZZz^>^Yz ϱϯϬ͕ϱϲϯ Ψϯ͘ϮϬ Ψϭ͕ϲϵϳ͕ϴϬϭ͘ϲϬ Ψϰ͘ϲϬ ΨϮ͕ϰϰϬ͕ϱϴϵ͘ϴϬ Ϯ WEhDd/d/ZZK>>ZKDWd/KE >^ ϭ Ψϭϭ͕ϱϬϬ͘ϬϬ Ψϭϭ͕ϱϬϬ͘ϬϬ Ψϳϳ͕ϬϬϬ͘ϬϬ Ψϳϳ͕ϬϬϬ͘ϬϬ ϯ dZ&&/KEdZK>W>EE/DW>DEdd/KE >^ ϭ ΨϰϳϬ͕ϬϬϬ͘ϬϬ ΨϰϳϬ͕ϬϬϬ͘ϬϬ ΨϴϯϬ͕ϬϬϬ͘ϬϬ ΨϴϯϬ͕ϬϬϬ͘ϬϬ ϰ ^dZd^tW/E'/E^>hZZzZ^;ϭzͿ >^ ϭ ΨϭϬϳ͕ϳϬϬ͘ϬϬ ΨϭϬϳ͕ϳϬϬ͘ϬϬ Ψϲϳ͕ϱϬϬ͘ϬϬ Ψϲϳ͕ϱϬϬ͘ϬϬ ϱ ^dZd^tW/E'/E^>hZZzZ^;ϯϬz^Ϳ >^ ϭ Ψϱϱ͕ϲϬϬ͘ϬϬ Ψϱϱ͕ϲϬϬ͘ϬϬ Ψϱϱ͕ϬϬϬ͘ϬϬ Ψϱϱ͕ϬϬϬ͘ϬϬ ϲ dDWKZZz^dZ/W/E'EWsDEdDZ</E'^>^ ϭ ΨϯϬ͕ϯϬϬ͘ϬϬ ΨϯϬ͕ϯϬϬ͘ϬϬ ΨϮϱ͕ϬϬϬ͘ϬϬ ΨϮϱ͕ϬϬϬ͘ϬϬ ϳ /<>E''Z/E>& ϱ͕ϯϭϱ Ψϲ͘Ϯϱ Ψϯϯ͕Ϯϭϴ͘ϳϱ Ψϭϭ͘ϱϬ Ψϲϭ͕ϭϮϮ͘ϱϬ ϴ hZZDW''Z/E>^ ϭ ΨϭϬϬ͕ϬϬϬ͘ϬϬ ΨϭϬϬ͕ϬϬϬ͘ϬϬ ΨϭϵϬ͕ϬϬϬ͘ϬϬ ΨϭϵϬ͕ϬϬϬ͘ϬϬ ϵ dZ&&//Z>͗ZZKZKDh>KEWdZ//>^ ϭ ΨϭϬ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ Ψϭϲ͕ϬϬϬ͘ϬϬ Ψϭϲ͕ϬϬϬ͘ϬϬ ϭϬ dZ&&//Z>͗ZZKZKDh>KEd^^:Z>^ ϭ ΨϮϭ͕ϭϬϬ͘ϬϬ ΨϮϭ͕ϭϬϬ͘ϬϬ ΨϮϳ͕ϭϬϬ͘ϬϬ ΨϮϳ͕ϭϬϬ͘ϬϬ ϭϭ dZ&&//Z>͗ZDKEE>EdZ>^ ϭ Ψϭϱ͕ϬϬϬ͘ϬϬ Ψϭϱ͕ϬϬϬ͘ϬϬ ΨϮϭ͕ϬϬϬ͘ϬϬ ΨϮϭ͕ϬϬϬ͘ϬϬ ϭϮ /<ZDW͗DKEEEKE/Z>^ ϭ ΨϭϬ͕ϰϬϬ͘ϬϬ ΨϭϬ͕ϰϬϬ͘ϬϬ ΨϭϬ͕ϰϬϬ͘ϬϬ ΨϭϬ͕ϰϬϬ͘ϬϬ ϭϯ ZDKsEZͲ/E^d>>y/^d/E'&>yWK^d^͕hZ^dKW^͕EW>EdZ>^ ϭ Ψϭϱ͕ϮϬϬ͘ϬϬ Ψϭϱ͕ϮϬϬ͘ϬϬ Ψϭϱ͕ϬϬϬ͘ϬϬ Ψϭϱ͕ϬϬϬ͘ϬϬ ϭϰ KDW>zt/d,>dZE^EZK,DEdWZD/d >^ ϭ Ψϭ͕ϲϱϬ͘ϬϬ Ψϭ͕ϲϱϬ͘ϬϬ Ψϱ͕ϬϬϬ͘ϬϬ Ψϱ͕ϬϬϬ͘ϬϬ ϭϱ KDW>zt/d,E/',dtKZ<WZD/d >^ ϭ Ψϰ͕ϯϬϬ͘ϬϬ Ψϰ͕ϯϬϬ͘ϬϬ Ψϱ͕ϬϬϬ͘ϬϬ Ψϱ͕ϬϬϬ͘ϬϬ ϭϲ DZ^,E^EdZK^^/'E>/DWZKsDEd^>^ ϭ Ψϲϯ͕ϱϬϬ͘ϬϬ Ψϲϯ͕ϱϬϬ͘ϬϬ Ψϱϱ͕ϬϬϬ͘ϬϬ Ψϱϱ͕ϬϬϬ͘ϬϬ ϭϳ dZdZ/DD/E'>^ ϭ ΨϭϬ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ ϭϴ ZDKsy/^d/E'E/E^d>>EtZK^^t><WsZ^WZE'͘^d͘ϳϯϱ ^Y&d ϴϬϬ ΨϴϬ͘ϬϬ Ψϲϰ͕ϬϬϬ͘ϬϬ ΨϴϬ͘ϬϬ Ψϲϰ͕ϬϬϬ͘ϬϬ ϭϵ t,/dͬz>>KtWsDEdDZ</E'^ͬ>'E^;ZZKt^͕tKZ^͕^zDK ^Y&d ϭϱ͕Ϯϵϳ Ψϳ͘ϬϬ ΨϭϬϳ͕Ϭϳϵ͘ϬϬ Ψϲ͘ϬϬ Ψϵϭ͕ϳϴϮ͘ϬϬ ϮϬ ϰΗt,/dͬz>>Ktͬ>h>& ϱ͕ϳϵϮ Ψϯ͘ϱϬ ΨϮϬ͕ϮϳϮ͘ϬϬ Ψϯ͘ϬϬ Ψϭϳ͕ϯϳϲ͘ϬϬ Ϯϭ ϰΗKh>t,/d>& ϯϬϮ Ψϭ͘Ϯϱ Ψϯϳϳ͘ϱϬ Ψϭ͘ϬϬ ΨϯϬϮ͘ϬϬ ϮϮ ϲΗKh>t,/d>& ϭϯϲ Ψϭ͘ϳϱ ΨϮϯϴ͘ϬϬ Ψϭ͘ϱϬ ΨϮϬϰ͘ϬϬ Ϯϯ ϲΗz>>Kt >& ϭ͕ϱϭϲ Ψϭ͘ϬϬ Ψϭ͕ϱϭϲ͘ϬϬ ΨϬ͘ϳϱ Ψϭ͕ϭϯϳ͘ϬϬ Ϯϰ ϭϮΗt,/dͬz>>Kt >& ϭϳ͕ϰϲϴ Ψϱ͘ϬϬ Ψϴϳ͕ϯϰϬ͘ϬϬ Ψϰ͘ϬϬ Ψϲϵ͕ϴϳϮ͘ϬϬ Ϯϱ ϮϰΗt,/dͬz>>Kt >& ϵ͕Ϭϭϭ Ψϵ͘Ϯϱ Ψϴϯ͕ϯϱϭ͘ϳϱ Ψϴ͘ϬϬ ΨϳϮ͕Ϭϴϴ͘ϬϬ Ϯϲ DK/&/d/>ϭͲ^,dϮ >& ϯ͕ϱϬϬ ΨϬ͘ϲϬ ΨϮ͕ϭϬϬ͘ϬϬ ΨϬ͘ϱϬ Ψϭ͕ϳϱϬ͘ϬϬ Ϯϳ d/>Ϯ >& ϭϭ͕ϯϳϬ Ψϭ͘ϬϬ Ψϭϭ͕ϯϳϬ͘ϬϬ ΨϬ͘ϳϱ Ψϴ͕ϱϮϳ͘ϱϬ Ϯϴ d/>ϴ >& ϮϬϳ ΨϬ͘ϳϬ Ψϭϰϰ͘ϵϬ ΨϬ͘ϱϬ ΨϭϬϯ͘ϱϬ Ϯϵ d/>ϵ >& Ϯ͕ϳϲϵ Ψϭ͘ϬϬ ΨϮ͕ϳϲϵ͘ϬϬ ΨϬ͘ϳϱ ΨϮ͕Ϭϳϲ͘ϳϱ ϯϬ d/>Ϯϭ >& ϮϬ Ψϭ͘ϭϱ ΨϮϯ͘ϬϬ Ψϭ͘ϬϬ ΨϮϬ͘ϬϬ ϯϭ d/>ϮϮ >& ϮϮ͕ϰϳϬ ΨϮ͘ϯϬ Ψϱϭ͕ϲϴϭ͘ϬϬ ΨϮ͘ϬϬ Ψϰϰ͕ϵϰϬ͘ϬϬ ϯϮ d/>Ϯϰ >& ϯϰϵ ΨϬ͘ϳϬ ΨϮϰϰ͘ϯϬ ΨϬ͘ϱϬ Ψϭϳϰ͘ϱϬ ϯϯ d/>Ϯϳ>& ϭϳ͕ϰϳϬ ΨϬ͘ϲϬ ΨϭϬ͕ϰϴϮ͘ϬϬ ΨϬ͘ϱϬ Ψϴ͕ϳϯϱ͘ϬϬ ϯϰ d/>Ϯϴ >& ϯϲϴ ΨϮ͘ϱϬ ΨϵϮϬ͘ϬϬ ΨϮ͘ϬϬ Ψϳϯϲ͘ϬϬ ϯϱ d/>Ϯϵ >& ϴϴ Ψϰ͘ϳϱ Ψϰϭϴ͘ϬϬ Ψϰ͘ϬϬ ΨϯϱϮ͘ϬϬ ϯϲ d/>ϯϬ >& ϰϯ Ψϰ͘ϳϱ ΨϮϬϰ͘Ϯϱ Ψϰ͘ϬϬ ΨϭϳϮ͘ϬϬ ϯϳ d/>ϯϮ >& ϴϭϭ Ψϰ͘ϳϱ Ψϯ͕ϴϱϮ͘Ϯϱ Ψϰ͘ϬϬ Ψϯ͕Ϯϰϰ͘ϬϬ ϯϴ d/>ϯϴ >& ϯ͕Ϭϴϯ ΨϮ͘ϱϬ Ψϳ͕ϳϬϳ͘ϱϬ ΨϮ͘ϬϬ Ψϲ͕ϭϲϲ͘ϬϬ ϯϵ d/>ϯϵ >& ϰ͕ϬϵϬ Ψϭ͘ϬϬ Ψϰ͕ϬϵϬ͘ϬϬ ΨϬ͘ϳϱ Ψϯ͕Ϭϲϳ͘ϱϬ ϰϬ d/>ϯϵ>& ϭ͕ϭϰϰ Ψϭ͘ϬϬ Ψϭ͕ϭϰϰ͘ϬϬ ΨϬ͘ϳϱ Ψϴϱϴ͘ϬϬ ϰϭ d/>ϰϬ >& ϴϲ Ψϰ͘ϳϱ ΨϰϬϴ͘ϱϬ Ψϰ͘ϬϬ Ψϯϰϰ͘ϬϬ ϰϮ d/>ϰϭ >& ϱϳ Ψϰ͘ϳϱ ΨϮϳϬ͘ϳϱ Ψϰ͘ϬϬ ΨϮϮϴ͘ϬϬ ϰϯ ϰΗ^,z>>KtͲϰΖ>/Et/d,ϴΖ'WͲ^,d^ϰ >& ϮϬϱ Ψϲ͘ϬϬ Ψϭ͕ϮϯϬ͘ϬϬ Ψϱ͘ϬϬ Ψϭ͕ϬϮϱ͘ϬϬ ϰϰ DK/&/>dZE^d/>ϮϮͲ^,dϰϮ >& ϱϵ Ψϲ͘ϬϬ Ψϯϱϰ͘ϬϬ Ψϱ͘ϬϬ ΨϮϵϱ͘ϬϬ ϰϱ ϭϮΗz>>Kt^dZ/Wt/d,ΗKDDZ/>>K/E'KE>zΗͲ^,dϰϯ >& ϭϬϬ Ψϭϭ͘ϱϬ Ψϭ͕ϭϱϬ͘ϬϬ ΨϭϬ͘ϬϬ Ψϭ͕ϬϬϬ͘ϬϬ ϰϲ z>>KtKdKd͕dzWzDZ<ZͲ^,d^ϱϳ  ϯϴ Ψϱϴ͘ϬϬ ΨϮ͕ϮϬϰ͘ϬϬ ΨϱϬ͘ϬϬ Ψϭ͕ϵϬϬ͘ϬϬ ϰϳ t,/dͬ>hWZ</E'Η>ΗKZΗdΗ  ϳϳϲ Ψϱϴ͘ϬϬ Ψϰϱ͕ϬϬϴ͘ϬϬ ΨϱϬ͘ϬϬ Ψϯϴ͕ϴϬϬ͘ϬϬ ϰϴ /^^zDK> ϯϰ Ψϯϰϱ͘ϬϬ Ψϭϭ͕ϳϯϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ΨϭϬ͕ϮϬϬ͘ϬϬ ϰϵ >hͬz>>KtͬZͬt,/dhZW/Ed >& ϭ͕ϰϴϳ Ψϯ͘ϰϱ Ψϱ͕ϭϯϬ͘ϭϱ Ψϯ͘ϬϬ Ψϰ͕ϰϲϭ͘ϬϬ ϱϬ 'ZE^>D^dZK>KZ^&W/Ed ^Y&d ϭϯ͕ϵϲϴ Ψϭϳ͘Ϯϱ ΨϮϰϬ͕ϵϰϴ͘ϬϬ Ψϭϱ͘ϬϬ ΨϮϬϵ͕ϱϮϬ͘ϬϬ ϱϭ 'ZE<,sZKE  ϭϰ ΨϱϮϬ͘ϬϬ Ψϳ͕ϮϴϬ͘ϬϬ ΨϰϱϬ͘ϬϬ Ψϲ͕ϯϬϬ͘ϬϬ ϱϮ 'ZE<^,ZZKt  ϯϯ ΨϵϮϬ͘ϬϬ ΨϯϬ͕ϯϲϬ͘ϬϬ ΨϴϬϬ͘ϬϬ ΨϮϲ͕ϰϬϬ͘ϬϬ ϱϯ 'ZE/<>EDZ</E'^^ϭ >& ϭ͕ϭϰϭ ΨϮϵ͘ϬϬ Ψϯϯ͕Ϭϴϵ͘ϬϬ ΨϮϱ͘ϬϬ ΨϮϴ͕ϱϮϱ͘ϬϬ ϱϰ 'ZE/<>EDZ</E'^^Ϯ >& Ϯϲϴ Ψϴϳ͘ϬϬ ΨϮϯ͕ϯϭϲ͘ϬϬ Ψϳϱ͘ϬϬ ΨϮϬ͕ϭϬϬ͘ϬϬ ϱϱ >&ddhZE/<Ky  ϭϮ Ψϭ͕ϴϱϬ͘ϬϬ ΨϮϮ͕ϮϬϬ͘ϬϬ Ψϭ͕ϲϬϬ͘ϬϬ Ψϭϵ͕ϮϬϬ͘ϬϬ ϱϲ /<h&&Z >& ϳ͕Ϯϲϭ ΨϮ͘ϳϱ Ψϭϵ͕ϵϲϳ͘ϳϱ ΨϮ͘Ϯϱ Ψϭϲ͕ϯϯϳ͘Ϯϱ ϱϳ /<h&&ZdZ/stz ^Y&d ϱ͕ϭϴϯ Ψϯ͘ϱϬ Ψϭϴ͕ϭϰϬ͘ϱϬ Ψϯ͘ϬϬ Ψϭϱ͕ϱϰϵ͘ϬϬ ϱϴ />Zz>dZ<>E^WZdKZ^ ϱϯ Ψϭϳϯ͘ϬϬ Ψϵ͕ϭϲϵ͘ϬϬ Ψϭ͕ϱϬϬ͘ϬϬ Ψϳϵ͕ϱϬϬ͘ϬϬ ϱϵ h^dKD>^^/s/<tz^/'E  ϱ Ψϭϳϯ͘ϬϬ Ψϴϲϱ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϳϱϬ͘ϬϬ /ŶƚĞƌŵŽƵŶƚĂŝŶ^ůƵƌƌLJ^ĞĂů ^/ Z͘ƵƌŬĞŽƌƉŽƌĂƚŝŽŶ Page 161 of 814 ϲϬ E/',KZ,KK'ZEtz^/'E;dzWWZW>E^Ϳ  Ϯϯ Ψϭϳϯ͘ϬϬ Ψϯ͕ϵϳϵ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϯ͕ϰϱϬ͘ϬϬ ϲϭ /Zd/KE>W>Yh;ϮϰΗyϲΗͿ&KZ'ZEtz;dzWWZW>E^Ϳ  ϵ Ψϭϳϯ͘ϬϬ Ψϭ͕ϱϱϳ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭ͕ϯϱϬ͘ϬϬ ϲϮ ZdZKZ&>d/s^,d/E'&>'Ͳ^,d^ϯϮ  Ϯ ΨϮϵ͘ϬϬ Ψϱϴ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϲϯ Z/',ddhZEz/>dK/<^/'E  ϭϭ Ψϭϳϯ͘ϬϬ Ψϭ͕ϵϬϯ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭ͕ϲϱϬ͘ϬϬ ϲϰ ZϭϬͲϭϭ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϲϱ ZϭϬͲϭϱ^/'E  ϭ Ψϭϳϯ͘ϬϬ Ψϭϳϯ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϭϱϬ͘ϬϬ ϲϲ ZϭͲϭ^/'E  ϭϯ Ψϭϳϯ͘ϬϬ ΨϮ͕Ϯϰϵ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭ͕ϵϱϬ͘ϬϬ ϲϳ ZϭϭͲϮ^/'E  ϭ Ψϭϳϯ͘ϬϬ Ψϭϳϯ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϭϱϬ͘ϬϬ ϲϴ ZϭͲϯW^/'E  ϲ Ψϭϳϯ͘ϬϬ Ψϭ͕Ϭϯϴ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϵϬϬ͘ϬϬ ϲϵ ZϭͲϲ^/'E  ϭϬ Ψϭϳϯ͘ϬϬ Ψϭ͕ϳϯϬ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭ͕ϱϬϬ͘ϬϬ ϳϬ ZϭϲͲϵW^/'E  ϭ Ψϭϳϯ͘ϬϬ Ψϭϳϯ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϭϱϬ͘ϬϬ ϳϭ ZϮͲϭ^/'E  ϱ Ψϭϳϯ͘ϬϬ Ψϴϲϱ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϳϱϬ͘ϬϬ ϳϮ ZϮϲ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϳϯ ZϯͲϳ^/'E  ϭ Ψϭϳϯ͘ϬϬ Ψϭϳϯ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϭϱϬ͘ϬϬ ϳϰ ZϯͲϴ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϳϱ ZϰͲϭϭ^/'E  ϱ Ψϭϳϯ͘ϬϬ Ψϴϲϱ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϳϱϬ͘ϬϬ ϳϲ ZϰͲϰ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϳϳ ZϱͲϭ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϳϴ ZϲͲϱW^/'E  ϭϭ Ψϭϳϯ͘ϬϬ Ψϭ͕ϵϬϯ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭ͕ϲϱϬ͘ϬϬ ϳϵ ZͲϴϭ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϴϬ ZϴͲϯĂ^/'E  ϭ Ψϭϳϯ͘ϬϬ Ψϭϳϯ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϭϱϬ͘ϬϬ ϴϭ tϭϳͲϭ^/'E  Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϴϮ tϴϰ;Ϳ^/'E  ϯϰ Ψϭϳϯ͘ϬϬ Ψϱ͕ϴϴϮ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϱ͕ϭϬϬ͘ϬϬ ϴϯ Et^dZdED^/'E  ϰ Ψϭϳϯ͘ϬϬ ΨϲϵϮ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϲϬϬ͘ϬϬ ϴϰ Zϵϵ;Ϳ^/'E  ϮϬ Ψϭϳϯ͘ϬϬ Ψϯ͕ϰϲϬ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϯ͕ϬϬϬ͘ϬϬ ϴϱ &/Z,zZEd>hDZ<Z  ϯϲϭ ΨϭϮ͘ϬϬ Ψϰ͕ϯϯϮ͘ϬϬ Ψϱ͘ϬϬ Ψϭ͕ϴϬϱ͘ϬϬ ϴϲ WyK/dzWK^dDK>͕ϭϴΗt,/dt/d,ϯz>>KttZW  ϵ Ψϯϰϱ͘ϬϬ Ψϯ͕ϭϬϱ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭ͕ϯϱϬ͘ϬϬ ϴϳ WyK/dzWK^dDK>͕ϯϲΗt,/dt/d,Ϯ>/',d'ZztZW  ϯϯ Ψϯϰϱ͘ϬϬ Ψϭϭ͕ϯϴϱ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϰ͕ϵϱϬ͘ϬϬ ϴϴ ZDKs;Ϳ^/'EWK^dzKZ/E'EWd,/E' Ϯ Ψϭϳϯ͘ϬϬ Ψϯϰϲ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϯϬϬ͘ϬϬ ϴϵ /E^d>>;EͿϭϮΖWhE,WK^d  ϭϭϱ ΨϮϴϴ͘ϬϬ Ψϯϯ͕ϭϮϬ͘ϬϬ ΨϭϱϬ͘ϬϬ Ψϭϳ͕ϮϱϬ͘ϬϬ ϵϬ ZDKs;ͿE/E^d>>;EͿϭϰΖWhE,WK^d  ϭϰ ΨϮϴϴ͘ϬϬ Ψϰ͕ϬϯϮ͘ϬϬ ΨϭϱϬ͘ϬϬ ΨϮ͕ϭϬϬ͘ϬϬ ϵϭ /E^d>>EtϰϴΗt,>^dKWWZE'͘^d͘ϮϮϲϬ  ϭϵ Ψϭϯϱ͘ϬϬ ΨϮ͕ϱϲϱ͘ϬϬ Ψϭϯϱ͘ϬϬ ΨϮ͕ϱϲϱ͘ϬϬ ϵϮ ^W,hDW  ϯϰ Ψϱ͕ϬϬϬ͘ϬϬ ΨϭϳϬ͕ϬϬϬ͘ϬϬ Ψϱ͕ϮϬϬ͘ϬϬ Ψϭϳϲ͕ϴϬϬ͘ϬϬ ϵϯ ^Wd> ϯ Ψϭϯ͕ϬϬϬ͘ϬϬ Ψϯϵ͕ϬϬϬ͘ϬϬ Ψϭϯ͕ϬϬϬ͘ϬϬ Ψϯϵ͕ϬϬϬ͘ϬϬ ϵϰ KEZd/<D/E >& ϴϯϯ Ψϴϳ͘ϬϬ ΨϳϮ͕ϰϳϭ͘ϬϬ Ψϴϳ͘ϬϬ ΨϳϮ͕ϰϳϭ͘ϬϬ ϵϱ ZdE'h>Z^d/ZKEW/W&KZKEZd/<D/E  ϱ ΨϲϱϬ͘ϬϬ Ψϯ͕ϮϱϬ͘ϬϬ ΨϴϬϬ͘ϬϬ Ψϰ͕ϬϬϬ͘ϬϬ ϵϲ ,D^hZ&ZW/Zd/>͕^,dϱ ^Y&d ϭϯ͕ϭϮϭ Ψϭϭ͘ϬϬ Ψϭϰϰ͕ϯϯϭ͘ϬϬ Ψϭϭ͘ϱϬ ΨϭϱϬ͕ϴϵϭ͘ϱϬ ϵϳ ϲΗWd,ZW/ZWZd/>͕^,dϱ ^Y&d ϭ͕Ϯϰϵ Ψϭϳ͘ϬϬ ΨϮϭ͕Ϯϯϯ͘ϬϬ Ψϭϳ͘ϬϬ ΨϮϭ͕Ϯϯϯ͘ϬϬ Ύϵϴ :h^dtdZs>sdK&/E/^,^hZ&WZE'͘^d͘ϲϬϰϬ  Ϯ Ψϭ͕ϱϬϬ͘ϬϬ Ψϯ͕ϬϬϬ͘ϬϬ Ψϭ͕ϱϬϬ͘ϬϬ Ψϯ͕ϬϬϬ͘ϬϬ Ύϵϵ :h^dDE,K>dK&/E/^,^hZ&WZE'͘^d͘ϲϬϰϬ  Ϯ ΨϮ͕ϭϬϬ͘ϬϬ Ψϰ͕ϮϬϬ͘ϬϬ ΨϮ͕ϭϬϬ͘ϬϬ Ψϰ͕ϮϬϬ͘ϬϬ ΎϭϬϬ :h^dEZ^dEdZ>/EDKEhDEdWZE'͘^d͘ϵϬϮϬ  Ϯ Ψϭ͕ϳϬϬ͘ϬϬ Ψϯ͕ϰϬϬ͘ϬϬ Ψϭ͕ϳϬϬ͘ϬϬ Ψϯ͕ϰϬϬ͘ϬϬ ΎϭϬϭ Ws/E''Z/>>KtEWZd/>͕^,dϱ ^Y&d ϭϬϬ ΨϭϮ͘ϬϬ Ψϭ͕ϮϬϬ͘ϬϬ ΨϭϮ͘ϬϬ Ψϭ͕ϮϬϬ͘ϬϬ ΎϭϬϮ KEZd^ZW/Z>>KtEWZd/>͕^,dϱ ^Y&d ϭϬϬ Ψϳϭ͘ϬϬ Ψϳ͕ϭϬϬ͘ϬϬ Ψϳϭ͘ϬϬ Ψϳ͕ϭϬϬ͘ϬϬ Ψϰ͕ϭϰϴ͕ϵϱϯ͘ϰϱ Ψϱ͕ϯϮϴ͕Ϯϰϱ͘ϴϬ ϭϬϯ dZ&&/KEdZK>W>EE/DW>DEdd/KE >^ ϭ ΨϭϬ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ Ψϱϲ͕ϱϬϬ͘ϬϬ Ψϱϲ͕ϱϬϬ͘ϬϬ ϭϬϰ WKd,K>/E'>^ ϭ Ψϰ͕ϱϬϬ͘ϬϬ Ψϰ͕ϱϬϬ͘ϬϬ Ψϰ͕ϱϬϬ͘ϬϬ Ψϰ͕ϱϬϬ͘ϬϬ ϭϬϱ dDWKZZz^dZ/W/E'EWsDEdDZ</E'^>^ ϭ Ψϭ͕ϱϬϬ͘ϬϬ Ψϭ͕ϱϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ ΨϭϬ͕ϬϬϬ͘ϬϬ ϭϬϲ KDW>zt/d,D/d/'d/KED^hZ^EZ,K>K'/>DKE/dKZ/E'>^ ϭ ΨϮ͕ϬϬϬ͘ϬϬ ΨϮ͕ϬϬϬ͘ϬϬ Ψϱ͕ϬϬϬ͘ϬϬ Ψϱ͕ϬϬϬ͘ϬϬ ϭϬϳ EhZZDW͗,/'hZEE/WKDK >^ ϭ ΨϭϬϬ͕ϬϬϬ͘ϬϬ ΨϭϬϬ͕ϬϬϬ͘ϬϬ ΨϭϬϴ͕ϬϬϬ͘ϬϬ ΨϭϬϴ͕ϬϬϬ͘ϬϬ ϭϬϴ hZZDW͗,/'hZEE/WKDK >^ ϭ ΨϰϬ͕ϬϬϬ͘ϬϬ ΨϰϬ͕ϬϬϬ͘ϬϬ ΨϰϬ͕ϬϬϬ͘ϬϬ ΨϰϬ͕ϬϬϬ͘ϬϬ ϭϬϵ ,/'hZEE/WKDK^/'E>DK/&/d/KE >^ ϭ Ψϳϵ͕ϬϬϬ͘ϬϬ Ψϳϵ͕ϬϬϬ͘ϬϬ Ψϲϯ͕ϭϬϬ͘ϬϬ Ψϲϯ͕ϭϬϬ͘ϬϬ ϭϭϬ :h^d^dKZDZ/EDE,K>WZE'͘^d͘ϲϬϰϬ  ϭ ΨϮ͕ϮϬϬ͘ϬϬ ΨϮ͕ϮϬϬ͘ϬϬ ΨϮ͕ϮϬϬ͘ϬϬ ΨϮ͕ϮϬϬ͘ϬϬ ϭϭϭ ZDKsy/^d/E'E/E^d>>EtϭϮΗWs^dKZDZ/E >& ϭϮ ΨϮϲϱ͘ϬϬ Ψϯ͕ϭϴϬ͘ϬϬ ΨϮϲϱ͘ϬϬ Ψϯ͕ϭϴϬ͘ϬϬ ϭϭϮ ZDKsy/^d/E'E/E^d>>EtϭϮΗ/W^dKZDZ/E >& ϰϴ ΨϯϯϬ͘ϬϬ Ψϭϱ͕ϴϰϬ͘ϬϬ Ψϯϯϯ͘ϬϬ Ψϭϱ͕ϵϴϰ͘ϬϬ ϭϭϯ ZDKsy/^d/E'E/E^d>>Et^dKZDZ/Ed,^/E  ϯ ΨϭϬ͕ϲϬϬ͘ϬϬ Ψϯϭ͕ϴϬϬ͘ϬϬ ΨϭϬ͕ϲϬϬ͘ϬϬ Ψϯϭ͕ϴϬϬ͘ϬϬ ϭϭϰ ZDKsy/^d/E'E/E^d>>Et/dzKDDhE/d/KEDE,K>WZ ϭ Ψϭϯ͕ϵϬϬ͘ϬϬ Ψϭϯ͕ϵϬϬ͘ϬϬ Ψϭϯ͕ϵϬϬ͘ϬϬ Ψϭϯ͕ϵϬϬ͘ϬϬ ϭϭϱ KEEddKy/^d/E'^dKZDZ/EDE,K>WZE'͘^d͘ϯϱϰϬ  ϭ ΨϮ͕ϬϬϬ͘ϬϬ ΨϮ͕ϬϬϬ͘ϬϬ ΨϮ͕ϬϬϬ͘ϬϬ ΨϮ͕ϬϬϬ͘ϬϬ ϭϭϲ ZDKs;Ϳ^:hEd/KEKy  ϭ Ψϯ͕ϬϬϬ͘ϬϬ Ψϯ͕ϬϬϬ͘ϬϬ Ψϯ͕ϬϬϬ͘ϬϬ Ψϯ͕ϬϬϬ͘ϬϬ ΨϯϬϴ͕ϵϮϬ͘ϬϬ Ψϯϱϵ͕ϭϲϰ͘ϬϬ Ψϰ͕ϰϱϳ͕ϴϳϯ͘ϰϱ Ψϱ͕ϲϴϳ͕ϰϬϵ͘ϴϬ ^/dKd> dKd>WZK:d/ /d/s>dZEdΗΗ/dKd> Page 162 of 814 AGREEMENT THIS AGREEMENT, made on _______________________, by and between the City of San Luis Obispo, a municipal corporation and charter city, San Luis Obispo County, California (hereinafter called the Owner) and R. BURKE CORPORATION. (hereinafter called the Contractor). WITNESSETH: That the Owner and the Contractor for the consideration stated herein agree as follows: ARTICLE 1, SCOPE OF WORK: The Contractor shall perform everything required to be performed, shall provide and furnish all of the labor, materials, necessary tools, expendable equipment, and all utility and transportation services required to complete all the work of construction of ROADWAY SEALING 2022, SPEC NO. 1000560 in strict compliance with the plans and specifications therefor, including any and all Addenda, adopted by the Owner, in strict compliance with the Contract Documents hereinafter enumerated. It is agreed that said labor, materials, tools, equipment, and services shall be furnished and said work performed and completed under the direction and supervision and subject to the approval of the Owner or its authorized representatives. ARTICLE II, CONTRACT PRICE: The Owner shall pay the Contractor as full consideration for the faithful performance of this Contract, subject to any additions or deductions as provided in the Contract Documents, the contract prices as follows: Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 1 37 TYPE II SLURRY SEAL SQYD 530,563 $3.20 $1,697,801.60 2 37 PNEUMATIC TIRE ROLLER COMPACTION LS 1 $11,500.00 $11,500.00 3 7, 12 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $470,000.00 $470,000.00 4 13 STREET SWEEPING IN SLURRY AREAS (1 DAY) LS 1 $107,700.00 $107,700.00 5 13 STREET SWEEPING IN SLURRY AREAS (30 DAYS) LS 1 $55,600.00 $55,600.00 6 12 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $30,300.00 $30,300.00 7 15 BIKE LANE EDGE GRIND LF 5,315 $6.25 $33,218.75 8 15 CURB RAMP EDGE GRIND LS 1 $100,000.00 $100,000.00           Page 163 of 814 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 9 73 TRAFFIC CIRCLE: CERRO ROMAULDO AND PATRICIA LS 1 $10,000.00 $10,000.00 10 73 TRAFFIC CIRCLE: CERRO ROMAULDO AND TASSAJARA LS 1 $21,100.00 $21,100.00 11 73 TRAFFIC CIRCLE: RAMONA AND LA ENTRADA LS 1 $15,000.00 $15,000.00 12 73 BIKE RAMP: MADONNA AND OCEANAIRE LS 1 $10,400.00 $10,400.00 13 15 REMOVE AND RE-INSTALL EXISTING FLEX POSTS, CURB STOPS, AND PLANTER BOXES AROUND PARKLETS LS 1 $15,200.00 $15,200.00 14 3 COMPLY WITH CALTRANS ENCROACHMENT PERMIT LS 1 $1,650.00 $1,650.00 15 7 COMPLY WITH NIGHT WORK PERMIT LS 1 $4,300.00 $4,300.00 16 86 MARSH AND SANTA ROSA SIGNAL IMPROVEMENTS LS 1 $63,500.00 $63,500.00 17 20 TREE TRIMMING LS 1 $10,000.00 $10,000.00 18 73 REMOVE EXISTING AND INSTALL NEW CROSSWALK PAVERS PER ENG. STD. 7355 SQFT 800 $80.00 $64,000.00 19 84 WHITE/YELLOW PAVEMENT MARKINGS/LEGENDS (ARROWS, WORDS, SYMBOLS, ETC.) SQFT 15,297 $7.00 $107,079.00 20 84 4" WHITE/YELLOW/BLUE LF 5,792 $3.50 $20,272.00 21 84 4" DOUBLE WHITE LF 302 $1.25 $377.50 22 84 6" DOUBLE WHITE LF 136 $1.75 $238.00 23 84 6" YELLOW LF 1,516 $1.00 $1,516.00 24 84 12" WHITE/YELLOW LF 17,468 $5.00 $87,340.00 25 84 24" WHITE/YELLOW LF 9,011 $9.25 $83,351.75 26 84 MODIFIED DETAIL 1 - SHEET C2 LF 3,500 $0.60 $2,100.00 27 84 DETAIL 2 LF 11,370 $1.00 $11,370.00 28 84 DETAIL 8 LF 207 $0.70 $144.90 29 84 DETAIL 9 LF 2,769 $1.00 $2,769.00 30 84 DETAIL 21 LF 20 $1.15 $23.00 31 84 DETAIL 22 LF 22,470 $2.30 $51,681.00 32 84 DETAIL 24 LF 349 $0.70 $244.30 33 84 DETAIL 27B LF 17,470 $0.60 $10,482.00 34 84 DETAIL 28 LF 368 $2.50 $920.00           Page 164 of 814 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 35 84 DETAIL 29 LF 88 $4.75 $418.00 36 84 DETAIL 30 LF 43 $4.75 $204.25 37 84 DETAIL 32 LF 811 $4.75 $3,852.25 38 84 DETAIL 38 LF 3,083 $2.50 $7,707.50 39 84 DETAIL 39 LF 4,090 $1.00 $4,090.00 40 84 DETAIL 39A LF 1,144 $1.00 $1,144.00 41 84 DETAIL 40 LF 86 $4.75 $408.50 42 84 DETAIL 41 LF 57 $4.75 $270.75 43 84 4" DASHED YELLOW - 4' LINE WITH 8' GAP - SHEET S4 LF 205 $6.00 $1,230.00 44 84 MODIFIED CALTRANS DETAIL 22 - SHEET 42 LF 59 $6.00 $354.00 45 84 12" YELLOW STRIPE WITH "COMMERCIAL LOADING ONLY" - SHEET 43 LF 100 $11.50 $1,150.00 46 84 YELLOW BOT DOT, TYPE AY MARKER - SHEET S57 EA 38 $58.00 $2,204.00 47 84 WHITE/BLUE PARKING "L" OR "T" EA 776 $58.00 $45,008.00 48 84 ADA ISA SYMBOL EA 34 $345.00 $11,730.00 49 84 BLUE/YELLOW/RED/WHITE CURB PAINT LF 1,487 $3.45 $5,130.15 50 84 GREEN SEALMASTER COLOR SAFE PAINT SQFT 13,968 $17.25 $240,948.00 51 84 GREENBACK CHEVRON EA 14 $520.00 $7,280.00 52 84 GREENBACK SHARROW EA 33 $920.00 $30,360.00 53 84 GREEN BIKE LANE MARKINGS CASE 1 LF 1,141 $29.00 $33,089.00 54 84 GREEN BIKE LANE MARKINGS CASE 2 LF 268 $87.00 $23,316.00 55 84 LEFT TURN BIKE BOX EA 12 $1,850.00 $22,200.00 56 84 BIKE BUFFER LF 7,261 $2.75 $19,967.75 57 84 BIKE BUFFER AT DRIVEWAY SQFT 5,183 $3.50 $18,140.50 58 84 ZICLA ZEBRA CYCLE TRACK LANE SEPARATORS EA 53 $173.00 $9,169.00 59 82 CUSTOM CLASS IV BIKEWAY SIGN EA 5 $173.00 $865.00 60 82 NEIGHBORHOOD GREENWAY SIGN (TYPE PER PLANS) EA 23 $173.00 $3,979.00 61 82 DIRECTIONAL PLAQUE (24"X6") FOR GREENWAY (TYPE PER PLANS) EA 9 $173.00 $1,557.00           Page 165 of 814 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 62 82 RETROREFLECTIVE SHEETING FLAG - SHEET S32 EA 2 $29.00 $58.00 63 82 RIGHT TURN YIELD TO BIKE SIGN EA 11 $173.00 $1,903.00 64 82 R10-11 SIGN EA 2 $173.00 $346.00 65 82 R10-15 SIGN EA 1 $173.00 $173.00 66 82 R1-1 SIGN EA 13 $173.00 $2,249.00 67 82 R11-2 SIGN EA 1 $173.00 $173.00 68 82 R1-3P SIGN EA 6 $173.00 $1,038.00 69 82 R1-6 SIGN EA 10 $173.00 $1,730.00 70 82 R16-9P SIGN EA 1 $173.00 $173.00 71 82 R2-1 SIGN EA 5 $173.00 $865.00 72 82 R26 SIGN EA 2 $173.00 $346.00 73 82 R3-7 SIGN EA 1 $173.00 $173.00 74 82 R3-8 SIGN EA 2 $173.00 $346.00 75 82 R4-11 SIGN EA 5 $173.00 $865.00 76 82 R4-4 SIGN EA 2 $173.00 $346.00 77 82 R5-1 SIGN EA 2 $173.00 $346.00 78 82 R6-5P SIGN EA 11 $173.00 $1,903.00 79 82 R-81 SIGN EA 2 $173.00 $346.00 80 82 R8-3a SIGN EA 1 $173.00 $173.00 81 82 W17-1 SIGN EA 2 $173.00 $346.00 82 82 W84(CA) SIGN EA 34 $173.00 $5,882.00 83 82 NEW STREET NAME SIGN EA 4 $173.00 $692.00 84 82 R99C (CA) SIGN EA 20 $173.00 $3,460.00 85 82 FIRE HYDRANT BLUE MARKER EA 361 $12.00 $4,332.00 86 82 PEXCO CITY POST MODEL EAC, 18" WHITE WITH 3 YELLOW WRAP EA 9 $345.00 $3,105.00 87 82 PEXCO CITY POST MODEL EAC, 36" WHITE WITH 2 LIGHT GREY WRAP EA 33 $345.00 $11,385.00 88 82 REMOVE (E) SIGN POST BY CORING AND PATCHING EA 2 $173.00 $346.00 89 82 INSTALL (N) 12' PUNCH POST EA 115 $288.00 $33,120.00 90 82 REMOVE (E) AND INSTALL (N) 14' PUNCH POST EA 14 $288.00 $4,032.00 91 73 INSTALL NEW 48" WHEEL STOP PER ENG. STD. 2260 EA 19 $135.00 $2,565.00           Page 166 of 814 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 92 39 SPEED HUMP EA 34 $5,000.00 $170,000.00 93 39 SPEED TABLE EA 3 $13,000.00 $39,000.00 94 84 CONCRETE BIKE MEDIAN LF 833 $87.00 $72,471.00 95 77 RECTANGULAR CAST IRON PIPE FOR CONCRETE BIKE MEDIAN EA 5 $650.00 $3,250.00 96 39 HMA SURFACE REPAIR DETAIL A, SHEET C5 SQFT 13,121 $11.00 $144,331.00 97 39 6" AC PATCH REPAIR PER DETAIL D, SHEET C5 SQFT 1,249 $17.00 $21,233.00 *98 15 ADJUST WATER VALVE TO FINISHED SURFACE PER ENG. STD. 6040 EA 2 $1,500.00 $3,000.00 *99 15 ADJUST MANHOLE TO FINISHED SURFACE PER ENG. STD. 6040 EA 2 $2,100.00 $4,200.00 *100 15 ADJUST AND RESET CENTERLINE MONUMENT PER ENG. STD. 9020 EA 2 $1,700.00 $3,400.00 *101 39, 96 PAVING GRID ALLOWANCE PER DETAIL B, SHEET C5 SQFT 100 $12.00 $1,200.00 *102 39,73 CONCRETE BASE REPAIR ALLOWANCE PER DETAIL C, SHEET C5 SQFT 100 $71.00 $7,100.00 Base Bid $4,148,953.45 103 7 TRAFFIC CONTROL PLAN AND IMPLEMENTATION LS 1 $10,000.00 $10,000.00 104 77 POTHOLING LS 1 $4,500.00 $4,500.00 105 84 TEMPORARY STRIPING AND PAVEMENT MARKINGS LS 1 $1,500.00 $1,500.00 106 14 COMPLY WITH MITIGATION MEASURES AND ARCHAEOLOGICAL MONITORING PLAN LS 1 $2,000.00 $2,000.00 107 73 N CURB RAMP: HIGUERA AND NIPOMO LS 1 $100,000.00 $100,000.00 108 73 E CURB RAMP: HIGUERA AND NIPOMO LS 1 $40,000.00 $40,000.00 109 86 HIGUERA AND NIPOMO SIGNAL MODIFICATION LS 1 $79,000.00 $79,000.00 110 15 ADJUST STORMDRAIN MANHOLE PER ENG. STD. 6040 EA 1 $2,200.00 $2,200.00 111 77 REMOVE EXISTING AND INSTALL NEW 12" PVC STORMDRAIN LF 12 $265.00 $3,180.00 112 77 REMOVE EXISTING AND INSTALL NEW 12" DIP STORMDRAIN LF 48 $330.00 $15,840.00 113 77 REMOVE EXISTING AND INSTALL NEW STORMDRAIN CATCH BASIN EA 3 $10,600.00 $31,800.00           Page 167 of 814 Item Item Unit of Estimated Item Price Total No. SS(1) Description Measure Quantity (in figures) (in figures) 114 77 REMOVE EXISTING AND INSTALL NEW CITY COMMUNICATION MANHOLE PER ENG. STD. 9030 EA 1 $13,900.00 $13,900.00 115 77 CONNECT TO EXISTING STORMDRAIN MANHOLE PER ENG. STD. 3540 EA 1 $2,000.00 $2,000.00 116 77 REMOVE (E) SD JUNCTION BOX EA 1 $3,000.00 $3,000.00 Additive Alternative A $308,920.00 BID TOTAL: $ 4,457,873.45 Payments are to be made to the Contractor in compliance with and subject to the provisions embodied in the documents made a part of this Contract. Should any dispute arise respecting the true value of any work omitted, or of any extra work which the Contractor may be required to do, or respecting the size of any payment to the Contractor, during the performance of this Contract, said dispute shall be decided by the Owner and its decision shall be final, and conclusive. ARTICLE III, COMPONENT PARTS OF THIS CONTRACT: The Contract consists of the following documents, all of which are as fully a part thereof as if herein set out in full, and if not attached, as if hereto attached: 1. Notice to Bidders and Information for Bidders 2. Standard Specifications and Engineering Standards 3. Special Provisions, any Addenda, Plans and Contract Change Orders 4. Caltrans Standard Specifications and Standard Plans 2015 5. Accepted Bid and Bid Bond 6. List of Subcontractors 7. Public Contract Code Sections 10285.1 Statement 8. Public Contract Code Section 10162 Questionnaire 9. Public Contract Code Section 10232 Statement 10. Labor Code Section 1725.5 Statements 11. Bidder Acknowledgements 12. Qualifications 13. Non-collusion Declaration 14. Agreement and Bonds 15. Insurance Requirements and Forms ARTICLE IV INDEMNIFICATION: The Contractor shall indemnify, defend with legal counsel approved by City, and hold harmless City, its officers, officials, employees and volunteers from and against all liability, loss, damage, expense, cost (including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation) of every nature arising out of or in connection with the Contractor’s negligence, recklessness or willful misconduct in the performance of work hereunder or its failure to           Page 168 of 814 comply with any of its obligations contained in this Agreement, except such loss or damage which is caused by the sole or active negligence or willful misconduct of the City. Should conflict of interest principles preclude a single legal counsel from representing both the City and the Contractor, or should the City otherwise find the Contractor’s legal counsel unacceptable, then the Contractor shall reimburse the City its costs of defense, including without limitation reasonable legal counsel fees, expert fees and all other costs and fees of litigation. The Contractor shall promptly pay any final judgment rendered against the City (and its officers, officials, employees and volunteers) with respect to claims determined by a trier of fact to have been the result of the Contractor’s negligent, reckless or wrongful performance. It is expressly understood and agreed that the foregoing provisions are intended to be as broad and inclusive as is permitted by the law of the State of California and will survive termination of this Agreement. The Contractor obligations under this section apply regardless of whether such claim, charge, damage, demand, action, proceeding, loss, stop notice, cost, expense, judgment, civil fine or penalty, or liability was caused in part or contributed to by an Indemnitee. However, without affecting the rights of the City under any provision of this agreement, the Contractor shall not be required to indemnify and hold harmless the City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where the City is shown to have been actively negligent and where the City’s active negligence accounts for only a percentage of the liability involved, the obligation of the Contractor will be for that entire portion or percentage of liability not attributable to the active negligence of the City. ARTICLE V. It is further expressly agreed by and between the parties hereto that should there be any conflict between the terms of this instrument and the bid of said Contractor, then this instrument shall control and nothing herein shall be considered as an acceptance of the said terms of said bid conflicting herewith. IN WITNESS WHEREOF, the parties to these presents have hereunto set their hands this year and date first above written. ATTEST: CITY OF SAN LUIS OBISPO A Municipal Corporation ___________________________________ Teresa Purrington, City Clerk ___________________________________ Erica A. Stewart, Mayor           Page 169 of 814 ATTEST: ___________________________________ Teresa Purrington, City Clerk CITY OF SAN LUIS OBISPO ________________________________ Erica A. Steward, Mayor APPROVED AS TO FORM ___________________________________ J. Christine Dietrick City Attorney CONTRACTOR: R. Burke Corporation ________________________________ Robert E. Burke President ________________________________ Kathryn A. Burke Treasurer           Page 170 of 814 :ĂĐŬ,ŽƵƐĞZŽŽĨĂŶĚtŝŶĚŽǁƐtĂůŬZĂŝůŝŶŐ;ϭϬϬϬϬϳϱͲϮϰͿ^ŽƵƚŚ^ƚƌĞĞƚDĞĚŝĂŶ>ĂŶĚƐĐĂƉŝŶŐ;ϭϬϬϬϬϯϳͿĐƚŝǀĞdƌĂŶƐƉŽƌƚĂƚŝŽŶWůĂŶ/ŵƉůĞŵĞŶƚĂƚŝŽŶ;ϭϬϬϱϬϮͿWĂƌŬŝŶŐ>ŽƚDĂŝŶƚĞŶĂŶĐĞ;ϭϬϬϬϬϯϭͿWĞĚĞƐƚƌŝĂŶĂŶĚŝĐLJĐůĞWĂƚŚǁĂLJDĂŝŶƚĞŶĂŶĐĞ;ϭϬϬϬϬϯϮͿ^ƚŽƌŵƌĂŝŶƐŶŶƵĂůƐƐĞƚDĂŝŶƚĞŶĂŶĐĞĐĐŽƵŶƚ;ϵϬϳϰϮͿ^ŝĚĞǁĂůŬŶŶƵĂůƐƐĞƚDĂŝŶƚĞŶĂŶĐĞĐĐŽƵŶƚ;ϵϬϴϰϵͿtĂƚĞƌsĂůǀĞŽǀĞƌĚũƵƐƚŵĞŶƚƐ;ϵϭϭϰϵͿ^ĞǁĞƌDĂŝŶƚĞŶĂŶĐĞ,ŽůĞŽǀĞƌĚũƵƐƚŵĞŶƚƐ;ϭϬϬϬϬϴϰͿ'ĞŶĞƌĂů&ƵŶĚ ^ϭ&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ 'ĞŶĞƌĂů&ƵŶĚ tĂƚĞƌ&ƵŶĚ ^ĞǁĞƌ&ƵŶĚĂƐĞŝĚdŽƚĂů Ψϭ͕ϵϱϭ͕ϳϲϵ Ψϭ͕ϰϵϬ͕ϰϱϵ ΨϭϬϬ͕ϬϬϬ ΨϮϭϰ͕ϱϮϱ ΨϮϬϬ͕ϬϬϬ Ψϯϱ͕ϬϬϬ ΨϭϱϬ͕ϬϬϬ ΨϬ ΨϬ Ψϯ͕ϬϬϬ Ψϰ͕ϮϬϬ Ψϰ͕ϭϰϴ͕ϵϱϯĚĚŝƚŝǀĞƚůŝĚdŽƚĂů ΨϭϬϴ͕ϵϮϬ ΨϬ ΨϬ ΨϬ ΨϬ ΨϬ ΨϬ ΨϭϬϬ͕ϬϬϬ ΨϭϬϬ͕ϬϬϬ ΨϬ ΨϬ ΨϯϬϴ͕ϵϮϬŽŶƚŝŶŐĞŶĐŝĞƐ Ψϳϲϯ͕ϴϮϳ ΨϬ ΨϬ ΨϬ ΨϬ ΨϬ ΨϬ ΨϮϬ͕ϬϬϬ ΨϮϬ͕ϬϬϬ Ψϳ͕ϬϬϬ Ψϱ͕ϴϬϬ Ψϴϭϲ͕ϲϮϳdŽƚĂůŽŶƐƚƌƵĐƚŝŽŶƐƚŝŵĂƚĞ ΨϮ͕ϴϮϰ͕ϱϭϲ Ψϭ͕ϰϵϬ͕ϰϱϵ ΨϭϬϬ͕ϬϬϬ ΨϮϭϰ͕ϱϮϱΨϮϬϬ͕ϬϬϬ Ψϯϱ͕ϬϬϬ ΨϭϱϬ͕ϬϬϬ ΨϭϮϬ͕ϬϬϬ ΨϭϮϬ͕ϬϬϬ ΨϭϬ͕ϬϬϬ ΨϭϬ͕ϬϬϬ Ψϱ͕Ϯϳϰ͕ϱϬϬŽŶƐƚƌƵĐƚŝŽŶDĂŶĂŐĞŵĞŶƚ ΨϮϱϬ͕ϬϬϬΨϮϱϬ͕ϬϬϬDĂƚĞƌŝĂůƐdĞƐƚŝŶŐ ΨϮϱ͕ϬϬϬΨϮϱ͕ϬϬϬWƌŝŶƚŝŶŐΘĚǀĞƌƚŝƐŝŶŐ ΨϱϬϬΨϱϬϬdŽƚĂůWƌŽũĞĐƚƐƚŝŵĂƚĞ Ψϯ͕ϭϬϬ͕Ϭϭϲ Ψϭ͕ϰϵϬ͕ϰϱϵ ΨϭϬϬ͕ϬϬϬ ΨϮϭϰ͕ϱϮϱ ΨϮϬϬ͕ϬϬϬ Ψϯϱ͕ϬϬϬ ΨϭϱϬ͕ϬϬϬ ΨϭϮϬ͕ϬϬϬ ΨϭϮϬ͕ϬϬϬ ΨϭϬ͕ϬϬϬ ΨϭϬ͕ϬϬϬ Ψϱ͕ϱϱϬ͕ϬϬϬǀĂŝůĂďůĞWƌŽũĞĐƚĂůĂŶĐĞ ΨϮϰϱ͕ϰϰϲ ΨϰϰϬ͕ϱϴϮ ΨϭϬϬ͕ϬϬϬ ΨϮϭϰ͕ϱϮϱ ΨϬ ΨϭϴϬ͕ϱϳϴ Ψϱ͕ϳϳϱ ΨϯϬϬ͕ϮϮϱ Ψϰϲϱ͕ϬϰϮ ΨϬ Ψϭ͕ϯϬϭ Ψϭ͕ϵϱϯ͕ϰϳϰ&zϮϬϮϮͲϮϯĚĚŝƚŝŽŶĂů&ƵŶĚŝŶŐŽŶϳͬϭͬϮϬϮϮΨϭ͕ϰϮϱ͕ϬϬϬ Ψϭ͕Ϭϰϵ͕ϴϳϳ ΨϮϬϬ͕ϬϬϬ Ψϯϱ͕ϬϬϬ ΨϭϱϬ͕ϬϬϬ ΨϳϮϱ͕ϬϬϬ ΨϮϱϬ͕ϬϬϬ ΨϯϬ͕ϬϬϬ ΨϮϱ͕ϬϬϬ Ψϯ͕ϴϴϵ͕ϴϳϳ&zϮϬϮϮͲϮϯĚĚŝƚŝŽŶĂů&ƵŶĚŝŶŐĨƌŽŵƵĚŐĞƚ^ƵƉƉůĞŵĞŶƚΨϭ͕ϱϴϱ͕ϬϬϬdŽƚĂů&ƵŶĚŝŶŐĨƚĞƌϳͬϭͬϮϬϮϮ Ψϯ͕Ϯϱϱ͕ϰϰϲ Ψϭ͕ϰϵϬ͕ϰϱϵ ΨϭϬϬ͕ϬϬϬ ΨϮϭϰ͕ϱϮϱ ΨϮϬϬ͕ϬϬϬ ΨϮϭϱ͕ϱϳϴ Ψϭϱϱ͕ϳϳϱ Ψϭ͕ϬϮϱ͕ϮϮϱ Ψϳϭϱ͕ϬϰϮ ΨϯϬ͕ϬϬϬ ΨϮϲ͕ϯϬϭ Ψϳ͕ϰϮϴ͕ϯϱϭZĞŵĂŝŶŝŶŐĂůĂŶĐĞ Ψϭϱϱ͕ϰϯϬ ΨϬ ΨϬ ΨϬ ΨϬ ΨϭϴϬ͕ϱϳϴ Ψϱ͕ϳϳϱ ΨϵϬϱ͕ϮϮϱ Ψϱϵϱ͕ϬϰϮΨϮϬ͕ϬϬϬ Ψϭϲ͕ϯϬϭ Ψϭ͕ϴϳϴ͕ϯϱϭ^ƚƌĞĞƚZĞĐŽŶƐƚƌƵĐƚŝŽŶĂŶĚZĞƐƵƌĨĂĐŝŶŐͲŶŶƵĂůƐƐĞƚDĂŝŶƚĞŶĂŶĐĞĐĐŽƵŶƚ;ϵϬϯϰϲͿ^d/DdWZK:dK^dz&hE/E'^KhZ^ZŽĂĚǁĂLJ^ĞĂůŝŶŐϮϬϮϮ͕^ƉĞĐŝĨŝĐĂƚŝŽŶEŽ͘ϭϬϬϬϱϲϬWƌŽũĞĐƚdŽƚĂůŽƐƚƐPage 171 of 814 Page 172 of 814