Loading...
HomeMy WebLinkAbout790 Foothill_Construction Usage of Foothill LaPublic Works / Community Development T 805.781.7015 919 Palm Street, San Luis Obispo, CA 93401 F 805.783.7751 ALL FIELDS MUST BE COMPLETED FOR APPROVAL General Info: Project Location: _______________________________________________________________________________________ Description of Work: ____________________________________________________________________________________ Agency / Company: _____________________________________________________________________________________ Contact Person: _________________________________________ Phone: _____________________________________ Check One Permit Project…………………… City Inspector: ______________________________ Capital Improvement Project…… City Inspector/Spec. No. ______________________ Special Event Street Closure……. City Event Supervisor: ______________________________ Schedule: Requested Schedule (Dates & Hours): Dates ___________________________________________ Hours: (From)_________(To)__________ Number of Days Required to complete work (list for each location):_____________________________________________________ Night Work Requests (7pm – 7am) must receive night work permit from Community Development Department. Night work application: Date Submitted __________ Date Approved __________ Permit Number _____________ Traffic Control: All temporary traffic control shall be per the most current version of the California Manual on Uniform Traffic Control Devices (MUTCD), City of San Luis Obispo Engineering Standards & Specifications (Engr. Std. Appendix G), and CalTrans Standard Plans & Specifications. Work Zone / Event Closure Area: STREET: _____________________________________________________________________________________________ FROM: ________ (Dist. Ft.) ______(Direction N,S,E,W) Of ________________________________________________(Street) TO: ________ (Dist. Ft.) ______(Direction N,S,E,W) Of ___________________________________________________(Street) Work Zone Description __________________________________________________________________________________ Work affects City Transit Stop or Route. Yes No Transit Division approved work: Yes No Date: __________ If yes, contractor must advise Transit Division 7 days prior to work. Contact SLO Transit at 781-7531 ____________________ (City Staff Name) Work requires closure of parking lane or parking meters Yes No Parking Division approved work: Yes No Date: __________ If yes, contractor must receive approval from Parking Division 7 days prior to work. Contact Parking Division at 781-7230. Work requires traffic control to be set up on Caltrans Right of Way. Yes No . If yes, attach copy of permit. Permit No.______________ SLO City Engineering Standard Appendix G. Check applicable standards AND indicate location of work zone on applicable standard. Fig. A Fig. B Fig. C Fig. D Fig. E Fig. F Fig. G Fig. H Fig. I Fig. J Fig. K Fig. L Fig. M Fig. N Fig. O Fig. P Custom Traffic Control Plan (TCP) Required and Attached. Traffic Control Plan Requirements for each phase of work: Accurate Depiction of Street (St. Names, Striping, Traffic Signals, Stop Signs, etc….) Depiction of work zone area (Approx. Dimension) Depiction of temporary delineation & signing (Taper Lengths Dimensioned) Traffic control plans should be submitted to the City Inspector assigned to your job; if the work is by permit then the plan should be submitted along with the encroachment permit. Please refer to the links below for typical applications, sign codes, use of flashing arrow panels, and taper lengths. Accepted Accepted With Comments See Additional Comments on TCP __________________________________________________ Denied (By: __________________ Date ______ ) Resubmittals shall include original application and traffic control plan with City comments CA MUTCD: http://www.dot.ca.gov/hq/traffops/signtech/mutcdsupp/ca_mutcd2012.htm SLO City Std. Plans: http://www.slocity.org/publicworks/stds/appx-g.pdf OFFICE USE ONLY Rec. By: _______ Date: _____ App. By: _______ Date: _____ TEMPORARY TRAFFIC CONTROL APPLICATION CONTRACTOR: PERMIT # PROJ # TOTAL # OF DAYS: WORK HOURS: START DATE: END DATE: DAILY WORKING DAYS SET UP BY: MAINTAINED BY: ONSITE CONTACT: PHONE NUMBER: PHASE #: PAGE #: LEVEL:1 2 3 CITY TCP #APPROVED FOR CITY OF FRESNO PORTIONS ONLY BY: DATE: Avila TS #: 1 of 1 1 of1TysenDelkener CSI STOP STOPROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 ROAD WORK AHEAD W20-1 RIGHT LANE CLOSED AHEAD W9-3R RIGHT LANE CLOSED AHEAD W9-3R LANE CLOSED C30LANECLOSEDC30 LEFT LANE CLOSED AHEAD W20-5 W4-2 DETOUR M4-9b DETOURM4-9mb DETOURM4-9mbDETOURM4- 9b DETOURM4-9b DETOURM4-9b D E T O U RM4-9b DETOUR M4-9b KEEP LEFT R4-7AL R3-6RDETOURM4- 9mb W11-1 ROAD WORK AHEAD W20-1 250'250'250'250' R3-6L 100' BROAD ST.25MPHFOOTHILL BLVD. 30MPH N C H O R R O S T 30 M P H Maintain 12' travel lane N 250' 250' 250' 250' 25 SPEED LIMIT W3-5 CSI: 790 Foothill-OffsiteConcrete Traffic PlanManifest 121 x Tubular 28 x Water Filled Barrier 5 x W20-1 road work ahead 4 x M4-9b detour for peds (R)3 x M4-9mb 2 x C30 LANE CLOSED 2 x M4-8A End Detour 2 x M4-9b detour for peds 2 x R3-6R Straight Ahead Or Right Turn Sign 2 x R4-7AL Keep Left 2 x W11- 1 Bicycle 2 x W16-1 share the road 2 x W3-5 Speed Reduction 2 x W9-3R Right Lane Closed Ahead 1 x C17 Road Work/ Speed Limit 1 x R3-6L R3-6L 1 x R4-7A Keep Right 1 x road narrows 1 x W20-5 left lane closed ahead All metal signs will be mounted on Type 1 Barricades. Legend Tubular Water Filled Barrier Nathan Horst 510) 759-7557 Avila Traffic Safety Avila Traffic Safety 120 GENERAL NOTES TRAFFIC CONTROL PER LATEST CA MUTCD.HOURS OF WORK TO BE DETERMIEND BY AGENCY.IF FLAGGERS ARE ON SITE, ALL FLAGGERS TO COMMUNICATE TRHOUGH HAND SIGNALS AND RADIO DEVICES.PEDESTRAIN, BICYCLE, AND DRIVEWAY TO REMAIN OPEN UNLESS NOTED ON TRAFFIC PLAN.NEW TRAFFIC CONTROL SHALL NOT INTERFERE WITH EXISTING TRAFFIC CONTROL.www.