HomeMy WebLinkAboutItem 5f. Railroad Safety Trail Fencing Project_Attachment A - High Resolution Project PlansSPECIFICATION NO.DATEofSHEETReference Documents:City Standard Specifications - 2020 EditionCity Engineering Standards - 2020 Edition1.CONTRACTOR SHALL COMPLY WITH 2020 CITY OF SAN LUIS OBISPO STANDARD DETAILS ANDSPECIFICATIONS, AS WELL AS 2019 CALIFORNIA BUILDING CODE, 2019 CALIFORNIARESIDENTIAL CODE (CRC), CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA PLUMBINGCODE (CPC), CALIFORNIA ELECTRICAL CODE (CEC), CALIFORNIA ENERGY CODE (CEnC) AND2019 CALIFORNIA GREEN BUILDING CODE (CGBSC).2.IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR PERMITTEE TO CONTACT"UNDERGROUND SERVICE ALERT OF NORTHERN CALIFORNIA" BY PHONE AT 8-1-1FORTY-EIGHT (48) HOURS PRIOR TO START OF CONSTRUCTION FOR LOCATION OF POWER,TELEPHONE, OIL AND NATURAL GAS UNDERGROUND FACILITIES. CONTRACTOR SHALL ALSOCONTACT THE APPROPRIATE AGENCY FOR THE LOCATION OF CABLE T.V., WATER, SEWER,DRAINAGE OR UNDERGROUND FACILITIES.3.THE CONTRACTOR SHALL POSSESS A CLASS A OR C-13 LICENSE AT THE TIME OF BIDOPENING AND THROUGHOUT PROJECT DURATION.4.THESE PLANS DO NOT INDICATE OVERHEAD LINES. CONTRACTOR SHALL TAKE CARE DURINGCONSTRUCTION TO AVOID CONTACT WITH OR DAMAGE TO EXISTING OVERHEAD LINES.5.PROJECT SURVEY MONUMENTS IN PLACE DURING CONSTRUCTION. THE CONTRACTORSHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH THE REPLACEMENT OFDAMAGED OR DISPLACED SURVEY MONUMENTS AND SHALL NOTIFY THE CITY FIVE (5)WORKING DAYS PRIOR TO RESTORING MONUMENTS. MONUMENTS SHALL BE RESET BY ACALIFORNIA LICENSED LAND SURVEY AND SHALL INCLUDE PREPARING AND FILING ACORNER RECORD WITH SAN LUIS OBISPO COUNTY.6.UNION PACIFIC RAILROAD FACILITIES SHALL BE PROTECTED IN PLACE. CONTACTOR SHALLMAINTAIN THE MAXIMUM DISTANCE FROM THEIR FACILITIES AT ALL TIMES AND STAY ON CITYRIGHT OF WAY.7.ENSURE FENCE BARRIER IS CONTINUOUS AND ALONG THE EXISTING ALIGNMENT -COORDINATE WITH ENGINEER AROUND TREES AND OTHER OBSTACLES THAT CANNOT BEREMOVED.index to planssheet no.descriptiongeneral notes:san luis obispo county, california6JULY 20221000116RAILROAD SAFETY TRAILFENCING11COVER SHEET2SITE PLAN3PLAN SHEET4PLAN SHEET5PLAN SHEET6PLAN SHEETFILE NO./LOCATIONabbreviations:APANGLE POINTExistEXISTINGConcCONCRETEElevELEVATIONEQUIVEQUIVALENTEEASTINGFDNFOUNDATIONHMAHOT MIX ASPHALTPROPPROPOSEDLLENGTH (CURVE OR LINE)NNORTHINGTypTYPICALUPRRUNION PACIFIC RAILROADR&RREMOVE AND REPLACEPC/BPPOINT OF CURVATURE (BEGIN CURVE)PCCPOINT OF COMPOUND CURVATURE (BEGIN CURVE)PT/EPPOINT OF TANGENCY (END CURVE)PIPOINT OF INFLECTIONRRADIUS OF CURVEStaSTATIONSNKSINKERo.c.ON CENTEROffOFFSETØDIAMETERX°X'X"DEGREE, MINUTE, SECONDGALVGALVANIZEDG:\Projects\ActiveProjects\Bicycle Paths\1000116 Park Major Maintenance - Railroad Bike Path Fence\450 Design Working Documents\454 CAD\454.2 Drawings\Cover Sheet.dwg
Brian Nelson, City Engineer Approved DateNo. C 79870B
R
I
AN A. NELSONCIVILR EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FOR
N
IA---N020004000PLAN1" = 2000'PROJECT OWNER: CITY OF SAN LUIS OBISPO, PUBLIC WORKS DEPARTMENT,PARKS MAINTENANCE DIVISIONPROJECT DESIGNER: WYATT BANKER-HIX, PUBLIC WORKSRKnow what'sbelow.Callbefore you dig.legend:EXISTING ELECTRICAL LINEEEXISTING FIBER OPTIC LINEEXISTING SEWER LINEWEXISTING WATER/IRRIGATION LINEEXISTING LIGHT POLE/LIGHTING BOXEXISTING IRRIGATION BOXTREES/BRUSHREMOVE AND REPLACE FENCERAILROAD SAFETY TRAIL LIMITSEXISTING FENCE TO REMAINEXISTING STORM DRAIN LINEEXISTING MANHOLE
0+0010+0020+0030+0040+0050+0060+00BP0+00.0BEGIN ALIGNMENTN: 2297108.34E: 5769329.50EP62+29.9END ALIGNMENTN: 2291888.54E: 5772300.10Sta:6+83.4Off:5.0BEGIN WORKSta:61+46.2Off:59.6END WORKof62R EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FORNIACIVIL No. C 86141WY
A
T
T A BANKER-HIX0SCALE IN FEET7501500CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONRAILROAD SAFETY TRAIL FENCING
WBHWBHBNBNAS NOTEDJULY 20221000116SITE PLAN---G:\Projects\ActiveProjects\Bicycle Paths\1000116 Park Major Maintenance - Railroad Bike Path Fence\450 Design Working Documents\454 CAD\454.2 Drawings\Site Map.dwg
PLANSHEET 3SHEET 3SHEET 4SHEET 4SHEET 5SHEET 5SHEET 6ORCUTT ROADBULLOCK LANEBISHOP STREETBROAD STREETSANTA BARBARAAVENUE ELLA STREETN
0+001+002+003+004+005+006+007+008+009+00 EEEENO ACCESS VIACUL-DE-SACSta:6+83.4Off:5.0BEGIN FENCE R&RSta:6+82.1Off:35.3APPASS FENCE BEHINDTREES. ENSURE CITYEXISTING ORNAMENTAL FENCEPROTECT IN PLACE. ENSURECONTINUOUS BARRIERBETWEEN NEW AND EXISTINGFENCEJENNIFER STREETBRIDGE - NOCONSTRUCTIONACCESSCAUTION: BURIEDFIBER OPTIC LINENEARBYWARNING: BURIED GAS LINECROSSES FENCE. POTHOLETO CONFIRMTRIM/REMOVE BRUSH THATINTERFERES WITH FENCEBP0+00.0BEGIN ALIGNMENTN:2297108.34E: 5769329.50PI6+78.7PT5+37.1PCC3+19.0R=461'L319.0'R=2438'L218.1'S18° 16' 18"E141.62S18° 53' 19"E303.819+00
10+0011+0012+0013+0014+0015+0016+0017+0018+0019+00EEEEEEEEEEEPASS FENCE BEHINDTREES. ENSURE CITYARBORIST PRESENT TOOBSERVECAUTION: BURIED FIBEROPTIC LINE NEARBYCAUTION: BURIEDELECTRIC LINE NEARBYWARNING:STORM DRAINCROSSESFENCE.POTHOLE TOCONFIRMPC9+82.5PC11+83.0PC15+47.3PT10+72.2PT12+32.4PT16+46.7R=431'L89.6'R=256'L49.4'R=1012'L99.5'Sta:12+51.7Off:34.1APSta:15+96.1Off:15.0APSta:17+06.3Off:21.9APS30° 35' 30"E110.81S20° 52' 48"E314.90of63R EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FORN
IACIVIL No. C 86141WY
A
T
T A BANKER-HIXN0SCALE IN FEET100200CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONRAILROAD SAFETY TRAIL FENCING
WBHWBHBNBNAS NOTEDJULY 20221000116PLAN SHEET---G:\Projects\ActiveProjects\Bicycle Paths\1000116 Park Major Maintenance - Railroad Bike Path Fence\450 Design Working Documents\454 CAD\454.2 Drawings\Plan Sheets.dwgPLAN
N0SCALE IN FEET100200PLANSWAZEY STREET UNION PACIFIC RAILROADRACHEL STRE
E
T
FLORENCE AVENUEUNION PACIFIC RAILROADJENNIFER STREETGEORGE STREET
18+0019+0020+0021+0022+0023+0024+0025+0026+0027+0028+00 EEEEEEEEEEECONSTRUCTION ACCESS.COORDINATE WITH CITY TO REMOVEBOLLARDSCAUTION: BURIED FIBEROPTIC LINE NEARBYCAUTION: BURIEDELECTRIC LINE NEARBYCAUTION: SEWER LINENEARBYWARNING: SEWER LINE CROSSESFENCE. POTHOLE TO CONFIRMPI21+07.1PC22+80.6PT26+13.6PCC24+92.4R=3742'L211.8'R=1111'L121.2'Sta:21+98.1Off:48.2APSta:24+41.6Off:52.5APS28° 40' 44"E460.41S27° 49' 54"E173.51S19° 33' 07"E226.34WARNING: STORM DRAINCROSSES FENCE.POTHOLE TO CONFIRM27+00
28+00
29+0030+00
31+00
32+00
33+00
34+00
35+00
36+00 EEEEEEEEECONSTRUCTIONACCESS VIABOULEVARD DELCAMPO.COORDINATEACCESS WITH CITYCAUTION: BURIEDFIBER LINE NEARBYCAUTION: BURIEDELECTRIC LINE NEARBYPC28+40.0PT31+96.0PCC30+33.6R=811'L193.7'R=981'L162.3'Sta:27+30.5Off:35.4APSta:28+47.0Off:25.9APSta:29+95.6Off:15.8APSta:32+40.1Off:13.4APS49° 41' 33"E921.34S19° 33' 07"E226.34of64R EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FORNIACIVIL No. C 86141WY
A
T
T A BANKER-HIXN0SCALE IN FEET100200CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONRAILROAD SAFETY TRAIL FENCING
WBHWBHBNBNAS NOTEDJULY 20221000116PLAN SHEET---G:\Projects\ActiveProjects\Bicycle Paths\1000116 Park Major Maintenance - Railroad Bike Path Fence\450 Design Working Documents\454 CAD\454.2 Drawings\Plan Sheets.dwgPLAN
N0SCALE IN FEET100200PLANSAN CARLOS DRIVEBUSHNELL STREETUNION PACIFIC RAILROADUNION PACIFIC RAILROAD
36+0037+0038+0039+0040+0041+0042+0043+0044+0045+00 EEEEEEEEEWWWWW W W WWW W W W W CAUTION: BURIEDELECTRIC LINE NEARBY CAUTION: BURIED FIBERLINE NEARBYFENCE DESTROYEDBY UPRR MATERIALS.MOVE PRIOR TOREPLACING FENCETRIM/REMOVE BRUSH THATINTERFERES WITH FENCE, TypARBORIST TO BE PRESENTFOR TREE TRIMMING ANDCONSTRUCTION WITHINDRIP LINE, TypWARNING: WATER LINECROSSES FENCE.POTHOLE TO CONFIRMWARNING: SEWER LINECROSSES FENCEPOTHOLE TO CONFIRMPC41+17.3PC43+62.4PT42+32.8PT44+56.4R=433'L115.5'R=231'L93.9'Sta:37+62.8Off:19.1APSta:41+57.2Off:27.2APSta:41+64.7Off:8.8END FENCE R&RSta:42+35.3Off:10.4BEGIN R&RSta:43+30.2Off:12.7APS39° 14' 55"E129.62S65° 01' 15"E64.27TIE INTO ExistCULVERT FENCING45+0046+00
47+00
48+00
49+00
50+0051+0052+00
53+00
54+00 EEEEEEEEEWWWWWWWWWWWWWWWWWCAUTION: BURIEDFIBER LINE NEARBYTRIM BRUSH THATINTERFERES WITH FENCEWARNING: STORM DRAINCROSSES FENCE.POTHOLE TO CONFIRMCAUTION: BURIEDSEWER LINE NEARBYCAUTION: BURIEDWATER LINE NEARBYPI51+77.9PC45+20.6PC48+41.5PC53+23.1PT46+27.3PT50+03.0R=146'L106.6'R=1020'L161.5'Sta:47+33.8Off:36.5APSta:50+99.7Off:15.8APSta:53+08.9Off:29.3APS30° 11' 33"E174.87S36° 25' 25"E145.18S20° 51' 18"E214.22of65R EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FOR
N
IACIVIL No. C 86141WY
A
T
T A BANKER-HIXN0SCALE IN FEET100200CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONRAILROAD SAFETY TRAIL FENCING
WBHWBHBNBNAS NOTEDJULY 20221000116PLAN SHEET---G:\Projects\ActiveProjects\Bicycle Paths\1000116 Park Major Maintenance - Railroad Bike Path Fence\450 Design Working Documents\454 CAD\454.2 Drawings\Plan Sheets.dwgPLAN
N0SCALE IN FEET100200PLANUNION PACIFICRAILROADUNION PACIFICRAILROAD
54+0055+0056+0057+0058+0059+0060+0061+0062+00 EEEEEEEEWWWWWWWWWWWWWWWWEXISTING PIPEFENCE. TIE R&RINTO EXISTINGFENCECAUTION: FIBER LINE NEARBYOVERHEADFIBER LINETRIM BRUSH THATINTERFERES WITH FENCE, TypCAUTION: STORM DRAIN NEARBYCAUTION: WATERLINE NEARBYEP62+29.9END ALIGNMENTN: 2291888.54E: 5772300.10PI60+79.5PC56+59.1PC58+93.1PT54+77.8PT57+85.6PT60+05.6R=516'L154.7'R=735'L126.4'R=353'L112.5'Sta:61+46.2Off:59.6END FENCE R&RS28° 44' 00"E181.39S20° 27' 30"E107.53S41° 42' 44"E73.84S48° 22' 24"E150.455.5'8' o.c. MAX14"Ø Typ2'6x6 PRESSURETREATED POSTS2x6 PRESSURE TREATEDRAILS. ATTACH WITH (3)3" COATED SCREWSCLASS C Conc FDN PER Std 90502"x2" METAL 10 GAUGE VINYL COATEDNON-CLIMB FENCE. USE 1" GALVSTAPLES TO RAILS AND POSTS, 6" o.c.IF DISTURBED, RE-COMPACTNATIVE SOIL TO 90% MAX DENSITYBEFORE PLACING FDN0.3'
EQ EQ EXTEND FENCE ACROSSFACE OF RAILS AND POSTS10"of66R EGISTER
E
D
PROFESSIONAL ENGINEERSTATE OF CALI
FORN
IACIVIL No. C 86141WY
A
T
T A BANKER-HIXN0SCALE IN FEET100200CITY SPECIFICATION NO.DATE:PROJECT TITLE:
SHEET TITLE:SHEET NO.DESIGNED BY:DRAWN BY:CHECKED BY:APPROVED BY:SCALE:PLAN FILE NO. / LOCATIONRAILROAD SAFETY TRAIL FENCING
WBHWBHBNBNAS NOTEDJULY 20221000116PLAN SHEET---G:\Projects\ActiveProjects\Bicycle Paths\1000116 Park Major Maintenance - Railroad Bike Path Fence\450 Design Working Documents\454 CAD\454.2 Drawings\Plan Sheets.dwgPLAN UNION PACIFICRAILROADORCUTT ROAD