Loading...
HomeMy WebLinkAboutAppendix H-Hydrologic Resources StudiesAPPENDIX H Hydrologic Resources Studies H.1 – Preliminary Hydrologic and Hydraulic Calculations H.2 – Existing Froom Creek Hydrologic Analysis H.3 – Preliminary Sediment Transport Analysis and Calculations Froom Ranch Specific Plan Project Draft EIR This Page Intentionally Left Blank. APPENDIX H.1 Preliminary Hydrologic and Hydraulic Calculations This Page Intentionally Left Blank. PRELIMINARYHYDROLOGIC AND HYDRAULIC CALCULATIONS 3UHSDUHGIRUWKH)URRP5DQFK6SHFLÀF3ODQ Date: 7-14-2017; Revised 31; Revised 02-22-2019 Prepared by RRM Design Group Prepared for John and Susan Madonna Trust and Villaggio Communities CREATING ENVIRONMENTS PEOPLE ENJOY® Table of Contents 1. Hydrologic and Hydraulic Analysis Page No. 1.1: Introduction 1-1 1.2: Location Map / Description 1-1 1.3: Executive Summary 1-2 1.4: Watershed Description 1-2 1.5: Methodology 1-3 1.6: Hydrologic Analysis 1-4 1.7: Hydraulic Analysis 1-8 1.8: Risk Assessment / Impacts Discussion 1-11 1.9: Unusual or Special Conditions 1-11 1.10: Conclusions 1-11 2. Geomorphic Evaluation 2.1: Introduction 2-1 2.2: Physical Setting 2-1 2.3: Existing Froom Creek Corridor Conditions 2-1 2.4: Proposed Froom Creek Corridor Conditions 2-2 2.5: Conclusion 2-4 3. Froom Creek Restoration Program 3.1: Introduction 3-1 3.2: Froom Creek Restoration Objectives 3-1 3.3: Froom Creek Planting Goals 3-1 3.4: Froom Creek Enhancement Plan 3-2 3.5: Froom Restoration Plan 3-4 3.6: Froom Restoration Plant List 3-5 3.7: Froom Restoration Sections 3-6 3.8: Conclusion 3-12 List of Tables: Table 1-1: Froom Ranch SP Development Areas - Storage Volume 1-10 Table 1-2: Offsite Development - Storage Volume 1-10 List of Figures: Figure 1-1 Existing location of Froom Ranch Specific Plan Area 1-1 Figure 1-2: Froom Creek Historical Alignment 1-3 Figure 1-3: Existing Drainage Conditions 1-4 Figure 1-4: Proposed Drainage Conditions 1-7 Figure 2-1: Proposed Froom Creek corridor concept 2-3 Figure 3-1: Froom Creek enhancement concept 3-3 Figure 3-2: Froom Creek restoration plan 3-4 Figure 3.3: Section A-1 3-7 Figure 3.4: Section A-2 3-8 Figure 3.5: Section A-3 3-9 Figure 3.6: Section B 3-10 Figure 3.7: Section C 3-11 Appendices: Appendix 1: HEC - RAS Summary Table and Cross Sections Appendix 2: Existing Tributary Area Appendix 3: Proposed Peak Flow Tabulation Appendix 4: Soils Information Appendix 5: Firm Maps Appendix 6: City of San Luis` Obispo Storm Water Control Plan Application Appendix 7: Cleath-Harris Groundwater Report Appendix 8: HEC – HMS Hydraulic Modeling Results Chapter 1 Hydrologic and Hydraulic Analysis 1-1 1. Hydrologic and Hydraulic Analysis 1.1 Introduction and Background This report was prepared to analyze the hydrologic and hydraulic data for the proposed Froom Ranch Specific Plan project and adjacent tributary runoff. The Froom Ranch Specific Plan is primarily a Senior housing development project with a mix of commercial and residential uses near the existing Irish Hills Plaza. 1.2 Location Map/Description The Froom Ranch property consists of approximately 109.7 acres. The site is composed of two parcels, located immediately west of Los Osos Valley Road within the County of San Luis Obispo’s jurisdiction, and adjacent to the City limits (APNs 067-241-030 and 067-241-031). Figure 1-1: Existing location of Froom Ranch Specific Plan Area 1-2 The site is characterized by relatively flatter grassland areas which transition to steeper slopes before approaching City open space property at the base of the Irish Hills. The bulk of the property is undeveloped but includes historical ranch and dairy structures on part of the site directly to the south of the Home Depot retail store which is included in the adjacent Irish Hills Plaza. This area of the property is currently used as an office (main ranch house) and equipment storage yard to support John Madonna Construction Co. Inc. The site also includes unimproved roads, staging and materials storage, a quarry area, and a storm water detention facility for the neighboring Irish Hills Plaza (see Figure 1-1). 1.3 Executive Summary The following sections of this report describe the proposed project and how the proposed condition affects the internal and surrounding hydrological elements. The project is compliant with following design guidelines: · The project complies with the San Luis Obispo Drainage Design Manual · The project complies with the San Luis Obispo Waterway Management Plan · The project complies with the Central Coast Regional Water Quality Control Post Construction Requirements · The project complies with the FEMA Floodplain Management guidelines Additionally, the project results in the following conditions: · The project does not cause significant negative downstream effects · The project does not negatively affect adjacent or on-site wetland habitat · The project does not negatively affect groundwater resources 1.4 Watershed Description The site is bisected by natural drainages in the northeastern flank of the Irish Hills. The existing Froom Creek corridor traverses the Specific Plan area in a mostly north to south direction and joins San Luis Obispo Creek south of the Specific Plan area before flowing towards the Pacific Ocean in Avila Beach. Small areas of wetland habitat occur along the unnamed tributary drainages to Froom Creek in the southwestern area of the site, and a larger contiguous wetland area exists in flat grassland areas where surface and subsurface water is impounded by Los Osos Valley Road and Calle Joaquin. Froom Creek is a relatively narrow channel with incised banks that bisect the Specific Plan area in a north to south direction, and ultimately flows beneath U.S. Highway 101 via two concrete box culverts, heading to its confluence with San Luis Obispo Creek. As stated in the Los Osos Valley Road and US101 Interchange Improvement Project, the box culverts do not support storms above the 10-year event and spill over the top of Calle Joaquin at the box culverts. Due to the lack of dominant wetland vegetation within or adjacent to the channel, Froom Creek was classified as non-wetland waters of the U.S. and State of California subject to U.S. Army Corps of Engineers, Regional Water Quality Control Board and California Department of Fish and Wildlife jurisdiction pursuant to the Clean Water Act (Sections 401 and 404) and California Fish and Game Code (KMA, 2015). 1-3 The Specific Plan area includes about 7.25 acres of jurisdictional wetland habitat located on the southwestern part of the site near Los Osos Valley Road and Calle Joaquin. These wetlands are partially within an existing open space easement. Froom Creek has a history of periodic flooding with estimated overbank flows occurring every five to six years (Balance Hydrologics, 2005). Studies have shown that while some overbank flow contributes to wetland habitat along Calle Joaquin, the primary function of Froom Creek appears to be groundwater recharge, and subsurface maintenance of the Calle Joaquin wetland area (see Figure 1-1). Historically, Froom Creek had a different alignment from what currently exists on the site today (see Figure 1-2). Based on review of an 1895 U.S. Geological Survey topographic map, the creek channel took a more direct northeasterly path as it exited the Irish Hills and ultimately connected with Prefumo Creek and San Luis Obispo Creek. In consideration of the unique characteristics of the Specific Plan area, a program has been developed to restore Froom Creek closer to its historic alignment on the property, keeping its current hydrologic connection to San Luis Obispo Creek and connection to the wetlands habitat near Calle Joaquin. Figure 1-2: Froom Creek Historical Alignment 1.5 Methodology The project site has been analyzed using several City of San Luis Obispo and FEMA approved methods including: HEC-HMS, HEC-RAS, The Rational Method, and the SCS Runoff Curve Number method. These methods combine in a variety of ways to present the information and tables found in this report. The inputs and assumptions used in each of these methods are included in the corresponding appendix. 1-4 Figure 1-3: Existing Drainage Conditions 1.6 Hydrologic Analysis The Froom Ranch Planning Area is located within the watershed of Froom Creek which is a relatively small watershed that originates in the Irish Hills. Existing Drainage Conditions: The existing drainage conditions for the Froom Creek Specific Plan Area include Froom Creek flows across the site in a north to south trajectory ultimately passing through two box culverts beneath Calle Joaquin and US 101 before its confluence with San Luis Obispo Creek. These culverts do not have adequate capacity to pass the 10-year event for the watershed it serves (LOVR/US101 Interchange Improvement Project 2010). Furthermore, the confluence of the San Luis Obispo Creek (a major waterway) and East Fork drainage immediately downstream of the culverts causes a tailwater condition limiting the ultimate efficacy of the existing Froom double box culverts. There are three small 1-5 ephemeral tributaries to Froom Creek in the southwestern portion of the site. In addition, there is a man- made drainage ditch that parallels Los Osos Valley Road (LOVR). An approximately 3.2-acre detention basin currently exists in the southeastern grassland area of the site to receive runoff from the adjacent Irish Hills Plaza development fronting LOVR. It consists of a de-siltation forebay which retains and infiltrates up to 2-year rain events, a main basin and spillway, and was sized to contain runoff from the Irish Hills Plaza. This basin releases water exceeding the 2-year event to the LOVR drainage ditch by a storm drain and swale. During large storm events, the main basin discharges runoff into the wetland area along Calle Joaquin via a concrete spillway. A report conducted by Cleath-Harris Geologists studying the groundwater (provided in Appendix 7) finds that the wetlands adjacent to Calle Joaquin and the Irish Hills detention basin is primarily fed by upward leakage of seasonally shallow groundwater. The report continues to find (based on a 2004 report from Balance Hydrologics) that Froom Creek overflow in high storm events happens infrequently and “may not be sufficient to sustain both seasonal and perennial wetlands”. Furthermore, the Irish Hills basin forebay does not source the adjacent wetland in small events as the forebay subdrains do not connect to the outer perimeter drains. The forebay’s primary function is to infiltrate runoff directed into the forebay by the diversion weir contained in the upstream manhole. The existing Froom Creek channel alignment comes down from the hillside easterly where it makes approximately a 90-degree turn where the channel banks recede and make way for a low-lying meandering channel. The existing Froom Creek channel does not have adequate capacity to convey 100- year storm events to the Highway 101 culverts and consequently overtops the existing banks and flows in a sheet flow manner towards LOVR and Calle Joaquin (see Figure 1-3). The resulting condition is that the low-lying area between LOVR and the Irish Hills is designated as a FEMA Flood Insurance Rate Map, Zone A, no base flood elevation is established as shown on FIRM Map Panel Nos. 06079C1331G & 06079C1068G (see appendix 6). Proposed Drainage Conditions: Development of the Specific Plan area will enhance and restore the historic Froom Creek corridor alignment and allow it to traverse future development areas. The restored creek corridor will be enhanced with native riparian plant communities. This would increase the function and value of the riverine system and resolve the periodic flooding issues. The creek channel will be sized to handle up to a 100-year storm event with a minimum of one foot of freeboard. The creek corridor is proposed to be developed in a manner consistent with the City of San Luis Obispo Waterways Management Plan. The San Luis Obispo Waterways Management Plan (WMP) sets forth criteria for drainage design for the Specific Plan areas tributary to San Luis Obispo Creek. The WMP indicates that storm water detention should be used in areas where there are downstream capacity limitations, which has been an issue in this area of the City. As stated above in the Existing Drainage Conditions, the downstream confluence of the San Luis Obispo Creek and the Froom drainage produces a tailwater condition. The WMP identifies this confluence as a problem area; any delay in the peak discharge of the Froom drainage exacerbates the 1-6 existing flooding at this confluence. Appendix 8 describes this condition through modeling by the HEC- HMS system which emulates the city-wide hydraulic process. The drainage plan proposed for the Froom Ranch Area complies with the WMP. The restored Froom Creek corridor conveys flows from the project and the offsite upper reaches of the existing creek to the southeast corner of the property to connect to the existing creek bed that ultimately leads to a double box culvert going under Highway 101. Implementation of the Specific Plan drainage program will remove the site development areas from the FEMA flood plain. The project proposes to formalize the removal of the project development area from the FEMA flood plain through the Conditional Letter of Map Revision (CLOMR)/Letter of Map Revision (LOMR) process. The proposed Froom Creek corridor includes a low flow channel throughout the reach of the channel and a large overbank area to convey larger flows. The low flow channel will provide a meandering conveyance designed to enhance and restore fish migration patterns on-site through stepped pools and terraces throughout the reach. At the jurisdictional wetlands, adjacent to Calle Joaquin, the overbank area is proposed to be flattened allowing storms larger than a two–year event to migrate into the existing wetland to provide water to sustain this wetland. The off-site (located on the Mountainbrook Church property) project basin which provides additional “surge” storage for large storm events (see Figure 1-4). The existing box culverts overtop the Calle Joaquin road immediately above the culverts during 10-year events. The proposed basin will allow for storage enough to allow the 25-year event to pass entirely through the culverts. The 50-year and 100-year events are prohibitively large to allow for storage during these events and overtop Calle Joaquin as safe overflow. Appendix 8 provides HEC-HMS modeling showing these storm events and the corresponding peak flows, high water elevations, and storage required. The basin also serves to provide storage pursuant to the post construction requirements 3 (Runoff Retention) and 4 (Peak Management). 1-7 Figure 1-4: Proposed Drainage Conditions 1-8 1.7 Hydraulic Analysis The Storm Water program for the Froom Ranch Specific Plan Area proposes to be consistent with the California Regional Water Quality Control Board, Post Construction Storm Water Management Requirements for Development Projects in the Central Coast Region and the City of San Luis Obispo Waterways Management Plans. The Froom Ranch Specific Plan area is segmented into varied residential densities and commercial uses. Each of the development areas consist of one or more drainage management areas. Development areas are accessed via public and private roads acting as a backbone circulation system for the project. A series of drainage conveyances and low impact development and storage components, including the restored Froom Creek corridor, serve to provide treatment, filtration and storage for the Specific Plan Area. It should be noted that development of each land use area is conceptual at this juncture however this report intends to provide storm water control directives to be implemented with development of each of the land use areas as well as backbone implementation of the creek corridor, storm water systems, storage and conveyances that will serve the specific plan area at build out. The detailed hydraulic analysis of the drainage management areas, channel flow and storm water systems are contained within Appendices 1 - 6 of this report. The key components of the storm water controls addressing post construction requirements are listed below: Restored Froom Creek Corridor: The Froom Creek corridor is a waterway conveying approximately 1088 cubic feet per second +/-(CFS) at the point of discharge through an existing double box culvert at Highway 101. The restored creek corridor connects to the existing Froom Creek channel at the southwesterly boundary of the project and conveys existing and proposed flows through the site to the point of discharge at Highway 101. The design of the restored corridor includes a low flow conveyance for storm events up to two – year flow and contains 100-year flows with a minimum of one foot of freeboard within the proposed creek banks. A Contech pre – fabricated natural bottom culvert is proposed in the alignment to allow roadway circulation to cross over the creek. The design of the Froom Creek corridor effectively removes the site from the FEMA, Zone A designated flood plain. A letter of map revision (LOMR) to remove development areas from the flood zone is anticipated to be part of the project implementation. The proposed creek corridor provides two key overbank design features along its reach, prior to discharge at Highway 101, one that perpetuates the existing wetland area along Calle Joaquin and a second overbank area that allows larger flows into a proposed storage basin on the adjacent Mountainbrook Church property. The capacity of the restored creek corridor requires bank slope protection measures outlined in the Drainage Design Manual section 3.6. Bank stabilization techniques will be utilized for sections of creek where flow speeds are erosive to naturally reconstructed embankments. Such techniques include but are not limited to: live staking and willow wattling, vegetated geogrids, live rock walls, rock slope protection, and planted gabion baskets. Los Osos Valley Road (LOVR) ditch: The project includes a vegetated drainage ditch adjacent to LOVR ditch to complete the alignment of the existing ditch that fronts the Irish Hills Plaza development that conveys flows of approximately 36 CFS +/- from the Irish Hills Plaza and approximately 155 CFS+/- from the Home Depot ditch to the Froom Creek corridor. The LOVR ditch includes a closed conduit crossing at 1-9 the entry road to the project. The LOVR ditch provides point source water quality treatment of development flows that are adjacent to its reach prior to entering the Froom Creek corridor. The LOVR ditch also receives delayed flows from the Costco drainage summarized in Appendix 8. The Home Depot ditch: The project proposes a vegetated retention basin along the northerly boundary that conveys flows of approximately 155 CFS +/- from a natural swale located behind Home Depot to the LOVR ditch and ultimately into the Froom Creek corridor. This ditch includes a closed conduit crossing at the project roadway connection to the Irish Hills Plaza drive aisle. This ditch provides point source treatment of development flows adjacent to its reach and relocates the Home Depot water quality bio filtration component (post construction requirement #2 — see appendix 6 for storm water control plan exhibit) from the existing position in the open space of Froom Ranch to a location adjacent to the western boundary. This retention basin serves as water quality treatment pursuant to the state adopted post construction requirements for water quality totaling 1.0 acre – feet of runoff treatment storage adjacent to the westerly edge of the project. An overflow bank is provided for larger storm events conveyed into the LOVR ditch at the northwesterly corner of the project. Land Use Areas: Development areas within the project are required to provide point source water quality treatment of storm water prior to discharge into the creek corridor. When a land use area is proposed for development, each individual project will be responsible for implementation of the state’s adopted post construction requirements 1 (Site Design) and 2 (Water Quality). The downstream basin serves to attenuate post development flows for post construction requirements 3 (Runoff Retention) and 4 (Peak Management). Backbone Roads: The project proposes public and private roads that provide access to each of the land use areas. Impervious surfaces associated with roadways incorporate vegetated swales and bio – filtration to address point source water quality treatment prior to conveyance of runoff to Froom Creek. Mountainbrook Church Basin: The project addresses PCR 4 peak management through use of a proposed storm water basin located directly adjacent to the Froom Ranch Specific Plan area on the Mountainbrook Church property. The basin is located southeasterly of the property boundary. The basin volume is approximately 28.8 acre - feet (+/-) with a minimum of one foot of freeboard. The storage volume meets or exceeds the Froom Ranch Specific Plan build – out PCR 4 requirement and also includes storage volume relocated from onsite for Home Depot, Irish Hills Plaza and potential future development of facilities on the Mountainbrook Church site. The design of the basin will promote infiltration of runoff and provide outflow controls to attenuate existing capacity issues at the Highway 101 double box culverts. Post Construction Performance Requirements (PCR’s) 1 through 4 for determining the post – development runoff storage volumes and addressing water quality treatment are included in the project storm water management program. As stated in the Land Use Area summary above PCR’s 1, 2 & 3 are required for build-out of individual projects in each of the Froom Ranch SP development areas, PCR 4 is addressed through use of the Mountainbrook Church basin and is summarized in the following paragraphs with additional technical data provided in appendix 6 of this report. 1-10 The flat areas of the site adjacent to Los Osos Valley Road lie in Watershed Management Zone (WMZ) 1. WMZ 1 requires a 95th percentile storm volume retention. Based on review of the WMZ rainfall mapping, the 95th percentile, 24-hour storm event is equal to 1.9 inches over the WMZ 1 development area. The upper reaches of the planning area are identified as WMZ 9 and require 85th percentile, 24- hour storage equivalent to 1.2 inches over the WMZ 9 development area. The Froom Ranch Planning Area has been segmented into drainage management areas (DMA’s) that are tributary to the proposed Froom Creek corridor. Detailed hydrologic calculations can be found in Appendices 1 - 8 of this report, a summary of PCR 3 storage volume requirements for onsite DMA’s is listed below. Table 1-1 identifies each of the land use areas, consistent with the Froom Ranch Specific Plan, and their respective effective impervious area storage volume requirements dictated by the state post construction requirement 3 to be retained and treated on each individual development area. Drainage Management Area Zoning / Land Use Designation Development Area (Acres) WMZ Retention Volume Required (ac-ft) Residential + Park R-3, Medium High Density Residential & Park 12.70 1/9 0.90 Commercial CR-SP, Commercial Retail 10.07 1 1.05 Lower Villaggio R-3-SP, Medium High Residential (Villaggio- Life Plan Community) 26.94 1 2.32 Upper Villaggio R-3-SP, Medium High Residential (Villaggio- Life Plan Community) 12.53 9 0.56 Totals 62.24 4.83 Table 1-1: Froom Ranch SP Development Areas - Storage Volume Table 1-2 lists other DDM derived basin storage volumes from offsite development areas relocated to the Mountainbrook Church Basin for Home Depot and Irish Hills Plaza and future Mountainbrook Church potential development (pursuant of PCR 4). PCR 2 for these areas will be located on-site near the point of discharge on the northerly border of the site. Offsite Drainage Areas Storm Water Feature Development Area (Acres) WMZ Storage Volume Required (ac-ft) Home Depot Relocated Detention Volume 10.14 1 1.27 Irish Hills Relocated Detention Volume 15.23 1 2.33 Mountainbrook Church Future development Runoff Retention Volume 3.67 9 0.37 Totals 32.43 3.97 Table 1-2: Offsite Development – Storage Volume 1-11 The Mountainbrook Church basin is designed with approximately 28.8 acre – feet of storage capacity at a water surface elevation of 104.0; the required storage volume is generated from the relocated and future detention from Table 1-2 (3.97 ac-ft) plus the detention volume calculated from Table 1-3 (16.99) which totals 20.96 ac-ft required. The basin has been designed to provide additional capacity for the purposes of attenuating high flow conditions that exceed the capacity of the Highway 101 culverts (565 cfs) pursuant to the San Luis Obispo Drainage Design Manual (DDM). The DDM requires attenuation from 2-yr through 100-yr events such that there are no significant (greater than 5% downstream increase) downstream effects. Appendix 3 tabulates the pre-vs-post conditions and show that the downstream effect is less than 5% with a net decrease in most storm events. The greater volume allows the basin attenuate the high inflow with the constrained double box culvert outflow thereby reducing flood stage elevations for the creek and along the Calle Joaquin wetland. The additional detention storage allows higher storm events to pass through the existing double box culverts without overtopping the above Calle Joaquin spillway. Finally, the existing hydraulically connected wetlands upstream of the project basin provides approximately 11 ac-ft of detention. Froom Lower Froom Dev Froom Lower Froom Dev Total Storage Req'd (ac-ft) Ex-2yr 30.133 20.454 Pro-2yr 36.251 22.909 8.573 Ex-10yr 40.954 22.874 Pro-10yr 49.941 26.289 12.402 Ex-25yr 51.175 25.161 Pro-25yr 62.137 29.206 15.007 Ex-50yr 58.985 26.908 Pro-50yr 71.165 31.333 16.605 Ex- 100yr 61.092 27.379 Pro-100yr 73.567 31.895 16.991 Table 1-3: Pre-Post storage design volumes. 1.8 Risk Assessment/Impacts Discussion Approximately 35% of the existing Froom Ranch Specific Plan area is in a FIRM map, Zone A designation, no base flood plain elevation. The FIRM Zone A area is in the lower flat land of the project bound on four sides by LOVR, Calle Joaquin, the Irish Hills Plaza and the hillside terrain of the Irish Hills Natural Reserve. Due to the very flat terrain along the LOVR corridor and along Calle Joaquin, runoff from LOVR and overtopping of the existing Froom Creek corridor creek banks localized flooding and ponding have historically been observed on the site. Additionally, the Highway 101 double 5’ x 5’ box culverts overtop at the 10 - year storm event, 547 CFS (WRECO, location hydraulic study, Nov. 2010). For the reasons stated above the project proposes to implement several flood control components key to minimizing risk associated with potential flooding. The restored Froom Creek corridor design proposes to convey up to 100 - year storm events within its creek banks with an additional minimum of one foot of freeboard. The grading of the project, prior to future individual projects, proposes to raise the elevation of the lower flat area above the projected flood stage so that finish floor elevations can achieve a minimum of one foot above the 100 – year flood. The Mountainbrook Church overbank area and basin are anticipated to provide better channel function and some attenuation of larger peak flows conveyed to the Highway 101 box culverts to assist in minimizing tail - water flooding potential. 1-12 1.9 Unusual or Special Conditions As discussed in previous sections of this report, the Froom Ranch Specific Plan project proposes to remove approximately 2,200 linear feet of the existing, relocated Froom Creek corridor and restore it to its approximate original location. The existing alignment does not provide adequate capacity for large storm events and does not provide an aquatic or riparian habitat. The new alignment provides a unique opportunity to recast the creek in a way that will restore it to a vibrant creek corridor and enhanced fish habitat. The proposed Froom Creek alignment will require permitting through the Army Corps of Engineers, California Fish and Wildlife, the Central Coast Regional Water Quality Control Board and other jurisdictional agencies. Other requirements include removal of the site from the FEMA FIRM map Zone A through processing of a Conditional Letter of Map Revision (CLOMR) and a final Letter of Map Revision (LOMR). 1.10 Conclusions The Froom Ranch Specific Plan project is a comprehensive plan to create a special environment for people to enjoy. It is included in the City of San Luis Obispo’s Adopted Land Use and Circulation Element (2014) as a desired annexation area with development anticipated. The project site provides challenges and opportunities in implementing a storm water program that balances limited development of the site (50% open space required), while enhancing the environmental elements. The findings and conclusions of this report are that restoring the Froom Creek corridor can be accomplished in a manner that meets environmental and flood control goals for the City of San Luis Obispo. The project as designed intends to comply with the City of San Luis Obispo Waterways Management Plan and the Central Coast Regional Water Quality Control Board Requirements for Development Projects in the Central Coast Region (Resolution No. 2013-0032). The project as designed accommodates new development without flood risk and removes the site from FEMA FIRM Map Zone A. And lastly, the project as designed, intends to implement a series of pipes, channels and low impact design features that comply with the City of San Luis Obispo standards for capacity and function. Chapter 2 Geomorphic Evaluation 2-1 2. Geomorphic Evaluation 2.1 Introduction The Froom Ranch Specific Plan Area proposes to restore the Froom Creek corridor to its approximate original alignment, an important component of the restoration effort includes evaluation of the existing creek corridor constraints and physical nature and provides discussion of the proposed creek corridor design as it relates to the development setting, the opportunities for restoration and the anticipated geomorphic controls. 2.2 Physical Setting Froom Creek is a tributary to San Luis Creek, it is approximately 1.5 miles long and runs east to west from its upper reach in the Irish Hills Natural Reserve hillside and then turns south to the point of confluence with San Luis Creek. Froom Creek consists of two distinct segments; the lower reach (approx. 4,200 linear feet), which has been significantly altered over time and traverses the Froom Ranch Specific Plan area to a double box culvert discharge conveyance which outlets into San Luis Creek and the upper reach (approx. 3700 linear feet) within the City Irish Hills natural reserve which remains in its existing condition upstream from the connection with the restored alignment onsite. 2.3 Existing Froom Creek Corridor Conditions The upper reach of Froom Creek, west of the project site, is to remain intact and exists as an intermittent stream. The creek varies in width and contains pools along the creek corridor, significant vegetation and is considered adequate habitat for steelhead. The upper reach dissipates as it enters the site into the altered lower reach. The lower reach of Froom Creek which traverses the site is an incised channel confined by a man – made earthen berm along a portion of the eastern bank of the creek. The creek bed is generally dry and consists of rock washed down from the upper reach of the channel and is devoid of significant vegetation. Soils within the lower reach Froom Creek within the project boundary generally consist of Obispo - Rock outcrop in steeper zones of the creek bed, consisting of black clay to a depth of approximately 18 inches underlain by serpentine rock, and Riverwash consisting of excessively drained, water deposited sand, loamy sand with gravel and cobbles (KMA – Delineation of waters of the U.S., August 2015). Areas of the lower reach channel do not contain large storm events within the creek banks and are prone to moderate erosion and bank cutting due to high velocities during larger storm events. The lower reach does not contain wetland vegetation within or adjacent to the channel. 2-2 Photograph of the existing lower reach Froom Creek corridor (Date: January 20th, 2015) 2.4 Proposed Froom Creek Corridor Conditions The proposed restored Froom Creek corridor joins the existing creek at the northwest corner of the Specific Plan area where it will flow east through the project site toward LOVR before it curves to parallel the Calle Joaquin road corridor on the border of the wetland area. The restored creek then intersects with the original creek bed at the southeast corner of the property. The restored Froom Creek lower reach is a unique opportunity to provide a healthy riparian corridor across the Specific Plan area in replacement of the degraded existing corridor. The restored Froom Creek corridor design, within the project area boundary will be constructed with imported fill and subject to geotechnical inspection during placement of materials. The hydraulic design criteria are based on the City of San Luis Obispo Waterway Management Plan. Detailed hydraulic analysis of the channel can be found in Appendices 1-3. A summary of the key hydraulic objectives and design goals are: 1.A low flow channel to handle up to two - year storm events. 2.Varying embankment slopes (maximum 2.5:1) to enable plant shading and minimize mass waste. 3.Upstream sediment capture within new development areas. 4. 100 – year storm containment within the creek corridor with one foot of freeboard. 2-3 5. Non – erosive velocities (approx. 2 – 8 feet per second) to minimize potential for undercutting. 6. Armoring of slope banks and culvert locations, in select locations where necessary, will provide openings to allow fish passage. 7. Intersecting tributary ditches or stream beds will be stepped to contain and direct fish within the main Froom Creek corridor. In addition to the hydraulic design features of the channel, the restored Froom Creek provides new riparian and steelhead habitat based on the City of San Luis Obispo’s Waterway Management Plan and the California Salmonid Stream Habitat Restoration Manual including: 1. A natural bottom utilizing existing boulders and cobbles that are relocated from the existing creek corridor. 2. A low-flow meandering channel that allows for pooling, deposition, and load transport. 3. Incorporate stepped pools and terraces to control fish migration patterns. 4. Overbank areas to provide runoff flow into adjacent existing wetlands. 5. Control of light reaching the stream bed. 6. Natural litter and invertebrate fall. 7. Woody debris components. Figure 2-1: Proposed Froom Creek corridor concept 2-4 More detailed information regarding the Froom Creek Restoration Program can be found in Section 3 of this report. 2.5 Conclusion The Froom Creek lower reach located in the Froom Ranch Specific Plan area is currently in a degraded condition and has been altered several times with the ranching uses on the property. The restored Froom Creek corridor meets the objectives of low velocity, minimal sediment transport, low impact design and conforms to the City of San Luis Obispo Waterway Management Plan and the California Salmonid Stream Habitat Restoration Manual. Chapter 3 Froom Creek Restoration Program 3-1 3. Froom Creek Restoration Program 3.1 Introduction The Froom Creek restoration program is based on the initial grading models, prepared in cooperation with City and other responsible agencies, for the new alignment as shown on the vesting tentative map, and is subject to modification during final design. The restoration program focuses on preparation of preliminary recommendations for creek cross sections, planting schemes and objectives for the design. 3.2 Froom Creek Restoration Objectives The creek restoration objectives for the Froom Creek corridor are to develop three zones for restoration: • Riparian Buffer: Zone between the top of bank and edge of setback. A 35’ setback is utilized for Froom Creek, and a 20’ setback for the drainage ditch along Los Osos Valley Road. The zones are envisioned to be planted with trees at an average of 50’ on center, and shrubs at an average of 5’ on center. This zone is proposed to be drip irrigated. • Channel Banks: Zone between the top and toe of bank. These zones are envisioned to include herbaceous species that can tolerate seasonal undulation, and planted at an average of 3’ on center spacing. This zone is proposed to be spray irrigated. • Channel Bottom: Zone below the toe of bank. This area is envisioned to include herbaceous wetland species planted at an average of 3’ on center spacing. This zone will not be entirely planted, but is approximated to be 30% of the bottom area and expected to naturalize and fill the flat bottom areas. This zone is proposed to be temporarily spray irrigated to establishment. 3.3 Froom Creek Planting Goals The planting goals for the Froom Creek corridor were developed utilizing the City of San Luis Obispo’s Waterway Management Plan, Volume III, Drainage Design Manual dated February 2003 as a guideline for creek design, cross - sections and plant list. The study assumes that plants used for creek restoration will meet the following parameters: • Native non-invasive riparian species • Mix of evergreen and deciduous varieties • Vegetation located in naturalistic groupings • Planting will include plant mitigation areas • Vegetation will tolerate recycled water for irrigation • Biotechnical erosion control methods will be utilized 3-2 • Adjacent existing wetland will be enhanced 3.4 Froom Creek Enhancement Plan The conceptual enhancement plan shows the general planting concepts for the Riparian Buffer, Channel Bank, and Channel Bottom zones. Froom Creek restoration will meet the following parameters: • The Channel Bottom contains a low-flow channel that allows for pooling, deposition and load transport. • Stepped pools and terraces will be used to control fish migration patterns. • Existing boulders and cobbles will be relocated from the existing creek corridor. • Project will explore opportunities in upper reaches of Froom Creek to enhance fish habitat. • Creek enhancements will be managed and monitored. • A riparian buffer with pedestrian amenities should be included. 3-3 Figure 3.1: Froom Creek enhancement concept 3-4 3.5 Froom Creek Restoration Plan The plan below demonstrates the realigned Froom Creek corridor with the proposed restoration enhancement areas. Consistent with the City of San Luis Obispo Creek Setbacks regulations (Chapter 17.16.025), the plan shows a 35’ setback along the Froom Creek corridor, and a 20’ setback along the Los Osos Valley Road drainage channel. The realigned creek corridor is proposed to run adjacent to the existing wetlands, and utilize this area for drainage during peak flows. All storm water will be treated prior to entering the creek corridor. Figure 3.2: Froom Creek restoration plan 3-5 3.6 Froom Creek Restoration Plant List The following list of plants is preliminary, and intended to provide the initial planting recommendations and a potential list of species. Additional species may be included and list revised as the project design is finalized. Trees: Trees are proposed to primarily 15 gallon containers. Trees are suggested to be planted within the Riparian Buffers, but not on the Channel Banks or Bottom. The creek restoration areas are envisioned to contain a mix of sizes and species. Trees will be clustered to allow view corridors. Riparian Buffer Trees: • Acer macrophyllum (Big Leaf Maple) • Alnus rhombifolia (White Alder) • Arbutus menziesii (Pacific Madrone) • Cercis occidentalis (Western Redbud) • Quercus agrifolia (Coast Live Oak) • Populus fremontii (Fremont Cottonwood) • Sycamore (Platanus racemosa) • Umbellularia californica (California Laurel) Shrubs and Groundcover: Shrubs and groundcover are proposed to primarily be 1 gallon containers. The creek restoration areas are envisioned to contain a mix of shrub sizes and species, with lower growing species along the trail. Riparian Buffer Shrubs and Groundcover: • Artemisia douglasiana (Mugwort) • Baccharis pilularis (Coyote Brush) • Ceanothus species (California Wild Lilac) • Diplacus aurantiacus (Sticky Monkeyflower) • Garrya elliptica (Coast Silktassel) • Heteromeles arbutifolia (Toyon) • Muhlenbergia rigens (Deer Grass) • Rhamnus californica (California Coffee Berry) • Ribes speciosum (Fuchsia Flowering Gooseberry) Channel Bank Shrubs and Groundcover: • Asclepias fascicularis (Milkweed) • Eleocharis acicularis (Needle Spikerush) • Elymus glaucus (Blue Wildrye) • Hordeum brachyantherum (California Meadow Barley) 3-6 • Leymus triticoides (Creeping Wild Rye) • Mimulus guttatus (Seep Monkeyflower) • Symphoricarpos mollis (Creeping Snowberry) Channel Bottom: • Alisma plantago-aquatica (Water Paintain) • Cyperus eragrostis (Umbrella Sedge) • Juncus species (Rush) • Scirpus species (Bulrush) 3.7 Froom Creek Restoration Sections The following conceptual sections are intended to show typical areas of creek restoration along the realigned corridor. The sections show the general planting and grading concepts for the Riparian Buffer, Channel Bank, and Channel Bottom zones. The sections also conceptually demonstrate the pedestrian trail and road crossings proposed along the creek corridor. Section A.1 to A.3: Sections A.1 through A.3 (Figure 3-3, 3-4, 3-5) are intended to represent typical cross sections of the Froom Creek restoration, to demonstrate the proposed undulation and meandering nature of the creek enhancements The Channel Bottom area is proposed to include a meandering low- flow channel that will facilitate the typical drainage for the creek corridor, and the Channel Banks will control seasonal and 100-year flooding (high water line). It is anticipated that boulders, cobbles, logs, and embedded tree roots will be placed in key locations along the Channel Bank and Channel Bottom to provide habitat areas. 3-7 Figure 3.3: Section A-1 3-8 Figure 3.4: Section A-2 3-9 Figure 3.5: Section A-3 3-10 Section B: Section B (see Figure 3-6) is intended to represent a typical road crossing at Froom Creek. The Channel Bottom area is proposed to be a natural bottom, and the overhead roadway crossing facilitated with a “Conspan” natural bottom culvert. The culvert is envisioned to be enhanced with a railing and decorative concrete, and armored with boulders, cobble and vegetation. The upper deck of the culvert is proposed to accommodate pedestrians, bicyclists, and vehicles. Figure 3.6: Section B 3-11 Section C: Section C is intended to represent a typical cross section where Froom Creek is proposed adjacent to the existing wetlands. The Channel Bottom is proposed to be configured so that the creek overbank will flow into the adjacent existing wetlands during storm larger than 2-year events. Figure 3.7: Section C 3.8 Conclusion The Froom Creek Restoration program, as proposed, conforms to guidelines for creek design and planting as outlined by the City of San Luis Obispo’s Waterway Management Plan and the California Salmonid Stream Habitat Restoration Manual. The restored lower reach of the Froom Creek corridor will protect and enhance creek, riparian, fish, and wetland habitats in the Froom Ranch Specific Plan area. Appendix 1 HEC - RAS Summary Table and Cross Sections River 2 3453.96 3210.45 2422.36 2031.65 1757.69 1429.43 912.75 603.53 218.37 HEC-RAS Plan: Plan 03 River: Main 2 Reach: River 2 Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) River 2 4164.67 2 yr 289.20 122.85 126.65 126.62 127.50 0.015272 7.41 39.03 21.95 0.98 River 2 4164.67 10yr 394.30 122.85 127.12 127.09 128.08 0.014664 7.88 50.04 24.91 0.98 River 2 4164.67 25 yr 489.10 122.85 127.48 127.44 128.53 0.014264 8.23 59.45 27.19 0.98 River 2 4164.67 50 yr 612.20 122.85 127.89 127.85 129.04 0.013847 8.60 71.16 29.78 0.98 River 2 4164.67 100 yr 691.80 122.85 128.13 128.09 129.34 0.013661 8.82 78.39 31.28 0.98 River 2 3969.73 2 yr 289.20 120.21 124.22 123.99 124.90 0.011357 6.58 43.96 23.70 0.85 River 2 3969.73 10yr 394.30 120.21 124.63 124.45 125.46 0.012068 7.28 54.18 26.30 0.89 River 2 3969.73 25 yr 489.10 120.21 124.94 124.81 125.89 0.012634 7.82 62.56 28.25 0.93 River 2 3969.73 50 yr 612.20 120.21 125.28 125.21 126.39 0.013273 8.43 72.65 30.43 0.96 River 2 3969.73 100 yr 691.80 120.21 125.49 125.44 126.68 0.013548 8.76 79.00 31.73 0.98 River 2 3714.24 2 yr 289.20 117.12 120.76 120.76 121.56 0.016383 7.20 40.19 25.24 1.01 River 2 3714.24 10yr 394.30 117.12 121.18 121.18 122.09 0.015641 7.64 51.62 28.67 1.00 River 2 3714.24 25 yr 489.10 117.12 121.51 121.51 122.49 0.015175 7.97 61.34 31.25 1.00 River 2 3714.24 50 yr 612.20 117.12 121.88 121.88 122.95 0.014706 8.33 73.51 34.31 1.00 River 2 3714.24 100 yr 691.80 117.12 122.09 122.09 123.22 0.014458 8.53 81.13 36.10 1.00 River 2 3453.96 2 yr 435.90 115.14 118.61 118.32 119.04 0.009472 5.27 82.66 55.87 0.76 River 2 3453.96 10yr 594.40 115.14 118.98 118.66 119.48 0.009242 5.71 104.13 61.25 0.77 River 2 3453.96 25 yr 737.30 115.14 119.26 118.92 119.83 0.009190 6.05 121.88 65.36 0.78 River 2 3453.96 50 yr 922.90 115.14 119.59 119.22 120.22 0.009055 6.40 144.14 70.12 0.79 River 2 3453.96 100 yr 1042.80 115.14 119.77 119.40 120.46 0.009048 6.62 157.50 72.77 0.79 River 2 3210.45 2 yr 435.90 111.66 114.50 114.50 115.29 0.015793 7.11 61.30 39.14 1.00 River 2 3210.45 10yr 594.40 111.66 114.89 114.89 115.81 0.015309 7.72 76.99 42.40 1.01 River 2 3210.45 25 yr 737.30 111.66 115.20 115.20 116.23 0.014793 8.11 90.90 45.27 1.01 River 2 3210.45 50 yr 922.90 111.66 115.56 115.56 116.71 0.014306 8.58 107.54 47.92 1.01 River 2 3210.45 100 yr 1042.80 111.66 115.79 115.79 116.99 0.013780 8.78 118.77 49.69 1.00 River 2 2422.36 2 yr 435.90 108.51 110.50 109.46 110.53 0.000818 1.50 290.01 210.43 0.23 River 2 2422.36 10yr 594.40 108.51 110.96 109.61 111.00 0.000631 1.51 392.60 231.85 0.21 River 2 2422.36 25 yr 737.30 108.51 112.36 109.73 112.37 0.000158 0.96 770.53 320.00 0.11 River 2 2422.36 50 yr 922.90 108.51 113.00 109.87 113.02 0.000114 0.94 977.81 324.27 0.10 River 2 2422.36 100 yr 1042.80 108.51 113.43 109.96 113.45 0.000095 0.93 1117.68 327.11 0.09 River 2 2031.65 2 yr 435.90 108.00 110.26 110.29 0.000679 1.29 337.03 266.26 0.20 River 2 2031.65 10yr 594.40 108.00 110.81 110.83 0.000400 1.22 487.83 283.41 0.16 River 2 2031.65 25 yr 737.30 108.00 112.32 112.32 0.000129 0.68 1086.30 649.69 0.09 River 2 2031.65 50 yr 922.90 108.00 112.98 112.99 0.000067 0.61 1517.87 652.65 0.07 River 2 2031.65 100 yr 1042.80 108.00 113.42 113.42 0.000048 0.58 1802.99 654.59 0.06 River 2 1757.69 2 yr 435.90 106.36 110.19 110.20 0.000161 0.89 487.49 227.12 0.11 River 2 1757.69 10yr 594.40 106.36 110.75 110.77 0.000142 0.96 617.59 234.25 0.10 River 2 1757.69 25 yr 737.30 106.36 112.29 112.30 0.000076 0.72 1029.70 382.16 0.08 River 2 1757.69 50 yr 922.90 106.36 112.96 112.97 0.000058 0.72 1287.34 385.79 0.07 River 2 1757.69 100 yr 1042.80 106.36 113.40 113.41 0.000049 0.72 1457.33 388.16 0.07 River 2 1429.43 2 yr 518.70 107.48 109.68 109.96 0.007914 4.18 124.07 105.45 0.68 River 2 1429.43 10yr 707.30 107.48 110.38 110.58 0.003168 3.58 197.84 106.18 0.46 River 2 1429.43 25 yr 877.20 107.48 112.15 112.21 0.001005 1.99 440.04 239.90 0.26 River 2 1429.43 50 yr 1098.10 107.48 112.86 112.91 0.000535 1.80 609.99 240.16 0.20 River 2 1429.43 100 yr 1240.80 107.48 113.31 113.36 0.000397 1.73 719.08 240.33 0.18 River 2 912.75 2 yr 518.70 103.64 108.28 108.36 0.000864 2.34 221.26 84.93 0.26 River 2 912.75 10yr 707.30 103.64 109.76 109.82 0.000425 1.93 367.01 111.16 0.19 River 2 912.75 25 yr 877.20 103.64 111.89 111.91 0.000192 1.16 757.84 272.67 0.12 River 2 912.75 50 yr 1098.10 103.64 112.69 112.71 0.000136 1.12 983.31 287.05 0.11 River 2 912.75 100 yr 1240.80 103.64 113.18 113.20 0.000113 1.10 1124.52 289.32 0.10 River 2 603.53 2 yr 518.70 97.00 108.33 108.33 0.000006 0.38 1361.62 183.55 0.02 River 2 603.53 10yr 707.30 97.00 109.80 109.80 0.000007 0.43 1636.19 191.66 0.03 River 2 603.53 25 yr 877.20 97.00 111.89 111.90 0.000008 0.41 2152.88 313.43 0.03 River 2 603.53 50 yr 1098.10 97.00 112.70 112.70 0.000008 0.46 2405.54 315.68 0.03 River 2 603.53 100 yr 1240.80 97.00 113.19 113.19 0.000009 0.48 2560.37 317.05 0.03 River 2 463.85 2 yr 518.70 95.51 108.33 108.33 0.000001 0.14 3598.84 494.73 0.01 River 2 463.85 10yr 707.30 95.51 109.80 109.80 0.000001 0.16 4329.52 501.42 0.01 River 2 463.85 25 yr 877.20 95.51 111.89 111.89 0.000001 0.16 5433.35 551.16 0.01 River 2 463.85 50 yr 1098.10 95.51 112.70 112.70 0.000001 0.19 5877.62 554.86 0.01 River 2 463.85 100 yr 1240.80 95.51 113.19 113.19 0.000001 0.20 6149.88 557.24 0.01 River 2 218.37 2 yr 518.70 100.00 108.30 102.41 108.33 0.000100 1.36 382.20 61.83 0.10 River 2 218.37 10yr 707.30 100.00 109.76 102.86 109.79 0.000100 1.49 475.99 66.56 0.10 River 2 218.37 25 yr 877.20 100.00 111.87 103.21 111.89 0.000100 1.24 706.78 132.01 0.09 River 2 218.37 50 yr 1098.10 100.00 112.67 103.62 112.69 0.000100 1.35 812.20 132.01 0.10 River 2 218.37 100 yr 1240.80 100.00 113.15 103.88 113.18 0.000100 1.42 876.44 132.01 0.10 0 100 200 300 400 500 600 70095 100 105 110 115 120 125 130 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr WS 100 yr EG 50 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Ground Bank Sta .035 Section 463 0 100 200 300 400 50090 100 110 120 130 140 150 160 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr WS 100 yr EG 50 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Ground Bank Sta .035 Section 603 0 100 200 300 400 500100 110 120 130 140 150 160 170 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr WS 100 yr EG 50 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Ground Bank Sta .035 Section 912 0 100 200 300 400105 110 115 120 125 130 135 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr EG 50 yr WS 100 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Crit 10yr Ground Bank Sta .035 Section 1429 0 100 200 300 400 500 600106 108 110 112 114 116 118 120 122 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr WS 100 yr EG 50 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Ground Bank Sta .035 Section 1757 0 100 200 300 400 500 600 700108 110 112 114 116 118 120 122 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr WS 100 yr EG 50 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Ground Bank Sta .035 Section 2031 0 100 200 300 400 500108 110 112 114 116 118 120 122 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr WS 100 yr EG 50 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr EG 2 yr WS 2 yr Crit 100 yr Crit 50 yr Crit 25 yr Crit 10yr Crit 2 yr Ground Bank Sta .035 Section 2422 0 50 100 150 200 250 300110 112 114 116 118 120 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr EG 50 yr EG 25 yr EG 10yr WS 100 yr Crit 100 yr WS 50 yr Crit 50 yr EG 2 yr WS 25 yr Crit 25 yr WS 10yr Crit 10yr WS 2 yr Crit 2 yr Ground Bank Sta .035 Section 3210 0 100 200 300 400 500112 114 116 118 120 122 124 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr EG 50 yr WS 100 yr WS 50 yr EG 25 yr WS 25 yr EG 10yr WS 10yr Crit 100 yr EG 2 yr Crit 50 yr WS 2 yr Crit 25 yr Crit 10yr Crit 2 yr Ground Bank Sta .035 Section 3453 0 20 40 60 80 100 120114 116 118 120 122 124 126 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr EG 50 yr EG 25 yr Crit 100 yr WS 100 yr EG 10yr Crit 50 yr WS 50 yr EG 2 yr Crit 25 yr WS 25 yr Crit 10yr WS 10yr Crit 2 yr WS 2 yr Ground Bank Sta .035 Section 3714 0 20 40 60 80 100 120118 120 122 124 126 128 130 132 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr EG 50 yr EG 25 yr EG 10yr EG 2 yr Crit 100 yr Crit 50 yr Crit 25 yr Crit 10yr Crit 2 yr WS 100 yr WS 50 yr WS 25 yr WS 10yr WS 2 yr Ground Bank Sta .035 Section 3969 0 20 40 60 80 100 120 140 160 180124 125 126 127 128 129 130 131 132 133 Froom Overall Plan: Plan 03 6/14/2017 Station (ft)Elevation (ft) Legend EG 100 yr EG 50 yr EG 25 yr WS 100 yr Crit 100 yr EG 10yr Crit 50 yr WS 50 yr EG 2 yr Crit 25 yr WS 25 yr WS 10yr Crit 10yr WS 2 yr Crit 2 yr Ground Bank Sta .035 Section 4164 Appendix 2 Existing Tributary Area Appendix 3 Proposed Peak Flow Tabulation Index Element Name[Pre] CN[Post] CNComments1Costco Hill69.369.3The CN is derived from the existing SLO HEC-HMS Hydrology Model2Double Box @ Hwy101--The junction elements in the HEC-HMS model do not have associated CN3Froom Creek (Lower)69.382.67Post development curve number calculated by weighted area development versus landscape4Froom Creek (Top)69.369.3The CN is derived from the existing SLO HEC-HMS Hydrology Model5Froom Creek (Upper)69.369.3The CN is derived from the existing SLO HEC-HMS Hydrology Model6Froom Development69.390Post development curve number calculated by weighted area development versus landscape7Froom Realignment--The junction elements in the HEC-HMS model do not have associated CN8Home Depot + Costco9393This curve number is a similar development to the Irish Hills development and thus equal CN9Irish Hills9393The CN is derived from the Irish Hills HEC-HMS model and report10Mid SLO Creek69.369.3The CN is derived from the existing SLO HEC-HMS Hydrology Model11Mountainbrook69.369.3The CN is derived from the existing SLO HEC-HMS Hydrology Model12SLO @ E Br ST 10177--The junction elements in the HEC-HMS model do not have associated CN13SLO @ Froom ST 11897--The junction elements in the HEC-HMS model do not have associated CN14SLO-Prefumo to E Fk--The junction elements in the HEC-HMS model do not have associated CNSummary of pre-development and post development Curve Numbers Index Element Name[Pre] Drainage Area (ac)[Post] Drainage Area (ac)[Pre] Peak Discharge (cfs)[Post] Peak Discharge (cfs)[Pre] Time of Peak[Post] Time of Peak [Pre] Volume (ac-ft)[Post] Volume (ac-ft)CFS % Change1Costco Hill108.00108.0029.7329.7312:3512:3514.0914.090.00%2Double Box @ Hwy1011175.671175.67276.27283.1513:1012:45190.09197.642.49%3Froom Creek (Lower)150.02150.0251.3576.7812:2012:2030.1336.2549.53%4Froom Creek (Top)204.20204.2038.2838.2813:5513:5533.6933.690.00%5Froom Creek (Upper)574.00574.00163.66163.6612:2012:2065.2965.290.00%6Froom Development33.5633.5618.4729.0412:2012:2020.4522.9157.20%7Froom Realignment965.34965.34237.15272.4313:1512:25150.73155.3614.88%8Home Depot + Costco30.3630.3620.0120.0112:3512:3510.4810.480.00%9Irish Hills15.2315.2315.8615.8612:1512:159.059.050.00%10Mid SLO Creek670.02670.02221.23221.2312:2012:2078.3078.300.00%11Mountainbrook60.3160.3121.1921.1912:2012:209.569.560.00%12SLO @ E Br ST 1017735833.3335833.336875.066876.8014:2514:254139.204144.870.03%13SLO @ Froom ST 1189727356.5927356.595803.825807.9414:0514:053216.103223.650.07%14SLO-Prefumo to E Fk27356.5927356.595649.875651.6114:2514:253162.203167.870.03%Froom development hydrologic summary of modeled elements [2-yr event] Index Element Name[Pre] Drainage Area (ac)[Post] Drainage Area (ac)[Pre] Peak Discharge (cfs)[Post] Peak Discharge (cfs)[Pre] Time of Peak[Post] Time of Peak [Pre] Volume (ac-ft)[Post] Volume (ac-ft)CFS % Change1Costco Hill108.00108.0059.0659.0612:3512:3522.1322.130.00%2Double Box @ Hwy1011175.671175.67507.92507.3313:2512:50275.28286.96-0.12%3Froom Creek (Lower)150.02150.02101.56143.3812:2012:2040.9549.9441.18%4Froom Creek (Top)204.20204.2072.1872.1813:5013:5048.0348.030.00%5Froom Creek (Upper)574.00574.00347.76347.7612:2012:20106.66106.660.00%6Froom Development33.5633.5629.7045.4912:2012:2022.8726.2953.14%7Froom Realignment965.34965.34462.10531.0113:1512:25220.88227.3214.91%8Home Depot + Costco30.3630.3631.9831.9812:3012:3013.7213.720.00%9Irish Hills15.2315.2323.6823.6812:1512:1510.6910.690.00%10Mid SLO Creek670.02670.02448.35448.3512:2012:20127.83127.830.00%11Mountainbrook60.3160.3141.6441.6412:2012:2014.0214.020.00%12SLO @ E Br ST 1017735833.3335833.3314669.3214604.6613:5013:507007.977018.09-0.44%13SLO @ Froom ST 1189727356.5927356.5912208.5512154.0513:4013:405448.905460.57-0.45%14SLO-Prefumo to E Fk27356.5927356.5911998.1711957.3813:5513:555387.575397.69-0.34%Froom development hydrologic summary of modeled elements [10-yr event] Index Element Name[Pre] Drainage Area (ac)[Post] Drainage Area (ac)[Pre] Peak Discharge (cfs)[Post] Peak Discharge (cfs)[Pre] Time of Peak[Post] Time of Peak [Pre] Volume (ac-ft)[Post] Volume (ac-ft)CFS % Change1Costco Hill108.00108.0079.4679.4612:3512:3529.6029.600.00%2Double Box @ Hwy1011175.671175.67618.59721.5613:3512:45354.89369.2416.65%3Froom Creek (Lower)150.02150.02137.10184.2412:2012:2051.1862.1434.38%4Froom Creek (Top)204.20204.2097.9097.9013:4513:4561.4261.420.00%5Froom Creek (Upper)574.00574.00479.27479.2712:2012:20145.73145.730.00%6Froom Development33.5633.5637.6554.6412:2012:1525.1629.2145.13%7Froom Realignment965.34965.34623.27712.1613:1512:25285.96294.2114.26%8Home Depot + Costco30.3630.3638.0738.0712:3012:3016.4416.440.00%9Irish Hills15.2315.2327.4927.4912:1512:1512.0712.070.00%10Mid SLO Creek670.02670.02604.34604.3412:2012:20174.13174.130.00%11Mountainbrook60.3160.3155.6855.6812:2012:2018.1918.190.00%12SLO @ E Br ST 1017735833.3335833.3319834.1819790.5813:4513:459381.039394.05-0.22%13SLO @ Froom ST 1189727356.5927356.5916351.5816313.9113:3513:357238.207252.55-0.23%14SLO-Prefumo to E Fk27356.5927356.5916132.1816095.4413:5013:507167.097180.12-0.23%Froom development hydrologic summary of modeled elements [25-yr event] Index Element Name[Pre] Drainage Area (ac)[Post] Drainage Area (ac)[Pre] Peak Discharge (cfs)[Post] Peak Discharge (cfs)[Pre] Time of Peak[Post] Time of Peak [Pre] Volume (ac-ft)[Post] Volume (ac-ft)CFS % Change1Costco Hill108.00108.0095.6095.6012:3512:3535.2635.260.00%2Double Box @ Hwy1011175.671175.67771.271029.2713:3012:35414.62430.7833.45%3Froom Creek (Lower)150.02150.02166.21216.8612:2012:2058.9971.1730.47%4Froom Creek (Top)204.20204.20115.11115.1113:4513:4571.4571.450.00%5Froom Creek (Upper)574.00574.00586.26586.2612:2012:20175.56175.560.00%6Froom Development33.5633.5644.1761.9312:2012:1526.9131.3340.22%7Froom Realignment965.34965.34747.75855.4013:1512:25334.75344.7514.40%8Home Depot + Costco30.3630.3642.7642.7612:3012:3018.3918.400.00%9Irish Hills15.2315.2330.7830.7812:1512:1513.0713.070.00%10Mid SLO Creek670.02670.02732.85732.8512:2012:20209.35209.350.00%11Mountainbrook60.3160.3167.2467.2412:2012:2021.3621.360.00%12SLO @ E Br ST 1017735833.3335833.3324064.0223926.3513:4013:4011409.0911424.05-0.57%13SLO @ Froom ST 1189727356.5927356.5920095.6819938.7713:3013:308833.348849.50-0.78%14SLO-Prefumo to E Fk27356.5927356.5919786.3619643.4213:4513:458750.228765.18-0.72%Froom development hydrologic summary of modeled elements [50-yr event] Index Element Name[Pre] Drainage Area (ac)[Post] Drainage Area (ac)[Pre] Peak Discharge (cfs)[Post] Peak Discharge (cfs)[Pre] Time of Peak[Post] Time of Peak [Pre] Volume (ac-ft)[Post] Volume (ac-ft)CFS % Change1Costco Hill108.00108.00107.91107.9112:3512:3536.8236.820.00%2Double Box @ Hwy1011175.671175.67896.791230.7213:2512:30431.98448.3737.24%3Froom Creek (Lower)150.02150.02187.49243.0912:2012:2061.0973.5729.65%4Froom Creek (Top)204.20204.20128.84128.8413:4513:4574.4874.480.00%5Froom Creek (Upper)574.00574.00664.08664.0812:2012:20183.63183.630.00%6Froom Development33.5633.5648.9268.3012:2012:1527.3831.9039.60%7Froom Realignment965.34965.34840.78962.4013:1512:25349.07358.7814.47%8Home Depot + Costco30.3630.3647.5347.5312:3012:3018.9218.930.00%9Irish Hills15.2315.2334.0434.0412:1512:1513.3313.330.00%10Mid SLO Creek670.02670.02829.32829.3212:2012:20218.84218.840.00%11Mountainbrook60.3160.3175.9375.9312:2012:2022.2122.210.00%12SLO @ E Br ST 1017735833.3335833.3327724.5827523.2113:3513:3512346.6312361.76-0.73%13SLO @ Froom ST 1189727356.5927356.5923113.2522872.2313:2513:259645.169661.56-1.04%14SLO-Prefumo to E Fk27356.5927356.5922761.0122513.3713:4013:409561.669576.79-1.09%Froom development hydrologic summary of modeled elements [100-yr event] Appendix 4 Soils Information GeoSolutions - Soils & Geology, June, 2016 Appendix 5 FIRM Maps Appendix 6 City of San Luis Obispo – Storm Water Control Plan Application Stormwater Control Plan for Post Construction Requirements Application Submittal  Where directions state “Done” that means no additional information or forms below that point needs to be filled out or furnished.  See Exhibits for Watershed Management Zones, Basins, & Urban Sustainability Areas  Use “n/a” where information requested is not applicable. If you are unsure regarding how to fill out any of the information, please come in and request assistance from a staff person. Project Information Step 1 Applicant Name: Tim Walters Application No: Project Name: Froom Ranch Specific Plan Location Address: Area northwest of the intersection of Calle Joaquin and Los Osos Valley Road Location APN: 067-241-30 & 067-241-31 Site Zoning: Residential R-3-SP, & R-4-SP, Commercial CR-SP, Parks P-F-SP and Open Space C/OS-SP Project Type:   Commercial Detached Single Family Residential Industrial  Multi-unit Residential Mixed Use  Public Project Phase: Specific Plan Project Description: Construction of Medium to High Density Residential, a Life Plan Community and Commercial Retail including roads utilities and drainage facilities to serve the project. Total Project Site Area = 109.7 acres Your project is NOT subject to Post Construction Requirements if… Step 2  Area (c) of project is < 2,500 square feet – Done OR  Area (c) of project is > 2,500 square feet, and is a project type listed below ( type) – Done  Road & parking surface repair – slurry & fog & crack seal, pothole & spot patching, overlay & resurfacing & other damage repair with no expansion  Road & parking shoulder grading  Road & parking cleaning, repairing, maintaining, reshaping, regarding drainage systems  Sidewalk & bike path / lane project – no other impervious service created and runoff is directed to vegetated area  Curb & gutter improvement or replacement – no other impervious created  Underground utility project – surface replaced in kind  Utility vaults – Ex: lift stations, backflows  Fuel storage – above ground with spill containment  Photovoltaic systems – on existing impervious surface, over pervious surface with vegetated cover, buffer strip at the most down gradient row of panels  Second story – no increase in building footprint  Decks & stairs & walkways – raised with space below for drainage  Temporary structures – in place less than 6 months Otherwise, your project is subject to the Post Construction Requirements Stormwater Control Plan for Post Construction Requirements Project Site Details Step 3 Watershed Management Zone: Zone 1 & Zone 9 Urban Sustainability Area Name: N/A  Meet USA Conditions Areas (a) Total New Impervious Surface Area = 38.7 ac (b) Total Replaced Impervious Surface Area = 0 ac (c) Total Existing Impervious Area = 0 ac (d) Total Impervious Area of Completed Project = 38.7 ac (e) Net Impervious Area: (a+b) – (c-d) = OR where (c-d) is a negative number: (a+b) = 38.7 ac  See Area calculations in Step 3 to compare to thresholds in each Step below  Where directions state “Go To”, fill out and attach the referenced Form and any supporting documents Step 4 Project is > 2,500 square feet  Yes - Go To Requirement 1 – Site Design & Runoff Reduction - Form 1 AND THEN Go To Step 5 Step 5 Detached single family residential project where Area (e) is > 15,000 square feet OR Project where Area (e) > 5,000 square feet  Yes - Go To Requirement 2 – Water Quality Treatment - Form 2 AND THEN Go To Step 6  No - Done Step 6 Detached single family residential project where Area (e) > 15,000 square feet OR Project where Area (a+b) > 15,000 square feet AND is in Watershed Management Zone 4,7,10 over a ground water basin OR in Zone 1,2,5,6,8,9  Yes - Go To Requirement 3 – Runoff Retention - Form 3 AND THEN Go To Step 7  No - Done Step 7 Project where Area (a+b) > 22,000 square feet AND is in Watershed Management Zone 1,2,3,6,9  Yes - Go To Requirement 4 – Peak Management - Form 4  No - Done Exhibits 1. Watershed Management Zones 2. Groundwater Basin Location 3. Watershed Management Zone Revision Request 4. Urban Sustainability Conditions and Maps of Approved Areas Stormwater Control Plan for Post Construction Requirements Form 1 Requirement 1 – Site Design and Runoff Reduction: Identify the strategies used to reduce runoff through site design. Strategies 1-5 required. Describe or attach simple plan details for 1. – 5. 1. Limit disturbance of creeks and natural drainage features and setback development from these features. A portion of Froom Creek will be re-routed and the channel size will be increased to reduce velocity and to accommodate 100-year storm flow rates. 2. Minimize compaction of highly permeable soils. The site has highly impermeable soils; however a large portion of the property is to remain undeveloped and these portions will not be compacted. 3. Minimize clearing of native vegetation and grading, conserving natural areas and maximizing undisturbed areas, and developing along natural landforms. Only a portion of the 109.7 acre site is to be developed. Undeveloped areas will be left undisturbed. 4. Minimize impervious surfaces including roadways and parking lots Sidewalk and street widths will be minimized to reduced overall site imperviousness. 5. Do one of the following:   Direct roof run off into cistern, rain barrel, or vegetated area  Direct driveway and/or parking area into vegetated area  Construct surfaces (bike lanes, walks, driveways, parking areas) with permeable surfaces Stormwater Control Plan for Post Construction Requirements Form 2 Requirement 2 – Water Quality Treatment: (Reference Post Construction Stormwater Management Requirements for Development Projects in the Central Coast Region – Adopted July 12, 2013 California Regional Water Quality Control Board Central Coast Region – for details regarding requirements – Section B.3 and Section C. Alternative Compliance.) Treatment Location   On Site  Off Site - Alternative Compliance Measure Used   1. Harvesting, infiltration, evapotranspiration  2. Bio-filtration Treatment (Document inability to use 1.)  3. Non-Retention Based Treatment (Document inability to use 1. or 2.) Description of structural controls: Since soils are poorly suited for infiltration, stormwater will be conveyed to bio-retention areas. Retention areas have been sized to hold the required water quality volume. Alternative compliance measures: N/A Attachments  Attach treatment/sizing calculations, including any volume treated with off-site compliance.  Attach construction and planting details and specifications for bio-filtration options  Attach documentation regarding Treatment Measure selection  Attach infeasibility analysis where alternative compliance is proposed. Certification I Tim Walters certify that the systems selected and sized, as demonstrated in the attached calculations, meet the Water Quality Treatment required for this project per the Post Construction Requirements adopted by the Central Coast Regional Water Quality Control Board. Where identified in the attached documentation, Water Quality Treatment will be met through alternative compliance. Signature Date Stormwater Control Plan for Post Construction Requirements Form 3 Requirement 3 – Runoff Retention: (Reference Post Construction Stormwater Management Requirements for Development Projects in the Central Coast Region – Adopted July 12, 2013 California Regional Water Quality Control Board Central Coast Region – for details regarding requirements – Section B.4 and Section C. Alternative Compliance.)  If a revision to the site’s Watershed Management Zone is being requested, attach Watershed Management Revision Request Form (Exhibit) and supporting documentation.  Rainfall maps are available from the Regional Water Quality Control Board Site Assessment Measures Summary  Attach documentation of the following information:  Site topography  Development envelope  Hydrologic features including natural areas, wetlands, watercourses, seeps, springs, and required setbacks  Vegetative cover including trees  Open space requirements  Location of groundwater wells used for drinking water  Depth to seasonal high groundwater  Soil types and hydrologic soil groups  Depth to impervious layer such as bedrock  Presence of unique geology (e.g. karst)  Geotechnical hazards  Existing structures, utilities, and drainage infrastructure including municipal storm drain system components  Existing easements and covenants  Documented soil or groundwater contamination  Source and estimated stormwater run-on from offsite, coming to project area  Drainage Management Areas (B.4.d.iii)  Drainage management strategies by Drainage Management Area  Runoff reduction measures and any structural control measures by Drainage Management Area (or full site as appropriate)  Technical infeasibility limits on-site compliance  10% of equivalent impervious surface area is dedicated to retention based stormwater control measures – No alternative compliance for retention Runoff volume - compliance not achieved on-site:  Alternative compliance for retention proposed Runoff volume – compliance not achieved onsite: Runoff volume – alternative compliance used: Analysis and Sizing  Attach calculated Tributary Areas and Design Volumes per the Post Construction Stormwater Management Requirements – Attachment D  Adjustment made for redevelopment  Adjustment made for being in, and meeting requirements of, an Urban Sustainability Area Control Mechanism Site in Zone 1, 4, 7, and/or 10 and over groundwater basin  95th percentile event retained via infiltration Stormwater Control Plan for Post Construction Requirements Form 3  Finding of technical infeasibility Site in Zone 2  95th percentile event retained via storage, harvesting, infiltration, and/or evapotranspiration  Finding of technical infeasibility – Structural Stormwater Measure proposed Site in Zone 5 and/or 8  85th percentile event retained via infiltration  Finding of technical infeasibility – Structural Stormwater Measure proposed Site in Zone 6 and/or 9  85th percentile event retained via storage, harvesting, infiltration, and/or evapotranspiration  Finding of technical infeasibility – Structural Stormwater Measure proposed Attachments  Attach Attachment D calculations for hydrologic analysis and stormwater control measure sizing  Attach discussion of technical infeasibility for structural stormwater measure, where proposed in lieu of preferred storage, harvesting, infiltration, and/or evapotranspiration, include justification for any non- retention based controls  Attach documentation of technical infeasibility for on-site compliance, including a site specific hydrologic and/or design analysis supporting findings  Attach description of alternative compliance project including a summary description of pollutant and flow reduction comparing the expected aggregate results of the alternate project to the results that would otherwise have been achieved by meeting the numeric performance requirements onsite.  Attach Attachment E calculations for retention requirement adjustment for technical infeasibility  Attach Attachment F calculations for off-site retention requirements  Attach agreement for alternative compliance site use, for purposes of achieving compliance  Attach Operations and Maintenance Plan for all stormwater control measures (include any Peak Management facilities) Post-Construction Owner Identification At the time of completion of the construction work, and the shift to post-construction stormwater controls, the below listed owner is responsible for Operations and Maintenance of stormwater control measures: Villaggio – Life Plan Community John Madonna (If responsibilities are divided, list all responsible owners and associated measures.) Certification I Tim Walters certify that the systems selected, sized, and designed as demonstrated in the attached calculations, meet the Runoff Retention Performance Requirement for this project per the Post Construction Requirements adopted by the Central Coast Regional Water Quality Control Board. Where identified in the attached documentation, Runoff Retention will be met through alternative compliance. Signature Date Stormwater Control Plan for Post Construction Requirements Form 4 Requirement 4 – Peak Management (Reference Post Construction Stormwater Management Requirements for Development Projects in the Central Coast Region – Adopted July 12, 2013 California Regional Water Quality Control Board Central Coast Region – for details regarding requirements – Section B.5) Show any stormwater control measures used to meet the requirements of this section, in the documentation and attachments required for Retention (Form 3), including in all mapping and Operations and Maintenance materials. Peak Management Compliance  Post-development peak flows, discharged from the site, do not exceed pre-project peak flows for the 2 through 10 years storm events.  Technical infeasibility limits on-site compliance  Alternative compliance for retention proposed Runoff volume – compliance not achieved onsite: Runoff volume – alternative compliance used: Attachments  Attach calculations showing pre-project discharge and post-project discharge for the 2 through 10 year storm events  Attach documentation of technical infeasibility for on-site compliance, including a site specific hydrologic and/or design analysis supporting findings  Attach description of alternative compliance project including a summary description of pollutant and flow reduction comparing the expected aggregate results of the alternate project to the results that would otherwise have been achieved by meeting the numeric performance requirements onsite.  Attach agreement for alternative compliance site use, for purposes of achieving compliance Post-Construction Owner Identification At the time of completion of the construction work, and the shift to post-construction stormwater controls, the below listed owner is responsible for Operations and Maintenance of the peak management control measures: Villaggio – Life Plan Community John Madonna (If responsibilities are divided, list all responsible owners and associated measures.) Certification I Tim Walters certify that the systems selected, sized, and designed as demonstrated in the attached calculations, meet the Peak Management requirements for this project per the Post Construction Requirements adopted by the Central Coast Regional Water Quality Control Board. Where identified in the attached documentation, Peak Management will be met through alternative compliance. Signature Date Stormwater Control Plan for Post Construction Requirements Exhibit 1 Watershed Management Zones Stormwater Control Plan for Post Construction Requirements Exhibit 2 Ground Water Basin Stormwater Control Plan for Post Construction Requirements Exhibit 3 Watershed Management Zone Revision Request It is understood that Watershed Management Zones were developed through the Central Coast Regional Water Quality Control Board Joint Effort with available data, at varying degrees of detail and accuracy. Zones may vary across properties, or be off from verifiable, on the ground data. Applicants may propose revisions to the designate Watershed Management Zone for the project. Applicants should carefully review the Post-Construction Stormwater Management Requirements For Development Projects in the Central Coast Region, California – Technical Support Document for a clear understanding of the basis of the Watershed Management Zone designations before proceeding with this application. Site Information Project Address: Area northwest of the intersection of Calle Joaquin and Los Osos Valley Road Current Watershed Management Zone(s): Zone 1 & 9 Proposed Watershed Management Zone(s): Zone 1 & 9 Watershed Management Zone Summary Copy table for multiple zones in the Project area  Mark the characteristics supported by geotechnical observation in the column marked ”(P)”  Identify the page number in any geotechnical report reference in the column marked “Pg” Watershed Management Zone 1 2 3 4 5 6 7 8 9 10 (P) Pg Drains to: Stream   Wetland   Stream or Wetland     Lake  River  Lake or River   Underlain by: 0-10% All types  > 40% All types  4 0-40% Quaternary & Late Tertiary  10-40% Quaternary & Late Tertiary  0-10% Early to Mid-Tertiary  10-40% Early to Mid-Tertiary  10-40% Franciscan melange, Pre-Quaternary crystalline, Early to Mid-Tertiary 5 > 40% Quaternary, Late Tertiary, Early to Mid- Tertiary   0-10% Franciscan melange, Pre-Quaternary crystalline  > 10% Franciscan melange, Pre-Quaternary crystalline 2 10-40% Franciscan melange, Pre-Quaternary crystalline 3 > 40% Franciscan melange, Pre-Quaternary crystalline  Stormwater Control Plan for Post Construction Requirements Exhibit 3 Watershed Management Zone 1 2 3 4 5 6 7 8 9 10 (P) Pg Slope: Steep     Moderate     Low   Watershed Process: Infiltration dominant  1   Infiltration less dominant     Chemical & biological remediation   Overland flow minimal      Notes: 1 – Over groundwater basin 2 – Zone 9 Wetland Draining 3 – Zone 9 Stream or Wetland Draining 4 – Zone 10 Lake Draining 5 – Zone 10 Lake or River Draining Watershed Management Zone Revision Supporting Summary Provide written summary of geotechnical/geological information supporting revised Watershed Management Zone designation. N/A Attachment  Attach geotechnical or geological information which supports revision (include page references in table above) Pages 6 thru 10: GeoSolutions Soils and Geotechnical Report, June 28, 2016. Stormwater Control Plan for Post Construction Requirements Exhibit 4 Urban Sustainability Areas Urban Sustainability Areas (USA) encompass high density urban centers where the documented objective is to preserve or enhance and existing pedestrian-oriented and/or public transit-oriented type of urban design through the promotion of high density redevelopment and infill. Requirements for USAs The City has received approval for certain sub-areas within three land use zoning areas for USAs designation, superimposed with minimum requirements. The Zones are Retail Commercial, Downtown Commercial, and High Density Residential. Maps are provided at the end of this document. Site specific requirements relating to floor areas or dwelling units, surface parking allowance, and alternative transportation meet or exceed the current Zoning Regulation requirements. To be eligible for reductions of Post- Construction Requirements, development and redevelopment projects must meet all the USA requirements listed below for the Zone. A. Retail Commercial (C-R) USA Requirements  Ratio of gross building floor area to site area minimum = 3:1  Site area building coverage minimum = 90%  Project uses < 10% of area for surface parking  Within 8 blocks of local transit route with at least hourly daytime service Monday through Friday, with connections to regional transit routes and train station  Provision of bike parking spaces = minimum 15% of auto parking requirement  Sidewalks provided on both sides of the street B. Downtown Commercial (C-D) USA Requirements  Ratio of gross building floor area to site area minimum = 3:1  Site area building coverage maximum = 100%  Project provides no surface parking, beyond incidental uses for emergency and ADA. Exception is municipal multi-story structures provided as park-in-lieu facilities for intense site developments  Within 8 blocks of local transit route with at least hourly daytime service Monday through Friday, with connections to regional transit routes and train station  Provision of bike parking spaces = minimum 15% of auto parking requirement  Sidewalks provided on both sides of the street C. High-Density Residential (R-4) USA Requirements  Dwelling units per net acre (net acre - excludes right-of-way, creeks, endangered & threatened species habitat) minimum = 24 + a low or moderate income density bonus  Site area building coverage minimum = 60%  Within 8 blocks of local transit route with at least hourly daytime service Monday through Friday, with connections to regional transit routes and train station  Provision of bike parking spaces = minimum 10% of auto parking requirement  Sidewalks provided on both sides of the street or approved alternative connection pathways Stormwater Control Plan for Post Construction Requirements Exhibit 4 Application of Post Construction Requirements within a USA Post Construction Requirements will be applied in USAs as follows: A. Performance Requirement No. 1: Site Design and Runoff Reduction  The City will apply those aspects of Site Design and Runoff Reduction that are applicable.  Site design activities may be limited by the pre-project condition and density goals.  Where complete, or nearly complete lot coverage is proposed, shifting of rainwater to vegetated areas, or for reuse may not be applicable. B. Performance Requirement No. 2: Water Quality Treatment  The City will apply Water Quality Treatment  Where Water Quality Treatment is demonstrated as infeasible, it will be handled per C.3.b  Site specific analysis completed and endorsed to show infeasibility per sections C.1.a & c  Off-site Project description, location within the same watershed, and scheduled completion date identified C. Performance Requirement No. 3: Runoff Retention  The City will apply Runoff Retention  Per B.4.b.ii, the total runoff volume to be retained from replaced impervious surfaces shall be less than, or equivalent to, the pre-project runoff volume retained  New impervious surfaces will comply with requirements of section B.4, calculated per Attachment D, where the tributary area is a function of new impervious only D. Performance Requirement No. 4 – Peak Management  The City will apply Peak Management Requirements  Post-development peak flows will generally not exceed pre-project peak flows for the 2 through 10 year storm events for redevelopment sites  Technical infeasibility will apply where density goals result in space constraints as provided for in C.1.c.v. Per C.1.a, and no site specific hydrologic or geotechnical analysis will be required. E. Off-Site Compliance  Where an off-site compliance proposal is included in the project submittal  Location, analysis for performance requirement compliance, and project mitigation completion schedule for off-site compliance will be required as part of the submittal.  Off-site compliance site will be within the same watershed, unless otherwise approved by the Central Coast Water Board EO. Stormwater Control Plan for Post Construction Requirements Exhibit 4 Maps of Approved USAs A. Retail Commercial (C-R) Stormwater Control Plan for Post Construction Requirements Exhibit 4 Stormwater Control Plan for Post Construction Requirements Exhibit 4 B. Downtown Commercial (C-D) Stormwater Control Plan for Post Construction Requirements Exhibit 4 C. High-Density Residential (R-4) Stormwater Control Plan for Post Construction Requirements Exhibit 4 Appendix 7 Cleath-Harris Groundwater Report Groundwater Assessment 1 9/21/2018 September 21, 2018 John Madonna John Madonna Construction Company P.O. Box 5310 San Luis Obispo, California 93403 Subject: Groundwater Impacts Assessment Froom Ranch Development San Luis Obispo, California Dear Mr. Madonna: Cleath-Harris Geologists (CHG) has performed an assessment of groundwater impacts resulting from the Froom Ranch Development project, San Luis Obispo, California. The proposed project location is presented on Figure 1. The focus of this assessment is the improvements that are proposed on the valley floor portion of the ranch. The impacts include impacts to the wetland area along Calle Joaquin, groundwater levels, groundwater recharge from percolation of flows in the Froom Creek stream channel, and subsidence from lowered groundwater levels. The existing and proposed drainage and wells on the ranch have been reviewed along with the proposed ground surface grade and the subsurface and surface hydrology as a basis for this analysis. Previous reports that form the partial basis for this assessment include the RRM Preliminary Hydraulic and Hydrologic Calculations (2017) and the GeoSolutions 2017 Subsurface Fault Investigation and Development Setback Map. For this assessment, the project applicant provided project preliminary plans, hydrologic investigations, fault studies, soils reports, and various data files and information. Data provided by the project applicant included: existing improvement and project plans and drawings, soils reports, well information, and drainage/stream flow calculations and environmental studies. Several test pits were dug to measure the depth to water around the forebay/detention basins. Access was provided to the property and to the wells for water level measurements. Well head elevations were surveyed to convert depth to water to groundwater level elevations. CONDUCT OF STUDY The impact assessment involved a characterization of groundwater basin sediments and groundwater level within the valley floor area between the Irish Hills and Los Osos Valley Road, a review of the proposed project drainage and finished grade topography, Figure 1 Location Map Froom Ranch Cleath-Harris Geologists Wells and Borings Cross Section Lines Specific Plan Area Detention Basin Drains Wetlands Pit with Water Level (9/20/18) Explanation 0 250 500 750 ft A' B' A B Los O so s Va l ley RoadCalle JoaquinHwy. 101Ranch Headquarters Prefumo CreekFroom Creek Forebay Basin Vineyard Church Property Detention Basin Groundwater Assessment 9/21/2018 2 and an evaluation of potential impacts to the wetlands and groundwater resources resulting from the project. Some of the tasks included in this characterization included: 1. A review of existing drainage works on the property and along Los Osos Valley Road and the proposed changes to the subsurface/surface drains; 2. A site reconnaissance to identify hydrologic features and facilities on the property 3. A definition of existing groundwater level elevations using water levels measured in existing wells, and exploratory holes; 4. Plotting of the groundwater level elevations using well head survey information. 5. Estimating the range of groundwater level fluctuations during wet and dry periods based on available groundwater level records and published literature; 6. Identifying where, and at what depth, sand and gravel aquifers are present underlying the property based on available subsurface data; 7. Identifying areas of confined groundwater resulting in artesian flow from wells and areas of rising water/wetland areas; SURFACE WATER/GROUNDWATER FACILITIES The existing water facilities on the valley floor portion of the ranch include the Froom Creek bermed drainage channel (flowing from the canyon, along the base of the hills, to where the creek flows between Calle Joaquin and the Vineyard Church property, and thence toward a culvert at Highway 101); A forebay basin and detention basin with subsurface drains receives water from the commercial property to the west of the ranch; two water supply wells (the domestic well and the irrigation well). Froom Creek, as it exists, has been moved to the current alignment from it’s original stream channel orientation as was documented in the RRM Hydrology Study, Figure 1-2. The original stream channel alignment was generally parallel to the Froom Ranch driveway. The NRCS soil survey map has “Riverwash”/xerofluvents soils in Froom Creek Canyon and in the vicinity of the ranch buildings, and Cropley clay soils on the remainder of the valley portion of the property. Downstream of where the creek flows out of the canyon (watershed area of 2 square miles), the geologic maps published by the California Geologic Survey (Wiegers, 2011) and by Lettis and Hall (1994) show an alluvial fan along the original stream channel alignment (GeoSolutions, 2017, Plates 3A and 7A). Typically, alluvial fan deposits are coarse grained sands and gravels at the mouth of a canyon. The current alignment parallels the hillside for a length of about 1,500 feet. The current channel bed is comprised of sand and gravel. Adjacent trenches excavated for seismic studies found that below the creek channel elevation, the soils were colluvial: a mixture of clays, sands, and gravels. The on-line NRCS soils survey map shows that much of the current channel alignment is on Obispo weathered bedrock soils. Groundwater Assessment 9/21/2018 3 The subsurface drains at the forebay/detention basin include perimeter drains and sub- basin drains. The western perimeter drain and the forebay/detention basin subsurface drains flow to a surface water discharge point that feeds to the drainageway along Los Osos Valley Road. The southern perimeter drain discharges to a leach field that allows the water to rise into the wetland area east of the detention basin. The domestic well (estimated pumping rate of about 10 gallons per minute) provides water to the ranch house and also to a construction water tank. The irrigation well (estimated pumping rate of about 300 gallons per minute) also provides water to the construction water tank. This water is primarily used for dust control at constructions sites. The water production from the wells is about 10 acre-feet. PROPOSED SURFACE WATER/GROUNDWATER FACILITIES The proposed project includes topographic modification of the site for roads, building pads and drainage (Figure 2). As part of this modification, the stream channel for Froom Creek along the base of the Irish Hills would be re-aligned in part to be near to the original channel position toward Los Osos Valley Road and then turning to an alignment parallel to Los Osos Valley Road and thence toward the base of the hills, along the western edge of the wetland (as shown on Figure 1-4 of the RRM Hydrology Study, returning to the existing creek channel- a distance of about 2,500 feet. The underlying soils along this proposed alignment are predominantly clayey. The existing stream channel and adjacent berm would be removed as a part of the grading for the development. The existing drainage detention basins would be removed as a part of the grading and the flow from the Home Depot/Costco property would be drained to the modified stream channel. Excess flow from the modified stream channel (not contained in the wetland area) would drain to an off-site detention basin proposed on the Vineyard Church property. Water supply to the proposed project would be from the City of San Luis Obispo and potentially from on-site wells and wastewater would be disposed of to the City sewer. SITE HYDROGEOLOGY The valley floor portion of the proposed development is underlain by alluvial deposits. The alluvium includes fan deposits at the mouth of Froom Creek Canyon and flood plain fine-grained sediments interbedded with stream channel sands and gravels. The depth of the alluvium reaches 200 feet near the driveway entrance to the Froom Ranch residence. The subsurface alluvial deposits, as defined at wells and borings (located on Figure 1), include clayey beds to a depth ranging from 25 to 50 feet below ground surface before Figure 2 Proposed Project Grade Froom Ranch Cleath-Harris Geologists Wells and Borings Cross Section Lines Specific Plan Area Wetlands Detention Basin Drains Proposed Stream Channel Current Stream Channel Pit with Water Level (9/20/18) Explanation 0 250 500 750 ft A' B' A B Los O so s Va l ley RoadCalle JoaquinHwy. 101Ranch Headquarters Prefumo CreekFroom Creek Forebay Basin Vineyard Church Property Detention Basin 127 Contour Elevation in Feet Groundwater Assessment 9/21/2018 4 reaching the first sand and gravel bed. The cross sections on Figures 3 and 4 include the borehole logs for some of these test holes/wells. Groundwater saturates much of the alluvial deposits. The shallow clay bed is an aquitard that inhibits percolation of surface water and confines the groundwater stored within the underlying sand and gravels. The groundwater level within the sand and gravel beds is typically at or above the level within the shallow saturated clays and, when this occurs, some upward leakage of groundwater occurs. Balance Hydrologics in their Calle Joaquin Wetlands groundwater study determined, based on salt concentration ratios, that a significant “key” source of the water feeding the wetlands was from upward leakage of groundwater from the deep sand and gravel deposits. Other recharge to the wetland occurs from percolation of Froom Creek surface water within the area of the alluvial fan and in the colluvial deposits along the western edge of the valley. Overflow from Froom Creek during high stream flow (400 cubic foot per second) conditions occurs infrequently and “may not be sufficient to sustain both seasonal and perennial wetlands” (Balance Hydrologics, 2004). Historically, groundwater levels on the property have fluctuated from near surface to about 30 feet below ground surface (CHG, 2018). The lowest level occurred when the City was extracting groundwater during the 1987-1991 drought years and has not occurred since then. The groundwater level measurements at the Madonna domestic well and the Artesian well, during this investigation found that the groundwater level depth below ground surface was about 10 feet at the Madonna domestic well on the west and at ground surface at the Artesian Well by Calle Joaquin on July 31, 2018. The depth to water in the proximity of the forebay/detention basins were measured in several backhoe pits on September 20, 2018. The depths to water in the backhoe pits around the basins were between 3 and 6 feet and inside the basins the depths to water were 2.3 feet (forebay) and 2.6 feet (detention) below the lowest point in the basins. The levels at pits 8 and 3 are included on Cross Section A-A’ (Figure 3). Based on historic groundwater monitoring at the Calle Joaquin wetlands, the groundwater level at the wetlands fluctuates seasonally 2 to 4 feet with a range of about 5 feet (from 3 feet below ground to 1+ feet above ground). Surface flow out of the wetland via drainages and culverts occurs once the water level is above grade. PROPOSED PROJECT GRADE The ground surface grade for the proposed development of the valley portion of the Froom Ranch is shown on Figure 2. Over the improved portion of the valley floor on the 80 100 120 140 0 500 1,000 1,500 2,000 2,500Elevation in Feet Above Sea LevelDistance in Feet A’ Southeast A Northwest 60 Madonna Domestic Well Calle Joaquin x x Detention Basins Hollingsworth Well Alluvium Smith & Smith Test Hole #1 Creek Figure 3 Hydrogeologic Cross Section A-A’ Froom Ranch Cleath-Harris Geologists Explanation Recent Water Level (Sounded) Current Grade Proposed Grade * See Figure 1 for Cross Section Alignment x Proposed Stream Channel 7/31/18 Projected Basin Drains 7/31/18 7/31/89 9/20/18 9/20/18 ClaySand &GravelClayClaySand &GravelClay 0 500 1,000 1,500 2,000Elevation in Feet Above Sea LevelDistance in Feet B’ East B West 60 80 100 120 140 160 Madonna Domestic Los Osos Valley Road Froom Creek Alluvium Bedrock Smith & Smith Test Hole #1 Irish Hills Test Hole #1 Explanation Current Water Level (Sounded) Current Grade Proposed Grade 7/31/18 Completed Well * See Figure 1 for Cross Section Alignment Bedrock Surface Figure 4 Hydrogeologic Cross Section B-B’ Froom Ranch Cleath-Harris Geologists 7/31/2018 ClaySand &GravelClayClay Groundwater Assessment 9/21/2018 5 property, the ground surface will generally be raised to a higher elevation for the project (Cross Sections A-A’ and B-B’ (Figures 3 and 4). The proposed creek alignment would be incised into the fill from the mouth of the canyon toward Los Osos Valley Road. The proposed creek would join with the drainage ditch along Los Osos Valley Road and follow the eastern/southeastern edge of the graded fill slope adjacent to the wetland, where the low flow creek channel will be shallow (and above the wetland elevation). During high flow conditions with a two year frequency event, overbank flow would go into the wetlands. RRM hydraulic sections/calculations drawn across the low flow/overbank flow section between the fill graded slope and the Calle Joaquin/Marriott property bank indicate that the creek/overbank wetland area can handle flows up to 100-year frequency flows. IMPACT ASSESSMENT The project impacts addressed include groundwater level impacts, changes in flow to the wetlands, subsidence, and recharge to the groundwater. The proposed project impacts to the groundwater level are not expected to be significant as no significant increase in groundwater extractions are proposed. Groundwater levels in the project area may rise if the detention basin drains are removed along with the basins. Rising water would cause more water to flow into the wetland area. Wetland Impact The proposed project’s impact to the wetlands would be to increase flow into the wetlands as the Froom Creek channel would utilize the wetlands as a part of the drainageway for winter flows and would be expected to allow more percolation into the alluvial fan deposits at the mouth of Froom Creek Canyon and along the longer project creek channel length resulting in a more extended period of high water levels after the end of the rainy season. Subsidence Impact Subsidence has been addressed recently by Yeh and Associates for the San Luis Obispo Groundwater Basin Characterization Study. Historically, subsidence has been observed when groundwater levels declined 30 feet along Los Osos Valley Road in the late 1980’s. Some of the old well concrete pad bottoms (such as at the Madonna Artesian well) are now above grade. Yeh and Associates mapped this area as having a moderate potential for subsidence (Yeh and Associates, Plate 2). The clayey soils identified on the soils map Groundwater Assessment 9/21/2018 6 and in the test hole logs indicate that there is a higher potential for compaction/subsidence. The proposed project (with no major groundwater extractions proposed) would not result in significantly lowered groundwater levels. If groundwater levels decline to a depth as occurred in the 1980’s due to regional or on-site pumping, subsidence can be expected to occur. The actual depth to water where subsidence would start to be noticed in this area has not been determined. One example of an area where subsidence was related to groundwater level change was in Cambria, where no significant ground deformation occurred when groundwater levels were maintained at 20 feet or shallower. Groundwater Recharge Impact Groundwater recharge to the alluvial aquifers in the wetland area is anticipated to increase as a result of the re-alignment of the Froom Creek stream channel. The longer reach and flatter grade of the re-aligned stream channel allows for a greater surface area and longer duration of wetted stream channel, increasing groundwater recharge when stream flow occurs. The re-aligned stream channel will traverse alluvial fan deposits along the old stream channel alignment and will not be flowing over Obispo weathered bedrock soils as occurs in the current channel alignment. The detention basin downstream of the project area, when saturated, is anticipated to result in a higher groundwater level than currently exists and reduce the groundwater flow gradient in the proximity to the wetlands. CONCLUSION The Froom Ranch Specific Plan valley area is underlain by up to 200-feet thick alluvial deposits comprised of shallow alluvial fan deposits near the ranch headquarters and shallow clayey deposits elsewhere underlain by permeable sand and gravel beds. The clayey deposits confine groundwater in these deeper sand and gravel beds but do allow for gradual upward leakage contributing water to the wetlands. Groundwater recharge also occurs from percolation of runoff where shallow alluvial fan deposits and stream channel deposits are present. During wet year winters, groundwater levels are near ground surface in the higher topographic areas of the valley and in the lower elevation wetland area above ground surface. Historically, the groundwater level declined more than 30 feet as a result of regional groundwater extractions during the 1987-1991 drought and subsidence was experienced. During the most recent drought period, groundwater levels remained within 10 feet of ground surface over most of the Froom Ranch valley area and no documented subsidence has occurred. Groundwater Assessment 9/21/2018 7 The proposed project will raise the ground surface on the valley floor in the buildable area and re-align the stream channel. The higher ground surface will increase the depth to water below grade, assuming the groundwater level elevation will be similar to the recent groundwater level elevations. The re-aligned stream channel is anticipated to result in some increase in recharge to the groundwater basin and increase the period of time during the winter when standing water is present in the wetland area. Groundwater levels are anticipated to be higher for a longer period after the rainy season due to the flatter groundwater gradient resulting from the downstream detention basin. Very truly yours, CLEATH-HARRIS GEOLOGISTS Timothy S. Cleath, Certified Hydrogeologist #81 President Groundwater Assessment 9/21/2018 8 REFERENCES Balance Hydrologics, Inc., 2004, Hydrologic Sufficiency for Sustaining a Separated Wetland near Calle Joaquin, San Luis Obispo, California. Cleath-Harris Geologists, 2018, Groundwater Flow Analysis, Recycled Water Project, San Luis Valley Sub-Area, San Luis Obispo Valley Groundwater Basin, prepared for the City of San Luis Obispo under contract with Water Systems Consulting. Cleveland, George, 1980, Drought and Ground Deformation, Cambria, San Luis Obispo County, California GeoSolutions, Inc., 2017, Subsurface Fault Investigation and Development Setback Map, Proposed Madonna Froom Ranch Specific Plan Area, APNs 067-241-030 and -031, San Luis Obispo Area, San Luis Obispo County, California. RRM Design Group, 2018, Preliminary Grading Plans, Froom Ranch Development. RRM Design Group, 2017, Preliminary Hydrologic and Hydraulic Calculations, prepared for the Froom Ranch Specific Plan. RRM Design Group, 2018, Well Head Survey Information. University of California, Davis and United States Department of Agriculture Natural Resources Conservation District, Soil Web. Wallace Group, 2006, Storm Water Basin Grading Plan Irish Hills Plaza 1, Drawing No. B-1.2, 48 of 66 Sheets. Yeh and Associates, 2017, Subsidence Evaluation, San Luis Obispo Valley Groundwater Basin Characterization Project, San Luis Obispo County, California Appendix 8 HEC-HMS Hydraulic Modeling Results Project: Modified_Froom(Pre-Post) Simulation Run: Proposed-2AStart of Run: 01Jan2000, 00:00 Basin Model: Froom DevelopmentEnd of Run: 01Jan2000, 23:45 Meteorologic Model: 2-yr Size A-12 km2Compute Time:12Oct2018, 11:04:47 Control Specifications:24-hr Design, 5 minHydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(AC-FT)Costco Hill0.1687529.73301Jan2000, 12:3514.089Double Box @ Hwy1011.51794267.04501Jan2000, 12:45168.115Froom Creek (Lower)0.234476.77501Jan2000, 12:2036.251Froom Creek (Upper)0.8969163.66001Jan2000, 12:2065.289Froom Development0.0524335.43801Jan2000, 12:1526.198Froom Realignment1.18931257.31901Jan2000, 12:25124.982Home Depot + Costco0.0474320.00801Jan2000, 12:3510.482Irish Hills0.023815.85701Jan2000, 12:159.048Mid SLO Creek1.0469221.23001Jan2000, 12:2078.303Mountainbrook0.0942321.19301Jan2000, 12:209.560Pref @ C Joaquin14.70162207.51001Jan2000, 12:55998.034SLO @ E Br ST 1017755.670546850.79401Jan2000, 14:254116.095SLO @ Froom ST 1189742.425645774.61001Jan2000, 14:053194.125 Project: Modified_Froom(Pre-Post) Simulation Run: Proposed-10AStart of Run: 01Jan2000, 00:00 Basin Model: Froom DevelopmentEnd of Run: 01Jan2000, 23:45 Meteorologic Model: 10-yr Size A-12 km2Compute Time:12Oct2018, 11:04:59 Control Specifications:24-hr Design, 5 minHydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(AC-FT)Costco Hill0.1687559.05801Jan2000, 12:3522.125Double Box @ Hwy1011.51794477.75901Jan2000, 12:50243.406Froom Creek (Lower)0.2344143.38301Jan2000, 12:2049.941Froom Creek (Upper)0.8969347.76501Jan2000, 12:20106.663Froom Development0.0524351.63001Jan2000, 12:1529.777Froom Realignment1.18931499.68501Jan2000, 12:25182.814Home Depot + Costco0.0474331.98001Jan2000, 12:3013.719Irish Hills0.023823.68101Jan2000, 12:1510.690Mid SLO Creek1.0469448.35201Jan2000, 12:20127.825Mountainbrook0.0942341.63501Jan2000, 12:2014.018Pref @ C Joaquin14.70164196.32701Jan2000, 13:001676.039SLO @ E Br ST 1017755.6705414567.88601Jan2000, 13:506975.220SLO @ Froom ST 1189742.4256412112.30101Jan2000, 13:405417.020 Project: Modified_Froom(Pre-Post) Simulation Run: Proposed-25AStart of Run: 01Jan2000, 00:00 Basin Model: Froom DevelopmentEnd of Run: 01Jan2000, 23:45 Meteorologic Model: 25-yr Size A-12 km2Compute Time:12Oct2018, 11:05:20 Control Specifications:24-hr Design, 5 minHydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(AC-FT)Costco Hill0.1687579.46001Jan2000, 12:3529.602Double Box @ Hwy1011.51794613.29801Jan2000, 12:50312.503Froom Creek (Lower)0.2344184.23601Jan2000, 12:2062.137Froom Creek (Upper)0.8969479.28201Jan2000, 12:20145.731Froom Development0.0524359.72501Jan2000, 12:1532.796Froom Realignment1.18931664.45901Jan2000, 12:25236.430Home Depot + Costco0.0474338.06901Jan2000, 12:3016.441Irish Hills0.023827.48601Jan2000, 12:1512.070Mid SLO Creek1.0469604.34301Jan2000, 12:20174.126Mountainbrook0.0942355.67601Jan2000, 12:2018.185Pref @ C Joaquin14.70165398.28401Jan2000, 13:052309.797SLO @ E Br ST 1017755.6705419729.60601Jan2000, 13:459338.087SLO @ Froom ST 1189742.4256416251.35401Jan2000, 13:357195.816 Project: Modified_Froom(Pre-Post) Simulation Run: Proposed-50AStart of Run: 01Jan2000, 00:00 Basin Model: Froom DevelopmentEnd of Run: 01Jan2000, 23:45 Meteorologic Model: 50-yr Size A-12 km2Compute Time:12Oct2018, 11:06:02 Control Specifications:24-hr Design, 5 minHydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(AC-FT)Costco Hill0.1687595.59601Jan2000, 12:3535.261Double Box @ Hwy1011.51794928.17001Jan2000, 12:35364.434Froom Creek (Lower)0.2344216.86001Jan2000, 12:2071.165Froom Creek (Upper)0.8969586.27701Jan2000, 12:20175.563Froom Development0.0524366.52701Jan2000, 12:1534.976Froom Realignment1.18931797.88101Jan2000, 12:25276.997Home Depot + Costco0.0474342.76201Jan2000, 12:3018.398Irish Hills0.023830.78301Jan2000, 12:1513.066Mid SLO Creek1.0469732.85401Jan2000, 12:20209.350Mountainbrook0.0942367.24301Jan2000, 12:2021.356Pref @ C Joaquin14.70166071.15901Jan2000, 13:102789.396SLO @ E Br ST 1017755.6705423882.62601Jan2000, 13:4011358.320SLO @ Froom ST 1189742.4256419895.09401Jan2000, 13:308783.155 Project: Modified_Froom(Pre-Post) Simulation Run: Proposed-100AStart of Run: 01Jan2000, 00:00 Basin Model: Froom DevelopmentEnd of Run: 01Jan2000, 23:45 Meteorologic Model: 100-yr Size A 12 km2Compute Time:16Oct2018, 11:16:33 Control Specifications:24-hr Design, 5 minHydrologicElementDrainage Area(MI2)Peak Discharge(CFS)Time of Peak Volume(AC-FT)Costco Hill0.16875107.90701Jan2000, 12:3536.819Double Box @ Hwy1011.517941132.48201Jan2000, 12:30378.904Froom Creek (Lower)0.2344243.08801Jan2000, 12:2073.567Froom Creek (Upper)0.8969664.09601Jan2000, 12:20183.637Froom Development0.0524373.18701Jan2000, 12:1535.551Froom Realignment1.18931899.65601Jan2000, 12:25288.013Home Depot + Costco0.0474347.52501Jan2000, 12:3018.925Irish Hills0.023834.03901Jan2000, 12:1513.327Mid SLO Creek1.0469829.32301Jan2000, 12:20218.839Mountainbrook0.0942375.92601Jan2000, 12:2022.210Pref @ C Joaquin14.70166547.90401Jan2000, 13:102924.130SLO @ E Br ST 1017755.6705427469.66501Jan2000, 13:3512293.146SLO @ Froom ST 1189742.4256422823.01501Jan2000, 13:259592.088 0246810121495.5096.1496.7997.4398.0798.7199.36100.0000:0003:0006:0009:0012:0015:0018:0021:0001Jan2000050100250300350400Reservoir "Double Box @ Hwy101" Results for Run "Proposed-2A"Run:Proposed-2A Element:Double Box @ Hwy101 Result:StorageRun:Proposed-2A Element:Double Box @ Hwy101 Result:Pool ElevationRun:Proposed-2A Element:Double Box @ Hwy101 Result:OutflowRun:Proposed-2A Element:Double Box @ Hwy101 Result:Combined Inflow200150Flow (cfs)Storage (AC-FT)High Water Elevation (ft) 0510152095.0096.6798.33100.00101.6700:0003:0006:0009:0012:0015:0018:0021:0001Jan20000100200300400500600700Reservoir "Double Box @ Hwy101" Results for Run "Proposed-10A"Run:Proposed-10A Element:Double Box @ Hwy101 Result:StorageRun:Proposed-10A Element:Double Box @ Hwy101 Result:Pool ElevationRun:Proposed-10A Element:Double Box @ Hwy101 Result:OutflowRun:Proposed-10A Element:Double Box @ Hwy101 Result:Combined InflowFlow (cfs)Storage (AC-FT)High Water Elevation (ft) 0510152025303595.0096.4397.8699.29100.71102.14103.57105.0000:0003:0006:0009:0012:0015:0018:0021:0001Jan200001002003005006007008009001,000Reservoir "Double Box @ Hwy101" Results for Run "Proposed-25A"Run:Proposed-25A Element:Double Box @ Hwy101 Result:StorageRun:Proposed-25A Element:Double Box @ Hwy101 Result:Pool ElevationRun:Proposed-25A Element:Double Box @ Hwy101 Result:OutflowRun:Proposed-25A Element:Double Box @ Hwy101 Result:Combined Inflow400Flow (cfs)Storage (AC-FT)High Water Elevation (ft) 051015202530354095.0096.3897.7599.12100.50101.88103.25104.62106.0000:0003:0006:0009:0012:0015:0018:0021:0001Jan200002004006008001,0001,200Reservoir "Double Box @ Hwy101" Results for Run "Proposed-50A"Run:Proposed-50A Element:Double Box @ Hwy101 Result:StorageRun:Proposed-50A Element:Double Box @ Hwy101 Result:Pool ElevationRun:Proposed-50A Element:Double Box @ Hwy101 Result:OutflowRun:Proposed-50A Element:Double Box @ Hwy101 Result:Combined InflowFlow (cfs)Storage (AC-FT)High Water Elevation (ft) 051015202530354094.0095.5097.0098.50100.00101.50103.00104.50106.0000:0003:0006:0009:0012:0015:0018:0021:0001Jan200002004006008001,0001,2001,400Reservoir "Double Box @ Hwy101" Results for Run "Proposed-100A"Run:Proposed-100A Element:Double Box @ Hwy101 Result:StorageRun:Proposed-100A Element:Double Box @ Hwy101 Result:Pool ElevationRun:Proposed-100A Element:Double Box @ Hwy101 Result:OutflowRun:Proposed-100A Element:Double Box @ Hwy101 Result:Combined InflowFlow (cfs)Storage (AC-FT)High Water Elevation (ft) Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) 0:00 36.000 11.000 95.836 0.768 0:05 35.829 16.791 96.010 0.918 0:10 35.057 18.942 96.069 1.039 0:15 35.190 20.871 96.121 1.144 0:20 35.445 22.642 96.167 1.237 0:25 35.806 24.271 96.208 1.321 0:30 36.217 25.773 96.245 1.397 0:35 36.631 27.159 96.279 1.465 0:40 37.010 28.435 96.309 1.527 0:45 37.332 29.605 96.337 1.583 0:50 37.598 30.695 96.362 1.634 0:55 37.820 31.655 96.384 1.679 1:00 38.007 32.498 96.403 1.719 1:05 38.163 33.279 96.421 1.755 1:10 38.290 33.975 96.437 1.786 1:15 38.393 34.592 96.450 1.814 1:20 38.477 35.139 96.462 1.839 1:25 38.548 35.621 96.473 1.861 1:30 38.608 36.045 96.482 1.879 1:35 38.661 36.418 96.490 1.896 1:40 38.707 36.745 96.498 1.910 1:45 38.748 37.032 96.504 1.923 1:50 38.785 37.283 96.509 1.934 1:55 38.818 37.504 96.514 1.944 2:00 38.849 37.698 96.518 1.952 2:05 38.878 37.868 96.522 1.960 2:10 38.906 38.017 96.525 1.966 2:15 38.932 38.149 96.528 1.972 2:20 38.956 38.265 96.530 1.977 2:25 38.981 38.368 96.533 1.982 2:30 39.005 38.460 96.534 1.986 2:35 39.029 38.542 96.536 1.989 2:40 39.053 38.615 96.538 1.992 2:45 39.076 38.681 96.539 1.995 2:50 39.099 38.741 96.540 1.998 2:55 39.123 38.795 96.542 2.000 3:00 39.147 38.845 96.543 2.002 3:05 39.171 38.891 96.544 2.004 3:10 39.195 38.934 96.545 2.006 3:15 39.219 38.974 96.545 2.008 3:20 39.244 39.012 96.546 2.010 3:25 39.269 39.048 96.547 2.011 3:30 39.294 39.082 96.548 2.013 3:35 39.319 39.116 96.548 2.014 Double Box Culvert Outlet and Storage [2‐year] Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [2‐year] 3:40 39.344 39.147 96.549 2.015 3:45 39.370 39.178 96.550 2.017 3:50 39.397 39.209 96.550 2.018 3:55 39.423 39.238 96.551 2.019 4:00 39.451 39.268 96.552 2.021 4:05 39.478 39.297 96.552 2.022 4:10 39.506 39.326 96.553 2.023 4:15 39.535 39.354 96.554 2.024 4:20 39.564 39.383 96.554 2.026 4:25 39.593 39.412 96.555 2.027 4:30 39.623 39.441 96.555 2.028 4:35 39.654 39.470 96.556 2.029 4:40 39.685 39.500 96.557 2.031 4:45 39.716 39.529 96.557 2.032 4:50 39.749 39.559 96.558 2.033 4:55 39.781 39.590 96.559 2.035 5:00 39.815 39.621 96.559 2.036 5:05 39.849 39.652 96.560 2.037 5:10 39.883 39.684 96.561 2.039 5:15 39.918 39.716 96.561 2.040 5:20 39.954 39.748 96.562 2.041 5:25 39.991 39.782 96.563 2.043 5:30 40.028 39.816 96.563 2.044 5:35 40.066 39.850 96.564 2.046 5:40 40.105 39.885 96.565 2.047 5:45 40.145 39.920 96.566 2.049 5:50 40.190 39.957 96.566 2.050 5:55 40.263 39.997 96.567 2.052 6:00 40.387 40.046 96.568 2.054 6:05 40.585 40.111 96.570 2.057 6:10 40.845 40.201 96.571 2.061 6:15 41.134 40.318 96.574 2.066 6:20 41.425 40.461 96.577 2.072 6:25 41.699 40.625 96.580 2.079 6:30 41.944 40.804 96.584 2.087 6:35 42.163 40.991 96.588 2.095 6:40 42.365 41.181 96.592 2.103 6:45 42.554 41.373 96.596 2.111 6:50 42.734 41.564 96.600 2.119 6:55 42.906 41.752 96.604 2.127 7:00 43.071 41.938 96.608 2.135 7:05 43.232 42.121 96.612 2.143 7:10 43.392 42.301 96.615 2.150 7:15 43.551 42.478 96.619 2.158 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [2‐year] 7:20 43.712 42.653 96.623 2.165 7:25 43.875 42.825 96.626 2.172 7:30 44.039 42.997 96.630 2.179 7:35 44.206 43.168 96.633 2.187 7:40 44.376 43.339 96.637 2.194 7:45 44.549 43.510 96.640 2.201 7:50 44.726 43.682 96.644 2.208 7:55 44.917 43.856 96.647 2.215 8:00 45.134 44.034 96.651 2.223 8:05 45.399 44.223 96.655 2.231 8:10 45.735 44.429 96.659 2.239 8:15 46.153 44.662 96.664 2.249 8:20 46.659 44.930 96.669 2.260 8:25 47.248 45.241 96.676 2.273 8:30 47.910 45.603 96.683 2.288 8:35 48.636 46.016 96.691 2.305 8:40 49.416 46.483 96.701 2.324 8:45 50.240 47.004 96.711 2.345 8:50 51.118 47.579 96.722 2.368 8:55 52.080 48.210 96.735 2.394 9:00 53.162 48.905 96.749 2.422 9:05 54.392 49.677 96.764 2.453 9:10 55.755 50.536 96.781 2.487 9:15 57.211 51.487 96.799 2.524 9:20 58.724 52.531 96.819 2.566 9:25 60.267 53.659 96.841 2.610 9:30 61.819 54.890 96.864 2.656 9:35 63.382 56.156 96.888 2.705 9:40 64.963 57.480 96.913 2.756 9:45 66.567 58.859 96.939 2.808 9:50 68.204 60.289 96.965 2.862 9:55 69.879 61.767 96.992 2.917 10:00 71.593 62.946 97.014 2.975 10:05 73.361 64.058 97.034 3.036 10:10 75.192 65.257 97.055 3.103 10:15 77.087 66.542 97.078 3.173 10:20 79.069 67.913 97.103 3.248 10:25 81.158 69.371 97.128 3.327 10:30 83.369 70.924 97.156 3.410 10:35 85.733 72.576 97.184 3.499 10:40 88.251 74.337 97.215 3.592 10:45 90.906 76.212 97.247 3.690 10:50 93.690 78.207 97.281 3.794 10:55 96.567 80.324 97.316 3.903 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [2‐year] 11:00 99.482 82.556 97.353 4.018 11:05 102.420 84.896 97.392 4.136 11:10 105.369 87.334 97.432 4.259 11:15 108.321 89.860 97.473 4.384 11:20 111.333 92.468 97.515 4.513 11:25 114.477 95.161 97.558 4.644 11:30 117.833 97.952 97.602 4.779 11:35 121.855 100.889 97.647 4.920 11:40 127.200 104.087 97.697 5.072 11:45 134.613 107.752 97.753 5.244 11:50 146.939 112.318 97.822 5.455 11:55 167.934 118.651 97.916 5.744 12:00 202.071 127.797 98.049 6.168 12:05 248.056 140.760 98.232 6.793 12:10 296.483 158.910 98.479 7.635 12:15 334.101 181.364 98.772 8.633 12:20 351.973 205.317 99.071 9.663 12:25 351.299 227.231 99.335 10.593 12:30 336.619 245.248 99.544 11.334 12:35 314.277 257.823 99.688 11.843 12:40 289.661 264.829 99.768 12.122 12:45 267.781 267.045 99.793 12.210 12:50 249.633 265.714 99.778 12.158 12:55 234.644 261.962 99.735 12.008 13:00 221.858 256.624 99.675 11.794 13:05 211.138 250.314 99.603 11.540 13:10 202.352 243.499 99.524 11.263 13:15 195.274 236.562 99.444 10.979 13:20 189.477 229.758 99.364 10.698 13:25 184.624 223.240 99.287 10.427 13:30 180.436 217.106 99.214 10.168 13:35 176.647 211.343 99.144 9.922 13:40 173.160 205.939 99.078 9.689 13:45 169.936 200.878 99.016 9.470 13:50 166.913 196.028 98.956 9.263 13:55 164.082 191.457 98.899 9.069 14:00 161.464 187.194 98.846 8.886 14:05 159.041 183.217 98.795 8.714 14:10 156.800 179.508 98.748 8.553 14:15 154.743 176.048 98.703 8.401 14:20 152.838 172.822 98.662 8.259 14:25 151.085 169.816 98.623 8.125 14:30 149.480 167.017 98.586 8.001 14:35 147.978 164.408 98.552 7.884 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [2‐year] 14:40 146.560 161.975 98.520 7.774 14:45 145.229 159.703 98.489 7.671 14:50 143.891 157.572 98.461 7.574 14:55 142.424 155.553 98.434 7.482 15:00 140.695 153.600 98.408 7.392 15:05 138.619 151.661 98.381 7.303 15:10 136.292 149.694 98.355 7.212 15:15 133.893 147.745 98.327 7.118 15:20 131.568 145.632 98.299 7.022 15:25 129.414 143.586 98.271 6.924 15:30 127.510 141.495 98.242 6.827 15:35 125.845 139.490 98.214 6.732 15:40 124.381 137.553 98.187 6.640 15:45 123.076 135.698 98.161 6.551 15:50 121.896 133.933 98.136 6.466 15:55 120.824 132.260 98.112 6.385 16:00 119.849 130.679 98.090 6.309 16:05 118.942 129.189 98.069 6.236 16:10 118.093 127.784 98.049 6.168 16:15 117.296 126.461 98.030 6.103 16:20 116.539 125.212 98.012 6.041 16:25 115.817 123.995 97.994 5.983 16:30 115.133 122.773 97.976 5.929 16:35 114.476 121.634 97.960 5.878 16:40 113.846 120.568 97.944 5.830 16:45 113.247 119.569 97.929 5.785 16:50 112.671 118.632 97.916 5.743 16:55 112.114 117.749 97.903 5.703 17:00 111.578 116.915 97.890 5.665 17:05 111.052 116.126 97.879 5.629 17:10 110.536 115.376 97.867 5.595 17:15 110.036 114.662 97.857 5.562 17:20 109.547 113.980 97.847 5.531 17:25 109.069 113.326 97.837 5.501 17:30 108.604 112.700 97.827 5.473 17:35 108.148 112.097 97.818 5.445 17:40 107.702 111.517 97.810 5.418 17:45 107.271 110.957 97.801 5.392 17:50 106.740 110.409 97.793 5.367 17:55 105.913 109.843 97.785 5.341 18:00 104.565 109.207 97.775 5.311 18:05 102.573 108.429 97.763 5.275 18:10 100.091 107.453 97.748 5.230 18:15 97.413 106.259 97.730 5.174 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [2‐year] 18:20 94.803 104.871 97.709 5.109 18:25 92.422 103.339 97.685 5.036 18:30 90.395 101.723 97.660 4.960 18:35 88.720 100.084 97.635 4.882 18:40 87.348 98.468 97.610 4.804 18:45 86.192 96.906 97.585 4.729 18:50 85.213 95.419 97.562 4.657 18:55 84.380 94.015 97.539 4.589 19:00 83.675 92.701 97.519 4.524 19:05 83.066 91.478 97.499 4.464 19:10 82.529 90.345 97.481 4.408 19:15 82.048 89.298 97.464 4.357 19:20 81.606 88.330 97.448 4.308 19:25 81.194 87.435 97.434 4.264 19:30 80.810 86.607 97.420 4.222 19:35 80.448 85.840 97.408 4.184 19:40 80.104 85.127 97.396 4.148 19:45 79.778 84.465 97.385 4.115 19:50 79.466 83.848 97.375 4.083 19:55 79.166 83.272 97.365 4.054 20:00 78.879 82.732 97.356 4.027 20:05 78.601 82.227 97.348 4.001 20:10 78.332 81.752 97.340 3.977 20:15 78.073 81.304 97.333 3.954 20:20 77.820 80.881 97.326 3.932 20:25 77.571 80.481 97.319 3.912 20:30 77.330 80.100 97.312 3.892 20:35 77.094 79.738 97.306 3.873 20:40 76.862 79.393 97.301 3.855 20:45 76.633 79.062 97.295 3.838 20:50 76.404 78.744 97.290 3.822 20:55 76.176 78.438 97.285 3.806 21:00 75.950 78.142 97.280 3.791 21:05 75.726 77.856 97.275 3.776 21:10 75.506 77.577 97.270 3.761 21:15 75.292 77.306 97.265 3.747 21:20 75.085 77.044 97.261 3.734 21:25 74.883 76.788 97.257 3.720 21:30 74.687 76.541 97.252 3.707 21:35 74.495 76.299 97.248 3.695 21:40 74.304 76.065 97.244 3.683 21:45 74.114 75.836 97.240 3.671 21:50 73.922 75.612 97.237 3.659 21:55 73.731 75.392 97.233 3.647 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [2‐year] 22:00 73.542 75.176 97.229 3.636 22:05 73.358 74.964 97.225 3.625 22:10 73.178 74.755 97.222 3.614 22:15 73.001 74.551 97.218 3.603 22:20 72.826 74.350 97.215 3.592 22:25 72.653 74.153 97.212 3.582 22:30 72.483 73.959 97.208 3.572 22:35 72.315 73.768 97.205 3.562 22:40 72.149 73.580 97.202 3.552 22:45 71.988 73.395 97.198 3.542 22:50 71.830 73.214 97.195 3.532 22:55 71.673 73.035 97.192 3.523 23:00 71.518 72.860 97.189 3.514 23:05 71.365 72.687 97.186 3.504 23:10 71.211 72.517 97.183 3.495 23:15 71.059 72.349 97.180 3.486 23:20 70.908 72.183 97.177 3.478 23:25 70.756 72.019 97.175 3.469 23:30 70.605 71.857 97.172 3.460 23:35 70.454 71.696 97.169 3.452 23:40 70.303 71.536 97.166 3.443 23:45 70.157 71.378 97.163 3.435 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) 0:00 36.000 11.000 95.836 0.768 0:05 35.830 16.791 96.010 0.918 0:10 35.067 18.943 96.070 1.039 0:15 35.224 20.875 96.121 1.144 0:20 35.525 22.652 96.167 1.238 0:25 35.951 24.294 96.209 1.322 0:30 36.436 25.817 96.246 1.399 0:35 36.925 27.232 96.281 1.469 0:40 37.372 28.543 96.312 1.533 0:45 37.753 29.752 96.340 1.590 0:50 38.067 30.876 96.366 1.643 0:55 38.330 31.902 96.389 1.690 1:00 38.551 32.774 96.410 1.732 1:05 38.737 33.596 96.428 1.769 1:10 38.889 34.332 96.445 1.803 1:15 39.011 34.987 96.459 1.832 1:20 39.112 35.569 96.472 1.858 1:25 39.197 36.083 96.483 1.881 1:30 39.270 36.537 96.493 1.901 1:35 39.334 36.937 96.502 1.919 1:40 39.391 37.288 96.509 1.934 1:45 39.441 37.598 96.516 1.948 1:50 39.486 37.870 96.522 1.960 1:55 39.528 38.109 96.527 1.970 2:00 39.567 38.320 96.531 1.980 2:05 39.603 38.505 96.535 1.988 2:10 39.637 38.668 96.539 1.995 2:15 39.670 38.813 96.542 2.001 2:20 39.702 38.942 96.545 2.007 2:25 39.734 39.056 96.547 2.012 2:30 39.764 39.158 96.549 2.016 2:35 39.795 39.250 96.551 2.020 2:40 39.826 39.333 96.553 2.023 2:45 39.856 39.407 96.555 2.027 2:50 39.886 39.476 96.556 2.030 2:55 39.917 39.539 96.557 2.032 3:00 39.948 39.597 96.559 2.035 3:05 39.979 39.651 96.560 2.037 3:10 40.010 39.702 96.561 2.039 3:15 40.042 39.750 96.562 2.041 3:20 40.074 39.796 96.563 2.043 3:25 40.106 39.839 96.564 2.045 3:30 40.139 39.881 96.565 2.047 3:35 40.172 39.922 96.566 2.049 Double Box Culvert Outlet and Storage [10‐year] Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [10‐year] 3:40 40.205 39.961 96.566 2.051 3:45 40.239 40.000 96.567 2.052 3:50 40.274 40.038 96.568 2.054 3:55 40.309 40.076 96.569 2.055 4:00 40.344 40.113 96.570 2.057 4:05 40.381 40.150 96.570 2.059 4:10 40.418 40.187 96.571 2.060 4:15 40.455 40.224 96.572 2.062 4:20 40.493 40.261 96.573 2.063 4:25 40.532 40.299 96.574 2.065 4:30 40.572 40.336 96.574 2.067 4:35 40.612 40.374 96.575 2.068 4:40 40.653 40.413 96.576 2.070 4:45 40.694 40.452 96.577 2.072 4:50 40.737 40.491 96.578 2.073 4:55 40.780 40.531 96.578 2.075 5:00 40.824 40.571 96.579 2.077 5:05 40.869 40.612 96.580 2.078 5:10 40.915 40.654 96.581 2.080 5:15 40.961 40.697 96.582 2.082 5:20 41.009 40.739 96.583 2.084 5:25 41.058 40.783 96.584 2.086 5:30 41.108 40.828 96.585 2.088 5:35 41.159 40.874 96.586 2.090 5:40 41.214 40.921 96.587 2.092 5:45 41.271 40.969 96.588 2.094 5:50 41.340 41.019 96.589 2.096 5:55 41.444 41.075 96.590 2.098 6:00 41.609 41.142 96.591 2.101 6:05 41.860 41.231 96.593 2.105 6:10 42.185 41.350 96.596 2.110 6:15 42.548 41.502 96.599 2.116 6:20 42.922 41.688 96.603 2.124 6:25 43.284 41.900 96.607 2.133 6:30 43.619 42.135 96.612 2.143 6:35 43.929 42.382 96.617 2.154 6:40 44.221 42.638 96.622 2.164 6:45 44.499 42.899 96.628 2.175 6:50 44.764 43.162 96.633 2.186 6:55 45.018 43.425 96.638 2.197 7:00 45.263 43.687 96.644 2.208 7:05 45.505 43.946 96.649 2.219 7:10 45.760 44.204 96.654 2.230 7:15 46.047 44.464 96.660 2.241 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [10‐year] 7:20 46.394 44.734 96.665 2.252 7:25 46.827 45.023 96.671 2.264 7:30 47.359 45.341 96.678 2.277 7:35 47.991 45.702 96.685 2.292 7:40 48.720 46.113 96.693 2.308 7:45 49.532 46.582 96.703 2.328 7:50 50.416 47.110 96.713 2.349 7:55 51.360 47.701 96.725 2.373 8:00 52.353 48.354 96.738 2.400 8:05 53.392 49.067 96.752 2.428 8:10 54.473 49.838 96.767 2.459 8:15 55.590 50.665 96.783 2.492 8:20 56.746 51.546 96.800 2.527 8:25 57.939 52.479 96.818 2.564 8:30 59.169 53.463 96.837 2.602 8:35 60.438 54.523 96.857 2.642 8:40 61.749 55.598 96.877 2.684 8:45 63.100 56.723 96.899 2.727 8:50 64.575 57.901 96.921 2.772 8:55 66.345 59.162 96.944 2.819 9:00 68.613 60.558 96.970 2.872 9:05 71.518 62.167 96.999 2.932 9:10 74.978 63.466 97.023 3.004 9:15 78.774 65.037 97.051 3.091 9:20 82.725 66.891 97.084 3.192 9:25 86.673 69.011 97.122 3.308 9:30 90.511 71.367 97.163 3.434 9:35 94.243 73.922 97.208 3.570 9:40 97.898 76.646 97.254 3.713 9:45 101.517 79.513 97.303 3.862 9:50 105.135 82.509 97.353 4.015 9:55 108.769 85.619 97.404 4.173 10:00 112.432 88.834 97.456 4.334 10:05 116.173 92.149 97.510 4.497 10:10 120.012 95.565 97.564 4.664 10:15 123.959 99.083 97.619 4.834 10:20 128.066 102.708 97.676 5.006 10:25 132.369 106.452 97.733 5.183 10:30 136.890 110.330 97.792 5.363 10:35 141.692 114.361 97.852 5.549 10:40 146.774 118.564 97.915 5.740 10:45 152.108 122.957 97.979 5.937 10:50 157.686 127.255 98.041 6.142 10:55 163.434 131.644 98.104 6.356 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [10‐year] 11:00 169.247 136.266 98.169 6.578 11:05 175.093 141.099 98.237 6.809 11:10 180.944 146.149 98.306 7.045 11:15 186.775 151.319 98.377 7.287 11:20 192.719 156.669 98.449 7.533 11:25 198.936 162.180 98.522 7.783 11:30 205.607 167.884 98.597 8.039 11:35 213.800 173.898 98.676 8.306 11:40 224.889 180.506 98.761 8.596 11:45 240.465 188.186 98.858 8.928 11:50 266.695 197.950 98.980 9.345 11:55 310.994 211.383 99.145 9.923 12:00 382.081 231.792 99.388 10.783 12:05 476.302 262.610 99.743 12.034 12:10 573.696 303.136 100.207 13.698 12:15 647.658 351.639 100.740 15.646 12:20 680.566 396.900 101.272 17.625 12:25 676.065 420.782 101.762 19.480 12:30 643.610 439.604 102.171 21.059 12:35 595.859 457.167 102.472 22.247 12:40 543.949 471.441 102.656 22.973 12:45 497.964 477.591 102.737 23.293 12:50 459.933 477.759 102.739 23.301 12:55 428.190 473.582 102.684 23.084 13:00 401.051 466.191 102.588 22.703 13:05 378.249 456.429 102.463 22.210 13:10 359.530 446.041 102.319 21.642 13:15 344.369 439.142 102.161 21.018 13:20 331.927 431.489 101.991 20.349 13:25 321.533 422.997 101.809 19.657 13:30 312.605 414.186 101.624 18.958 13:35 304.611 405.208 101.440 18.262 13:40 297.343 396.238 101.259 17.575 13:45 290.681 383.917 101.083 16.908 13:50 284.473 368.395 100.919 16.299 13:55 278.683 354.318 100.769 15.751 14:00 273.328 341.825 100.633 15.256 14:05 268.363 330.510 100.510 14.806 14:10 263.756 320.328 100.398 14.397 14:15 259.525 311.133 100.296 14.024 14:20 255.605 302.804 100.203 13.684 14:25 252.001 295.240 100.118 13.373 14:30 248.699 288.361 100.040 13.087 14:35 245.602 282.001 99.967 12.825 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [10‐year] 14:40 242.678 276.094 99.899 12.585 14:45 239.934 270.697 99.836 12.364 14:50 236.982 265.747 99.778 12.159 14:55 233.299 260.879 99.723 11.965 15:00 228.287 256.120 99.669 11.774 15:05 221.630 251.217 99.613 11.576 15:10 213.805 245.971 99.553 11.364 15:15 205.594 240.319 99.487 11.133 15:20 197.658 234.331 99.418 10.888 15:25 190.412 228.141 99.345 10.631 15:30 184.193 221.927 99.272 10.371 15:35 178.969 215.859 99.199 10.115 15:40 174.576 210.028 99.128 9.865 15:45 170.801 204.501 99.061 9.627 15:50 167.524 199.305 98.997 9.402 15:55 164.666 194.310 98.935 9.190 16:00 162.167 189.698 98.877 8.993 16:05 159.934 185.453 98.824 8.811 16:10 157.917 181.548 98.774 8.641 16:15 156.091 177.958 98.728 8.485 16:20 154.407 174.657 98.685 8.340 16:25 152.828 171.615 98.646 8.205 16:30 151.330 168.806 98.609 8.080 16:35 149.882 166.201 98.575 7.964 16:40 148.488 163.778 98.543 7.855 16:45 147.176 161.517 98.514 7.753 16:50 145.949 159.405 98.485 7.657 16:55 144.800 157.432 98.459 7.568 17:00 143.722 155.587 98.434 7.483 17:05 142.689 153.858 98.411 7.404 17:10 141.696 152.234 98.389 7.329 17:15 140.746 150.707 98.368 7.259 17:20 139.828 149.266 98.349 7.192 17:25 138.932 147.903 98.330 7.128 17:30 138.052 146.647 98.313 7.068 17:35 137.167 145.377 98.296 7.010 17:40 136.280 144.208 98.279 6.954 17:45 135.407 143.095 98.264 6.901 17:50 134.412 141.936 98.248 6.848 17:55 133.072 140.825 98.233 6.796 18:00 131.128 139.645 98.216 6.740 18:05 128.443 138.315 98.198 6.676 18:10 125.210 136.770 98.176 6.603 18:15 121.787 134.993 98.151 6.517 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [10‐year] 18:20 118.478 133.011 98.123 6.422 18:25 115.452 130.881 98.093 6.319 18:30 112.830 128.671 98.061 6.211 18:35 110.599 126.444 98.029 6.102 18:40 108.718 124.235 97.997 5.994 18:45 107.124 121.896 97.963 5.889 18:50 105.790 119.696 97.931 5.791 18:55 104.675 117.647 97.901 5.698 19:00 103.732 115.752 97.873 5.612 19:05 102.898 114.007 97.847 5.532 19:10 102.137 112.402 97.823 5.459 19:15 101.434 110.926 97.801 5.391 19:20 100.774 109.565 97.780 5.328 19:25 100.144 108.309 97.761 5.269 19:30 99.536 107.144 97.744 5.215 19:35 98.931 106.060 97.727 5.164 19:40 98.330 105.044 97.712 5.117 19:45 97.743 104.089 97.697 5.072 19:50 97.185 103.189 97.683 5.029 19:55 96.674 102.341 97.670 4.989 20:00 96.232 101.544 97.658 4.951 20:05 95.854 100.802 97.646 4.916 20:10 95.512 100.113 97.635 4.883 20:15 95.173 99.472 97.625 4.852 20:20 94.805 98.871 97.616 4.824 20:25 94.402 98.300 97.607 4.796 20:30 93.977 97.751 97.598 4.770 20:35 93.538 97.219 97.590 4.744 20:40 93.098 96.699 97.582 4.719 20:45 92.671 96.192 97.574 4.694 20:50 92.264 95.698 97.566 4.671 20:55 91.885 95.218 97.559 4.647 21:00 91.548 94.755 97.551 4.625 21:05 91.249 94.311 97.544 4.603 21:10 90.967 93.889 97.537 4.583 21:15 90.673 93.485 97.531 4.563 21:20 90.346 93.093 97.525 4.544 21:25 89.993 92.709 97.519 4.525 21:30 89.641 92.330 97.513 4.506 21:35 89.310 91.956 97.507 4.488 21:40 89.004 91.589 97.501 4.470 21:45 88.722 91.233 97.495 4.452 21:50 88.448 90.887 97.489 4.435 21:55 88.169 90.551 97.484 4.419 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [10‐year] 22:00 87.876 90.222 97.479 4.402 22:05 87.567 89.896 97.474 4.386 22:10 87.241 89.572 97.468 4.370 22:15 86.909 89.248 97.463 4.354 22:20 86.574 88.923 97.458 4.338 22:25 86.249 88.597 97.453 4.322 22:30 85.952 88.275 97.447 4.306 22:35 85.690 87.958 97.442 4.290 22:40 85.454 87.649 97.437 4.275 22:45 85.232 87.352 97.432 4.260 22:50 85.003 87.064 97.428 4.245 22:55 84.758 86.783 97.423 4.231 23:00 84.492 86.505 97.418 4.217 23:05 84.208 86.229 97.414 4.203 23:10 83.922 85.951 97.409 4.189 23:15 83.656 85.674 97.405 4.176 23:20 83.416 85.400 97.400 4.162 23:25 83.198 85.132 97.396 4.148 23:30 82.988 84.872 97.392 4.135 23:35 82.775 84.618 97.388 4.122 23:40 82.560 84.369 97.383 4.110 23:45 82.355 84.126 97.379 4.097 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) 0:00 36.000 11.000 95.836 0.768 0:05 35.832 16.792 96.010 0.918 0:10 35.085 18.944 96.070 1.039 0:15 35.287 20.881 96.121 1.145 0:20 35.674 22.671 96.168 1.239 0:25 36.221 24.337 96.210 1.325 0:30 36.844 25.899 96.248 1.403 0:35 37.471 27.368 96.284 1.475 0:40 38.044 28.744 96.317 1.542 0:45 38.532 30.026 96.347 1.603 0:50 38.934 31.209 96.374 1.659 0:55 39.270 32.296 96.399 1.710 1:00 39.554 33.289 96.421 1.755 1:05 39.791 34.187 96.441 1.796 1:10 39.985 34.996 96.459 1.833 1:15 40.141 35.720 96.475 1.865 1:20 40.270 36.365 96.489 1.894 1:25 40.379 36.937 96.502 1.919 1:30 40.472 37.443 96.513 1.941 1:35 40.553 37.890 96.522 1.961 1:40 40.625 38.285 96.531 1.978 1:45 40.689 38.633 96.538 1.993 1:50 40.746 38.939 96.545 2.006 1:55 40.800 39.210 96.550 2.018 2:00 40.849 39.448 96.556 2.028 2:05 40.894 39.659 96.560 2.038 2:10 40.938 39.845 96.564 2.046 2:15 40.980 40.010 96.567 2.053 2:20 41.020 40.157 96.571 2.059 2:25 41.060 40.288 96.573 2.065 2:30 41.098 40.406 96.576 2.070 2:35 41.137 40.512 96.578 2.074 2:40 41.176 40.608 96.580 2.078 2:45 41.214 40.696 96.582 2.082 2:50 41.252 40.776 96.584 2.085 2:55 41.291 40.850 96.585 2.089 3:00 41.330 40.919 96.587 2.092 3:05 41.369 40.983 96.588 2.094 3:10 41.408 41.044 96.589 2.097 3:15 41.448 41.101 96.590 2.099 3:20 41.488 41.156 96.591 2.102 3:25 41.529 41.209 96.593 2.104 3:30 41.570 41.260 96.594 2.106 3:35 41.611 41.310 96.595 2.108 Double Box Culvert Outlet and Storage [25‐year] Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [25‐year] 3:40 41.653 41.358 96.596 2.110 3:45 41.696 41.406 96.597 2.112 3:50 41.740 41.453 96.598 2.114 3:55 41.784 41.499 96.599 2.116 4:00 41.829 41.545 96.600 2.118 4:05 41.874 41.591 96.601 2.120 4:10 41.921 41.637 96.602 2.122 4:15 41.968 41.683 96.602 2.124 4:20 42.016 41.730 96.603 2.126 4:25 42.066 41.777 96.604 2.128 4:30 42.116 41.824 96.605 2.130 4:35 42.167 41.872 96.606 2.132 4:40 42.222 41.920 96.607 2.134 4:45 42.281 41.970 96.608 2.136 4:50 42.345 42.022 96.610 2.138 4:55 42.418 42.076 96.611 2.141 5:00 42.498 42.134 96.612 2.143 5:05 42.586 42.195 96.613 2.146 5:10 42.683 42.262 96.614 2.148 5:15 42.786 42.333 96.616 2.151 5:20 42.898 42.410 96.618 2.155 5:25 43.017 42.493 96.619 2.158 5:30 43.142 42.582 96.621 2.162 5:35 43.273 42.676 96.623 2.166 5:40 43.409 42.777 96.625 2.170 5:45 43.549 42.883 96.627 2.175 5:50 43.704 42.996 96.630 2.179 5:55 43.907 43.119 96.632 2.185 6:00 44.195 43.261 96.635 2.190 6:05 44.600 43.434 96.639 2.198 6:10 45.112 43.650 96.643 2.207 6:15 45.700 43.918 96.649 2.218 6:20 46.357 44.241 96.655 2.231 6:25 47.086 44.622 96.663 2.247 6:30 47.893 45.063 96.672 2.265 6:35 48.791 45.569 96.682 2.286 6:40 49.786 46.145 96.694 2.310 6:45 50.869 46.795 96.707 2.336 6:50 52.026 47.522 96.721 2.366 6:55 53.239 48.324 96.737 2.398 7:00 54.493 49.199 96.755 2.433 7:05 55.785 50.142 96.773 2.471 7:10 57.112 51.149 96.793 2.511 7:15 58.468 52.216 96.813 2.553 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [25‐year] 7:20 59.854 53.339 96.835 2.597 7:25 61.270 54.542 96.857 2.643 7:30 62.712 55.761 96.881 2.690 7:35 64.185 57.029 96.904 2.738 7:40 65.688 58.342 96.929 2.788 7:45 67.219 59.698 96.954 2.840 7:50 68.782 61.096 96.980 2.892 7:55 70.378 62.428 97.004 2.946 8:00 72.003 63.448 97.023 3.003 8:05 73.664 64.546 97.043 3.063 8:10 75.363 65.719 97.064 3.128 8:15 77.099 66.962 97.086 3.196 8:20 78.879 68.275 97.109 3.268 8:25 80.704 69.654 97.133 3.342 8:30 82.571 71.098 97.159 3.420 8:35 84.489 72.606 97.185 3.500 8:40 86.459 74.177 97.212 3.583 8:45 88.479 75.811 97.240 3.669 8:50 90.707 77.517 97.269 3.758 8:55 93.420 79.330 97.300 3.852 9:00 96.949 81.321 97.333 3.955 9:05 101.497 83.588 97.371 4.070 9:10 106.894 86.217 97.414 4.203 9:15 112.769 89.262 97.463 4.355 9:20 118.790 92.720 97.519 4.525 9:25 124.735 96.554 97.580 4.712 9:30 130.418 100.701 97.645 4.911 9:35 135.858 105.094 97.712 5.119 9:40 141.112 109.677 97.782 5.333 9:45 146.260 114.406 97.853 5.551 9:50 151.366 119.252 97.925 5.771 9:55 156.461 124.196 97.997 5.992 10:00 161.567 128.772 98.063 6.216 10:05 166.760 133.455 98.129 6.443 10:10 172.067 138.265 98.197 6.674 10:15 177.499 143.248 98.266 6.908 10:20 183.151 148.279 98.335 7.146 10:25 189.084 153.514 98.406 7.388 10:30 195.354 158.927 98.479 7.636 10:35 202.064 164.551 98.554 7.890 10:40 209.188 170.421 98.631 8.152 10:45 216.654 176.561 98.710 8.423 10:50 224.422 182.985 98.792 8.704 10:55 232.357 189.690 98.877 8.993 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [25‐year] 11:00 240.285 196.654 98.964 9.290 11:05 248.165 203.698 99.051 9.592 11:10 255.970 210.848 99.138 9.901 11:15 263.688 218.160 99.227 10.212 11:20 271.504 225.623 99.316 10.527 11:25 279.624 233.267 99.405 10.844 11:30 288.270 241.108 99.497 11.166 11:35 298.867 249.301 99.591 11.499 11:40 313.161 258.210 99.693 11.858 11:45 333.179 268.397 99.809 12.269 11:50 367.352 281.098 99.956 12.789 11:55 425.415 298.812 100.158 13.520 12:00 518.759 325.845 100.459 14.619 12:05 642.081 366.591 100.900 16.229 12:10 768.429 407.018 101.477 18.400 12:15 862.687 440.012 102.181 21.096 12:20 902.095 490.475 102.910 23.976 12:25 892.225 535.542 103.552 26.617 12:30 845.862 569.530 104.073 28.793 12:35 779.856 592.167 104.438 30.390 12:40 709.369 605.939 104.667 31.392 12:45 647.672 612.396 104.776 31.869 12:50 597.516 613.298 104.792 31.936 12:55 556.174 610.068 104.737 31.696 13:00 521.278 603.698 104.629 31.227 13:05 492.196 594.936 104.484 30.589 13:10 468.453 584.419 104.311 29.836 13:15 449.201 572.682 104.123 29.012 13:20 433.306 559.895 103.922 28.151 13:25 419.905 546.208 103.712 27.280 13:30 408.242 532.311 103.504 26.419 13:35 397.631 518.364 103.301 25.576 13:40 387.852 504.473 103.103 24.759 13:45 378.810 490.425 102.909 23.973 13:50 370.357 476.295 102.720 23.225 13:55 362.483 462.519 102.540 22.516 14:00 355.229 449.250 102.371 21.848 14:05 348.536 441.230 102.208 21.205 14:10 342.334 434.053 102.048 20.570 14:15 336.625 426.554 101.884 19.945 14:20 331.319 418.941 101.723 19.333 14:25 326.432 411.385 101.566 18.739 14:30 321.959 403.963 101.414 18.165 14:35 317.774 396.704 101.268 17.611 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [25‐year] 14:40 313.833 388.304 101.129 17.082 14:45 310.128 376.136 101.001 16.599 14:50 306.143 365.031 100.883 16.169 14:55 301.212 355.073 100.777 15.780 15:00 294.581 345.937 100.678 15.418 15:05 285.868 337.018 100.581 15.065 15:10 275.712 328.081 100.483 14.709 15:15 265.123 318.985 100.383 14.343 15:20 254.925 309.759 100.281 13.968 15:25 245.621 300.524 100.177 13.591 15:30 237.607 291.446 100.075 13.216 15:35 230.830 282.665 99.974 12.852 15:40 225.072 274.133 99.876 12.505 15:45 220.086 266.202 99.783 12.177 15:50 215.740 258.530 99.696 11.871 15:55 211.956 251.490 99.616 11.587 16:00 208.673 245.043 99.542 11.326 16:05 205.768 239.157 99.474 11.086 16:10 203.155 233.793 99.412 10.865 16:15 200.766 228.902 99.354 10.663 16:20 198.525 224.382 99.302 10.477 16:25 196.403 220.363 99.253 10.305 16:30 194.398 216.611 99.208 10.146 16:35 192.488 213.146 99.166 9.999 16:40 190.678 209.934 99.127 9.861 16:45 188.987 206.955 99.091 9.733 16:50 187.393 204.184 99.057 9.614 16:55 185.876 201.604 99.025 9.502 17:00 184.419 199.182 98.995 9.397 17:05 182.988 196.849 98.966 9.298 17:10 181.581 194.662 98.939 9.205 17:15 180.213 192.602 98.914 9.118 17:20 178.882 190.655 98.889 9.034 17:25 177.605 188.809 98.866 8.955 17:30 176.409 187.059 98.844 8.880 17:35 175.276 185.400 98.823 8.808 17:40 174.178 183.826 98.803 8.740 17:45 173.084 182.327 98.784 8.675 17:50 171.760 180.873 98.765 8.612 17:55 169.897 179.403 98.747 8.548 18:00 167.151 177.815 98.726 8.478 18:05 163.356 175.987 98.703 8.398 18:10 158.802 173.825 98.675 8.303 18:15 153.991 171.308 98.642 8.192 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [25‐year] 18:20 149.336 168.485 98.605 8.066 18:25 145.080 165.443 98.565 7.930 18:30 141.406 162.288 98.524 7.788 18:35 138.306 159.119 98.482 7.644 18:40 135.705 156.014 98.440 7.503 18:45 133.493 153.025 98.400 7.366 18:50 131.615 150.185 98.361 7.234 18:55 130.020 147.575 98.325 7.110 19:00 128.658 145.014 98.291 6.993 19:05 127.460 142.755 98.259 6.884 19:10 126.393 140.554 98.229 6.783 19:15 125.438 138.577 98.201 6.689 19:20 124.574 136.752 98.176 6.602 19:25 123.777 135.067 98.152 6.521 19:30 123.031 133.511 98.130 6.446 19:35 122.301 132.069 98.110 6.376 19:40 121.573 130.726 98.091 6.311 19:45 120.839 129.468 98.073 6.250 19:50 120.099 128.282 98.056 6.192 19:55 119.365 127.159 98.040 6.137 20:00 118.665 126.091 98.024 6.084 20:05 118.005 125.078 98.010 6.035 20:10 117.391 124.084 97.995 5.987 20:15 116.826 123.084 97.981 5.943 20:20 116.299 122.150 97.967 5.901 20:25 115.804 121.279 97.954 5.862 20:30 115.335 120.465 97.942 5.825 20:35 114.877 119.703 97.931 5.791 20:40 114.413 118.986 97.921 5.759 20:45 113.928 118.303 97.911 5.728 20:50 113.408 117.648 97.901 5.698 20:55 112.862 117.010 97.892 5.669 21:00 112.309 116.386 97.882 5.641 21:05 111.763 115.774 97.873 5.613 21:10 111.233 115.173 97.864 5.586 21:15 110.730 114.585 97.856 5.559 21:20 110.258 114.012 97.847 5.533 21:25 109.826 113.457 97.839 5.507 21:30 109.444 112.923 97.831 5.483 21:35 109.108 112.415 97.823 5.459 21:40 108.793 111.932 97.816 5.437 21:45 108.467 111.473 97.809 5.416 21:50 108.099 111.030 97.802 5.396 21:55 107.687 110.594 97.796 5.375 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [25‐year] 22:00 107.243 110.161 97.789 5.355 22:05 106.781 109.725 97.783 5.335 22:10 106.314 109.286 97.776 5.315 22:15 105.859 108.844 97.769 5.294 22:20 105.423 108.402 97.763 5.274 22:25 105.017 107.964 97.756 5.253 22:30 104.654 107.534 97.750 5.233 22:35 104.331 107.116 97.743 5.214 22:40 104.025 106.713 97.737 5.195 22:45 103.705 106.322 97.731 5.177 22:50 103.347 105.940 97.725 5.159 22:55 102.964 105.559 97.719 5.141 23:00 102.581 105.178 97.714 5.123 23:05 102.221 104.799 97.708 5.105 23:10 101.888 104.425 97.702 5.088 23:15 101.581 104.059 97.696 5.070 23:20 101.281 103.702 97.691 5.053 23:25 100.976 103.352 97.686 5.037 23:30 100.658 103.008 97.680 5.021 23:35 100.327 102.667 97.675 5.005 23:40 100.000 102.328 97.670 4.988 23:45 99.700 101.993 97.665 4.973 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) 0:00 36.000 11.000 95.836 0.768 0:05 35.835 16.792 96.010 0.918 0:10 35.109 18.946 96.070 1.040 0:15 35.367 20.889 96.121 1.145 0:20 35.861 22.695 96.168 1.240 0:25 36.560 24.392 96.211 1.327 0:30 37.357 26.003 96.251 1.408 0:35 38.157 27.538 96.288 1.484 0:40 38.888 28.997 96.323 1.554 0:45 39.509 30.372 96.355 1.620 0:50 40.021 31.681 96.384 1.680 0:55 40.448 32.843 96.411 1.735 1:00 40.808 33.936 96.436 1.785 1:05 41.109 34.931 96.458 1.830 1:10 41.354 35.831 96.478 1.870 1:15 41.551 36.640 96.495 1.906 1:20 41.713 37.363 96.511 1.938 1:25 41.850 38.007 96.525 1.966 1:30 41.966 38.578 96.537 1.991 1:35 42.067 39.084 96.548 2.013 1:40 42.157 39.531 96.557 2.032 1:45 42.236 39.926 96.566 2.049 1:50 42.307 40.274 96.573 2.064 1:55 42.372 40.582 96.579 2.077 2:00 42.432 40.854 96.585 2.089 2:05 42.488 41.094 96.590 2.099 2:10 42.541 41.307 96.595 2.108 2:15 42.592 41.496 96.599 2.116 2:20 42.641 41.664 96.602 2.123 2:25 42.688 41.814 96.605 2.130 2:30 42.735 41.950 96.608 2.135 2:35 42.782 42.072 96.611 2.140 2:40 42.828 42.182 96.613 2.145 2:45 42.874 42.283 96.615 2.149 2:50 42.920 42.376 96.617 2.153 2:55 42.966 42.462 96.619 2.157 3:00 43.013 42.541 96.620 2.160 3:05 43.059 42.616 96.622 2.163 3:10 43.107 42.687 96.623 2.166 3:15 43.154 42.754 96.625 2.169 3:20 43.202 42.818 96.626 2.172 3:25 43.251 42.880 96.627 2.174 3:30 43.299 42.940 96.629 2.177 3:35 43.349 42.999 96.630 2.179 Double Box Culvert Outlet and Storage [50‐year] Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [50‐year] 3:40 43.399 43.056 96.631 2.182 3:45 43.451 43.112 96.632 2.184 3:50 43.507 43.168 96.633 2.187 3:55 43.568 43.224 96.634 2.189 4:00 43.636 43.281 96.636 2.191 4:05 43.713 43.341 96.637 2.194 4:10 43.800 43.404 96.638 2.196 4:15 43.898 43.472 96.639 2.199 4:20 44.006 43.545 96.641 2.202 4:25 44.124 43.625 96.643 2.206 4:30 44.251 43.711 96.644 2.209 4:35 44.388 43.803 96.646 2.213 4:40 44.532 43.904 96.648 2.217 4:45 44.683 44.011 96.651 2.222 4:50 44.840 44.126 96.653 2.227 4:55 45.004 44.248 96.655 2.232 5:00 45.171 44.376 96.658 2.237 5:05 45.343 44.511 96.661 2.243 5:10 45.521 44.653 96.664 2.248 5:15 45.712 44.801 96.667 2.254 5:20 45.931 44.958 96.670 2.261 5:25 46.202 45.129 96.673 2.268 5:30 46.549 45.321 96.677 2.276 5:35 46.989 45.545 96.682 2.285 5:40 47.526 45.809 96.687 2.296 5:45 48.153 46.124 96.693 2.309 5:50 48.894 46.497 96.701 2.324 5:55 49.819 46.942 96.710 2.342 6:00 51.018 47.486 96.721 2.364 6:05 52.563 48.161 96.734 2.392 6:10 54.418 49.001 96.751 2.426 6:15 56.486 50.024 96.771 2.466 6:20 58.665 51.230 96.794 2.514 6:25 60.878 52.604 96.821 2.568 6:30 63.062 54.123 96.850 2.628 6:35 65.207 55.789 96.881 2.691 6:40 67.318 57.518 96.914 2.757 6:45 69.405 59.325 96.947 2.826 6:50 71.474 61.195 96.982 2.896 6:55 73.524 62.824 97.011 2.968 7:00 75.560 64.192 97.036 3.044 7:05 77.594 65.647 97.062 3.124 7:10 79.636 67.182 97.090 3.208 7:15 81.683 68.789 97.118 3.295 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [50‐year] 7:20 83.744 70.461 97.147 3.386 7:25 85.821 72.195 97.178 3.478 7:30 87.913 73.983 97.209 3.573 7:35 90.029 75.825 97.240 3.670 7:40 92.169 77.716 97.272 3.769 7:45 94.333 79.655 97.305 3.869 7:50 96.527 81.638 97.338 3.971 7:55 98.755 83.666 97.372 4.074 8:00 101.015 85.736 97.406 4.179 8:05 103.316 87.850 97.440 4.285 8:10 105.661 90.006 97.475 4.392 8:15 108.046 92.206 97.511 4.500 8:20 110.483 94.450 97.546 4.610 8:25 112.972 96.740 97.583 4.721 8:30 115.510 99.077 97.619 4.833 8:35 118.110 101.463 97.656 4.947 8:40 120.773 103.899 97.694 5.063 8:45 123.496 106.389 97.732 5.180 8:50 126.370 108.939 97.771 5.299 8:55 129.529 111.572 97.811 5.421 9:00 133.125 114.329 97.852 5.547 9:05 137.259 117.263 97.895 5.681 9:10 141.834 120.422 97.942 5.823 9:15 146.658 123.828 97.991 5.976 9:20 151.587 127.189 98.040 6.138 9:25 156.514 130.729 98.091 6.311 9:30 161.347 134.477 98.144 6.492 9:35 166.117 138.400 98.199 6.680 9:40 170.858 142.530 98.256 6.873 9:45 175.606 146.704 98.313 7.070 9:50 180.421 150.983 98.372 7.271 9:55 185.320 155.422 98.432 7.476 10:00 190.310 159.970 98.493 7.683 10:05 195.459 164.635 98.555 7.894 10:10 200.786 169.422 98.618 8.108 10:15 206.292 174.343 98.681 8.326 10:20 212.052 179.412 98.747 8.548 10:25 218.082 184.647 98.813 8.776 10:30 224.375 190.067 98.882 9.009 10:35 231.018 195.692 98.952 9.249 10:40 238.020 201.484 99.024 9.496 10:45 245.362 207.411 99.096 9.753 10:50 253.070 213.627 99.172 10.019 10:55 261.034 220.140 99.250 10.296 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [50‐year] 11:00 269.089 226.954 99.331 10.582 11:05 277.190 234.043 99.414 10.876 11:10 285.281 241.349 99.499 11.175 11:15 293.302 248.835 99.586 11.480 11:20 301.619 256.476 99.673 11.788 11:25 310.699 264.353 99.762 12.103 11:30 321.078 272.330 99.855 12.431 11:35 334.739 280.982 99.955 12.784 11:40 353.749 290.744 100.066 13.185 11:45 380.423 302.456 100.199 13.670 11:50 424.894 318.057 100.373 14.305 11:55 498.518 340.797 100.622 15.215 12:00 614.535 375.613 100.995 16.578 12:05 765.898 409.759 101.533 18.613 12:10 919.755 444.181 102.276 21.472 12:15 1033.733 507.211 103.142 24.919 12:20 1080.486 565.261 104.006 28.499 12:25 1067.042 611.951 104.769 31.836 12:30 1008.735 804.741 105.316 34.299 12:35 925.650 928.170 105.453 34.929 12:40 836.445 888.918 105.412 34.740 12:45 757.323 815.495 105.329 34.359 12:50 691.917 748.178 105.243 33.964 12:55 637.159 692.405 105.159 33.580 13:00 590.607 648.293 105.075 33.192 13:05 551.678 624.047 104.976 32.744 13:10 519.830 616.325 104.843 32.162 13:15 493.942 606.624 104.679 31.442 13:20 472.645 595.510 104.493 30.631 13:25 454.908 583.417 104.295 29.765 13:30 439.840 570.678 104.091 28.873 13:35 426.618 557.122 103.879 27.973 13:40 414.849 543.046 103.664 27.082 13:45 404.238 528.925 103.454 26.212 13:50 394.455 514.868 103.250 25.368 13:55 385.387 500.962 103.054 24.556 14:00 377.007 486.823 102.861 23.780 14:05 369.233 472.857 102.675 23.046 14:10 362.001 459.322 102.500 22.355 14:15 355.336 446.752 102.335 21.705 14:20 349.130 439.810 102.176 21.078 14:25 343.386 432.762 102.019 20.458 14:30 338.073 425.380 101.859 19.849 14:35 333.055 417.970 101.703 19.256 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [50‐year] 14:40 328.317 410.629 101.551 18.680 14:45 323.901 403.422 101.403 18.123 14:50 319.579 396.363 101.261 17.585 14:55 315.066 387.981 101.125 17.069 15:00 310.049 375.951 100.999 16.591 15:05 304.310 364.718 100.880 16.156 15:10 298.071 354.412 100.770 15.754 15:15 291.712 344.903 100.667 15.377 15:20 285.538 335.902 100.569 15.021 15:25 279.781 327.446 100.476 14.683 15:30 274.650 319.523 100.389 14.364 15:35 270.128 312.138 100.307 14.065 15:40 266.125 305.284 100.231 13.786 15:45 262.556 298.945 100.160 13.526 15:50 259.331 293.096 100.093 13.284 15:55 256.385 287.705 100.032 13.060 16:00 253.662 282.664 99.974 12.852 16:05 251.076 277.931 99.920 12.660 16:10 248.601 273.562 99.869 12.481 16:15 246.236 269.513 99.822 12.315 16:20 243.957 265.773 99.778 12.160 16:25 241.771 262.128 99.737 12.015 16:30 239.705 258.736 99.699 11.879 16:35 237.738 255.574 99.663 11.752 16:40 235.862 252.620 99.629 11.633 16:45 234.077 249.851 99.597 11.521 16:50 232.354 247.245 99.567 11.415 16:55 230.681 244.787 99.539 11.316 17:00 229.059 242.461 99.512 11.221 17:05 227.467 240.253 99.487 11.131 17:10 225.916 238.149 99.462 11.045 17:15 224.428 236.142 99.439 10.962 17:20 222.986 234.222 99.417 10.883 17:25 221.578 232.383 99.395 10.807 17:30 220.196 230.617 99.374 10.734 17:35 218.821 228.913 99.354 10.663 17:40 217.470 227.266 99.335 10.595 17:45 216.176 225.671 99.316 10.528 17:50 214.640 224.092 99.298 10.463 17:55 212.384 222.506 99.279 10.396 18:00 208.851 220.711 99.257 10.320 18:05 203.742 218.541 99.231 10.228 18:10 197.468 215.849 99.199 10.114 18:15 190.737 212.600 99.160 9.976 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [50‐year] 18:20 184.174 208.859 99.114 9.815 18:25 178.179 204.765 99.064 9.639 18:30 173.076 200.482 99.011 9.453 18:35 168.870 196.064 98.957 9.265 18:40 165.403 191.733 98.903 9.080 18:45 162.460 187.599 98.851 8.903 18:50 159.928 183.698 98.801 8.735 18:55 157.753 180.050 98.755 8.576 19:00 155.901 176.661 98.711 8.428 19:05 154.313 173.534 98.671 8.290 19:10 152.937 170.661 98.634 8.163 19:15 151.732 168.030 98.599 8.046 19:20 150.640 165.623 98.568 7.938 19:25 149.627 163.419 98.539 7.839 19:30 148.670 161.396 98.512 7.748 19:35 147.742 159.533 98.487 7.663 19:40 146.837 157.810 98.464 7.585 19:45 145.958 156.210 98.443 7.512 19:50 145.099 154.717 98.423 7.443 19:55 144.272 153.318 98.404 7.379 20:00 143.495 152.006 98.386 7.319 20:05 142.767 150.776 98.369 7.262 20:10 142.077 149.620 98.354 7.208 20:15 141.411 148.533 98.339 7.158 20:20 140.747 147.567 98.325 7.110 20:25 140.087 146.560 98.311 7.064 20:30 139.445 145.605 98.299 7.020 20:35 138.819 144.716 98.286 6.979 20:40 138.204 143.888 98.275 6.939 20:45 137.593 143.091 98.263 6.901 20:50 136.971 142.319 98.253 6.863 20:55 136.342 141.486 98.242 6.827 21:00 135.722 140.747 98.232 6.792 21:05 135.114 140.026 98.222 6.758 21:10 134.512 139.322 98.212 6.724 21:15 133.910 138.633 98.202 6.691 21:20 133.302 137.956 98.193 6.659 21:25 132.707 137.290 98.183 6.627 21:30 132.154 136.637 98.174 6.596 21:35 131.655 136.003 98.165 6.566 21:40 131.193 135.390 98.157 6.536 21:45 130.745 134.799 98.148 6.508 21:50 130.278 134.227 98.140 6.480 21:55 129.787 133.667 98.132 6.453 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [50‐year] 22:00 129.279 133.117 98.125 6.427 22:05 128.763 132.572 98.117 6.401 22:10 128.253 132.032 98.109 6.374 22:15 127.763 131.498 98.102 6.349 22:20 127.291 130.972 98.094 6.323 22:25 126.834 130.455 98.087 6.298 22:30 126.390 129.947 98.080 6.273 22:35 125.954 129.449 98.072 6.249 22:40 125.523 128.959 98.065 6.225 22:45 125.100 128.479 98.059 6.201 22:50 124.681 128.007 98.052 6.178 22:55 124.263 127.542 98.045 6.156 23:00 123.850 127.085 98.039 6.133 23:05 123.437 126.634 98.032 6.111 23:10 123.023 126.188 98.026 6.089 23:15 122.614 125.747 98.019 6.067 23:20 122.203 125.310 98.013 6.046 23:25 121.792 124.878 98.007 6.025 23:30 121.383 124.449 98.000 6.003 23:35 120.973 123.982 97.994 5.983 23:40 120.561 123.521 97.987 5.962 23:45 120.152 123.067 97.980 5.942 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) 0:00 36.000 11.000 95.836 0.768 0:05 35.834 16.792 96.010 0.918 0:10 35.100 18.945 96.070 1.040 0:15 35.338 20.886 96.121 1.145 0:20 35.792 22.686 96.168 1.240 0:25 36.434 24.372 96.210 1.326 0:30 37.167 25.965 96.250 1.406 0:35 37.903 27.475 96.286 1.481 0:40 38.576 28.903 96.320 1.550 0:45 39.149 30.244 96.352 1.614 0:50 39.620 31.507 96.380 1.672 0:55 40.015 32.642 96.407 1.726 1:00 40.347 33.697 96.430 1.774 1:05 40.626 34.657 96.452 1.817 1:10 40.853 35.524 96.471 1.856 1:15 41.036 36.302 96.488 1.891 1:20 41.187 36.997 96.503 1.922 1:25 41.314 37.615 96.516 1.949 1:30 41.423 38.163 96.528 1.973 1:35 41.519 38.648 96.538 1.994 1:40 41.603 39.076 96.548 2.012 1:45 41.678 39.455 96.556 2.029 1:50 41.745 39.789 96.563 2.043 1:55 41.808 40.083 96.569 2.056 2:00 41.865 40.344 96.574 2.067 2:05 41.919 40.575 96.579 2.077 2:10 41.971 40.779 96.584 2.086 2:15 42.020 40.961 96.587 2.093 2:20 42.067 41.123 96.591 2.100 2:25 42.113 41.268 96.594 2.106 2:30 42.159 41.398 96.597 2.112 2:35 42.204 41.516 96.599 2.117 2:40 42.250 41.622 96.601 2.121 2:45 42.295 41.720 96.603 2.126 2:50 42.340 41.810 96.605 2.129 2:55 42.385 41.893 96.607 2.133 3:00 42.431 41.970 96.608 2.136 3:05 42.476 42.043 96.610 2.139 3:10 42.523 42.112 96.611 2.142 3:15 42.569 42.178 96.613 2.145 3:20 42.617 42.240 96.614 2.148 3:25 42.665 42.301 96.615 2.150 3:30 42.713 42.359 96.617 2.153 3:35 42.761 42.416 96.618 2.155 Double Box Culvert Outlet and Storage [100‐year] Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [100‐year] 3:40 42.811 42.473 96.619 2.157 3:45 42.861 42.528 96.620 2.160 3:50 42.913 42.582 96.621 2.162 3:55 42.965 42.636 96.622 2.164 4:00 43.018 42.690 96.623 2.166 4:05 43.075 42.744 96.624 2.169 4:10 43.136 42.799 96.626 2.171 4:15 43.204 42.855 96.627 2.173 4:20 43.282 42.914 96.628 2.176 4:25 43.370 42.977 96.629 2.179 4:30 43.467 43.043 96.631 2.181 4:35 43.574 43.116 96.632 2.184 4:40 43.690 43.194 96.634 2.188 4:45 43.815 43.279 96.635 2.191 4:50 43.947 43.370 96.637 2.195 4:55 44.086 43.469 96.639 2.199 5:00 44.232 43.574 96.642 2.204 5:05 44.385 43.686 96.644 2.208 5:10 44.544 43.805 96.646 2.213 5:15 44.708 43.930 96.649 2.218 5:20 44.876 44.062 96.652 2.224 5:25 45.049 44.200 96.654 2.230 5:30 45.228 44.344 96.657 2.236 5:35 45.422 44.495 96.660 2.242 5:40 45.650 44.654 96.664 2.248 5:45 45.933 44.829 96.667 2.256 5:50 46.314 45.028 96.671 2.264 5:55 46.866 45.269 96.676 2.274 6:00 47.662 45.577 96.682 2.286 6:05 48.757 45.984 96.691 2.303 6:10 50.127 46.521 96.701 2.325 6:15 51.697 47.206 96.715 2.353 6:20 53.393 48.043 96.732 2.387 6:25 55.152 49.024 96.751 2.426 6:30 56.924 50.137 96.773 2.471 6:35 58.699 51.363 96.797 2.520 6:40 60.476 52.687 96.822 2.572 6:45 62.255 54.096 96.849 2.627 6:50 64.038 55.603 96.878 2.684 6:55 65.824 57.141 96.906 2.743 7:00 67.611 58.733 96.936 2.803 7:05 69.410 60.372 96.967 2.865 7:10 71.226 62.053 96.997 2.928 7:15 73.057 63.272 97.020 2.993 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [100‐year] 7:20 74.912 64.525 97.042 3.062 7:25 76.793 65.858 97.066 3.136 7:30 78.697 67.266 97.091 3.213 7:35 80.632 68.744 97.117 3.293 7:40 82.599 70.289 97.144 3.376 7:45 84.596 71.898 97.173 3.462 7:50 86.629 73.568 97.201 3.551 7:55 88.701 75.297 97.231 3.642 8:00 90.810 77.083 97.262 3.736 8:05 92.964 78.925 97.293 3.831 8:10 95.167 80.823 97.325 3.929 8:15 97.414 82.776 97.357 4.029 8:20 99.715 84.785 97.390 4.131 8:25 102.074 86.850 97.424 4.235 8:30 104.484 88.972 97.459 4.340 8:35 106.960 91.151 97.494 4.448 8:40 109.506 93.390 97.530 4.558 8:45 112.118 95.692 97.566 4.670 8:50 114.988 98.069 97.603 4.785 8:55 118.423 100.569 97.643 4.905 9:00 122.788 103.278 97.684 5.033 9:05 128.304 106.314 97.731 5.176 9:10 134.751 109.781 97.784 5.338 9:15 141.723 113.734 97.843 5.520 9:20 148.836 118.167 97.909 5.722 9:25 155.848 123.028 97.980 5.940 9:30 162.551 127.875 98.050 6.172 9:35 168.973 132.879 98.121 6.415 9:40 175.188 138.119 98.195 6.667 9:45 181.289 143.582 98.270 6.924 9:50 187.361 149.128 98.347 7.185 9:55 193.441 154.852 98.424 7.450 10:00 199.555 160.694 98.503 7.716 10:05 205.796 166.651 98.581 7.984 10:10 212.197 172.727 98.661 8.255 10:15 218.767 178.929 98.740 8.527 10:20 225.594 185.272 98.821 8.803 10:25 232.698 191.775 98.903 9.082 10:30 240.074 198.457 98.986 9.366 10:35 247.827 205.160 99.069 9.656 10:40 255.966 212.081 99.153 9.953 10:45 264.482 219.279 99.240 10.260 10:50 273.405 226.795 99.329 10.575 10:55 282.615 234.646 99.422 10.901 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [100‐year] 11:00 291.931 242.791 99.516 11.234 11:05 301.306 251.196 99.613 11.576 11:10 310.675 259.821 99.711 11.923 11:15 319.971 268.529 99.811 12.275 11:20 329.620 277.256 99.912 12.632 11:25 340.167 286.231 100.015 12.998 11:30 352.242 295.411 100.120 13.380 11:35 368.108 305.405 100.232 13.791 11:40 390.074 316.887 100.360 14.258 11:45 420.730 330.830 100.514 14.819 11:50 471.614 349.163 100.713 15.548 11:55 555.565 375.845 100.998 16.587 12:00 687.599 404.017 101.416 18.169 12:05 859.621 434.470 102.057 20.606 12:10 1034.337 490.185 102.906 23.961 12:15 1163.761 556.259 103.866 27.917 12:20 1216.915 615.148 104.823 32.074 12:25 1201.904 968.024 105.493 35.113 12:30 1136.026 1132.482 105.645 35.811 12:35 1041.924 1092.485 105.609 35.649 12:40 940.832 1001.905 105.526 35.265 12:45 851.133 911.116 105.435 34.848 12:50 777.011 832.451 105.349 34.450 12:55 714.891 766.942 105.268 34.080 13:00 662.104 712.473 105.191 33.727 13:05 618.028 668.052 105.116 33.382 13:10 581.999 634.703 105.039 33.028 13:15 552.762 622.241 104.945 32.607 13:20 528.790 615.100 104.822 32.071 13:25 508.863 606.557 104.677 31.437 13:30 491.919 597.002 104.518 30.739 13:35 477.000 586.710 104.349 29.999 13:40 463.681 575.884 104.174 29.235 13:45 451.661 564.672 103.997 28.459 13:50 440.583 552.609 103.810 27.685 13:55 430.311 540.435 103.625 26.920 14:00 420.795 528.241 103.444 26.170 14:05 411.928 516.103 103.268 25.442 14:10 403.662 504.090 103.098 24.737 14:15 396.060 492.047 102.932 24.061 14:20 389.035 479.963 102.769 23.417 14:25 382.593 468.259 102.615 22.809 14:30 376.689 456.986 102.470 22.237 14:35 371.136 446.675 102.334 21.701 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [100‐year] 14:40 365.881 440.975 102.203 21.182 14:45 360.936 435.174 102.072 20.668 14:50 355.782 429.187 101.941 20.159 14:55 349.769 422.966 101.808 19.655 15:00 342.156 416.579 101.674 19.146 15:05 332.542 409.899 101.536 18.624 15:10 321.549 402.825 101.391 18.077 15:15 310.162 395.300 101.240 17.505 15:20 299.182 384.057 101.084 16.914 15:25 289.130 369.589 100.932 16.345 15:30 280.430 355.825 100.785 15.810 15:35 273.038 343.192 100.648 15.310 15:40 266.720 331.515 100.521 14.846 15:45 261.224 320.838 100.404 14.417 15:50 256.385 311.117 100.296 14.024 15:55 252.099 302.275 100.197 13.662 16:00 248.280 294.241 100.106 13.331 16:05 244.796 286.942 100.023 13.028 16:10 241.588 280.150 99.945 12.750 16:15 238.629 273.914 99.873 12.496 16:20 235.859 268.236 99.807 12.263 16:25 233.251 262.984 99.747 12.049 16:30 230.797 258.075 99.691 11.853 16:35 228.461 253.588 99.640 11.672 16:40 226.251 249.472 99.593 11.506 16:45 224.190 245.675 99.549 11.352 16:50 222.258 242.174 99.509 11.209 16:55 220.425 238.938 99.471 11.077 17:00 218.661 235.935 99.437 10.954 17:05 216.917 233.137 99.404 10.838 17:10 215.199 230.511 99.373 10.730 17:15 213.531 228.037 99.344 10.627 17:20 211.908 225.697 99.316 10.530 17:25 210.330 223.534 99.290 10.437 17:30 208.799 221.367 99.265 10.348 17:35 207.288 219.359 99.241 10.263 17:40 205.796 217.433 99.218 10.181 17:45 204.339 215.579 99.196 10.103 17:50 202.655 213.773 99.174 10.026 17:55 200.351 211.942 99.152 9.947 18:00 196.973 209.967 99.128 9.863 18:05 192.285 207.691 99.100 9.765 18:10 186.649 204.998 99.067 9.649 18:15 180.686 201.858 99.028 9.513 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [100‐year] 18:20 174.923 198.297 98.984 9.359 18:25 169.673 194.389 98.936 9.194 18:30 165.179 190.363 98.885 9.022 18:35 161.430 186.347 98.835 8.849 18:40 158.318 182.445 98.785 8.680 18:45 155.697 178.719 98.738 8.518 18:50 153.485 175.208 98.693 8.364 18:55 151.601 171.928 98.650 8.219 19:00 149.969 168.887 98.611 8.084 19:05 148.498 166.074 98.574 7.958 19:10 147.156 163.476 98.539 7.842 19:15 145.937 161.078 98.508 7.733 19:20 144.822 158.863 98.478 7.633 19:25 143.785 156.818 98.451 7.540 19:30 142.797 154.925 98.425 7.453 19:35 141.821 153.166 98.402 7.372 19:40 140.860 151.523 98.380 7.296 19:45 139.934 149.982 98.359 7.225 19:50 139.057 148.534 98.339 7.158 19:55 138.226 147.224 98.320 7.094 20:00 137.442 145.903 98.303 7.034 20:05 136.684 144.683 98.286 6.977 20:10 135.951 143.568 98.270 6.924 20:15 135.250 142.509 98.255 6.872 20:20 134.577 141.418 98.241 6.824 20:25 133.923 140.447 98.228 6.778 20:30 133.279 139.521 98.215 6.734 20:35 132.629 138.635 98.202 6.692 20:40 131.976 137.783 98.190 6.651 20:45 131.335 136.960 98.179 6.612 20:50 130.714 136.163 98.168 6.573 20:55 130.123 135.394 98.157 6.537 21:00 129.569 134.652 98.146 6.501 21:05 129.038 133.939 98.136 6.467 21:10 128.514 133.251 98.126 6.433 21:15 127.975 132.585 98.117 6.401 21:20 127.406 131.935 98.108 6.370 21:25 126.815 131.295 98.099 6.339 21:30 126.222 130.662 98.090 6.308 21:35 125.638 130.037 98.081 6.277 21:40 125.074 129.419 98.072 6.247 21:45 124.540 128.811 98.063 6.218 21:50 124.032 128.215 98.055 6.189 21:55 123.545 127.633 98.046 6.160 Time Inflow (cfs) Outflow  (cfs) Elevation Storage  (AC‐FT) Double Box Culvert Outlet and Storage [100‐year] 22:00 123.076 127.066 98.038 6.132 22:05 122.619 126.513 98.030 6.105 22:10 122.171 125.974 98.023 6.079 22:15 121.734 125.448 98.015 6.053 22:20 121.294 124.934 98.007 6.027 22:25 120.836 124.430 98.000 6.003 22:30 120.348 123.880 97.992 5.978 22:35 119.825 123.335 97.984 5.954 22:40 119.289 122.794 97.976 5.930 22:45 118.779 122.256 97.969 5.906 22:50 118.316 121.726 97.961 5.882 22:55 117.903 121.210 97.953 5.859 23:00 117.530 120.712 97.946 5.836 23:05 117.177 120.234 97.939 5.815 23:10 116.828 119.774 97.932 5.794 23:15 116.471 119.331 97.926 5.774 23:20 116.101 118.898 97.919 5.755 23:25 115.719 118.475 97.913 5.736 23:30 115.332 118.057 97.907 5.717 23:35 114.937 117.644 97.901 5.698 23:40 114.536 117.234 97.895 5.679 23:45 114.133 116.824 97.889 5.661 APPENDIX H.2 Existing Froom Creek Hydrologic Analysis This Page Intentionally Left Blank. HYDROLOGIC ANALYSIS EXISTING FROOM CREEK Prepared as a Supplement for the Froom Ranch Hydrology Report for the Proposed Condition Date: 07-16-2019 Prepared by RRM Design Group Prepared for John and Susan Madonna Trust and Villaggio Communities CREATINGENVIRONMENTSPEOPLEENJOY® Table of Contents Page No. 1. Purpose 1 2. Background 1 3. Scope, Objective and Analysis 1-2 4. Conclusion 2 Appendix 1: Historic Condition Analysis 1.1: Aerial Imagery 2005 4 1.2: Aerial Imagery 2011 5 1.3: Cross-Section Locations Exhibit 6 1.4: HEC-RAS Cross-Section Results 7-17 1.5: Historic Froom Creek Profile 18 1.6: Historic Froom Creek Tabular Results 19 Appendix 2: Existing Condition Analysis 2.1: Aerial Imagery from 2013 21 2.2: Cross-Sections Location Exhibit 22 2.3: HEC-RAS Cross-Section Results 23-45 2.4: Existing Froom Creek Profile 46 2.5: Existing LOVR Ditch and Calle Joaquin 47 2.6: Existing Froom Creek Tabular Results 48-49 2.7: Existing Froom Creek Overbanking Results 50 1. Purpose: The purpose of this report is to describe and analyze the Historic and Existing Froom Creek conditions, and to compare those with the Proposed condition, with respect to periodic overbanking of the creek banks, which flows to the existing LOVR Ditch and Calle Joaquin Wetlands. 2. Background: a. Historic Condition (Prior to 2013) For the purpose of this report, the condition of Froom Creek prior to 2013 is referred to as the ‘Historic Condition.’ Appendix I of this report analyzes the Historical Condition of the Froom Creek before 2013, and the creek bank overbanking that occurred. This analysis confirms the overbanking conditions anticipated by Balanced Hydrologics in their report from 2005, appendix A (pg. 5). This report also details the specific water surface elevation at which each cross-section overbanks. See Appendix 1, section D (pgs. 7-17), of this report for the specific water surface elevations when overbanking occurs. Aerial imagery from 2005 and 2011 (pg. 4-5) is provided to show the creek condition before the addition of the artificial berm placed after 2013 (see pg. 21). b. Existing Condition (2013 to Present) In or around 2013, an artificial berm was placed along the eastern bank of Froom Creek. The analysis of the Existing Froom Creek is included in this report, Appendix 2. Overbanking is significantly reduced and occurs at a much higher flowrate when compared to the Historic Condition; See Appendix 2, Section C (pgs. 23-45). Aerial imagery from 2013 (pg. 21) has been provided to show the visible change to the creek due to the added embankment. The Froom Creek Channel receives water from watershed indexes #4 (Froom Creek Top) and #5 (Froom Creek Upper) (see report titled “Preliminary Hydrologic and Hydraulic Calculations,” Appendix 3, prepared by RRM Design Group, dated February 22, 2019). The parallel channel, comprised of the LOVR Ditch and the Calle Joaquin Wetland, receives water from watershed indexes #8 (Home Depot + Costco), #9 (Irish Hills), and occasionally from the Existing Froom Creek when overbanking occurs. 3. Scope, Objectives, and Analysis: a. Scope: The Historic Condition was analyzed conveying the flow from watershed indexes #4 (Froom Creek Top) and #5 (Froom Creek Upper). The cross-sections used in this analysis only consider the extents of the Historic Froom Creek channel to accurately depict where overbanking occurs. Page 1 The Existing Condition was also analyzed conveying the flow from watershed indexes #4 (Froom Creek Top) and #5 (Froom Creek Upper) in the Existing Froom Creek. The LOVR Ditch and Calle Joaquin Wetland convey flow from watershed indexes #8 (Home Depot + Costco), #9 (Irish Hills), and occasionally from the Existing Froom Creek when overbanking occurs. b. Objectives: The objectives of this report are to describe and analyze the Historic and Existing Froom Creek conditions, and to compare those with the Proposed condition, with respect to periodic overbanking of the creek banks, which flows to the existing LOVR Ditch and Calle Joaquin Wetlands. c. Analysis: The proposed restored Froom Creek condition will mimic the historic condition, in that the creek will overbank only after the 2-yr peak flow is achieved. Flows greater than a 2-yr design storm will overbank to the Calle Joaquin Wetland or be contained within the channel when not adjacent to the wetland. This is much like the Historical Condition, which had no artificial berm placed adjacent to the creek. See table below for a summary comparison of the three conditions and when Froom Creek overbanking occurs. 4. Conclusion: With the exception of a two-year design storm, the Proposed Condition overflows at similar flowrates compared to the Historic Condition. The two-year design storm is contained within a low flow swale, as required by the City of San Luis Obispo, per the Drainage Design Manual. The Existing Condition overbanking flowrates are reduced due to the artificial berm placed adjacent to Froom Creek. In summary, the proposed development achieves the objective of returning the watershed to the historic condition. Historic Existing Proposed 2-yr 253.3 (100) 253.3 (0) 518.7 (0) 10-yr 521.5 (318) 521.5 (89.4) 707.3 (188.6) 25-yr 714.3 (475.2) 714.3 (282.2) 877.2 (358.5) 50-yr 867.6 (599.3) 867.6 (435.5) 1098.1 (579.4) 100-yr 980.4 (691) 980.4 (548.3) 1240.8 (722.1) Total Creek Flow (Overbank Flowrate) (cfs) Page 2 Appendix 1: Historic Condition Analysis Page 3 1000 ft N➤➤NPage 4 No Artificial Berm Placed Adjacent to Creek Froom Creek - Historic Condition 2005 Froom Creek AerialPage 4 1000 ft N➤➤NPage 5 No Artificial Berm Placed Adjacent to Creek Froom Creek - Historic Condition 2011 Froom Creek Aerial Detention Basins Added Page 5 Page 6 0102030405060108109110111112113Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 272.83 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 1Page 7 0510152025109110111112113114115Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 401.44 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 2Page 8 051015202530108110112114116118Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 535.09 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 3Page 9 0246810121416112113114115116117118Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 770.3 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 4Page 10 051015202530112113114115116117118119120121Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 916.4 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 5Page 11 05101520253035115116117118119120121Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1191.25 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 6Page 12 0510152025117118119120121122Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1387.15 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 7Page 13 0510152025303540121122123124125126127Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1695.61 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 8Page 14 05101520253035125126127128129130Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1921.22 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 9Page 15 0510152025125126127128129130131132Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 2096.2 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 10Page 16 0102030405060132133134135136137138Creek Only Plan: Plan 01 6/10/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 2444.37 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Historic Froom CreekCross Section: 11Page 17 05001000150020002500105110115120125130135140Creek Only Plan: Plan 01 6/10/2019 Main Channel Distance (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundExisting Froom C Froom Creek ExisHistoric Froom Creek ProfileSection 11Section 1Page 18 HEC-RAS Plan: Plan 01 River: Existing Froom C Reach: Froom Creek Exis Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Froom Creek Exis 2444.37 2-yr 201.93 132.66 134.74 134.74 135.26 0.018234 5.83 34.62 33.42 1.01 Froom Creek Exis 2444.37 10-yr 419.94 132.66 135.44 135.44 136.17 0.016390 6.86 61.18 42.57 1.01 Froom Creek Exis 2444.37 25-yr 577.16 132.66 135.80 135.80 136.67 0.015272 7.51 76.90 44.00 1.00 Froom Creek Exis 2444.37 50-yr 701.37 132.66 136.04 136.04 137.03 0.014997 7.99 87.73 44.78 1.01 Froom Creek Exis 2444.37 100-yr 792.91 132.66 136.22 136.22 137.29 0.014584 8.27 95.87 45.35 1.00 Froom Creek Exis 2096.2 2-yr 201.93 125.91 128.87 129.17 0.004504 4.44 45.52 20.61 0.53 Froom Creek Exis 2096.2 10-yr 419.94 125.91 129.97 130.56 0.005713 6.16 68.17 20.61 0.60 Froom Creek Exis 2096.2 25-yr 577.16 125.91 130.56 131.36 0.006599 7.17 80.46 20.61 0.64 Froom Creek Exis 2096.2 50-yr 701.37 125.91 130.96 131.93 0.007348 7.92 88.59 20.61 0.67 Froom Creek Exis 2096.2 100-yr 792.91 125.91 131.21 132.32 0.007954 8.45 93.79 20.61 0.70 Froom Creek Exis 1921.22 2-yr 201.93 125.00 127.06 127.06 127.74 0.017815 6.61 30.55 23.03 1.01 Froom Creek Exis 1921.22 10-yr 419.94 125.00 127.94 127.94 128.95 0.016096 8.04 52.22 26.41 1.01 Froom Creek Exis 1921.22 25-yr 577.16 125.00 128.45 128.45 129.63 0.015527 8.73 66.09 28.37 1.01 Froom Creek Exis 1921.22 50-yr 701.37 125.00 128.81 128.81 130.11 0.015168 9.17 76.51 29.77 1.01 Froom Creek Exis 1921.22 100-yr 792.91 125.00 129.06 129.06 130.44 0.014857 9.42 84.18 30.81 1.00 Froom Creek Exis 1695.61 2-yr 201.93 121.57 123.89 124.24 0.008535 4.77 42.37 30.30 0.71 Froom Creek Exis 1695.61 10-yr 419.94 121.57 124.81 125.31 0.007637 5.66 74.16 36.82 0.70 Froom Creek Exis 1695.61 25-yr 577.16 121.57 125.34 125.93 0.006873 6.17 93.62 36.82 0.68 Froom Creek Exis 1695.61 50-yr 701.37 121.57 125.75 126.40 0.006359 6.46 108.57 36.82 0.66 Froom Creek Exis 1695.61 100-yr 792.91 121.57 126.05 126.73 0.006021 6.64 119.48 36.82 0.65 Froom Creek Exis 1387.15 2-yr 201.93 117.71 119.86 119.86 120.57 0.017177 6.78 29.78 20.84 1.00 Froom Creek Exis 1387.15 10-yr 419.94 117.71 120.76 120.76 121.92 0.016273 8.67 48.45 20.84 1.00 Froom Creek Exis 1387.15 25-yr 577.16 117.71 121.31 121.31 122.75 0.016052 9.63 59.95 20.84 1.00 Froom Creek Exis 1387.15 50-yr 701.37 117.71 121.71 121.71 123.35 0.015996 10.27 68.31 20.84 1.00 Froom Creek Exis 1387.15 100-yr 792.91 117.71 121.99 121.99 123.77 0.016012 10.69 74.14 20.84 1.00 Froom Creek Exis 1191.25 2-yr 201.93 115.00 117.38 117.79 0.009089 5.13 39.34 26.89 0.75 Froom Creek Exis 1191.25 10-yr 419.94 115.00 118.65 119.10 0.005348 5.38 78.10 31.94 0.61 Froom Creek Exis 1191.25 25-yr 577.16 115.00 119.51 119.97 0.003953 5.47 105.54 31.94 0.53 Froom Creek Exis 1191.25 50-yr 701.37 115.00 120.17 120.65 0.003328 5.53 126.74 31.94 0.49 Froom Creek Exis 1191.25 100-yr 792.91 115.00 120.65 121.13 0.003014 5.59 141.97 31.94 0.47 Froom Creek Exis 916.4 2-yr 201.93 112.99 116.31 116.50 0.002647 3.47 58.19 25.63 0.41 Froom Creek Exis 916.4 10-yr 419.94 112.99 117.85 118.13 0.002297 4.26 98.66 26.54 0.39 Froom Creek Exis 916.4 25-yr 577.16 112.99 118.81 119.15 0.002167 4.64 124.33 26.54 0.38 Froom Creek Exis 916.4 50-yr 701.37 112.99 119.53 119.90 0.002105 4.90 143.28 26.54 0.37 Froom Creek Exis 916.4 100-yr 792.91 112.99 120.03 120.43 0.002076 5.06 156.58 26.54 0.37 Froom Creek Exis 770.3 2-yr 201.93 112.00 114.72 114.72 115.62 0.017780 7.59 26.61 15.15 1.01 Froom Creek Exis 770.3 10-yr 419.94 112.00 115.85 115.85 117.29 0.017453 9.63 43.61 15.15 1.00 Froom Creek Exis 770.3 25-yr 577.16 112.00 116.53 116.53 118.31 0.017744 10.69 53.97 15.15 1.00 Froom Creek Exis 770.3 50-yr 701.37 112.00 117.02 117.02 119.05 0.018138 11.42 61.39 15.15 1.00 Froom Creek Exis 770.3 100-yr 792.91 112.00 117.37 117.37 119.57 0.018358 11.89 66.68 15.15 1.00 Froom Creek Exis 535.09 2-yr 253.28 109.00 113.70 113.87 0.001814 3.30 76.84 28.32 0.35 Froom Creek Exis 535.09 10-yr 521.50 109.00 115.28 115.57 0.001899 4.29 121.50 28.32 0.37 Froom Creek Exis 535.09 25-yr 714.26 109.00 116.21 116.57 0.001992 4.84 147.70 28.32 0.37 Froom Creek Exis 535.09 50-yr 867.58 109.00 116.88 117.30 0.002055 5.20 166.87 28.32 0.38 Froom Creek Exis 535.09 100-yr 980.40 109.00 117.35 117.81 0.002098 5.44 180.24 28.32 0.38 Froom Creek Exis 401.44 2-yr 253.28 109.00 112.27 112.27 113.24 0.017113 7.89 32.11 16.88 1.01 Froom Creek Exis 401.44 10-yr 521.50 109.00 113.53 113.53 114.90 0.016043 9.39 55.56 20.30 1.00 Froom Creek Exis 401.44 25-yr 714.26 109.00 114.17 114.17 115.85 0.016020 10.42 68.54 20.30 1.00 Froom Creek Exis 401.44 50-yr 867.58 109.00 114.63 114.63 116.55 0.016125 11.13 77.98 20.30 1.00 Froom Creek Exis 401.44 100-yr 980.40 109.00 114.96 114.96 117.04 0.016210 11.59 84.61 20.30 1.00 Froom Creek Exis 272.83 2-yr 253.28 108.41 110.86 110.61 111.25 0.010002 4.96 51.10 40.17 0.77 Froom Creek Exis 272.83 10-yr 521.50 108.41 111.63 111.39 112.19 0.010003 6.00 86.97 50.96 0.81 Froom Creek Exis 272.83 25-yr 714.26 108.41 112.00 111.75 112.71 0.010002 6.73 106.20 51.83 0.83 Froom Creek Exis 272.83 50-yr 867.58 108.41 112.27 112.01 113.08 0.010019 7.25 119.74 51.83 0.84 Froom Creek Exis 272.83 100-yr 980.40 108.41 112.45 112.19 113.34 0.010017 7.59 129.21 51.83 0.85 Historic Froom Creek Tabular Results Page 19 Appendix 2: Existing Condition Analysis Page 20 1000 ft N➤➤NPage 21 New Artificial Berm Placed Adjacent to Creek Froom Creek - Existing Condition 2013 Froom Creek AerialPage 21 Page 22 020406080100120140108110112114116118Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 272.83 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 1Page 23 020406080100120140160180108110112114116118120Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 401.44 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 2Page 24 020406080109110111112113114115116Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 535.09 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 3Page 25 0102030405060112114116118120122Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 770.3 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 4Page 26 020406080100120112114116118120122124126Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 916.4 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 5Page 27 050100150200114116118120122124Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1191.25 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 6Page 28 020406080100117118119120121122123124125Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1387.15 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 7Page 29 050100150200250120122124126128130132Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1695.61 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 8Page 30 020406080100120140160125126127128129130131132Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 1921.22 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 9Page 31 020406080100120140124126128130132134136Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 2096.2 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 10Page 32 020406080100120140132134136138140142Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Froom Creek Exis RS = 2444.37 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Froom CreekCross Section: 11Page 33 020406080100120140160106.5107.0107.5108.0108.5109.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 115.55 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Calle Joaquin WetlandCross Section: 1Page 34 050100150200250300350106.0106.5107.0107.5108.0108.5109.0109.5Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 169 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Calle Joaquin WetlandCross Section: 2Page 35 0100200300400500106.0106.5107.0107.5108.0108.5109.0109.5Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 205.35 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Calle Joaquin WetlandCross Section: 3Page 36 050100150200250300350400106.0106.5107.0107.5108.0108.5109.0109.5Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 318.73 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Calle Joaquin WetlandCross Section: 4Page 37 0100200300400500106.0106.5107.0107.5108.0108.5109.0109.5110.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 440.14 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Calle Joaquin WetlandCross Section: 5Page 38 050100150200250300350108.0108.5109.0109.5110.0110.5111.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 741.18 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035Existing Calle Joaquin WetlandCross Section: 6Page 39 050100150200250110.0110.5111.0111.5112.0112.5113.0113.5114.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 1437.42 Station (ft)Elevation (ft)LegendWS 10-yrWS 2-yrWS 25-yrWS 100-yrWS 50-yrGroundBank Sta.035.035Existing LOVR DitchCross Section: 7Page 40 0100200300400500113.5114.0114.5115.0115.5116.0116.5117.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 1654.9 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035.035Existing LOVR DitchCross Section: 8Page 41 050100150200250300350400116.0116.5117.0117.5118.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 1993.69 Station (ft)Elevation (ft)LegendWS 25-yrWS 10-yrWS 100-yrWS 50-yrWS 2-yrGroundBank Sta.035Existing LOVR DitchCross Section: 9Page 42 050100150200250300350400116.0116.5117.0117.5118.0118.5119.0119.5120.0Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 2201.97 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035.035Existing LOVR DitchCross Section: 10Page 43 050100150200250300350400117.0117.5118.0118.5119.0119.5120.0120.5Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 2413.92 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035.035Existing LOVR DitchCross Section: 11Page 44 020406080100120140118119120121122123124Existing Froom Creek Model Plan: Plan 01 6/13/2019 River = Existing Froom C Reach = Wetland RS = 2794.8 Station (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundBank Sta.035.035Existing LOVR DitchCross Section: 12Page 45 05001000150020002500105110115120125130135140Existing Froom Creek Model Plan: Plan 01 6/10/2019 Main Channel Distance (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundExisting Froom C Froom Creek ExisExisting Froom Creek ProfileSection 11Section 1Page 46 050010001500200025003000106108110112114116118120Existing Froom Creek Model Plan: Plan 01 6/11/2019 Main Channel Distance (ft)Elevation (ft)LegendWS 100-yrWS 50-yrWS 25-yrWS 10-yrWS 2-yrGroundExisting Froom C WetlandExisting LOVR Ditch and Calle JoaquinWetland ProfileSection 12Section 1Page 47 HEC-RAS Plan: .Plan 01 Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Froom Creek Exis 2444.37 2-yr 201.93 132.66 134.73 134.73 135.26 0.018466 5.86 34.47 33.36 1.02 Froom Creek Exis 2444.37 10-yr 419.94 132.66 135.43 135.43 136.17 0.016526 6.89 60.95 42.41 1.01 Froom Creek Exis 2444.37 25-yr 577.16 132.66 135.83 135.83 136.66 0.015700 7.28 79.23 48.81 1.01 Froom Creek Exis 2444.37 50-yr 701.37 132.66 136.09 136.09 136.99 0.015386 7.61 92.17 52.38 1.01 Froom Creek Exis 2444.37 100-yr 792.91 132.66 136.26 136.26 137.21 0.015003 7.83 101.22 54.03 1.01 Froom Creek Exis 2096.2 2-yr 201.93 125.91 128.88 129.07 0.005310 3.49 57.88 47.27 0.56 Froom Creek Exis 2096.2 10-yr 419.94 125.91 129.61 129.88 0.006130 4.21 99.65 68.65 0.62 Froom Creek Exis 2096.2 25-yr 577.16 125.91 129.96 130.29 0.006367 4.57 126.16 79.17 0.64 Froom Creek Exis 2096.2 50-yr 701.37 125.91 130.18 130.55 0.006449 4.88 143.65 82.55 0.65 Froom Creek Exis 2096.2 100-yr 792.91 125.91 130.32 130.73 0.006497 5.09 155.64 84.39 0.66 Froom Creek Exis 1921.22 2-yr 201.93 125.00 127.00 127.00 127.44 0.019712 5.32 37.97 44.70 1.02 Froom Creek Exis 1921.22 10-yr 419.94 125.00 127.59 127.59 128.17 0.017302 6.08 69.05 60.29 1.00 Froom Creek Exis 1921.22 25-yr 577.16 125.00 127.90 127.90 128.56 0.016545 6.51 88.72 67.73 1.00 Froom Creek Exis 1921.22 50-yr 701.37 125.00 128.11 128.11 128.82 0.016093 6.78 103.41 72.63 1.00 Froom Creek Exis 1921.22 100-yr 792.91 125.00 128.25 128.25 129.00 0.015814 6.97 113.83 75.83 1.00 Froom Creek Exis 1695.61 2-yr 201.93 121.57 123.87 124.17 0.008370 4.38 46.08 38.13 0.70 Froom Creek Exis 1695.61 10-yr 419.94 121.57 124.76 125.00 0.008282 3.95 106.41 102.70 0.68 Froom Creek Exis 1695.61 25-yr 577.16 121.57 125.15 125.37 0.007778 3.76 153.34 151.71 0.66 Froom Creek Exis 1695.61 50-yr 701.37 121.57 125.32 125.56 0.007361 3.92 178.91 159.80 0.65 Froom Creek Exis 1695.61 100-yr 792.91 121.57 125.43 125.68 0.007067 4.02 197.05 164.16 0.65 Froom Creek Exis 1387.15 2-yr 201.93 117.71 119.89 119.89 120.51 0.017672 6.36 31.77 26.18 1.02 Froom Creek Exis 1387.15 10-yr 419.94 117.71 120.76 120.76 121.51 0.015888 6.95 60.41 40.29 1.00 Froom Creek Exis 1387.15 25-yr 577.16 117.71 121.16 121.16 122.01 0.015632 7.40 78.00 46.83 1.01 Froom Creek Exis 1387.15 50-yr 701.37 117.71 121.45 121.45 122.35 0.014926 7.62 92.03 51.06 1.00 Froom Creek Exis 1387.15 100-yr 792.91 117.71 121.63 121.63 122.58 0.014684 7.80 101.61 53.76 1.00 Froom Creek Exis 1191.25 2-yr 201.93 115.00 117.43 117.81 0.008375 4.98 40.53 27.23 0.72 Froom Creek Exis 1191.25 10-yr 419.94 115.00 118.51 118.99 0.007380 5.57 75.36 38.90 0.71 Froom Creek Exis 1191.25 25-yr 577.16 115.00 119.15 118.44 119.64 0.006428 5.58 103.36 48.06 0.67 Froom Creek Exis 1191.25 50-yr 701.37 115.00 119.45 119.99 0.006798 5.94 118.10 52.25 0.70 Froom Creek Exis 1191.25 100-yr 792.91 115.00 119.65 120.23 0.006975 6.16 128.82 55.09 0.71 Froom Creek Exis 916.4 2-yr 201.93 112.99 116.31 116.48 0.002911 3.25 62.22 34.41 0.43 Froom Creek Exis 916.4 10-yr 419.94 112.99 117.50 117.72 0.002857 3.73 112.61 50.60 0.44 Froom Creek Exis 916.4 25-yr 577.16 112.99 118.08 118.33 0.003344 3.99 144.70 66.79 0.48 Froom Creek Exis 916.4 50-yr 701.37 112.99 118.40 118.67 0.003209 4.23 166.00 67.83 0.48 Froom Creek Exis 916.4 100-yr 792.91 112.99 118.62 118.92 0.003121 4.38 181.17 68.57 0.47 Froom Creek Exis 770.3 2-yr 201.93 112.00 114.80 114.80 115.57 0.016881 7.03 28.72 18.73 1.00 Froom Creek Exis 770.3 10-yr 419.94 112.00 115.87 115.87 116.83 0.015062 7.85 53.50 27.43 0.99 Froom Creek Exis 770.3 25-yr 577.16 112.00 116.46 116.46 117.35 0.015793 7.56 76.31 43.17 1.00 Froom Creek Exis 770.3 50-yr 701.37 112.00 116.70 116.70 117.71 0.015594 8.07 86.94 43.99 1.01 Froom Creek Exis 770.3 100-yr 792.91 112.00 116.87 116.87 117.97 0.015547 8.41 94.26 44.55 1.02 Froom Creek Exis 535.09 2-yr 253.28 109.00 113.57 113.74 0.002594 3.32 76.26 38.65 0.42 Froom Creek Exis 535.09 10-yr 521.50 109.00 114.77 114.99 0.003058 3.78 138.13 65.61 0.46 Froom Creek Exis 535.09 25-yr 714.26 109.00 115.30 115.56 0.002965 4.08 174.98 71.91 0.46 Froom Creek Exis 535.09 50-yr 867.58 109.00 115.67 115.95 0.002943 4.30 201.92 76.19 0.47 Froom Creek Exis 535.09 100-yr 980.40 109.00 115.88 116.19 0.002940 4.49 218.32 76.70 0.47 Froom Creek Exis 401.44 2-yr 253.28 109.00 112.27 112.27 112.98 0.016648 6.74 37.57 26.48 1.00 Froom Creek Exis 401.44 10-yr 521.50 109.00 113.23 113.23 114.13 0.015455 7.64 68.24 37.91 1.00 Froom Creek Exis 401.44 25-yr 714.26 109.00 113.72 113.72 114.73 0.015083 8.03 88.91 45.17 1.01 Froom Creek Exis 401.44 50-yr 867.58 109.00 114.08 114.08 115.13 0.014572 8.23 105.46 50.23 1.00 Froom Creek Exis 401.44 100-yr 980.40 109.00 114.38 114.38 115.38 0.014803 8.01 122.47 61.54 1.00 Froom Creek Exis 272.83 2-yr 253.28 108.41 110.86 110.61 111.25 0.010001 4.96 51.10 40.17 0.77 Froom Creek Exis 272.83 10-yr 521.50 108.41 111.76 111.48 112.17 0.010004 5.10 102.17 77.07 0.78 Froom Creek Exis 272.83 25-yr 714.26 108.41 112.10 111.84 112.57 0.010003 5.50 129.96 87.76 0.80 Froom Creek Exis 272.83 50-yr 867.58 108.41 112.30 112.06 112.83 0.010016 5.87 147.74 90.39 0.81 Froom Creek Exis 272.83 100-yr 980.40 108.41 112.43 112.19 113.02 0.010012 6.12 160.25 92.16 0.82 Wetland 2794.8 2-yr 15.86 118.00 119.19 118.73 119.24 0.002682 1.70 9.30 13.37 0.36 Wetland 2794.8 10-yr 23.68 118.00 119.36 118.89 119.43 0.003198 2.01 11.75 15.00 0.40 Wetland 2794.8 25-yr 27.49 118.00 119.44 118.95 119.51 0.003387 2.14 12.86 15.68 0.42 Wetland 2794.8 50-yr 30.78 118.00 119.50 119.00 119.58 0.003403 2.20 13.97 16.34 0.42 Wetland 2794.8 100-yr 34.04 118.00 119.56 119.05 119.64 0.003496 2.28 14.92 16.88 0.43 Wetland 2413.92 2-yr 15.86 117.27 117.49 117.51 0.009060 1.19 13.34 83.53 0.52 Wetland 2413.92 10-yr 23.68 117.27 117.54 117.46 117.57 0.008093 1.33 17.79 86.41 0.52 Wetland 2413.92 25-yr 27.49 117.27 117.56 117.59 0.008013 1.41 19.55 86.80 0.52 Wetland 2413.92 50-yr 30.78 117.27 117.57 117.61 0.008595 1.50 20.51 87.06 0.55 Wetland 2413.92 100-yr 34.04 117.27 117.59 117.50 117.63 0.008729 1.56 21.76 87.82 0.55 Wetland 2201.97 2-yr 15.86 116.28 116.81 116.82 0.001641 0.70 22.63 86.98 0.24 Wetland 2201.97 10-yr 23.68 116.28 116.89 116.90 0.001678 0.77 30.69 105.93 0.25 Wetland 2201.97 25-yr 27.49 116.28 116.93 116.94 0.001608 0.79 35.08 115.03 0.25 Wetland 2201.97 50-yr 30.78 116.28 116.97 116.98 0.001433 0.77 40.08 124.35 0.24 Wetland 2201.97 100-yr 34.04 116.28 117.00 117.01 0.001428 0.79 43.42 130.20 0.24 Existing Froom Creek Tabular Results (1) Page 48 HEC-RAS Plan: .Plan 01 (Continued) Reach River Sta Profile Q Total Min Ch El W.S. Elev Crit W.S. E.G. Elev E.G. Slope Vel Chnl Flow Area Top Width Froude # Chl (cfs) (ft) (ft) (ft) (ft) (ft/ft) (ft/s) (sq ft) (ft) Wetland 1993.69 2-yr 15.86 116.00 116.38 116.39 0.002734 0.79 20.02 93.90 0.30 Wetland 1993.69 10-yr 23.68 116.00 116.45 116.46 0.002760 0.87 27.06 110.13 0.31 Wetland 1993.69 25-yr 27.49 116.00 116.45 116.47 0.003577 1.00 27.47 110.99 0.35 Wetland 1993.69 50-yr 30.78 116.00 116.43 116.45 0.005702 1.23 25.07 105.79 0.44 Wetland 1993.69 100-yr 34.04 116.00 116.44 116.47 0.006128 1.29 26.33 108.56 0.46 Wetland 1654.9 2-yr 15.86 114.00 114.20 114.20 114.26 0.026913 1.38 8.94 78.13 0.82 Wetland 1654.9 10-yr 23.68 114.00 114.24 114.24 114.30 0.027447 1.51 12.79 104.47 0.84 Wetland 1654.9 25-yr 27.49 114.00 114.30 114.26 114.33 0.013814 1.17 20.14 150.88 0.61 Wetland 1654.9 50-yr 30.78 114.00 114.35 114.37 0.006634 0.96 28.94 176.75 0.44 Wetland 1654.9 100-yr 34.04 114.00 114.36 114.38 0.006188 0.98 31.57 178.20 0.43 Wetland 1437.42 2-yr 15.86 110.42 112.06 111.32 112.08 0.002035 0.89 17.91 56.30 0.28 Wetland 1437.42 10-yr 23.68 110.42 112.17 111.49 112.19 0.002075 0.96 24.56 69.07 0.29 Wetland 1437.42 25-yr 27.49 110.42 111.92 111.56 112.00 0.008579 2.25 12.21 27.57 0.60 Wetland 1437.42 50-yr 30.78 110.42 111.62 111.62 111.93 0.022051 4.48 6.87 10.99 1.00 Wetland 1437.42 100-yr 34.04 110.42 111.65 111.65 112.00 0.023557 4.71 7.23 11.28 1.04 Wetland 741.18 2-yr 15.86 108.00 108.36 108.36 108.45 0.032518 2.42 6.54 36.65 1.01 Wetland 741.18 10-yr 23.68 108.00 108.42 108.42 108.53 0.030880 2.63 8.99 42.83 1.01 Wetland 741.18 25-yr 27.49 108.00 108.69 108.71 0.002943 1.12 24.51 72.02 0.34 Wetland 741.18 50-yr 30.78 108.00 108.98 108.99 0.000595 0.59 52.19 121.27 0.16 Wetland 741.18 100-yr 34.04 108.00 109.16 109.17 0.000280 0.44 77.13 157.16 0.11 Wetland 440.14 2-yr 15.86 106.37 107.34 107.34 0.000049 0.19 83.46 164.15 0.05 Wetland 440.14 10-yr 23.68 106.37 108.17 108.17 0.000004 0.08 279.81 286.72 0.02 Wetland 440.14 25-yr 27.49 106.37 108.70 108.70 0.000001 0.06 446.07 333.12 0.01 Wetland 440.14 50-yr 154.99 106.37 108.98 108.98 0.000026 0.29 539.73 355.45 0.04 Wetland 440.14 100-yr 249.79 106.37 109.15 109.15 0.000050 0.42 601.47 372.06 0.06 Wetland 318.73 2-yr 15.86 106.00 107.33 107.33 0.000006 0.09 181.44 241.37 0.02 Wetland 318.73 10-yr 23.68 106.00 108.17 108.17 0.000001 0.06 415.05 311.26 0.01 Wetland 318.73 25-yr 184.65 106.00 108.70 108.70 0.000027 0.31 593.03 357.78 0.04 Wetland 318.73 50-yr 312.15 106.00 108.97 108.97 0.000050 0.45 691.57 372.30 0.06 Wetland 318.73 100-yr 406.95 106.00 109.14 109.14 0.000063 0.54 753.93 372.30 0.07 Wetland 205.35 2-yr 15.86 106.00 107.33 107.33 0.000005 0.08 189.34 242.51 0.02 Wetland 205.35 10-yr 157.79 106.00 108.16 108.16 0.000051 0.36 444.33 349.79 0.06 Wetland 205.35 25-yr 354.36 106.00 108.69 108.70 0.000086 0.55 639.13 383.37 0.08 Wetland 205.35 50-yr 510.97 106.00 108.95 108.96 0.000114 0.69 741.89 394.26 0.09 Wetland 205.35 100-yr 627.14 106.00 109.12 109.13 0.000132 0.78 807.50 402.20 0.10 Wetland 169 2-yr 15.86 106.00 107.33 107.33 0.000005 0.08 195.96 255.54 0.02 Wetland 169 10-yr 157.79 106.00 108.16 108.16 0.000047 0.37 423.63 293.43 0.05 Wetland 169 25-yr 354.36 106.00 108.69 108.69 0.000091 0.61 585.17 318.94 0.08 Wetland 169 50-yr 510.97 106.00 108.95 108.96 0.000122 0.76 668.85 318.94 0.09 Wetland 169 100-yr 627.14 106.00 109.11 109.12 0.000143 0.87 720.99 318.94 0.10 Wetland 115.55 2-yr 15.86 106.93 107.28 107.20 107.33 0.010019 1.68 9.41 37.68 0.59 Wetland 115.55 10-yr 157.79 106.93 107.98 107.81 108.14 0.009992 3.16 49.96 77.70 0.69 Wetland 115.55 25-yr 354.36 106.93 108.46 108.24 108.66 0.010001 3.56 99.60 129.73 0.72 Wetland 115.55 50-yr 510.97 106.93 108.68 108.49 108.91 0.010004 3.92 130.47 146.85 0.73 Wetland 115.55 100-yr 627.14 106.93 108.79 108.61 109.07 0.010002 4.25 147.63 146.85 0.75 Existing Froom Creek Tabular Results (2) Page 49 Section QTotal (cfs) Qoverflow (cfs)Section Qtotal (cfs) 1 980.4 0.0 1 627.1 2 980.4 266.4 2 627.1 3 980.4 593.1 3 627.1 4 792.9 372.9 4 407.0 5 792.9 252.9 5 287.0 6 792.9 0.0 6 34.0 7 792.9 0.0 7 34.0 8 792.9 0.0 8 34.0 9 792.9 0.0 9 34.0 10 792.9 0.0 10 34.0 11 792.9 0.0 11 34.0 12 34.0 Existing Froom Creek Existing Wetland Existing (After 2013) Froom Creek Analysis (100-yr Event) Page 50 APPENDIX H.3 Preliminary Sediment Transportation Analysis and Calculations This Page Intentionally Left Blank. PRELIMINARYSEDIMENT TRANSPORT ANALYSIS AND CALCULATIONS Prepared as a Supplement for the Froom Ranch Hydrology Report for the Proposed Condition Date: 07-16-2019 Prepared by RRM Design Group Prepared for John and Susan Madonna Trust and Villaggio Communities CREATING ENVIRONMENTS PEOPLE ENJOY® Table of Contents 1. Introduction Page No. 1.1: Introduction 1 2. Method & Assumptions 2.1: Modeling Software 1 2.2: Geometry 1 2.3: Hydrology 1-2 2.4: Sediment 2-3 2.5: Quasi-Unsteady Flow 3 3. Sediment 3.1: Sediment Inputs 3 3.2: Computational Increment 4 3.3: Sediment Gradation 4 3.4: Allowable Depth of Scour and Erodible Bed Limits 4 4. Analysis Results 4 5. Conclusion 4-5 Appendix I 6-31 1 1. Introduction At the request of the City of San Luis Obispo, RRM Design Group has prepared a sediment transport model of the Proposed Condition of Froom Creek. The sediment transport model analyzes the proposed Froom Creek low-flow channel, which has the capacity to carry a 2-year storm event. A one-dimensional sediment transport model has been developed to address the following primary questions related to reaching the primary project goals: 1. What is the anticipated spatial and temporal distribution of deposited sediment? 2. Will the proposed low-flow channel erode and ultimately flow to the adjacent Calle Joaquin Wetland? Since this is a new creek corridor, there is a lack of measured sediment discharge and geometric data over time. Because of this, the model cannot be calibrated to match any sort of observed historic conditions. This analysis is based on historical rainfall data, dating back to October 2016. The model represents anticipated erosivity and flow line movement in the Froom Creek low-flow channel and creek bottom during the scenarios modeled, based on the proposed design. This model can be calibrated in the future based on more detailed design elements in the final construction document phase. 2. Method & Assumptions 2.1: Modeling Software The US Army Corps of Engineers (USACE) Hydrologic Engineering Center River Analysis System (HEC-RAS) Version 5.0.3 was chosen for this analysis. The study uses both the hydraulic and sediment transport modules within the HEC-RAS software. The basic requirements for hydraulic calculations in HEC-RAS are channel cross sectional geometry, Manning’s n-values for the cross sections, riverbank locations, distances between the cross sections, flow information, and flow boundary information. The HEC-RAS sediment transport module calculates transport capacity for non-cohesive and cohesive soil using hydraulic variables (velocity, flow depth, and shear stress) and sediment properties. The results from this analysis are a representation of sediment transport that is anticipated for the proposed project. This analysis should serve to identify areas of concern and the overall impact of sediment transport. 2.2: Geometry The geometric data inputs for this model are derived from the proposed condition of Froom Creek, associated with the project. This proposed condition includes a low-flow channel, which has the capacity to carry a 2-year storm event. The proposed condition matches into the Existing Froom Creek geometric alignment after section 1429.43 (see p. 24 for section). 2.3: Hydrology The flow considered in this analysis is historical data from October 1, 2016 to May 31, 2019. The proposed Froom Creek channel receives water from Watershed indexes #3, #6, and #7 (see Appendix 2 2 from report prepared by RRM Design Group, titled “Preliminary Hydrologic and Hydraulic Calculations,” dated February 22, 2019). The total contributing area is 944.7 acres. See the graph below, which shows the historical rainfall data. 2.4: Sediment The sediment file provides the model with sediment data required for execution of the sediment transport simulations. It contains the properties of both the bed material and incoming sediment loads, which are considered consistent throughout the creek. Sediment grain sizes, grain size distributions, sediment mass density, porosity of deposited sediment, bed material properties, and sediment loads flowing in the creek are contained in the input files. Sediment gradation table is shown below. Diameter (mm) % Finer 0.004 10 0.008 13 0.016 16 0.032 18 0.0625 22 0.125 29 0.25 36 0.5 43 1 50 2 50 4 50 8 50 16 50 32 50 64 60 128 80 256 100 0 2 4 6 8 10 12 Jan-16 Aug-16 Mar-17 Sep-17 Apr-18 Oct-18 May-19 Dec-19Rainfall Depth (in)Historic Rainfall Data Used in Analysis 3 Several equations are available in HEC-RAS to calculate sediment transport, bed sorting, and fall velocity. The equation used in the model is selected on the sediment input screen. Bed sorting calculations are required to simulate how the bed material composition may change over time. For example, if the bed material becomes coarser due to the preferential removal of fine material it may become armored. Once the armoring effect takes place, it protects the sub-surface sediments and limits the amount of sediment that can be removed from the riverbed for transportation. The fall velocity is required to determine its mobility, which is how easy it is to settle the material and to re-entrain it once settled on the riverbed. For this analysis the Ackers-White sediment transport function, the Active Layer sorting equation, and the Ruby fall velocity equation were selected. The Ackers-White sediment transport theory predicts the movement of non-cohesive sediments. The theory contains four empirical parameters which were determined by fitting them to observed transport data. These equations are widely used to calculate sediment transport, morphological change in channels, the size of stable alluvial channels and to design physical models. The Active Layer sorting equation is an active layer method, that considers two layers. The model has an active layer thickness set to d90 by default. The Ruby fall velocity method is suitable for silt, sand, and gravel sizes with specific gravities of around 2.65. One of the limitations of the HEC-RAS sediment transport modeling is that only one sediment gradation can be defined per cross-section. This is an important observation because the sediment properties on the surface and sub-surface often differ especially if the channel has armored. 2.5: Quasi-Unsteady Flow The quasi-unsteady flow file is used to define a flow hydrograph for the HEC-RAS model. The flows are entered as a flow series for a specified duration. The computational increment is specified as a part of the flow series. This increment determines how often calculations are performed. The temperature of the creek water must be specified for calculating sediment particle fall velocities. A constant water temperature of 55 degrees Fahrenheit was used for all simulations. 3. Sediment 3.1: Sediment Inputs Since this is a new creek corridor, there is a lack of measured sediment discharge and geometric data over time. Because of this, the model cannot be calibrated to match any sort of observed historic conditions. This analysis is based on historic rainfall data, dating back to October 2016. The model represents anticipated erosivity and flow line movement in the Froom Creek low-flow channel and creek bottom during the scenarios modeled, based on the proposed design. This model can be calibrated in the future based on more detailed design elements in the final construction document phase, as well as after construction. 4 3.2: Computational Increment For this analysis, computational increments were performed every hour. It was determined that a 60- minute computational increment would provide the best balance between model stability and run time. 3.3: Sediment Gradation Sediment data was entered into the program based on the anticipated sediment gradation in the proposed condition. The proposed project seeks to add river rock to the bed of the channel to limit the effects of erosion, scour, and sediment transport. For more details of the proposed creek bed, see Chapter 2 of the report titled, “Preliminary Hydrologic and Hydraulic Calculations,” prepared by RRM Design Group. 3.4: Allowable Depth of Scour and Erodible Bed Limits HEC-RAS allows a set of maximin scour depths and erodible bed limits (horizontal extents of allowable scour) that are applied during simulation. The scour depth limits that were tested ranges from 0 to 5 feet. The bank stations were used as boundaries for the erodible bed limits. All the results indicate significantly less than 5 feet of scour in the final condition, so this limit is within the bounds of what needs to be analyzed. See pages 6-31 for detailed scour depth outputs. 4. Analysis Results The analysis results are included in Appendix I. The Froom Creek profile output (p. 7) shows the anticipated creek profile elevation after applying the historical rain data and running the model. The Froom Creek Cross-Section outputs (pages 8-31) show the extents of erosion that takes place in each cross-section. Based on these results, it can be observed that the banks of Froom Creek do not erode. The analysis results for section 1757.69 show some scour of the wetland. This model uses a manning’s roughness coefficient of 0.035 to represent the proposed swale condition, which doesn’t account for the vegetation in the wetland. When the of vegetation in the wetland is considered, it is anticipated that no erosion of the wetland will take place. The analysis also shows a significant amount of erosion at cross-section 3210.45. This section shows significantly more scour due to the change in slope that occurs at this point in the proposed low-flow channel. This condition has been anticipated by RRM and will be mitigated with an appropriate armoring method along the channel of the creek. 5. Conclusion As discussed in the introduction, there are two main questions to be address by the sediment transport model results. 1. What is the anticipated spatial and temporal distribution of deposited sediment? The profile output (Appendix I, p. 7) graphically shows what the anticipated creek profile will look like after several years of rain events. As discussed earlier in the report, the armoring effect will take place, which will limit the amount of erosion that takes place in the future. Although erosion of the creek bed is anticipated, it will be minimal after the first few heavy rains, as evidenced by the Invert Change Vs. 5 Time graphs provided in Appendix I. All the Invert Change Vs. Time graphs show a steep decline in sediment transport after the initial rain events. This is a result of the armoring effect, which limits sediment transport after the fine grain soils on the surface are transported by flow. 2. Will the proposed low-flow channel erode and ultimately flow to the adjacent Calle Joaquin Wetland? All the Froom Creek Cross-Section results show that although the flowline of the creek may erode slightly, none of the results indicate that the creek banks will erode, or that the flow line will move horizontally. The minimal erosion that is predicted will take place along the bed of Froom Creek, not along the banks. Based on the results obtained in this analysis, RRM anticipates minimal sediment transport and erosion to occur after armoring occurs. Although some erosion of the Froom Creek bed is anticipated, RRM sees no indication that the channel banks will erode. 6 Appendix I Proposed Froom Creek Alignment 7 Proposed Froom Creek Profile Output 0100020003000400095100105110115120125n:\2014\1014012-Froom-Ranch-SP-Il-Villaggio\Engineering\hydro\Hec Ras\Sediment Analysis\SedimentAnalysis.sed08Main Channel Distance (ft)Ch Invert El (ft)Legend01OCT2016 01:00:00-Ch Invert El (ft)31MAY2019 00:00:00-Ch Invert El (ft)Main 2-River 2Proposed FroomCreek ProfileProjected FroomCreek Profile 8 Froom Creek Cross-Section Outputs 0204060801001201401601801201221241261281301324164.67 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00004164.67Proposed Low Flow Swale 9 121121.25121.5121.75122122.25122.5Creek Bed Invert (ft)October 1, 2016 May 31, 2019Section 4164.67 - Low Flow Swale Flowline Elevation Change Over Time 10 0204060801001201181201221241261283969.73 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00003969.73Proposed Low Flow Swale 11 121.25121.5121.75122122.25Creek Bed Invert (ft)October 1, 2016 May 31, 2019Section 3969.73 - Low Flow Swale Flowline Elevation Change Over Time 12 0204060801001201161181201221241261283714.24 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00003714.24Proposed Low Flow Swale 13 116116.25116.5116.75117Creek Bed Invert (ft)October 1, 2016 May 31, 2019Section 3714.24 - Low Flow Swale Flowline Elevation Change Over Time 14 01002003004005001121141161181201221241263453.96 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00003453.96Proposed Low Flow SwaleExisting LOVR Ditch(not affected) 15 113113.25113.5113.75114Creek Bed Invert (ft)October 1, 2016 May 31, 20193453.96 - Low Flow Swale Flowline Elevation Change Over Time 16 0501001502002503001061081101121141161181203210.45 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00003210.45Proposed Low Flow SwaleSee "Analysis Results" on Pg. 4 17 106106.5107107.5108108.5109109.5110110.5Creek Bed Invert (ft)October 1, 2016 May 31, 2019Section 3210.45 - Low Flow Swale Flowline Elevation Change Over Time 18 01002003004005001061081101121141161181201222422.36 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00002422.36Proposed Low Flow SwaleExisting Calle Joaquin Wetland 19 107107.25107.5107.75108108.25108.5Creek Bed Invert (ft)October 1, 2016 May 31, 20192422.36 - Low Flow Swale Flowline Elevation Change Over Time 20 01002003004005006007001061081101121141161181201222031.65 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00002031.65Proposed Low Flow SwaleExisting Calle Joaquin Wetland 21 106.5106.75107107.25107.5107.75108108.25108.5Creek Bed Invert (ft)October 1, 2016 May 31, 20192031.65 - Low Flow Swale Flowline Elevation Change Over Time 22 01002003004005006001021041061081101121141161181201221757.69 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00001757.69Proposed Low Flow SwaleExisting Calle Joaquin WetlandSee "Analysis Results" on Pg. 4 23 102.4102.6102.8103103.2103.4103.6103.8104104.2104.4Creek Bed Invert (ft)October 1, 2016 May 31, 20191757.69 - Low Flow Swale Flowline Elevation Change Over Time 24 01002003004001001051101151201251301351429.43 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 00001429.43Existing CreekProposed HighFlow Bypass 25 102.25102.5102.75103103.25Creek Bed Invert (ft)October 1, 2016 May 31, 2019Section 1429.43 - Low Flow Swale Flowline Elevation Change Over Time 26 010020030040050090100110120130140150160912.75 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 0000912.75Existing CreekHigh Flow Bypass 27 96.2596.596.7597Creek Bed Invert (ft)October 1, 2016 May 31, 2019912.75 - Low Flow Swale Flowline Elevation Change Over Time 28 010020030040050090100110120130140150160603.53 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 0000603.53Proposed DetentionBasinExisting Creek 29 96.296.4596.796.9597.2Creek Bed Invert (ft)October 1, 2016 May 31, 2019603.53 - Low Flow Swale Flowline Elevation Change Over Time 30 010020030040050060070095100105110115120125130463.85 Station (ft)Elevation (ft)Legend01Oct2016 010031May2019 0000463.85Existing CreekProposed DetentionBasin 31 9595.2595.595.7596Creek Bed Invert (ft)October 1, 2016 May 31, 2019463.85 - Low Flow Swale Flowline Elevation Change Over Time