Loading...
HomeMy WebLinkAbout12-03-2013 c3 water tank maintenance 2014 proj FROM: Carrie Mattingly, Utilities Director Prepared By: Jennifer Lawrence, Project Manager SUBJECT: WATER TANK MAINTENANCE 2014 PROJECT, SPECIFICATION NO. 91152 RECOMMENDATIONS 1. Approve the Special Provisions for “Water Tank Maintenance Project 2014, Specification No. 91152.” 2. Authorize staff to advertise for bids. 3. Authorize the City Manager to award the contract if the lowest responsible bid is within the Engineer’s Estimate. DISCUSSION Background The City has over 180 miles of pipeline providing potable water to its citizens and businesses. Water storage is provided in 11 tanks and two reservoirs located throughout the City ranging in size from 40,000 gallon to 7.5 million gallons. The reservoirs are a combination of above grade steel tanks and underground concrete reservoirs with a total combined storage capacity of approximately 26 million gallons. Regular maintenance of water storage tanks is important for economic, environmental, and health reasons. The effects of corrosion to steel tanks, for instance, can lead to structural failure, leaks, and water contamination which can affect the health of its users. In 2009, the City hired Advantage Technical Services (ATS) to inspect the interior and exterior of seven of the City’s water storage facilities and prepare written assessment reports with the observations, recommendations, and preliminary cost estimates. Following the inspections, staff worked with ATS to assign a priority ranking to each of the recommendations for maintenance. Due to deteriorating conditions of the Edna Saddle and Rosemont water storage tanks, such as coating deficiencies resulting in significant corrosion, their maintenance and repairs were identified as a high priority. The Bishop Tank was not included in the initial inspection reports; however significant coating failures have been observed since its construction in 2006. Staff has determined, with supporting recommendation from ATS, that maintenance repairs to this facility are also considered high priority. Project Summary The Water Tank Maintenance 2014 project is part of an ongoing program of maintenance to the City’s water supply facilities. The 2011-12 Mid-Year Budget Review identified the Edna Saddle and Rosemont water tanks as an urgent maintenance project due to intrusive corrosion at both tanks. The Bishop Tank maintenance was added to the project in 2013 as staff has observed significant delamination and deterioration of the exterior coating and determined that any further delay in Meeting Date Item Number December 3, 2013 C3 - 1 making repairs could result in higher costs and significant structural deficiencies. Additionally, further deterioration at the Edna Saddle tank roof has occurred in the time since the project was originally scheduled and it was determined those repairs should take place at this time as well. In general, the project includes: • Preparation and exterior coating of Edna Tank • Caulking of the chime/concrete interface of Edna Tank • Spot repair of exterior coating at Edna Tank • Spot repair of exterior and interior coating at Rosemont Tank • Welded steel patch repairs at Rosemont Tank • Interior ladder modification at Rosemont Tank • Cleaning and disinfection of the interior of Rosemont Tank • Preparation and exterior coating of Bishop Tank roof and knuckle • Spot repair of exterior coating at Bishop Tank These repairs are essential to prevent structural failures and water contamination which could pose potential health and safety risks to their users, as well as provide safer working conditions for City maintenance staff. CONCURRENCES The Public Works Department staff concurs with this request. Community Development Department has granted a Categorical Exemption in accordance with the California Environmental Quality Act (CEQA). FISCAL IMPACT The Edna Saddle and Rosemont Tanks Maintenance project is identified in the 2011-12 Mid-Year Budget Review, page C-31, with $66,600 for design, construction, and construction management services. A total of $25,990 was previously awarded to Advantage Technical Services for Professional and Technical Services. This leaves an available balance of $40,610. The design services portion of the project will be paid to ATS from the current encumbrance (29712) which has an available balance of $10,105.00. With the additional repairs to Edna and the addition of Bishop Tank maintenance, the Engineer's Estimate of construction cost of the entire project is $223,715. The additional $178,755 needed will be funded from Water Fund Working Capital. A Budget Amendment Request will be processed at time of contract award to transfer funding from Water Fund Working Capital to the project’s construction account. C3 - 2 $4,350 $154,000 $23,100 $41,965 $300 Total Construction Costs:$219,365 Total Project Costs:$223,715 Water Tank Maintenance 2014 Project Costs: Construction Estimate Construction Contingencies (15%): Construction Management Miscellaneous Construction Costs (Printing, Materials Testing, Etc.) Design Services: Construction Services: ALTERNATIVES Defer the Bishop Tank Maintenance. This alternative is not recommended. If the delamination of the coating is not corrected in the near future, the resulting corrosion will cause the water storage tank to more rapidly deteriorate to the point of requiring more costly repairs and potentially jeopardize the health and safety of customers and staff. ATTACHMENTS 1. Vicinity Map of each site (PDF) AVAILABLE FOR REVIEW IN THE COUNCIL OFFICE 1. Special Provisions for the “Water Tank Maintenance Project 2014, Specification No. 91152” (PDF) ..\Water Tank Maintenance Proj (Mattingly-Lawrence) C3 - 3 B R O A D R O C K V I E W McMIL LAN LAWRENCE GARIB ALDI MITCHELL V I C T O R I A ORCUTT STONERIDGE CAUDILL P E R K I N S F R A N C I S GAI L LAW TON BL U E R O C K MASON H U M B E R T S W E E N E Y FENNEL SAC RAMENTO M U TS U H I T O CHANDLER TENBROOK MORRISON R O C K VIE W C T L A W R E N C E WATER TANK MAINTENANCE PROJECT 2012 EDNA SADDLE TANK N 02004006008001,000100 Feet SPECIFICATION NO. 91152 - EDNA SADDLE TANK - C3 - 4 HIGHLAND AL-HIL FEL-MAR O A K RID G E P A T R I C I A JAYCEE CRAIG DALY C L O V ER LOS CERROS ANACAPA B R I T T A N Y LOS ROB LES WATER TANK MAINTENANCE PROJECT 2012 ROSEMONT TANK N 02004006008001,000100 Feet SPECIFICATION NO. 91152 - ROSEMONT TANK - C3 - 5 J O H N S O N F L O R A B I S H O P A U G U S T A S Y D N E Y S I E R R A F I X L I N I EL L A H E L E N A IR IS P A R K L A N D W I L D I N G S U N S E T S M I T H S A N MA TEO R E B A E L C E R R I T O S A N C A R L O S LA CITA S K Y L A R K C E C E L I A G R E T A V I E WM O N T R I C H L A V I N E D A G E R D A BOULEVARD D EL C AMPO C O R O N A JOY C E E N C I N O BIN NS SYLVIA M A R I A N E L PA S E O S Y D N E Y S A N C A R L O S WATER TANK MAINTENANCE PROJECT 2012 BISHOP TANK N 02004006008001,000100 Feet SPECIFICATION NO. 91152 - BISHOP TANK - C3 - 6