Mayor Marx and Council Members,
Please find attached our recommendations regarding items for further study within the scope of the Land Use and
Circulation Elements EIR.
Thank you for your consideration, AGENDA
CORRESPONDENCE
Charlene Rosales
Date -,4.11
Director of Governmental Affairs 1 2t�
San Luis Obispo Chamber of Commerce
895 Monterey St., San Luis Obispo, CA 93401
p (805) 786 -2770 f (805) 543 -1255
www.slochamber. M : www.visitslo.com : www.slo- business.com
facebook.com/slochamber: @slochamber
895 Monterey Street
San Luis Obispo, CA
93401 -3278
Ermina Karim, President/CEO
January 24, 2014
Honorable Mayor and Council Members
City of San Luis Obispo
990 Palm St.
San Luis Obispo, CA 93401
Subject: Recommendation re. LUCE EIR
Dear Mayor Marx and City Council Members,
The San Luis Obispo Chamber of Commerce appreciates the opportunity to continue our participation in the
City's important Land Use & Circulation Element (LUCE) update. This update is the community's opportunity
to address current inequities regarding available housing, opportunities for economic growth, infrastructure for
all modes of transportation, and address gaps for much needed community amenities. The amendments to the
LUCE will provide important guidance for the coming decades of community development.
As such, the Chamber would like to provide some additional comments that specifically address the critical
need for additional housing capacity in our city. We are certainly not alone in recognizing the benefits of
adequately accommodating those who wish to work and live in the same community. The lack of housing
available for our workforce is consistently among the top needs identified by residents in annual city surveys; it
is the long- standing top business challenge for local employers of all sizes; and it is the chief contributor to
greenhouse gas emissions in our region.
We have asked throughout this process that the City's jobs- housing goals as identified in numerous documents
-- including the General Plan Annual Report, Climate Action Plan, and Economic Development Strategic Plan --
be more specifically addressed in the LUCE update. The city's stated jobs- housing target is 1.5 jobs per housing
unit; according to the city's own reports, it appears that we are currently at an approximately 1.8 jobs -to-
housing ratio. This performance gap is merely maintained in the current LUCE document.
While our community may not achieve its target ideal balance, identifying potential tools to move us closer to
this goal and understanding the implications of these tools is critical so that wise future planning decisions can
be made. For this reason, the Chamber would like to submit the following suggestions for consideration with
the scope of the LUCE environmental impact report (EIR):
1. Building Heights: After careful analysis of all the planning areas within the LUCE document, we have
identified specific areas where additional building height may be appropriate to increase the
availability of housing while discouraging sprawl. There are many considerations when increasing
building height, such as impacts to view shed, however the EIR process can help identify impacts for
Y 805.781.2670 slochamber,orq
F 805.543.1255 visi!slo com
E slochamber ®slochamber.org slo•buiness.com
895 Monterey Street
San Luis Obispo, CA
93401 -3278
Ermina Karim, President/CEO
future decision making. In some instances, the existing language already supports potential building
height adjustments. Our request is intended to provide more specific direction to the EIR consultant in
order to yield more beneficial analysis. While we are not specifically supporting heights to increase in
each of these areas at this time, we want this topic to be studied within the scope of the EIR so that the
community can make informed decisions long into the future. We have attached specific
recommendations to this letter for consideration (See addendum).
2. The Chamber requests the City to consider a program to study height limits citywide and modernize
zoning regulations to reflect these updates.
We urge that the City direct the EIR consultant to study an alternative in the program EIR that
produces specifically the City's own goal of a jobsihousing ratio of 1.5:1.
It is imperative that the LUCE addresses our jobs- housing imbalance so that we can strive to minimize it over
time. The jobs- housing relationship is at the heart of AB 32 and AB 375, the funding source of the Sustainable
Communities Grant for this LUCE update. We urge you to more meaningfully address this inequity and
request that you incorporate the study of the items identified above and in the attached language within the
scope of the EIR so that we can move one step closer to our collective goal of improving San Luis Obispo
economically, socially and environmentally.
In conclusion, the Chamber would like to thank the City for embarking on this important undertaking and we
appreciate the spirit of open collaboration shown us to date.
Thank you for your consideration.
Sincerely,
Stacey White, Chair
SLO Chamber of Commerce LUCE Task Force
Cc: Eric Meyer, Chairperson, LUCE Task Force
Michael Draze, Chairperson, City of San Luis Obispo Planning Commission
Kim Murry, Deputy Director, Community Development Department
T 805.781.2670 slochamber.org
F 805.543,1255 visitslo com
E siochamber ®siochamber,org sio- buiness.com
895 Monterey Street
San Luis Obispo, CA
93401 -3278
Ermina Karim, President/CEO
Addendum: Recommendations for Study within the Scope of the LUCE EIR
1.4 Jobs /Housing Relationship
Recommendation for study: Add additional language to the jobs /housing policy
The gap between housing demand (due to more job and college enrollment) and supply should
not increase. The City shall strive to improve the gap between jobs and housing from the 2014
ratio of 1.8:1 towards the target of 1.5:1.
Caltrans Site
Recommendation for study: Increase height from 45 to 60 ft.
While this area is within the Mid - Higuera Area, the unique qualities and opportunities provided
by the site warranted special consideration in the General Plan. This area is planned for
redevelopment from a Caltrans office and yard complex to a mixed use development.
Commercial uses will be as described under the Tourist Commercial designation with some
residential incorporated using a Medium High to High Density Residential component.
Redevelopment plans shall consider the suitability of realignment of the Madonna /South Higuera
intersection. The site should be developed to serve as a gateway into the community, with
consideration of additional open space uses, retention and rehabilitation of the Master List historic
structure, and retention of Heritage Trees on the site. Conference center -type uses are encouraged
along with other appropriate tourist - serving uses as appropriate for the site.... Building height
adjustments in this area can also be considered up to 60 feet with mixed use development.
Foothill Boulevard / Santa Rosa Area
Recommendation for study: Increase height from 45 to 60 ft.
This area, which includes land on both sides of Foothill Boulevard between Chorro and Santa
Rosa, is currently developed as commercial centers that include highway and neighborhood
serving commercial uses. At the affected property owners' request, the boundary of this area on
the north side of Foothill maybe extended to include one or more of the existing commercial
properties west of Chorro Street, The City shall work with property owners /developers to
redevelop the area as mixed use (either horizontal or vertical mixed use) to include a mix of uses
as described under the Neighborhood Commercial, Community Commercial and Medium High to
High Density Residential designations.
T 805.781.2670
F 805.543.1255
E slochamber ®slochamber.org
895 Monterey Street
San Luis Obispo, CA
93401 -3278
Ermina Karim, President/CEO
Building height adjustments up to 60 feet in this area can also be considered with mixed use
development that provides additional residential housing.
Upper Monterey
Recommendation for study: Add a section "i" to the list of actions in this area, with consideration of an increased
height limit from 45 to 60 ft. in the area closer to Downtown
i. Consider building height adjustments up to 60 feet with mixed use development in the
lower Monterey area defined as Santa Rosa St. to California Blvd.
Mid - Higuera Area
Recommendation for study: Increase from 35 -45 ft. to 60 ft.
The City will update the plan for this multi -block commercial area to reflect current needs and
changes that have occurred since the 2001 plan was adopted. Building height adjustments up to 60
feet in this area can also be considered with mixed use development.
Broad Street at Tank Farm Road Site
Recommendation for study: Increase height from 35 to 50 ft.
Located at the northwest corner of Board Street and Tank Farm Road, this approximate 10 acre site
will be used as a mixed use site, providing for a mix of uses as described under the Community
Commercial and Office designations and residential limited to upper floors. Building height
adjustments in this area can also be considered up to 50 feet. Areas along the creek on the western
edge of the site will be appropriately buffered to provide creek protections. Attention to
connectivity and comfort of bicycle and pedestrian circulation will be especially important in the
development of this corner.
Building Height (Downtown)
Recommendation for study: Increase height from 50 to 60 f, for new buildings; increase height from 50 to 75 to 60 to
75 ft, for taller buildings
New buildings shall fit within the context and vertical scale of existing development, shall not obstruct
views from, or sunlight to, publicly -owned gathering places such as Mission Plaza, and should be
stepped back above the second or third level to maintain a street facade that is consistent with the
historic pattern of development. Generally, new buildings should not exceed 60 feet in height. Tall
buildings (60 -75 feet) shall be designed to achieve multiple policy objectives, including design
amenities, housing and retail land uses, such as:
v 805.781.2670 alocr;arnhcar.org
F 805.543.1255 vlsasio coop
E slochamber®slochamber.org shrblarsossz:orri
895 Monterey Street
San Luis Obispo, CA
93401 -3278
Ermina Karim, President/CEO
• Publicly accessible, open viewing spaces at the upper levels
• Housing affordability in excess of the Inclusionary Housing Requirement
• Energy efficiency beyond State mandated requirements
• Adaptive reuse of a historical resource in a manner consistent with the Secretary of the Interior's
Standards for Rehabilitation
• High residential density (e.g. above 24 units per acre) achieved by a concentration of smaller
dwelling units
• Street level features such as a public plaza, public seating and /or public art
• Increased retail floor area, including multi -story retail
• Directly implements specific and identifiable City objectives, as set forth in the General Plan, the
Conceptual Plan for the City's Center, the Downtown Strategic Plan and other key policy
documents
• Receiving Transfer of Development Credits for open space protection or historic preservation
• Provide midblock or other significant pedestrian connections
Margarita Area Specific Plan Update
Recommendation for study: Add back more specific target for study that reflects prior project plans
Location: The Margarita Area covers about 420 acres bounded by South Higuera Street,
Broad Street, Tank Farm Road, and the ridge of the South Street Hills in the
southern portion of San Luis Obispo.
Purpose: Adopted in October 2004, the Margarita Area Specific Plan contains five key
principles: open space and sensitive resource production, cohesive neighborhood
creation, transit supporting land uses and densities, pedestrian environment, and
minimizing infrastructure costs.
The approved specific plan includes 868 residential dwelling units, as well as a
business park, a neighborhood park, sports fields, and open space areas. Over 40
percent of the land area is designated as open space and 56 acres are designated as
parks.
The City shall consider this area as potentially appropriate to accommodate
additional housing up to 1,200 units. Revision to the Margarita Area Specific Plan
will be require if residential development in excess of that accommodated in the
plan is proposed.