HomeMy WebLinkAbout1/12/2023 Item 4a, Friends of La Loma AdobeFriends of
LA LMA ADOBE
A Caiifornh Nan -profit Public Benefit Corporation
Post Office Box 13253
San Luis Obispo, California 93406
FrdendrofLaLoma Adobe Inclusion of La Loma Adobe in 2023-2025 Budget Cycle
Board of lXrectors
January 10, 2023
Robert Jor€�ensen
President
Robert Vesselx; P.E. Madam Mayor and Council Members,
Vice President
Norma Frey Thank you for taking the time to consider the future of the La Loma Adobe. Friends of La Loma
serretag Adobe (FLLA) has been working in coordination with City staff in the hope of preserving the La
Pierre Radeinaker Loma Adobe as an historical asset for the community and an appropriate feature at the
Treasurer trailhead of the Bowden Ranch and Reservoir Canyon Open Space. We are confident that we
Jan Trench can bring this important cultural resource to the next level of preservation within the next City
Robert Hoover,Ph.D. budget cycle.
Joan Sullivan
(Emeritus) FLLA and City staff have accomplished several very important steps. We commissioned an
Nancy Hillenburg Historic Resource Evaluation which documented the status of this adobe as eligible for the
(Emeritus) California Register of Historic Resources. Also, an Historic Structures Report is currently
underway which will define the critical historic features of the building that need to be
considered when planning for the future of the resource.
We have hardly been alone in this process. We have enjoyed enthusiastic support, material
and financial from neighbors, the City, as well as a pair of grants from the California Missions
Foundation.
The adobe is failing. It has become clear that we need to structurally stabilize the building and
tighten up its outside shell, particularly the roof, before any rehabilitation work is attempted.
FLLA has conducted emergency repairs and temporary fixes on its own, but the next steps are
beyond FLLA's current capacity. Thus, we seek an allocation of City funds to conduct the
needed stabilization and roof repair. We expect to oversee the design and construction work
so as to relieve the Public Works Department of the task as much as possible.
Fortunately, there are tried-and-true structural improvement techniques that have been used
on adobe buildings throughout the southwestern US as well as locally, for example, at the
Dana Adobe in Nipomo, the Rodriguez Adobes here in San Luis Obispo and even at our own
Mission Church. At the end of this process, we anticipate a stable and secure outside shell
ready for whatever new use is deemed appropriate.
Attached is an outline of the work we propose to accomplish over the next two years with
financial support from the City. We appreciate your consideration.
Sincerely,
0
Robert E. Jorgensen, President
La Loma Rehabilitation Cost & Schedule
Projects Accomplished
Final Cost
Date
Adobe
Installed shoring inside adobe
$1400 lumber, labor donated
January, 2019
Installed security lights
$100 parts, labor donated
2020-2022
Installed temporary roofing
$4700 bid, $1000 donated
April, 2019
Installed gutters & downspouts
$2450
June, 2019
Repaired adobe wall & footing at the northwest corner
$560 materials, labor donated
Spring 2020
• Repair adobe walls & plaster
$85,000
Site
$75,000
Removed inappropriate plants
In-kind donation
On going
Installed native & Mission -era plants
In-kind donation
On going
Installed benches & walkways
In-kind donation
On going
Installed water tank for reclaimed water
$150
June, 2018
Upgrade security lights & cameras
$2000
Spring 2024
Analysis
$25,000
Spring 2024
Commissioned Historic Resource Evaluation, completed
$7850
January, 1021
Commissioned Historic Structures Report
$60,000
Under way
Commissioned archaeological survey by remote sensing
technology
donated
June, 2017
Projects Planned
Projected Cost -;Schedule
Adobe
Commission construction plans & specifications
$50,000
Spring 2023
Install water & electrical service
$18,000
Summer 2023
Subtotal
$68,000
Rehabilitate the building envelope*
• Install structural rehabilitation measures
$250,000
• Repair adobe walls & plaster
$85,000
• Install new roof framing as necessary
$75,000
• Install new wood shingle roof
$35,000
Rehabilitation Subtotal
$445,000
Summer2023
Reinstall gutters & downspouts
$4000
Fail 2023
Fumigate against termites
$5000
Spring 2024
Upgrade security lights & cameras
$2000
Spring 2024
Commission interior archaeological study
$25,000
Spring 2024
Subtotal
$36,000
Site
Commission further archaeological survey
$25,000
Summer 2024
Install second & third phase of landscaping & signage
$50,000
As funds allow
Upgrade the fence around the adobe
$2,000
As funds allow
Subtotal
$77,000
*Based on similar rehabilitation of the Rodriguez Adobe in 2004 updated for inflation