Loading...
HomeMy WebLinkAboutRW Exhibits - Alt 3STOPSTOP067-121-022 APN 053-041-078 053-041-031 053-051-045 POTENTIAL STATE R/W ESTIMATEKEY 053-041-072 053-041-071 POTENTIAL STATE R/W ESTIMATE WITH STRUCTURE ACRE POTENTIAL CITY R/W ESTIMATE ACRE POTENTIAL CITY SLOPE EASEMENT ESTIMATE ACRE ACRE -- -- -- Filename: O:\PRJ\2436\2436EX030.dwg Plot Date: 11 February 2021 - 9:13 PM Date Report No. Project No.City of San Luis Obispo US 101/Prado Road IC PA/ED 11144990 2/11/2021 Source: GHD FIGURE 3 Alternative A3 Estimate of R/W and Slope Easements 0 1 inch = ft. 400 400 400N0.3141.456 -- -- -- 0.627 0.091 0.026 0.118 0.201 1.182 0.008 0.071 0.278 0.9090.038 AUXILIARY LANE ELKS LANE REALIGNMENT RTA FACILITY CITY CORPORATION YARD APN: 053-051-045 APN: 053-041-078 APN: 053-041-072 APN: 053-041-071 APN: 053-041-025 APN: 067-121-022 053-041-077 APN: 053-051-033 ---- 053-041-032 ----0.017 0.042 053-041-036 ---- 053-041-076(3)---- LEGEND: PRELIMINARY ESTIMATE OF RIGHT-OF-WAY & SLOPE EASEMENTS APN: 053-041-032 APN: 053-041-077 APN: 053-041-031 APN: 053-041-076 APN: 053-041-036 0.0050.002 0.0015.699 X 10-4 7.681 X 10-5 EXISTING PROPERTY LINES EXISTING RIGHT-OF-WAY PROPOSED CITY RIGHT-OF-WAY PROPOSED STATE RIGHT-OF-WAY FOR FILL SLOPES NOTE: EXISTING CITY R/W THAT NEEDS TO BE TRANSFERRED OVER TO THE STATE IS NOT SHOWN 8.442 X 10-4 0.0008 3.578 0.2990.3191.346 TOE OF SLOPE 053-041-025 7.838 X 10-4 ------ PROPOSED STATE RIGHT-OF-WAY FOR STRUCTURE NOTES AND ASSUMPTIONS: 1.THE PROPOSED STATE R/W EXTENDS 100' BEYOND THE END OF THE CURB RETURN FOR THE NB RAMPS/FUTURE SB RAMPS PER HDM INDEX 504.8. 2.CITY R/W EXTENDS A MINIMUM OF 2' BEYOND THE BACK OF SIDEWALK, BACK OF CURB, OR STRUCTURE PER CITY STANDARD 1010 SECTION 3.1.19(A). 3.APN-053-041-076 IS A CITY EASEMENT. 4.THE PROPOSED STATE R/W FOR THE STRUCTURE CONDITION IS ASSUMED TO BE 10' OFF THE STRUCTURE. 5.THE PROPOSED STATE R/W FOR THE FILL CONDITION IS ASSUMED TO BE 15' OFF THE TOE OF SLOPE. 6.THE PROPOSED CITY R/W FOR THE STRUCTURE CONDITION IS ASSUMED TO BE 2' OFF THE STRUCTURE. WRRF FACILITY TOTAL IMPACT 0.358 -- CORP YARD BUS YARD RTA 2.392 0.196 BLDG IMPACT ACRE ACRE -- -- -- 0.056 CITY OF SLO BUS YARD WATER RESOURCE RECOVERY FACILITY (WRRF) TOTAL IMPACT 0.043 -- 0.362 BLDG IMPACT ACRE ACRE -- -- -- 0.021 FILL CONDITION STRUCTURE CONDITION -- PRELIMINARY FACILITY IMPACTS