HomeMy WebLinkAbout05-06-2014 C10 Advertisment of PD HVAC ReplacementCity of San Luis Obispo, Council Agenda Report, Meeting Date, Item Number FROM: Daryl R. Grigsby, Director of Public Works Prepared By: Michael J. McGuire, Engineer III SUBJECT: POLICE DEPARTMENT HVAC REPLACEMENT, SPECIFICATION NO. 91251 RECOMMENDATIONS 1. Approve plans and specifications for "Police Department HVAC Replacement, Specification No. 91251.” 2. Authorize staff to advertise for bids and authorize the City Manager to award the contract if the lowest responsible bidder is within the Engineer’s Estimate of $140,000. 3. Approve the transfer of $18,500 from the project’s construction management account to the construction account at the time of bid award. DISCUSSION The existing 50-ton Heating Ventilation Air Conditioning (HVAC) unit, the main air handler and cooling unit for the Police Department Station, has been in place for over 20 years. The typical lifespan for commercial HVAC equipment is 12 to 15 years. The existing unit is rusted and this corrosion cannot be repaired in a cost effective manner. The HVAC unit experienced numerous breakdowns and requires repairs that consume a great deal of time by building maintenance staff or contractors. Also, the roof underneath the unit is deteriorating to the point that if repairs are not made to the roofing, water intrusion will occur into the Station. This project will replace the existing HVAC unit with a unit of the same capacity and a 15 year lifespan but will be more energy efficient, resulting in energy use savings and carbon footprint reductions. In a recent energy audit, PG&E identified replacement of the HVAC unit as being eligible for incentive rebates. The roof area under the HVAC unit will be repaired as part of this new unit installation. CONCURRENCES This project has the concurrence of the Police Department. It also has environmental clearance from the Community Development Department with building permits pending approval. FISCAL IMPACT The 2013-15 Financial Plan, Appendix B, pages 3-19 to 3-21, identifies $141,500 to replace and install the new HVAC unit in 2014-15, along with $18,500 for construction management. The current construction schedule allows for staff inspection and negates the need for consultant services for construction management. A transfer of the $18,500 from construction management into the construction account phase will make these funds available to support higher than May 6, 2014 C10 C10 - 1 PD HVAC Replacement (91251) Page 2 anticipated construction costs or unforeseen conditions during construction. This will provide a total construction budget of $160,000. ALTERNATIVE Deny approval of award. The Council could choose to deny or defer the approval for advertising of this project. Staff does not recommend this option. Should this be denied or deferred, HVAC replacement to the Police Department Station will be delayed. The existing unit will continue to deteriorate with the possibility of sudden irreparable failure, require substantial staff time for maintenance and repair, and energy cost savings will not be realized. ATTACHMENT 2013-15 Financial Plan, Appendix B, pages 3-19 to 3-21 COUNCIL READING FILE Plans and Special Provisions t:\council agenda reports\2014\2014-05-06\advertisement of pd hvac replacement (grigsby-mcguire)\91251 car advertise.docx Fiscal Impact Summary 2014-15 Approved Project Budget:160,000$ Engineer's Estimate Construction:140,000$ Construction Contingencies:15,000$ Total for Construction:155,000$ Printing & Advertising:500$ Total Cost of Project:155,500$ C10 - 2 CA P I T A L I M P R O V E M E N T P L A N - P U B L I C S A F E T Y PO L I C E D E P A R T M E N T A D M I N H V A C R E P L A C E M E N T Pr o j e c t D e s c r i p t i o n Re p l a c i n g t h e M c Q u a y r o o f t o p c h i l l e r a n d r e h a b o f m e c h a n i c a l ro o f a r e a f o r t h e P o l i c e S t a t i o n b u i l d i n g a t 1 0 4 2 W a l n u t w i l l h a v e a design cost of $12,300 in 20 1 3 - 1 4 w i t h c o n s t r u c t i o n c o s t a t $ 1 7 2 , 3 0 0 i n 2 0 1 4 - 1 5 . Ma i n t e n a n c e / R e p l a c e m e n t Ne w p r o j e c t Fl e e t R e p l a c e m e n t Ne w F l e e t R e q u e s t Co u n c i l G o a l / M e a s u r e Y P r i o r i t y : M a i n t e n a n c e o f C i t y I n f r a s t r u c t u r e Ne e d a n d U r g e n c y Th i s p i e c e o f e q u i p m e n t i s t h e m a i n a i r - h a n d l e r a n d 5 0 - t o n c o o l i n g u n i t f o r t h e P o l i c e S t a t i o n . S t a n d a r d l i f e s p a n f o r c o m m e r c i a l H VAC equipment is 12-15 years. Th i s u n i t i s 2 0 - y e a r s o l d a n d i s e x p e r i e n c i n g m a n y b r e a k - d o w n s a n d i s r u s t i n g a n d c o r r o d i n g i n p l a c e . T h i s p r o j e c t i s t o r e p l a c e t h i s m e c h a n i c a l e q u i p m e n t a n d t o re h a b t h e a r e a o f t h e r o o f u n d e r t h i s u n i t . Th e r e p l a c e m e n t o f t h i s u n i t w a s i d e n t i f i e d a s a p r i m e t a r g e t f o r e n e r g y u s e s a v i n g s a n d c a r b o n f o o t p r i n t r e d u c t i o n s i n a 2 0 1 1 au d i t b y P G & E e n g i n e e r s . Re a d i n e s s t o B u i l d S t u d y c o m p l e t e o r n / a E q u i p m e n t p u r c h a s e d o r n / a P r o p e r t y o w n e d o r p r o p e r t y a g r e e m e n t i n p l a c e n / a En v i r o n m e n t a l a p p r o v a l a n d p e r m i t s c o m p l e t e o r n/ a Sp e c i f i c a t i o n s o r c o n s t r u c t i o n d o c u m e n t s c o m p l e t e n / a IT S t e e r i n g C o m m i t t e e r e v i e w n/ a En v i r o n m e n t a l R e v i e w a n d P e r m i t s R e q u i r e d E n v i r o n m e n t a l R e v i e w n / a Bu i l d i n g P e r m i t n/ a Wa t e r w a y P e r m i t s ( F i s h & W i l d l i f e , W a t e r Q u a l i t y , A r m y C o r p s ) n/ a Ra i l r o a d n/ a Ot h e r : ( E n t e r t h e t i t l e a n d a g e n c y o f a n y o t h e r n e e d e d p e r m i t s ) n/ a    C10 - 3 CA P I T A L I M P R O V E M E N T P L A N - P U B L I C S A F E T Y PO L I C E D E P A R T M E N T A D M I N H V A C R E P L A C E M E N T Op e r a t i n g P r o g r a m N u m b e r a n d T i t l e : 80 1 0 0 P o l i c e A d m i n i s t r a t i o n Pr o j e c t P h a s i n g a n d F u n d i n g S o u r c e s C o n t i n u i n g , o n g o i n g o r m a s t e r a c c o u n t p r o j e c t - S p e c i f i c a t i o n N o . In i t i a l P r o j e c t C o s t s b y P h a s e Bu d g e t t o D a t e 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 T o t a l De s i g n $ 1 2 , 3 0 0 $ 1 2 , 3 0 0 $ 2 4 , 6 0 0 Co n s t r u c t i o n $ 1 4 1 , 5 0 0 $ 1 4 1 , 5 0 0 Co n s t r u c t i o n M a n a g e m e n t $ 1 8 , 5 0 0 $ 1 8 , 5 0 0 To t a l $0 $ 1 2 , 3 0 0 $ 1 7 2 , 3 0 0 $0 $0 $0 $ 1 8 4 , 6 0 0 Bu d g e t t o D a t e 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 T o t a l Ut i l i t i e s -$ 1 , 2 3 3 - $ 8 0 0 - $ 8 0 0 - $ 2 , 8 3 3 To t a l $ 0 $ 0 $ 0 - $ 1 , 2 3 3 - $ 8 0 0 - $ 8 0 0 - $ 2 , 8 3 3 On g o i n g C o s t s b y T y p e De t a i l o f o n g o i n g c o s t s a n d a l t e r n a t i v e s t o o n g o i n g c o s t s i n c l u d i n g r e t u r n o n i n v e s t m e n t i n f o r m a t i o n : O n - g o i n g c o s t s w i l l b e r e d u ced by using less staff and co n t r a c t o r t i m e f o r r e p a i r s , a l s o e l e c t r i c a l c o n s u m p t i o n r e d u c t i o n i s e s t i m a t e d a t $ 8 0 0 . 0 0 p e r y e a r , w i t h a n a d d i t i o n a l o n e - t i m e incentive of $433.00, with a re d u c t i o n i n k W h o f 4 , 8 0 0 a n d a r e d u c t i o n o f 2 4 0 5 p o u n d s o f C O 2 p e r y e a r . An t i c i p a t e d F a c i l i t y L i f e S p a n : E x c l u d i n g c a t a s t r o p h e , p r o g r a m u s e i s s u e s o r c o d i f i c a t i o n r e q u i r i n g r e p l a c e m e n t , g i v e n p r o p e r r es o u r c e s a r e a p p l i e d t o m a i n t e n a n c e an d r e n o v a t i o n , t h i s f a c i l i t y c o u l d e a s i l y s e r v e t h e c o m m u n i t y f o r t h e n e x t 5 0 - y e a r s , w i t h t h e n e w u n i t h a v i n g a 1 5 y e a r l i f e s pa n . Bu d g e t t o D a t e 2 0 1 3 - 1 4 2 0 1 4 - 1 5 2 0 1 5 - 1 6 2 0 1 6 - 1 7 2 0 1 7 - 1 8 T o t a l Ge n e r a l F u n d $1 2 , 3 0 0 $ 1 7 2 , 3 0 0 $184,600 To t a l $0 $ 1 2 , 3 0 0 $ 1 7 2 , 3 0 0 $0 $0 $0 $ 1 8 4 , 6 0 0 Pr o j e c t F u n d i n g b y S o u r c e Re d u c e d / E n h a n c e d P r o j e c t A l t e r n a t i v e s Al t e r n a t e p r o j e c t i s f e a s i b l e o r a d v a n t a g e o u s – C o s t o f a l t e r n a t i v e p r o j e c t : T h e r o o f r e p a i r s c o u l d b e p o s t p o n e d , b u t w o u l d l e a d to higher roofing costs. Pr o j e c t c a n b e p h a s e d – N u m b e r o f y e a r s f o r p h a s i n g : N / A    C10 - 4 CA P I T A L I M P R O V E M E N T P L A N - P U B L I C S A F E T Y PO L I C E D E P A R T M E N T A D M I N H V A C R E P L A C E M E N T Pr o j e c t T e a m As s i g n m e n t P r o g r a m E s t i m a t e d H o u r s Pr o j e c t M a n a g e r CI P E n g i n e e r i n g 1 0 0 Co n s t r u c t i o n I n s p e c t i o n CI P E n g i n e e r i n g 1 0 0 En v i r o n m e n t a l R e v i e w Pl a n n i n g 4 Co n t r a c t A d m i n i s t r a t i o n CI P A d m i n i s t r a t i o n 4 0 Th e M c Q u a y u n i t i s a b o u t t h e s i z e o f t w o V o l k s w a g e n b u s e s e n d t o e n d .    C10 - 5 Page intentionally left blank. C10 - 6