Loading...
HomeMy WebLinkAboutRE Tract 2428 - final trail alignment1 From:Chacon, Ken Sent:Tuesday, August 11, 2015 10:04 AM To:'Ziel, Craig' Cc:Dennis Moresco (DMoresco@midlandpacific.com) Subject:RE: Tract 2428 Craig, Use the trail that in your opinion is closest to the intent of the of the Class 1 bike path (taking into account the sensitivity of the drainage channels). It appears the alignment currently on the plans may do that, but you have the best understanding of it during the design layout. Please provide a letter and exhibit outlining all the discrepancies between the proposed bike path and a Caltrans Class 1 bike path with the next submittal. We have kept a copy of the trail Central B design for our supporting documentation. Ken Chacon Senior Civil Engineer Community Development Engineering Development Review 919 Palm Street, San Luis Obispo, CA 93401-3218 E kchacon@slocity.org T 805.781.7575 C 805.540.8519 slocity.org From: Ziel, Craig [mailto:Craig.Ziel@tetratech.com] Sent: Tuesday, July 14, 2015 2:18 PM To: Chacon, Ken Cc: Dennis Moresco (DMoresco@midlandpacific.com) Subject: FW: Tract 2428   Ken,    Attached includes the trail alignment as shown on the current set of an improvement plans (Trail Central A) and a third  option for the trail alignment (Trail Central B). Trail Central B is a draft exhibit that illustrates trail geometry that closely  represent the design constraints outlined in the Caltrans HDM for class 1 trails. Crossing the drainage course by lot  138/139 is not an option as it would require a bridge, additional wetland mitigation and permitting through the various  regulating agencies, impact at a minimum three private lots, and divert traffic through a private driveway. Please review  each layout and select the preferred alignment. Once the city selects an alignment, I will prepare a letter outlining all  discrepancies between the layout shown on the plans and the HDM as requested on the recent plan check.     Thank you,    Craig