Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AQ Modeling Data Needs 083021
Start Date End Date Equipment Type Number of Pieces Avg. Hours of Daily Use/Piece of Equipment Total Days of Use 8/1/2022 8/2/2022 DOZER (PARKING DECK)1 8 2 8/1/2023 8/5/2023 DOZER (TOWER)1 8 5 8/1/2022 8/4/2022 DOZER (PARKING DECK)1 8 4 8/1/2023 8/10/2023 DOZER (TOWER)1 8 10 9/1/2022 9/20/2022 EXCAVATOR (PARKING DECK)1 8 20 9/1/2023 11/30/2023 EXCAVATOR (TOWER)1 8 60 11/1/2023 1/15/2024 CRANE - MOBILE (TOWER)1 8 110 7/1/2023 7/3/2023 PAVER (PARKING DECK)1 8 3 12/1/2024 12/5/2024 PAVER (TOWER)1 8 5 Building Construction Paving Grading/Excavation (if applicable) Site Preparation/Grubbing (if applicable) Equipment Use Primary Construction Activity Demolition Construction Schedule