Loading...
HomeMy WebLinkAboutSLO TF One Parameter Wetlands Submittal 10-23-SLOTF Wetland Summary Table All Areas in Acres) Rev 10.18.13 2008 Delineation (WSP 2008) 1 JENESIS Delineation 2 Federal Jurisdiction Wetlands Federal Jurisdiction Waters Isolated Wetlands / Waters TOTAL JENESIS Areas Outside of 2008 Delineation TOTAL Delineated Onsite 49.0 3.9 19.2 72.1 16.85 73.2 5 Impacts: Remediation 19.42 8.90 28.32 4.18 28.55 Restoration 11.45 0 11.45 2.69 11.79 Impact Area TOTAL 3 30.87 8.90 39.77 6.87 40.34 Impacts Breakdown by Future Use : Acreage of Impact Located w/in Development Areas 4 1.83 1.02 0.86 Acreage of Remediation / Restoration Impact Located w/in Restoration / Open Space Areas 4 29.04 7.88 6.01 Notes: 1 2008 delineation was conducted by WSP and Padre, see An Analysis of the Geographic Extent of Waters of the U.S., Including Wetlands at the Chevron Tank Farm Facility, San Luis Obispo, California dated August 5, 2008 (2008 Wetland Report) 2 FINAL State Wetland Delineation Report, UNOCAL’S San Luis Obispo Tank Farm dated September 2003 by JENESIS 3 Impact Area Total = Remediation + Restoration. No new impacts will result from development. 4 For evaluation purposes, Total Impacts have been divided into those within development areas and those outside the development areas in remediation/restoration areas 5 Only includes acreage within current SLOTF property. Original JENESIS delineation reported 75.95 acres of state wetlands, but this included areas mapped outside of current SLOTF property boundary. Reservoir 4 Reservoir 2 Reservoir3Reservoir7 Reservoir 6 Reservoir 5 PROJECT NUMBER:DATE: PROJECT NAME: CHEVRON EMC - SAN LUISOBISPOTANKFARMRESTORATIONANDRE-DEVELOPMENT PROJECT 0601-3284 2013 TOTAL PROJECTIMPACTSTOONEPARAMETERWETLANDS( JENESIS, 2003) FIGUREC:\ Sarah\Chevron\SLO_TankFarm\GIS\ JENESISWetlands-TotalProjectImpact.mxd\10/ 9/2013APPROXIM ATE SCALE IN FEET 0 500 1,000250 SITE PRO PERTY BO UNDARY PROJECT IMPA CTS TO ONE PARAM ETER WETLA NDS (JENES IS, 2003 ) ( 40.34 AC)DE VELO PME NT IMPACT ARE A TOTAL PRO JECT DISTURBANCE (REME DIATIO N + RESTORATION)ONE PARAMETER W ETLANDS (JE NESIS , 2003) (7 3.2 A