Loading...
HomeMy WebLinkAboutNCE Master Fee Proposal - SLO Sewer Main_Rev1I. SURVEY SERVICES $11,065.00 A. Topographic Mapping 1. Prepare 1' Interval Contour Map along N/E Property a. Locate Existing Structures on Site b. Locate Existing Structures Adjacent to Site c. Locate Existing Surface Features d. Detail Access Drives and Adjacent Roads e. Locate Visual Surface and Overhead Utilities f. Locate Pothole Information 2. Locate Manholes and Pipe Information a. Ella St Between Ruth and Sierra Way b. Binns Ct to Kendra CT & Kendra Ct c. Sierra Way to ±700 feet from Ella St d. Sewer behind houses between Sierra and Ella e. Sewer and Storm from Ruth St to George, & George E TOTAL ESTIMATED FEE:$11,065.00 PROPOSAL FOR PROFESSIONAL SERVICES SEWER MAIN November 10, 2022 CITY OF SAN LUIS OBISPO 1255 ELLA STREET SAN LUIS OBISPO, CALIFORNIA ESTIMATED FEE K:\Proposals\2022-mid\P22-114 City of SLO Sewer Main\P22-114 Master Fee Proposal.xlsx Page 1 of 1 805.239.3127 725 Creston Road, Suite C, Paso Robles, CA 93446 175 147 112 91 73 225 170 300 165 125 210 2.0 8.0 1.0 8.0 3,816.00 2.0 5.0 2.0 20.0 7,250.00 4.0 0.0 13.0 0.0 0.0 0.0 3.0 28.0 0.0 0.0 0.0 700 $0 $1,456 $0 $0 $0 $510 $8,400 $0 $0 $0 $11,066 TOTAL $11,066 0% CONTINGENCY $0 SUBTOTAL $11,066 EXPENSES $0 GRAND TOTAL $11,066 LSIPLSRLSLSII 1-MAN PWTOTALJLS2-MAN 2-MAN TR 2-MAN PW 1-MAN 1-MAN TR 1-MAN PW TOTALPLSRLSLSIILSIJLS2-MAN 2-MAN TR 2-MAN PW 1-MAN 1-MAN TR K:\Proposals\2022-mid\P22-114 City of SLO Sewer Main\P22-114 Master Fee Proposal.xlsx Page 1 of 1 TOPOGRAPHIC SURVEY AREA LOCATEMANHOLESLOCATEMANHOLES 805.239.3127 725 Creston Road, Suite C, Paso Robles, CA 93446 F E E S C H E D U L E July1, 2022 CLASSIFICATION HOURLY RATE E Principal $205.00 N Principal Engineer $189.00 G Senior Project Manager $166.00 I Project Manager $149.00 N Project Engineer $127.00 E Staff Engineer $ 110.00 E Assistant Engineer $ 89.00 R Engineering Intern $ 73.00 I Qualified SWPPP Developer $ 149.00 N Qualified SWPPP Practitioner $ 89.00 G Administrative $ 68.00 Expert Witness - Principal Engineer $ 445.00 Expert Witness - Principal Surveyor $ 350.00 S Principal Land Surveyor $175.00 U Registered Land Surveyor $147.00 R Land Surveyor II $ 112.00 V Land Surveyor I $ 91.00 E Junior Land Surveyor $ 73.00 Y Two-Man Survey Crew $225.00 Two-Man Survey Crew - Travel $170.00 Two-Man Survey Crew – Prevailing Wage $300.00 One-Man Survey Crew $165.00 One-Man Survey Crew - Travel $125.00 One-Man Survey Crew – Prevailing Wage $210.00 REIMBURSABLE EXPENSES 1. Actual cost of express charges, postage, outside reproduction and survey supplies. 2. Cost + 10% for professional subconsultants required for the work. 3. Mileage at the current IRS business standard mileage rate. 4. In-house reproduction and telecommunications costs, charged at the current North Coast Engineering, Inc. rates. FEE REVISIONS North Coast Engineering, Inc. reserves the right to revise this Fee Schedule on a semi -annual basis.