Loading...
HomeMy WebLinkAbout4/20/2023 Item PC, Finger Helene Finger < To:Advisory Bodies Subject:Active Transportation Committee Correspondence Attachments:ATP Bridge St at Meadow Park annotated.pdf; ATP Madonna at Higuera plan annotated.pdf This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Dear Active Transportation Committee, I am writing today to ask for your support in getting community input to revise the design features for the intersection of Higuera & Madonna and the Meadow Park neighborhood project. Last June, the City of SLO submitted a successful grant application that included the attached preliminary designs. As a resident of this neighborhood, I see design features that are not needed (like traffic circles on Corrida St and high visibility cross walks on tiny cul-de-sacs) as well as important features that are missing from the design (like a cross walk connecting the Class 1 path from Meadow Park to the Class 1 path to Bridge St. as well as a protected bike lane at the intersection of Madonna & Higuera that doesn’t require middle-school students to cross a high volume lane of traffic). Please share my request for the consultant to not proceed with finalizing designs of features that may not be wanted or necessary, and instead start with using the already developed drawings for community discussions about design features. Kind regards, Helene Finger 1 GREENWAYGREEN WAY GREENWAYGREENWAYGREENWAYGREENWAYEXPOSITION DR CORRIDA DR60'40'60'40' 56' 36' 50' 50'50'Ø20' 16'16'16'12'MEADOW PARK SPEED CUSHION, MARKINGS, AND SIGNS, PER DETAIL 9, SHEET D-03 GREENWAY MARKING (THRU), PER DETAIL 7, SHEET D-02 GREENWAY MARKING (LEFT), PER DETAIL 7, SHEET D-02 GREENWAY SIGN, DETAIL 2, SHEET 8 GREENWAY SIGN, PER DETAIL 8, SHEET D-02 YELLOW CENTERLINE TRAFFIC CIRCLE AND STRIPING YELLOW CENTERLINE STOP MARKING AND LIMIT LINE GREENWAY MARKING (THRU), PER DETAIL 7, SHEET D-02 GREENWAY MARKING (RIGHT), PER DETAIL 7, SHEET D-02 GREENWAY SIGN, PER DETAIL 8, SHEET D-02 GREENWAY SIGN, PER DETAIL 8, SHEET D-02 R/W R/W GREENWAYGREENWAYCORRI D A D R CORRIDA DR MADRID CT56'36'56'56'36'36'GREENWAY MARK ING (R IGHT ) ,PER DETA IL 7 , SHEET D -02GREENWAY S IGN , PERGREENWAY S IGN ,PER DETA IL 8 ,SHEET D -02 NEW HIGH VISIBILITY CROSSWALK R/W R/W PROJECT NO: DESIGNED BY: DRAWN BY: REVIEWED BY: DATE: SCALE: DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert SHEET OF SHEET NO.SHEET TITLE MARK DESCRIPTION ISSUE DATE INTIAL 93401 SAN LUIS OBISPO, CA 919 PALM STREET 617 W 7th Street, #1103 | Los Angeles, CA 90017 213-489-7443 | altago.com Dwg filename: N:\Shared\PROJECTS\2021\00-2021-206 SLO, CA Higuera Street Quick Build 10%\CAD\01_Plans\2021-206_C-PLN_GREENWAY.dwg Last saved by: vincenthellens Plot date: 6/7/2022 10:19 PM Plotstyle table: ALTA NCS Standard.stbSCALE PLAN SCALE FEET 020 2010 40MATCH LINE - SEE SHEET L-19MATCH LINE - SEE BELOW LEFT MATCH L INE - SEE ABOVE R IGHT MATCH LINE - SEE SHEET L-2100-2021-206 30% CONCEPT DESIGN L-20 CITY OF SAN LOUIS OBISPO HIGUERA CORRIDOR COMPLETE STREET LAYOUT SHEET VH JP JG 6.7.2022 1"=20' 27 34 ALL NON-COMPLIANT CURB RAMPS WITHIN THE PROJECT LIMITS SHALL BE UPGRADED TO LATEST ADA REQUIREMENTS (74 TOTAL). ALL CLASS IV SEPARATION VERTICAL ELEMENTS SHALL INCLUDE ZICLA ZEBRA CYCLE TRACK LANE SEPARATORS COMBINED WITH 36" WHITE PEXCO CITY POST WITH LIGHT GREY WRAP (10' OC) UNLESS SPECIFIED ON THESE PLANS. (1350 TOTAL) PROTECT IN PLACE ALL EXISTING CURB AND GUTTER, SIDEWALK, STREET LIGHT POLES, STREET SIGNS, DRIVEWAYS, TREES, AND EXISTING IMPROVEMENTS IN ROADWAY AND PARKWAY UNLESS OTHERWISE SPECIFIED ON THESE PLANS. NOTES:BIKEPAT ESHOULD BE NOT0SownNEEDED ⑧0 MISSING CROSSWALK NOT NEED ED 0 111+00112+00113+0027+00 28+00 29+00 30+00 31+00 31+23 INTERSECTION CONFLICT ZONE MARKINGS MADONNA RD UPGRADE EX. CROSSWALKS WITH HIGH VISIBILITY CROSSWALK MARKINGS S HIGUERA STINTERSECTION CONFLICT ZONE MARKINGS MADONN A R D EXPAND EX. PATHWAY THROUGH MEDIAN TO ACCOMMODATE PEDESTRIANS AND BICYCLISTS NEW BICYCLE CROSSING PARALLEL TO EX. CROSSWALK 67'5'10'10'10'10'10'5'2'2'1 0 ' 1 0 ' 1 0 ' 1 0 ' PROJECT NO: DESIGNED BY: DRAWN BY: REVIEWED BY: DATE: SCALE: DIAL TOLL FREE 1-800-422-4133 AT LEAST TWO WORKING DAYS BEFORE YOU DIG Underground Service Alert SHEET OF SHEET NO.SHEET TITLE MARK DESCRIPTION ISSUE DATE INTIAL 93401 SAN LUIS OBISPO, CA 919 PALM STREET 617 W 7th Street, #1103 | Los Angeles, CA 90017 213-489-7443 | altago.com Dwg filename: N:\Shared\PROJECTS\2021\00-2021-206 SLO, CA Higuera Street Quick Build 10%\CAD\01_Plans\2021-206_PLN_Higuera-10-Percent_expanded.dwg Last saved by: vincenthellens Plot date: 6/7/2022 10:18 PM Plotstyle table: ALTA NCSStandard.stbMATCHLINE - STA 26+50, SEE SHEET 17SCALE PLAN SCALE FEET 020 2010 40 00-2021-206 30% CONCEPT DESIGN L-17 CITY OF SAN LOUIS OBISPO HIGUERA CORRIDOR COMPLETE STREET LAYOUT SHEET VH JP JG 6.7.2022 1"=20' 24 34 ALL NON-COMPLIANT CURB RAMPS WITHIN THE PROJECT LIMITS SHALL BE UPGRADED TO LATEST ADA REQUIREMENTS (74 TOTAL). ALL CLASS IV SEPARATION VERTICAL ELEMENTS SHALL INCLUDE ZICLA ZEBRA CYCLE TRACK LANE SEPARATORS COMBINED WITH 36" WHITE PEXCO CITY POST WITH LIGHT GREY WRAP (10' OC) UNLESS SPECIFIED ON THESE PLANS. (1350 TOTAL) PROTECT IN PLACE ALL EXISTING CURB AND GUTTER, SIDEWALK, STREET LIGHT POLES, STREET SIGNS, DRIVEWAYS, TREES, AND EXISTING IMPROVEMENTS IN ROADWAY AND PARKWAY UNLESS OTHERWISE SPECIFIED ON THESE PLANS. NOTES: ! MOT SAFE I-0 R STUDENTS