HomeMy WebLinkAbout223101A-SLO_Roadway_Sealing_2022-2022-08-25-2022-08-30Filippin Engineering
354-D S. Fairview Ave.
Goleta, California 93117
P: (805) 845-4602
Project: 223101A - SLO Roadway Sealing
2022
919 Palm St.
San Luis Obispo, California 93401
P: 805-781-7200
Daily Log Inspection: Thursday 8/25/2022
NOTES LOG
No.Created By Comments
1 Jerry Missamore Observation By Jerry Missamore:
Bid Item 18: Burke had same 5 man crew working on finishing up the pavers to
have crosswalks open for farmers market tonight. THey placed the glue sand down
and viberplated in. Also tied in the joint to meet the pavers togther and cleaned up
area. barricades were placed in teh pave back areas on both sides of crosswalk to
allow access for pedestrians.
Bid Item 96: Burke did edge digouts with Calportland 3/8'' mix A3311G010 17.08
TN on various locations on Palm from Santa Rosa to Chorro and on Monterey from
Broad to Nipomo.
694 SF completed for the day.
Bid Iem 98: Burke had a 4 man crew go around and raise water valves at various
loctions through out town. Cerro Romaludo, Los Cerros, and Nipomo at Palm.
Calportland Class 1 concrtete with accelerator was used to pour valves back.
Sterndahl followed the slurry operation for Temp strip layout. Thermo was applied
on OceanAire from Modonna to Galleon getting all the humps and stop bars and
symbols completed. Convesation was had with Sterndahl moving forward the
speed humps need to be temp striped due to many complaints from the public
about not being able to see the humps. Talked with Jordy about the potential night
work at the intersection of Marsh and Higuera next Monday night.
Slurry operations were on going with help from PEI (Richard St. Crye) who over saw
the operations for the day. All slurry work was preformed in Area 6 for the day.
Weekly meeting was held to discuss PCO, Chang orders and any potential
problems with the project. Burke provided a 3 week look ahead schedule.
Filippin Engineering Page 1 of 9 Printed on 8/30/2022 at 08:37 AM PDT
NOTES LOG
No.Created By Comments
2 Austin Della Slurry-
Richard with PEI on site to observe slurry activities. Reference PEI report for
quantities and other information.
MANPOWER LOG 39 Workers | 312.0 Man Hours
No.Contact/
Company
Notes: Cost Code Workers # Hours Man
Hours
Location
1 Pavement
Coatings Co.
Fedrico Herrera-Lab
Francisco Gonzales-Lab
Raudal Aguilar-Lab
Manuel Garcia-Lab
Abraam Diaz-Lab
Brian Ware-Foreman
Cesar Penaloza-Lab
Jaime Fafaines-La
Juan Ruiz-Ramos-Lab
BI #1
Equipment
Slurry Truck #80022
Slurry Truck #80087
Slurry Truck #80047
Sweeper Truck
TC Truck
Rubber Wheel roller
Created By: Austin Della
9 8.0 72.0
2 R. Burke
Corporation Juan Zavala-Mason
BI 18
8HRS
Created By: Jerry Missamore
5 8.0 40.0
Filippin Engineering Page 2 of 9 Printed on 8/30/2022 at 08:37 AM PDT
MANPOWER LOG 39 Workers | 312.0 Man Hours
No.Contact/
Company
Notes: Cost Code Workers # Hours Man
Hours
Location
3 Sterndhahl
Enterprises,
Inc
Temp Striping/Thermo
Jordy Carlon-striper
Charles Shultz-striper
Carlos Meza-Striper
Jerry valentine- striper
Osbaldo Rodriquez
Joshua Gibbons
Marco Cervantes
GMC 2500 truck #137-Layout
Flatbed Truck-#189
Paint striper- #198
Flatbed #129
Thermo Truck- #195
Created By: Jerry Missamore
7 8.0 56.0
4 R. Burke
Corporation
Jacinto Sanchez-LAB
BI 98
8hrs
Created By: Jerry Missamore
1 8.0 8.0
5 R. Burke
Corporation
Leo Huitron- OE
BI 96
8HRs
Created By: Jerry Missamore
1 8.0 8.0
6 R. Burke
Corporation
James Manning- LAB
BI 97
8HRS
Created By: Jerry Missamore
1 8.0 8.0
7 R. Burke
Corporation
Caralee Casil- LAB
BI 98
8HRS
Created By: Jerry Missamore
1 8.0 8.0
Filippin Engineering Page 3 of 9 Printed on 8/30/2022 at 08:37 AM PDT
MANPOWER LOG 39 Workers | 312.0 Man Hours
No.Contact/
Company
Notes: Cost Code Workers # Hours Man
Hours
Location
8 R. Burke
Corporation
Robert Farmsworth-OE
BI 97
8HRS
Created By: Jerry Missamore
1 8.0 8.0
9 R. Burke
Corporation
John Farmsworth- teamster
BI 96
8HRS
Created By: Jerry Missamore
1 8.0 8.0
10 R. Burke
Corporation
Quintin Thompson-OE
BI 96
8HRS
Created By: Jerry Missamore
1 8.0 8.0
11 R. Burke
Corporation
Dennis Patton-OE
BI 96
8HRS
Created By: Jerry Missamore
1 8.0 8.0
12 R. Burke
Corporation
Samuel Delgado-CM Foreman
BI 18
8HRs
Created By: Jerry Missamore
1 8.0 8.0
13 R. Burke
Corporation
Lawrence Manzares- CM
BI 18
8HRs
Created By: Jerry Missamore
1 8.0 8.0
14 R. Burke
Corporation
Mathew Burke -OE Apprentice
BI 18
8HRS
Created By: Jerry Missamore
1 8.0 8.0
15 R. Burke
Corporation
Carlos Vasquez-CM apprentice
BI 18
8HRs
Created By: Jerry Missamore
1 8.0 8.0
Filippin Engineering Page 4 of 9 Printed on 8/30/2022 at 08:37 AM PDT
MANPOWER LOG 39 Workers | 312.0 Man Hours
No.Contact/
Company
Notes: Cost Code Workers # Hours Man
Hours
Location
16 R. Burke
Corporation
Jorge Sanchez-CM Foreman
BI 18
8HRS
Created By: Jerry Missamore
1 8.0 8.0
17 CCTS David Zepeda - lb
2500 GMC traffic control truck
Created By: Jerry Missamore
1 8.0 8.0
18 R. Burke
Corporation
Scott Furness-LAB
BI 98
8HRS
Created By: Jerry Missamore
1 8.0 8.0
19 R. Burke
Corporation
Norman Gularte-LAB
BI 96
8HRS
Created By: Jerry Missamore
1 8.0 8.0
20 R. Burke
Corporation
Jesus Gonzales-LAB
Bi 96
8HRS
Created By: Jerry Missamore
1 8.0 8.0
21 R. Burke
Corporation
Matthew Burke-OE App
BI 98
Created By: Jerry Missamore
1 8.0 8.0
39 312.0
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
1 JD 210L Skip loader 0.0 0.0 No 03:24 PM
Notes:Created By: Jerry Missamore
2 Burke-F450 Concrete
utility truck
0.0 0.0 No 03:25 PM
Notes:Created By: Jerry Missamore
Filippin Engineering Page 5 of 9 Printed on 8/30/2022 at 08:37 AM PDT
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
3 Burke-CAT CB24B roller 0.0 0.0 No 03:25 PM
Notes:Created By: Jerry Missamore
4 Burke-F750 dump truck
#542
0.0 0.0 No 03:28 PM
Notes:Created By: Jerry Missamore
5 Burke-F450 #294 0.0 0.0 No 03:32 PM
Notes:Created By: Jerry Missamore
6 CAT 289D skidsteer 0.0 0.0 No 03:34 PM
Notes:Created By: Jerry Missamore
7 CAT 268B Skid Steer 0.0 0.0 No 03:34 PM
Notes:Created By: Jerry Missamore
8 Burke-410 backhoe No 03:05 PM
Notes:Created By: Jerry Missamore
9 Burke-DynoPac 3-5 ton
roller
0.0 0.0 No 03:32 AM
Notes:Created By: Jerry Missamore
10 Burke-F250 Pickup #203 0.0 0.0 No 03:33 AM
Notes:Created By: Jerry Missamore
11 Pavement Coatings-2500
GMC
No 03:30 PM
Notes:Created By: Jerry Missamore
12 Pavement Coatings-Slurry
Truck
No 03:30 PM
Notes:Created By: Jerry Missamore
13 Pavement Coatings-Slurry
Truck #2
No 03:30 PM
Notes:Created By: Jerry Missamore
14 Pavement Coatings-
Rubber Tire Roller
No 03:30 PM
Notes:Created By: Jerry Missamore
Filippin Engineering Page 6 of 9 Printed on 8/30/2022 at 08:37 AM PDT
EQUIPMENT LOG
No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location
15 Pavement Coatings-Traffic
Truck
No 03:30 PM
Notes:Created By: Jerry Missamore
16 Sterndahl- Chevery 2500 No 03:30 PM
Notes:Created By: Jerry Missamore
17 Sterndahl-Thermo Truck No 03:30 PM
Notes:Created By: Jerry Missamore
18 Sterndahl-Skidsterr W/Mill No 03:30 PM
Notes:Created By: Jerry Missamore
19 Sterndahl-Sweeper No 03:30 PM
Notes:Created By: Jerry Missamore
20 Sterndahl-Striping Truck No 03:30 PM
Notes:Created By: Jerry Missamore
21 Sterndahl-Flatbed Pickup No 03:30 PM
Notes:Created By: Jerry Missamore
OBSERVED WEATHER CONDITIONS
Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity
No
WEATHER REPORT
Temperature Precipitation Since Humidity Windspeed
Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust
52°F 77°F 63°F 0.00 in.0.00 in.0.00 in.55%76%97%55°F 1.9 mph 4 mph 7 mph
Filippin Engineering Page 7 of 9 Printed on 8/30/2022 at 08:37 AM PDT
DAILY SNAPSHOT
06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM
Partly Cloudy
52°F
Partly Cloudy
57°F
Clear
73°F
Clear
77°F
Clear
72°F
Clear
62°F
PHOTOS
DA886AB2-32E3-46C7-82F4-BC0C9E90C6ED.jpeg
EB072D53-6A43-4184-AEA8-D5B1E03AE1C4.jpeg
46AA4D32-F026-4918-8358-78221F024619.jpeg
B3668C6E-DAED-4AC0-A5FE-6D6718FA9076.jpeg
1B652EEA-BCD7-4483-B49D-8CEC7EA75FEA.jpeg
Filippin Engineering Page 8 of 9 Printed on 8/30/2022 at 08:37 AM PDT
By Date Copies To