Loading...
HomeMy WebLinkAbout223101A-SLO_Roadway_Sealing_2022-2022-08-25-2022-08-30Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 223101A - SLO Roadway Sealing 2022  919 Palm St. San Luis Obispo, California 93401 P: 805-781-7200 Daily Log Inspection: Thursday 8/25/2022      NOTES LOG   No.Created By Comments   1 Jerry Missamore Observation By Jerry Missamore: Bid Item 18: Burke had same 5 man crew working on finishing up the pavers to have crosswalks open for farmers market tonight. THey placed the glue sand down and viberplated in. Also tied in the joint to meet the pavers togther and cleaned up area. barricades were placed in teh pave back areas on both sides of crosswalk to allow access for pedestrians. Bid Item 96: Burke did edge digouts with Calportland 3/8'' mix A3311G010 17.08 TN on various locations on Palm from Santa Rosa to Chorro and on Monterey from Broad to Nipomo. 694 SF completed for the day. Bid Iem 98: Burke had a 4 man crew go around and raise water valves at various loctions through out town. Cerro Romaludo, Los Cerros, and Nipomo at Palm. Calportland Class 1 concrtete with accelerator was used to pour valves back. Sterndahl followed the slurry operation for Temp strip layout. Thermo was applied on OceanAire from Modonna to Galleon getting all the humps and stop bars and symbols completed. Convesation was had with Sterndahl moving forward the speed humps need to be temp striped due to many complaints from the public about not being able to see the humps. Talked with Jordy about the potential night work at the intersection of Marsh and Higuera next Monday night. Slurry operations were on going with help from PEI (Richard St. Crye) who over saw the operations for the day. All slurry work was preformed in Area 6 for the day. Weekly meeting was held to discuss PCO, Chang orders and any potential problems with the project. Burke provided a 3 week look ahead schedule.     Filippin Engineering Page 1 of 9 Printed on 8/30/2022 at 08:37 AM PDT        NOTES LOG   No.Created By Comments   2 Austin Della Slurry- Richard with PEI on site to observe slurry activities. Reference PEI report for quantities and other information.       MANPOWER LOG  39 Workers  |   312.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   1 Pavement Coatings Co. Fedrico Herrera-Lab Francisco Gonzales-Lab Raudal Aguilar-Lab Manuel Garcia-Lab Abraam Diaz-Lab Brian Ware-Foreman Cesar Penaloza-Lab Jaime Fafaines-La Juan Ruiz-Ramos-Lab BI #1 Equipment Slurry Truck #80022 Slurry Truck #80087 Slurry Truck #80047 Sweeper Truck TC Truck Rubber Wheel roller Created By:  Austin Della   9 8.0 72.0       2 R. Burke Corporation Juan Zavala-Mason BI 18 8HRS Created By:  Jerry Missamore   5 8.0 40.0         Filippin Engineering Page 2 of 9 Printed on 8/30/2022 at 08:37 AM PDT        MANPOWER LOG  39 Workers  |   312.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   3 Sterndhahl Enterprises, Inc Temp Striping/Thermo Jordy Carlon-striper Charles Shultz-striper Carlos Meza-Striper Jerry valentine- striper Osbaldo Rodriquez Joshua Gibbons Marco Cervantes GMC 2500 truck #137-Layout Flatbed Truck-#189 Paint striper- #198 Flatbed #129 Thermo Truck- #195 Created By:  Jerry Missamore   7 8.0 56.0       4 R. Burke Corporation Jacinto Sanchez-LAB BI 98 8hrs Created By:  Jerry Missamore   1 8.0 8.0       5 R. Burke Corporation Leo Huitron- OE BI 96 8HRs Created By:  Jerry Missamore   1 8.0 8.0       6 R. Burke Corporation James Manning- LAB BI 97 8HRS Created By:  Jerry Missamore   1 8.0 8.0       7 R. Burke Corporation Caralee Casil- LAB BI 98 8HRS Created By:  Jerry Missamore   1 8.0 8.0         Filippin Engineering Page 3 of 9 Printed on 8/30/2022 at 08:37 AM PDT        MANPOWER LOG  39 Workers  |   312.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   8 R. Burke Corporation Robert Farmsworth-OE BI 97 8HRS Created By:  Jerry Missamore   1 8.0 8.0       9 R. Burke Corporation John Farmsworth- teamster BI 96 8HRS Created By:  Jerry Missamore   1 8.0 8.0       10 R. Burke Corporation Quintin Thompson-OE BI 96 8HRS Created By:  Jerry Missamore   1 8.0 8.0       11 R. Burke Corporation Dennis Patton-OE BI 96 8HRS Created By:  Jerry Missamore   1 8.0 8.0       12 R. Burke Corporation Samuel Delgado-CM Foreman BI 18 8HRs Created By:  Jerry Missamore   1 8.0 8.0       13 R. Burke Corporation Lawrence Manzares- CM BI 18 8HRs Created By:  Jerry Missamore   1 8.0 8.0       14 R. Burke Corporation Mathew Burke -OE Apprentice BI 18 8HRS Created By:  Jerry Missamore   1 8.0 8.0       15 R. Burke Corporation Carlos Vasquez-CM apprentice BI 18 8HRs Created By:  Jerry Missamore   1 8.0 8.0         Filippin Engineering Page 4 of 9 Printed on 8/30/2022 at 08:37 AM PDT        MANPOWER LOG  39 Workers  |   312.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   16 R. Burke Corporation Jorge Sanchez-CM Foreman BI 18 8HRS Created By:  Jerry Missamore   1 8.0 8.0       17 CCTS David Zepeda - lb 2500 GMC traffic control truck Created By:  Jerry Missamore   1 8.0 8.0       18 R. Burke Corporation Scott Furness-LAB BI 98 8HRS Created By:  Jerry Missamore   1 8.0 8.0       19 R. Burke Corporation Norman Gularte-LAB BI 96 8HRS Created By:  Jerry Missamore   1 8.0 8.0       20 R. Burke Corporation Jesus Gonzales-LAB Bi 96 8HRS Created By:  Jerry Missamore   1 8.0 8.0       21 R. Burke Corporation Matthew Burke-OE App BI 98 Created By:  Jerry Missamore   1 8.0 8.0           39  312.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 JD 210L Skip loader 0.0 0.0 No   03:24 PM    Notes:Created By: Jerry Missamore   2 Burke-F450 Concrete utility truck 0.0 0.0 No   03:25 PM    Notes:Created By: Jerry Missamore     Filippin Engineering Page 5 of 9 Printed on 8/30/2022 at 08:37 AM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   3 Burke-CAT CB24B roller 0.0 0.0 No   03:25 PM    Notes:Created By: Jerry Missamore   4 Burke-F750 dump truck #542 0.0 0.0 No   03:28 PM    Notes:Created By: Jerry Missamore   5 Burke-F450 #294 0.0 0.0 No   03:32 PM    Notes:Created By: Jerry Missamore   6 CAT 289D skidsteer 0.0 0.0 No   03:34 PM    Notes:Created By: Jerry Missamore   7 CAT 268B Skid Steer 0.0 0.0 No   03:34 PM    Notes:Created By: Jerry Missamore   8 Burke-410 backhoe No   03:05 PM    Notes:Created By: Jerry Missamore   9 Burke-DynoPac 3-5 ton roller 0.0 0.0 No   03:32 AM    Notes:Created By: Jerry Missamore   10 Burke-F250 Pickup #203 0.0 0.0 No   03:33 AM    Notes:Created By: Jerry Missamore   11 Pavement Coatings-2500 GMC No   03:30 PM    Notes:Created By: Jerry Missamore   12 Pavement Coatings-Slurry Truck No   03:30 PM    Notes:Created By: Jerry Missamore   13 Pavement Coatings-Slurry Truck #2 No   03:30 PM    Notes:Created By: Jerry Missamore   14 Pavement Coatings- Rubber Tire Roller No   03:30 PM    Notes:Created By: Jerry Missamore     Filippin Engineering Page 6 of 9 Printed on 8/30/2022 at 08:37 AM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   15 Pavement Coatings-Traffic Truck No   03:30 PM    Notes:Created By: Jerry Missamore   16 Sterndahl- Chevery 2500 No   03:30 PM    Notes:Created By: Jerry Missamore   17 Sterndahl-Thermo Truck No   03:30 PM    Notes:Created By: Jerry Missamore   18 Sterndahl-Skidsterr W/Mill No   03:30 PM    Notes:Created By: Jerry Missamore   19 Sterndahl-Sweeper No   03:30 PM    Notes:Created By: Jerry Missamore   20 Sterndahl-Striping Truck No   03:30 PM    Notes:Created By: Jerry Missamore   21 Sterndahl-Flatbed Pickup No   03:30 PM    Notes:Created By: Jerry Missamore     OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 52°F 77°F 63°F 0.00 in.0.00 in.0.00 in.55%76%97%55°F 1.9 mph 4 mph 7 mph   Filippin Engineering Page 7 of 9 Printed on 8/30/2022 at 08:37 AM PDT      DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Partly Cloudy   52°F Partly Cloudy   57°F Clear   73°F Clear   77°F Clear   72°F Clear   62°F   PHOTOS DA886AB2-32E3-46C7-82F4-BC0C9E90C6ED.jpeg  EB072D53-6A43-4184-AEA8-D5B1E03AE1C4.jpeg  46AA4D32-F026-4918-8358-78221F024619.jpeg  B3668C6E-DAED-4AC0-A5FE-6D6718FA9076.jpeg  1B652EEA-BCD7-4483-B49D-8CEC7EA75FEA.jpeg    Filippin Engineering Page 8 of 9 Printed on 8/30/2022 at 08:37 AM PDT        By  Date  Copies To     Filippin Engineering Page 9 of 9 Printed on 8/30/2022 at 08:37 AM PDT