Loading...
HomeMy WebLinkAbout223101A-SLO_Roadway_Sealing_2022-2022-09-28-2022-10-12Filippin Engineering 354-D S. Fairview Ave. Goleta, California 93117 P: (805) 845-4602 Project: 223101A - SLO Roadway Sealing 2022  919 Palm St. San Luis Obispo, California 93401 P: 805-781-7200 Daily Log Inspection: Wednesday 9/28/2022      NOTES LOG   No.Created By Comments   1 Jerry Missamore Observation By Jerry Missamore: Bid Item 03: CCTS set up traffic control for work on the north corner of Nipomo and Higuera Bid Item 107: Burke started to form up the ADA ramp portion of the ramp and also began putting the inside forms in teh DI's to place concrete around. Spoke to Jorge (Concrete Foreman) about having to chip down the front of the DI as Burke used the wrong grades to pour too on the first pour. Jorge replied he was wating till the hardware was there and kept forming. Extra work: Lincoln and Broad Burked had 5 man crew there and installed the 16'' DIP poured the POC and also poured the DI box. The box moved during the concrete pour doesn't appear to be in the right spot needing to be 8'' back from face of curb appears to only be 6. The mark had a 3 man crew working on getting the sub grade dug out and base grade made. The tree well area also was dug out for the thicked edge that goes around the tree. A water box was brought out for the crew provided by the city. Sterndahl was onsite at 5 AM to do the temp markings on Osos from Marsh to monterey. Sterndahl at 7 Am then moved to Perfumo Canyon were they spent the rest of the day performing thermo for the detail 22 and teh bike lane and buffer zone.     Filippin Engineering Page 1 of 7 Printed on 10/12/2022 at 07:39 AM PDT        MANPOWER LOG  26 Workers  |   176.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   1 R. Burke Corporation Aldo Lopez-CM BI 107 8hrs Created By:  Jerry Missamore   1 8.0 8.0       2 R. Burke Corporation Samuel Delgado- CM Bid item 107 8hrs Created By:  Jerry Missamore   1 8.0 8.0       3 R. Burke Corporation Jorge Sanchez-CM Foreman Bid item 107 8hrs Created By:  Jerry Missamore   1 8.0 8.0       4 R. Burke Corporation Juan Zavala-CM Bid item 107 8hrs Created By:  Jerry Missamore   1 8.0 8.0       5 R. Burke Corporation Christian Fees- OE foreman extra work 8Hrs Created By:  Jerry Missamore   8 4.0 32.0       6 CCTS David Zepeda - lb 2500 GMC traffic control truck Created By:  Jerry Missamore   1 8.0 8.0       7 R. Burke Corporation James Manning-LAB extra work 8Hrs Created By:  Jerry Missamore   1 8.0 8.0       8 R. Burke Corporation Robert Farmsworth-OE extra work 8hrs Created By:  Jerry Missamore   1 8.0 8.0         Filippin Engineering Page 2 of 7 Printed on 10/12/2022 at 07:39 AM PDT        MANPOWER LOG  26 Workers  |   176.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   9 R. Burke Corporation John Farmsworth- Teamste extra work 8Hrs Created By:  Jerry Missamore   1 8.0 8.0       10 R. Burke Corporation Dennis Patton-OE extra work 8Hrs Created By:  Jerry Missamore   1 8.0 8.0       11 R. Burke Corporation Scott Furness- LAB extra work 8HRs Created By:  Jerry Missamore   1 8.0 8.0       12 R. Burke Corporation Leo Huitron-OE extra work 8hrs Created By:  Jerry Missamore   1 8.0 8.0       13 Sterndhahl Enterprises, Inc Jordy Carlson-Foreman Thermo 8HRS Created By:  Jerry Missamore   1 8.0 8.0       14 Sterndhahl Enterprises, Inc Jerry Valentine-Lab Thermo 8HRS Created By:  Jerry Missamore   1 8.0 8.0       15 Sterndhahl Enterprises, Inc Jose Rojas-LAB Thermo 8HRS Created By:  Jerry Missamore   1 8.0 8.0       16 Sterndhahl Enterprises, Inc Joshua Gibbons-Lab Thermo 8HRS Created By:  Jerry Missamore   1 8.0 8.0         Filippin Engineering Page 3 of 7 Printed on 10/12/2022 at 07:39 AM PDT        MANPOWER LOG  26 Workers  |   176.0 Man Hours  No.Contact/ Company Notes: Cost Code Workers # Hours Man Hours Location   17 Sterndhahl Enterprises, Inc Omar Rameriez Thermo 8HRS Created By:  Jerry Missamore   1 8.0 8.0       18 Sterndhahl Enterprises, Inc Marco Cervantes-LAB THermo 8HRS Created By:  Jerry Missamore   1 8.0 8.0       19 R. Burke Corporation Carlos Vasquez-CM apprentice BID Item 107 8HRS Created By:  Jerry Missamore   1 8.0 8.0           26  176.0      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   1 Burke-Super 10 Dumptruck 0.0 0.0 No   05:26 AM    Notes:Created By: Jerry Missamore   2 Burke-JD 410L backhoe 0.0 0.0 No   05:26 AM    Notes:Breaker attachment Created By: Jerry Missamore   3 Burke-Mini Ex 0.0 0.0 No   05:27 AM    Notes:Created By: Jerry Missamore   4 Burke- JD mini ex 60G 0.0 0.0 No   05:28 AM    Notes:Created By: Jerry Missamore   5 Diamond C dump trailer- 617 0.0 0.0 No   05:04 AM    Notes:Created By: Jerry Missamore   6 Burke-F-750 dump truck 0.0 0.0 No   05:05 AM    Notes:Created By: Jerry Missamore     Filippin Engineering Page 4 of 7 Printed on 10/12/2022 at 07:39 AM PDT      EQUIPMENT LOG No.Equipment Name Cost Code Hrs Operating Hrs Idle Inspected?Inspection Time Location   7 Burke-F450 #294 0.0 0.0 No   05:05 AM    Notes:Created By: Jerry Missamore   8 Burke-F250 Pickup #203 0.0 0.0 No   05:05 AM    Notes:Created By: Jerry Missamore   9 Burke-F450 Concrete utility truck 0.0 0.0 No   05:37 PM    Notes:Created By: Jerry Missamore   10 Sterndahl- Chevery 2500 No   05:35 AM    Notes:Created By: Jerry Missamore   11 Sterndahl-Thermo Truck No   05:35 AM    Notes:Created By: Jerry Missamore   12 Sterndahl-Flatbed Pickup No   05:35 AM    Notes:Created By: Jerry Missamore     OBSERVED WEATHER CONDITIONS Weather Delay Sky Temp Average Precipitation Wind Ground/Sea Calamity   No        WEATHER REPORT Temperature Precipitation Since Humidity Windspeed Low High Avg Midnight 2 Days Ago 3 Days Ago Low Avg High Dew Avg Max Gust 54°F 82°F 65°F 0.00 in.0.00 in.0.00 in.39%68%91%54°F 3.7 mph 7 mph 11 mph   DAILY SNAPSHOT 06:00 AM 09:00 AM 12:00 PM 03:00 PM 06:00 PM 09:00 PM Clear   55°F Clear   61°F Clear   78°F Clear   82°F Clear   75°F Clear   62°F   Filippin Engineering Page 5 of 7 Printed on 10/12/2022 at 07:39 AM PDT      PHOTOS AD733C5E-7EFE-4C97-B625-82B5D9745B1A.jpeg  079781EB-6A8C-448A-9433-995CC263480C.jpeg  71B1D26D-376A-495D-89B0-83E356EAA1D3.jpeg  5C993D28-3E47-42EE-8567-0F8BABD82508.jpeg  BF7EA82A-DA58-41DE-8ED6-467F5F8D0CB6.jpeg  4BA0F778-4EB1-440E-8474-94E8935C7940.jpeg  70A0BBE8-78A0-48E9-AFE1-BB395C62BD87.jpeg  6789835E-3807-403C-826B-7BBC861C7CCC.jpeg    Filippin Engineering Page 6 of 7 Printed on 10/12/2022 at 07:39 AM PDT    E1918D14-3FAD-4B86-8259-B59506B78B9B.jpeg      By  Date  Copies To     Filippin Engineering Page 7 of 7 Printed on 10/12/2022 at 07:39 AM PDT