Loading...
HomeMy WebLinkAbout6/20/2023 Item 6c, Hermann and Erquiaga - Staff Agenda CorrespondenceCity of San Luis Obispo, Council Memorandum City of San Luis Obispo Council Agenda Correspondence DATE: June 20, 2023 TO: Mayor and Council FROM: Greg Hermann, Deputy City Manager Josh Erquiaga, Network Services Supervisor VIA: Derek Johnson, City Manager SUBJECT: ITEM 6C – ADOPTION OF THE BROADBAND PLAN City have staff noted a typographical error in the table listing the Estimated Construction Costs of the Conceptual Network Design. This is Table 2 in Attachment A – Broadband Plan Summary (page 10) and Table 17 in Attachment B – Broadband Plan (page 69). The table incorrectly lists the Phase 2 Total as $84,243. The corrected table below has the correct Phase 2 Total of $4,929,833. All other figures are accurate, including the total cost for all phases. Length (feet) Price per Foot Estimated Cost Phase 1 – City Backbone Loop & Critical City Sites Design & Engineering Design & Engineering (New Construction) 57,739 $ 1.75 $ 101,044 As-Builts (Existing City Network Upgrades) 120,198 $ 0.20 $ 24,040 Fielding Survey -- -- $ 50,000 Public Engineering Stamps -- -- $ 50,000 Phase 1 Design & Engineering Subtotal $ 225,084 Construction Existing City Network Upgrades 120,198 $ 5.00 $ 600,990 New Backbone Construction 52,348 $ 110.00 $ 5,758,280 New Lateral Construction (City Assets) 5,391 $ 80.00 $ 431,280 Phase 1 Total 177,937 -- $ 7,015,634 Phase 1B – Residential Backbone Extension Design & Engineering Design & Engineering (New Construction) 13,801 $ 1.75 $ 24,152 As-Builts (Existing City Network Upgrades) -- $ 0.20 -- Fielding Survey -- -- $ 15,000 Public Engineering Stamps -- -- $ 20,000 Phase 1 Design & Engineering Subtotal $ 59,152 Construction Existing City Network Upgrades -- $ 5.00 -- New Backbone Construction 13,801 $ 110.00 $ 1,518,110 New Lateral Construction (City Assets) - $ 80.00 -- Phase 1B Total 13,801 $ 1,577,262 Item 6c. Adoption of the Broadband Plan Page 2 Phase 2 – Water Assets & Parks Design & Engineering Design & Engineering (New Construction) 48,139 $ 1.75 $ 84,243 As-Builts (Existing City Network Upgrades) -- $ 0.20 -- Fielding Survey -- -- $ 25,000 Public Engineering Stamps -- -- $ 35,000 Phase 2 Design & Engineering Subtotal $ 144,243 Construction Existing City Network Upgrades -- $ 5.00 -- New Backbone Construction 31,149 $ 110.00 $ 3,426,390 New Lateral Construction (City Assets) 16,990 $ 80.00 $ 1,359,200 Phase 2 Total 48,139 -- $ 4,929,833 TOTAL – ALL PHASES 239,877 $ 13,522,728