HomeMy WebLinkAboutResponsive emailsFrom:Browning, Bobby
To:Whipple, Anthony
Subject:FW: RBCO - Tree trimming Prefumo Canyon
Date:Tuesday, August 2, 2022 5:11:00 PM
Attachments:image001.png
R. Burke will be using their own arborist to trim trees on Perfumo Canyon. See below.
Bobby Browning
Engineer II
Public Works
919 Palm Street, San Luis Obispo, CA 93401-7314
E bbrowning@slocity.org
From: Kevin Wells <kevinw@rburkecorporation.com>
Sent: Tuesday, August 2, 2022 5:04 PM
To: Austin Della <Austin@fecivil.com>; 'Raul Estrada' <raul@fecivil.com>; Browning, Bobby
bbrowning@slocity.org>
Cc: John Overland <johno@rburkecorporation.com>; Rob Burke <robb@rburkecorporation.com>
Subject: RBCO - Tree trimming Prefumo Canyon
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Austin,
In an effort to provide a better slurry product, we would like to trim the trees on the northernmost
side of Prefumo Canyon between Headley and Castillo rd.
We intend to use a certified arborist (Bunyon Bros) to trim trees & Shrubs from approximately 2.5’
from the gutter lip to the CL, and up to a height of approximately 15’
We will not be cutting any branches greater than 2” in diameter and believe this work to take
approximately one (1) day.
Thank you
Best
Kevin Wells, PM
R. Burke Corporation
O: (805) 543-8568
C: (805) 610-8279
From:Raul Estrada (Filippin Engineering)
To:Browning, Bobby
Subject:FW: Submittals: #27.8: Slurry Schedule & TC
Date:Tuesday, August 23, 2022 11:16:04 AM
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
SLO Roadway Sealing 2022
More details: View online | View PDF
From:Raul Estrada (Filippin Engineering)
Date:Tuesday, August 23, 2022 at 11:15 am PDT
Sent To:Bobby Browning (City of San Luis Obispo)
Jennifer Rice (City of San Luis Obispo)
CC:Austin Della (Filippin Engineering)
Raul Estrada (Filippin Engineering)
Jerry Missamore (Filippin Engineering)
Hai Nguyen (City of San Luis Obispo- Utilities)
Attachments:None
Hey Bobby.
I am forwarding you the Submittal #27.8 slurry schedule and TC for City comment. Question,
please let me know. Thank you.
Raul Estrada
Filippin Enigneering
805-403-1041
Sent from Procore
Submittal Item Details
Project:SLO Roadway Sealing 2022
Submittal #:27.8
Title:Slurry Schedule & TC
Type:Plans
Responsible Contractor:R. Burke Corporation
Received From:Kevin Wells
Ball In Court:Raul Estrada
Approvers:Estrada, Raul (Filippin Engineering)
Distribution:Browning, Bobby (City of San Luis Obispo)
Burke, Rob (R. Burke Corporation)
Della, Austin (Filippin Engineering)
Estrada, Raul (Filippin Engineering)
Nguyen, Hai (City of San Luis Obispo- Utilities)
Overland, John (R. Burke Corporation)
Wells, Kevin (R. Burke Corporation)
Due Date:09/13/22
Description:See attached revised week 3 for the slurry schedule.
The residential areas on Saturday have been replaced with
the downtown school areas and Garden st.
Propose starting at 4am.
For the nighttime work it should start at midnight to 10am.
Kevin
General Information
Attachments:
Submittal 1000560-27-09 (WK 3 8_22_22).pdf
Approver:Estrada, Raul (Filippin Engineering)
Date:Sent: 08/22/22
Returned:
Response:Pending
Attachments:None
Comments:None
More details: View online | View PDF
Powered By Procore | support@procore.com | https://support.procore.com
From:Rice, Jennifer
To:Jerry Missamore; Browning, Bobby; Raul Estrada; Austin Della
Subject:Re: Striping Layout
Date:Wednesday, August 31, 2022 2:01:09 PM
Attachments:image001.png
I can’t get out to review until tomorrow morning. Is prefumo laid out per plan? If there are no
concerns and it is per plan, I’m fine with either FE or Bobby’s approval.
I had previously laid out the stop bar at la entrada and San Jose for them to tab before sealing.
If that didn’t happen, I can drive by tomorrow morning.
Jennifer Rice
pronouns she/her/hers
Transportation Planner/Engineer III
City of San Luis Obispo
Public Works
Transportation Planning/Engineering
919 Palm Street, San Luis Obispo, CA 93401-3218
E jrice@slocity.org
T 805.781.7058
slocity.org
Stay connected with the City by signing up for e-notifications
From: Jerry Missamore <Jerry@fecivil.com>
Sent: Wednesday, August 31, 2022 1:53 PM
To: Browning, Bobby <bbrowning@slocity.org>; Rice, Jennifer <jrice@slocity.org>; Raul Estrada
raul@fecivil.com>; Austin Della <Austin@fecivil.com>
Subject: Striping Layout
This message is from an External Source. Use caution when deciding to open attachments, click links, or
respond.
Bobby,
There is a new stop bar and detail 22 laid out on La Entrada and San Jose that Sterndahl would like
approval on. Plans are calling for 26LF with a dog leg in the stop bar. Currently it is laid out at 16’
with a 5’ dog leg. Is this acceptable to the City. Also Perfumo Canyon is laid out from LOVR to Isabela
is it acceptable for Sterndahl to temp strip? Currently no paint is down just CAT tracked.
Sterndahl also let me know the traffic circle is laid out at La Entrada and Romana and is ready for buy
off.
Thanks
From:Raul Estrada (Filippin Engineering)
To:Browning, Bobby
Subject:SLO Roadway Sealing 2022: Submittal Distributed: (#27.8: Slurry Schedule & TC)
Date:Wednesday, August 24, 2022 1:16:11 PM
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
SLO Roadway Sealing 2022
More details: View online | View PDF
DO NOT REPLY TO THIS EMAIL
This is a notification sent from an unmonitored email address.
Please click on the "View Online" link in this Email to reply to this Submittal in
Procore.
Raul Estrada has distributed (#27.8: Slurry Schedule
TC)
Project:SLO Roadway Sealing 2022
Submittal #:27
Title:Slurry Schedule & TC
Recipients:John Overland (R. Burke Corporation)
Hai Nguyen (City of San Luis Obispo- Utilities)
Jerry Missamore (Filippin Engineering)
Austin Della (Filippin Engineering)
Bobby Browning (City of San Luis Obispo)
Kevin Wells (R. Burke Corporation)
Jennifer Rice (City of San Luis Obispo)
Message:None
Additional Attachments:Submittal 1000560-27-09 (WK 3 8_22_22).pdf
DISTRIBUTED RESPONSE
Name:Raul Estrada (Filippin Engineering)
Response:Revise and Resubmit
Comment:
TC is acceptable
Contractor to obtain approval and confirmation of 4
AM start. Provide justification for starting at this time
Submittal details included mention of night work
from midnight to 10 AM. No streets in the exhibit
indicate a start time of midnight. No night work hours
of midnight to 10 AM are approved with this
submittal, unless further requested.
Let SLO in Motion communications team know once
final schedule is approved
Attachments:None
More details: View online | View PDF
Powered By Procore | support@procore.com | https://support.procore.com
From:Browning, Bobby
To:Stanley, Jesse
Subject:SLO Roadway Slurry Seal Project Schedule
Date:Tuesday, July 12, 2022 7:42:00 AM
Attachments:image001.png
image002.png
image003.png
image004.png
Submittal 1000560-22-01.pdf
Submittal 1000560-27-01 (1).pdf
Hey Jesse,
Here’s the upcoming schedule for the slurry job so you can plan on delays or impacts to the
bus routes.
7/11 to 8/5: Garden and Marsh half intersection being worked on. Two lanes of traffic on
Marsh and Garden closed.
7/18 to 7/26: Patricia/Cerro Romauldo roundabout. Delayed access with flagging.
7/14 to 8/5: Higuera/Nipomo curb ramps. Likely delays with lanes delineated or one lane
road. See attached.
7/25: Grind shoulder Perfumo Canyon between LOVR and Del Rio. Shoulder/Parking area
closure.
7/27-7/29: Ramona speed hump table. Between Elm Ct and Verde. Delays with one lane
road and flagging.
Also see attached slurry schedule. Yes, it’s drawn in crayon. They have the streets listed
with FC (full closure) or the number of traffic lanes available. These dates are subject to
change.
Bobby Browning
Engineer II
Public Works
919 Palm Street, San Luis Obispo, CA 93401-7314
E bbrowning@slocity.org
slocity.org
Stay connected with the City by signing up for e-notifications
From:Jerry Missamore
To:Browning, Bobby; Rice, Jennifer; Raul Estrada; Austin Della
Subject:Striping Layout
Date:Wednesday, August 31, 2022 1:53:28 PM
Attachments:image001.png
This message is from an External Source. Use caution when deciding to open attachments, click links, or
respond.
Bobby,
There is a new stop bar and detail 22 laid out on La Entrada and San Jose that Sterndahl would like
approval on. Plans are calling for 26LF with a dog leg in the stop bar. Currently it is laid out at 16’
with a 5’ dog leg. Is this acceptable to the City. Also Perfumo Canyon is laid out from LOVR to Isabela
is it acceptable for Sterndahl to temp strip? Currently no paint is down just CAT tracked.
Sterndahl also let me know the traffic circle is laid out at La Entrada and Romana and is ready for buy
off.
Thanks