Loading...
HomeMy WebLinkAboutResponsive emailsFrom:Browning, Bobby To:Whipple, Anthony Subject:FW: RBCO - Tree trimming Prefumo Canyon Date:Tuesday, August 2, 2022 5:11:00 PM Attachments:image001.png R. Burke will be using their own arborist to trim trees on Perfumo Canyon. See below. Bobby Browning Engineer II Public Works 919 Palm Street, San Luis Obispo, CA 93401-7314 E bbrowning@slocity.org From: Kevin Wells <kevinw@rburkecorporation.com> Sent: Tuesday, August 2, 2022 5:04 PM To: Austin Della <Austin@fecivil.com>; 'Raul Estrada' <raul@fecivil.com>; Browning, Bobby bbrowning@slocity.org> Cc: John Overland <johno@rburkecorporation.com>; Rob Burke <robb@rburkecorporation.com> Subject: RBCO - Tree trimming Prefumo Canyon This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Austin, In an effort to provide a better slurry product, we would like to trim the trees on the northernmost side of Prefumo Canyon between Headley and Castillo rd. We intend to use a certified arborist (Bunyon Bros) to trim trees & Shrubs from approximately 2.5’ from the gutter lip to the CL, and up to a height of approximately 15’ We will not be cutting any branches greater than 2” in diameter and believe this work to take approximately one (1) day. Thank you Best Kevin Wells, PM R. Burke Corporation O: (805) 543-8568 C: (805) 610-8279 From:Raul Estrada (Filippin Engineering) To:Browning, Bobby Subject:FW: Submittals: #27.8: Slurry Schedule & TC Date:Tuesday, August 23, 2022 11:16:04 AM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. SLO Roadway Sealing 2022 More details: View online | View PDF From:Raul Estrada (Filippin Engineering) Date:Tuesday, August 23, 2022 at 11:15 am PDT Sent To:Bobby Browning (City of San Luis Obispo) Jennifer Rice (City of San Luis Obispo) CC:Austin Della (Filippin Engineering) Raul Estrada (Filippin Engineering) Jerry Missamore (Filippin Engineering) Hai Nguyen (City of San Luis Obispo- Utilities) Attachments:None Hey Bobby. I am forwarding you the Submittal #27.8 slurry schedule and TC for City comment. Question, please let me know. Thank you. Raul Estrada Filippin Enigneering 805-403-1041 Sent from Procore Submittal Item Details Project:SLO Roadway Sealing 2022 Submittal #:27.8 Title:Slurry Schedule & TC Type:Plans Responsible Contractor:R. Burke Corporation Received From:Kevin Wells Ball In Court:Raul Estrada Approvers:Estrada, Raul (Filippin Engineering) Distribution:Browning, Bobby (City of San Luis Obispo) Burke, Rob (R. Burke Corporation) Della, Austin (Filippin Engineering) Estrada, Raul (Filippin Engineering) Nguyen, Hai (City of San Luis Obispo- Utilities) Overland, John (R. Burke Corporation) Wells, Kevin (R. Burke Corporation) Due Date:09/13/22 Description:See attached revised week 3 for the slurry schedule. The residential areas on Saturday have been replaced with the downtown school areas and Garden st. Propose starting at 4am. For the nighttime work it should start at midnight to 10am. Kevin General Information Attachments: Submittal 1000560-27-09 (WK 3 8_22_22).pdf Approver:Estrada, Raul (Filippin Engineering) Date:Sent: 08/22/22 Returned: Response:Pending Attachments:None Comments:None More details: View online | View PDF Powered By Procore | support@procore.com | https://support.procore.com From:Rice, Jennifer To:Jerry Missamore; Browning, Bobby; Raul Estrada; Austin Della Subject:Re: Striping Layout Date:Wednesday, August 31, 2022 2:01:09 PM Attachments:image001.png I can’t get out to review until tomorrow morning. Is prefumo laid out per plan? If there are no concerns and it is per plan, I’m fine with either FE or Bobby’s approval. I had previously laid out the stop bar at la entrada and San Jose for them to tab before sealing. If that didn’t happen, I can drive by tomorrow morning. Jennifer Rice pronouns she/her/hers Transportation Planner/Engineer III City of San Luis Obispo Public Works Transportation Planning/Engineering 919 Palm Street, San Luis Obispo, CA 93401-3218 E jrice@slocity.org T 805.781.7058 slocity.org Stay connected with the City by signing up for e-notifications From: Jerry Missamore <Jerry@fecivil.com> Sent: Wednesday, August 31, 2022 1:53 PM To: Browning, Bobby <bbrowning@slocity.org>; Rice, Jennifer <jrice@slocity.org>; Raul Estrada raul@fecivil.com>; Austin Della <Austin@fecivil.com> Subject: Striping Layout This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Bobby, There is a new stop bar and detail 22 laid out on La Entrada and San Jose that Sterndahl would like approval on. Plans are calling for 26LF with a dog leg in the stop bar. Currently it is laid out at 16’ with a 5’ dog leg. Is this acceptable to the City. Also Perfumo Canyon is laid out from LOVR to Isabela is it acceptable for Sterndahl to temp strip? Currently no paint is down just CAT tracked. Sterndahl also let me know the traffic circle is laid out at La Entrada and Romana and is ready for buy off. Thanks From:Raul Estrada (Filippin Engineering) To:Browning, Bobby Subject:SLO Roadway Sealing 2022: Submittal Distributed: (#27.8: Slurry Schedule & TC) Date:Wednesday, August 24, 2022 1:16:11 PM This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. SLO Roadway Sealing 2022 More details: View online | View PDF DO NOT REPLY TO THIS EMAIL This is a notification sent from an unmonitored email address. Please click on the "View Online" link in this Email to reply to this Submittal in Procore. Raul Estrada has distributed (#27.8: Slurry Schedule TC) Project:SLO Roadway Sealing 2022 Submittal #:27 Title:Slurry Schedule & TC Recipients:John Overland (R. Burke Corporation) Hai Nguyen (City of San Luis Obispo- Utilities) Jerry Missamore (Filippin Engineering) Austin Della (Filippin Engineering) Bobby Browning (City of San Luis Obispo) Kevin Wells (R. Burke Corporation) Jennifer Rice (City of San Luis Obispo) Message:None Additional Attachments:Submittal 1000560-27-09 (WK 3 8_22_22).pdf DISTRIBUTED RESPONSE Name:Raul Estrada (Filippin Engineering) Response:Revise and Resubmit Comment: TC is acceptable Contractor to obtain approval and confirmation of 4 AM start. Provide justification for starting at this time Submittal details included mention of night work from midnight to 10 AM. No streets in the exhibit indicate a start time of midnight. No night work hours of midnight to 10 AM are approved with this submittal, unless further requested. Let SLO in Motion communications team know once final schedule is approved Attachments:None More details: View online | View PDF Powered By Procore | support@procore.com | https://support.procore.com From:Browning, Bobby To:Stanley, Jesse Subject:SLO Roadway Slurry Seal Project Schedule Date:Tuesday, July 12, 2022 7:42:00 AM Attachments:image001.png image002.png image003.png image004.png Submittal 1000560-22-01.pdf Submittal 1000560-27-01 (1).pdf Hey Jesse, Here’s the upcoming schedule for the slurry job so you can plan on delays or impacts to the bus routes. 7/11 to 8/5: Garden and Marsh half intersection being worked on. Two lanes of traffic on Marsh and Garden closed. 7/18 to 7/26: Patricia/Cerro Romauldo roundabout. Delayed access with flagging. 7/14 to 8/5: Higuera/Nipomo curb ramps. Likely delays with lanes delineated or one lane road. See attached. 7/25: Grind shoulder Perfumo Canyon between LOVR and Del Rio. Shoulder/Parking area closure. 7/27-7/29: Ramona speed hump table. Between Elm Ct and Verde. Delays with one lane road and flagging. Also see attached slurry schedule. Yes, it’s drawn in crayon. They have the streets listed with FC (full closure) or the number of traffic lanes available. These dates are subject to change. Bobby Browning Engineer II Public Works 919 Palm Street, San Luis Obispo, CA 93401-7314 E bbrowning@slocity.org slocity.org Stay connected with the City by signing up for e-notifications From:Jerry Missamore To:Browning, Bobby; Rice, Jennifer; Raul Estrada; Austin Della Subject:Striping Layout Date:Wednesday, August 31, 2022 1:53:28 PM Attachments:image001.png This message is from an External Source. Use caution when deciding to open attachments, click links, or respond. Bobby, There is a new stop bar and detail 22 laid out on La Entrada and San Jose that Sterndahl would like approval on. Plans are calling for 26LF with a dog leg in the stop bar. Currently it is laid out at 16’ with a 5’ dog leg. Is this acceptable to the City. Also Perfumo Canyon is laid out from LOVR to Isabela is it acceptable for Sterndahl to temp strip? Currently no paint is down just CAT tracked. Sterndahl also let me know the traffic circle is laid out at La Entrada and Romana and is ready for buy off. Thanks