HomeMy WebLinkAboutCity of SLO RFP -- Better Buildings SLONotice Requesting Proposals for Consultant Services for the
“BETTER BUILDINGS SLO”
EXISTING CONDITIONS AND NEEDS ASSESSMENT
The City of San Luis Obispo is requesting sealed proposals for services associated with the Better Buildings
SLO Existing Conditions and Needs Assessment.
All firms interested in receiving further correspondence regarding this Request for Proposals (RFP) will be
required to complete a free registration proposals using BidSync (https://www.bidsync.com/bidsync-app-
web/vendor/register/Login.xhtml).
All proposals must be received via BidSync by the Department of Finance at or before May 12, 2021 when
they will be opened publicly in the City Hall Conference Hearing Room, 990 Palm Street, San Luis Obispo,
CA 93401.
Proposals received after said time may not be considered. The preferred method of submission is
electronically via BidSync, but if you wish to send a hard copy, to guard against premature opening, each
proposal shall be submitted to the Department of Finance in a sealed envelope plainly marked with the
proposal title, project number, proposer name, and time and date of the proposal opening. Proposals
shall be submitted using the forms provided in the project package.
An optional pre-proposal conference call will be held to answer any questions that the prospective
proposers may have regarding the City's request for proposals.
April 29, 2021; 1:00-2:00 PM PST
(209) 645-4165
Code: 821978589#
Project packages and additional information may be obtained at the City’s BidSync website at
www.BidSync.com.
Please contact Dan Clancy at dclancy@slocity.org with any questions. For technical issues with BidSync,
please contact BidSync.
Table of Contents
A. Introduction 3
B. Required Outcomes 4
C. Project Budget 4
D. General Terms and Conditions 5
E. Special Terms and Conditions 11
F. Form of Agreement 16
G. Insurance Requirements 18
H. Proposal Submittal Forms 19
City of San Luis Obispo
Specification No. 9xxxx
-3-
A. INTRODUCTION
The City of San Luis Obispo has initiated the development of a comprehensive building retrofit program
to create a pathway for achieving deep emissions reductions across the existing building stock. The City
wishes to lead by example both in the community and amongst peer climate leadership cities and is
seeking proposals from highly innovative, creative, and qualified consulting organizations or teams to
support the development of an existing conditions assessment of the building stock in San Luis Obispo.
This assessment will provide critical and contextualized insight into the current state of buildings in the
jurisdiction, characterize those buildings based on factors relevant to program needs, and act as the
foundation for informed market-based solutions and policy development processes.
The development of a comprehensive building retrofit program is embedded in the City’s broader climate
initiative and is specifically a foundational action identified in the City’s Climate Action Plan for Community
Recovery. Adopted by City Council in September 2020, this plan lays the groundwork to achieve an
ambitious goal of community carbon neutrality by 2035. The plan is divided into six decarbonization
pillars, including Green Buildings. The Green Buildings sector goal is to achieve no net new building
emissions from onsite energy use by 2020 and a 50 percent reduction in existing building emissions by
2030 (For more information, visit www.slocity.org/climateactionplan).
The City has already taken significant steps to achieve the Green Buildings goals. In June 2020, Council
adopted the Clean Energy Choice Program for New Buildings, which encourages clean, efficient, and cost
effective all-electric new buildings through incentives and local amendments to the California Energy
Code. This program only applies to new buildings. Building on the momentum of this work effort, staff are
now focused on existing building emissions and reduction strategies.
The City has conceptualized the Better Buildings SLO workflow as illustrated in Figure 1. The work
requested in this RFP is narrowly confined to “1.1 Analysis” and will establish the analytic framework
and foundation for the larger Better Buildings SLO project. The City is aware of several common
approaches to existing buildings analysis including building inventories, market segmentation analysis,
building prototype modeling, annual energy benchmarking, and site level energy load/curve assessments,
among others. The City does not currently have a preference among these approaches and is open to
proposals so long as they are supportive of project outcomes as described in Section B.
Figure 1. Better Buildings SLO Conceptual Workflow
•1.1 Analysis
•1.2 Alignment
•1.3 Approach
Research
Phase 1:
Foundation
•2.1 Pilot Projects
•2.2 City Grant Program
Phase 2:
Demonstration •3.1 Support Market
Based Approaches
•3.2 Adopt/Implement
Policy Based
Spproaches
Phase 3:
Implementation
City of San Luis Obispo
Specification No. 9xxxx
-4-
A. REQUIRED OUTCOMES
Prospective contractors or teams are invited to provide a scope of work that they feel best meet the needs
of the City given the available budget of $65,000. The proposed work can take whatever form the proposer
demonstrates will be most useful to achieving the outcomes as described below.
To date, staff have considered building inventory, market segmentation analysis, prototypical building
models, building energy benchmarking systems, and energy load assessments based on their use in
existing community retrofit programs. Staff seeks work that provides the foundation for and enables the
following (including, but not limited to):
• Sufficient information about existing buildings to inform and accelerate emerging collaboration
with energy efficiency programs (e.g., 3C-REN), Central Coast Community Energy, and other
organizations with capacity to fund decarbonization measures.
• Sufficient information about existing buildings to inform potential creation of sector specific,
effective, and equitable policy and regulation.
• Sufficient information to have a general understating of what decarbonization measures are going
to be economically and environmentally beneficial for building owners, tenants, or both and
related understanding of market potential by sector.
• Ability to have an ongoing understanding of site or sector level energy use in the community.
• Ability to incorporate equity and resilience considerations including onsite generation and storage
potential.
• Building of staff level capacity to access and manipulate energy or building data for ongoing or
periodic updates.
Staff are open to proposals that suggest alternative outcomes as critical for program success. In the spirit
of creativity, entrepreneurship, and extended learning, the City is requesting a creative approach that
helps the City obtain the foundational information needed to effectively develop policies and programs.
The City is interested in understanding existing conditions for all building sectors and would prefer a
proposal that provides this information. However, vendors may propose specific sectors so long as a
compelling case is made for why the narrower and deeper focus is the best approach.
The City is currently working with non-profits, peer communities, and participants in the larger California
building decarbonization network of professionals to conduct local stakeholder outreach, review existing
literature and best practices, and conduct a review of market based and policy based retrofit approaches.
Please note that the City is not seeking the development of a retrofit program through this RFP, just the
analytic background that will support and inform the development of a retrofit program. Proposers may
add program development as optional task items in the proposal, but this is not the core focus of this RFP.
B. Project Budget
The project budget shall not exceed $65,000 inclusive of direct costs and contingency funding. Bidders
may include options for reducing or adding services, including services that could be performed by City
staff.
City of San Luis Obispo
Specification No. 9xxxx
-5-
E. GENERAL TERMS AND CONDITIONS
PROPOSAL REQUIREMENTS
1. Requirement to Meet All Provisions. Each individual or firm submitting a proposal (bidder) shall
meet all the terms, and conditions of the Request for Proposals (RFP) project package. By virtue
of its proposal submittal, the bidder acknowledges Agreement with and acceptance of all
provisions of the RFP specifications.
2. Proposal Submittal. Each proposal must be submitted on the form(s) provided in the
specifications and accompanied by any other required submittals or supplemental materials.
Proposal documents shall be enclosed in an envelope that shall be sealed and addressed to the
Department of Finance, City of San Luis Obispo, 990 Palm Street, San Luis Obispo, CA, 93401. To
guard against premature opening, the proposal should be clearly labeled with the proposal title,
project number, name of bidder, and date and time of proposal opening. No FAX or emailed
submittals will be accepted.
3. Insurance Certificate. Each proposal must include a certificate of insurance showing:
a. The insurance carrier and its A.M. Best rating.
b. Scope of coverage and limits.
c. Deductibles and self-insured retention.
The purpose of this submittal is to generally assess the adequacy of the bidder’s insurance
coverage during proposal evaluation; as discussed under paragraph 12 below, endorsements are
not required until contract award. The City’s insurance requirements are detailed in Section E.
4. Proposal Quotes and Unit Price Extension. The extension of unit prices for the quantities
indicated and the lump sum prices quoted by the bidder must be entered in figures in the spaces
provided on the Proposal Submittal Form(s). Any lump sum bid shall be stated in figures. The
Proposal Submittal Form(s) must be totally completed. If the unit price and the total amount
stated by any bidder for any item are not in Agreement, the unit price alone will be considered as
representing the bidder’s intention and the proposal total will be corrected to conform to the
specified unit price.
5. Proposal Withdrawal and Opening. A bidder may withdraw its proposal, without prejudice prior
to the time specified for the proposal opening, by submitting a written request to the Director of
Finance for its withdrawal, in which event the proposal will be returned to the bidder unopened.
No proposal received after the time specified or at any place other than that stated in the “Notice
Inviting Bids/Requesting Proposals” will be considered. All proposals will be opened and declared
publicly. Bidders or their representatives are invited to be present at the opening of the
proposals.
6. Submittal of One Proposal Only. No individual or business entity of any kind shall be allowed to
make or file, or to be interested as the primary submitter in more than one proposal, except an
alternative proposal when specifically requested; however, an individual or business entity that
has submitted a sub-proposal to a bidder submitting a proposal, or who has quoted prices on
City of San Luis Obispo
Specification No. 9xxxx
-6-
materials to such bidder, is not thereby disqualified from submitting a sub-proposal or from
quoting prices to other bidders submitting proposals.
7. Communications. All timely requests for information submitted in writing will receive a written
response from the City. Telephone communications with City staff are not encouraged but will
be permitted. However, any such oral communication shall not be binding on the City.
CONTRACT AWARD AND EXECUTION
8. Proposal Retention and Award. The City reserves the right to retain all proposals for a period of
60 days for examination and comparison. The City also reserves the right to waive non-substantial
irregularities in any proposal, to reject any or all proposals, to reject or delete one part of a
proposal and accept the other, except to the extent that proposals are qualified by specific
limitations. See the “special terms and conditions” in Section C of these specifications for
proposal evaluation and contract award criteria.
9. Competency and Responsibility of Bidder. The City reserves full discretion to determine the
competence and responsibility, professionally and/or financially, of bidders. Bidders will provide,
in a timely manner, all information that the City deems necessary to make such a decision.
10. Contract Requirement. The bidder to whom award is made (Contractor) shall execute a written
contract with the City within ten (10) calendar days after notice of the award has been sent by
mail to it at the address given in its proposal. The contract shall be made in the form adopted by
the City and incorporated in these specifications.
CONTRACT PERFORMANCE
11. Insurance Requirements. The Contractor shall provide proof of insurance in the form, coverages
and amounts specified in Section E of these specifications within 10 (ten) calendar days after
notice of contract award as a precondition to contract execution.
12. Business License & Tax. The Contractor must have a valid City of San Luis Obispo business license
& tax certificate before execution of the contract. Additional information regarding the City’s
business tax program may be obtained by calling (805) 781-7134.
13. Ability to Perform. The Contractor warrants that it possesses, or has arranged through
subcontracts, all capital and other equipment, labor, materials, and licenses necessary to carry
out and complete the work hereunder in compliance with all federal, state, county, city, and
special district laws, ordinances, and regulations.
14. Laws to be Observed. The Contractor shall keep itself fully informed of and shall observe and
comply with all applicable state and federal laws and county and City of San Luis Obispo
ordinances, regulations and adopted codes during its performance of the work.
15. Payment of Taxes. The contract prices shall include full compensation for all taxes that the
Contractor is required to pay.
City of San Luis Obispo
Specification No. 9xxxx
-7-
16. Permits and Licenses. The Contractor shall procure all permits and licenses, pay all charges and
fees, and give all notices necessary.
17. Safety Provisions. The Contractor shall conform to the rules and regulations pertaining to safety
established by OSHA and the California Division of Industrial Safety.
18. Public and Employee Safety. Whenever the Contractor’s operations create a condition hazardous
to the public or City employees, it shall, at its expense and without cost to the City, furnish, erect
and maintain such fences, temporary railings, barricades, lights, signs and other devices and take
such other protective measures as are necessary to prevent accidents or damage or injury to the
public and employees.
19. Preservation of City Property. The Contractor shall provide and install suitable safeguards,
approved by the City, to protect City property from injury or damage. If City property is injured
or damaged resulting from the Contractor’s operations, it shall be replaced or restored at the
Contractor’s expense. The facilities shall be replaced or restored to a condition as good as when
the Contractor began work.
20. Immigration Act of 1986. The Contractor warrants on behalf of itself and all subcontractors
engaged for the performance of this work that only persons authorized to work in the United
State pursuant to the Immigration Reform and Control Act of 1986 and other applicable laws shall
be employed in the performance of the work hereunder.
21. Contractor Non-Discrimination. In the performance of this work, the Contractor agrees that it
will not engage in, nor permit such subcontractors as it may employ, to engage in discrimination
in employment of persons because of age, race, color, sex, national origin or ancestry, sexual
orientation, or religion of such persons.
22. Work Delays. Should the Contractor be obstructed or delayed in the work required to be done
hereunder by changes in the work or by any default, act, or omission of the City, or by strikes, fire,
earthquake, or any other Act of God, or by the inability to obtain materials, equipment, or labor
due to federal government restrictions arising out of defense or war programs, then the time of
completion may, at the City’s sole option, be extended for such periods as may be agreed upon
by the City and the Contractor. In the event that there is insufficient time to grant such extensions
prior to the completion date of the contract, the City may, at the time of acceptance of the work,
waive liquidated damages that may have accrued for failure to complete on time, due to any of
the above, after hearing evidence as to the reasons for such delay, and making a finding as to the
causes of same.
23. Payment Terms. The City’s payment terms are 30 days from the receipt of an original invoice and
acceptance by the City of the materials, supplies, equipment, or services provided by the
Contractor (Net 30).
24. Inspection. The Contractor shall furnish City with every reasonable opportunity for City to
ascertain that the services of the Contractor are being performed in accordance with the
requirements and intentions of this contract. All work done, and all materials furnished, if any,
shall be subject to the City’s inspection and approval. The inspection of such work shall not relieve
Contractor of any of its obligations to fulfill its contract requirements.
City of San Luis Obispo
Specification No. 9xxxx
-8-
25. Audit. The City shall have the option of inspecting and/or auditing all records and other written
materials used by Contractor in preparing its invoices to City as a condition precedent to any
payment to Contractor.
26. Interests of Contractor. The Contractor covenants that it presently has no interest, and shall not
acquire any interest—direct, indirect or otherwise—that would conflict in any manner or degree
with the performance of the work hereunder. The Contractor further covenants that, in the
performance of this work, no subcontractor or person having such an interest shall be employed.
The Contractor certifies that no one who has or will have any financial interest in performing this
work is an officer or employee of the City. It is hereby expressly agreed that, in the performance
of the work hereunder, the Contractor shall at all times be deemed an independent contractor
and not an agent or employee of the City.
27. Hold Harmless and Indemnification.
(a) Non-design, non-construction Professional Services: To the fullest extent permitted by law
(including, but not limited to California Civil Code Sections 2782 and 2782.8), Consultant shall
indemnify, defend, and hold harmless the City, and its elected officials, officers, employees,
volunteers, and agents (“City Indemnitees”), from and against any and all causes of action, claims,
liabilities, obligations, judgments, or damages, including reasonable legal counsels’ fees and costs
of litigation (“claims”), arising out of the Consultant’s performance or Consultant’s failure to
perform its obligations under this Agreement or out of the operations conducted by Consultant,
including the City’s active or passive negligence, except for such loss or damage arising from the
sole negligence or willful misconduct of the City. In the event the City Indemnitees are made a
party to any action, lawsuit, or other adversarial proceeding arising from Consultant’s
performance of this Agreement, the Consultant shall provide a defense to the City Indemnitees
or at the City’s option, reimburse the City Indemnitees their costs of defense, including reasonable
legal fees, incurred in defense of such claims.
(b) Non-design, construction Professional Services: To the extent the Scope of Services involve a
“construction contract” as that phrase is used in Civil Code Section 2783, this paragraph shall
apply in place of paragraph A. To the fullest extent permitted by law (including, but not limited to
California Civil Code Sections 2782 and 2782.8), Consultant shall indemnify, defend, and hold
harmless the City, and its elected officials, officers, employees, volunteers, and agents (“City
Indemnitees”), from and against any and all causes of action, claims, liabilities, obligations,
judgments, or damages, including reasonable legal counsels’ fees and costs of litigation (“claims”),
arising out of the Consultant’s performance or Consultant’s failure to perform its obligations
under this Agreement or out of the operations conducted by Consultant, except for such loss or
damage arising from the active negligence, sole negligence or willful misconduct of the City. In
the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial
proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide
a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their
costs of defense, including reasonable legal fees, incurred in defense of such claims.
(c) Design Professional Services: In the event Consultant is a “design professional”, and the Scope
of Services require Consultant to provide “design professional services” as those phrases are used
in Civil Code Section 2782.8, this paragraph shall apply in place of paragraphs A or B. To the fullest
City of San Luis Obispo
Specification No. 9xxxx
-9-
extent permitted by law (including, but not limited to California Civil Code Sections 2782 and
2782.8) Consultant shall indemnify, defend and hold harmless the City and its elected officials,
officers, employees, volunteers and agents (“City Indemnitees”), from and against all claims,
damages, injuries, losses, and expenses including costs, attorney fees, expert consultant and
expert witness fees arising out of, pertaining to or relating to, the negligence, recklessness or
willful misconduct of Consultant, except to the extent caused by the sole negligence, active
negligence or willful misconduct of the City. Negligence, recklessness or willful misconduct of any
subcontractor employed by Consultant shall be conclusively deemed to be the negligence,
recklessness or willful misconduct of Consultant unless adequately corrected by Consultant. In
the event the City Indemnitees are made a party to any action, lawsuit, or other adversarial
proceeding arising from Consultant’s performance of this Agreement, the Consultant shall provide
a defense to the City Indemnitees or at the City’s option, reimburse the City Indemnitees their
costs of defense, including reasonable legal fees, incurred in defense of such claims. In no event
shall the cost to defend charged to Consultant under this paragraph exceed Consultant’s
proportionate percentage of fault. However, notwithstanding the previous sentence, in the event
one or more defendants is unable to pay its share of defense costs due to bankruptcy or
dissolution of the business, Consultant shall meet and confer with other parties regarding unpaid
defense costs.
(d) The review, acceptance or approval of the Consultant’s work or work product by any
indemnified party shall not affect, relieve or reduce the Consultant’s indemnification or defense
obligations. This Section survives completion of the services or the termination of this contract.
The provisions of this Section are not limited by and do not affect the provisions of this contract
relating to insurance.
28. Contract Assignment. The Contractor shall not assign, transfer, convey or otherwise dispose of
the contract, or its right, title or interest, or its power to execute such a contract to any individual
or business entity of any kind without the previous written consent of the City.
29. Termination for Convenience. The City may terminate all or part of this Agreement for any or no
reason at any time by giving 30 days written notice to Contractor. Should the City terminate this
Agreement for convenience, the City shall be liable as follows: (a) for standard or off-the-shelf
products, a reasonable restocking charge not to exceed ten (10) percent of the total purchase
price; (b) for custom products, the less of a reasonable price for the raw materials, components
work in progress and any finished units on hand or the price per unit reflected on this Agreement.
For termination of any services pursuant to this Agreement, the City’s liability will be the lesser of
a reasonable price for the services rendered prior to termination, or the price for the services
reflected on this Agreement. Upon termination notice from the City, Contractor must, unless
otherwise directed, cease work and follow the City’s directions as to work in progress and finished
goods.
30. Termination. If, during the term of the contract, the City determines that the Contractor is not
faithfully abiding by any term or condition contained herein, the City may notify the Contractor in
writing of such defect or failure to perform. This notice must give the Contracto r a 10 (ten)
calendar day notice of time thereafter in which to perform said work or cure the deficiency.
If the Contractor has not performed the work or cured the deficiency within the ten days specified
in the notice, such shall constitute a breach of the contract and the City may terminate the
City of San Luis Obispo
Specification No. 9xxxx
-10-
contract immediately by written notice to the Contractor to said effect. Thereafter, neither party
shall have any further duties, obligations, responsibilities, or rights under the contract except,
however, any and all obligations of the Contractor’s surety shall remain in full force and effect,
and shall not be extinguished, reduced, or in any manner waived by the terminations thereof.
In said event, the Contractor shall be entitled to the reasonable value of its services performed
from the beginning date in which the breach occurs up to the day it received the City’s Notice of
Termination, minus any offset from such payment representing the City’s damages from such
breach. “Reasonable value” includes fees or charges for goods or services as of the last milestone
or task satisfactorily delivered or completed by the Contractor as may be set forth in the
Agreement payment schedule; compensation for any other work, services or goods performed or
provided by the Contractor shall be based solely on the City’s assessment of the value of the work-
in-progress in completing the overall work scope.
The City reserves the right to delay any such payment until completion or confirmed
abandonment of the project, as may be determined in the City’s sole discretion, so as to permit a
full and complete accounting of costs. In no event, however, shall the Contractor be entitled to
receive in excess of the compensation quoted in its proposal.
City of San Luis Obispo
Specification No. 9xxxx
-11-
SPECIAL TERMS AND CONDITIONS
1. Contract Award. Subject to the reservations set forth in Paragraph 9 of Section B (General Terms
and Conditions) of these specifications, the contract will be awarded to the lowest responsible,
responsive proposer.
2. Sales Tax Reimbursement.
For sales occurring within the City of San Luis Obispo, the City receives sales tax revenues.
Therefore, for bids from retail firms located in the City at the time of proposal closing for which
sales tax is allocated to the City, 1% of the taxable amount of the bid will be deducted from the
proposal by the City in calculating and determining the lowest responsible, responsive proposer.
3. Labor Actions.
In the event that the successful proposer is experiencing a labor action at the time of contract
award (or if its suppliers or subcontractors are experiencing such a labor action), the City reserves
the right to declare said proposer is no longer the lowest responsible, responsive proposer and to
accept the next acceptable low proposal from a proposer that is not experiencing a labor action,
and to declare it to be the lowest responsible, responsive proposer.
4. Failure to Accept Contract.
The following will occur if the proposer to whom the award is made (Contractor) fails to enter into
the contract: the award will be annulled; any bid security will be forfeited in accordance with the
special terms and conditions if a proposer's bond or security is required; and an award may be
made to the next lowest responsible, responsive proposer who shall fulfill every stipulation as if
it were the party to whom the first award was made.
5. Contract Term.
The supplies or services identified in this specification will be used by the City for up to one year.
The prices quoted for these items must be valid for the entire period indicated above unless
otherwise conditioned by the proposer in its proposal.
6. Contract Extension.
The term of the contract may be extended by mutual consent for an additional one-year, and
annually thereafter, for a total of four years.
7. Supplemental Purchases
Supplemental Purchases. Supplemental purchases may be made from the successful proposer
during the contract term in addition to the items listed in the Detail Proposal Submittal Form. For
these supplemental purchases, the proposer shall not offer prices to the City in excess of the
amounts offered to other similar customers for the same item. If the proposer is willing to offer
the City a standard discount on all supplemental purchases from its generally prevailing or
published price structure during the contract term, this offer and the amount of discount on a
percentage basis should be provided with the proposal submittal.
City of San Luis Obispo
Specification No. 9xxxx
-12-
8. Contractor Invoices.
The Contractor may deliver either a monthly invoice to the City with attached copies of detail
invoices as supporting detail, or in one lump-sum upon completion.
9 Non-Exclusive Contract. The City reserves the right to purchase the items listed in the Detail
Proposal Submittal Form, as well as any supplemental items, from other vendors during the
contract term.
10. Unrestrictive Brand Names. Any manufacturer's names, trade names, brand names or catalog
numbers used in the specifications are for the purpose of describing and establishing general
quality levels. Such references are not intended to be restrictive. Proposals will be considered for
any brand that meets or exceeds the quality of the specifications given for any item. In the event
an alternate brand name is proposed, supplemental documentation shall be provided
demonstrating that the alternate brand name meets or exceeds the requirements specified
herein. The burden of proof as to the suitability of any proposed alternatives is upon the proposer,
and the City shall be the sole judge in making this determination.
11. Delivery. Prices quoted for all supplies or equipment to be provided under the terms and
conditions of this RFP package shall include delivery charges, to be delivered F.O.B. San Luis
Obispo by the successful proposer and received by the City within 90 days after authorization to
proceed by the City.
12. Start and Completion of Work. Work on this project shall begin immediately after contract
execution and shall be completed within 90 calendar days thereafter, unless otherwise negotiated
with City by mutual Agreement.
13. Change in Work. The City reserves the right to change quantities of any item after contract award.
If the total quantity of any changed item varies by 25% or less, there shall be no change in the
agreed upon unit price for that item. Unit pricing for any quantity changes per item in excess of
25% shall be subject to negotiation with the Contractor.
14. Submittal of References. Each proposer shall submit a statement of qualifications and references
on the form provided in the RFP package.
15. Statement of Contract Disqualifications. Each proposer shall submit a statement regarding any
past governmental agency bidding or contract disqualifications on the form provided in the RFP
package.
City of San Luis Obispo
Specification No. 9xxxx
-13-
PROPOSAL CONTENT
Proposal Content. Proposals shall not exceed 5 pages (not including covers, front matter, links to relevant
examples, and submittal forms included in this RFP (Section H)) and must include a proposed approach to
the work, an explanation of why the proposed approach establishes a sufficient foundation for the City to
achieve its retrofit goals, a high-level budget and schedule, and sufficient evidence that the proposer has
the technical experience and expertise to complete the work.
2. Proposal Evaluation and Consultant Selection. Proposals will be evaluated by a review
committee and contract award process as follows:
Phase 1 – Written Proposal Review/Finalist Candidate Selection
The proposal letters will be evaluated based on the following criteria as evidenced in their written
proposals:
a. Understanding of the work required by the City.
b. Quality, clarity and responsiveness of the proposal.
c. Demonstrated competence and professional qualifications necessary for successfully
performing the work required by the City.
d. Recent team experience in successfully performing similar services.
e. Creativity of the proposed approach in completing the work.
f. Value
g. Background and experience of the specific individuals managing and assigned to this
project.
Phase 2 – Oral Presentations/Interviews and Consultant Selection (at City’s option)
At the City’s discretion, a group of finalist candidates may be asked to provide an oral presentation
via conference phone call to the review committee and answer questions about their proposal.
Phase 3 – Scope and Schedule Detail
The City will select a preferred contractor and will collaboratively develop and negotiate the
proposed work scope, schedule, and budget.
Contract award will be based on a combination of factors that represent the best overall value for
completing the work scope as determined by the City, including: the written proposal criteria
described above; results of background and reference checks; results from the interviews; and
cost.
3. Proposal Review and Award Schedule. The following is an outline of the anticipated schedule for
proposal review and contract award:
a. Issue RFP 4/22/21
b. Optional pre-bid conference 4/29/21
c. Receive proposals 5/12/21
d. Complete proposal evaluations 5/14/21
e. Conduct finalist interviews and finalize recommendation 5/19/21
f. Issue Purchase Order 6/7/21
g. Start work 7/1/21
4. Ownership of Materials. All original drawings, plan documents and other materials prepared by
or in possession of the Contractor as part of the work or services under these specifications shall become
the permanent property of the City and shall be delivered to the City upon demand.
City of San Luis Obispo
Specification No. 9xxxx
-14-
5. Release of Reports and Information. Any reports, information, data, or other material given to,
prepared by or assembled by the Contractor as part of the work or services under these specifications
shall be the property of the City and shall not be made available to any individual or organization by the
Contractor without the prior written approval of the City.
6. Copies of Reports and Information. If the City requests additional copies of reports, drawings,
specifications, or any other material in addition to what the Contractor is required to furnish in limited
quantities as part of the work or services under these specificat ions, the Contractor shall provide such
additional copies as are requested, and City shall compensate the Contractor for the costs of duplicating
of such copies at the Contractor's direct expense.
ALTERNATIVE PROPOSALS
1. Alternative Proposals. The proposer may submit an alternative proposal (or proposals) that it
believes will also meet the City's project objectives but in a different way. In this case, the
proposer must provide an analysis of the advantages and disadvantages of each of the alternative
and discuss under what circumstances the City would prefer one alternative to the other(s).
2. Attendance at Meetings and Hearings. As part of the work scope and included in the contract
price is attendance by the Contractor at up to [number] public meetings to present and discuss
its findings and recommendations. Contractor shall attend as many "working" meetings with staff
as necessary in performing work-scope tasks.
3. Accuracy of Specifications. The specifications for this project are believed by the City to be
accurate and to contain no affirmative misrepresentation or any concealment of fact. Bidders are
cautioned to undertake an independent analysis of any test results in the specifications, as City
does not guaranty the accuracy of its interpretation of test results contained in the specifications
package. In preparing its proposal, the bidder and all subcontractors named in its proposal sha ll
bear sole responsibility for proposal preparation errors resulting from any misstatements or
omissions in the plans and specifications that could easily have been ascertained by examining
either the project site or accurate test data in the City's possession. Although the effect of
ambiguities or defects in the plans and specifications will be as determined by law, any patent
ambiguity or defect shall give rise to a duty of bidder to inquire prior to proposal submittal. Failure
to so inquire shall cause any such ambiguity or defect to be construed against the bidder. An
ambiguity or defect shall be considered patent if it is of such a nature that the bidder, assuming
reasonable skill, ability and diligence on its part, knew or should have known of the existence of
the ambiguity or defect. Furthermore, failure of the bidder or subcontractors to notify City in
writing of specification or plan defects or ambiguities prior to proposal submittal shall waive any
right to assert said defects or ambiguities subsequent to submittal of the proposal.
To the extent that these specifications constitute performance specifications, the City shall not be
liable for costs incurred by the successful bidder to achieve the project’s objective or standard
beyond the amounts provided therefor in the proposal.
In the event that, after awarding the contract, any dispute arises as a result of any actual or alleged
ambiguity or defect in the plans and/or specifications, or any other matter whatsoever,
Contractor shall immediately notify the City in writing, and the Contractor and all subcontractors
shall continue to perform, irrespective of whether or not the ambiguity or defect is major,
City of San Luis Obispo
Specification No. 9xxxx
-15-
material, minor or trivial, and irrespective of whether or not a change order, time extens ion, or
additional compensation has been granted by City. Failure to provide the hereinbefore described
written notice within one (1) working day of contractor's becoming aware of the facts giving rise
to the dispute shall constitute a waiver of the right to assert the causative role of the defect or
ambiguity in the plans or specifications concerning the dispute.
City of San Luis Obispo
Specification No. 9xxxx
-16-
SECTION G: FORM OF AGREEMENT
AGREEMENT
THIS AGREEMENT is made and entered into in the City of San Luis Obispo on [day, date, year] by
and between the CITY OF SAN LUIS OBISPO, a municipal corporation, hereinafter referred to as City, and
[CONTRACTOR’S NAME IN CAPITAL LETTERS], hereinafter referred to as Contractor.
W I T N E S S E T H:
WHEREAS, on [date], City requested proposals for [______________], per Project No. [xxxx]
WHEREAS, pursuant to said request, Contractor submitted a proposal that was accepted by City
for said project;
NOW THEREFORE, in consideration of their mutual promises, obligations and covenants
hereinafter contained, the parties hereto agree as follows:
1. TERM. The term of this Agreement shall be from the date this Agreement is made and
entered, as first written above, until acceptance or completion of said project.
2. INCORPORATION BY REFERENCE. City Specification No. ______ and Contractor's
proposal dated [date] is hereby incorporated in and made a part of this Agreement and attached as
Exhibit A.
3. CITY'S OBLIGATIONS. For providing the services as specified in this Agreement, City will
pay, and Contractor shall receive therefore compensation [xxxxxxx].
4. CONTRACTOR/CONSULTANT’S OBLIGATIONS. For and in consideration of the payments
and agreements hereinbefore mentioned to be made and performed by City, Contractor agrees with City
to do everything required by this Agreement and the said specifications.
5. AMENDMENTS. Any amendment, modification or variation from the terms of this
Agreement shall be in writing and shall be effective only upon approval by the City Manager.
6. COMPLETE AGREEMENT. This written Agreement, including all writings specifically
incorporated herein by reference, shall constitute the complete Agreement between the parties hereto.
No oral agreement, understanding or representation not reduced to writing and specifically incorporated
herein shall be of any force or effect, nor shall any such oral agreement, understanding or representation
be binding upon the parties hereto.
City of San Luis Obispo
Specification No. 9xxxx
-17-
7. NOTICE. All written notices to the parties hereto shall be sent by United States mail,
postage prepaid by registered or certified mail addressed as follows:
City Name
Dept.
Address
Consultant Name
Title
Address
Address
8. AUTHORITY TO EXECUTE AGREEMENT. Both City and Contractor do covenant that
everyone executing this Agreement on behalf of each party is a person duly authorized and empowered
to execute Agreements for such party.
IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed the day
and year first above written.
CITY OF SAN LUIS OBISPO:
By:_____________________________________
City Manager
APPROVED AS TO FORM: CONSULTANT:
________________________________ By: _____________________________________
City Attorney Name of CAO / President
Its: CAO / President
City of San Luis Obispo
Specification No. 9xxxx
-18-
INSURANCE REQUIREMENTS
Consultant Services
The Contractor shall procure and maintain for the duration of the contract insurance against claims for
injuries to persons or damages to property which may arise from or in connection with the performance
of the work hereunder by the Contractor, its agents, representatives, employees or subcontractors.
Minimum Scope of Insurance. Coverage shall be at least as broad as:
1. Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001).
2. Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1
(any auto).
3. Workers' Compensation insurance as required by the State of California and Employer's Liability
Insurance.
4. Errors and Omissions Liability insurance as appropriate to the consultant's profession.
Minimum Limits of Insurance. Contractor shall maintain limits no less than:
1. General Liability: $1,000,000 per occurrence for bodily injury, personal injury and property
damage. If Commercial General Liability or other form with a general aggregate limit is used, either the
general aggregate limit shall apply separately to this project/location or the general aggregate limit shall
be twice the required occurrence limit.
2. Automobile Liability: $1,000,000 per accident for bodily injury and property damage.
3. Employer's Liability: $1,000,000 per accident for bodily injury or disease.
4. Errors and Omissions Liability: $1,000,000 per occurrence.
Deductibles and Self-Insured Retentions. Any deductibles or self-insured retentions must be declared to
and approved by the City. At the option of the City, either: the insurer shall reduce or eliminate such
deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers;
or the Contractor shall procure a bond guaranteeing payment of losses and related investigations, claim
administration and defense expenses.
Other Insurance Provisions. The general liability and automobile liability policies are to contain, or be
endorsed to contain, the following provisions:
1. The City, its officers, officials, employees, agents and volunteers are to be covered as insureds as
respects: liability arising out of activities performed by or on behalf of the Contractor; products and
completed operations of the Contractor; premises owned, occupied or used by the Contractor; or
automobiles owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special
limitations on the scope of protection afforded to the City, its officers, official, employees, agents or
volunteers.
2. For any claims related to this project, the Contractor's insurance coverage shall be primary
insurance as respects the City, its officers, officials, employees, agents and volunteers. Any insurance or
self-insurance maintained by the City, its officers, officials, employees, agents or volunteers shall be excess
of the Contractor's insurance and shall not contribute with it.
City of San Luis Obispo
Specification No. 9xxxx
-19-
3. The Contractor's insurance shall apply separately to each insured against whom claim is made or
suit is brought, except with respect to the limits of the insurer's liability.
4. Each insurance policy required by this clause shall be endorsed to state that coverage shall not be
suspended, voided, canceled by either party, reduced in coverage or in limits except after thirty (30) days'
prior written notice by certified mail, return receipt requested, has been given to the City.
Acceptability of Insurers. Insurance is to be placed with insurers with a current A.M. Best's rating of no
less than A: VII.
Verification of Coverage. Contractor shall furnish the City with a certificate of insurance showing
maintenance of the required insurance coverage. Original endorsements effecting general liability and
automobile liability coverage required by this clause must also be provided. The endorsements are to be
signed by a person authorized by that insurer to bind coverage on its behalf. All endorsements are to be
received and approved by the City before work commences.
SECTION I: PROPOSAL SUBMITTAL FORM - SAMPLE
Consultants
The undersigned declares that she or he has carefully examined this RFP, is thoroughly familiar with its
contents; is authorized to represent the proposing firm; and agrees to perform the specified work for the
following cost quoted in full:
Description Cost
Task 1
Task 2
Task 3
Task 4
Etc.
Firm Name and Address
Contact Phone
Signature of Authorized Representative
Date
City of San Luis Obispo
Specification No. 9xxxx
-20-
REFERENCES
Number of years engaged in providing the services included within the scope of the specifications under
the present business name: .
Describe fully the last three contracts performed by your firm that demonstrate your ability to provide
the services included with the scope of the specifications. Attach additional pages if required. The City
reserves the right to contact each of the references listed for additional information regarding your firm's
qualifications.
Reference No. 1:
Agency Name
Contact Name
Telephone & Email
Street Address
City, State, Zip Code
Description of services provided
including contract amount, when
provided and project outcome
Reference No. 2:
Agency Name
Contact Name
Telephone & Email
Street Address
City, State, Zip Code
Description of services provided
including contract amount, when
provided and project outcome
City of San Luis Obispo
Specification No. 9xxxx
-21-
Reference No. 3
Agency Name
Contact Name
Telephone & Email
Street Address
City, State, Zip Code
Description of services provided
including contract amount, when
provided and project outcome
CURRENT CONTRACTS:
1.
2.
3.
4.
City of San Luis Obispo
Specification No. 9xxxx
-22-
STATEMENT OF PAST CONTRACT DISQUALIFICATIONS
The proposer shall state whether it or any of its officers or employees who have a proprietary interest in
it, has ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal,
state, or local government project because of the violation of law, a safety regulation, or for any other
reason, including but not limited to financial difficulties, project delays, or disputes regarding work or
product quality, and if so to explain the circumstances.
◼ Do you have any disqualification as described in the above paragraph to declare?
Yes ❑ No ❑
◼ If yes, explain the circumstances.
Executed on at _______________________________________ under penalty of
perjury of the laws of the State of California, that the foregoing is true and correct.
______________________________________
Signature of Authorized Proposer Representative
PRICE PROPOSAL