Loading...
HomeMy WebLinkAbout18133-163Serrano-TPM-2020-02-10N0 ° 0 0 ' 5 3 " E 1 0 0 . 8 7 ' S 3 ° 0 2 ' 2 4 " E 1 0 1 . 0 3 ' N89°56'08"W 200.35' S89°56'08"E 121.00' S 1 3 ° 4 1 ' 2 8 " E 1 4 4 . 6 1 ' S0 ° 0 1 ' 0 6 " E 8 5 . 4 2 ' S89°56'08"E 179.22' S0 ° 0 1 ' 0 6 " E 1 4 0 . 4 6 ' EXISTING PARCEL 1 LLA-SLOAL-19-0050 RECORDED: ________ PARCEL 3 0.335 ACRES AVG SLOPE: 18.0% PARCEL 2 0.418 ACRES AVG SLOPE: 19.6% PARCEL 1 0.225 ACRES AVG SLOPE: 14.1% S89°56'08"E 86.82' N82°31'28" W 1 1 9 . 8 8 ' S89°56'20"E 94.62' N0 ° 0 0 ' 5 3 " E 1 2 5 . 0 0 ' N89°56'08"W 100.00' SE R R A N O H E I G H T S 20 ' A C C E S S DR I V E W A Y (N) 20' PRIVATE DRAINAGE EASEMENT 12 ' D R I V E W A Y (E) 60.00' ACCESS EASEMENT PER 605-OR-244 (E) CENTERLINE OF POWER POLE EASEMENT, EXCEPTION #2 (E) 10' WIDE UTILITY EASEMENT EXCEPTION #7 (E) 5.00' WIDE SEWER EASEMENT EXCEPTION #5 & #6 (E) 10.00' WIDE ACCESS EASEMENT EXCEPTION #4 FIRETRUCK TURNAROUND (N) 20' WIDE ACCESS ROAD (N) 10'x10' PUBLIC UTILITY EASEMENT (N) 5'x10' PUBLIC UTILITY EASEMENT (N) 30' WIDE ROAD PROJECT INFORMATION: 163 SERRANO HEIGHTS DR SAN LUIS OBISPO, CA 93405 APN#:052-061-034 EXISTING LOT SIZE:1.56 ACRES PROPOSED LOTS:SEE PLAN ZONING:R-1 PROJECT TEAM: OWNERS INFORMATION JOHN ROURKE 163 SERRANO HEIGHTS DR. SAN LUIS OBISPO, CA 93405 805.440.4973 PROJECT CIVIL ENGINEER & AGENT ABOVE GRADE ENGINEERING 245 HIGUERA STREET SAN LUIS OBISPO, CA 93401 805.540.1515 CITY BENCH MARK: THE BENCH MARK FOR THIS PROJECT IS A FOUND CITY OF SAN LUIS OBISPO BENCH MARK NUMBER 166A. BEING A LEAD AND TACK IN TOP OF CURB AT THE BCR OF THE NORTHEASTERLY CURB OF PALOMAR AND SERRANO ELEVATION = 274.26' NAVD 88 PROPERTY DESCRIPTION: A PORTION OF THE SOUTHEAST 1 / 4 OF THE NORTHWEST 1 / 4 OF SECTION 27 OF TOWNSHIP 30 SOUTH, RANGE 12 EAST, IN THE CITY OF SAN LUIS OBISPO, COUNTY OF SAN LUIS OBISPO, CALIFORNIA. PREPARED BY: SCOTT STOKES, PRESIDENT, PE 58256 ABOVE GRADE ENGINEERING 245 HIGUERA STREET SAN LUIS OBISPO, CA 93401 ( IN FEET ) 1 INCH = FT. 10 2020 20 400 TENTATIVE PARCEL MAP: PROPERTY LINES & EASEMENTS SURVEY INFORMATION: TOPOGRAPHIC SURVEY PERFORMED MARCH, 2018 BY MBS LAND SURVEYS BASIS OF BEARINGS:THE BASIS OF BEARINGS FOR THIS SURVEY IS A GEODETIC NORTH BASED ON A GPS OBESERVATION FROM A 90d SET IN A DIRT FIELD DISTANT S 22° 12' 12" E 138.25 FEET FROM THE FOUND 1" IRON PIPE AT THE SOUTHEAST CORNER OF D3. SUPPLEMENTAL SURVEY PERFORMED DECEMBER, 2018 BY ABOVE GRADE ENGINEERING, INC BOUNDARY:THE EXTERIOR BOUNDARY SHOWN IS PER RECORD OF SURVEY 17-043. VICINITY MAP: SAN LUIS OBISPO SHEET INDEX: TPM-1 PROPERTY LINES & EASEMENTS TPM-2 SITE FEATURES TPM-3 FUTURE IMPROVEMENTS TPM-4 AVERAGE SLOPE CALCULATIONS DATE: 163 SERRANO HEIGHTS DR. SLO18-0151 FEBRUARY 11, 2019 SHEET NUMBER: TPM-1 LEGEND: (N) PRIVATE ACCESS, PRIVATE UTILITY AND DRAINAGE EASEMENT (N) ROADWAYS PRELIMINARY TITLE REPORT: EXCEPTIONS LISTED ARE PER THE TITLE REPORT PROVIDED BY FIRST AMERICAN TITLE COMPANY, ORDER NUMBER 4001-5826767, DATED NOVEMBER 19, 2018. APPROXIMATE EARTHWORK INFORMATION: PARCEL 1: 30 CY CUT / 20 CY FILL PARCEL 2: 20 CY CUT / 30 CY FILL PARCEL 3: 25 CY CUT / 25 CY FILL NOTE:THE EARTHWORK QUANTITIES SHOWN ARE FOR BONDING AND ESTIMATING PURPOSES ONLY AND ARE CALCULATED FROM APPROXIMATE SUBGRADE TO EXISTING SURFACE. THE QUANTITIES DO NOT TAKE CERTAIN FACTORS INTO ACCOUNT, INCLUDING, BUT NOT LIMITED TO SUBGRADE, AREA OF OVEREXCAVATION AND RECOMPACTION, SHRINKAGE AND EXPANSION OF THE SOIL. THE CONTRACTOR IS RESPONSIBLE FOR CALCULATING EARTHWORK QUANTITIES FOR BIDDING AND CONSTRUCTION PURPOSES. EXISTING PARCEL 1 LLA-SLOAL-19-0050 RECORDED: ________ PARCEL 3 0.335 ACRES AVG SLOPE: 18.0% PARCEL 2 0.418 ACRES AVG SLOPE: 19.6% PARCEL 1 0.225 ACRES AVG SLOPE: 14.1% SE R R A N O H E I G H T S 1 1 1 1 1 1 1 1 1 2 2 2 2 2 5 55 5 5 5 5 5 7 8 8 9 9 10 11 11 11 11 10 8 2 NOTES: 1 EXISTING PROPERTY LINE 2 PROPOSED PARCEL PROPERTY LINE 3 EXISTING RETAINING WALL TO REMAIN 4 EXISTING RESIDENCE TO REMAIN 5 EXISTING FENCE LINE 6 EXISTING ASPHALT PAVED ROAD 7 EXISTING DRAINAGE INLET TO REMAIN 8 EXISTING STORM DRAIN LINE TO REMAIN 9 EXISTING ELECTRICAL POLE TO REMAIN 10 EXISTING SHED/BARN TO REMAIN 11 EXISTING OVERHEAD LINES # ( IN FEET ) 1 INCH = FT. 10 2020 20 400 TENTATIVE PARCEL MAP: SITE FEATURES DATE: 163 SERRANO HEIGHTS DR. SLO18-0151 FEBRUARY 11, 2019 SHEET NUMBER: TPM-2 CO CO CO EXISTING PARCEL 1 LLA-SLOAL-19-0050 RECORDED: ________ PARCEL 3 0.335 ACRES AVG SLOPE: 18.0% PARCEL 2 0.418 ACRES AVG SLOPE: 19.6% PARCEL 1 0.225 ACRES AVG SLOPE: 14.1% W W W W W W W W W W SS SS SS SS SS SS SS SS SS SS SE R R A N O H E I G H T S 2 16% MAX 16% MAX (E ) 8 " W A T E R M A I N (E ) G A S M A I N (E ) 6 " S E W E R M A I N 3 3 3 7 9 10 10 10 8 88 8 9 9 9 2 9 R 3 0 . 0 0 ' R 4 0 . 0 0 ' R40. 0 0 ' R 4 0 . 0 0 ' 3.5% 1 1 1 1 11 11 1 1 1 2 8 10 S L O P E 11 10 7 10 10 12 13 14 2 15 15 2 16 16 17 NOTES: 1 EDGE OF FUTURE PAVED ROAD 2 TREE TO BE IMPACTED/REMOVED 3 EXISTING SEWER LINE TO BE PROTECTED-IN-PLACE 4 NOT USED. 5 NOT USED. 6 NOT USED. 7 INSTALL WATER METER 8 INSTALL SEWER SERVICE AND CLEANOUTS 9 INSTALL GAS LINE SERVICE 10 INSTALL WATER SERVICE LINE 11 EDGE OF FUTURE PAVED ROAD WITH AN AC DIKE 12 INSTALL CATCH BASIN WITH AC DIKE PERIMETER 13 INSTALL STORM DRAIN LINE 14 INSTALL UNDERGROUND CHAMBER SYSTEM 15 INSTALL FIRE HYDRANT THAT CAN PROVIDE 1000 GPM AT 20 PSI RESIDUAL PRESSURE 16 EDGE OF 300 FOOT FIRE HYDRANT COVERAGE 17 EXISTING 30'-0" WIDE PAVED ROAD TO BE MAINTAINED # ( IN FEET ) 1 INCH = FT. 10 2020 20 400 TENTATIVE PARCEL MAP: FUTURE IMPROVEMENTS DATE: 163 SERRANO HEIGHTS DR. SLO18-0151 FEBRUARY 11, 2019 SHEET NUMBER: TPM-3 12" SHOULDER 20' WIDE ACCESS ROAD 12" SHOULDER 2:1 MA X 2:1 MA X 2:1 M A X 2:1 M A X ASPHALT DRIVEWAY SECTION TO BE PER SOILS REPORT RECOMMENDATIONS BASED ON T.I. OF 4.5 AND IN THE FIELD R-VALUES TYPICAL PRIVATE ROAD CROSS-SECTION SCLE: NONE AC DIKE 3.0% NOTE: ·POST CONSTRUCTION REQUIREMENTS FOR DRAINAGE SHALL BE ADDRESSED WITH EACH INDIVIDUAL LOT DURING THE CONSTRUCTION DOCUMENT PHASE. THE PROPOSED DRIVEWAY WILL BE TREATED VIA THE PROPOSED CHAMBER SYSTEM. ·WIRE SERVICES TO BE INSTALLED WITHIN JOINT TRENCH WITH THE GAS SERVICE LINES UNDERGROUND. FURTHER DETAILS SHALL BE PROVIDED DURING THE CONSTRUCTION DOCUMENT PHASE. 10' LANE 12" SHOULDER 2:1 MA X 2:1 MA X 2:1 M A X 2:1 M A X ASPHALT ROADWAY SECTION TO BE PER SOILS REPORT RECOMMENDATIONS BASED ON T.I. OF 5.5 AND IN THE FIELD R-VALUES TYPICAL SERRANO HEIGHTS CROSS-SECTION SCLE: NONE 1.5% 12" SHOULDER 10' LANE 1.5% STORMWATER FOR ACCESS ROAD: ·IMPERVIOUS AREA: 5,560 SQFT ·85TH PERCENTILE STORM DEPTH: 1.2 INCH ·RUNOFF COEFFICIENT OF PAVEMENT: 0.90 ·REQUIRED TREATMENT VOLUME: 5560 x 1.2 x 0.9 x (1 / 12) = 500 CUBIC FEET ·PROPOSED CHAMBER SYSTEM: (2) MC-4500 CHAMBERS, (2) END CAPS AND SURROUNDING ROCK LAYER FOR A TOTAL VOLUME OF 613 CUBIC FEET. A B LAB =155.7'EAB =28'SAB =18.0% WITH AN AVERAGE SLOPE OF 18.0% IN A R-1 ZONE, THEN DENSITY = ACREAGE x 4DU/ACRE 0.335 ACRES x (4DU/ACRE) = 1.34 DWELLING UNITS WITH AN AVERAGE SLOPE OF 19.6% IN A R-1 ZONE, THEN DENSITY = ACREAGE x 4DU/ACRE 0.418 ACRES x (4DU/ACRE) = 1.67 DWELLING UNITS SAVG = [(0.065 x 35.2) + (0.195 x 22.1) + (0.045 x 26.8) + (0.113 x 3.5)] / 0.418 SAVG = [(2.288) + (4.309) + (1.206) + (0.396)] / 0.418 SAVG = [8.199] / 0.418 SAVG = 19.6% A1 A4 A3 WITH AN AVERAGE SLOPE OF 14.1% IN A R-1 ZONE, THEN DENSITY = ACREAGE x 7DU/ACRE 0.202 ACRES x (7DU/ACRE) = 1.41 DWELLING UNITS SAVG = [(0.021 x 5.5) + (0.181 x 15.1)] / 0.202 SAVG = [(0.116) + (2.733)] / 0.202 SAVG = [2.849] / 0.202 SAVG = 14.1% A1 A2 A3 AREA "A3" WILL BE EXCLUDED SINCE IT IS A STREET RIGHT-OF-WAY ( IN FEET ) 1 INCH = FT. 15 3030 30 600 TENTATIVE PARCEL MAP: AVERAGE SLOPE CALCULATIONS DATE: 163 SERRANO HEIGHTS DR. SLO18-0151 FEBRUARY 11, 2019 SHEET NUMBER: TPM-4