Loading...
HomeMy WebLinkAboutDebris Cleanup PRRDate 2/3/2023 2/7/2023 2/12/2023 2/16/2023 2/17/2023 2/28/2023 2/28/2023 2/28/2023 2/28/2023 3/14/2023 3/22/2023 3/30/2023 4/13/2023 4/26/2023 Vendor Greenvale Tree Company Bunyon Bros Tree Service JTS Tree Brough Construction Greenvale Tree Company Souza Kirk Construction Kirk Construction JTS Tree Souza JTS Tree Souza Souza Souza Invoice E-14840 27976 906537 230031 E-15260A 022823.856 23-058 23-057 906571 031423.856 906615 033023.856 041323.861 042623.844 Description Remove Eucalyptus in Creek - Hayfiled Loop Debris removal on Creek Bank Creek Debris Creek Debris Perfumo Creek City Farm Creek Cleanup - Debris Creek Debris 101 LOVR Creek Debris 101 LOVR Creek Debris San Luis Creek Debris CN# Creek Debris San Luis Creek Debris CN#39-43 Perfumo Creek Debris Debris from creek adjacent to S. Bound LOVR Category Debris Debris Debris Debris Debris Debris Debris Debris Debris Debris Debris Debris Debris Debris FEMA Category A A A A A A A A A A A A A A Total Cost 3200 940 122634.72 125593.27 8000 291621.67 121270.44 38163.96 13646.1 200165.39 2698.46 17741.08 10252.68 44015.03 999942.8 Folder # 199 207 218 243 268 288 302 303 323 329 342 352 355 374 375 376 377 378 404 430 431 Location Marsh St and Higuera St 415 Dana St Stenner Water Treatment Plant 1900 Stenner Creek Road 2135-2207 San Luis Dr 130 High St Eto Park - 170 Brook St Andrews St Bypass Marsh St Bridge Prado Bridge Prefumo Creek Lizzie and Wilding street 722 marsh Mission plaza Priolo-Martin Park Morro and Higuera Los Osos valley road and froom ranch road Los Osos valley road and Madonna Bus barn and Rail Road bike path Mission Plaza Extension by pedestrian bridge near Old SLO BBQ Laguna Lake Golf Course Laguna lake golf course Description of Debrir Flooding caused damages to road seal and striping, debris clean up is and was required on road and out of flowing creek. Mud removal, street sweeping and tree removal at creek Mudslide compromising water treatment plant effluent pipeline to water storage tanks. Inspect and repair pipe if needed Three storm drains filled with debris Dirt build up along both side of High St and sidewalk mud removal and replace damaged landscaping Removing sediment Large tree that needs to be removed Large trees to side of channel both upstream and downstream Various sediment deposition, tree removal, etc processes needing further evaluation Undermining trees Tree split in half Tree failure Tree down Limb failure Tree failure Tree failure Tree failure’s 2M performed silt or sediment removal from walkway due to creek flooding. Vegetation/tree blockage of storm drain. Post are failing/potential blockage of creek. FEMA Category A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance A - Debris Clearance