HomeMy WebLinkAboutRainscape 12-22-231
Teague, Nick
From:Victor Rocha <victor@rainscapeslo.com>
Sent:Wednesday, February 22, 2023 10:29 AM
To:Teague, Nick
Cc:Fortner, Kellie
Subject:Re: REMINDER: Recycled Water Site Inspections due in March 2023
Attachments:image008.png
This message is from an External Source. Use caution when deciding to open attachments, click links, or respond.
Thanks Nick!
Victor Noel Rocha
Maintenance Supervisor/ Certified Arborist / Estimator
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
www.rainscapeslo.com
Office: 205 South Street Unit A, San Luis Obispo, CA 93401
Mailing: P.O. Box 4132 San Luis Obispo, CA 93403
Office: 805.541.8536
Fax: 805.548.8088
Cell: 805.903.3882
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
www.ultimategreenlawns.com
Exclusive Dealer and Installer
2
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
San Luis Obispo and Santa Barbara Counties
Office: 205 South Street Unit A, San Luis Obispo, CA 93401
Mailing: P.O. Box 4132 San Luis Obispo, CA 93403
805.548.8665
This email may contain confidential or proprietary information or material and is for the sole use of the intended recipient. Any review, use
distribution or disclosure by others is strictly prohibited. If you are not the intended recipient, please contact the sender by reply email and
delete all copies of this message.
On Wed, Feb 22, 2023 at 10:23 AM Teague, Nick <nteague@slocity.org> wrote:
Recycled Water Site supervisors and Property Managers/Owners,
This email serves as a reminder that First Quarter 2023 Site Inspections will be delivered next month. To
ensure that the City remains compliant with its State-issued permit, we ask that you comply with the policies
described in the City’s Procedures for Recycled Water Use. Below are some things to consider when
completing this quarter’s inspection forms.
1. Meter reads are required this quarter. This requirement has been added to ensure that Site Supervisors
are aware of their meter’s location, know how to read the water consumption using the meter, and
know how to recognize irrigation system issues using the meter’s error codes. The City will still be
reading each meter monthly for billing purposes. Ultimately, the goal is to provide Site Supervisors
with tools and information that can be used to optimize irrigation system operation.
If Site Supervisors would like assistance learning the location of, and how to read their site’s water
meter, please contact the Utilities Department prior to the inspection due date.
The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location.
3
For those that do not want to provide a meter read, you will be required to submit a record of all
inspections, modifications, and repair work for the quarter. The City’s Procedures for Recycled Water
Use state that Site Supervisors should “establish and maintain an accurate record keeping system of
all inspections, modifications, and repair work”.
Inspection forms without a meter read or without an attached record of inspections, modifications, and
repairs will be deemed incomplete and non-compliant.
2. Ensure that the inspection form is completed with accurate information and submitted on or before the
due date. Inaccurate or late inspection forms will be deemed non-compliant.
3. Inspection forms can only be signed and submitted by the Site Supervisor on record with the City. If you
are no longer a Site Supervisor for a recycled water site, please notify the Utilities Department. New
Site Supervisors must complete on-site training with Utilities Department staff before they can sign and
submit an inspection form. Inspection forms signed and/or submitted by someone other than the Site
Supervisor will be deemed non-compliant.
4. Non-compliant inspection forms will result in suspension of recycled water service. Recycled water
service will be restored only after non-compliance issues have been resolved. A reconnection fee of
$50 will be charged for reconnection of service within 5 business days, or $358 for reconnection within
24 hours.
Nick Teague
Water Resources Program Manager
Public Utilities
879 Morro Street, San Luis Obispo, CA 93401-2710
E nteague@slocity.org
T 805.781.7217
C 805.440.5054
slocity.org
Stay connected with the City by signing up for e-notifications