Loading...
HomeMy WebLinkAbout10-02-2023 Item 4a - Applicant Presentation10/2/2023 Item 4a ‐ Applicant Presentation 1 Applicant: PHASE 3 APARTMENTS Architectural Review Commission 02 October 2023 Consultant Team: Anacapa Apartments 2. Overall Development Plan w/ Phase 3/R-4 Project TO AIRPORT C-N R- R-2 R-3 R- R-2 R-2 R-2 TRUST AUTOMATION R-2 PARK E PARK I PARK H PARK F OPEN SPACE OPEN SPACE OPEN SPACE OPEN SPACE OPEN SPACE TO HIGUERAR-3 MULTI-USE TRAIL PARK C PARK D PARK B PARK A PARK G R-3 APPROVED PHASE 1 BUCKLEY RD.VACHELL LN.PHASE 3/R-4PHASE 3/R-4 FUTURE PHASE 4 C-N FUTURE PHASE 6 APPROVED PHASE 3 EARTHWOOD DR.APPROVED PHASE 5 R-1 R-1 MEMPHIS BELLE WY KITTY HAWK CT.CESSNA CT.PIPER LN.EARTHWOOD DR. VENTURE DR. APPROVED PHASE 2 1 2 10/2/2023 Item 4a ‐ Applicant Presentation 2 3. Summary of Entitlements ENTITLEMENT HISTORY 2017 2021 2022 On-going: General Plan Amendment, Rezone, Development Plan & VTTM approved EIR adopted. Design Review Approval for [297] Medium Density Residential (R-2, Phases 1 & 2) Design Review Approval for [101] Low-Density Residential (R-1, Phase 5) In-tract & off-site improvements. Recordation of the Phase 1 Final Map PHASE 5 / R‐1 RENDERINGPHASE 5 / R‐1 RENDERING PHASE 1 / R‐2 RENDERING 4. On- + Off-site Improvements and Home Construction LAND DEVELOPMENT CompleteBuckley Road Ext CompleteSewer Lift Station 2024-25Buckley Rd. Widening CompleteTank Farm @ Higuera CompleteHiguera @ South CompleteSuburban Road Ph 1 CompleteVachell Widening Q1-2024Higuera @ Vachell On-goingMulti-Purpose Trail PH. 1 (R-2) HOME CONSTRUCTION Permitting & construction on-going 84 homes purchased or occupied Off-site Improvements PH. 5 (R-1) HOME CONSTRUCTION TBD Model Home Complex Buckley Road Extension @ S. Higuera Street. Entry Monument Signage Home ConstructionMulti-Purpose Trail @ Park ‘C’ Play Equipment @ Park ‘A’ Buckley Road Extension @ Vachell Lane 3 4 10/2/2023 Item 4a ‐ Applicant Presentation 3 5. Site PlansEARTHWOOD DR.CESSNA CT.KITTY HAWK CT.PIPER LN.BUILDING A BUILDING B SENDERO SENDERO APARTMENTS ANACAPA APARTMENTS •85 Units •Studio, 1-, & 2- bedroom units •Two 3-story buildings •60 Units •1-, 2-, & 3- bedroom units •3-story building with courtyard Affordable Units Market-Rate Units 6. Streetscape Elevations Anacapa Building ASendero EarthwoodLane A. North View from Cessna and Kitty Hawk Courts B. West View from Earthwood Lane Sendero 5 6 10/2/2023 Item 4a ‐ Applicant Presentation 4 7. Streetscape Elevations C. South View Sendero D. East View from Earthwood Lane Anacapa Building AAnacapa Building B Anacapa Building B Earthwood Lane 8. Anacapa Site PlanEARTHWOOD DR.PIPER LN.BUILDING A BUILDING B BIKES BIKES PATIO PASEO TRASH TRASH COMM. AREA SIGNMarket-Rate Units •85 Units •Studio, 1-, & 2- bedroom units •Two 3-story buildings 7 8 10/2/2023 Item 4a ‐ Applicant Presentation 5 9. Anacapa Perspective Rendering PERSPECTIVE ORIENTATION 10. Anacapa Building A Elevations 9 10 10/2/2023 Item 4a ‐ Applicant Presentation 6 11. Anacapa Building B Elevations BUILDING B SOUTH ELEVATION 12. Sendero Site Plan TRASH TRASH SIGN EARTHWOOD DR.BIKES COMMON REC. AREA CESSNA CT. •60 Units •1-, 2-, & 3- bedroom units •3-story building with courtyard Affordable Units 11 12 10/2/2023 Item 4a ‐ Applicant Presentation 7 13. Sendero Perspective Rendering PERSPECTIVE ORIENTATION 14. Sendero Exterior Elevations 13 14 10/2/2023 Item 4a ‐ Applicant Presentation 8 15. Sendero Exterior Elevations 16. Building Color & Materials DOOR & WINDOW TRIM COMPOSITE WOOD SIDING STANDING BATTEN METAL ROOF STUCCO COLORS 15 16 10/2/2023 Item 4a ‐ Applicant Presentation 9 17. Anacapa Landscape Features & Plant Palette PLANT PALETTE SHADE ARBOR LANDSCAPING 6 FT TALL WOOD FENCE CONCRETE PASEO WALK BOLLARD PATHWAY LIGHTS BIKE BARN LANDSCAPING 17. Anacapa Landscape Features & Plant Palette SHADE ARBOR TABLE SEATING LANDSCAPING SIGNAGE CONCRETE PASEO WALK ENHANCED PAVING ENTRY E BIKE PARKING 17 18 10/2/2023 Item 4a ‐ Applicant Presentation 10 18. Sendero Landscape Features & Plant Palette PING PONG TABLE SYNTHETIC TURF PLAY MOUND HAMMOCKS CONCRETE SEAT WALL(S) PLAY EQUIPMENT (AGE 2-5) WITH SAFETY SURFACING CHESS/CHECKERS TABLE ENHANCED PAVING 19. Bike Storage Buildings and Trash Enclosures Trash Enclosures Bike Storage Buildings Type BType A 19 20 10/2/2023 Item 4a ‐ Applicant Presentation 11 20. Enhanced Wayfinding Pavement Treatment SENDERO APARTMENTS ANACAPA APARTMENTS EARTHWOOD DR.Proposed Locations of Enhanced Wayfinding Colored & Stamped Concrete 21. Signage Signage Color & Materials COMPOSITE WOODSTUCCO STUCCO STUCCO 21 22 10/2/2023 Item 4a ‐ Applicant Presentation 12 22. Lighting Area Lighting Ligman Martini 32 LED Dark Sky compliant Internal house side shields to minimize spill and glare Adjustable light distribution Bollard Lighting Lithonia DSXB LED Dark Sky compliant Zero uplight Full cut-off luminaire Building Lighting Dazuma Long Strip Sconce Dark Sky compliant Stainless Steel LED Lighting Example of a Site Photometric Plan (Partial) 23. Drainage Channel Wall & Fence Sections Section ‘A’ Section ‘A’ Section ‘B’ SENDERO APARTMENTS ANACAPA APARTMENTSEARTHWOOD DR.SENDERO ANACAPA Industrial Property Business Park PropertySection ‘B’Industrial PropertyBusiness Park Property23 24 10/2/2023 Item 4a ‐ Applicant Presentation 13 Applicant: Phase 3 Apartments Architectural Review Commission 02 October 2023 Consultants: Sendero Apartments 25