HomeMy WebLinkAbout10-02-2023 Item 4a - Applicant Presentation10/2/2023 Item 4a ‐ Applicant Presentation
1
Applicant:
PHASE 3 APARTMENTS
Architectural Review Commission
02 October 2023
Consultant Team:
Anacapa Apartments
2. Overall Development Plan w/ Phase 3/R-4 Project
TO AIRPORT
C-N
R-
R-2
R-3
R-
R-2
R-2
R-2
TRUST AUTOMATION
R-2
PARK E
PARK I
PARK H
PARK F
OPEN SPACE
OPEN SPACE
OPEN SPACE
OPEN SPACE
OPEN SPACE
TO HIGUERAR-3
MULTI-USE TRAIL
PARK C
PARK D
PARK B
PARK A
PARK G
R-3
APPROVED
PHASE 1
BUCKLEY RD.VACHELL LN.PHASE 3/R-4PHASE 3/R-4
FUTURE PHASE 4
C-N
FUTURE PHASE 6
APPROVED PHASE 3
EARTHWOOD DR.APPROVED PHASE 5
R-1
R-1
MEMPHIS BELLE WY
KITTY HAWK CT.CESSNA CT.PIPER LN.EARTHWOOD DR.
VENTURE DR.
APPROVED PHASE 2
1
2
10/2/2023 Item 4a ‐ Applicant Presentation
2
3. Summary of Entitlements
ENTITLEMENT HISTORY
2017
2021
2022
On-going:
General Plan Amendment, Rezone,
Development Plan & VTTM approved
EIR adopted.
Design Review Approval for
[297] Medium Density Residential
(R-2, Phases 1 & 2)
Design Review Approval for
[101] Low-Density Residential
(R-1, Phase 5)
In-tract & off-site
improvements.
Recordation of the Phase 1 Final Map
PHASE 5 / R‐1 RENDERINGPHASE 5 / R‐1 RENDERING
PHASE 1 / R‐2 RENDERING
4. On- + Off-site Improvements and Home Construction
LAND DEVELOPMENT
CompleteBuckley Road Ext
CompleteSewer Lift Station
2024-25Buckley Rd. Widening
CompleteTank Farm @ Higuera
CompleteHiguera @ South
CompleteSuburban Road Ph 1
CompleteVachell Widening
Q1-2024Higuera @ Vachell
On-goingMulti-Purpose Trail
PH. 1 (R-2) HOME
CONSTRUCTION
Permitting & construction on-going
84 homes purchased or occupied
Off-site Improvements
PH. 5 (R-1) HOME
CONSTRUCTION
TBD
Model Home Complex
Buckley Road
Extension @
S. Higuera Street.
Entry Monument
Signage
Home
ConstructionMulti-Purpose
Trail @ Park ‘C’
Play Equipment
@ Park ‘A’
Buckley Road
Extension @
Vachell Lane
3
4
10/2/2023 Item 4a ‐ Applicant Presentation
3
5. Site PlansEARTHWOOD DR.CESSNA CT.KITTY HAWK CT.PIPER LN.BUILDING A
BUILDING B
SENDERO
SENDERO APARTMENTS ANACAPA APARTMENTS
•85 Units
•Studio, 1-, & 2-
bedroom units
•Two 3-story
buildings
•60 Units
•1-, 2-, & 3-
bedroom units
•3-story building
with courtyard
Affordable Units
Market-Rate Units
6. Streetscape Elevations
Anacapa Building ASendero
EarthwoodLane
A. North View from Cessna and Kitty Hawk Courts
B. West View from Earthwood Lane
Sendero
5
6
10/2/2023 Item 4a ‐ Applicant Presentation
4
7. Streetscape Elevations
C. South View
Sendero
D. East View from Earthwood Lane
Anacapa Building AAnacapa Building B
Anacapa Building B
Earthwood Lane
8. Anacapa Site PlanEARTHWOOD DR.PIPER LN.BUILDING A
BUILDING B
BIKES
BIKES
PATIO PASEO
TRASH
TRASH
COMM. AREA
SIGNMarket-Rate Units
•85 Units
•Studio, 1-, & 2-
bedroom units
•Two 3-story
buildings
7
8
10/2/2023 Item 4a ‐ Applicant Presentation
5
9. Anacapa Perspective Rendering
PERSPECTIVE ORIENTATION
10. Anacapa Building A Elevations
9
10
10/2/2023 Item 4a ‐ Applicant Presentation
6
11. Anacapa Building B Elevations
BUILDING B SOUTH ELEVATION
12. Sendero Site Plan
TRASH
TRASH SIGN
EARTHWOOD DR.BIKES
COMMON REC. AREA
CESSNA CT.
•60 Units
•1-, 2-, & 3-
bedroom units
•3-story building
with courtyard
Affordable Units
11
12
10/2/2023 Item 4a ‐ Applicant Presentation
7
13. Sendero Perspective Rendering
PERSPECTIVE ORIENTATION
14. Sendero Exterior Elevations
13
14
10/2/2023 Item 4a ‐ Applicant Presentation
8
15. Sendero Exterior Elevations
16. Building Color & Materials
DOOR & WINDOW TRIM
COMPOSITE WOOD SIDING
STANDING BATTEN METAL ROOF
STUCCO COLORS
15
16
10/2/2023 Item 4a ‐ Applicant Presentation
9
17. Anacapa Landscape Features & Plant Palette
PLANT PALETTE
SHADE ARBOR
LANDSCAPING
6 FT TALL WOOD FENCE
CONCRETE PASEO WALK BOLLARD PATHWAY LIGHTS
BIKE BARN
LANDSCAPING
17. Anacapa Landscape Features & Plant Palette
SHADE ARBOR
TABLE SEATING
LANDSCAPING
SIGNAGE CONCRETE PASEO WALK
ENHANCED PAVING ENTRY
E BIKE PARKING
17
18
10/2/2023 Item 4a ‐ Applicant Presentation
10
18. Sendero Landscape Features & Plant Palette
PING PONG TABLE
SYNTHETIC TURF PLAY MOUND
HAMMOCKS
CONCRETE SEAT WALL(S)
PLAY EQUIPMENT (AGE 2-5) WITH SAFETY SURFACING
CHESS/CHECKERS TABLE
ENHANCED PAVING
19. Bike Storage Buildings and Trash Enclosures
Trash Enclosures
Bike Storage Buildings
Type BType A
19
20
10/2/2023 Item 4a ‐ Applicant Presentation
11
20. Enhanced Wayfinding Pavement Treatment
SENDERO APARTMENTS
ANACAPA APARTMENTS
EARTHWOOD DR.Proposed Locations of Enhanced Wayfinding
Colored & Stamped Concrete
21. Signage
Signage Color & Materials
COMPOSITE WOODSTUCCO STUCCO STUCCO 21
22
10/2/2023 Item 4a ‐ Applicant Presentation
12
22. Lighting
Area Lighting
Ligman Martini 32 LED
Dark Sky compliant
Internal house side shields
to minimize spill and glare
Adjustable light
distribution
Bollard Lighting
Lithonia DSXB LED
Dark Sky compliant
Zero uplight
Full cut-off luminaire
Building Lighting
Dazuma Long Strip Sconce
Dark Sky compliant
Stainless Steel
LED Lighting
Example of a Site Photometric Plan (Partial)
23. Drainage Channel Wall & Fence Sections
Section ‘A’
Section ‘A’
Section ‘B’
SENDERO APARTMENTS ANACAPA APARTMENTSEARTHWOOD DR.SENDERO
ANACAPA
Industrial Property
Business Park PropertySection ‘B’Industrial PropertyBusiness Park Property23
24
10/2/2023 Item 4a ‐ Applicant Presentation
13
Applicant:
Phase 3 Apartments
Architectural Review Commission
02 October 2023
Consultants:
Sendero Apartments
25