Loading...
HomeMy WebLinkAboutDaily report 07-26-2022CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No: CEM-4601 (Mod. 6/2011)Date: M T W T F S Su (Select Day) Shift Hours:8 Start Stop 8 8 2 2 6 8 8 1 5 5+ RE Hours Onsite Signature TitleMatthew Natividad APWA CP II 2 mason/apprentice laborer Francisco/AbrahamSub Lanscape3 7:00A-3:30P Edgar /Carlos/Blaze 3 mason Christian/Luis /George 1 foreman Ruben R. 2 mason Julio C./Sergio C 3 mason/flagger July.26,2022 7:00a 7:30p Location & Description of Work : Poured stamped concrete median stamped concrete OE line EQUIP. NO. NO. MEN DESCRIPTION (of Equipment or Labor) EQUIPMENT AND/OR LABOR 58322IDLE OR DOWN55F- 73Fcloudy EST. HOURS - ITEM NO. Gilberto/Isaac Cole F. City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately. THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Item no. 58 ( Textured Concrete /Truck Apron /Truck Blister ) Rubens crew poured the median stamped concrete at OE line and started the median work CCO by Spanish Oaks. Item no. 3 ( Temporary Traffic Control ) Souza flaggers performed one lane traffic control during the concrete pour at the OE line median from 8:00 A-1:30 P Item no. 22 ( Irrigation ) Sub Contractor Wildbloom Landscaping was on site around 12:30 P and continued their work at the irrigation P.O.C. Note. When Wildbloom showed up on site around 12:30 P, i brought up to Francisco the need for a new meter to hook up at the existing irrigation main. I mentioned to him that the P.O.C detail shown on sheet 53 of approve plans does not require a new meter since they are only connecting to an existing system and meter. According to Francisco and Abraham, they were not able or review the detail on sheet no. 53 and they were only going by the detail shown on sheet no. 49 of approve plans. I mentioned to him that it is their responsibility to know the plans prior to doing the work. The meter was only requested due to their request but since it wont be needed then meter will not be provided. Also mentioned to Francisco and Abraham that all point of connection work is to be inspected first before backfilling the trench. Also mentioned to Francisco that he needs to extend the sleeve at the main by the median as it is required to be extended 18" + from hardscape. Weekly progress meeting. CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION .