HomeMy WebLinkAboutDaily report 07-28-2022CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No:
CEM-4601 (Mod. 6/2011)Date:
M T W T F S Su (Select Day)
Shift Hours:8 Start Stop
8
8 2
8
8
8
2 2 4
8
8
8
5+
RE Hours Onsite Signature Title
Mark M./Steve H.
Anselmo G./Joventino/Rafael
Ty S./Ryan O./Ruben H
Sub CCTS2
Jose/AngelSub - LWE2
Sub- Super Seal
Cat 308 Emin ex
laborers3
operators
Matthew Natividad APWA CP II
2 mason/apprentice
laborer
2 Souza-flaggers
5
Francisco/Abraham/Sub Landscape5
7:00A-3:30P
carpenters2
3
Edgar /Carlos
3 mason Christian/Luis /George
1 foreman Ruben R.
2 mason Julio C./Sergio C
3 mason/flagger
July.28,2022
7:00a 7:30p
Location & Description of Work :
Striping cat tracking. Raising of utilities to FG , Irrigation work.
EQUIP.
NO.
NO.
MEN
DESCRIPTION
(of Equipment or Labor)
EQUIPMENT AND/OR LABOR
58369,7292,9322ccoIDLE OR DOWN55F- 75F AM cloudysunny
EST. HOURS - ITEM NO.
Gilberto/Isaac
Cole F.
JC/Hylan
City Of San Luis Obispo
Tank Farm Road & Orcutt Rd.
Roundabout
Cannon ID 210332
Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately.
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
City Of San Luis Obispo
Tank Farm Road & Orcutt Rd.
Roundabout
Cannon ID 210332
Item no. 57 ( Minor Concrete -Stamped concrete )
Rubens crew poured the stamped concrete for the median at Spanish Oaks Formed and poured the
stamped concrete median along OE line and at the street light location east end of job limits.
Item no. 3 ( Temporary Traffic Control )
Souza flaggers performed one lane traffic control during the concrete pour , striping lay out and raising of
valves to finish surface elevations work. 7"00 A -
Item no. 22 ( Irrigation )
Sub Contractor Wildbloom Landscaping was on site around 10:30 P and continued their work at the
irrigation P.O.C.
Item no. 92,93 ( Roadside sign -one post-two post )
CCTS was on site today and performed a 6" core for the 2" galvanize metal post at hardscape locations to
locations called for on sheet 44 of approve plans. Work in progress
Item no. ( CCO -Arch footings )
Mark and Steve of Souza was on site today and started the Arch footing foundation work by digging for
the beam and etc. Cole was working with them on the mini ex. Work in progress.
Item no. 69, 72 ( Adjust Water Valve, Adjust gas valve, -Adjust Sewer Manhole to FG )
Ty Souzas crew performed utility adjustment to finish surface work as per City STD details 6040.
Note:
CANNON CONSTRUCTION MANAGEMENT DIVISION
RESIDENT ENGINEER'S DAILY REPORT
ASSISTANT RESIDENT ENGINEER'S DAILY REPORT
CEM-4601 (Mod. 6/2011)
Report No:Date:M T W T F S Su (Select Day)
Shift Hours:
Start Stop Temperature:Min:Max:
SIGNATURE TITLE
THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION
.