Loading...
HomeMy WebLinkAboutDaily report 07-28-2022CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT Report No: CEM-4601 (Mod. 6/2011)Date: M T W T F S Su (Select Day) Shift Hours:8 Start Stop 8 8 2 8 8 8 2 2 4 8 8 8 5+ RE Hours Onsite Signature Title Mark M./Steve H. Anselmo G./Joventino/Rafael Ty S./Ryan O./Ruben H Sub CCTS2 Jose/AngelSub - LWE2 Sub- Super Seal Cat 308 Emin ex laborers3 operators Matthew Natividad APWA CP II 2 mason/apprentice laborer 2 Souza-flaggers 5 Francisco/Abraham/Sub Landscape5 7:00A-3:30P carpenters2 3 Edgar /Carlos 3 mason Christian/Luis /George 1 foreman Ruben R. 2 mason Julio C./Sergio C 3 mason/flagger July.28,2022 7:00a 7:30p Location & Description of Work : Striping cat tracking. Raising of utilities to FG , Irrigation work. EQUIP. NO. NO. MEN DESCRIPTION (of Equipment or Labor) EQUIPMENT AND/OR LABOR 58369,7292,9322ccoIDLE OR DOWN55F- 75F AM cloudysunny EST. HOURS - ITEM NO. Gilberto/Isaac Cole F. JC/Hylan City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Distribution (All projects): Original local agency project (field office). Reports covering extra work should be filed seperately. THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTIONTHE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION City Of San Luis Obispo Tank Farm Road & Orcutt Rd. Roundabout Cannon ID 210332 Item no. 57 ( Minor Concrete -Stamped concrete ) Rubens crew poured the stamped concrete for the median at Spanish Oaks Formed and poured the stamped concrete median along OE line and at the street light location east end of job limits. Item no. 3 ( Temporary Traffic Control ) Souza flaggers performed one lane traffic control during the concrete pour , striping lay out and raising of valves to finish surface elevations work. 7"00 A - Item no. 22 ( Irrigation ) Sub Contractor Wildbloom Landscaping was on site around 10:30 P and continued their work at the irrigation P.O.C. Item no. 92,93 ( Roadside sign -one post-two post ) CCTS was on site today and performed a 6" core for the 2" galvanize metal post at hardscape locations to locations called for on sheet 44 of approve plans. Work in progress Item no. ( CCO -Arch footings ) Mark and Steve of Souza was on site today and started the Arch footing foundation work by digging for the beam and etc. Cole was working with them on the mini ex. Work in progress. Item no. 69, 72 ( Adjust Water Valve, Adjust gas valve, -Adjust Sewer Manhole to FG ) Ty Souzas crew performed utility adjustment to finish surface work as per City STD details 6040. Note: CANNON CONSTRUCTION MANAGEMENT DIVISION RESIDENT ENGINEER'S DAILY REPORT ASSISTANT RESIDENT ENGINEER'S DAILY REPORT CEM-4601 (Mod. 6/2011) Report No:Date:M T W T F S Su (Select Day) Shift Hours: Start Stop Temperature:Min:Max: SIGNATURE TITLE THE RELENTLESS PURSUIT OF THE ELEGANT SOLUTION .